Project Miramon Center (Sleeping Bays) HVAC Calculations Tue Apr 14 16:27:11 EDT 2009 The Btuh Gain for 100 SqFt of North and Shaded Double Pane Glass = 2000 The Btuh Gain for 1650 SqFt of Wood R-11 & 1/2" Gypsum Wall Number 1 = 4290 The Btuh Gain for 3000 SqFt of Roof Only 6" - 7" R-22; Ceiling Number 1 = 14400 The Btuh Gain for 3000 SqFt of Area Lighting in an Office = 9000 The Sleeping Bays Outside Fresh Air #1 = 290 cfm Btuh gain for Outside Fresh Air #1 = 8700 The Total Outside Fresh Air CFM = 0 This is in accordance with International Mechanical Code 2003 The Total BTUh Gain = 38390 The Total Tons of HVAC needed = 3.199