Index of /BackUp/ClosedJobs/20260314-050003-630/backup/mnt/nfs/Jobs/- Closed Jobs/- Hospitals - Medical - Dental/2063 - SMH COMPLY WITH USP 797, PHARMACY UPGRADE

[ICO]NameLast modifiedSizeDescription

[PARENTDIR]Parent Directory  -  
[   ]6-10-10Slidell Rx P-01-24-10-1-1.pdf2025-08-15 13:36 6.9M 
[   ]11-30-10 meeting.pdf2025-08-15 13:36 266K 
[   ]12-10-10 notes.odt2025-08-15 13:36 16K 
[   ]A1-New Floor Plan Model (1).pdf2025-08-15 13:36 68K 
[   ]APS Restart Procedure[1].pdf2025-08-15 13:36 23K 
[   ]ARC-DesignationOfConstruction[1]..%20.pdf2025-08-15 13:36 2.1M 
[   ]ARC door A1-New Floor Plan Model (1).pdf2025-08-15 13:36 95K 
[DIR]AS-BUILT CD/2025-08-15 13:37 -  
[DIR]Approved finishes for SMH/2025-08-15 13:36 -  
[   ]BILL.pdf2025-08-15 13:36 19K 
[   ]Bldg Exh Sys 10-23-081.pdf2025-08-15 13:36 108K 
[   ]COPY OF PROJECT MILESTONES.pdf2025-08-15 13:36 461K 
[   ]Certificate of Completion City of Slidell.pdf2025-08-15 13:36 734K 
[   ]Copy of 2008 USP - 797.pdf2025-08-15 13:36 12M 
[   ]Cover page for rfp and quote proposal.docx2025-08-15 13:36 59K 
[DIR]DEPARTMENT OF HEALTH AND HOSPITALS/2025-08-15 13:37 -  
[   ]DoorCloser[1].pdf2025-08-15 13:36 680K 
[DIR]Drawings/2025-08-15 13:37 -  
[   ]FIRE%20MARSHAL[1].pdf2025-08-15 13:36 72K 
[   ]FIRE MARSHALL REVIEW LETTER APPROVAL.pdf2025-08-15 13:36 1.6M 
[DIR]Fire Marshall Review Scanned Documents/2025-08-15 13:37 -  
[   ]Fire Marshall acceptance.pdf2025-08-15 13:36 759K 
[DIR]From MAS/2025-08-15 13:37 -  
[DIR]From SMH/2025-08-15 13:37 -  
[DIR]From Winsor/2025-08-15 13:37 -  
[   ]Good Morning Bruce.doc2025-08-15 13:36 20K 
[   ]Items to clarify.docx2025-08-15 13:36 11K 
[DIR]MEETING MINUTES GOING OUT/2025-08-15 13:37 -  
[IMG]Medical Air Solutions 1 for Pharmacy2.JPG2025-08-15 13:36 378K 
[IMG]Medical Air Solutions 2 for Pharmacy2.JPG2025-08-15 13:36 415K 
[   ]Meeting Minutes 6-9-10 2.doc2025-08-15 13:36 25K 
[   ]Meeting Minutes 6-14-10 2.doc2025-08-15 13:36 26K 
[   ]Meeting Minutes 11-30-10 2.doc2025-08-15 13:36 28K 
[   ]Monthly Milestones.xls2025-08-15 13:36 44K 
[   ]NOTES FOR MEETING.doc2025-08-15 13:36 21K 
[   ]Notice to Proceed[1].odt2025-08-15 13:36 77K 
[DIR]OUT TO BIDDERS/2025-08-15 13:37 -  
[DIR]PICTURES/2025-08-15 13:37 -  
[   ]PRE CONSTRUCTION MEETING 8-2-10.doc2025-08-15 13:36 28K 
[   ]Q-01007741.pdf2025-08-15 13:36 301K 
[   ]Q-01007751.pdf2025-08-15 13:36 278K 
[   ]QUOTE PROPOSAL FORM.doc2025-08-15 13:36 35K 
[   ]QUOTE PROPOSAL FORM.pdf2025-08-15 13:36 17K 
[   ]Quotation Slidell 06-09-10.doc2025-08-15 13:36 189K 
[   ]REVISED 9-16-10 Slidell Rx P-01-24-10-R2.pdf2025-08-15 13:36 2.6M 
[   ]REVISED 9-16-10attachments_2010_09_16.zip2025-08-15 13:36 1.0M 
[   ]RFP%20No%2010-06-01R%20Pharmacy%20Construction%20Project[1].doc2025-08-15 13:36 91K 
[   ]RFP No.10-06-01R Construction Project.doc2025-08-15 13:36 93K 
[   ]RFP No.10-06-01R Construction Project 06072010.pdf2025-08-15 13:36 30K 
[   ]RFP No.10-06-01R Construction Project CINDY EDIT PER BARRY.doc2025-08-15 13:36 102K 
[   ]RFP No 10-06-01R Pharmacy Construction Project (3).docx2025-08-15 13:36 84K 
[   ]RFP No 10-06-01R Pharmacy Construction Project _3_.pdf2025-08-15 13:36 33K 
[   ]SMH Clean Room1.pdf2025-08-15 13:36 73K 
[IMG]SPECIFICATION SHT.dwg2025-08-15 13:36 341K 
[   ]SPRINKLER APPROVAL FIRE MARSHALL.pdf2025-08-15 13:36 455K 
[DIR]SUBMITTALS FROM CNOTRACTOR/2025-08-15 13:37 -  
[   ]Slidell Inv. 11111.pdf2025-08-15 13:36 72K 
[   ]SlidellMechDrawings-Comments.pdf2025-08-15 13:36 153K 
[   ]SlidellMemorialCompoundArea.tam[1].doc2025-08-15 13:36 51K 
[   ]SlidellProjectDocument.pdf2025-08-15 13:36 3.7M 
[   ]SlidellProjectDocument rev 1.pdf2025-08-15 13:36 3.7M 
[   ]Slidell Rx P-01-24-10-1-1.pdf2025-08-15 13:36 6.9M 
[   ]This project consists of a CSP area Upgrade to comply with USP 797.doc2025-08-15 13:36 19K 
[   ]Transmittal to SMH payapp 6.xls2025-08-15 13:36 22K 
[   ]Transmittal to SMH pharmacy upgrade.xls2025-08-15 13:36 28K 
[   ]USP 797 PC Printer Drops Diagram.PDF2025-08-15 13:36 584K 
[   ]added work from ARC.pdf2025-08-15 13:36 319K 
[   ]additional coils_2010_09_29.zip2025-08-15 13:36 28K 
[   ]answer for aps unit from bob witbankDocument[1].pdf2025-08-15 13:36 310K 
[   ]approval for arc.zip2025-08-15 13:36 2.0M 
[   ]aps and room monitor attachments_2010_08_16.zip2025-08-15 13:36 851K 
[   ]attachments_2010_05_07.zip2025-08-15 13:36 403K 
[   ]attachments_exhaust fan and sprinkler.zip2025-08-15 13:36 960K 
[   ]attendance sheet.pdf2025-08-15 13:36 235K 
[   ]bruce E1-New Electrical Power Plan Model (1).pdf2025-08-15 13:36 27K 
[   ]calcs from bill for ac.pdf2025-08-15 13:36 2.1M 
[   ]comcheck.cck2025-08-15 13:36 5.8K 
[   ]construction notes 10-18-10.doc2025-08-15 13:36 19K 
[   ]contact list for RFP pre bid date change.docx2025-08-15 13:36 10K 
[   ]debbie D1-Demolition Floor Plan Model (1).pdf2025-08-15 13:36 279K 
[   ]estimate from kb kaufmann.pdf2025-08-15 13:36 1.3M 
[   ]firemarshall letter for information.doc2025-08-15 13:36 24K 
[   ]firgerator and controls_2010_09_24.zip2025-08-15 13:36 4.7M 
[   ]flooring price from perque.pdf2025-08-15 13:36 133K 
[   ]for bidders SlidellProjectDocument[1].pdf2025-08-15 13:36 3.7M 
[   ]for bidders SlidellProjectDocument[1].zip2025-08-15 13:36 10M 
[DIR]from bob 6-23-10/2025-08-15 13:37 -  
[   ]generalChapter797_20081.pdf2025-08-15 13:36 7.7M 
[   ]letter IV%20Room%20update_05112010[1].doc2025-08-15 13:36 81K 
[   ]light fixture.pdf2025-08-15 13:36 66K 
[   ]mechanical asbuilt from subcontractor.pdf2025-08-15 13:36 244K 
[   ]mfg approval for APS unitpdf.pdf2025-08-15 13:36 21K 
[   ]non compliance letter from fire marshall.pdf2025-08-15 13:36 351K 
[   ]panel location Model (1).pdf2025-08-15 13:36 86K 
[DIR]pdfs/2025-08-15 13:37 -  
[   ]pre construction meeting.pdf2025-08-15 13:36 198K 
[   ]revised Slidell Rx P-01-24-10-1-1.pdf2025-08-15 13:36 6.9M 
[   ]revised july 7 2010 Slidell%20Rx%20P-01-24-10-1-1[1].pdf2025-08-15 13:36 2.5M 
[   ]revised july 7 2010 SlidellProjectDocument[1].pdf2025-08-15 13:36 1.1M 
[   ]schedule of values.pdf2025-08-15 13:36 231K 
[   ]sprinkler system.pdf2025-08-15 13:36 108K 
[   ]submittal for Munters HVAC unit.pdf2025-08-15 13:36 7.5M 
[   ]tax excempt attachments_2010_09_15.zip2025-08-15 13:36 45K 
[   ]test and balance report.pdf2025-08-15 13:36 1.4M 
[   ]tom Model (1).pdf2025-08-15 13:36 59K 
[   ]updated and revised on 4-13-11 AS3500EG_Manual-V7-0[1].pdf2025-08-15 13:36 231K 
[   ]updated project milestone chart.pdf2025-08-15 13:36 487K 

Apache/2.4.58 (Ubuntu) Server at dammonengineering.com Port 80