| Name | Last modified | Size | Description | |
|---|---|---|---|---|
| Parent Directory | - | |||
| Gary Avenel structural dwgs 12-26-2019.pdf | 2025-08-15 13:08 | 6.0M | ||
| S101 - Piling Plan S101 (1).pdf | 2025-08-15 13:08 | 524K | ||
| S102 - Ground Level Plan S101 (1).pdf | 2025-08-15 13:08 | 2.4M | ||
| S103 - Second Level plan S102 (1).pdf | 2025-08-15 13:08 | 517K | ||
| S104 - Third Level plan S103 (1).pdf | 2025-08-15 13:08 | 353K | ||
| S105 - ROOF Level plan S103 (1).pdf | 2025-08-15 13:08 | 325K | ||
| S106 - 110 mph Exposure C S601 (1).pdf | 2025-08-15 13:08 | 2.2M | ||