Stormwater Pollution Prevention Plan SWPPP - $1,500 Stormwater drainage/detention - $3,500 (Need recent Topo Survey also include subsurface inverts) (No site visit included in fee, city may require engineer to certify installation, if required each site visit is $1,200) Paving - $2,500 (Need recent Geotechnical Report with paving recommendations for soils) Utilities Site Plan - $2,500 (Need recent Topo Survey also include subsurface inverts) ( Also need to know location and distance to nearest Fire Hydrant.) Landscaping - $3,500 Building Foundation - $2,500 (Need recent Geotechnical Report with foundation recommendations for soils) Building Structural - $2,500 (Need to know if metal or wood framing) Mechanical - $2,000 Electrical - $2,000 Plumbing - $2,000 We do not design Sprinkler or alarm systems but can find companies to do design and submittal to State Fire Marshal. Remember the hood system would fall under the sprinkler company. Contact Info : City Engineer is by a Engineering Firm, Pan American Engineers, LLC (PAE), (318) 473-2100 Contact Name is Tom David Water District contact is Jimmy Flinch, (c) (318) 452-3440 Site Plan & IBC Reviews done by the Rapides Area Planning Commission, (318) 487-5401