   @   ,h  @ 2         2                                    Ђ  I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                     $ SECTION 01700

" CONTRACT CLOSEOUT


PART 1   GENERAL

   ? x 1.01   SECTION INCLUDES

   ?   ((                    A.   Closeout procedures.

   ?   ((                   B.   Final cleaning.

   ? (
  ((                   C.   Adjusting.

   ?   ((                   D.   Project record documents.

   ? H  ((                   E.   Operation and maintenance data.

   ?   ((                   F.   Warranties.

   ? h  ((                   G.   Spare parts and maintenance materials.

   ?  1.02   RELATED SECTIONS

   ?   ((   A.  Section 01740 - Warranties and Bonds.

   ?  1.03   CLOSEOUT PROCEDURES

   ?   ((   A. H Submit written certification that Contract Documents havebeen reviewed, Work has been inspected, and that Work iscomplete in accordance with Contract Documents and readyfor Architect/Engineer's inspection.(#

   ?   ((   B. H Provide submittals to Architect/Engineer that are requiredby governing or other authorities.(#

   ?   ((   C. H Submit final Application for Payment identifying totaladjusted Contract Sum, previous payments, and sumremaining due.(#

   ?    ((   D. H Owner will occupy all portions of the work as specified inSection 01039.(#

   ? `" 1.04   FINAL CLEANING

   ? #  ((   A.  Execute final cleaning prior to final inspection.

   ? %  ((   B. H Clean interior and exterior glass and surfaces exposed toview; remove temporary labels, stains and foreignsubstances, polish transparent and glossy surfaces, vacuumcarpeted and soft surfaces where contractor has worked.(#

   h)         0*0*0*  ԌSection 01700  Page 2

   ?   ((   C. H Remove waste and surplus materials, rubbish, andconstruction facilities from the site.  Restore lawn andplanting areas to quality of preconstruction.(#

   ?  1.05   PROJECT RECORD DOCUMENTS

   ? @  ((  A. H Maintain on site, one set of the following recorddocuments; record actual revisions to the Work:(#
   ?   ((                     1.  		 Contract Drawings.
   ?   ((                    2.  		 Specifications.
   ? `	  ((                    3.  		 Addenda.
   ? (
  ((                    4.  (		 Change Orders and other Modifications to the Contract.(#	
   ? 
  ((                    5.  		 Reviewed shop drawings, product data, and samples.

   ?   ((   B. H Store Record Documents separate from documents used forconstruction.(#

   ?   ((   C.  Record information concurrent with construction progress.

   ? h  ((   D. H Specifications: Legibly mark and record at each Productsection description of actual Products installed,including the following:(#
   ?   ((                    6.  		 Manufacturer's name and product model and number.
   ?   ((                    7.  		 Product substitutions or alternates utilized.
   ? P  ((                    8.  		 Changes made by Addenda and Modifications.

   ?   ((   E. H Record Documents and Shop Drawings: Legibly mark each itemto record actual construction including:(#
   ? p  ((     1. 		 Field changes of dimension and detail.
 ((     2.  Details not on original Contract Drawings.

   ?  1.06  OPERATION AND MAINTENANCE DATA

   ? X  ((   A. H Submit two sets prior to final inspection, bound in8-1/2xinch text pages, three D side ring binders withdurable covers.(#

   ? x  ((   B. H Prepare binder covers with printed title "OPERATION ANDMAINTENANCE INSTRUCTIONS", title of project, and subjectmatter of binder when multiple binders are required.(#

   ? !  ((   C. H Internally subdivide the binder contents with permanentpage dividers, logically organized as described below;with tab titling clearly printed under reinforcedlaminated plastic tabs.(#

   ? %  ((   D. H Project documents and certificates, including thefollowing:(#
   ? '  ((     1. 		 Shop drawings and product data.
   ? '  ((     2. 		 Certificates.
   ? (  ((     3. 		 Photocopies of warranties.
   h)         0*0*0*  ԌSection 01700  Page 3

   ?   ((   E. H Submit final volumes revised, within ten days after finalinspection.(#

   ?  1.07 WARRANTIES

   ? x  ((   A.  Provide duplicate notarized copies.

   ?   ((   B. H Execute and assemble documents from Subcontractors,suppliers, and manufacturers.(#

   ? `	  ((   C. H Provide Table of Contents and assemble in three D sidering binder with durable cover.(#

   ?   ((   D.  Submit prior to final Application for Payment.

   ? H  ((   E. H For items of Work delayed beyond date of SubstantialCompletion, provide updated submittal within ten daysafter acceptance, listing date of acceptance as start ofwarranty period.(#

PART 2  PRODUCTS

((   NOT USED

   ? P PART 3  EXECUTION

((   NOT USED

# END OF SECTION