   @   ,h  @ 2         2                                      I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                      ,              mSection 02072  Page ,    = $ SECTION 02072

 ((      		     MINOR DEMOLITION FOR REMODELING


                  1  PART 1   GENERAL

   ? x  ((                 1.1   SECTION INCLUDES

   ?   ((                  A.   Removal of designated building equipment and fixtures.

   ?   ((                 B.   Removal of designated construction.

   ? (
  ((                 C.   Identification of utilities.

   ?   1.2  RELATED SECTIONS

   ? H  ((   A. H Section 01010 - Summary of Work: 5 Owner's continuedoccupancy.(#

   ?   (( 1.3   SUBMITTALS

   ? 0  ((   A.  Submit under provisions of General Conditions.

   ?   ((   B. H Shop Drawings:  Indicate areas for demolition, removalsequence and location of salvageable items.(#

   ?   (( 1.4 REGULATORY REQUIREMENTS

   ?   ((   A. H Obtain required permits from authorities.(#

   ? 8  ((   B. H Do not close or obstruct egress width to exits.(#

   ?   ((   C. H Do not disable or disrupt building fire or life safetysystems without 3 day prior written notice to the Owner.(#

   ?    ((   D. H Conform to procedures applicable when discovering hazardousor contaminated materials.(#

               2  PART 2   PRODUCTS

 ((     Not Used

                 3  PART 3   EXECUTION

   ? (#  ((                 3.1   PREPARATION

   ? $  ((                  A.  H Provide, erect, and maintain temporary barriers at locationswhere demolition is taking place.(#

   ? '  ((                 B.  H Erect and maintain weatherproof closures for any exterioropenings created by demolition.(#

   h)      =  0*0*0*  Ԍ   ?     ((                 C.  H Erect and maintain temporary partitions to prevent spread ofdust, odors and noise to permit continued Owner occupancy. (#

   ? X  ((                 D.  H Protect existing materials and finishes which are not to bedemolished.(#

   ?   ((                 E.  H Prevent movement of structure; provide required bracing andshoring.(#

   ?   ((                 F.   Mark location of utilities.

   ?   ((               3.2   DEMOLITION REQUIREMENTS

   ? (
  ((                  A.  H Conduct demolition to minimize interference with adjacentand occupied building areas.(#

   ?   ((                 B.  H Maintain protected egress and access to the Work.(#

   ?   ((               3.3   DEMOLITION

   ?   ((                  A.  H Except where noted otherwise, remove demolished materialsfrom site.  Do not burn or bury materials on site.(#

   ?   ((                 B.  H Remove demolished materials from site as work progresses.Upon completion of work, leave areas in clean condition.(#

   ? P  ((                 C.   Remove temporary Work.

# END OF SECTION