   @   ,h  @ 2         2                                      I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                     $ SECTION 02072

 ((      		     MINOR DEMOLITION FOR REMODELING


PART 1   GENERAL

   ? x 1.01   SECTION INCLUDES

   ?   ((                    A.   Removal of designated construction.

   ?  1.02   RELATED SECTIONS

   ? (
  ((   A. H Section 01700 - Contract Closeout:  Project recorddocuments.(#

   ?  1.03  SUBMITTALS

 ((    None.

   ?  1.04   PROJECT RECORD DOCUMENTS

   ? 0  ((   A.  Submit under provisions of Section 01700.

   ?   ((   B. H Prepare preconstruction video of windows, walls, lawn andplants.(#

   ?  1.05   REGULATORY REQUIREMENTS

 ((    None.

   ? 8 1.06   SEQUENCING

 ((    None.

   ? X 1.07   SCHEDULING

   ?   ((   A.  Describe removal procedures and schedule.

PART 2   PRODUCTS

 ((     Not Used

PART 3   EXECUTION

   ? (# 3.01   DEMOLITION REQUIREMENTS

   ? $  ((   A. H Conduct any demolition to minimize interference withadjacent and occupied building areas.(#




   h)         0*0*0*  ԌSection 02072  Page 2

   ?   ((   B. H Cease operations immediately if structure appears to be indanger.  Notify Architect/Engineer.  Do not resumeoperations until directed.(#

   ?   ((   C.  Maintain protected egress and access to the Work.

   ? @ 3.03   DEMOLITION

   ?   ((    A. H Demolish in an orderly and careful manner.  Protect existingelements.(#

   ? (
  ((   B. H Except where noted otherwise, remove demolished materialsfrom site.  Do not burn or bury materials on site.(#

   ?   ((   C. H Remove demolished materials from site as work progresses.Upon completion of work, leave areas in clean condition.(#

   ?   ((                   B.   Remove temporary Work.

# END OF SECTION