     rx 6X   @ 8  X@ 2         *                                    Ђ  I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                     $ SECTION 03370

h# CONCRETE CURING


PART 1   GENERAL

   ? x 1.01   SECTION INCLUDES

   ?   ((                    A.  H Initial and final curing of horizontal and verticalconcrete surfaces.(#

   ? `	 1.02   RELATED SECTIONS

   ? 
  ((   A.  Section 03300 - Cast-In-Place Concrete.

   ?   ((                   B.   Section 03346 - Concrete Floor Finishing.

   ?  1.03   REFERENCES

   ?   ((   A.  ACI 301 - Structural Concrete for Buildings.

   ? 0  ((   B. H ACI 302 - Recommended Practice for Concrete Floor and SlabConstruction.(#

   ?   ((                   C.   ACI 308 - Standard Practice for Curing Concrete.

   ?   ((                   D.   ASTM C171 - Sheet Materials for Curing Concrete.

   ?   ((                   E.  H ASTM C309 - Liquid Membrane-Forming Compounds for CuringConcrete.(#

   ?    ((                   F.   ASTM D2103 - Polyethylene Film and Sheeting.

   ?  1.04   QUALITY ASSURANCE

   ?    ((   A.  Perform Work in accordance with ACI 301.

   ?   ((   B.  Maintain one copy copies of document on site.

   ? @ 1.05   DELIVERY, STORAGE, AND HANDLING

   ?    ((   A. H Deliver, store, protect and handle products underprovisions of General Conditions.(#

   ? (#  ((   B. H Deliver curing materials in manufacturer's packagingincluding application instructions.(#


PART 2   PRODUCTS

   ? '    Not Used

 ((    h)         0*0*0*  ԌSection 03370  Page 2

PART 3   EXECUTION

   ?   3.01   EXAMINATION

   ?   ((   A. H Verify substrate conditions under provisions of GeneralConditions.(#

   ?   ((   B.  Verify that substrate surfaces are ready to be cured.

   ?  3.02   EXECUTION - HORIZONTAL SURFACES

   ? (
  ((   A. H Cure floor surfaces in accordance with ACI 308.(#

   ?    1 .1  A. 1. a. 1) a)                   1 .1  A. 1. a. 1) a)                                                                      ((                 B.  H Spraying:  Spray water over floor slab areas and maintainwet for 7 days.(#

   ?  3.03   PROTECTION OF FINISHED WORK

   ?   ((   A. H Protect finished Work under provisions of GeneralConditions.(#

   ?   ((   B.  Do not permit traffic over unprotected floor surface.


# END OF SECTION