First Floor  Exterior

1.   Replace 4 inch roof drain.
 
  (Replace all exterior downspouts.
2. X  Remove wood deck (balcony) above, add to flat bar supportsystem (one between each existing, repair welds, replace one21/2 inch column at corner, redeck with pressure treatedwood.  Reinstall and repair railing on deck.(#
3. X  Replace all original light fixtures below balcony.  Usesimilar type fixture.(#
4. X  Point up cracks in wall, paint or skim coat walls.(#
5. X  Replace missing doors.  Add exit hardware.(#
6.   Repair or remove existing flood lights under balcony.
7. X  Repair and/or replace all exterior shutters.(#
8. X  Repair windows, add strengtheners to back of mullions, addglass.(#
9. X  Clean, repair, paint and add glass to all exterior doors.(#
10. X  Remove and rerun telephone lines on exterior wall.(#
11. X  Rework gas meter box, remove unused meters. Replaceelectrical panel rework meters and bring up to code.(#

Room A
1. X  Remove mineral board from walls, add ceiling in front onethird of room.  Door to courtyard is not original.  Repairand leave as is or replace with larger unit.  Clean andpaint walls and ceiling.  Continue base board where missing.(#

Room B
1. X  Investigate rot in floor above and replace if necessary. Rework ceiling panels, add rear onethird ceiling.(#
2. X  Add gyp board for rating of stair closet.(#
3. X  Install window in rear window opening.(#
4.   Continue base board where missing.

Room C
1. X  Frame opening at first door to patio, raise brick (bottom ofdoor).(#
2. X  Repair termite damaged floor and joist above.  Add joistwhere damage is significant.  Clean walls and paint orrepair and paint.(#
3. X  Repair windows or remove and have false shutters inside,repair shutters outside.(#
4. X  Remove wall between C & D or add interior door for office.(#
5. X  Add new brick floor over sand fill.  (Add any desiredplumbing first.)(#
6. X  Repair all doors and door ways.(#

Room D
1. X  Move plumbing to wall and repeat Room C.(#
   '          Courtyard
1. X  Remove all 2nd floor balcony decking and rails and replace. Replace columns along rear wall.(#
2. X  Repair rear exit hallway to Wilkenson St. Move A/C unit(#
3. X  Point and paint all stucco walls to roof.(#
4. X  Excavate courtyard, install drain, fill with sand andinstall brick floor.(#
5. X  Repair all windows, screens and shutters around courtyard.(#
6. X  Replace all downspouts and tie to new drain.(#

Second Floor  Exterior
1. X  Replace roof over south balcony.  Add supports.(#
2. X  North balcony roof is OK but should be changed to matchsouth balcony.(#
3. X  Repair all roofs.  Check attic to see if areas of rot.Repair such.(#
4. X  Add bracing where roof has sagged.(#
5. X  Repair leak at balcony and toilet and door on west end ofnorth balcony.(#

Room F
1. X  Replace termite damage.  Have termite company to check foractive (live) termites.(#
2. X  Clean and paint room or clean and use as is.(#
3. X  Repair doors, screen door, windows and shutters.(#

Room J
1. X  Clean and repair.  Check for rot in kitchen and bath floor.(#
2. X  Paint.(#
3. X  Install carpet.(#
4. X  Repair all plumbing fixtures.(#
5. X  Install new builtin appliances.(#

Rooms G & H
1. X  Renovating these rooms will be by others except for exteriorfeatures and repair of areas where roof leaks have causeddeterioration.(#

General
1. X  All shutters, doors and windows will be given two coats ofpaint.(#