h# SUMMARY OF WORK

   ?   1  PART 1`	`	  GENERAL

   ?    1.1`	`	 SECTION INCLUDES

   ? @  A.`	`	 Existing Conditions.
 
   ?   B.`	`	 Owner Occupancy

   ? `	  C.`	`	 Safety

   ? 
   1.2`	`	 EXISTING CONDITIONS

  `	`	 The work is to be accomplished at the Timbers OrleansParish School Systems office complex located at 3500 and3510 Gen. DeGaulle Drive on the westbank.  The buildingis occupied and will be so when the work of this contractis accomplished.(#`	

   ? 0   1.3`	`	 SPECIFIC PROJECTS

   ?   A. `	`	 Ceiling System, 2nd floor, Building 3510 (#`	

   ? P  `	`	 1.  Install ceiling and smoke/fire alarm system, carpetand wall covering. This area is located on the 2ndfloor of the 3510 building.  The entire floor isunoccupied at the present time.  The freightelevator will be made available to the contractorto take material to the second floor each day,after office hours.  Toilets on that floor will beavailable to the contractor's workmen, and will beleft clean at the end of each day's work.(#

   ?    B. `	`	 Window Walls, Building 3500(#`	

   ?   `	`	 1.  Generally, window walls to be repaired are on thethird floor of building 3500.  The work must beexecuted from the exterior side of the windows,with as little interference from the inside aspossible.  Work requiring inside access will beperformed during after hours and on weekends.(#

   ? (#  C.`	`	 Replace Sidewalks

   ? $  `	`	 1.  The work is located at the east end of the building 3500 and at the boiler house.  The workgenerally involves removal of badly tiltedsidewalk, installing subgrade materials to levelwalks, and installing new concrete sidewalks.(#

   h)      =  0*0*0*  Ԍ   ?    ԙ D.`	`	 Handicap Toilets, Building 3500

   ?   `	`	 1.  Renovate the men's and women's toilets on the 1stfloor of building 3500 by installing an approvedhandicap toilet and toilet partitions.(#

   ?    1.4`	`	 OWNER OCCUPANCY

  `	`	 The owner will occupy all areas of the work of thiscontract, during progress of the work, with the exceptionthat the 2nd floor of building 3510 is and will beunoccupied during this work.(#`	

   ? (
   1.5`	`	 SAFETY

  `	`	 The contractor shall make all necessary efforts to assurethat the work of the contract is carried out in such amanner as to assure the safety of his workmen, theowner's employees, and to others who are in the area.(#`	

# END OF SECTION