WPC4  
      2      B       P   Z             Courier 10cpi #| x              A~x 6X   @ 8 X@Canon BJ-200ex (LQ mode)             CB20LQMO.PRS x 
   @   ,hX@Courier 10cpi  2     V   @   Z                   ? x x x h    Aox 6X   @ 8 X@Canon BJ-200ex (LQ mode)             CB20LQMO.PRS x 
   @   ,h  @ #| x           2         2                                    Ђ  I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                     $ SECTION 01400

h# QUALITY CONTROL


PART 1   GENERAL

   ? x 1.01  SECTION INCLUDES

   ?   ((                    A.   Quality assurance and control of installation.

   ?   ((                   B.   References.

   ? (
  ((                   C.   Field samples.

   ?   ((                   D.   Mock-up.

   ? H  ((                   E.   Inspection and testing laboratory services.

   ?   ((                   F.   Manufacturers' field services and reports.

   ? h 1.02   QUALITY ASSURANCE/CONTROL OF INSTALLATION

   ?   ((   A. H Monitor quality control over suppliers, manufacturers,Products, services, site conditions, and workmanship, toproduce Work of specified quality.(#

   ?   ((   B. H Comply fully with manufacturers' instructions, includingeach step in sequence.(#

   ? p  ((   C. H Should manufacturers' instructions conflict with ContractDocuments, request clarification from Architect/Engineerbefore proceeding.(#

   ?   ((   D. H Comply with specified standards as a minimum quality forthe Work except when more stringent tolerances, codes, orspecified requirements indicate higher standards or moreprecise workmanship.(#

   ? x  ((   E. H Perform work by persons qualified to produce workmanshipof specified quality.(#

   ?    ((   F. H Secure Products in place with positive anchorage devicesdesigned and sized to withstand stresses, vibration,physical distortion or disfigurement.(#

1.03  REFERENCES
 (( 
   ? %  ((  A. H Obtain copies of standards when required by ContractDocuments.(#

   ? '  ((   B. H Should specified reference standards conflict withContract Documents, request clarification forArchitect/Engineer before proceeding.(#   h)        0*0*0*  Ԍ   ?    ԙ ((  D. H The contractual relationship of the parties to theContract shall not be altered from the Contract Documentsby mention or inference otherwise in any referencedocument.(#

   ?  1.04   INSPECTION AND TESTING LABORATORY SERVICES

   ? x  ((   A. H Owner will appoint, employ, and pay for services of anindependent firm to perform inspection and testing.(#
 ((   
   ?  ((  B. H Retesting required because of non-conformance to specifiedrequirements shall be performed by the same independentfirm on instructions by the Architect/Engineer.  Paymentfor retesting will be charged to the Contractor bydeducting inspection or testing charges from the ContractSum/Price.(#

PART 2   PRODUCTS

 ((       Not Used

PART 3   EXECUTION

 ((       Not Used.


# END OF SECTION
