USACE / NAVFAC / AFCESA / NASA      UFGS-00 41 00 (January 2007)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Replacing without change<BRK/>
                                    UFGS-00 41 00 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 00 41 00</SCN><BRK/>
<BRK/>
<STL>BID SCHEDULES</STL><BRK/>
<DTE>01/07</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>unit prices, additive 
and deductive bid items, and options</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   BASIS OF BIDS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose appropriate paragraph and sample form.  For all forms:</NPR><BRK/>
<BRK/>
<NPR>1.  Leave dollar values blank.</NPR><BRK/>
<BRK/>
<NPR>2.  Provide the completed form with the final drawings and specifications for 
inclusion in Standard Form 1442, "Solicitation, Offer and Award."</NPR><BRK/>
<BRK/>
<NPR>3.  Provide a copy of completed form for Cost Engineering Department for Government 
estimate.</NPR><BRK/>
<BRK/>
<NPR>4.  Elements of each additive bid item shall be readily identifiable on the 
drawings.  If necessary to clarify, they shall be designated as "Additive Bid 
Item."  Do not designate bid item numbers on drawings.</NPR><BRK/>
<BRK/>
<NPR>For PACNAVFACENGCOM projects:  Designate bid item numbers on applicable drawings 
and include a description of the work associated with the bid item(s) shown 
on the drawings.  Additionally, on the Project Drawing Title Sheet (first sheet), 
describe all of the bid items.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT>[<TTL>1.1.1   Unit Price Schedule</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select when the bidding format will be one lump sum with unit prices 
for selected items of work.  Edit "Unit Prices Form;" or prepare similar unit 
price schedule.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This contract will be awarded as one lump sum with unit prices required for specifically selected work.  A schedule 
of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and Award."  See Contract 
Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys," "DFARS.236-7008, 
Contract Prices."</TXT><BRK/>
<PGE/><MET><TBL><THD><BRK/>
<HL4>Unit Prices Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Basis of Bid for Item 0001 shall be the Total Amount for Item 1 (Items 1AA through 1AJ), complete in accordance 
with the drawings and specifications.<BRK/>
<BRK/>
    ______________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    ______________________________________________________________________<BRK/>
    0001AA  All work complete in       1 Job              XXX      $______<BRK/>
            accordance with the<BRK/>
            drawings and<BRK/>
            specifications but<BRK/>
            not including the work<BRK/>
            indicated or specified<BRK/>
            under 0001b thru 0001<BRK/>
            [_____].<BRK/>
<BRK/>
    0001AB  Mass rock excavation and   [_____]    CM      $______  $______<BRK/>
            disposal.<BRK/>
<BRK/>
    0001AC  Trench rock excavation     [_____]    CM      $______  $______<BRK/>
            and disposal.<BRK/>
<BRK/>
    0001AD  Removal and disposal of    [_____]    LM      $______  $______<BRK/>
            asbestos containing pipe<BRK/>
            insulation (by pipe<BRK/>
            diameter ranges).<BRK/>
<BRK/>
    0001AE  Removal and disposal of    [_____]    SM      $______  $______<BRK/>
            asbestos containing floor<BRK/>
            tile.<BRK/>
<BRK/>
    0001AF  Removal and disposal of    [_____]    SM      $______  $______<BRK/>
            asbestos containing<BRK/>
            siding.<BRK/>
<BRK/>
    0001AG  Piles (by type and         [_____]    LM      $______  $______<BRK/>
            diameter or cross section<BRK/>
            size as appropriate).<BRK/>
<BRK/>
    0001AH  Removal and disposal of    [_____]    L       $______  $______<BRK/>
            oily water and sludge<BRK/>
            inside tanks [_____].<BRK/>
<BRK/>
    0001AI  Removal and disposal of    [_____]    CM      $______  $______<BRK/>
            contaminated stockpiled<BRK/>
            soils.<BRK/>
<BRK/>
    0001AJ  Provision and compaction   [_____]    CM      $______  $______<BRK/>
            of fill in place of<BRK/>
            removed contaminated soil.<BRK/>
<BRK/>
                                 Total Amount for Item 0001        $______<BRK/>
<BRK/>
  In the event there is a difference between a unit price and the extended total, the unit price will be held to 
be the intended bid.  If the bidder shows only the total price but fails to enter a unit price, the total divided 
by the estimated quantity will be held to be the intended unit price.<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>Unit Prices Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Basis of Bid for Item 0001 shall be the Total Amount for Item 1 (Items 1a through 1j), complete in accordance 
with the drawings and specifications.<BRK/>
<BRK/>
    ______________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    ______________________________________________________________________<BRK/>
    0001a   All work complete in       1 Job      LS      XXX      $______<BRK/>
            accordance with the<BRK/>
            drawings and<BRK/>
            specifications but<BRK/>
            not including the work<BRK/>
            indicated or specified<BRK/>
            under 0001b thru 0001<BRK/>
            [_____].<BRK/>
<BRK/>
    0001b   Mass rock excavation and   [_____]    CY      $______  $______<BRK/>
            disposal.<BRK/>
<BRK/>
    0001c   Trench rock excavation     [_____]    CY      $______  $______<BRK/>
            and disposal.<BRK/>
<BRK/>
    0001d   Removal and disposal of    [_____]    LF      $______  $______<BRK/>
            asbestos containing pipe<BRK/>
            insulation (by pipe<BRK/>
            diameter ranges).<BRK/>
<BRK/>
    0001e   Removal and disposal of    [_____]    SF      $______  $______<BRK/>
            asbestos containing floor<BRK/>
            tile.<BRK/>
<BRK/>
    0001f   Removal and disposal of    [_____]    SF      $______  $______<BRK/>
            asbestos containing<BRK/>
            siding.<BRK/>
<BRK/>
    0001g   Piles (by type and         [_____]    LF      $______  $______<BRK/>
            diameter or cross section<BRK/>
            size as appropriate).<BRK/>
<BRK/>
    0001h   Removal and disposal of    [_____]    Gal     $______  $______<BRK/>
            oily water and sludge<BRK/>
            inside tanks [_____].<BRK/>
<BRK/>
    0001i   Removal and disposal of    [_____]    CY      $______  $______<BRK/>
            contaminated stockpiled<BRK/>
            soils.<BRK/>
<BRK/>
    0001j   Provision and compaction   [_____]    CY      $______  $______<BRK/>
            of fill in place of<BRK/>
            removed contaminated soil.<BRK/>
<BRK/>
                                 Total Amount for Item 0001        $______<BRK/>
<BRK/>
  In the event there is a difference between a unit price and the extended total, the unit price will be held to 
be the intended bid.  If the bidder shows only the total price but fails to enter a unit price, the total divided 
by the estimated quantity will be held to be the intended unit price.<BRK/></TBL>
</ENG><BRK/>
<PGE/>]</SPT><SPT>[<TTL>1.1.2   Bid Items</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select when the project requires bid items. If the prepared cost estimate 
indicates a total cost for the work in excess of 90 percent of the ECC, submit 
a list of suggested bid items to a maximum of four additive bid items.</NPR><BRK/>
<BRK/>
<NPR>Bid Item 1 should be a complete and usable facility, not be dependent on any 
additive bid item.  Additive bid items should not be dependent on any other 
additive bid item.</NPR><BRK/>
<BRK/>
<NPR>Using, "Bid Items Form," prepare brief descriptions of the bid items.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This contract is solicited with bid items.  A description of the bid items is contained in Standard Form SF 1442, 
"Solicitation, Offer and Award."</TXT><BRK/>
<PGE/><MET><TBL><THD><BRK/>
<HL4>Bid Items Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Basis of Bid for Item 0001 shall be the entire work complete in accordance with the drawings and specifications, 
but not including the work indicated or specified to be provided under and other Bid Item.<BRK/>
<BRK/>
                                                    Bid Item 0001  $______<BRK/>
<BRK/>
(ii)   Basis of Bid for Item 0002 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0002  $______<BRK/>
<BRK/>
(iii)  Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0003  $______<BRK/>
<BRK/>
(iv)   Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0004  $______<BRK/>
<BRK/>
(v)    Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0005  $______<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>Bid Items Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Basis of Bid for Item 0001 shall be the entire work complete in accordance with the drawings and specifications, 
but not including including the work indicated or specified to be provided under any other Bid Item.<BRK/>
<BRK/>
                                                    Bid Item 0001  $______<BRK/>
<BRK/>
(ii)   Basis of Bid for Item 0002 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0002  $______<BRK/>
<BRK/>
(iii)  Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0003  $______<BRK/>
<BRK/>
(iv)   Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0004  $______<BRK/>
<BRK/>
(v)    Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                    Bid Item 0005  $______<BRK/></TBL>
</ENG><BRK/>
<PGE/>]</SPT><SPT>[<TTL>1.1.3   Bid Items With Unit Prices</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select when the project requires bid items and involves unit prices for 
selected items of work. If the prepared cost estimate indicates a total cost 
for the work in excess of 90 percent of the ECC, submit a list of suggested 
bid items to a maximum of four additive bid items.  Combination of bid items 
requires Level III Contracting Officer approval.</NPR><BRK/>
<BRK/>
<NPR>Bid Item 0001 should be a complete and usable facility, not be dependent on 
any additive bid item.  Additive bid items should not be dependent on any other 
additive bid item.</NPR><BRK/>
<BRK/>
<NPR>Using, "Bid Items and Unit Prices Form," prepare brief descriptions of the bid 
items and prepare a list of the unit price work similar to that shown on "Unit 
Prices Form" as the unit price work relates to the specific bid item.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This contract will be solicited with bid items and unit prices required for specifically selected work.  A description 
of the bid items and schedule of the unit price work is contained in Standard Form 1442, "Solicitation, Offer 
and Award."  See Contract Clauses, "FAR 52.212-11, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity 
Surveys."</TXT><BRK/>
<PGE/><MET><TBL><THD><BRK/>
<HL4>Bid Items with Unit Prices Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Basis of Bid for Item 0001 shall be the Total Amount for Item 0001, but not including the work indicated or 
specified to be provided under any other Bid Item.<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0001    All work complete in       1 Job      LS      XXX     $______<BRK/>
            accordance with the<BRK/>
            drawings and<BRK/>
            specifications but not<BRK/>
            including the work<BRK/>
            indicated or specified<BRK/>
            under 0001AA thru<BRK/>
            0001A[_] [_____].<BRK/>
<BRK/>
    0001AA  (Provide description(s)    [_____]    [_____] $______ $______<BRK/>
            of unit price work<BRK/>
            similar to that shown in<BRK/>
            "Unit Prices Form" A as it             relates to Bid Item 0001.)<BRK/>
<BRK/>
    0001AB  [_____]                    [_____]    [_____] $______ $______<BRK/>
<BRK/>
                                 Total Amount for Item 0001       $______<BRK/>
<BRK/>
(ii)   Basis of Bid for Item 0002 shall be the Total Amount for Item 0002,        for the addition of the following work:<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price   Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0002a   Provision of all work      1 Job      LS      XXX     $______<BRK/>
            for [_____] complete<BRK/>
            in accordance with the<BRK/>
            drawings and<BRK/>
            specifications but not<BRK/>
            including the work<BRK/>
            indicated or specified<BRK/>
            under 0002b thru 0002<BRK/>
            [_____].<BRK/>
<BRK/>
    0002b   (Provide description(s)    [_____]    [_____] $______ $______<BRK/>
            of unit price work<BRK/>
            similar to that shown<BRK/>
            in "Unit Prices Form" as it<BRK/>
            relates to Bid Item 0002.)<BRK/>
<BRK/>
    0002c   [_____]                    [_____]    [_____] $______ $______<BRK/>
<BRK/>
                                 Total Amount for Item 0002       $______<BRK/>
<BRK/>
(iii)  Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                 Bid Item 0003     $______<BRK/>
<BRK/>
(iv)   Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                 Bid Item 0004     $______<BRK/>
<BRK/>
(v)    Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                 Bid Item 0005     $______<BRK/>
<BRK/>
(vi)   Evaluation of Bids:  The funds available for this project, known as the control amount, will be recorded prior 
to bid opening and announced at bid opening.  The low bidder for purposes of award shall be determined in accordance 
with Contract Clause "DFARS 252.236-7007, Additive or Deductive Items," of Section [00200] [00201], "Instruction 
to [Bidders] [Offerors]."<BRK/>
<BRK/>
  In the event there is a difference between a unit price and the extended total, the unit price will be held to 
be the intended bid.  If the bidder shows only the total price but fails to enter a unit price, the total divided 
by the estimated quantity will be held to be the intended unit price.<BRK/>
<BRK/>
  Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive.  An 
unbalanced bid is one which is based on price significantly less than cost for some work and price which is   significantly 
overstated for other work.<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>Bid Items with Unit Prices Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Basis of Bid for Item 0001 shall be the Total Amount for Item 0001, but not including the work indicated or 
specified to be provided under any other Bid Item.<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0001a   All work complete in       1 Job      LS      XXX     $______<BRK/>
            accordance with the<BRK/>
            drawings and<BRK/>
            specifications but not<BRK/>
            including the work<BRK/>
            indicated or specified<BRK/>
            under 0001b thru 0001<BRK/>
            [_____].<BRK/>
<BRK/>
    0001b   (Provide description(s)    [_____]    [_____] $______ $______<BRK/>
            of unit price work<BRK/>
            similar to that shown in<BRK/>
            "Unit Prices Form" as it<BRK/>
            relates to Bid Item 0001.)<BRK/>
<BRK/>
    0001c   [_____]                    [_____]    [_____] $______ $______<BRK/>
<BRK/>
                                 Total Amount for Item 0001       $______<BRK/>
<BRK/>
(ii)   Basis of Bid for Item 0002 shall be the Total Amount for Item 0002, for the addition of the following work:<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price   Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0002a   Provision of all work      1 Job      LS      XXX     $______<BRK/>
            for [_____] complete<BRK/>
            in accordance with the<BRK/>
            drawings and<BRK/>
            specifications but not<BRK/>
            including the work<BRK/>
            indicated or specified<BRK/>
            under 0002b thru 0002<BRK/>
            [_____].<BRK/>
<BRK/>
    0002b   (Provide description(s)    [_____]    [_____] $______ $______<BRK/>
            of unit price work<BRK/>
            similar to that shown<BRK/>
            in "Unit Prices Form" as it<BRK/>
            relates to Bid Item 0002.)<BRK/>
<BRK/>
    0002c   [_____]                    [_____]    [_____] $______ $______<BRK/>
<BRK/>
                                 Total Amount for Item 0002       $______<BRK/>
<BRK/>
(iii)  Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                 Bid Item 0003     $______<BRK/>
<BRK/>
(iv)   Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                 Bid Item 0004     $______<BRK/>
<BRK/>
(v)    Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                 Bid Item 0005     $______<BRK/>
<BRK/>
(vi)   Evaluation of Bids:  The funds available for this project, known as the control amount, will be recorded prior 
to bid opening and announced at bid opening.  The low bidder for purposes of award shall be determined in accordance 
with Contract Clause "DFARS 252.236-7007, Additive or Deductive Items," of Section [00200] [00201], "Instruction 
to [Bidders] [Offerors]."<BRK/>
<BRK/>
  In the event there is a difference between a unit price and the extended total, the unit price will be held to 
be the intended bid.  If the bidder shows only the total price but fails to enter a unit price, the total divided 
by the estimated quantity will be held to be the intended unit price.<BRK/>
<BRK/>
  Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive.  An 
unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly 
overstated for other work.<BRK/></TBL>
</ENG><BRK/>
<PGE/>]</SPT><SPT>[<TTL>1.1.4   Options</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use of "Options" requires prior approval of the Contracts Office.  Contact 
the Goverment.</NPR><BRK/>
<BRK/>
<NPR>Select when the project requires option items.</NPR><BRK/>
<BRK/>
<NPR>Item 0001, Base Amount should be a complete and usable facility, Not be dependent 
on any option item.  Option items should not be dependent on any other option 
item.</NPR><BRK/>
<BRK/>
<NPR>Using, "Options Form," prepare brief descriptions of option items.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This contract will be solicited with options.  A description of the options is contained in Standard Form 1442, 
"Solicitation, Offer and Award."</TXT><BRK/>
<PGE/><MET><TBL><THD><BRK/>
<HL4>Options Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Item 0001:  Base Amount<BRK/>
<BRK/>
       Basis of Bid for Item 0001 shall be the entire work complete in accordance with the drawings and specifications, 
but not including the work indicated or specified to be provided under any Option Item.<BRK/>
<BRK/>
                                                        Item 0001  $______<BRK/>
<BRK/>
(ii)   Item 0002:  Option 1<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0002 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].                                        <BRK/>
                                                        Item 0002  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains  [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(iii)  Item 0003:  Option 2<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                        Item 0003  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(iv)   Item 0004:  Option 3<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                        Item 0004  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(v)    Item 0005:  Option 4<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                        Item 0005  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
       The low bidder for purposes of award will be determined as in Clause "FAR 52.217-4, Evaluation of Options 
Exercised at Time of Contract Award," of Section [00200] [00201], "Instructions to [Bidders] [Offerors]."<BRK/>
<BRK/>
       NOTE:  The minimum bid guarantee shall be [_____] percent of the aggregate amount of Items 0001 [,] [and] 
0002 [,] [_____] and [_____].<BRK/>
<BRK/>
       NOTE:  If the option under Item[s] 0002 [,] [_____] [and] [_____] [is] [are] exercised, additional bonding 
and consent of surety will be required.  Consequently, the Performance Bond shall reflect 100 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____] [and] [_____].  Payment Bonds shall reflect 50 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____] [and][_____].  See attached Consent of Surety Form.<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>Options Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Item 0001:  Base Amount<BRK/>
<BRK/>
       Basis of Bid for Item 0001 shall be the entire work complete in accordance with the drawings and specifications, 
but not including the work indicated or specified to be provided under any Option Item.<BRK/>
<BRK/>
                                                        Item 0001  $______<BRK/>
<BRK/>
(ii)   Item 0002:  Option 1<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0002 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].                                        <BRK/>
                                                        Item 0002  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(iii)  Item 0003:  Option 2<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                        Item 0003  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(iv)   Item 0004:  Option 3<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                        Item 0004  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(v)    Item 0005:  Option 4<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                        Item 0005  $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
       The low bidder for purposes of award will be determined as in Clause "FAR 52.217-4, Evaluation of Options 
Exercised at Time of Contract Award," of Section [00200] [00201], "Instructions to [Bidders] [Offerors]."<BRK/>
<BRK/>
       NOTE:  The minimum bid guarantee shall be [_____] percent of the aggregate amount of Items 0001 [,] [and] 
0002 [,] [_____] and [_____].<BRK/>
<BRK/>
       NOTE:  If the option under Item[s] 0002 [,] [_____] [and] [_____] [is] [are] exercised, additional bonding 
and consent of surety will be required.  Consequently, the Performance Bond shall reflect 100 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____] [and] [_____].  Payment Bonds shall reflect 50 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____] [and] [_____].  See attached Consent of Surety Form.<BRK/></TBL>
</ENG><BRK/>
<PGE/>]</SPT><SPT>[<TTL>1.1.5   Options and Unit Prices</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use of "Options" requires prior approval of the Contracts Office.</NPR><BRK/>
<BRK/>
<NPR>Select when the project requires option items and involves unit prices for selected 
items of work.</NPR><BRK/>
<BRK/>
<NPR>Item 0001, Base Amount should be a complete and usable facility, not be dependent 
on any option item.  Option items shall not be dependent on any other option 
item.</NPR><BRK/>
<BRK/>
<NPR>Using, "Options and Unit Prices Form," prepare brief descriptions of the option 
items and prepare a list of the unit price work similar to that shown on "Unit 
Prices Form" as the unit price work relates to the specific option item.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This contract will be awarded with options and unit prices required for specifically selected work.  A description 
of the options and schedule of the unit price work is contained in Standard Form 1442, "Solicitation, Offer and 
Award."  See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity 
Surveys."</TXT><BRK/>
<PGE/><MET><TBL><THD><BRK/>
<HL4>Options and Unit Prices Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Item 0001:  Base Amount<BRK/>
<BRK/>
       Basis of Bid for Item 0001 shall be the Total Amount for Item 0001, but not including the work indicated or 
specified to be provided under any Option Item.<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0001a   All work complete in       1 Job      LS      XXX      $_____<BRK/>
            accordance with the<BRK/>
            drawings and<BRK/>
            specifications but not<BRK/>
            including the work<BRK/>
            indicated or specified<BRK/>
            under 0001b thru 0001<BRK/>
            [_____].<BRK/>
<BRK/>
    0001b   (Provide description(s)    [_____]    [_____] $______  $______<BRK/>
            of unit price work<BRK/>
            similar to that shown<BRK/>
            in "Unit Prices Form as<BRK/>
            it relates to Item 0001:<BRK/>
            Base Amount.)<BRK/>
<BRK/>
    0001c   [_____]                    [_____]    [_____] $______  $______<BRK/>
<BRK/>
                             Total Amount for Item 0001            $______<BRK/>
<BRK/>
(ii)   Item 0002:  Option 1<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0002 shall be the Total Amount for Item 0002,for the addition of the following work:<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0002a   Provision of all work      1 Job      LS      XXX      $_____<BRK/>
            for [_____] complete in<BRK/>
            accordance with the<BRK/>
            drawings and specifications<BRK/>
            but not including the<BRK/>
            work indicated or<BRK/>
            specified under 0002b<BRK/>
            thru 0002 [_____].<BRK/>
<BRK/>
    0002b   (Provide description(s)    [_____]    [_____] $______  $_____<BRK/>
            of unit price work<BRK/>
            similar to that shown in<BRK/>
            "Unit Prices Form as<BRK/>
            it relates to Item 0002:<BRK/>
            Option 1.)<BRK/>
<BRK/>
    0002c   [_____]                    [_____]    [_____] $_____   $_____<BRK/>
<BRK/>
                             Total Amount for Item 0002            $_____<BRK/>
<BRK/>
         [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
         [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
         [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
         In the event there is a difference between a unit price and the the extended total, the unit price will 
be held to be the intended bid.  If the bidder shows only the total price but fails to enter a unit price, the total 
divided by the estimated quantity will be held to be the intended unit price.<BRK/>
<BRK/>
         Any bid price for items indicated above which are unbalanced as as to price may be rejected as non-responsive.  
An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly 
overstated for other work.<BRK/>
<BRK/>
(iii)  Item 0003:  Option 2<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                     Item 0003    $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(iv)   Item 0004:  Option 3<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                     Item 0004    $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(v)    Item 0005:  Option 4<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation for bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                     Item 0005    $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
       The low bidder for purposes of award will be determined as in Clause "FAR 52.217-4, Evaluaiton of Options 
Exercised at Time of Contract Award," of Section [00200] [00201], "Instructions to [Bidders] [Offerors]."<BRK/>
<BRK/>
       NOTE:  The minimum bid guarantee shall be [_____] percent of the aggregate amount of Items 0001 [,] [and] 
0002 [,] [_____] and [_____].<BRK/>
<BRK/>
       NOTE:  If the option under Item[s] 0002 [,] [_____] [and] [_____] [is] [are] exercised, additional bonding 
and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____] [and] [_____].  Payment Bonds shall reflect 50 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____].  See attached Consent of Surety Form.<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>Options and Unit Prices Form</HL4><BRK/>
<BRK/>
                                                     N[_____]-[__]-B-[____]<BRK/></THD>
<BRK/>
(i)    Item 0001:  Base Amount<BRK/>
<BRK/>
       Basis of Bid for Item 0001 shall be the Total Amount for Item 0001, but not including the work indicated or 
specified to be provided under any Option Item.<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0001a   All work complete in       1 Job      LS      XXX      $_____<BRK/>
            accordance with the<BRK/>
            drawings and<BRK/>
            specifications but not<BRK/>
            including the work<BRK/>
            indicated or specified<BRK/>
            under 0001b thru 0001<BRK/>
            [_____].<BRK/>
<BRK/>
    0001b   (Provide description(s)    [_____]    [_____] $______  $______<BRK/>
            of unit price work<BRK/>
            similar to that shown<BRK/>
            in "Unit Prices Form" as<BRK/>
            it relates to Item 0001:<BRK/>
            Base Amount.)<BRK/>
<BRK/>
    0001c   [_____]                    [_____]    [_____] $______  $______<BRK/>
<BRK/>
                             Total Amount for Item 0001            $______<BRK/>
<BRK/>
(ii)   Item 0002:  Option 1<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0002 shall be the Total Amount for Item 0002, for the addition of the following work:<BRK/>
<BRK/>
    _____________________________________________________________________<BRK/>
    Item    Description                Estimated          Unit<BRK/>
                                       Quantity   Unit    Price    Amount<BRK/>
    _____________________________________________________________________<BRK/>
    0002a   Provision of all work      1 Job      LS      XXX      $_____<BRK/>
            for [_____] complete in<BRK/>
            accordance with the<BRK/>
            drawings and specifications<BRK/>
            but not including the<BRK/>
            work indicated or<BRK/>
            specified under 0002b<BRK/>
            thru 0002 [_____].<BRK/>
<BRK/>
    0002b   (Provide description(s)    [_____]    [_____] $______  $_____<BRK/>
            of unit price work<BRK/>
            similar to that shown in<BRK/>
            "Unit Prices Form" as<BRK/>
            it relates to Item 0002:<BRK/>
            Option 1.)<BRK/>
<BRK/>
    0002c   [_____]                    [_____]    [_____] $_____   $_____<BRK/>
<BRK/>
                             Total Amount for Item 0002            $_____<BRK/>
<BRK/>
         [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
         [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
         [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
  In the event there is a difference between a unit price and the extended total, the unit price will be held to 
be the intended bid.  If the bidder shows only the total price but fails to enter a unit price, the total divided 
by the estimated quantity will be held to be the intended unit price.<BRK/>
<BRK/>
  Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive.  An 
unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly 
overstated for other work.<BRK/>
<BRK/>
(iii)  Item 0003:  Option 2<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0003 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                     Item 0003    $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(iv)   Item 0004:  Option 3<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation of bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0004 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                     Item 0004    $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
(v)    Item 0005:  Option 4<BRK/>
<BRK/>
       Option may be exercised at the time of award or within [_____] calendar days after award by the Contracting 
Officer.  A firm fixed bid price is required for the option.  No provision is made for economic price adjustment.  
Method for evaluation for bids for award purposes is specified below.<BRK/>
<BRK/>
       Basis of Bid for Item 0005 shall be the addition of the following work complete:<BRK/>
<BRK/>
       Provision of all work for [_____].<BRK/>
<BRK/>
                                                     Item 0005    $______<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date remains [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the contract.]<BRK/>
<BRK/>
       [If Option is exercised, the contract completion date shall be [_____] calendar days after award of the option.]<BRK/>
<BRK/>
       The low bidder for purposes of award will be determined as in Clause "FAR 52.217-4, Evaluaiton of Options 
Exercised at Time of Contract Award," of Section [00200] [00201], "Instructions to [Bidders] [Offerors]."<BRK/>
<BRK/>
       NOTE:  The minimum bid guarantee shall be [_____] percent of the aggregate amount of Items 0001 [,] [and] 
0002 [,] [_____] and [_____].<BRK/>
<BRK/>
       NOTE:  If the option under Item[s] 0002 [,] [_____] [and] [_____] [is] [are] exercised, additional bonding 
and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____] [and] [_____].  Payment Bonds shall reflect 50 percent of the aggregate 
amount of Items 0001 [,] [and] 0002 [,] [_____].  See attached Consent of Surety Form.<BRK/></TBL>
</ENG>]<BRK/>
<BRK/></SPT>
</SPT></PRT>    <EOD/><BRK/></SEC>