USACE / NAVFAC / AFCESA / NASA                  UFGS-03 01 32 (April 2006)<BRK/>
                                                --------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                      Replacing without change<BRK/>
                                                UFGS-03931 (May 2004)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATION</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 03 01 32</SCN><BRK/>
<BRK/>
<STL>CONCRETE REHABILITATION FOR CIVIL WORKS</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>rehabilitation of 
concrete for Civil Works type structures</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
This guide specification includes tailoring options for controlled blasting, 
crack repair, joint resealing, use of precast concrete, overlay, and refacing.  
Selection or deselection of a tailoring option will include or exclude that 
option in the section, but editing the resulting section to fit the project 
is still required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification was prepared to be compatible with the guidance 
given in EM 1110-2-2000, EM 1110-2-2002, ACI 224.1R, UFC 3-270-03 and UFC 3-270-04.</NPR><BRK/>
<BRK/>
<NPR>The following information should be shown on the project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Location and extent of spalled, cracked or damaged concrete to be repaired 
with epoxy;</NPR><BRK/>
<BRK/>
<NPR>2.  Location and extent of cracked concrete or saw kerfs to be filled with epoxy 
mortar;</NPR><BRK/>
<BRK/>
<NPR>3.  Location of dowels to be installed and cracks to be repaired with non-pressure 
grout; and</NPR><BRK/>
<BRK/>
<NPR>4.  Location and sizes of cracks to be filled by pressure grouting.</NPR><BRK/>
<BRK/>
<NPR>This guide specification is intended to be used in conjunction with other guide 
specifications for cement-based concrete materials.  Normally, the applicable 
formwork, joint construction, reinforcing and structural concrete sections should 
be included.  For smaller projects, the specification Section <SRF>03 30 53</SRF> MISCELLANEOUS 
CAST-IN-PLACE CONCRETE should be included.  Determination of appropriate guide 
specifications should be made in accordance with EM 1110-2-2000, Chapter 5.  
Where only small amounts of cement-based concrete are involved, the applicable 
portions of the appropriate guide specifications may be incorporated into this 
section.  The following guide specifications are referenced in this specification:<BRK/>
<BRK/>
    <SRF>01 22 00.00 10</SRF> MEASUREMENT AND PAYMENT<BRK/>
    <SRF>01 74 19</SRF> CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT<BRK/>
    <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION<BRK/>
    <SRF>32 01 19</SRF> FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS<BRK/>
    <SRF>03 11 14.00 10</SRF> FORMWORK FOR CONCRETE<BRK/>
    <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN CONCRETE 
FOR CIVIL WORKS<BRK/>
    <SRF>03 20 02</SRF> STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT FOR 
CIVIL WORKS<BRK/>
    <SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE<BRK/>
    <SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS<BRK/>
    <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE<BRK/>
    <SRF>03 37 13</SRF> SHOTCRETE<BRK/>
    <SRF>03 37 00</SRF> PREPLACED-AGGREGATE CONCRETE<BRK/>
    <SRF>03 45 33</SRF> PRECAST [PRESTRESSED] STRUCTURAL CONCRETE</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to in the text by basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ACI INTERNATIONAL (ACI)</ORG><BRK/><BRK/><RID>ACI 117</RID><RTL>(2006) Standard Specifications for Tolerances for Concrete Construction and Materials</RTL><BRK/><BRK/><RID>ACI 211.1</RID><RTL>(1991; R 2002) Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete</RTL><BRK/><BRK/><RID>ACI 318</RID><RTL>(2008; Errata 2008) Building Code Requirements for Structural Concrete and Commentary</RTL><BRK/><BRK/><RID>ACI 318M</RID><RTL>(2008) Metric Building Code Requirements for Structural Concrete and Commentary</RTL><BRK/><BRK/><RID>ACI 504R</RID><RTL>(1990, R 1997) Guide to Sealing Joints in Concrete Structures</RTL><BRK/><BRK/><RID>ACI 548.4</RID><RTL>(1993; R 1998) Standard Specification for Latex-Modified Concrete (LMC) Overlays</RTL><BRK/><BRK/><RID>ACI SP-66</RID><RTL>(2004) ACI Detailing Manual</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)</ORG><BRK/><BRK/><RID>AASHTO M 288</RID><RTL>(2006) Standard Specification for Geotextile Specification for Highway Applications</RTL><BRK/><BRK/><RID>AASHTO T 334</RID><RTL>(2008) Standard Method of Test for Estimating the Cracking Tendency of Concrete</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 36/A 36M</RID><RTL>(2008) Standard Specification for Carbon Structural Steel</RTL><BRK/><BRK/><RID>ASTM A 615/A 615M</RID><RTL>(2008b) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement</RTL><BRK/><BRK/><RID>ASTM A 722/A 722M</RID><RTL>(2007) Standard Specification for Uncoated High-Strength Steel Bar for Prestressing Concrete</RTL><BRK/><BRK/><RID>ASTM A 775/A 775M</RID><RTL>(2007b) Standard Specification for Epoxy-Coated Steel Reinforcing Bars</RTL><BRK/><BRK/><RID>ASTM A 820/A 820M</RID><RTL>(2006) Standard Specification for Steel Fibers for Fiber-Reinforced Concrete</RTL><BRK/><BRK/><RID>ASTM A 996/A 996M</RID><RTL>(2006a) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars or Concrete Reinforcement</RTL><BRK/><BRK/><RID>ASTM C 1012</RID><RTL>(2004) Standard Test Method for Length Change of Hydraulic-Cement Mortars Exposed to a Sulfate Solution</RTL><BRK/><BRK/><RID>ASTM C 1017/C 1017M</RID><RTL>(2007) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete</RTL><BRK/><BRK/><RID>ASTM C 1059/C 1059M</RID><RTL>(1999; R 2008) Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete</RTL><BRK/><BRK/><RID>ASTM C 1077</RID><RTL>(2008) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation</RTL><BRK/><BRK/><RID>ASTM C 109/C 109M</RID><RTL>(2008) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)</RTL><BRK/><BRK/><RID>ASTM C 1116/C 1116M</RID><RTL>(2008) Standard Specification for Fiber-Reinforced Concrete</RTL><BRK/><BRK/><RID>ASTM C 117</RID><RTL>(2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 143/C 143M</RID><RTL>(2008) Standard Test Method for Slump of Hydraulic-Cement Concrete</RTL><BRK/><BRK/><RID>ASTM C 1438</RID><RTL>(1999; R 2005e1) Standard Specification for Latex and Powder Polymer Modifiers for Hydraulic Cement Concrete and Mortar</RTL><BRK/><BRK/><RID>ASTM C 144</RID><RTL>(2004) Standard Specification for Aggregate for Masonry Mortar</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 157/C 157M</RID><RTL>(2008) Standard Test Method for Length Change of Hardened Hydraulic-Cement Mortar and Concrete</RTL><BRK/><BRK/><RID>ASTM C 172</RID><RTL>(2008) Standard Practice for Sampling Freshly Mixed Concrete</RTL><BRK/><BRK/><RID>ASTM C 192/C 192M</RID><RTL>(2007) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory</RTL><BRK/><BRK/><RID>ASTM C 231</RID><RTL>(2008c) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method</RTL><BRK/><BRK/><RID>ASTM C 273/C 273M</RID><RTL>(2007a) Shear Properties of Sandwich Core Materials</RTL><BRK/><BRK/><RID>ASTM C 31/C 31M</RID><RTL>(2008a) Standard Practice for Making and Curing Concrete Test Specimens in the Field</RTL><BRK/><BRK/><RID>ASTM C 33</RID><RTL>(2007) Standard Specification for Concrete Aggregates</RTL><BRK/><BRK/><RID>ASTM C 39/C 39M</RID><RTL>(2005e1e2) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens</RTL><BRK/><BRK/><RID>ASTM C 469</RID><RTL>(2002e1) Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression</RTL><BRK/><BRK/><RID>ASTM C 494/C 494M</RID><RTL>(2008a) Standard Specification for Chemical Admixtures for Concrete</RTL><BRK/><BRK/><RID>ASTM C 596</RID><RTL>(2007) Drying Shrinkage of Mortar Containing Hydraulic Cement</RTL><BRK/><BRK/><RID>ASTM C 666/C 666M</RID><RTL>(2003; R 2008) Resistance of Concrete to Rapid Freezing and Thawing</RTL><BRK/><BRK/><RID>ASTM C 881/C 881M</RID><RTL>(2002) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete</RTL><BRK/><BRK/><RID>ASTM C 882/C 882M</RID><RTL>(2005e1) Bond Strength of Epoxy-Resin Systems Used with Concrete by Slant Shear</RTL><BRK/><BRK/><RID>ASTM C 928/C 928M</RID><RTL>(2008) Packaged, Dry, Rapid-Hardening Cementitious Materials for Concrete Repairs</RTL><BRK/><BRK/><RID>ASTM C 937</RID><RTL>(2002) Grout Fluidifier for Preplaced-Aggregate Concrete</RTL><BRK/><BRK/><RID>ASTM C 940</RID><RTL>(1998a; R 2003) Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory</RTL><BRK/><BRK/><RID>ASTM D 1623</RID><RTL>(2003) Tensile and Tensile Adhesion Properties of Rigid Cellular Plastics</RTL><BRK/><BRK/><RID>ASTM D 2103</RID><RTL>(2008) Standard Specification for Polyethylene Film and Sheeting</RTL><BRK/><BRK/><RID>ASTM D 2240</RID><RTL>(2005) Standard Test Method for Rubber Property - Durometer Hardness</RTL><BRK/><BRK/><RID>ASTM D 226</RID><RTL>(2006) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing</RTL><BRK/><BRK/><RID>ASTM D 2822</RID><RTL>(2005) Asphalt Roof Cement</RTL><BRK/><BRK/><RID>ASTM D 323</RID><RTL>(2006) Vapor Pressure of Petroleum Products (Reid Method)</RTL><BRK/><BRK/><RID>ASTM D 3418</RID><RTL>(2008) Transition Temperatures of Polymers by Differential Scanning Calorimetry</RTL><BRK/><BRK/><RID>ASTM D 395</RID><RTL>(2003; R 2008) Standard Test Methods for Rubber Property - Compression Set</RTL><BRK/><BRK/><RID>ASTM D 4016</RID><RTL>(2008) Viscosity of Chemical Grouts by Brook field Viscometer (Laboratory Method)</RTL><BRK/><BRK/><RID>ASTM D 4101</RID><RTL>(2008) Standard Specification for Polypropylene Injection and Extrusion Materials</RTL><BRK/><BRK/><RID>ASTM D 412</RID><RTL>(2006ae1e2) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension</RTL><BRK/><BRK/><RID>ASTM D 450</RID><RTL>(2007) Coal-Tar Pitch Used in Roofing, Dampproofing, and Waterproofing</RTL><BRK/><BRK/><RID>ASTM D 471</RID><RTL>(2006; R 2008) Standard Test Method for Rubber Property - Effect of Liquids</RTL><BRK/><BRK/><RID>ASTM D 4869</RID><RTL>(2005; R 2006) Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing</RTL><BRK/><BRK/><RID>ASTM D 572</RID><RTL>(2004) Rubber Deterioration by Heat and Oxygen</RTL><BRK/><BRK/><RID>ASTM D 75</RID><RTL>(2003) Standard Practice for Sampling Aggregates</RTL><BRK/><BRK/><RID>ASTM E 488</RID><RTL>(1996; R 2003) Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements</RTL><BRK/><BRK/></REF><REF><ORG>CONCRETE SAWING AND DRILLING ASSOCIATION (CSDA)</ORG><BRK/><BRK/><RID>CSDA-W-104</RID><RTL>(June 1, 1998) Track Mounted Wall Sawing</RTL><BRK/><BRK/></REF><REF><ORG>POST-TENSIONING INSTITUTE (PTI)</ORG><BRK/><BRK/><RID>PTI A</RID><RTL>(Nov 1990) Post-Tensioning Manual</RTL><BRK/><BRK/></REF><REF><ORG>PRECAST/PRESTRESSED CONCRETE INSTITUTE (PCI)</ORG><BRK/><BRK/><RID>PCI MNL-116</RID><RTL>(1999) Manual for Quality Control for Plants and Production of Structural Precast Concrete Products</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>COE CRD-C 164</RID><RTL>(1992) Standard Test Method for Direct Tensile Strength of Cylindrical Concrete or Mortar Specimens</RTL><BRK/><BRK/><RID>COE CRD-C 39</RID><RTL>(1981) Test Method for Coefficient of Linear Thermal Expansion of Concrete</RTL><BRK/><BRK/><RID>COE CRD-C 400</RID><RTL>(1963) Requirements for Water for Use in Mixing or Curing Concrete</RTL><BRK/><BRK/><RID>EM 385-1-1</RID><RTL>(2008) Safety and Health Requirements Manual</RTL><BRK/><BRK/></REF><REF><ORG>U.S. GENERAL SERVICES ADMINISTRATION (GSA)</ORG><BRK/><BRK/><RID>CID A-A-1922</RID><RTL>(Rev A; Notice 1) Shield, Expansion (Caulking Anchors, Single Lead)</RTL><BRK/><BRK/><RID>CID A-A-55614</RID><RTL>(Basic; Notice 1) Shield, Expansion (Non-Drilling Expansion Anchors)</RTL><BRK/><BRK/><RID>FS A-A-1923</RID><RTL>(Rev A; Notice 1) Shield, Expansion (Lag, Machine and Externally threaded Wedge Bolt Anchors)</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  See ACI 201.1 for definitions of various types of concrete deterioration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.2.1   Concrete</TTL><BRK/>
<BRK/>
<TXT>A mixture of binder material, water,  and fine and coarse aggregate, with or without admixtures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Mortar</TTL><BRK/>
<BRK/>
<TXT>A mixture of binder material, water, and fine aggregate, with or without admixtures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Grout</TTL><BRK/>
<BRK/>
<TXT>A mixture of binder material and water, with or without a filler.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Cement-Based Material</TTL><BRK/>
<BRK/>
<TXT>A material consisting of portland cement and/or other cementitious materials as a binder and aggregate.  As used 
in this specification, cement-based materials do not include materials with polymer modifiers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.5   Polymer-Modifier</TTL><BRK/>
<BRK/>
<TXT>A polymer used to modify the properties of a cement-based concrete or mortar.  The polymers commonly associated 
with concrete rehabilitation are styrene-butadiene and acrylic latex.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.6   Polymer-Modified Material</TTL><BRK/>
<BRK/>
<TXT>A combination of polymer, portland cement and/or other cementitious materials, and fine and/or coarse aggregate.  
Polymer-modified concrete is normally placed to a thickness of<MET> 25 mm</MET><ENG> 1 inch</ENG> or greater.  Polymer-modified mortar 
is normally placed to a thickness of less than<MET> 25 mm</MET><ENG> 1 inch</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.7   Epoxy Resin Binder</TTL><BRK/>
<BRK/>
<TXT>A two-component epoxy resin binder system in low and medium viscosities used by itself as a primer or for producing 
epoxy concrete or mortars when mixed with aggregate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.8   Epoxy Concrete</TTL><BRK/>
<BRK/>
<TXT>A combination of epoxy resin and fine and coarse aggregate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.9   Epoxy Mortar</TTL><BRK/>
<BRK/>
<TXT>A combination of epoxy resin, a mineral filler, and fine aggregate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.10   Non-Pressure Epoxy Grout</TTL><BRK/>
<BRK/>
<TXT>A combination of epoxy resin binder, a mineral filler and a thixotropic agent.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR"><SPT><TTL>1.2.11   Epoxy Injection Adhesive</TTL><BRK/>
<BRK/>
<TXT>A low viscosity epoxy resin system pumped under pressure into  cracks.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>1.2.12   Rapid-Hardening Repair Material</TTL><BRK/>
<BRK/>
<TXT>A combination of rapid-setting cement and aggregate(s) that can develop sufficient compressive strength at an 
early age to permit intended use.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR"><SPT><TTL>1.2.13   Non-Structural Cracks</TTL><BRK/>
<BRK/>
<TXT>Cracks that do not affect the load-carrying capacity of the structure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.14   Structural Cracks</TTL><BRK/>
<BRK/>
<TXT>Cracks that affect the load-carrying capacity of the structure.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.3   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the 
project specifications, this paragraph title (UNIT PRICES) should be deleted 
from this section and the remaining appropriately edited subparagraphs below 
should be inserted into Section 01 22 00.00 10.  For additional guidance on 
payment items, see International Concrete Repair Institute Guidelines No. 03735 
"Guide for Methods of Measurement and Contract Types for Concrete Repair Work".</NPR><BRK/>
<BRK/>
<NPR>For small projects where other relevant guide specifications are not included 
in the project specification, insert applicable measurement and payment paragraphs 
either here or in Section 01 22 00.00 10.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.3.1   Concrete Removal</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Repeat this bid item and its respective subparagraphs for each bid item 
of concrete removal, renumbering the bid items appropriately.  Unit price bid 
items should be inserted in paragraph UNIT PRICE BID ITEMS of Section 01 22 
00.00 10 MEASUREMENT AND PAYMENT.  Where concrete removal depth is uniform across 
an area, measurement and payment may be made on an area basis, in which case 
the "ALTERNATE" paragraph may be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.3.1.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with concrete removal, which includes preparatory work, removal of 
concrete and embedded items, and disposal of debris.  Payment will be made at the contract price per cubic<MET> meter</MET><ENG>
 yard</ENG> of concrete removed.  No payment will be made for concrete removal, as such, that is in connection with 
items for which payment is made as a lump sum.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Concrete removal will be measured for payment based upon the actual volume of concrete removed within the pay 
lines as indicated on the drawings.  Measurement will be made in accordance with paragraph FIELD MEASUREMENT.  
No measurement will be made of concrete removal outside the pay lines shown which is incidental to the indicated 
removal unless such removal is specifically authorized by the Contracting Officer.  No deductions will be made 
for rounded or beveled edges or for voids or embedded items that are either less than<MET> 0.15 cubic meters</MET><ENG> five 
cubic feet</ENG> in volume or<MET> 0.10 square meter</MET><ENG> one square foot</ENG> in cross section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meters</MET><ENG> yards</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.2   Concrete Removal (Alternate)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Repeat this bid item and its respective subparagraphs for each bid item 
of concrete removal, renumbering the bid items appropriately.  Unit price bid 
items should be inserted in paragraph UNIT PRICE BID ITEMS of Section 01 22 
00.00 10 MEASUREMENT AND PAYMENT.  Where concrete removal depth is not uniform 
across an area, measurement and payment should be made on a volume basis basis, 
in which case the previous paragraph should be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.3.2.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with concrete removal, which includes preparatory work, removal of 
concrete and embedded items, and disposal of debris.  Payment will be made at the contract price per square<MET> meter</MET><ENG>
 yard</ENG> of concrete removed.  No payment will be made for concrete removal, as such, that is in connection with 
items for which payment is made as a lump sum.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Concrete removal will be measured for payment based upon the actual area of concrete removed within the pay lines 
as indicated on the drawings.  No measurement will be made of concrete removal outside the pay lines shown which 
is incidental to the indicated removal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  square<MET> meters</MET><ENG> yards</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.3   Drilling and Grouting Dowels and Anchors</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.3.1   Payment</TTL><BRK/>
 <BRK/>
<TXT>Payment will be made for costs associated with drilling holes and grouting dowels and anchors for anchoring new 
concrete and for repairs to existing concrete.  The price shall include the cost of furnishing all equipment, 
labor, and materials, except dowels and anchors, and all other incidental costs in connection with completing 
the item of work as shown and as specified.  Payment for dowels and anchors will be made as specified for dowels, 
anchors, and reinforcing steel bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of drilling holes and grouting dowels and anchors will be made by the linear<MET> meter</MET><ENG> foot</ENG> of hole actually 
drilled and grouted to the depth indicated.  Measurement will be made from the surface of the concrete after 
removal or surface preparation and will be made to the nearest<MET> 25 mm</MET><ENG> inch</ENG>.  No payment will be made for holes 
improperly drilled or grouted nor for repairs required due to damage caused by the drilling and grouting operations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: linear<MET> meter</MET><ENG> feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.4   Dowels and Anchors</TTL><BRK/>
<BRK/>
<TXT>Measurement and payment for furnishing and placing dowels, anchors and reinforcing steel bars for anchorage will 
be made as specified in Section <SRF>03 20 02</SRF> STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT FOR CIVIL 
WORKS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   Concrete</TTL><BRK/>
<BRK/>
<TXT>Measurement and payment for cement-based concrete will be made as specified in Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE 
STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][<SRF>03 30 53</SRF> MISCELLANEOUS 
CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.5.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for [epoxy] [polymer-modified] [fiber-reinforced] concrete will be made at the respective contract unit 
prices per cubic<MET> meter</MET><ENG> yard</ENG>.  These payments shall constitute full compensation for performing the work and shall 
include the cost of all labor, equipment and tools, materials and supplies required to complete the concrete 
work under this contract; except steel reinforcement, and embedded parts which are specified to be paid for separately.  
No measurement and payment will be made for concrete, as such, which is placed in structures for which payment 
is made as a lump sum.  No separate payment will be made for bonding coats or agents.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of concrete will be made on the basis of the actual volume of concrete placed, within the limits 
of work, as indicated on the contract drawings.  Measurement of concrete placed against the sides of any excavation 
without the use of intervening forms will be made only within the pay lines of the structure shown on the contract 
drawings.  Measurement will be made in accordance with paragraph FIELD MEASUREMENT.  No deductions will be made 
for rounded or beveled edges or space occupied by metal work, electrical conduits or other materials, nor for 
individual voids or embedded items which are either less than<MET> 0.15 cubic meters</MET><ENG> five cubic feet</ENG> in volume or<MET> 
0.10 square meter</MET><ENG> one square foot</ENG> in cross section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.6   Mortar</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.6.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for [cement-based mortar] [epoxy mortar] [polymer-modified mortar] [Rapid-Hardening Repair Mortar] will 
be made at the respective contract unit prices per cubic<MET> meter</MET><ENG> foot</ENG>.  These payments shall constitute full compensation 
for performing the work and shall include the cost of all labor, equipment and tools, materials and supplies 
required to complete the mortar work under this contract; except steel reinforcement, and embedded parts which 
are specified to be paid for separately.  No measurement and payment will be made for mortar, as such, which 
is placed in structures for which payment is made as a lump sum.  No separate payment will be made for bonding 
coats or agents.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.6.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of mortar will be made on the basis of the actual volume of mortar placed, within the limits of work, 
as indicated on the contract drawings.  Measurement will be made in accordance with paragraph FIELD MEASUREMENT.  
No deductions will be made for rounded or beveled edges or space occupied by metal work, electrical conduits 
or other materials, nor for voids or embedded items.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.6.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.7   Grout</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.7.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for [cement-based] [epoxy] [polymer-modified] grout will be made at the respective contract unit prices 
per cubic<MET> meter</MET><ENG> foot</ENG>.  These payments shall constitute full compensation for performing the work and shall include 
the cost of all labor, equipment and tools, materials and supplies required to complete the grout work under 
this contract.  No measurement and payment will be made for grout, as such, which is placed in structures for 
which payment is made as a lump sum.  No separate payment will be made for bonding coats or agents.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.7.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of grout will be made on the basis of the actual volume of grout placed, within the limits of work, 
as indicated on the contract drawings.  Measurement will be made in accordance with paragraph FIELD MEASUREMENT.  
No deductions will be made for rounded or beveled edges or space occupied by metal work, electrical conduits 
or other materials, nor for individual voids or embedded items.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.7.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><TAI OPT="PRECAST CONCRETE"><SPT><TTL>1.3.8   Precast Concrete Units</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Repeat this bid item and its respective subparagraphs for each bid item 
of precast concrete units, renumbering the bid items appropriately.  Unit price 
bid items should be inserted in paragraph UNIT PRICE BID ITEMS of Section 01 
22 00.00 10 MEASUREMENT AND PAYMENT.  When uniform thickness and construction 
precast units are used, area measurement is appropriate.  If the units are not 
uniform, either separate area measurements of volume measurements should be 
specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.3.8.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with fabricating, transporting and erecting precast concrete units.  
The payment will include bearing pads, shims, and all temporary supports required for erection.  Payment for 
precast units will be made at the contract price per square<MET> meter</MET><ENG> foot</ENG> for:</TXT><BRK/>
<BRK/>
<TXT>[&lt;Insert Type of Precast Concrete Unit(s) here&gt;]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.8.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of precast concrete units will be made on the basis of the actual surface area of precast units placed, 
and accepted, within the limits of work as indicated on the contract drawings.  No deductions will be made for 
beveled edges or space occupied by metal work, or for embedded items. </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.8.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: square<MET> meter</MET><ENG> feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="OVERLAY"><SPT><TTL>1.3.9   Overlays</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.9.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for [cement-based] [polymer-modified] concrete overlay will be made at the respective contract unit prices 
per square<MET> meter</MET><ENG> yard</ENG>.  These payments shall constitute full compensation for performing the work and shall include 
the cost of all labor, equipment and tools, materials and supplies required to complete the overlay work under 
this contract, including surface preparation.  No separate payment will be made for bonding agents or primers, 
when required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.9.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of [cement-based] [polymer-modified] concrete overlay will be made on the basis of the actual area 
of overlay placed, within the limits of work, as indicated on the contract drawings.  No deductions will be made 
for voids or embedded items which are less than<MET> 0.09 square meter</MET><ENG> one square foot</ENG> in area.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.9.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: square<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>1.3.10   Crack Injection</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.10.1   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If there is considerable uncertainty concerning the quantity to be used, 
consideration should be given to using subdivided payment items, with the first 
amount being the minimum anticipated and subitems to cover unknown quantities 
above the minimum.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment will be made for costs associated with injecting cracks with [ultra-fine cement grout][epoxy injection 
adhesive] [polyurethane injection adhesive], including cleaning the cracks, preparing the surface for crack surface 
sealer, placing crack surface sealer, installing injection ports, and cleanup upon completion of injection.  
Payment for will be made at the contract price per<MET> liter</MET><ENG> gallon</ENG> of material injected.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.10.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of crack injection will be made on the basis of the actual volume of [ultra-fine cement][epoxy][polyurethane] 
material injected, and accepted, within the limits of work as indicated on the contract drawings.  No measurement 
will be made of grout that is released through ports or otherwise wasted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.10.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CRACK REPAIR,JOINT RESEALING"><SPT><TTL>1.3.11   Crack or Joint Sealing</TTL><BRK/>
<BRK/>
<TXT>Measurement and payment for crack or joint sealing, including sawing or routing cracks or joints, removing existing 
deteriorated sealants and joint materials, surface preparation, installing sealant and backup materials, and 
cleanup upon completion of sealing will be made as specified in Section <SRF>32 01 19</SRF> FIELD MOLDED SEALANTS FOR SEALING 
JOINTS IN RIGID PAVEMENTS.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>1.3.12   Notch and Seal Crack Filling</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.12.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with filling cracks with [dry-pack mortar][polymer-modified mortar], 
including preparing the cracks.  Payment for will be made at the contract price per cubic<MET> meter</MET><ENG> foot</ENG> of material 
placed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.12.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of crack filling will be made on the basis of the actual volume of mortar placed, and accepted, within 
the limits of work as indicated on the contract drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.12.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>1.3.13   Mechanical Anchoring of Cracks</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When a substantial amount of work involves mechanical anchoring of cracks, 
consideration may be given to using separate unit prices for drilling, reinforcing 
or prestressing steel, and miscellaneous metals for anchorages.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.3.13.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be for costs associated with preparation and installation of mechanical anchorage systems for crack 
repair.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.13.2   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: [each] [lump sum].</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>1.3.14   Crack Stitching</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the area of stitching is small and/or well defined, payment may 
be lump sum.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.3.14.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with stitching cracks, including drilling, grouting, and furnishing 
and installing stitching staples.  Payment for will be made at the contract price per stitching staple installed.  
Payment for sealing cracks will be made as specified for the specific type of crack treatment.</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>1.3.14.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of crack stitching will be made on the basis of the actual number of stitching staples installed 
and accepted, within the limits of work as indicated on the contract drawings.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>1.3.14.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: [each][lump sum].</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>1.3.15   Drilling and Plugging Cracks</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.15.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with drilling and plugging cracks with [portland cement grout][polymer-modified 
mortar], including drilling the cracks and furnishing and placing the [grout][mortar].  Payment for will be made 
at the contract price per cubic<MET> meter</MET><ENG> foot</ENG> of material placed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.15.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of drilling and plugging cracks will be made on the basis of the actual volume of [portland cement 
grout][polymer-modified mortar]placed, and accepted, within the limits of work as indicated on the contract drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.15.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>1.3.16   Gravity Crack Filling</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.16.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for gravity filling of cracks will be made at the contract unit price per square<MET> meter</MET><ENG> yard</ENG>.  This payments 
shall constitute full compensation for performing the work and shall include the cost of all labor, equipment 
and tools, materials and supplies required to complete the gravity filling work under this contract, including 
surface preparation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.16.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of gravity crack filling will be made on the basis of the actual area of concrete surface treated, 
within the limits of work, as indicated on the contract drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.16.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: square<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI></SPT><SPT><TTL>1.4   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Design Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If higher earlier strength is needed for repairs, revise this paragraph 
to provide appropriate criteria.  The mixture design should maximize aggregate 
size and minimize the water-cementitious material ratio to reduce shrinkage.  
Material properties should be coordinated with EM 1110-2-2002 Evaluation and 
Repair of Concrete Structures.  Where other guide specifications are included 
in the project specification, ensure that appropriate parameters are inserted 
in the applicable specification.  Consideration should be given to including 
and alternative age other than 28 days such as 90 days when pozzolan is used 
to provide more cost effective use of materials.  If flowability of the grout 
is important, use ASTM C 1017/C 1017M for admixture and specify where it is 
to be used; otherwise use ASTM C 494/C 494M.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Concrete.  Design the concrete mixtures in accordance with Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE 
STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][<SRF>03 30 53</SRF> MISCELLANEOUS 
CAST-IN-PLACE CONCRETE].</LST><BRK/>
<BRK/>
<LST>b.  Mortar.  Design the mortar mixtures to produce material having an average compressive strength of 
[_____]<MET> kPa</MET><ENG> psi</ENG> at 28 days of age, determined in conformance with <RID>ASTM C 109/C 109M</RID>.  Design the mixtures 
to secure an air content by volume of [5][_____] percent, plus or minus 1-1/2 percent, based on measurements 
made on concrete at the point of placement in conformance with <RID>ASTM C 231</RID>.  The range of slump shall 
be<MET> 13 to 50 mm</MET><ENG> 1/2 to 2 inches</ENG> when tested in accordance with <RID>ASTM C 143/C 143M</RID> except that maximum slump 
may be increased to<MET> 100 mm</MET><ENG> 4 inches</ENG> when the Contractor has included an approved water-reducing, high 
range, admixture conforming to <RID>ASTM C 494/C 494M</RID> in the mix design.  To minimize drying shrinkage, the 
maximum water-cementitious materials ratio by weight shall be 0.45 and the maximum cement content shall 
be kept to a minimum to limit water volume.  Make mix design studies and tests in accordance with <RID>ASTM C 39/C 39M</RID>
 and <RID>ASTM C 192/C 192M</RID>, and submit the test results for approval.</LST><BRK/>
<BRK/>
<LST>c.  Grout.  Design the grout mixtures to produce material having an average compressive strength of [_____]<MET>
 kPa</MET><ENG>psi</ENG> at 28 days of age, determined in conformance with <RID>ASTM C 109/C 109M</RID>.  Design the mixtures to 
secure an air content by volume of [5][_____] percent, plus or minus 1-1/2 percent, based on measurements 
made on concrete at the point of placement in conformance with <RID>ASTM C 231</RID>.  The range of slump shall 
be<MET> 13 to 50 mm</MET><ENG> 1/2 to 2 inches</ENG> when tested in accordance with <RID>ASTM C 143/C 143M</RID> except that maximum slump 
may be increased to<MET> 100 mm</MET><ENG> 4 inches</ENG> when the Contractor has included an approved water-reducing, high 
range, admixture conforming to [<RID>ASTM C 494/C 494M</RID>][<RID>ASTM C 1017/C 1017M</RID>] in the mix design.  To minimize 
drying shrinkage, the maximum water-cementitious materials ratio by weight shall be 0.45 and the maximum 
cement content shall be kept to a minimum to limit water volume.  Make mix design studies and tests in 
accordance with <RID>ASTM C 39/C 39M</RID> and <RID>ASTM C 192/C 192M</RID>, and submit the test results for approval.</LST><BRK/>
<BRK/>
<LST>d.  Repair Materials.  [Provide the services of a technical specialist experienced in using the polymer 
for repair materials.]</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   Repair Material Performance Requirements</TTL><BRK/>
<BRK/>
<TXT>Design repair materials to conform to the following requirements at 28 days unless otherwise indicated:</TXT><BRK/>
<MET><TBL><BRK/>
<THD><HL4>Physical Properties of Cement-Based Repair materials</HL4><BRK/>
<BRK/>
    Property                     Test method     Criteria<BRK/></THD>
<BRK/>
    Tensile Strength (28 days)   <RID>COE CRD-C 164</RID>   2.8 MPa (minimum)<BRK/>
<BRK/>
    Modulus of Elasticity        <RID>ASTM C 469</RID>      24 GPa (maximum)<BRK/>
<BRK/>
    Coefficient of Thermal<BRK/>
     Expansion                   <RID>COE CRD-C 39</RID>    12 millionths/degree C<BRK/>
                                                  (maximum)<BRK/>
<BRK/>
    Drying Shrinkage             <RID>ASTM C 157/C 157M</RID><BRK/>
     (28 days)                   (modified)      400 millionths (maximum)<BRK/>
     (1 year)                                    1,000 millionths (maximum)<BRK/>
<BRK/>
    Restrained Shrinkage         <RID>AASHTO T 334</RID><BRK/>
     Cracking                                    No cracks within 14 days,<BRK/>
    Implied strain at 1 year                     1,000 millionths (maximum)   </TBL></MET><BRK/>
<ENG><TBL><BRK/>
<THD><HL4>Physical Properties of Cement-Based Repair Materials</HL4><BRK/>
<BRK/>
    Property                    Test method      Criteria<BRK/></THD>
<BRK/>
    Tensile Strength (28 days)   <RID>COE CRD-C 164</RID>   400 psi (minimum)<BRK/>
<BRK/>
    Modulus of Elasticity        <RID>ASTM C 469</RID>      3,500,000 psi<BRK/>
                                                             (maximum)<BRK/>
    Coefficient of Thermal<BRK/>
     Expansion                   <RID>COE CRD-C 39</RID>   6.7 millionths/degree F<BRK/>
                                                  (maximum)<BRK/>
    Drying Shrinkage             <RID>ASTM C 157/C 157M</RID><BRK/>
     (28 days)                   (modified)      400 millionths (maximum)<BRK/>
     (1 year)                                    1,000 millionths (maximum)<BRK/>
<BRK/>
    Restrained Shrinkage         <RID>AASHTO T 334</RID><BRK/>
     Cracking                                    No cracks within 14 days,<BRK/>
    Implied strain at 1 year                     1,000 millionths<BRK/>
                                                  (maximum)<BRK/></TBL>
</ENG><BRK/>
<TXT>Notes on Table: </TXT><BRK/>
<BRK/>
<LST>a.  <RID>ASTM C 157/C 157M</RID> (modified).  The modifications to the test method for this requirement are as follows:</LST><BRK/>
<BRK/>
<ITM>(1)  Standard specimen size is<MET> 76x76x275 mm</MET><ENG> 3x3x11-1/4 inch</ENG> for concrete mortar expanded with 
aggregate and mortar.</ITM><BRK/>
<BRK/>
<ITM>(2)  Remove sample from mold at 23 plus or minus 1/2 hours and make initial comparator reading 
immediately.  (For rapid hardening materials, remove sample from mold at 3 hours and make initial 
comparator reading.)</ITM><BRK/>
<BRK/>
<ITM>(3)  The specimens are then stored under the standard conditions at<MET> 23.0 <HL1>+</HL1> 2 degree C</MET><ENG> 73.4 plus 
or minus 3 degrees F</ENG> and 50 plus or minus 4% RH.</ITM><BRK/>
<BRK/>
<LST>Subsequent comparator readings are to be taken at ages of 3 days, 7 days, 14 days, 1 month, 2 months; 
measurements shall continue until 90% of ultimate drying shrinkage is reached.  Ultimate shrinkage is 
to be determined as described in <RID>ASTM C 596</RID>.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Work Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit the proposed methods for constructing or repairing each type of concrete section.  
The plan shall include, but shall not be limited to, repair materials to be used with specific 
information on products and/or constituents, and requirements for handling, storage, etc., equipment 
to be used, surface preparation, and requirements for placement, finishing, curing and protection 
specific to the materials used</ITM><BRK/>
<BRK/>
<ITM><SUB>Demolition Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit the procedures proposed for the accomplishment of the demolition and removal work.  
The procedures shall provide for safe conduct of the work, including procedures and methods 
to provide necessary supports, lateral bracing and shoring when required, careful removal and 
disposition of materials specified to be salvaged, protection of property which is to remain 
undisturbed, coordination with other work in progress, and timely disconnection of utility services.  
The procedures shall include a detailed description of the methods and equipment to be used 
for each operation, and the sequence of operations in accordance with <RID>EM 385-1-1</RID>.  Where applicable, 
the plan shall include drilling patterns and means of controlling crack propagation.  The work 
plan shall also include an access plan for personnel; [a Lead Protection Plan]; and method of 
controlling, collecting, and removing debris.</ITM><BRK/>
<BRK/>
<TAI OPT="CONTROLLED BLASTING"><ITM><SUB>Blasting Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit a detailed plan for blasting, safety, and traffic controls for approval at least [30][60] 
days prior to performance of any blasting.  Submit a detailed blasting plan for each individual 
blast for approval at least 24 hours prior to drilling for the blast.  The blasting plan shall 
state location, number of holes, size, depth, spacing, loading of individual holes, type of 
explosives, time delay sequences, and seismographic monitoring to performed.  The plan shall 
also address coordination with highway, railroad and river traffic, project personnel and the 
public as applicable.</ITM></TAI><BRK/>
<BRK/>
<ITM><SUB>Water Control Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit a detailed plan for collection, treatment and disposal of wastewater from drilling, 
sawing and other concrete removal operations at least [30][60] days prior to performance of 
any operations that produce wastewater.  The plan shall include copies of required permits or 
other evidence of compliance with applicable Federal, State and local laws and regulations.</ITM><BRK/>
<BRK/>
<TAI OPT="PRECAST CONCRETE"><ITM><SUB>Erection Plan for Precast Units</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit a detailed erection plan at least [30][60] days prior to the date that erection of 
precast units is to begin.  This plan shall be in sufficient detail so that adequacy of equipment, 
techniques and accessories can be determined and comments offered.  The plan shall include design 
calculations for loading and deflection on the precast units.  Acceptance of the Contractor's 
erection plan shall not relieve the Contractor of his responsibility for erecting the precast 
units into position as required by the contract drawings, and these specifications.  The plan 
shall include the procedure of placing the infill concrete, including the positioning of hoppers 
and chutes, and all forming techniques to be employed.</ITM><BRK/>
<BRK/></TAI>
<TAI OPT="PRECAST CONCRETE"><ITM><SUB>Alignment Plan for Precast Units</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit a detailed plan for aligning precast units to the alignment and profile indicated on 
the contract drawings.  Identify all safety and quality control aspects for performing this 
alignment operation.  Submit with the erection plan.</ITM></TAI><BRK/>
<BRK/>
<ITM><SUB>Contractor Qualifications</SUB></ITM><BRK/>
<ITM><SUB>Worker Qualifications</SUB></ITM><BRK/>
<TAI OPT="CONTROLLED BLASTING"><ITM><SUB>Blasting Personnel Qualifications</SUB></ITM></TAI><BRK/>
<BRK/>
<ITM>  Submit Information, including name, dollar value, date, and point-of-contact for similar projects 
which demonstrates the required experience and/or training.  Submit resumes, pertinent information, 
past experience, training, and education of all operators of specialized demolition equipment.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Rapid-Hardening Repair Material</SUB></ITM><BRK/>
<ITM><SUB>Polymer Modifier</SUB></ITM><BRK/>
<ITM><SUB>Latex Bonding Compound</SUB></ITM><BRK/>
<ITM><SUB>Polyurethane Injection Adhesive</SUB></ITM><BRK/>
<ITM><SUB>Polyester Resin Grout</SUB></ITM><BRK/>
<ITM><SUB>Epoxy Resin Materials</SUB></ITM><BRK/>
<ITM><SUB>Bond Breaker</SUB></ITM><BRK/>
<ITM><SUB>Fiber Reinforcement</SUB></ITM><BRK/>
<TAI OPT="PRECAST CONCRETE"><ITM><SUB>Neoprene Bearing Pads for Precast Units</SUB>; <SUB>[  ], [  ]</SUB></ITM></TAI><BRK/>
<ITM><SUB>Mechanical Anchors</SUB></ITM><BRK/>
<ITM><SUB>High Molecular Weight Methacrylate (HMWM) Sealer</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit manufacturer's literature from suppliers that demonstrates compliance with applicable 
specifications for the above materials.  For proportioned materials, submit three copies of 
the proposed mix design prior to placement.  The mix design shall indicate the weight of each 
ingredient of the mixture.  No concrete shall be placed prior to approval of the proposed mix 
design.  No deviation from the approved job-mix formula will be permitted without prior approval.</ITM><BRK/>
<BRK/>
<ITM><SUB>Testing Technicians</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit statements that the concrete testing technicians meet the specified requirements.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Field Molded Sealants and Primer</SUB></ITM><BRK/>
<BRK/>
<ITM>  Provide<MET> four liters</MET><ENG> one gallon</ENG> of field-molded sealant and<MET> 1 L</MET><ENG> one quart</ENG> of primer (when primer 
is recommended by the sealant manufacturer) for testing.</ITM><BRK/>
<BRK/>
<ITM>[<SUB>Epoxy-Coated SteelBars</SUB></ITM><BRK/>
<BRK/>
<ITM>  Sample of coating material and<MET> 700 g</MET><ENG> 1.5 pounds</ENG> of patching material shall be submitted with 
the delivery of the bars.]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Repair material mixture proportioning</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit mixture proportioning and test results.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Test reports should be required unless the repairs are considered minor 
and non-critical, in which case manufacturer's certificates could be accepted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM><SUB>Compression Seals and Lubricant</SUB></ITM><BRK/>
<ITM><SUB>Cement-Based Concrete</SUB></ITM><BRK/>
<ITM><SUB>Cement-Based Mortar</SUB></ITM><BRK/>
<ITM><SUB>Rapid-Hardening Repair Material</SUB>.</ITM><BRK/>
<ITM><SUB>Dry-Pack Mortar</SUB>.</ITM><BRK/>
<ITM><SUB>Polymer-Modified Concrete</SUB></ITM><BRK/>
<ITM><SUB>Polymer-Modified Mortar</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit copies of test results, within [24] [_____] hours of physical completion of laboratory 
testing.  Manufacturer's certifications may be submitted rather than laboratory test results 
for proposed materials.  Certificates should certify compliance with the appropriate specification 
referenced herein.  Do not place materials without prior approval from the Contracting Officer.</ITM><BRK/>
<TAI OPT="CRACK REPAIR"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following submittal on projects involving injection grouting 
of cracks, and other projects where the total surface area of the structure 
to be repaired exceeds 2 square meters (20 square feet).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>  Sieve analysis test for <SUB>aggregate</SUB></ITM><BRK/>
<ITM><SUB>Epoxy resin binder</SUB> tests</ITM><BRK/>
<ITM><SUB>Epoxy resin grout</SUB> tests</ITM></TAI><BRK/>
<BRK/>
<TAI OPT="CONTROLLED BLASTING"><ITM><SUB>Seismographic Monitoring Records</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit records of seismographic monitoring of blasting within 48 hours of blasting.  Provide 
permanent records of seismological measurement of vibrations in the structure caused by the 
blast. The record shall contain the following minimum data:</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(1)  Date and time of blast.</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(2)  Location of seismological instruments, manufacture and model No.</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(3)  Velocity measured in<MET> mm</MET><ENG> inches</ENG> per second in vertical, longitudinal, and transverse directions.</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(4)  Displacement measured in<MET> mm</MET><ENG> inches</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(5)  Acceleration measured in<MET> mm</MET><ENG> inches</ENG> per second squared.</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(6)  Energy ratio computation.</ITM><BRK/>
<BRK/>
<ITM INDENT="0.50">(7)  Peak particle velocity.</ITM></TAI><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM>  Submit manufacturer's certifications in lieu of laboratory test results for proposed materials.  
Certificates should certify compliance with the appropriate specification referenced herein.  
Do not place materials without prior approval from the Contracting Officer.</ITM><BRK/>
<BRK/>
<ITM><SUB>Grout Fluidifier</SUB></ITM><BRK/>
<ITM><SUB>Aggregate</SUB></ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this submittal on small repair projects, not requiring injection 
grouting of cracks, whose total surface area to be repaired does not exceed 
2 square meters (20 square feet).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM><SUB>Epoxy Resin Binder</SUB></ITM><BRK/>
<ITM><SUB>Epoxy Grout</SUB></ITM><BRK/>
<ITM>[<SUB>Epoxy-Coated Steel Bars</SUB></ITM><BRK/>
<BRK/>
<ITM>  Written certification for coating material and coated bars shall be submitted with the delivery 
of the bars.]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Polymer-Modified Mortar</SUB></ITM><BRK/>
<ITM><SUB>Polymer-Modified Concrete</SUB></ITM><BRK/>
<ITM><SUB>Polymer Modifier</SUB></ITM><BRK/>
<ITM><SUB>Epoxy Concrete</SUB></ITM><BRK/>
<ITM><SUB>Epoxy Mortar</SUB></ITM><BRK/>
<ITM><SUB>Epoxy Grout</SUB></ITM><BRK/>
<TAI OPT="CRACK REPAIR"><ITM><SUB>Epoxy Injection Adhesive</SUB></ITM></TAI><BRK/>
<ITM><SUB>Rapid-Hardening Repair Material</SUB></ITM><BRK/>
<TAI OPT="CRACK REPAIR"><ITM><SUB>Polyurethane Injection Adhesive</SUB></ITM></TAI><BRK/>
<ITM><SUB>High Molecular Weight Methacrylate (HMWM) Sealer</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit manufacturer's written mixing, application and curing instructions for each type of 
material.</ITM><BRK/>
<ITM><SUB>Manufacturer's Material Safety Data Sheets</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit manufacturer's Material Safety Data Sheets for epoxies, polyurethanes, and other potentially 
hazardous materials.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Qualifications</TTL><BRK/>
<BRK/>
<TXT>Submit Contractor qualifications and worker qualifications for approval in accordance with paragraph SUBMITTALS.  
The submittals shall, where applicable, identify individuals who will be working on this contract and their relevant 
experience.  Do not make changes in approved personnel without prior approval of the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.1.1   <SUB>Contractor Qualifications</SUB></TTL><BRK/>
<BRK/>
<TXT>The Contractor performing the repair work shall have been involved in a minimum of [three] [_____] concrete repair 
projects similar in size and scope to this project for at least [five] [_____] years.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.1.2   <SUB>Worker Qualifications</SUB></TTL><BRK/>
<BRK/>
<TXT>Each worker engaged in the use of specialized removal or application equipment, including [saw operators,] [milling 
machine operators,] [hydromilling equipment operators,] <TAI OPT="CRACK REPAIR">[epoxy] [polyurethane] injection process, </TAI>shall have 
satisfactorily completed an instruction program in the operation of the equipment.  <TAI OPT="CRACK REPAIR">[The instruction program 
for workers engaged in the use of grout injection equipment shall have included theory on the nature and causes 
of cracking in concrete, methods for permanently repairing damaged structural members, the technical aspects 
of correct material selection and use, and the operation, maintenance, and troubleshooting of equipment used 
in the repair work.]</TAI>  Each worker engaged in the operation of specialized equipment for the contract work shall 
have a minimum of three years of experience in the operation of the equipment.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CONTROLLED BLASTING"><SPT><TTL>1.6.1.3   <SUB>Blasting Personnel Qualifications</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide a Blasting Engineer to supervise the overall job and a Blasting Foreman for each shift that blasting 
will occur.  The Blasting Engineer shall be experienced in the supervision of controlled blasting operations 
and shall be responsible for the drilling plan, supervising blasting operations, and maintaining required records.  
The Blasting Engineer does not need to be at the site for the entire blasting operation.  The Blasting Engineer 
and Blasting Foreman shall have a minimum of 10 years experience in controlled blasting.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>1.6.1.4   Quality Control Personnel Qualifications</TTL><BRK/>
<BRK/>
<TXT>The individuals who sample and test concrete as required in this specification shall have demonstrated a knowledge 
and ability to perform the necessary test procedures equivalent to the ACI minimum guidelines for certification 
of Concrete Field <SUB>Testing Technicians</SUB>, Grade I.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.2   Regulatory Requirements</TTL><BRK/>
<BRK/>
<TXT>Perform all work in accordance with applicable Federal, State and local safety, health and environmental requirements, 
and <RID>EM 385-1-1</RID>.  The Contractor shall be responsible for obtaining all permits required by Federal, State and 
local agencies for the performance of the work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3   Pre-Construction Conference</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Appropriate technical representatives for specialized repair materials 
should be required to meet with the Government and Contractor representatives 
to ensure that all parties involved are knowledgeable of the material properties 
and application requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor shall arrange a pre-constructino conference for [the repair materials] [    ] to ensure that the 
Contractor personnel understand all aspects of the repair material, its properties and application procedures.  
The conference shall include the Contracting Officer or authorized representative, the Contractor, and a competent 
Technical Representative of the material manufacturer.  The Technical Representative shall be fully qualified 
to perform the work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.4   <SUB>Repair Material Mixture Proportioning</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit, at least 15 days before work commences, a repair material mixture proportioning for each use of [<SUB>polymer-modified 
mortar</SUB>] [<SUB>polymer-modified concrete</SUB>] [<SUB>dry-pack mortar</SUB>].  Test reports shall accompany the mixture proportions.  
Identify the proposed source of the materials and state the proportions of each constituent.  When determining 
the mixture design, use samples of materials to be used on the job.</TXT><BRK/>
<BRK/>
<LST>a.  Trial batches:  Trial batches and testing requirements for various repair materials specified shall 
be the responsibility of the Contractor.  The laboratory performing the tests shall be on site and shall 
conform to <RID>ASTM C 1077</RID>.  Samples of aggregates shall be obtained in accordance with the requirements 
of <RID>ASTM D 75</RID>.  Samples of materials other than aggregate shall be representative of those proposed for 
the project and shall be accompanied by the manufacturer's test reports indicating compliance with applicable 
specified requirements.  Trial mixtures having proportions, consistencies, and air content suitable for 
the work shall be made based on methodology described in <RID>ACI 211.1</RID>, which will produce a range of strength 
encompassing those required for the work.  The maximum water-cementitious materials ratios required in 
Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE 
FOR CIVIL WORKS][<SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE], paragraph MAXIMUM WATER-CEMENTITIOUS 
MATERIALS RATIO will be converted to a weight ratio of water to cementitious materials.</LST><BRK/>
<BRK/>
<LST>b.  Supporting criteria:  Include in the submittal the following data for each trial batch:</LST><BRK/>
<BRK/>
<ITM>(1)  Proportions by weight</ITM><BRK/>
<BRK/>
<ITM>(2)  Unit weights and specific gravities of constituents </ITM><BRK/>
<BRK/>
<ITM>(3)  Batch weights</ITM><BRK/>
<BRK/>
<ITM>(4)  Compressive strengths in accordance with the following:</ITM><BRK/>
<TBL><BRK/>
<THD>  Material                  Specimen Size                     Test</THD><BRK/>
<BRK/>
  Concrete         <MET>150 by 300 mm</MET><ENG> 6 by 12 inch</ENG> cylinders   <RID>ASTM C 39/C 39M</RID><BRK/>
  Mortar           <MET>75 by 150 mm</MET><ENG> 3 by 6 inch</ENG> cylinders     <RID>ASTM C 39/C 39M</RID><BRK/>
  Grout            <MET>50 mm</MET><ENG> 2 inch</ENG>  cube                   <RID>ASTM C 109/C 109M</RID><BRK/></TBL>
<BRK/>
<ITM>(5)  Curing time</ITM><BRK/>
<BRK/>
<ITM>(6)  Working time (polymer-modified materials)</ITM><BRK/>
<BRK/>
<ITM>(7)  Slump</ITM><BRK/>
<BRK/>
<ITM>(8)  Air content</ITM></SPT><BRK/>
<BRK/>
<SPT><TTL>1.6.5   Test Reports</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.5.1   <SUB>Epoxy Resin Binder</SUB></TTL><BRK/>
<BRK/>
<TXT>Include the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Viscosity</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Consistency</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Gel time</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Absorption</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Shrinkage</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Thermal compatibility</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5.2   <SUB>Epoxy Resin Grout</SUB></TTL><BRK/>
<BRK/>
<TXT>Include the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Epoxy number</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Consistency</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Compressive single shear strength</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Pot life</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5.3   [<SUB>Cement-Based Concrete</SUB>] [and] [<SUB>Cement-Based Mortar</SUB>]</TTL><BRK/>
<BRK/>
<TXT>Include the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Initial Slump</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Slump over Time</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Air Content</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Compressive Strength at 7, [14,] 28, 56, [and] [90] days.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Water to cementitious materials ratio</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[f.  Tensile Strength]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[g.  Flexural Strength]</ITM> <BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5.4   [<SUB>Polymer-Modified Concrete</SUB>] [and] [<SUB>Polymer-Modified Mortar</SUB>]</TTL><BRK/>
<BRK/>
<TXT>Include the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Tensile Strength (28 days)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Modulus of Elasticity</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Coefficient of Thermal Expansion</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Drying Shrinkage</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Restrained Shrinkage</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Cracking</ITM> <BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Implied strain at 1 year</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.6   Field Samples</TTL><BRK/>
<BRK/>
<TXT>Prepare a <SUB>work plan</SUB> describing the methods of concrete removal and repair, including methods, equipment and materials 
to be used for each feature.  Submit the work plan for approval at least 30 days prior to the start of the work, 
in accordance with paragraph SUBMITTAL REQUIREMENTS.  The work plan shall include a description of field demonstrations.  
Do not commence work until the work plan and field demonstration representative of the type of work are approved.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.6.1   Concrete Removal</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The size of the removal demonstration area should be sufficient to show 
the proposed methods and the results under typical conditions.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prior to commencement of production concrete removal, perform a test break on an area of [sufficient size] [<MET>3 
m by 3 m</MET><ENG> 10 feet by 10 feet</ENG>] [_____] to demonstrate that the proposed removal procedure will result in compliance 
with the specified requirements.  The test break shall verify [proper spacing of holes and procedure for control 
of crack propagation,] [selection of abrasive materials,] <TAI OPT="CONTROLLED BLASTING">[loading and stemming of charges,] </TAI>and suitability 
of the equipment to remove the existing materials.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR,JOINT RESEALING"><SPT><TTL>1.6.6.2   Joint and Crack Sealing</TTL><BRK/>
<BRK/>
<TXT>Prepare and seal a test section consisting of approximately<MET> [61][_____] meters</MET><ENG> [20][_____] feet</ENG> at a location 
determined by the Contracting Officer to demonstrate the preparatory and application procedures prior to beginning 
production sealing.  Additional test sections may be required by the Contracting Officer.  Remove any material 
that does not comply with the contract requirements and replace at no additional cost to the Government.  Test 
sections that comply with the contract requirements may remain in place and will be included payment for the 
work.  Use the same procedures and materials as used in the successful test section for production work.  [The 
test section may be incorporated in the final work if accepted by the Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="PRECAST CONCRETE"><SPT><TTL>1.6.6.3   Precast Unit Assembly Test</TTL><BRK/>
<BRK/>
<TXT>Perform a demonstration of all methods and techniques to be used for erecting the precast units.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>1.6.6.4   Sample Repair Panels</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit this paragraph as appropriate.  Specify location for all field test 
panels.  Add requirements for mock-ups if applicable.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Construct field test panels prior to beginning of work using the repair materials and procedures proposed for 
use on the job, to demonstrate the results to be attained.  The panel shall contain reinforcing steel and embedded 
items as the production work.  The quality and appearance of each panel shall be subject to the approval of the 
Contracting Officer, and, if not judged satisfactory, additional panels shall be constructed until approval is 
attained.  Formed and finished surfaces in the completed structure shall match the quality and appearance of 
the approved sample repair panel.  <TAI OPT="REFACING">For wall refacing, construct a minimum of one sample panel at least<MET> 1.25 m</MET><ENG>
 4 feet</ENG> by<MET> 1.5 m</MET><ENG> 5 feet</ENG> and the same thickness as the production panel to demonstrate each type of formed and 
unformed finish required.  Each panel shall include a full length and full width joint line.</TAI></TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.7   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<SPT><TTL>1.7.1   Packing, Shipping, Handling, and Unloading</TTL><BRK/>
<BRK/>
<TXT>Inspect materials delivered to site for damage, unload and store with a minimum of handling.  Deliver resin components 
and aggregate materials in original sealed containers where applicable.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.2   Epoxy-Resin Materials</TTL><BRK/>
<BRK/>
<TXT>Deliver epoxy-resin materials to the site in such manner as to avoid damage or loss.  Do not allow epoxy-resin 
materials to freeze.  Storage areas shall be in a windowless and weatherproof, but ventilated, insulated noncombustible 
building, with provision nearby for conditioning the material to<MET> 20 degrees C</MET><ENG> 70 degrees F</ENG> to<MET> 30 degrees C</MET><ENG> 85 
degrees F</ENG> for a period of 48 hours prior to use.  Store epoxy resin components and aggregate materials in dry 
covered areas at temperatures below<MET> 30 degrees C</MET><ENG> 90 degrees F</ENG>.  Remove unused mixed materials that have reached 
end of working or pot life from the job site.  Use epoxy-resin materials before the expiration date marked on 
the packaging.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.3   Polymer Materials</TTL><BRK/>
<BRK/>
<TXT>Storage areas shall be in a windowless and weatherproof, but ventilated, insulated noncombustible building.  
Store polymer materials at temperatures between<MET> 4.4 degrees C</MET><ENG> 40 degrees F</ENG> to<MET> 30 degrees C</MET><ENG> 85 degrees F</ENG>.  Do 
not allow polymer materials to freeze.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.4   Chemical Admixtures</TTL><BRK/>
<BRK/>
<TXT>Protect chemical admixtures and store and maintain between<MET> 5 degrees C</MET><ENG> 40 degrees F</ENG> to<MET> 30 degrees C</MET><ENG> 90 degrees 
F</ENG>.  Remove from the site any admixtures subjected to temperatures outside this range, or stored for longer than 
recommended by the manufacturer.  Do not use any admixture that has been in storage for longer than recommended 
by the manufacturer or that has been subjected to freezing in the work.  Remove such materials from the site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.5   Waste Management and Disposal</TTL><BRK/>
<BRK/>
<TXT>Prepare a <SUB>water control plan</SUB> to describe methods and equipment to be used for controlling, collecting and disposing 
of wastewater from the construction operations.  Unless otherwise specified, do not permit concrete and other 
debris to drop into the [water] [_____].  Collect concrete and/or debris and retain near to its point of removal.  
Describe the method of debris control and removal in the <SUB>demolition plan</SUB>.  The method of debris control and removal 
must be approved by the Contracting Officer.  Dispose of debris in accordance with Section <SRF>01 74 19</SRF> CONSTRUCTION 
AND DEMOLITION WASTE MANAGEMENT.  Remove all concrete which falls into the [water] [_____] at no additional cost 
to the Government.  [Do not permit waste water from surface preparation, cleaning, drilling and cutting operations 
to directly enter the [water] [_____].  Collect wastewater and treat in accordance with Section 
<SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.8   PROJECT/SITE CONDITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.1   Environmental Requirements</TTL> <BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The maximum placement temperature is a function of the humidity in accordance 
with EM 1110-2-2000 (Table 8-2) for thin repairs or the mass of the placement 
for larger repairs.  Limitations if ready-mix concrete is specified must also 
be considered </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Do not place repair materials when weather conditions detrimentally affect the quality of the finished product.  
Do not place cement-based repair materials when the air temperature is below<MET> 5 degrees C</MET><ENG> 40 degrees F</ENG> in the 
shade.  When air temperature is likely to exceed<MET> 35 degrees C</MET><ENG> 90 degrees F</ENG>, the cement-based repair material 
shall have a temperature not exceeding<MET> 35 degrees C</MET><ENG> 90 degrees F</ENG> when deposited, and the surface of such placed 
cement-based repair material shall be kept damp with a water fog until the approved curing medium is applied.  
Do not place polymer-modified repair materials when the air temperature is below<MET> 7 degrees C</MET><ENG> 45 degrees F</ENG> or 
above<MET> 30 degrees C</MET><ENG> 85 degrees F</ENG> unless approved by the polymer manufacturer.  <TAI OPT="CRACK REPAIR,JOINT RESEALING">Do not place sealant in joints 
or cracks when the temperature is below<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG>.  </TAI>Placement restrictions for other materials 
shall be in accordance with the manufacturer's published literature.  Halt work when weather conditions are potentially 
detrimental to the quality of repairing or bonding concrete.  Apply epoxy resin materials only when the contact 
surfaces are completely dry and if the ambient and surface temperature ranges are suitable for the specified 
epoxy material.  Follow manufacturer's instructions for weather conditions and temperature ranges.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.2   Existing Conditions</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.2.1   Concrete Test Data</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Test information and evaluation reports should be included with the contract 
package if applicable.  When a substantial amount of information is available, 
a summary of pertinent information should be included and the remaining information 
should be made available for review.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The existing concrete has been evaluated by means of [core drilling and destructive testing] [petrographic examination] 
[determination of rebound number] [determination of penetration resistance] [ultrasonic pulse-velocity evaluation].  
The results of the evaluation are [given in [_____]] [available for review at [_____]].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.2.2   Concrete Core(s)</TTL><BRK/>
<BRK/>
<TXT>Concrete core(s) obtained from the structure, which was (were) not destroyed by testing, is (are) available for 
viewing at [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.2.3   Embedded Materials</TTL><BRK/>
<BRK/>
<TXT>The contract drawings and reference drawings do not constitute a complete description of all metal parts and 
other materials that may be encountered, but represent the best information available to the Government.  Other 
items, or different locations for items shown, may exist.  Exercise care to avoid drilling through functional 
embedded items intended to remain in service.   The Contractor's selection of equipment and methods shall consider 
the presence of such materials, and the Government will not be responsible in any way for the effect of such 
items on the Contractor's equipment or progress.  Where indicated, remove existing metal items to the limits 
noted on drawings.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.9   SEQUENCING AND SCHEDULING</TTL><BRK/>
<BRK/>
<TXT>Unless otherwise specified, perform the work in such sequence that new work does not damage previously completed 
work.  Do not perform concrete removal and other operations which cause vibrations within<MET> [15] [_____] m</MET><ENG> [50] 
[_____] feet</ENG> of repair materials that have cured less than 24 hours.  Provide protective measures as required 
to protect completed work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.10   CONSTRUCTION TOLERANCES</TTL><BRK/>
<BRK/>
<SPT><TTL>1.10.1   Concrete Removal</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  One-inch tolerance is suitable for concrete removal over six inches deep.  
For thinner repairs, a tighter tolerance would be more appropriate.  The methods 
of removal should also be considered.  The relative costs of achieving closer 
tolerance should be weighed against the anticipated benefits.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Remove concrete to the lines of removal indicated on the contract drawings.  A tolerance of plus or minus [<MET>25 
mm</MET><ENG> 1 inch</ENG>] [<MET>13 mm</MET><ENG> 1/2 inch</ENG>] will be allowed about the lines indicated [except in the thin wall areas where no 
removal beyond that indicated will be permitted].  Concrete removals that vary by more than the indicated tolerance 
will be acceptable, unless evidence indicates that deteriorated concrete is still present or the variation in 
tolerance results in a violation of the requirements for material placement, in which case removal shall continue 
to the lines indicated.  Additional concrete removal beyond the allowable tolerance will be acceptable when deteriorated 
concrete is found as determined in accordance with paragraph Determination of Removal Limits, and the limits 
of such removal are set and approved by the Contracting Officer.  Unauthorized concrete removals in excess of<MET>
 25 mm</MET><ENG> 1 inch</ENG> beyond the lines shown will not be acceptable, and repair of such excess area shall be performed 
by the Contractor to the satisfaction of the Contracting Officer and at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.10.2   Repair Materials and Products</TTL><BRK/>
<BRK/>
<TXT>Place repair materials to the lines indicated on the drawings.  Construction tolerances for concrete and mortar 
repair materials shall meet the requirements of <RID>ACI 117</RID>.  <TAI OPT="PRECAST CONCRETE">Construction tolerances for erection of precast concrete 
units shall meet the requirements of <RID>PCI MNL-116</RID>.</TAI></TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.11   FIELD MEASUREMENTS</TTL> <BRK/>
<BRK/>
<SPT><TTL>1.11.1   Measurement of Vertical Concrete Removal</TTL><BRK/>
<BRK/>
<TXT>Determine the volume of vertical concrete removal from cross sections made prior to and after removal.  Make 
cross sections from surveyed measurements [on a<MET> 1.5 by 1.5 meter</MET><ENG> 5 by 5 foot</ENG> grid system][at a minimum of 20 
points], unless otherwise specified by the Contracting Officer.  Take initial survey of the existing surface 
prior to removal, and take final surveys on the same control stations.  Calculate volumes by the average-end-area 
method using the cross sections surveyed, unless otherwise specified.  For areas of vertical concrete removal 
which are not readily accessible for survey,  determine the volume of concrete from the neat lines of concrete 
removal as shown on the contract drawings, with the approval of the Contracting Officer,.  Do not include any 
volume of concrete removal made beyond the allowable tolerances specified in paragraph CONSTRUCTION TOLERANCES.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.11.2   Measurement of Horizontal Concrete Removal</TTL><BRK/>
<BRK/>
<TXT>Determine volumes of horizontal concrete removal from cross sections made prior to and after removal.  Make cross 
sections from surveyed measurements [on a<MET> 3 by 3 meter</MET><ENG> 10 by 10 foot</ENG> grid system][at a minimum of 20 points], 
unless otherwise specified by the Contracting Officer.  Take initial survey of the existing surface prior to 
removal,  and take final cross sections at the same control stations.  Calculate volumes by the average-end-area 
method using the cross sections surveyed, unless otherwise specified.  Do not include any volume of concrete 
removal made beyond the allowable tolerances specified in paragraph CONSTRUCTION TOLERANCES. </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.11.3   Measurements of Concrete</TTL><BRK/>
<BRK/>
<TXT>For areas that are readily accessible by a survey crew, determine volumes by cross sections of the areas prior 
to and after concrete placement.  Take the initial and final cross sections at the same control stations used 
for concrete removal where possible.  Calculate volumes by the average-end-area method using the cross sections 
surveyed, unless otherwise specified.  For areas of concrete placement which are not readily accessible for survey, 
determine the volume of concrete from the neat lines of concrete placement as shown on the contract drawings.  
Do not include any volume of concrete placed to compensate for removal made beyond the allowable tolerances specified 
in paragraph CONSTRUCTION TOLERANCES.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.12   RELATED WORK SPECIFIED ELSEWHERE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.12.1   Formwork</TTL><BRK/>
<BRK/>
<TXT>Formwork shall conform to the requirements of Section <SRF>03 11 14.00 10</SRF> FORMWORK FOR CONCRETE.  Do not use form 
oil with epoxy or polymer-modified repair materials.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.12.2   Reinforcing Steel</TTL><BRK/>
<BRK/>
<TXT>Reinforcing Steel shall conform to the requirements of Section <SRF>03 20 02</SRF> STEEL BARS AND WELDED WIRE FABRIC FOR 
CONCRETE REINFORCEMENT FOR CIVIL WORKS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.12.3   Field-Molded Sealants</TTL><BRK/>
<BRK/>
<TXT>Field-molded sealants shall conform to the requirements of Section <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION AND 
CONSTRUCTION JOINTS IN CONCRETE FOR CIVIL WORKS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.12.4   Compression Seals</TTL><BRK/>
<BRK/>
<TXT>Compression seals shall conform to the requirements of Section <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION AND CONSTRUCTION 
JOINTS IN CONCRETE FOR CIVIL WORKS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.12.5   Concrete</TTL><BRK/>
<BRK/>
<TXT>Unless otherwise specified, concrete shall conform to the requirements of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE 
STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS 
CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.12.6   Shotcrete</TTL><BRK/>
<BRK/>
<TXT>Shotcrete shall conform to the requirements of Section <SRF>03 37 13</SRF> SHOTCRETE.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.12.7   Preplaced-Aggregate Concrete</TTL><BRK/>
<BRK/>
<TXT>Preplaced-aggregate concrete shall conform to the requirements of Section <SRF>03 37 00</SRF> PREPLACED-AGGREGATE CONCRETE.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="PRECAST CONCRETE"><SPT><TTL>1.12.8   Precast Concrete</TTL><BRK/>
<BRK/>
<TXT>Precast concrete shall conform to the requirements of Section <SRF>03 45 33</SRF> PRECAST [PRESTRESSED] STRUCTURAL CONCRETE.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>1.12.9   Disposal of Waste Materials</TTL><BRK/>
<BRK/>
<TXT>Dispose waste materials in accordance with the requirements of Section <SRF>01 74 19</SRF> CONSTRUCTION AND DEMOLITION WASTE 
MANAGEMENT.  Dispose of waste water in accordance with <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.13   SAFETY</TTL><BRK/>
<BRK/>
<TXT>Perform all work performed in accordance with <RID>EM 385-1-1</RID>.  To protect personnel from overexposure to toxic materials, 
conform to the applicable <SUB>manufacturer's Material Safety Data Sheets</SUB> (MSDS) or local regulation.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Material selection, including type of cement and other cementitious materials, 
aggregates and admixtures should be in accordance with  EM 1110-2-2000 and EM 
1110-2-2002.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.1.1   Cement-Based Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  See the appropriate concrete aggregates design memorandum or thermal 
study to select the proper requirements for cementitious materials options, 
pozzolan, and silica fume and insert in the referenced sections as applicable.  
Determination of the type of cement, including optional physical and chemical 
requirements, must be based on consideration of environmental exposure, material 
reactivity and heat of hydration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cementitious materials shall meet the requirements specified in Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL 
CONCRETE][ <SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][<SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE 
CONCRETE].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1.1   <SUB>Rapid-Hardening Repair Material</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  ASTM C 928/C 928M does not provide requirements for for freeze-thaw durability, 
for sulphate exposure or alkali reactivity.  These materials should be used 
only when the properties are needed, and then only when a service record for 
the proposed material, in the same environment, is available or when Government 
testing is performed.  Use the bracketed requirements when necessary for the 
exposure.  See Table 1 in ASTM C 928 for properties of Type R1, R2 and R3.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepackaged or site-mixed material: <RID>ASTM C 928/C 928M</RID>, Type [R1] [R2] [R3], [with Durability Factor of 50 or 
more when subjected to freezing and thawing in accordance with <RID>ASTM C 666/C 666M</RID>, Procedure A] [and] [length 
change of not more than [ ]% when tested for sulfate expansion in accordance with <RID>ASTM C 1012</RID>].  Use bonding 
agent as recommended by the manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.2   Ultra-fine Cement</TTL><BRK/>
<BRK/>
<TXT>Maximum particle size shall be less than 10 microns.  The ultra-fine cement shall contain a dispersing agent.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.2   Admixtures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  High-range water reducers are only appropriate for high slump (150 mm+ 
(6"+)) mixtures.  Accelerating or retarding admixtures should not be used unless 
specific project requirements justify their use.  Accelerators may promote more 
cracking, and the retarder may make the concrete susceptible to damage, settlement, 
etc.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Admixtures to be used, when required or permitted, shall conform to the appropriate specification listed.  Admixtures 
shall meet the requirements specified in Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][
<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][<SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE].  <SUB>
Grout Fluidifier</SUB> shall conform to <RID>ASTM C 937</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   <SUB>Aggregate</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Aggregate quality requirements shall be selected based on exposure and 
environmental conditions, and shall consider quality issues and potential material 
reactivity for the locality where the work is to be performed.</NPR><BRK/>
<BRK/>
<NPR>The maximum practical size of coarse aggregate should be used.  The maximum 
size aggregate should be based on depth of concrete removal, as well as reinforcing 
and form clearances.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Aggregates shall meet the quality and grading requirements of [<RID>ASTM C 33</RID> Class Designations 4M or better] [or] 
[state highway department specification] and the following specific requirements.  For material passing No. 200 
sieve provide a non-plastic material composed of a minimum of 75 percent limestone dust, talc or silica inert 
filler.  Provide dry aggregate.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  For epoxy concrete:  <RID>ASTM C 33</RID>, [maximum size [_____] [<MET>13 mm</MET><ENG> 1/2 inch</ENG>]].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  For epoxy mortar:  <RID>ASTM C 144</RID>, [maximum size [_____] [<MET>mm</MET><ENG> inch</ENG>] [No. 8 sieve] [No. 40 sieve] 
[[_____] sieve]].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  For dry-pack mortar:  <RID>ASTM C 144</RID>, maximum size No. 16 sieve</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  For polymer-modified concrete: <RID>ASTM C 33</RID>, Size No. 8.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  For polymer-modified mortar: <RID>ASTM C 144</RID>, [maximum size [_____] [<MET>mm</MET><ENG> inch</ENG>] [No. 8 sieve] [No. 
40 sieve] [[_____] sieve]].</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.4   Water</TTL><BRK/>
<BRK/>
<TXT>Water for cleaning, mixing and curing shall be fresh, clean, potable, and free of injurious amounts of oil, acid, 
salt, or alkali, except that non-potable water may be used if it meets the requirements of <RID>COE CRD-C 400</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   <SUB>Fiber Reinforcement</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For nominal maximum aggregate size less than 40 mm (1-1/2 inch), consider 
using fibers which are slightly larger than the maximum aggregate size.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Fiber reinforcement shall be fibrillated polyolefin fiber made from virgin polypropylene meeting the requirements 
for Type III fibers in accordance with <RID>ASTM C 1116/C 1116M</RID>.][Fiber reinforcement shall be steel deformed type 
meeting the requirements of <RID>ASTM A 820/A 820M</RID>, Type I or II.  The aspect ratio (length divided by diameter or 
equivalent diameter) of the fibers shall be between 45 and 100.]  Length of fibers shall be<MET> 40 mm</MET><ENG> 1-1/2 inch</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6   Polymer Materials</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.6.1   <SUB>Polymer Modifier</SUB> for Concrete or Mortar</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 1438</RID>, Type II.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR"><SPT><TTL>2.1.6.2   <SUB>Polyurethane Injection Adhesive</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Polyurethane injection adhesive is intended for sealing non-structural 
cracks.  Polyurethane injection adhesive is not intended for, and should not 
be used for, structural repairs.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Two part system composed of polyurethane resin and water.  Polyurethane resin shall be 100% hydrophilic resin, 
capable of forming either a flexible closed-cell foam or cured gel when mixed with water.  When mixed with water, 
the resin shall meet the following requirements.</TXT><BRK/>
<BRK/>
<MET><TBL><THD><HL4>Performance Criteria<BRK/>
Properties of the Cured Polyurethane Injection Grout</HL4><BRK/>
<BRK/>
    Property                   Test Method               Criteria</THD><BRK/>
<BRK/>
    Tensile Strength           <RID>ASTM D 1623</RID>   138 kPa (minimum)<BRK/>
    Elongation                 <RID>ASTM D 1623</RID>   400% (minimum)<BRK/>
    Bond to Concrete (wet)     <RID>ASTM C 273/C 273M</RID>    138 kPa (minimum)<BRK/>
   </TBL></MET><BRK/>
<ENG><TBL><THD><HL4>Performance Criteria<BRK/>
Properties of the Cured Polyurethane Injection Grout</HL4><BRK/>
<BRK/>
    Property                   Test Method               Criteria</THD><BRK/>
<BRK/>
    Tensile Strength           <RID>ASTM D 1623</RID>   20 psi (minimum)<BRK/>
    Elongation                 <RID>ASTM D 1623</RID>   400% (minimum)<BRK/>
    Bond to Concrete (wet)     <RID>ASTM C 273/C 273M</RID>    20 psi (minimum)<BRK/></TBL>
</ENG><BRK/></SPT>
</TAI><SPT><TTL>2.1.6.3   <SUB>Polyester Resin Grout</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Polyester resin grout should not be used for anchors installed in wet 
holes unless the two-step procedure specified in paragraph ANCHORING AND REINFORCING 
is used.  Single stage grouting can be accomplished with polyester resin grout 
by using fast setting resin grout cartridges or capsules in the bond zone and 
slower setting resin grout in the free stressing zone.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Polyester resin grout consisting of high strength, unsaturated polyester resin filled with nonreactive, inorganic 
aggregate and a separated catalyst contained in a cartridge of polyester film or glass capsule.  Gel time and 
cure time shall be appropriate for the installation procedures.  The polyester resin grout shall have the following 
minimum properties:</TXT><BRK/>
<BRK/>
<LST>Compressive Strength - <MET>83 MPa</MET><ENG> 12000 psi</ENG>.<BRK/>
Tensile Strength - <MET>27.6 MPa</MET><ENG> 4000 psi</ENG>.<BRK/>
Shear Strength - <MET>20.7 MPa</MET><ENG> 3000 psi</ENG>.</LST><BRK/>
<BRK/>
<TXT>Do not use resin cartridges or capsules with expired shelf life.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6.4   <SUB>Latex Bonding Compound</SUB></TTL><BRK/>
<BRK/>
<TXT>Latex bonding compound agents for bonding fresh to hardened concrete shall conform to <RID>ASTM C 1059/C 1059M</RID>, Type 
II.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6.5   <SUB>High Molecular Weight Methacrylate (HMWM) Sealer</SUB></TTL><BRK/>
<BRK/>
<TXT>High molecular weight methacrylate shall be a 2-component, rapid curing, solvent-free, penetrating sealer with 
components meeting the following requirements:.  Sand for covering the HMWM shall meet the quality and grading 
requirements of aggregate for masonry mortar in accordance with <RID>ASTM C 144</RID>.</TXT><BRK/>
<BRK/>
<LST>a.  HMWM Monomer.  The monomer shall be a high molecular weight or substituted methacrylate that conforms 
the following properties:</LST><BRK/>
<BRK/>
<MET><TBL><BRK/>
<THD><HL4>Physical Properties of HMWH Monomer</HL4><BRK/>
Property                 Test Method                     Criteria<BRK/></THD>
<BRK/>
Vapor Pressure         <RID>ASTM D 323</RID>          Less than 133 Pa at 25 degrees C<BRK/>
Flash Point            Pensky-Martens CC   Greater than 93 degrees C<BRK/>
Density                                    Greater than 1.0 g per cubic cm<BRK/>
                                            at 25 degrees C<BRK/>
Viscosity              <RID>ASTM D 4016</RID>         .012 <HL1>+</HL1> .004 Pas at 23 degrees C<BRK/>
Index of Refraction                        1.470 <HL1>+</HL1> 0.002<BRK/>
Boiling point @ 133 Pa                     70 degrees C<BRK/>
Shrinkage on cure                          less than 11 %<BRK/>
Glass Transition       <RID>ASTM D 3418</RID>         57.2 degrees C<BRK/>
 Temperature (DSC)<BRK/>
Curing Time                                 Greater than 40 minutes at 25<BRK/>
 (100 g mass)                               degrees C, with 4% cuemene<BRK/>
                                            hydroperoxide<BRK/>
Bond Strength          <RID>ASTM C 882/C 882M</RID>          Greater than 10.3 mPa  <BRK/></TBL>
<BRK/></MET>
<ENG><TBL><BRK/>
<THD><HL4>Physical Properties of HMWH Monomer</HL4><BRK/>
Property                 Test Method                     Criteria<BRK/></THD>
<BRK/>
Vapor Pressure         <RID>ASTM D 323</RID>          Less than 0.02 psi at 77 degrees F<BRK/>
Flash Point            Pensky-Martens CC   Greater than 200 degrees F<BRK/>
Density                                    Greater than 8.4 lb. per gal.<BRK/>
                                            at 77 degrees F<BRK/>
Viscosity            <RID>  ASTM D 4016</RID>         12 plus or minus 4 cps at 73 degrees F<BRK/>
Index of Refraction                        1.470 plus or minus 0.002<BRK/>
Boiling point @ 0.02 psi                   158 degrees F<BRK/>
Shrinkage on cure                          less than 11 %<BRK/>
Glass Transition       <RID>ASTM D 3418</RID>         158 degrees F<BRK/>
 Temperature (DSC)<BRK/>
Curing Time                                 Greater than 40 minutes at 73<BRK/>
 (100 g mass)                               degrees F, with 4% cuemene<BRK/>
                                            hydroperoxide<BRK/>
Bond Strength          <RID>ASTM C 882/C 882M</RID>          Greater than 1,500 psi  <BRK/></TBL>
</ENG><BRK/>
<LST>b.  Initiator/Promoter System</LST><BRK/>
<BRK/>
<ITM>Initiator Cuemene Hydroperoxide     78 percent<BRK/>
Promoter Cobalt Napthenate           6 percent</ITM><BRK/>
<BRK/>
<LST>The initiator/promoter system shall be capable of providing a surface cure time of not less than 40 minutes 
nor more than 3 hours at the surface temperature of the concrete during application.  The initiator/promotor 
system shall be such that the gel time may be adjusted to compensate for changes in temperature that 
may occur throughout the treatment application.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.7   <SUB>Epoxy Resin Materials</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The grades for ASTM C 881/C 881M and classes for both standards are as 
follows:</NPR><BRK/>
<BRK/>
<NPR>1.  Grade 1:  Low viscosity</NPR><BRK/>
<BRK/>
<NPR>2.  Grade 2:  Medium viscosity</NPR><BRK/>
<BRK/>
<NPR>3.  Grade 3:  Non-sagging consistency</NPR><BRK/>
<BRK/>
<NPR>4.  Class B:  For use between 5 and 15 degrees C (40 and 60 degrees F).</NPR><BRK/>
<BRK/>
<NPR>5.  Class C:  For use above 15 degrees C (60 degrees F).</NPR><BRK/>
<BRK/>
<NPR>Epoxy mortars and concrete do not have thermal characteristics compatible with 
portland cement concrete.  This thermal incompatibility should be carefully 
considered before specifying epoxy mortar or concrete for exterior concrete 
surface repairs.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Epoxy compounds for repairs shall be moisture insensitive.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.7.1   <SUB>Epoxy Resin Binder </SUB>for Concrete and Mortar</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 881/C 881M</RID>, Type III, Grade [1] [2], Class [B] [C] without mineral filler.  [For [vertical] [and] [overhead] 
use <RID>ASTM C 881/C 881M</RID>, Type III, Grade 3, Class [B] [C] with filler.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.7.2   Non-Pressure <SUB>Epoxy Grout</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 881/C 881M</RID> Type IV, Grade [2] [3], Class [B] [C] with or without mineral filler.  For setting anchors 
and dowels, use Type III, Grade [2] [3] with mineral filler.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR"><SPT><TTL>2.1.7.3   <SUB>Epoxy Injection Adhesive</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 881/C 881M</RID>, Type IV, Grade 1, Class [B] [C] without filler.  </TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="CRACK REPAIR"><SPT><TTL>2.1.7.4   Crack Surface Sealer for Injection Grouting</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 881/C 881M</RID>, Type IV, Grade 3, Class [B] [C] with mineral filler.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>2.1.7.5   Epoxy Bonding Agent</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 881/C 881M</RID>, Type II or V.  Type II material for non-loadbearing applications.  Type V material for load 
bearing applications.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.8   <SUB>Bond Breaker</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  ASTM D 2822 is an asphalt roofing cement, ASTM D 226 and ASTM D 4869 
are asphalt saturated organic felt.  ASTM D 2103 is polyethylene sheet.  AASHTO 
M 288 is geotextile.  ASTM D 450 is a bituminous coating.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[<RID>ASTM D 2822</RID>], [<RID>ASTM D 4869</RID>], [<RID>ASTM D 226</RID>, Type I] ,<RID>ASTM D 2103</RID>, minimum thickness<MET> 0.25 mm</MET><ENG> 0.010 inch</ENG>, [<RID>AASHTO M 288</RID>
, Erosion Control, Class B], [<RID>ASTM D 450</RID>, Type II].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.9   <SUB>Field-Molded Sealants and Primer</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Verify with ACI 504 that sealants are appropriate for the project requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Sealants and primers shall meet the requirements specified in Section [<SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION 
AND CONSTRUCTION JOINTS IN CONCRETE FOR CIVIL WORKS][<SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.10   High-Strength Steel Bars</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 722/A 722M</RID>, Type [I] [or] [II], meeting all supplementary requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.11   <SUB>Compression Seals and Lubricant</SUB></TTL><BRK/>
<BRK/>
<TXT>Compression seals shall meet the requirements specified in Section <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION AND 
CONSTRUCTION JOINTS IN CONCRETE FOR CIVIL WORKS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.12   <SUB>Epoxy-Coated Steel Bars</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 722/A 722M</RID>, Type [I] [or] [II], conforming to the coating requirements of <RID>ASTM A 775/A 775M</RID>, <MET>0.3 mm</MET><ENG> 8 
mils</ENG> minimum thickness.  Coating at the anchorage end may be omitted over the length provided for threading the 
nut against the bearing plate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.13   Anchors</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 615/A 615M</RID>, <RID>ASTM A 996/A 996M</RID>, <RID>ASTM A 36/A 36M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.14   Dowels</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 615/A 615M</RID>, <RID>ASTM A 996/A 996M</RID>, <RID>ASTM A 36/A 36M</RID>.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR"><SPT><TTL>2.1.15   Anchor Head</TTL><BRK/>
<BRK/>
<TXT>Anchor head shall consist of steel bearing plate with nut.  Anchorage devices shall be capable of developing 
95 percent of the guaranteed ultimate strength of prestressing steel.  The anchorage devices shall conform to 
the static strength requirements of Section 3.1.6 (1) and Section 3.1.8 (1) and (2) of <RID>PTI A</RID>.  [Threaded anchorage 
items for epoxy coated bars shall be designed to fit over the epoxy coating and maintain the capacity of the 
prestressing steel.]</TXT> <BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>2.1.16   <SUB>Mechanical Anchors</SUB></TTL><BRK/>
<BRK/>
<TXT>[<RID>CID A-A-1922</RID>][<RID>FS A-A-1923</RID>][<RID>CID A-A-55614</RID>], galvanized unless otherwise indicated.  Provide sleeve anchors of 
the length and diameter indicated.  Minimum concrete embedment shall be as shown.  Design values listed shall 
be as tested according to <RID>ASTM E 488</RID>.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Minimum [ultimate][allowable] pullout value shall be [_____]<MET> kN</MET><ENG> lb</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Minimum [ultimate][allowable] shear value shall be [_____]<MET> kN</MET><ENG> lb</ENG>.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   ACCESSORIES</TTL><BRK/>
<BRK/>
<TAI OPT="CRACK REPAIR"><SPT><TTL>2.2.1   Stitching staples</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 615/A 615M</RID>, bar size as shown, with legs bend for embedment as shown on the drawings.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="PRECAST CONCRETE"><SPT><TTL>2.2.2   <SUB>Neoprene Bearing Pads for Precast Units</SUB></TTL><BRK/>
<BRK/>
<TXT>Molded or extruded polychloroprene, containing reinforcing carbon black, zinc oxide, accelerators, antioxidants, 
vulcanizing agents, and plasticizer.  Pads shall be of the sizes indicated on the contract drawings.  The characteristics 
of the neoprene bearing pads shall meet the following requirements:</TXT><BRK/>
<BRK/>
<MET><TBL><THD><HL4>Test Method</HL4><BRK/>
  Physical Test                  Test Value             Specification</THD><BRK/>
<BRK/>
  Tensile Strength               8.3 mPa (minimum)        <RID>ASTM D 412</RID><BRK/>
  Elongation at Break            450 % (minimum)          <RID>ASTM D 412</RID><BRK/>
  300 % Modulus                  6.2 mPa (minimum)        <RID>ASTM D 412</RID><BRK/>
  Durometer Hardness<BRK/>
   Shore Type A                  45 to 55 (50 Average)    <RID>ASTM D 2240</RID><BRK/>
  Water Absorption               5 % by Weight (maximum)  <RID>ASTM D 471</RID><BRK/>
  Compression Set                30 % (maximum)           <RID>ASTM D 395</RID><BRK/>
  Tensile Strength               80 % (minimum of tensile <BRK/>
                                 after aging 48 hours <BRK/>
                                 strength)                <RID>ASTM D 572</RID></TBL></MET><BRK/>
<ENG><TBL><THD><HL4>Test Method</HL4><BRK/>
  Physical Test                  Test Value             Specification</THD><BRK/>
<BRK/>
  Tensile Strength               2,000 psi (minimum)      <RID>ASTM D 412</RID><BRK/>
  Elongation at Break            450 % (minimum)          <RID>ASTM D 412</RID><BRK/>
  300 % Modulus                  900 psi (minimum)        <RID>ASTM D 412</RID><BRK/>
  Durometer Hardness<BRK/>
   Shore Type A                  45 to 55 (50 Average)    <RID>ASTM D 2240</RID><BRK/>
  Water Absorption               5 % by Weight (maximum)  <RID>ASTM D 471</RID><BRK/>
  Compression Set                30 % (maximum)           <RID>ASTM D 395</RID><BRK/>
  Tensile Strength               80 % (minimum of tensile <BRK/>
                                 after aging 48 hours <BRK/>
                                 strength)                <RID>ASTM D 572</RID></TBL></ENG><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   Plastic Shims</TTL><BRK/>
<BRK/>
<TXT>Plastic shims for shimming precast concrete units shall conform to <RID>ASTM D 4101</RID>, polypropylene material, of the 
widths and lengths as shown on the contract drawings.</TXT><BRK/>
<BRK/></SPT>
</TAI>[<SPT><TTL>2.2.4   Expansion Joint Filler Strips, Premolded</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if Section 03 15 14.00 10 EXPANSION, CONTRACTION 
AND CONSTRUCTION JOINTS IN CONCRETE is used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Expansion joint filler strips shall meet the requirements specified in Section <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION 
AND CONSTRUCTION JOINTS IN CONCRETE.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>2.3   MIXTURE PROPORTIONING</TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Cement-Based Concrete</TTL><BRK/>
<BRK/>
<TXT>Mixes for cement-based concrete shall be in accordance with paragraph DESIGN REQUIREMENTS and the applicable 
provisions of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL 
CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE].  Approved batch tickets shall 
be furnished for each load of ready-mixed concrete.  </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   Fiber-Reinforced Concrete</TTL><BRK/>
<BRK/>
<TXT>Mixtures for fiber-reinforced concrete shall be in accordance with <RID>ASTM C 1116/C 1116M</RID>, paragraph DESIGN REQUIREMENTS 
and the applicable provisions of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE 
STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.3   Dry-Pack Mortar</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For severe conditions, the water-cementitious materials ratio may need 
to be 0.40 or less.  Dry-pack mortar may be polymer-modified when appropriate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare mortar consisting of one part portland cement, three parts fine sand which passes a No. 16 sieve, [polymer 
proportioned as recommended by the manufacturer, ]and only enough water so the mortar will stick together in 
a ball when molded by hand.  The water-cementitious materials ratio shall not be greater than [0.45][_____] by 
weight.  Let mortar set 1/2 hour prior to placing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.4   Polymer-Modified Mortar</TTL><BRK/>
<BRK/>
<TXT>Polymer-modified mortar shall consist of portland cement, fine aggregate, water, and polymer.  Proportion mortar 
in accordance with polymer manufacturer's recommendations.  Cured mortar shall comply with the requirements of 
paragraph REPAIR MATERIAL PERFORMANCE REQUIREMENTS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.5   Polymer-Modified Concrete</TTL><BRK/>
<BRK/>
 <TXT>Polymer-modified concrete shall consist of portland cement, fine and coarse aggregate, water, and polymer.  Proportion 
concrete in accordance with polymer manufacturer's recommendations.  Cured concrete shall comply with the requirements 
of paragraph REPAIR MATERIAL PERFORMANCE REQUIREMENTS.<TAI OPT="OVERLAY">  Polymer-modified concrete for overlays shall conform 
to <RID>ACI 548.4</RID>.</TAI></TXT> <BRK/>
<BRK/></SPT>
<TAI OPT="PRECAST CONCRETE"><SPT> <TTL>2.3.6   Precast Concrete Units</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Consider use of harder aggregates and pozzolan in the design of precast 
concrete to assure that the units are durable and abrasion resistant.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT> Cement for precast concrete may be Type I portland cement or Type III high early strength portland cement in 
accordance with <RID>ASTM C 150</RID>.  If using Type III cement, make all necessary adjustments pursuant to ACI requirements 
to assure the dimensional stability of the units.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>2.3.7   Cement-Based Grout</TTL><BRK/>
<BRK/>
<TXT>Cement-based grout shall consist of equal parts of Type [I or II], [III] portland cement [and] sand by dry weight, 
[and water-reducing admixture, ]thoroughly mixed with water to yield a thick, creamy mixture.  The water-cementitious 
materials ratio shall not be greater than 0.45 by weight.  The sand shall meet the requirements of the fine aggregate 
specified herein, except 100 percent shall pass a<MET> 2.36 mm</MET><ENG> No. 8</ENG> sieve.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR"><SPT><TTL>2.3.8   Ultra-fine Cement Grout</TTL><BRK/>
<BRK/>
<TXT>Proportion the ultra-fine cement grout to eliminate shrinkage.  The water/cement ratio shall be by volume and 
shall not exceed manufacturer recommendations for the required strength.  Proportion the grout to limit bleed 
water.  The final bleeding in accordance with <RID>ASTM C 940</RID> shall be less than 2%.  The expansion in accordance 
with <RID>ASTM C 940</RID> shall be 0 to 5%.  Mix the ultra-fine cement using a high shear colloidal mixer.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Assemble at the site of the work sufficient equipment that is dependable, appropriate and adequate to accomplish 
the work specified.  Deliver the equipment a sufficient time before the start of repairs to permit thorough inspection, 
calibration of weighing and measuring devices, adjustment of parts, and the making of any repairs that may be 
required.  Machines, tools, and equipment used in the performance of the work shall be approved before the work 
is started and shall be maintained in satisfactory condition at all times.  Maintain the equipment in good working 
condition.  Provide dust suppression on equipment as needed to comply with Section <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL 
PROTECTION.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Cement-Based Concrete Mixing Equipment</TTL><BRK/>
<BRK/>
<TXT>Mixing equipment shall conform to the requirements of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][ 
<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE 
CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OVERLAY"><SPT><TTL>3.1.2   Polymer-Modified Concrete Mixing Equipment</TTL><BRK/>
<BRK/>
<TXT>Use proportioning and mixing equipment with capacity and continuous rate so that final finishing can be completed 
prior to the formation of a plastic film on the polymer-modified concrete surface. The equipment shall consistently 
produce a uniformly blended mixture within the specified air content and slump limits. The mixer shall also:</TXT><BRK/>
<BRK/>
<LST>a.  Be equipped with a recording meter with a ticket printout device to record an indication of the cement 
quantity being introduced into the mix. The metering device shall be accurate within a tolerance of -1 
to +3 percent.</LST><BRK/>
<BRK/>
<LST>b.  Be equipped with a polymer metering device to indicate volume dispensed. The metering device shall 
be accurate within a tolerance of -1 to +2 percent.  In addition the polymer tank shall have a stand 
pipe marked in<MET> liters</MET><ENG> gallons</ENG>.</LST><BRK/>
<BRK/>
<LST>c.  Be equipped with a water flow indicator, and have a water flow control that is readily adjustable 
to provide for minor variations in aggregate moisture content.  The flow indicator shall be accurate 
within a tolerance of plus or minus 1 percent in the range of expected use.</LST><BRK/>
<BRK/>
<LST>d.  Be equipped with a control to regulate the quantity of each of the polymer-modified concrete components 
to permit production of a mix having the specified composition.  To ensure that the mixer can accurately 
proportion and blend all components of the polymer-modified concrete on a continuous or intermittent 
basis, the mixer shall be calibrated prior to the start of the overlay placement.</LST><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>3.1.3   Epoxy Mixing Equipment</TTL><BRK/>
<BRK/>
<TXT>Use a container recommended by the epoxy manufacturer as the mixing vessel.  Use a power drive (air or spark-proof) 
propeller type blade for mixing except that hand mixing may be used for small batches.  Use equipment specified 
by epoxy manufacturer for field mixing of aggregates and epoxy resin.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Grout Mixing Equipment</TTL><BRK/>
<BRK/>
<TXT>Use a high-speed, high-shear, colloidal type grout mixer capable of continuous mechanical mixing that will produce 
uniform and thoroughly mixed grout which is free of lumps and undispersed cement.  The mixer shall be equipped 
with a suitable water [and admixture] measuring device[s] calibrated to read in<MET> cubic centimeters</MET><ENG> cubic feet</ENG> 
and tenths and so designed that after each delivery the device can be conveniently set back to zero.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CRACK REPAIR,JOINT RESEALING"><SPT><TTL>3.1.5   Joint and Crack [Cleaning] and [Sealing] Equipment</TTL><BRK/>
<BRK/>
<TXT>Joint and crack [cleaning] and [sealing] equipment shall meet the requirements specified in [Section 
<SRF>32 01 19</SRF> FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS][Section <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION 
AND CONSTRUCTION JOINTS IN CONCRETE FOR CIVIL WORKS].</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>3.1.6   Drilling Equipment</TTL><BRK/>
<BRK/>
<TXT>Use percussion or rotary drilling equipment of a type suitable for the depth, diameter and material to be drilled.  
Use only rotary drilling equipment where vibration from percussion drilling could damage the concrete to remain 
or adjacent structures.  Use equipment capable of maintaining the required alignment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.7   Vehicle-Mounted Breakers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The energy of breakers should be limited to prevent damage to concrete 
and other structures which are to remain.  Verify that the stated energy limits 
are appropriate for the project requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Use boom or vehicle mounted impact breakers, spring-action hammers or drop balls with blow energy not exceeding 
approximately<MET> [205] [_____] newton-meters</MET><ENG> [150] [_____] ft-lbs</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.8   Hand-Held Breaker</TTL><BRK/>
<BRK/>
<TXT>Use<MET> 14 kg</MET><ENG> 30 pound</ENG> breaker for removal of concrete above reinforcing steel.  Use<MET> 7 kg</MET><ENG> 15 pound</ENG> chipping hammer 
to remove concrete around reinforcing steel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.9   Hydromilling Equipment</TTL><BRK/>
<BRK/>
<TXT>Use hydromilling equipment consisting of filtering and pumping units operating in conjunction with a remote-controlled 
robotic device or beam.  The equipment shall operate at a noise level of less than 90 decibels at a distance 
of<MET> 15 meters</MET><ENG> 50 feet</ENG> from the equipment.  The equipment shall produce a highly roughened, bondable surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.10   Rotary Milling Equipment</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.10.1   Horizontal Surfaces</TTL><BRK/>
<BRK/>
<TXT>Use milling equipment for horizontal surfaces consisting of a self-propelled unit with rotary cutter head with 
tungsten-carbide bits.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.10.2   Vertical Surfaces</TTL><BRK/>
<BRK/>
<TXT>Use rotary equipment consisting of a boom-mounted rotary cutter.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.2   PROTECTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Protection of Existing Features</TTL><BRK/>
<BRK/>
<TXT>Before beginning any concrete removal work, carefully survey the structure and examine the drawings and specifications 
to determine the extent of the work.  Take all necessary precautions to insure against damage to existing concrete 
or other structures to remain in place, and repair or replace any damage to such items as approved by the Contracting 
Officer at no additional cost to the Government.  Carefully coordinate the work of this section with all other 
work, and construct and maintain shoring, bracing and supports, as required.  Insure that structural elements 
are not overloaded, and increase structural supports or add new supports as may be required as a result of any 
removal work performed under any part of this contract.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Protection of Personnel</TTL><BRK/>
<BRK/>
<TXT>Insure that adequate measures are in place to protect workers, facility operation personnel and the public from 
injury due to the operations being performed.  Provide protective measures in accordance with <RID>EM 385-1-1</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   REMOVAL OF EXISTING CONCRETE</TTL> <BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Depending on the method of concrete removal and the condition of the 
existing concrete, microfracturing may occur beyond the removal limits.  Additional 
concrete removal by other methods such as hand-held breakers, bushhammering, 
or high-pressure water may be required to remove some of the microfractured 
concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.3.1   General</TTL><BRK/>
<BRK/>
<TXT>Prepare a <SUB>demolition plan</SUB> describing the methods and equipment to be used to remove existing concrete.  Remove 
the existing concrete in the area to be repaired to the minimum depth indicated and to such additional depth 
where necessary to expose a surface of sound, unweathered concrete that is uncontaminated by oils, greases, or 
deicing salts or solutions.  The actual depth of removal shall be subject to approval by the Contracting Officer.  
Remove concrete with care to avoid damage to adjacent structures and concrete that is not to be repaired under 
this contract and embedded metal that is not to be removed.  Repair any such damage at no additional cost to 
the Government.  Mark on the surface the limits of concrete removal for approval by the Contracting Officer prior 
to any removal.  Do not remove metal and other embedded items exposed during the concrete removal operations 
without authorization of the Contracting Officer.  Unless otherwise indicated, continue removal using appropriate 
equipment to remove unsound concrete and to eliminate any offsets in the area to be repaired which would cause 
an abrupt change in thickness of the repair and to remove protrusions between holes.  Variations in the final 
prepared surface shall not exceed the nominal maximum size aggregate of the repair material, except for relatively 
thin repairs in which case the variation shall not exceed 25 percent of the repair thickness.  Any removal beyond 
the limits shown on the drawings shall be approved by the Contracting Officer prior to performing the additional 
removal.  All equipment and removal methods shall comply with applicable sections of <RID>EM 385-1-1</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1.1   Determination of Removal Limits</TTL><BRK/>
<BRK/>
<TXT>Approximate locations and areas of repairs are indicated on the drawings.  Determine actual locations and limits 
of deteriorated concrete by visual inspection and by tapping with a hammer or steel rod and listening for dull 
or hollow sounds.  On horizontal surfaces, a chain drag may be used in lieu of the hammer or rod.  Perform sounding 
in the presence of the Contracting Officer or authorized representative.  Mark areas where sounding does not 
produce a solid tone with highly visible paint.  After the investigation process is completed, the Contracting 
Officer will inspect the areas marked by the Contractor to confirm and/or adjust the limits of removal.  Do not 
remove concrete from these areas until the Contracting Officer or authorized representative approves the areas.  
Upon completion of removal, sound the surface and remove additional concrete until testing produces a solid tone.  
Additional removal of concrete within these areas will be measured for payment as specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.1.2   Perimeter Saw Cut</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In general, the minimum depth of saw cut should be the nominal maximum 
size coarse aggregate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Make a perpendicular saw cut at least<MET> [25] [50] [_____] mm</MET><ENG> [1] [2] [_____] inches</ENG> deep, but no deeper than the 
reinforcing steel, a minimum of<MET> [25] [_____] mm</MET><ENG> [1][_____] inch</ENG> outside of the area to be repaired to delineate 
the perimeter of the repair area and avoid feather edges.  The perimeter saw cut shall have no angles less than 
90 degrees.  Exercised care not to cut through existing steel reinforcement or embedded metal that is not to 
be removed.  Omit saw-cutting where prohibited by existing metal or other items which are not to be removed.  
Perform sawing in accordance with <RID>CSDA-W-104</RID>, except as specified herein.  Edges of repaired areas which are 
not mechanically anchored shall be dove-tailed.  Where concrete is being removed from a vertical face by controlled 
blasting, mechanical presplitting, or expansive agents, sawcut the bottom limit of the removal area to the full 
depth of the removal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.1.3   Preliminary Surface Cleaning</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where the depth of removal exceeds the anticipated depth of contamination, 
removal of such contamination prior to removal of the concrete is not normally 
necessary.  Where depth of removal is shallow or where the removal methods may 
result in spreading of contamination or contamination of exposed concrete surfaces, 
the contaminants must be remove prior to removal of the concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Clean concrete surfaces that are contaminated with oil, grease or dirt prior to beginning concrete removal in 
the area.  Use detergents, proprietary cleaners formulated for removal of contaminants from concrete, or steam 
cleaning in accordance with the manufacturer's written instructions.  Do not use solvents for removal of oil 
or grease.  All traces of cleaning agents and contaminants shall be removed from the surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.1.4   Reinforcing Steel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The deterioration point at which reinforcing steel must be replaced should 
be made by a structural engineer and should consider the function of the reinforcing 
steel (i.e. temperature vs. tension).  If the referenced specification is not 
included in the project specification, applicable portions should be inserted 
here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Following the concrete removal operation, inspect the condition of all exposed reinforcing bars designated to 
remain in place.  Remove and replace bars which are deteriorated at any point where the original cross section 
of any bar has been reduced by more than [25][_____] percent or the original cross section of adjacent bars has 
been reduced by more than [20][_____] percent.  Splice new replacement steel in accordance with the provisions 
of <MET><RID>ACI 318M</RID></MET><ENG><RID>ACI 318</RID></ENG>.  Secure to adjacent bars all reinforcing steel that is free to vibrate or otherwise move 
excessively.  Concrete reinforcement shall conform to Section <SRF>03 20 02</SRF> STEEL BARS AND WELDED WIRE FABRIC FOR 
CONCRETE REINFORCEMENT FOR CIVIL WORKS.  Where the bond between the concrete and any reinforcing steel has been 
destroyed, or where the concrete deterioration is caused by corrosion of the reinforcing steel, remove the adjacent 
concrete to a depth that will permit cleaning of the steel and bonding of the concrete.  Provide a minimum clearance 
below the steel of<MET> 25 mm</MET><ENG> 1 inch</ENG> or<MET> 6 mm</MET><ENG> 1/4 inch</ENG> plus the maximum size of aggregate in the repair material, which 
ever is greater, clearance around the steel, except where other reinforcing steel makes this impractical.  Use 
chipping hammers weighing less than<MET> 7 kg</MET><ENG> 15 pounds</ENG>, abrasive water cutting, or high-pressure water for removal 
of concrete around reinforcing steel.  Remove all corrosion from reinforcing steel by sandblasting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.1.5   Shallow Repairs</TTL><BRK/>
<BRK/>
<TXT>For shallow repairs that do not require reinforcing steel, remove the existing concrete to a minimum depth of<MET>
 [50] [_____] mm</MET><ENG> [2] [_____] inches</ENG> below the finished surface and to such additional depth where necessary to 
expose a surface of sound, unweathered concrete that is uncontaminated by oils, greases, or deicing salts or 
solutions.  Remove all loose and deteriorated concrete from the spalled areas indicated.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.2   Cutting </TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.2.1   General</TTL><BRK/>
<BRK/>
<TXT>Use cutting to remove segments of concrete intact or to define the limits of removal by other methods.</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>3.3.2.2   Abrasive-Water-Jet Cutting</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  EM 1110-2-2002 does not consider abrasive-water-jet cutting to be cost 
effective when compared to diamond blade cutting.  This method should only be 
used when unique project conditions  require its use.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform abrasive-water-jet cutting by injecting abrasive material into a high pressure stream of water.  The 
water pressure shall be<MET> 200 to 340 MPa</MET><ENG> 30,000 to 50,000 psi</ENG>.  Adjust the water pressure and amount of abrasive 
added as required to provide optimum cutting action.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>3.3.2.3   Diamond-Blade Cutting</TTL><BRK/>
<BRK/>
<TXT>Use diamond-blade cutting for cutting through relatively thin sections and defining limits of removal to be performed 
by other methods.  Perform diamond blade cutting using equipment of the correct type and power and with appropriate 
blade composition for the material being cut.  Use a track system for maintaining the alignment of the saw for 
vertical cuts or where multiple cuts are required for deep cuts.  Provide supports as required to support the 
concrete to be removed.  [Core drill corners of removal area or use corner saw to avoid overcutting.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.4   Diamond-Wire Cutting</TTL><BRK/>
<BRK/>
<TXT>Perform diamond wire cutting using equipment of the correct type and power using continuous loop cable with appropriate 
diamond beads for the material being cut.  Core drill holes at corners of removal section to the accuracy required 
for the wire cutting.  Provide supports as required to support the concrete to be removed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.5   Stitch Drilling</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Rotary-percussion drilling is more efficient for unreinforced concrete.  
Core drilling may be required for reinforced concrete or where the vibration 
of rotary-percussion drilling may cause damage to adjacent structures or equipment.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drill overlapping holes of appropriate size along the removal line.  Unless otherwise indicated, drill holes 
using rotary-percussion or core drilling equipment.  Utilize guides as required to maintain alignment.  Provide 
supports as required to support the concrete to be removed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.3   Impacting</TTL><BRK/>
<BRK/>
<TXT>Removal of concrete may be accomplished by use of impact-type power tools.  Take adequate precautions to prevent 
impact equipment from vibrating on reinforcing steel.  All demolition equipment shall be subject to approval 
of the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.3.1   Vehicle-Mounted Breaker</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Vehicle-mounted breakers may result in microfracture damage of the concrete 
which remains.  Additional concrete removal by other methods such as hand-held 
breakers or high-pressure water may be required to remove some of the microfractured 
concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Use boom or vehicle mounted impact breakers or spring-action hammers or drop balls to remove concrete in relatively 
thin sections or to break up concrete which has been separated from the structure by other methods.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3.2   Hand-Held Breaker</TTL><BRK/>
<BRK/>
<TXT>Use hand-held breakers or chipping hammers for removal of concrete in small or restricted areas, where the energy 
to be applied must be limited to prevent damage to adjacent concrete, structures or facilities which are not 
to be removed, and to complete removal where other methods have been used.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.4   Milling</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.4.1   Hydromilling</TTL><BRK/>
<BRK/>
<TXT>Remove concrete from vertical or horizontal surfaces by means of high pressure water applied though nozzles attached 
to a remotely-controlled device or beam.  Adjust water pressure and rate of movement as required to remove concrete 
to the required depth and avoid excessive removal.  Supplement hydromilling with abrasive water-jet, high-pressure 
wand, or other methods in areas not accessible to the hydromilling equipment.  Submit proposed hydromilling equipment 
and procedures to the Contracting Officer for review and approval before beginning work.  Remove slurry from 
the prepared surface before it hardens.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.4.2   Rotary Head Milling</TTL><BRK/>
<BRK/>
<TXT>Use rotary head milling for uniform depth removal on horizontal or vertical surfaces.  Use boom-mounted milling 
head for vertical surfaces.  When operating rotary head equipment from top of wall for removal from vertical 
surfaces, provide communication between observer and operator to aid in control of removal.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.5   Presplitting</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Presplitting only separates the concrete.  Other measures must be employed 
to remove reinforcing steel and other embedded items.  Hole spacing and diameter 
are critical to proper development of the presplit plane.  A test break should 
be performed to verify the proposed procedure.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.3.5.1   Expansive Agents</TTL><BRK/>
<BRK/>
<TXT>Use an expansive compound, manufactured for concrete and rock demolition.  Drill holes, including relief holes, 
of the size and at the spacing recommended by the manufacturer.  Mix and place the material in accordance with 
the manufacturer's recommendations.  Insert closed-end plastic tubes into each hole prior to placing the expansive 
material to prevent dilution of the material and to prevent slurry from entering existing cracks.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.5.2   Mechanical Presplitting</TTL><BRK/>
<BRK/>
<TXT>Drill holes of size and spacing as recommended by the manufacturer for the conditions present.  Insert and operate 
mechanical splitters in accordance with the manufacturer's instructions.</TXT><BRK/>
<BRK/></SPT>
</SPT><TAI OPT="CONTROLLED BLASTING"><SPT><TTL>3.3.6   Controlled Blasting</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Blasting may result in microfracturing of the concrete which remains.  
Additional concrete removal by other methods such as hand-held breakers or high-pressure 
water may be required to remove some of the microfractured concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.3.6.1   General</TTL><BRK/>
<BRK/>
<TXT>Controlled blasting shall consist of a systematic process of sawcutting, drilling, loading and blasting to break 
the concrete on a controlled plane.  Submit a detailed <SUB>blasting plan</SUB> in accordance with paragraph SUBMITTALS.  
All use of explosives shall be subject to prior approval of the Contracting Officer.  Do not deviate from the 
approved plan without authorization of the Contracting Officer.  After blasting, submit an "as-built" blasting 
plan showing any approved changes.  Approval of the Contractor's blasting plan shall not relieve him of responsibility 
for any damages or injuries resulting from blasting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.2   Safety</TTL><BRK/>
<BRK/>
<TXT>Handle, store, and use explosives in accordance with applicable provisions of the <RID>EM 385-1-1</RID> and state and local 
regulations.  All blasting work shall be at the risk and responsibility of the Contractor.  Conduct all blasting 
operations with due regard to the safety of persons in the vicinity and traffic passing the site.  Make provisions 
for warning personnel and traffic in advance of blasting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.3   Procedure</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The suggested peak particle velocity applies to concrete adjacent to 
structures which are to remain.  The permissible peak particle velocity should 
be determined based on the existing materials and conditions to avoid damage 
to structures and equipment to remain.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Determining the diameter, depth and spacing of holes, and loading, delays and stemmings for explosives.  Drill 
holes with equipment competent to maintain the alignment and plane of the drill hole pattern throughout the full 
depth of the holes.   Limit extent of blasting area and use delays as required, to prevent damage to the structure.  
Peak particle velocity shall not exceed<MET> [50] [_____] mm</MET><ENG> [2] [_____] inches</ENG> per second.  Airblast pressure shall 
not exceed<MET> 0.7 kPa</MET><ENG> 0.1 psi</ENG>.  Should vibration exceed the specified limits, modify the blasting plan as required, 
subject to approval by the Contracting Officer.  Use detonating cord as explosives.  Use blasting mats as necessary 
to control flyrock and contain debris.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.4   Preblasting and Postblasting Inspections</TTL><BRK/>
<BRK/>
<TXT>Perform a preblast and postblast inspection of all structures within<MET> [180] [_____] meters</MET><ENG> [600] [_____] feet</ENG> 
of the blasting operations.  The inspection shall include preblast and postblast notes, diagrams, and/or tape 
recorded descriptions of defects in interior walls, ceilings, floors and foundations; photographs and/or videotape 
recordings of all prominent interior and exterior cracks; notes on walkways, retaining walls, accessible roofs, 
chimneys, and similar features.  Complete the preblast inspection prior to the beginning of any blasting.  Complete 
the postblast inspection immediately upon cessation of all blasting.  Notify the Contracting Officer in writing 
a minimum of [7] [_____] days in advance of the inspections.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.5   Vibration Monitoring</TTL><BRK/>
<BRK/>
<TXT>Perform vibration monitoring by placing recording devices on adjacent structures as indicated on the drawings.  
Modifications to the monitoring procedure may be directed by the Contracting Officer.  In order to control blasting 
vibrations within specified limits, provide the services of an approved commercial vibration-testing laboratory.  
Furnish <SUB>seismographic monitoring records</SUB> and written interpretations of such to the Contracting Officer within 
48 hours, except that in the event that any record or records indicate the potential for damage or imminent danger, 
make an immediate verbal report and remedial recommendation.  The vibration monitoring record shall include the 
following minimum data:</TXT><BRK/>
<BRK/>
<LST>a.  Date and time of blast.</LST><BRK/>
<LST>b.  Location of seismological instruments, manufacture and Model No.</LST><BRK/>
<LST>c.  Velocity measured in<MET> mm</MET><ENG> inches</ENG> per second in vertical, longitudinal and transverse directions.</LST><BRK/>
<LST>d.  Displacement measured in<MET> mm</MET><ENG> inches</ENG>.</LST><BRK/>
<LST>e.  Acceleration measured in<MET> mm</MET><ENG> inches</ENG> per second squared.</LST><BRK/>
<LST>f.  Energy ratio computation.</LST><BRK/>
<LST>g.  Peak particle velocity.</LST><BRK/>
<BRK/></SPT>
</SPT></TAI></SPT><SPT><TTL>3.4   ANCHORING AND REINFORCING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For core drilled holes, use epoxy grout only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.4.1   Drilling and Grouting Dowels and Anchors</TTL><BRK/>
<BRK/>
<TXT>Drill holes for dowels and anchors using drilling equipment suitable for the intended purpose, as approved by 
the Contracting Officer.  Diameter of holes shall be [as shown on the drawings] [as recommended by the adhesive 
manufacturer].  Clean holes by flushing with water and compressed air prior to placing grout.  Anchor [dowels] 
[anchors] with [epoxy grout], [polyester resin grout], [polyester resin grout cartridges] [or] [cement-based 
grout].  Place grout and install [dowels] [and] [anchors] as recommended by the grout manufacturer.  Remove excess 
grout after the [dowel] [or] [anchor] has been set in place.  [When installing resin cartridges or capsules in 
submerged conditions, place properly proportioned resin material in bottom of hole using a mixing tube prior 
to inserting the cartridge or capsule.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Drilling and Installing Mechanical Anchors</TTL><BRK/>
<BRK/>
<TXT>Drill holes for anchors using drilling equipment suitable for the intended purpose, as approved by the Contracting 
Officer.  Diameter of holes shall be [as shown on the drawings] [as recommended by the anchor manufacturer].  
Clean holes by flushing with water and compressed air prior to placing grout.  Install anchors and set anchors 
in place in accordance with the manufacturer's recommendations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.3   Installating Reinforcement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the referenced specification is not included in the project specification, 
applicable portions should be inserted here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Place reinforcement steel and accessories as specified and as shown on the contract drawings.  Placement details 
of steel and accessories not specified or shown on the drawings shall be in accordance with <RID>ACI SP-66</RID> and <MET><RID>ACI 318M</RID></MET><ENG><RID>
ACI 318</RID></ENG> or as directed by the Contracting Officer.  Fabricate and place reinforcing steel in accordance with 
<SRF>03 20 02</SRF> STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT FOR CIVIL WORKS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   MIXING MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Make batches small enough to ensure placement before binder sets.  Mix materials in accordance with manufacturer's 
recommendations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   SURFACE PREPARATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For additional guidance on surface preparation, see International Concrete 
Repair Institute Guidelines No. 03732 "Selecting and Specifying Concrete Surface 
Preparation for Sealers, Coatings, and Polymer Overlays".</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.6.1   General</TTL><BRK/>
<BRK/>
<TXT>After removal of concrete to the specified limits, clean the surface to which the repair material is to be applied 
to remove dust, debris and laitance.  Perform final cleaning immediately prior to placement of the repair material.  
Unless otherwise specified, keep the existing concrete wet for a minimum of 12 hours and dried for 12 hours immediately 
prior to placing new concrete.  The surface shall be dry with no standing water on the surface upon which concrete 
is placed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.2   Cleaning</TTL> <BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the referenced specification is not included in the project specification, 
applicable portions should be inserted here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform all cleaning operations to the satisfaction of the Contracting Officer.  Protect adjacent structures 
and embedded items.  Use potable water for all cleaning operations.  Perform a preliminary washing as soon as 
the chipping and trimming are completed to remove loose materials and dust particles.  Clean surfaces to which 
new concrete is to be bonded in accordance with Section <SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR 
CIVIL WORKS, paragraph CONSTRUCTION JOINT TREATMENT.  Final cleaning shall remove all laitance, carbonation, 
scum, dirt, oil, grease, and loose or disintegrated concrete.  Perform additional surface chipping to remove 
coarse aggregate that is undercut by cleaning process.  Perform such additional chipping as determined necessary 
by the Contracting Officer at no additional cost to the Government.  Wire brush or sandblast metal surfaces against 
which concrete is to be placed to remove rust and other contaminants which would prevent proper bond with the 
concrete.  Perform final cleaning immediately prior to concrete placement.  Protect all work from contamination 
during all phases of cleanup and preparation prior to repair.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.3   Waste Water Disposal</TTL><BRK/>
<BRK/>
<TXT>Dispose of waste water employed in cutting, washing, and rinsing of concrete surfaces in a manner such that the 
waste water does not stain, discolor, or affect exposed surfaces of the structures, or damage the environment 
of the project area.  The method of disposal shall meet all requirements of Section <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL 
PROTECTION.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7   SURFACE REPAIRS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Dry-pack mortar is also typically used for small spalled areas with high 
depth to surface area ration.  Polymer-modified mortar, polymer-modified concrete 
and cement-based concrete are typically used for larger repair areas.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Place dowels and anchors as shown on the contract drawings.  [Construct formwork in accordance with Section 
<SRF>03 11 14.00 10</SRF> FORMWORK FOR CONCRETE.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.7.1   <SUB>Epoxy Mortar</SUB></TTL><BRK/>
<BRK/>
<TXT>Prime surfaces with epoxy resin binder.  Scrub prime coat into surface with a stiff bristle brush.  Make coating 
approximately<MET> 0.5 mm</MET><ENG> 20 mils</ENG> thick.  Place epoxy mortar while primer is still tacky.  Apply at a thickness recommended 
by the manufacturer.  Work mortar into place and consolidate thoroughly so that contact surfaces are wetted by 
the mortar.  Finish surface of mortar to the required texture.  Do not feather edge epoxy mortar onto adjacent 
surfaces.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.2   <SUB>Epoxy Concrete</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Do not place epoxy concrete in layers greater than 25 mm (one inch) in 
thickness.  This is to avoid heat buildup and subsequent thermal contraction.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prime dry cavity surfaces with epoxy resin using a stiff bristle brush. Make coating approximately<MET> 0.5 mm</MET><ENG> 20 
mils</ENG> thick.  Place epoxy concrete while primer is still tacky and in layers not exceeding<MET> 25 mm</MET><ENG> one inch</ENG> thick.  
Use vibratory floats, plates, or hand tampers to consolidate the concrete. Level each layer and screed the final 
surface to match the adjoining surfaces.  Remove excess epoxy concrete on adjacent surfaces before the concrete 
hardens.  Do not feather epoxy concrete out onto adjacent surfaces.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.3   Polymer-Modified Mortar or Concrete</TTL><BRK/>
<BRK/>
<SPT><TTL>3.7.3.1   Horizontal Surfaces</TTL><BRK/>
<BRK/>
<TXT>Prime surfaces prepared to receive repair material using the manufacturer's recommended bonding agent using a 
stiff bristle brush and in accordance with the manufacturer's instructions.  Place polymer-modified concrete 
before the bonding agent dries and in layers not exceeding<MET> 25 mm</MET><ENG> one inch</ENG> thick for mortar and<MET> 50 mm</MET><ENG> two inches</ENG>
 thick for concrete.  Moist cure polymer-modified material for a minimum of 24 hours but not more than 48 hours, 
and then air dry.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.3.2   Vertical Surfaces</TTL><BRK/>
<BRK/>
<TXT>For vertical surfaces that are troweled follow the procedure for horizontal surfaces.  For formed vertical surfaces 
follow the procedure for cement-based concrete for vertical surfaces.  Moist cure polymer-modified material for 
a minimum of 24 hours but not more than 48 hours, and then air dry.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7.4   Dry-Pack Mortar</TTL><BRK/>
<BRK/>
<TXT>Prime surfaces prepared to receive repair material with a cement-based grout, an epoxy resin meeting the requirements 
of paragraph EPOXY RESIN, or a latex bonding agent meeting the requirements of paragraph LATEX BONDING COMPOUND.  
For cement-based grout, dampen the area with water prior to applying the grout.  Place the mortar immediately 
after applying the bonding agent.  Place mortar in approximately<MET> 10 mm</MET><ENG> 3/8-inch</ENG> lifts, compact each lift thoroughly 
with a blunt stick or hammer, and scratch the surface to promote bonding with subsequent lifts.  Place consecutive 
layers continuously.  Finish the top layer flush with the surrounding concrete and cure with saturated burlap 
or curing compound.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.5   Cement-Based Mortar or Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When formwork prevents application of bonding agents in a timely manner, 
new concrete should be applied directly to the existing concrete.  Bonding agent 
should not be used when the concrete placement exceeds 3 inches in thickness.<BRK/>
<BRK/>
Placement through a chimney at the top of the form is the preferred method of 
placement.  Internal vibration should be used unless conditions prevent proper 
operation, in which case external vibration may be used.<BRK/>
<BRK/>
Delete the options for form and pump placement and external vibration unless 
placement through a chimney is not possible and/or external vibration is permitted.<BRK/>
<BRK/>
If the referenced specifications are not included in the project specification, 
applicable portions should be inserted here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[For vertical surfaces, construct forms with a chimney at top for placement and consolidation of concrete.]  
[Prime surfaces prepared to receive repair material, using a cement-based grout meeting the requirements of paragraph 
Cement-Based Grout, an epoxy resin meeting the requirements of paragraph EPOXY RESIN, or a latex bonding agent 
meeting the requirements of paragraph LATEX BONDING COMPOUND.  For cement-based grout, dampen the area with water 
prior to applying the grout.  Place the concrete immediately after applying the bonding agent.]  Place, consolidate 
and finish concrete in accordance with applicable requirements of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL 
CONCRETE][ <SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE 
CONCRETE].  [Use form and pump method of placement where placement through a form chimney is not possible.  Inspect 
concrete surfaces to ensure that no areas remain which would trap air between the new and existing concrete.  
Make forms grout tight and brace to withstand pumped concrete pressures.  Provide vents to release air from within 
the forms as concrete is placed.  Pump concrete into form using variable output pump of appropriate size.]  [Use 
external vibration only where internal vibration is not possible.  After the cavity is filled with concrete, 
install a pressure cap at the form chimney and apply pressure while the form is vibrated.]  [Remove chimney projection 
after 24 hours.]  Cure in accordance with Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][
<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE 
CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.6   Spalls at Joints and Cracks</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the referenced specification is not included in the project specification, 
applicable portions should be inserted here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>For spalls to be repaired that are adjacent to joints and working cracks insert preformed joint filler to the 
working faces of the spall.  Trim filler to fit shape of the working faces of joint or crack so repair material 
is prevented from bypassing filler.  Where practicable, extend filler horizontally and vertically into joint 
or crack opening.  Secure filler strip in place prior to and during placement of repair material. [Apply a bond 
breaker to working faces at keyed joints.  Keep bond breaker off of concrete surface to be bonded.]  After the 
repair material has completely cured, saw out the top<MET> 25 mm</MET><ENG> inch</ENG> of the preformed joint filler and install joint 
sealant in accordance with Section <SRF>03 15 14.00 10</SRF> EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN CONCRETE 
FOR CIVIL WORKS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.7   Rapid-Hardening Repair Material</TTL><BRK/>
<BRK/>
<TXT>Mix and place material in accordance with the manufacturer's recommendations.</TXT><BRK/>
<BRK/></SPT>
</SPT><TAI OPT="CRACK REPAIR"><SPT><TTL>3.8   CRACK REPAIR</TTL><BRK/>
<BRK/>
<SPT><TTL>3.8.1   Routing and Sealing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Surface sealing is not effective for active cracks.  The minimum width 
of the prepared crack should be 6 mm (1/4 inch).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.8.1.1   Preparation</TTL><BRK/>
<BRK/>
<TXT>Clean cracks by saw cutting or routing to provide the proper profile for sealants.  After the crack is sawcut 
or routed, clean the surfaces by sandblasting and/or waterjetting.  Adjust the height, angle of inclination and 
the size of the nozzle as necessary to provide satisfactory results.  Provide protective covers and barriers 
as required to prevent over-spray onto adjacent surfaces.  Remove dust, dirt and loosely bonded materials resulting 
from cleaning.  Ensure surfaces are dry before application of repair material.  Apply bond breaker to the bottom 
of the routed or sawed crack.  Where cracks extend through surfaces to be repaired, make the repair first and 
then tool, rout or saw the original line of the cracks into the repaired area.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.1.2   Rate of Progress</TTL><BRK/>
<BRK/>
<TXT>Limit the stages of crack sealing, which includes preparation and placement of bond breaker, so only that length 
of crack that can be sealed during the same workday is prepared.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.1.3   Time of Application</TTL><BRK/>
<BRK/>
<TXT>Seal prepared cracks immediately following the cleaning and drying process.  Walls of the prepared crack shall 
be surface dry, and the atmospheric and concrete temperatures shall be above<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG> at the 
time of application of the sealant.  Provide an approved temporary seal for open routed cracks that cannot be 
sealed under the conditions specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.1.4   Sealing</TTL><BRK/>
<BRK/>
<TXT>Do not apply sealant until the prepared cracks have been inspected and approved.  [Place masking tape on the 
finish surface on one or both sides of a crack cavity to protect adjacent finish surfaces from primer or sealant 
smears.  Remove masking tape within 10 minutes after crack has been filled and tooled.]  Fill the cracks from 
the bottom up and tool the top surface as indicated or as recommended by the manufacturer.  Apply sealant in 
accordance with <RID>ACI 504R</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.1.5   Preformed Compression Seals</TTL><BRK/>
<BRK/>
<TXT>Rout or cut the crack to the dimensions indicated.  Install the seals with equipment that is capable of installing 
joint seals to the prescribed depth without cutting, nicking, twisting, or otherwise distorting or damaging the 
seal and with no more than five percent stretching of the seal.  Cover the sides of the crack and, if necessary, 
the sides of the compression seal with a coating of lubricant, and install the seal to the depth indicated with 
joint installation equipment.  Coat butt joints with liberal applications of lubricant.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8.2   Filling Cracks with Grout or Mortar</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Filling cracks is not effective for active cracks.  The prepared crack 
should be minimum 25 mm (1 inch) wide and 25 mm (1 inch) deep.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.8.2.1   Preparation</TTL><BRK/>
<BRK/>
<TXT>Clean cracks by saw cutting or routing to provide the proper profile for sealants.  After the crack is sawcut 
or routed, clean the surfaces by sandblasting and/or waterjetting.  Adjust the height, angle of inclination and 
the size of the nozzle as necessary to provide satisfactory results.  Provide protective covers and barriers 
as required to prevent over-spray onto adjacent surfaces.  Remove dust, dirt and loosely bonded materials resulting 
from cleaning.  Dry surfaces to receive repair material as recommended by the grout or polymer manufacturer.</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>3.8.2.2   Epoxy Grout</TTL><BRK/>
<BRK/>
<TXT>Apply epoxy grout at a thickness recommended by the manufacturer.  Work grout into place and consolidate thoroughly 
so that contact surfaces are wetted by the grout.  Finish surface of grout to the required texture.  Do not feather 
edge epoxy grout onto adjacent surfaces.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>3.8.2.3   Dry-Pack Mortar</TTL><BRK/>
<BRK/>
<TXT>Coat the surfaces of the crack with a slurry consisting of equal parts portland cement and fine sand mixed with 
water to a fluid paste consistency.  Place the mortar immediately after applying the slurry.  Place mortar in 
approximately<MET> 10 mm</MET><ENG> 3/8-inch</ENG> lifts, compact each lift thoroughly with a blunt stick or hammer, and scratch the 
surface to promote bonding with subsequent lifts.  Place consecutive layers continuously.  Finish the top layer 
flush with the surrounding concrete and cure with saturated burlap or curing compound.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.2.4   Curing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the referenced specifications are not included in the project specification, 
applicable portions should be inserted here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cure epoxy materials in accordance with manufacturer's recommendations.  Cure dry-pack mortar in accordance with 
Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR 
CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8.3   Gravity Crack Filling</TTL><BRK/>
<BRK/>
<SPT><TTL>3.8.3.1   Surface Preparation</TTL><BRK/>
<BRK/>
<TXT>Clean concrete surfaces that are contaminated with oil, grease or dirt prior to beginning surface preparation 
in the area.  Use only detergents or proprietary cleaners formulated for removal of contaminants from concrete, 
and use them in accordance with the manufacturer's written instructions.  Do not use solvents for removal of 
oil or grease.  Remove all traces of cleaning agents and contaminants from the surface and cracks.  Perform final 
surface cleaning immediately prior to application of gravity filling in accordance with paragraph REMOVAL OF 
EXISTING CONCRETE, subparagraph Surface Preparation.  Dry surfaces to receive repair material as recommended 
by the grout or polymer manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.3.2   Applying Sealer</TTL><BRK/>
<BRK/>
<TXT>Apply high molecular weight methacrylate sealer to prepared surfaces in accordance with manufacturer's directions.  
Remove excess sealer, leaving no visible surface film.  Fill cracks greater than<MET> 3 mm</MET><ENG> 1/8 inch</ENG> wide in accordance 
with sealer manufacturer's recommendations.  Apply a second treatment of sealer evenly over the cracks and remove 
excess sealer on the surface.  Cover with light broadcast of a dry masonry sand.  Distribute evenly over the 
surface at the rate recommended by the sealer manufacturer.  After a curing period of 12 hours at<MET> 23 degrees 
C</MET><ENG> 73 degrees F</ENG>, remove any loose sand by lightly brooming.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8.4   Drilling and Plugging Cracks</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Drilling and plugging is applicable only for cracks which are reasonably 
straight and accessible from one end.  The hole must be large enough to intercept 
the crack for its entire length.  If load transfer is necessary, plug the hole 
with grout.  If watertightness is necessary, but not load transfer, plug the 
hole with resilient material.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drill a<MET> [50] [75] mm</MET><ENG> [2] [3] inch</ENG> diameter hole centered on the crack.  Clean the hole by flushing with water 
and compressed air prior to placing grout.  Fill the hole with [portland cement grout consisting of one part 
portland cement, three parts fine aggregate, and sufficient water to permit placement in the hole][bituminous 
joint sealant].  Place the grout in lifts to avoid pressure from the weight of the grout causing the grout to 
leak through the crack at lower levels.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.5   Injection Grouting Cracks</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Portland cement grout is normally used to seal wide cracks, but may be 
used to seal cracks as narrow as 0.05 mm (0.002 inch).  Ultra-fine cement grout 
may be used to seal cracks of a smaller size.  Epoxy resin is normally used 
for cracks between 0.13 and 6.3 mm (0.005 and 0.25 inch) wide.  Polyurethane 
is normally used for cracks greater than 0.13 mm (0.005 inch) wide.<BRK/>
<BRK/>
The interval between valves should be greater than the thickness of the member 
being repaired.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.8.5.1   Preparation</TTL><BRK/>
<BRK/>
<TXT>Clean each crack of dust, dirt, loose concrete and unsound material by vacuuming or flushing with water and allowing 
to dry to remove free water in the crack.  Insert a valve at both ends of each crack, at the junction of two 
cracks, and along the length of each crack at<MET> [400 to 500][_____] mm</MET><ENG> [16 to 20] [_____] inch</ENG> intervals.  Fill 
crack between valves with crack surface sealer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.5.2   Injection</TTL><BRK/>
<BRK/>
<TXT>After crack surface sealer has hardened and cured, pump [epoxy injection adhesive][polyurethane injection adhesive][ultra-fine 
cement grout] into valve at one end of crack.  For vertical surfaces start at lowest valve and work upwards.  
As crack sealer appears at next valve, pinch pumping valve closed and move to next valve and commence pumping.  
Continue procedure until other end of crack is reached.  Avoid delays in pumping operation.  After crack sealer 
has hardened and cured grind valves off flush with concrete surface.  Coat areas of valves with crack surface 
sealer and allow to harden and cure.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8.6   Crack Repair with Additional Reinforcement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Repairing cracks with additional reinforcement is used to stabilize active 
cracks to permit sealing and to reestablish tensile strength across cracks.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Stabilize cracks by anchoring as shown on the drawings.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.8.6.1   Stitching</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the crack must be made watertight, one of the methods for sealing 
or repairing the crack should be used prior to stabilizing the crack.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drill holes of appropriate size and depth for grouting the stitching staples and at the spacing shown on the 
drawings.  Reduce spacing at ends of crack.  Vary the orientation and length of stitching staples to avoid applying 
tension to a single plane within the concrete.  If the end of the crack within the structure can be determined, 
drill a hole at the end of the crack to relieve stress concentration.  Clean the holes by flushing with water 
and compressed air prior to placing grout.  Dry surfaces to receive grout as recommended by the grout manufacturer.  
Partially fill the holes with epoxy resin grout and insert the stitching staples into the holes.  Place additional 
grout and consolidate it by rodding until remainder of the hole is filled.  Place grout with the equipment capable 
of supplying, mixing, and placing the grout in the holes in a manner that will ensure complete filling of the 
holes and elimination of voids, air pockets, and water.  After placing, allow the grout to set for a period of 
not less than 24 hours, and protect the stitching staples against damage.  Remove and reset any stitching staples 
which are disturbed during curing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.6.2   Conventional Reinforcement</TTL><BRK/>
<BRK/>
<TXT>Drill holes, of a size appropriate for the reinforcement and grout used, at right angle to the crack plane, and 
extending a minimum of<MET> 0.45 m</MET><ENG> 18 inches</ENG> on each side of the crack.  Space holes as indicated on the drawings.  
Clean the holes by flushing with water and compressed air prior to placing grout.  Insure that holes are dry 
before placing grout.  Inject epoxy grout at a pressure sufficient to distribute the grout in the hole but not 
great enough to cause additional damage to the concrete.  Insert reinforcing bar so that it extends at least<MET> 
0.45 m</MET><ENG> 18 inches</ENG> on each side of the crack.  [After grout has set, seal the crack by injection grouting.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.6.3   Internal Prestressing Reinforcement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where both sides of the structure are accessible, the prestressing steel 
may extend from an anchor plate on one side with the stressing head at the other 
side with the hole grouted after stressing.  When only one side is exposed, 
the prestressing steel is grouted in place and stressed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Drill holes of the size and depth [shown on the drawings][recommended by the grout manufacturer] 
and at the location shown.  Cut recess for [anchor plate and] stressing head in the concrete as shown.  
Clean the hole by flushing with water and compressed air prior to placing grout.  Dry holes as recommended 
by the grout manufacturer.</LST><BRK/>
<BRK/>
<LST>b.  Place [cement-based][polymer-modified][epoxy] grout pads [in the recess(es)][on the face of the wall] 
as shown on the drawings and install the [anchor plate,] stressing plate.</LST><BRK/>
<BRK/>
<LST>c.  [Install the threaded bar and nuts and tighten until snug until the grout pads have set.][Insert 
the required resin cartridges into the drilled hole, taking care not to rupture the skin.  Use rapid 
setting cartridges in the anchor zone of the bar and slower setting cartridges in the stressing zone.  
To avoid premature rupture of the resin cartridges it may be necessary to place them in a thin-walled 
tube and insert the tube in the drilled hole to the specified depth.  Withdraw the tube carefully prior 
to insertion of the threaded bar.</LST><BRK/>
<BRK/>
<LST>d.  Rotate the threaded bolt through the cartridges to end of hole in accordance with the cartridge manufacturer's 
recommendations in order to rupture the skin and mix the resin.  Use method, rotation time, and speed 
of rotation as recommended by the manufacturer and approved by the Contracting Officer.]</LST><BRK/>
<BRK/>
<LST>e.  No permanent installation of threaded bars will be permitted until it is demonstrated to the satisfaction 
of the Contracting Officer that the anchors can be properly installed.  Stress the threaded bar to [_____]<MET>
 KPa</MET><ENG> psi</ENG> using equipment recommended by the bar manufacturer.  This load is the final effective (residual) 
load per bar after all losses have occurred.  Determine the stress load by the measurement of the threaded 
bar elongation and by checking pressure of the hydraulic jack.  Correlation shall be within 5 percent 
of agreement.  After stressing the threaded bar, cut the bar and fill the recess with dry-pack mortar.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.6.4   External Stressing</TTL><BRK/>
<BRK/>
<TXT>Install anchorages as shown on the drawings.  Install prestressing bars and stress in increments in accordance 
with the procedure shown on the drawings to avoid eccentric loads.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></TAI><TAI OPT="JOINT RESEALING"><SPT><TTL>3.9   CLEANING AND RESEALING JOINTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The drawings must show typical details for the joint sealing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.9.1   Preparation of Joints</TTL><BRK/>
<BRK/>
<TXT>Immediately before the installation of the sealant, thoroughly clean the joints to remove all laitance, loose 
or deteriorated filler, and old sealant from the sides and upper edges of the joint space to be sealed.  Clean 
joints to sufficient depth to remove all loose material and debris and to permit placement of the backup material 
and sealant as shown on the drawings.  Concrete surfaces shall be dry at the time of sealant application.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.1.1   Existing Sealant Removal</TTL><BRK/>
<BRK/>
<TXT>Cut the in-place sealant and expansion joint material loose from both joint faces and to the minimum depth required 
to permit placement of the back-up material and sealant depth equal to one half the width of joint or as recommended 
by the sealant manufacturer, unless otherwise shown on the drawings, using the waterjetting equipment as specified 
in paragraph EQUIPMENT.  Removal may be efficiently accomplished using high pressure water jet with abrasive 
added.  Prior to further cleaning operations, remove all loose old sealant remaining in the joint opening by 
blowing with compressed air.  Chipping, spalling, or otherwise damaging the concrete will not be permitted.[  
For compression seals, sawcut the joint to the width and depth shown on the drawings.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.1.2   Sandblasting and Waterjetting</TTL><BRK/>
<BRK/>
<TXT>Sandblast or waterjet clean the newly exposed concrete joint faces to at least the depth of the back-up material 
and sealant and the concrete surfaces extending a minimum of<MET> 13 mm</MET><ENG> 1/2 inch</ENG> from the joint edges.  Use a multiple-pass 
technique until the surfaces are free of dust, dirt, filler, old sealant residue, or any foreign debris that 
might prevent the bonding of the sealant to the concrete.  After final cleaning and immediately prior to sealing, 
blow the joints out with compressed air to ensure that the joints are completely free of debris and water.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.1.3   Rate of Progress of Joint Preparation</TTL><BRK/>
<BRK/>
<TXT>Limit the joint preparation which includes sandblasting or waterjetting, air pressure cleaning and placing of 
the back-up material to only that lineal footage that can be sealed during the same day.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9.2   Installation of Sealant</TTL><BRK/>
<BRK/>
<TXT>Store and apply the primer and sealant in accordance with the manufacturer's written safety instructions and 
precautions and using manufacturer recommended procedures.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.2.1   Time of Application</TTL><BRK/>
<BRK/>
<TXT>Seal joints immediately following final cleaning of the joint sidewalls and following the placement of the bond 
breaker and back-up material.  Reclean open joints that cannot be sealed under the conditions specified, or when 
rain interrupts sealing operations, and allowed to dry prior to installing the sealant.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.2.2   Back-Up Material and Bond Breaker</TTL><BRK/>
<BRK/>
<TXT>Plug or seal off the lower portion of the joint opening using a back-up material to prevent the entrance of the 
sealant below the specified depth.  Take care to ensure that the backup material is placed at the specified depth 
and is not stretched or twisted during installation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.2.3   Sealing Joints</TTL><BRK/>
<BRK/>
<TXT>Perform a final cleaning with compressed air immediately preceding, but not more than 50 feet ahead of the sealing 
operations.  The joint surfaces shall be dry at the time the sealant is installed.  Apply primer evenly to the 
joint faces in accordance with the manufacturer's instructions before placement of the back-up material.  Place 
bond breaker material after the primer is applied.  Fill the joints from the bottom up to the [bottom of the 
beveled edge][surface of the concrete].  Depth of sealant shall be one-half the joint width or as recommended 
by the sealant manufacturer.  [Commence sealing of joints at the bottom of the slope or wall and continue up 
the concrete slope or wall].  Remove excess or spilled sealant from the concrete surface by approved methods 
and discard.  Install the sealant using a gun cartridge in such a manner as to prevent the formation of voids 
and entrapped air.  Do not install sealant material using gravity methods or pouring pots.  Check joints frequently 
to ensure that the newly installed sealant is cured to a tack-free condition within the time specified.  Tool 
the sealant concave immediately after application.</TXT><BRK/>
<BRK/></SPT>
</SPT>[<SPT><TTL>3.9.3   Installation of Preformed Compression Seals</TTL><BRK/>
<BRK/>
<TXT>Install the joint seals with equipment capable of installing joint seals to the prescribed depth without cutting, 
nicking, twisting, or otherwise distorting or damaging the seal and with no more than five percent stretching 
of the seal.  Cover the sides of the joint and, if necessary, the sides of the compression seal, with a coating 
of lubricant, and install the seal to the depth indicated with joint installation equipment.  Coat butt joints 
with liberal applications of lubricant.</TXT><BRK/>
<BRK/></SPT>
]</SPT></TAI><TAI OPT="OVERLAY"><SPT><TTL>3.10   OVERLAYS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the referenced specifications are not included in the project specification, 
applicable portions should be inserted here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.10.1   Cement-Based Concrete Overlay</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When overlaying mass concrete with a relatively thin layer of cement-based 
concrete or where movement in the base concrete may occur, a bond breaker should 
be placed to prevent shrinkage and restraint cracking of the overlay due to 
constraint of the overlay.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install anchors and reinforcement [and place bond breaker] as shown on the drawings.  Place, consolidate, finish 
and cure concrete in accordance with the applicable requirements of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL 
CONCRETE][<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE 
CONCRETE], except only moist curing will be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.2   Polymer-Modified Concrete Overlay</TTL><BRK/>
<BRK/>
<TXT>Mixing, placing and curing polymer-modified concrete shall be in accordance with <RID>ACI 548.4</RID> and the following 
requirements.  Mix and place polymer-modified concrete only within the temperature limits recommended by the 
polymer manufacturer.  Prime the surface with a slurry of polymer-modified mortar of the same composition as 
the polymer-modified concrete except for coarse aggregate.  Place polymer-modified concrete before the prime 
coat dries.  Place polymer-modified concrete within 15 minutes of addition of polymer.  Moist cure overlay for 
not less than 24 hours nor more than 48 hours, then air dry.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3   Joints</TTL><BRK/>
<BRK/>
<TXT>Construct expansion and contraction joints in concrete overlay at the locations shown.  Maintain alignment of 
control joints within<MET> 6 mm</MET><ENG> 1/4-inch</ENG>, to either side, of the required joint alignment.  Construct expansion and 
contraction joints at the locations shown and in accordance with Section <SRF>03 15 13.00 10</SRF> EXPANSION JOINTS, CONTRACTION 
JOINTS, AND WATERSTOPS.  Construct expansion joints at existing joints using preformed expansion joint material 
of the thickness shown and extending the full depth of the overlay.  Construct control joints by tooling the 
plastic concrete, then sawcutting at the appropriate time.  Saw control joints to a minimum [depth of [_____]<MET>
 mm</MET><ENG> inch(es)</ENG>][of 25 percent of the thickness of the slab].  Maintain an ample supply of saw blades on the job 
before concrete placement is started, and have at least one standby sawing unit in good working order available 
at the jobsite at all times during the sawing operations.  Begin sawcutting as soon as it is possible to saw 
the concrete without damaging adjacent concrete.  Inspect the faces of joints during sawcutting for undercutting 
or washing of the concrete due to early sawing.  Complete sawcutting within 16 hours of concrete placement. Continue 
sawcutting regardless of weather conditions. Delay sawing if undercutting is sufficiently deep to cause structural 
weakness or excessive roughness in the joint or chipping, tearing, or spalling of the concrete occurs at the 
surface. Discontinue sawing when a crack develops ahead of the saw cut.  Immediately after the joint is sawed, 
flush the saw cut and adjacent concrete surface thoroughly with water until all residue from sawing is removed 
from the joint.  Control and dispose of waste water from sawcutting and cleanup in accordance with Section 
<SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="REFACING"><SPT><TTL>3.11   REFACING VERTICAL SURFACES</TTL><BRK/>
<BRK/>
<SPT><TTL>3.11.1   Cement-Based Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where there is concern about placement of high lifts of refacing concrete, 
use the optional text concerning lift height and placement time.  The permissible 
height of individual lifts and time limit between placing lifts should be determined 
by the form design to prevent overloading of the forms and to maintain required 
construction tolerances.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install anchors and reinforcement as shown on the drawings.  Place, consolidate, finish and cure concrete in 
accordance with the applicable requirements of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][
<SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS][Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE 
CONCRETE][Section <SRF>03 37 13</SRF> SHOTCRETE].  Do not place concrete when, in the opinion of the Contracting Officer, 
weather conditions prevent proper placement, consolidation, and curing.  [In order to prevent overloading of 
forms, place concrete systematically in lifts not to exceed<MET> [1.3] [_____] m</MET><ENG> [4] [_____] feet</ENG>, across the complete 
placement area.  Place the next lift no sooner than [4] [_____] hours from the time that the first lift is placed.]  
Deposit concrete as close as possible to its final position in the forms, and in so depositing do not permit 
a vertical drop greater than<MET> 1.5 m</MET><ENG> five feet</ENG> except where suitable equipment is provided to prevent segregation 
and where specifically authorized.  Regulate depositing of the concrete so that it may be effectively consolidated 
in horizontal layers<MET> 600 mm</MET><ENG> 2.0 feet</ENG> or less in thickness with a minimum of lateral movement.  Deposit in each 
location only that amount of concrete that can be readily and thoroughly consolidated.  Thoroughly distribute 
and consolidate concrete around embedded items, assuring that no air pockets occur behind vertical items.  Provide 
sufficient placing capacity so that concrete can be kept plastic and free of cold joints while concrete is being 
placed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2   Preplaced-Aggregate Concrete</TTL><BRK/>
<BRK/>
<TXT>Install anchors and reinforcement as shown on the drawings.  Place, consolidate, finish and cure concrete in 
accordance with the applicable requirements of Section <SRF>03 37 00</SRF> PREPLACED-AGGREGATE CONCRETE.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="PRECAST CONCRETE"><SPT><TTL>3.11.3   Precast Concrete Units</TTL><BRK/>
<BRK/>
<TXT>Prepare base and install anchors as shown on the drawings.  Fabricate precast concrete units in accordance with 
Section <SRF>03 45 33</SRF> PRECAST [PRESTRESSED] STRUCTURAL CONCRETE.  Cure by steam at atmospheric pressure only.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.3.1   Erection of Precast Units</TTL><BRK/>
<BRK/>
<TXT>Erect precast units in accordance with the details shown on the approved shop drawings and <SUB>erection plan for 
precast units</SUB>, <SUB>alignment plan for precast units</SUB>, approved revisions to the approved plans resulting from the 
precast unit assembly test, and in accordance with Section <SRF>03 45 33</SRF> PRECAST [PRESTRESSED] STRUCTURAL CONCRETE.  
Install equipment required by other trades as the work progresses if required by design.  Do not field-cut openings 
in the units unless recommended by the manufacturer and approved by the Contracting Officer.  Ensure that all 
bearing surfaces are level and free from irregularities.  Install precast units at right angles to bearing surfaces, 
drawn up tight without forcing or distortion, and with sides plumb.  Set precast units true to alignment, level 
and plumb, with joints properly spaced and aligned both vertically and horizontally.  Place shims as required 
as units are erected to maintain correct alignment.  Install [elastomeric expansion joint filler material], back-up 
material, and neoprene bearing pads as shown on the contract drawings.  Bond elastomeric filler material and 
neoprene bearing pads to the precast units using adhesive as recommended by the manufacturers.  After erection, 
fill pickup points, inserts, and similar items and finish with dry-pack mortar to match adjacent areas.  Erection 
tolerances shall be in accordance with the requirements of <RID>PCI MNL-116</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.3.2   Temporary Unit Supports</TTL><BRK/>
<BRK/>
<TXT>Install temporary unit supports to align precast units and support the units during infill concrete placement.  
Place the temporary unit supports well in advance of any scheduled infill concrete placement.  Secure temporary 
unit supports prior to infill concrete placements and keep in place after infill placement for at least 24 hours, 
unless appropriate calculation and break histories verify that the infill concrete has reached a strength of 
500 psi sooner.  Do not remove temporary unit supports in less than 12 hours.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.3.3   Installation of Neoprene Bearing Pads and Joint Filler Material</TTL><BRK/>
<BRK/>
<TXT>Install neoprene bearing pads in accordance with the details shown on the contract drawings.  Install expansion 
joint filler material in horizontal and vertical joints between all precast concrete units in accordance with 
the details shown on the contract drawings.  Install neoprene bearing pads accurately to the locations shown.  
Apply adhesive to neoprene bearing pads and expansion joint filler material to bond these materials to the concrete 
surfaces of the precast units.  Allow adhesive to cure for an appropriate time.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.3.4   Placement of Infill Concrete</TTL><BRK/>
<BRK/>
<TXT>After precast units have been erected, plumbed, leveled, and secured with the temporary unit supports, place 
infill concrete to fill the void behind the precast units as shown.  Place infill concrete behind the [bottom 
and middle] units in lifts of the heights shown on the drawings.  Do not place consecutive lifts in less than 
the time indicated in the approved erection plan.  Ensure that all formwork at joints and open ends are leak-tight, 
and sufficiently rigid to withstand the pressures encountered during the infill concrete placement.  Block elastomeric 
filler material, neoprene bearing pads, expansion joint material, back-up material, and shims sufficiently  to 
prevent movement during placement of infill concrete.   Begin curing of infill concrete as soon as possible after 
completion of the placement and continue until the next lift of precast units is installed.  Cure the exposed 
infill concrete in accordance with [Section <SRF>03 31 01.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS] 
[Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><SPT><TTL>3.11.4   Shotcrete</TTL><BRK/>
<BRK/>
<TXT>Install anchors and reinforcement as shown on the drawings.  Place, finish and cure shotcrete in accordance with 
the applicable requirements of Section <SRF>03 37 13</SRF> SHOTCRETE.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><SPT><TTL>3.12   TESTS AND INSPECTIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.12.1   General</TTL><BRK/>
<BRK/>
<TXT>The individuals who sample and test repair materials as required in this specification shall have demonstrated 
a knowledge and ability to perform the necessary test procedures equivalent to the ACI minimum guidelines for 
certification of Concrete Field Testing Technicians, Grade I.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2   Preparations for Placing</TTL><BRK/>
<BRK/>
<TXT>Inspect prepared surfaces, forms, and embedded items in sufficient time prior to each placement of repair material 
to certify that the surfaces are ready to receive the repair material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.3   Grouted Dowels and Anchors</TTL><BRK/>
<BRK/>
<TXT>Test the first three dowels or anchors of each type and a minimum of three dowels or anchors per 1,000 dowels 
or anchors in accordance with <RID>ASTM E 488</RID>.  Use incremental loading for tensile test to 75% of the yield strength 
of the dowel or anchor.  Consider anchors to have failed if displacement exceeds<MET> 2.5 mm</MET><ENG> 0.1 inch</ENG> or if any of 
the failure modes of paragraph 12.2 occur.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.4   Epoxy Mortar</TTL><BRK/>
<BRK/>
<SPT><TTL>3.12.4.1   Sampling</TTL><BRK/>
<BRK/>
<TXT>As soon as epoxy resin and aggregate materials are available for sampling, obtain by random selection a sample 
of each batch.  Clearly identify samples by designated name, specification number, batch number, project contract 
number, intended use and quantity involved.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.4.2   Testing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For projects requiring large amounts of epoxy repairs use the bracketed 
sentences.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>At the discretion of the Contracting Officer, samples provided may be tested by the Government for verification.  
[Test samples by an approved laboratory.  If a sample fails to meet specification requirements after two tests, 
replace the batch represented by the samples tested and retest.  Test aggregates in accordance with <RID>ASTM C 117</RID>
 and <RID>ASTM C 136</RID>.]</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.4.3   Inspection</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph for projects having large repaired surface areas.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Check each repaired area for cracks, spalls, popouts and loss of bond between repaired area and surrounding concrete.  
Check each repaired area for voids by tapping with a hammer or steel rod and listening for dull or hollow sounds.  
Immediately repair defects.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.5   [Cement-Based ] [or] [Polymer-Modified] Concrete and Mortar</TTL><BRK/>
<BRK/>
<SPT><TTL>3.12.5.1   Air Content</TTL><BRK/>
<BRK/>
<TXT>Check air content at least [once] [twice] during each shift that concrete is placed [for each type and class 
of repair material required].  Obtain samples in accordance with <RID>ASTM C 172</RID> and test in accordance with <RID>ASTM C 231</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.5.2   Slump</TTL><BRK/>
<BRK/>
<TXT>Check slump [once] [twice] during each shift that concrete is produced [for each type and class of repair material 
required].  Obtain samples in accordance with <RID>ASTM C 172</RID> and test in accordance with <RID>ASTM C 143/C 143M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.5.3   Consolidation and Protection</TTL><BRK/>
<BRK/>
<TXT>Ensure that the repair material is properly consolidated, finished, protected, and cured.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.5.4   Compression Tests</TTL><BRK/>
<BRK/>
<TXT>Prepare compression test cubes in accordance with <RID>ASTM C 31/C 31M</RID> and cure at the site under the same conditions 
as the repair.  Test in accordance with <RID>ASTM C 109/C 109M</RID>.<BRK/>
<BRK/></TXT>
</SPT><SPT><TTL>3.12.5.5   Curing</TTL><BRK/>
<BRK/>
<LST>a.  Moist-Curing Inspections - At least once each shift, and once per day on nonwork days, inspect all 
areas subject to moist curing.  Note and record the surface moisture condition.</LST><BRK/>
<BRK/>
<LST>b.  Membrane-Curing Inspection - Do not apply curing compound until the Contractor's authorized representative 
has verified that the compound is properly mixed and ready for spraying.  At the end of each operation, 
estimate the quantity of compound used by measurement of the container and the area of repair material 
surface covered and compute the rate of coverage in<MET> square meters/L</MET><ENG> square feet/gallon</ENG>.  Note whether 
or not coverage is uniform.</LST><BRK/>
<BRK/>
<LST>c.  Sheet-Curing Inspection - At least once each shift and once per day on nonwork days, inspect all 
areas being cured using material sheets.  Note and record the condition of the covering and the tightness 
of the laps and tapes.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.6   Aggregates</TTL><BRK/>
<BRK/>
<TXT>Test gradation in accordance with <RID>ASTM C 136</RID> and <RID>ASTM C 117</RID>.  Determine the percent passing the No. 200 sieve 
by washing in accordance with <RID>ASTM C 117</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.7   Action Required</TTL><BRK/>
<BRK/>
<SPT><TTL>3.12.7.1   Placing</TTL><BRK/>
<BRK/>
<TXT>The placing foreman shall not permit placing to begin until he has verified that appropriate placement, consolidation 
and finishing equipment, which are in working order and have competent operators, are available.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.7.2   Grouted Anchors and Dowels</TTL><BRK/>
<BRK/>
<TXT>Test a minimum of two adjacent anchors or dowels for each anchor or dowel that fails.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.7.3   Air Content</TTL><BRK/>
<BRK/>
<TXT>Whenever a test result is outside the specification limits, do not deliver the concrete to the forms and adjust 
the dosage of the air-entrainment admixture.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.7.4   Slump</TTL><BRK/>
<BRK/>
<TXT>Whenever a test result is outside the specification limits, do not deliver the concrete to the forms and an adjustment 
should be made in the batch weights of water and fine aggregate.  The adjustments are to be made so that the 
water-cementitious materials ratio does not exceed that specified in the submitted concrete mixture proportion.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.7.5   Curing</TTL><BRK/>
<BRK/>
<LST>a.  Moist-Curing Corrective Action - When a daily inspection report lists an area of inadequate curing, 
take immediate corrective action, and extend the required curing period for such areas by one (1) day.</LST><BRK/>
<BRK/>
<LST>b.  Membrane-Curing Corrective Action - When the coverage rate of the curing compound is less than that 
specified or when the coverage is not uniform, spray the entire surface.</LST><BRK/>
<BRK/>
<LST>c.  Sheet-Curing Corrective Action - When a daily inspection report lists any tears, holes, or laps or 
joints that are not completely closed, promptly repair the tears and holes or replace the sheets, close 
the joints, and extend the required curing period for those areas by one (1) day.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.8   Final Inspection</TTL><BRK/>
<BRK/>
<TXT>Following completion of the work, inspect surfaces for damage, staining, and other distresses.  Inspect [repairs] <TAI OPT="OVERLAY">
[overlays] </TAI><TAI OPT="REFACING">[and] [refacing] </TAI>for cracking, crazing, delamination, unsoundness, staining and other defects.  Inspect 
the finish and surface tolerances of the repairs to verify that all requirements have been met.  Repair all surfaces 
exhibiting defects as directed at no cost to the Government when defects are due to Contractor workmanship or 
procedures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.9   Reports</TTL><BRK/>
<BRK/>
<TXT>Report the results of all tests and inspections conducted at the project site informally at the end of each shift 
and in writing weekly and deliver within 3 days after the end of each weekly reporting period.  See Section 
<SRF>01 45 01</SRF> USACE QUALITY CONTROL.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.10   Manufacturer Field Service</TTL><BRK/>
<BRK/>
<TXT>Provide the services of a manufacturer's technical representative experienced in mixture proportioning and placement 
procedures for the following materials:</TXT><BRK/>
<BRK/>
<LST>a.   Epoxy mortar or concrete</LST><BRK/>
<LST>b.   Polymer-modified mortar or concrete</LST><BRK/>
<LST>b.   Epoxy injection grout</LST><BRK/>
<LST>d.   High molecular weight methacrylate sealer</LST><BRK/>
<LST>e.   Concrete containing High-Range Water Reducers (HRWRA)</LST><BRK/>
<LST>f.   Concrete containing Silica Fume</LST><BRK/>
<BRK/>
<TXT>Provide, at no additional cost to the Government, the  services of the manufacturer's experienced technical representative 
during mixture proportioning, planning and production.  The manufacturer's representative shall be available 
for consultation by both the Contractor and the Contracting officer during mixture proportioning, planning, and 
production of the materials and shall be on-site immediately prior to and during at least the first placement 
of the material, and at other times if directed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.13   CLEAN UP</TTL><BRK/>
<BRK/>
<TXT>Clean all surfaces of concrete and adjacent facilities which are stained by dirt, oil, grease, fuel, or other 
byproducts that are created by the construction operations with detergent and pressure wash.  Dispose of debris 
in accordance with Section <SRF>01 74 19</SRF> CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT[ and Section <SRF>01 57 20.00 10</SRF> 
ENVIRONMENTAL PROTECTION].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14   DUST CONTROL</TTL><BRK/>
<BRK/>
<TXT>Control dust resulting from demolition to prevent the spread of dust and avoid creation of a nuisance in the 
surrounding area.  Do not use water when it will result in, or create, hazardous or objectionable conditions 
such as ice, flooding, or pollution.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15   PROTECTION PRIOR TO ACCEPTANCE</TTL><BRK/>
<BRK/>
<TXT>Do not permit vehicular or heavy equipment traffic on the repair surfaces [during the curing period][until [7] 
[_____] days after completion of the repair].  Permit light local traffic on the concrete surfaces at the end 
of the curing period, if approved by the Contracting Officer.  Where shelter or other protective measures are 
provided for repair during inclement weather, maintain such protective measures until the repair material has 
cured and discontinuance of the measures is authorized.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.16   SCHEDULES</TTL><BRK/>
<TBL><BRK/>
<THD><HL4>Concrete Removal Methods</HL4><BRK/>
<BRK/>
                                             Removal Method<BRK/>
        Feature                   A   B   C   D   E   F   G   H   I   J   K  <BRK/>
<BRK/></THD>
<BRK/>
  Horizontal Surface                  X   X   X   X   X   X   X   X  <BRK/>
  <BRK/>
  Vertical Surfaces               X   X       X   X   X   X   X   X   X   X<BRK/>
<BRK/>
  Slab-on-grade                           X           X   X           X   X<BRK/>
<BRK/>
<TAI OPT="CONTROLLED BLASTING">   A   Controlled Blasting<BRK/></TAI>
   B   Abrasive Water Jet<BRK/>
        Cutting<BRK/>
   C   Diamond Blade Cutting<BRK/>
   D   Diamond Wire Cutting<BRK/>
   E   Stitch Cutting<BRK/>
   F   Boom Mounted Breaker<BRK/>
   G   Hand Held Breaker<BRK/>
   H   Hydromilling<BRK/>
   I   Rotary Head Milling<BRK/>
   J   Presplitting (Expansive<BRK/>
        Agent)<BRK/>
   K   Mechanical Presplitting<BRK/></TBL>
<TBL><BRK/>
<THD><HL4>Repair Material</HL4><BRK/>
<BRK/>
                                                   Repair Material<BRK/>
        Feature                           A   B   C   D   E   F   G   H   I<BRK/></THD>
<BRK/>
  Horizontal Surfaces (repair)                X       X   X   X   X  <BRK/>
<BRK/>
  <TAI OPT="OVERLAY">Horizontal Surfaces (Overlay)           X       X       X       X<BRK/>
<BRK/>
 </TAI> Vertical Surfaces (repair)              X   X   X   X   X   X       X    X<BRK/>
<BRK/>
<TAI OPT="REFACING">  Vertical Surfaces (Refacing)            X       X       X       X   X    X<BRK/>
<BRK/></TAI>
   A   Cement-Based Concrete<BRK/>
   B   Cement-Based Mortar   <BRK/>
<TAI OPT="PRECAST CONCRETE">   C   Precast Portland Cement Concrete   <BRK/></TAI>
   D   Polymer-Modified Mortar<BRK/>
   E   Polymer-Modified Concrete<BRK/>
   F   Epoxy Mortar<BRK/>
   G   Epoxy Concrete<BRK/>
   H   Preplaced-Aggregate Concrete<BRK/>
   I   Shotcrete<BRK/>
 </TBL><TBL><BRK/>
<TAI OPT="CRACK REPAIR"><THD><HL4>Crack Repair</HL4><BRK/>
<BRK/>
                                                     Repair Method<BRK/>
         Type of Crack                           A   B   C   D   E   F<BRK/></THD>
<BRK/>
   Open Crack on Surface                         X   X<BRK/>
<BRK/>
   Structural Crack (Inactive)                   X   X       X   X<BRK/>
<BRK/>
   Structural Crack (Active)                             X           X<BRK/>
<BRK/>
    A  Clean and Seal<BRK/>
    B  Clean and Fill<BRK/>
    C  Drill and Plug<BRK/>
    D  Injection<BRK/>
    E  Stitching<BRK/>
    F  Mechanical Anchoring<BRK/>
<BRK/></TAI>
</TBL></SPT></PRT>    <END/><BRK/></SEC>