<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA            UFGS-03 31 00.00 10 (April 2006)<BRK/>
                                          --------------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                Replacing without change<BRK/>
                                          UFGS-03300A (January 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 03 31 00.00 10</SCN><BRK/>
<BRK/>
<STL>CAST-IN-PLACE STRUCTURAL CONCRETE</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>cast-in-place concrete 
materials, mixing, placement, and finishes</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This specification covers concrete work primarily for buildings, but 
may also be used for other applications such as wharves, docks, drainage structures, 
warehouse type slabs, and driveways.  The following guide specifications are 
relative to this section and will be included to the extent applicable in projects 
where this section is used:</NPR><BRK/>
<BRK/>
<NPR>Section 03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK</NPR><BRK/>
<NPR>Section 03 20 01.00 10 CONCRETE REINFORCEMENT</NPR><BRK/>
<NPR>Section 03 15 13.00 10 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS</NPR><BRK/>
<NPR>Section 07 92 00 JOINT SEALANTS</NPR><BRK/>
<BRK/>
<NPR>Specifications on concrete for bridge construction should be in a separate section 
and should be essentially in agreement with concrete construction requirements 
in the American Association of State Highway and Transportation Officials, "Standard 
Specifications for Highway Bridges."  Requirements for deck slabs, curbs, gutters, 
and sidewalks forming an integral part of the bridge should be included in the 
section concerning concrete for bridge construction.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ACI INTERNATIONAL (ACI)</ORG><BRK/><BRK/><RID>ACI 117</RID><RTL>(2006) Standard Specifications for Tolerances for Concrete Construction and Materials</RTL><BRK/><BRK/><RID>ACI 211.1</RID><RTL>(1991; R 2002) Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete</RTL><BRK/><BRK/><RID>ACI 211.2</RID><RTL>(1998; R 2004) Standard Practice for Selecting Proportions for Structural Lightweight Concrete</RTL><BRK/><BRK/><RID>ACI 213R</RID><RTL>(2003) Guide for Structural Lightweight Aggregate Concrete</RTL><BRK/><BRK/><RID>ACI 214R</RID><RTL>(2002) Recommended Practice for Evaluation of Strength Test Results of Concrete</RTL><BRK/><BRK/><RID>ACI 301</RID><RTL>(2005; Errata 2008) Specifications for Structural Concrete</RTL><BRK/><BRK/><RID>ACI 303R</RID><RTL>(2004) Guide to Cast-In-Place Architectural Concrete Practice</RTL><BRK/><BRK/><RID>ACI 305R</RID><RTL>(1999; Errata 2006) Hot Weather Concreting</RTL><BRK/><BRK/><RID>ACI 318</RID><RTL>(2008; Errata 2008) Building Code Requirements for Structural Concrete and Commentary</RTL><BRK/><BRK/><RID>ACI 318M</RID><RTL>(2008) Metric Building Code Requirements for Structural Concrete and Commentary</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)</ORG><BRK/><BRK/><RID>AASHTO M 182</RID><RTL>(2005) Standard Specification for Burlap Cloth Made from Jute or Kenaf and Cotton Mats</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM C 1017/C 1017M</RID><RTL>(2007) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete</RTL><BRK/><BRK/><RID>ASTM C 1059/C 1059M</RID><RTL>(1999; R 2008) Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete</RTL><BRK/><BRK/><RID>ASTM C 1064/C 1064M</RID><RTL>(2008) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete</RTL><BRK/><BRK/><RID>ASTM C 1077</RID><RTL>(2008) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation</RTL><BRK/><BRK/><RID>ASTM C 1107/C 1107M</RID><RTL>(2008) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)</RTL><BRK/><BRK/><RID>ASTM C 1116/C 1116M</RID><RTL>(2008) Standard Specification for Fiber-Reinforced Concrete</RTL><BRK/><BRK/><RID>ASTM C 1240</RID><RTL>(2005) Standard Specification for Silica Fume Used in Cementitious Mixtures</RTL><BRK/><BRK/><RID>ASTM C 1260</RID><RTL>(2007) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)</RTL><BRK/><BRK/><RID>ASTM C 131</RID><RTL>(2006)Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 143/C 143M</RID><RTL>(2008) Standard Test Method for Slump of Hydraulic-Cement Concrete</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 1567</RID><RTL>(2008) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)</RTL><BRK/><BRK/><RID>ASTM C 171</RID><RTL>(2007) Standard Specification for Sheet Materials for Curing Concrete</RTL><BRK/><BRK/><RID>ASTM C 172</RID><RTL>(2008) Standard Practice for Sampling Freshly Mixed Concrete</RTL><BRK/><BRK/><RID>ASTM C 173/C 173M</RID><RTL>(2008) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method</RTL><BRK/><BRK/><RID>ASTM C 192/C 192M</RID><RTL>(2007) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory</RTL><BRK/><BRK/><RID>ASTM C 231</RID><RTL>(2008c) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method</RTL><BRK/><BRK/><RID>ASTM C 260</RID><RTL>(2006) Standard Specification for Air-Entraining Admixtures for Concrete</RTL><BRK/><BRK/><RID>ASTM C 309</RID><RTL>(2007) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete</RTL><BRK/><BRK/><RID>ASTM C 31/C 31M</RID><RTL>(2008a) Standard Practice for Making and Curing Concrete Test Specimens in the Field</RTL><BRK/><BRK/><RID>ASTM C 33</RID><RTL>(2007) Standard Specification for Concrete Aggregates</RTL><BRK/><BRK/><RID>ASTM C 330</RID><RTL>(2005) Standard Specification for Lightweight Aggregates for Structural Concrete</RTL><BRK/><BRK/><RID>ASTM C 39/C 39M</RID><RTL>(2005e1e2) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens</RTL><BRK/><BRK/><RID>ASTM C 42/C 42M</RID><RTL>(2004) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete</RTL><BRK/><BRK/><RID>ASTM C 494/C 494M</RID><RTL>(2008a) Standard Specification for Chemical Admixtures for Concrete</RTL><BRK/><BRK/><RID>ASTM C 496/C 496M</RID><RTL>(2004e1) Standard Test Method for Splitting Tensile Strength of Cylindrical Concrete Specimens</RTL><BRK/><BRK/><RID>ASTM C 552</RID><RTL>(2007) Standard Specification for Cellular Glass Thermal Insulation</RTL><BRK/><BRK/><RID>ASTM C 567</RID><RTL>(2005a) Determining Density of Structural Lightweight Concrete</RTL><BRK/><BRK/><RID>ASTM C 578</RID><RTL>(2008b) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation</RTL><BRK/><BRK/><RID>ASTM C 591</RID><RTL>(2008) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation</RTL><BRK/><BRK/><RID>ASTM C 595</RID><RTL>(2008) Standard Specification for Blended Hydraulic Cements</RTL><BRK/><BRK/><RID>ASTM C 618</RID><RTL>(2008a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete</RTL><BRK/><BRK/><RID>ASTM C 685/C 685M</RID><RTL>(2007) Concrete Made by Volumetric Batching and Continuous Mixing</RTL><BRK/><BRK/><RID>ASTM C 78</RID><RTL>(2008) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)</RTL><BRK/><BRK/><RID>ASTM C 881/C 881M</RID><RTL>(2002) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete</RTL><BRK/><BRK/><RID>ASTM C 937</RID><RTL>(2002) Grout Fluidifier for Preplaced-Aggregate Concrete</RTL><BRK/><BRK/><RID>ASTM C 94/C 94M</RID><RTL>(2007) Standard Specification for Ready-Mixed Concrete</RTL><BRK/><BRK/><RID>ASTM C 940</RID><RTL>(1998a; R 2003) Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory</RTL><BRK/><BRK/><RID>ASTM C 989</RID><RTL>(2006) Standard Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars</RTL><BRK/><BRK/><RID>ASTM D 1751</RID><RTL>(2004; R 2008) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)</RTL><BRK/><BRK/><RID>ASTM D 1752</RID><RTL>(2004a; R 2008) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion</RTL><BRK/><BRK/><RID>ASTM D 75</RID><RTL>(2003) Standard Practice for Sampling Aggregates</RTL><BRK/><BRK/><RID>ASTM E 1155</RID><RTL>(1996; R 2008) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers</RTL><BRK/><BRK/><RID>ASTM E 1155M</RID><RTL>(1996; R 2008) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers (Metric)</RTL><BRK/><BRK/><RID>ASTM E 96/E 96M</RID><RTL>(2005) Standard Test Methods for Water Vapor Transmission of Materials</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)</ORG><BRK/><BRK/><RID>NIST HB 44</RID><RTL>(2007) NIST Handbook 44:  Specifications, Tolerances, and other Technical Requirements for Weighing and Measuring Devices</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)</ORG><BRK/><BRK/><RID>NRMCA CPMB 100</RID><RTL>(2000) Concrete Plant Standards</RTL><BRK/><BRK/><RID>NRMCA QC 3</RID><RTL>(2002) Quality Control Manual: Section 3, Plant Certifications Checklist: Certification of Ready Mixed Concrete Production Facilities</RTL><BRK/><BRK/><RID>NRMCA TMMB 100</RID><RTL>(2001) Truck Mixer, Agitator and Front Discharge Concrete Carrier Standards</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>COE CRD-C 104</RID><RTL>(1980) Method of Calculation of the Fineness Modulus of Aggregate</RTL><BRK/><BRK/><RID>COE CRD-C 400</RID><RTL>(1963) Requirements for Water for Use in Mixing or Curing Concrete</RTL><BRK/><BRK/><RID>COE CRD-C 521</RID><RTL>(1981) Standard Test Method for Frequency and Amplitude of Vibrators for Concrete</RTL><BRK/><BRK/><RID>COE CRD-C 540</RID><RTL>(2001) Standard Specification for Nonbituminous Inserts for Contraction Joints in Portland Cement Concrete Airfield Pavements, Sawable Type</RTL><BRK/><BRK/><RID>COE CRD-C 572</RID><RTL>(1974) Specifications for Polyvinylchloride Waterstops</RTL><BRK/><BRK/><RID>COE CRD-C 94</RID><RTL>(1995) Specification for Surface Retarders</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   UNIT PRICE CONTRACT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove these paragraphs when lump sum contract is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.2.1   Measurement</TTL><BRK/>
<BRK/>
<TXT>Measurement of concrete for payment will be made on the basis of the actual volume within the pay lines of the 
structure as indicated on the contract drawings.  Measurement for payment of concrete placed against the sides 
of any excavation without intervening forms will be made only within the pay lines of the structure as shown 
on the contract drawings.  No deductions will be made for rounded or beveled edges, for space occupied by metal 
work, for conduits, for voids, or for embedded items which are less than<MET> 0.15 cubic meters</MET><ENG> 5 cubic feet</ENG> in volume 
or<MET> 0.09 square meters</MET><ENG> 1 square foot</ENG> in cross section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Payment</TTL><BRK/>
<BRK/>
<TXT>Unless otherwise specified, payment for concrete will be made at the respective unit prices per cubic<MET> meter</MET><ENG> yard</ENG>
 for the various items of the schedule, measured as specified above, which price shall include the cost of all 
labor, materials, and the use of equipment and tools required to complete the concrete work, except for any reinforcement 
and embedded parts specified to be paid separately.  Unit price payment will not be made for concrete placed 
in structures for which payment is made as a lump sum.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   LUMP SUM CONTRACT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove this paragraph when unit price contract is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Under this type of contract concrete items will be paid for by lump sum and will not be measured.  The work covered 
by these items consists of furnishing all concrete materials, reinforcement, miscellaneous embedded materials, 
and equipment, and performing all labor for the forming, manufacture, transporting, placing, finishing, curing, 
and protection of concrete in these structures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Mixture Proportions</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  The results of trial mixture design studies along with a statement giving the maximum nominal 
coarse aggregate size and the proportions of ingredients that will be used in the manufacture 
of each strength or class of concrete, at least 14 days prior to commencing concrete placing 
operations.  Aggregate weights shall be based on the saturated surface dry condition.  The statement 
shall be accompanied by test results from an approved independent commercial testing laboratory, 
showing that mixture design studies have been made with materials proposed for the project and 
that the proportions selected will produce concrete of the qualities indicated.  No substitutions 
shall be made in the materials used in the mixture design studies without additional tests to 
show that the quality of the concrete is satisfactory.</ITM><BRK/>
<BRK/>
<ITM><SUB>Lightweight Aggregate Concrete</SUB></ITM><BRK/>
<BRK/>
<ITM>  Written recommendations from lightweight aggregate supplier on batching and mixing cycles.</ITM><BRK/>
<BRK/>
<ITM><SUB>Dry Shake Finish</SUB></ITM><BRK/>
<BRK/>
<ITM>  Manufacturer's written instructions on application of dry shake material 15 days prior to 
start of construction.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Surface Retarder</SUB></ITM><BRK/>
<BRK/>
<ITM>  Sample of surface retarder material with manufacturer's instructions for application in conjunction 
with air-water cutting.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Testing and Inspection for Contractor Quality Control</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Certified copies of laboratory test reports, including mill tests and all other test data, 
for portland cement, blended cement, pozzolan, ground granulated blast furnace slag, silica 
fume, aggregate, admixtures, and curing compound proposed for use on this project.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Qualifications</SUB></ITM><BRK/>
<BRK/>
<ITM>  Written documentation for Contractor Quality Control personnel.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   <SUB>QUALIFICATIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Contractor Quality Control personnel assigned to concrete construction shall be American Concrete Institute (ACI) 
Certified Workmen in one of the following grades or shall have written evidence of having completed similar qualification 
programs:</TXT><BRK/>
<TBL><BRK/>
<BRK/>
         Concrete Field Testing Technician, Grade I<BRK/>
         Concrete Laboratory Testing Technician, Grade I or II<BRK/>
         Concrete Construction Inspector, Level II<BRK/>
<BRK/>
         Concrete Transportation Construction Inspector or <BRK/>
         Reinforced Concrete Special Inspector, Jointly certified by American Concrete Institute (ACI), Building 
Official and Code Administrators International (BOCA), International Code Council (ICC), and Southern Building Code 
Congress International (SBCCI).<BRK/></TBL>
<BRK/>
<TXT>The foreman or lead journeyman of the flatwork finishing crew shall have similar qualification for ACI Concrete 
Flatwork Technician/Finisher or equal, with written documentation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   FIELD TEST PANELS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit these paragraphs as appropriate.  Specify location for all field 
test panels.  Add requirements for mock-ups if applicable.  Add requirements 
for slab panels if exposed aggregate slab finish is required or if superflat 
slab finish is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Field test panels shall be constructed prior to beginning of work using the materials and procedures proposed 
for use on the job, to demonstrate the results to be attained.  The quality and appearance of each panel shall 
be subject to the approval of the Contracting Officer, and, if not judged satisfactory, additional panels shall 
be constructed until approval is attained.  Formed or finished surfaces in the completed structure shall match 
the quality and appearance of the approved field example.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Sample Wall Panels</TTL><BRK/>
<BRK/>
<TXT>One sample panel at least<MET> 1220 mm</MET><ENG> 4 feet</ENG> by<MET> 1525 mm</MET><ENG> 5 feet</ENG>and<MET> 150 mm</MET><ENG> 6 inches</ENG> thick shall be constructed to demonstrate 
Class A formed finish and a similar one for Class B formed finish.  Panels shall be located [_____].  Each panel 
shall include a full length and full width joint line and shall have at least two voids each at least<MET> 300 mm</MET><ENG> 
12 inches</ENG> by<MET> 300 mm</MET><ENG> 12 inches</ENG> by<MET> 75 mm</MET><ENG> 3 inches</ENG> deep either impressed in the concrete as placed or chipped in 
the hardened concrete.  After the concrete is 7 days old, the voids shall be patched to demonstrate the effectiveness 
and the appearance of the Contractor's repair procedures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   Slab Panels</TTL><BRK/>
<BRK/>
<TXT>A slab panel at least<MET> 1220 mm</MET><ENG> 4 feet</ENG> by<MET> 1525 mm</MET><ENG> 5 feet</ENG> and<MET> 100 mm</MET><ENG> 4 inches</ENG> thick shall be constructed to demonstrate 
exposed aggregate slab finish and a similar panel for extra high class slab finish.  Panels shall be located 
[_____].  Each panel shall have a full length joint line.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.7   SPECIAL REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the construction includes special items such as very high strength 
concrete; non-sparking, conductive flooring; acid-resistant concrete; slipforming; 
super-flat floors; etc., a pre-installation meeting will be required.  In which 
case this paragraph will be retained with appropriate editing and identification.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A pre-installation meeting with the Contracting Officer will be required at least 10 days prior to start of construction 
on [_____].  The Contractor shall be responsible for calling the meeting; the Project Superintendent and active 
installation personnel shall be present.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8   GENERAL REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In addition to specified requirements the following information will 
be shown on project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Assumed temperature range when temperature stresses are a factor in design.</NPR><BRK/>
<BRK/>
<NPR>2.  Details of concrete sections showing dimensions, reinforcement cover, and 
required camber.</NPR><BRK/>
<BRK/>
<NPR>3.  Joint details showing locations and dimensions, including critical construction 
joints, indicating waterstop locations and splices, keys, and dowels when required.</NPR><BRK/>
<BRK/>
<NPR>4.  Locations where structural lightweight concrete will be used.</NPR><BRK/>
<BRK/>
<NPR>5.  Details which require a depressed structural slab for tile, terrazzo, or 
other floor finishes in order to provide finished surfaces at the same elevations.</NPR><BRK/>
<BRK/>
<NPR>6.  When exposed concrete surfaces are specified, the locations in the finished 
structure shall be indicated.  If other than cast finish is required, the type 
and location shall be indicated.</NPR><BRK/>
<BRK/>
<NPR>7.  Loading assumptions</NPR><BRK/>
<BRK/>
<NPR>8.  Material strengths used in design, and f'c.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.8.1   Tolerances</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert any special tolerance requirements of the project.  Select the 
method desired for floor finish tolerance and delete the other.  Do not use 
both as a Contractor's option.  An effort should be made to begin to convert 
to the F-system for floor slabs.  The F-system should always be used where very 
flat floors are required, particularly warehouse aisles where high-lift forklift 
units or other similar stackers will operate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified herein, tolerances for concrete batching, mixture properties, and construction 
as well as definition of terms and application practices shall be in accordance with <RID>ACI 117</RID>.  Level and grade 
tolerance measurements of slabs shall be made as soon as possible after finishing; when forms or shoring are 
used, the measurements shall be made prior to removal.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.8.1.1   Floors</TTL><BRK/>
<BRK/>
<TXT>For the purpose of this Section the following terminology correlation between <RID>ACI 117</RID> and this Section shall 
apply:</TXT><BRK/>
<TBL><THD><BRK/>
         Floor Profile Quality<BRK/>
  Classification From <RID>ACI 117</RID>             This Section<BRK/>
  --------------------------------------          ---------------------<BRK/></THD>
<BRK/>
  Conventional Bullfloated                                Same<BRK/>
  Conventional Straightedged                              Same<BRK/>
  Flat                                     Float Finish or Trowel Finish<BRK/>
  Very Flat                                Same.  Use only with F-system<BRK/></TBL>
<BRK/>
<TXT>Levelness tolerance shall not apply where design requires floors to be sloped to drains or sloped for other reasons.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.1.2   Floors by the F-Number System</TTL><BRK/>
<BRK/>
<TXT>The flatness and levelness of floors shall be carefully controlled and the tolerances shall be measured by the 
F-Number system of Paragraph 4.5.6 and 4.5.6.1 of <RID>ACI 117</RID>.  The Contractor shall furnish an approved floor profilograph 
or other equipment capable of measuring the floor flatness (FF) number and the floor levelness (FL) number in 
accordance with<MET> <RID>ASTM E 1155M</RID></MET><ENG> <RID>ASTM E 1155</RID></ENG>.  The Contractor shall perform the tolerance measurements within 72 
hours after floor slab construction while being observed by the Contracting Officer.  The tolerances of surfaces 
beyond the limits of<MET> <RID>ASTM E 1155M</RID></MET><ENG> <RID>ASTM E 1155</RID></ENG> (the areas within<MET> 600 mm</MET><ENG> 24 inches</ENG> of embedments and construction 
joints) shall be acceptable to the Contracting Officer. Tolerances of the following areas shall meet the requirements 
for the listed surfaces as specified in paragraphs 4.5.6 and 4.5.6.1 of <RID>ACI 117</RID>.</TXT><BRK/>
<TBL><BRK/>
                      Bullfloated-     Areas [_____]<BRK/>
                      Straightedged-   Areas [_____]<BRK/>
                      Float Finish-    Areas [_____]<BRK/>
                      Trowel Finish-   Areas [_____]<BRK/>
                      Very Flat-       Areas [_____]<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>1.8.1.3   Floors by the Straightedge System</TTL><BRK/>
<BRK/>
<TXT>The flatness of the floors shall be carefully controlled and the tolerances shall be measured by the straightedge 
system as specified in paragraph 4.5.7 of <RID>ACI 117</RID>, using a<MET> 3 m</MET><ENG> 10 foot</ENG> straightedge, within 72 hours after floor 
slab installation and before shores and/or forms are removed.  The listed tolerances shall be met at any and 
every location at which the straightedge can be placed.</TXT><BRK/>
<TBL><BRK/>
  Bullfloated   [_____]<BRK/>
  Straightedged [_____]<BRK/>
  Float Finish  [_____]<BRK/>
  Trowel Finish [_____]<BRK/></TBL>
<BRK/></SPT>
</SPT><SPT><TTL>1.8.2   Strength Requirements and w/c Ratio</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.2.1   Strength Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will list the strengths of concrete for the job and the 
uses for each.  A 28-day compressive strength of 20 MPa (3000 psi) will be required 
for most building work.  Concrete of 27.5 MPa (4000 psi) should be used in containers 
for liquids, and in other structures where loading, durability, or wear requirements 
dictate.  Higher compressive strengths will be used if required by structural 
design.  A 28-day flexural strength of 4.5 MPa (650 psi) will normally be specified 
for slabs on grade subject to vehicular traffic; however, since cylinders are 
easier to cast and test than beams, 27.5 MPa (4000 psi) compressive strength 
concrete may be specified if past experience has shown this to be appropriate.  
Concrete for hangar floors will be designed according to airfield pavement criteria 
and will be specified in Section 32 13 13.03 AIRFIELDS AND HEAVY-DUTY CONCRETE 
PAVEMENT LESS THAN 10000 CUBIC YARDS.</NPR><BRK/>
<BRK/>
<NPR>When the designer considers it appropriate, 90-day compressive or flexural strength 
may be specified in lieu of 28-day, but not both.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Specified compressive strength (f'c) shall be as follows:</TXT><BRK/>
<TBL><THD><BRK/>
COMPRESSIVE STRENGTH                    STRUCTURE OR PORTION OF STRUCTURE<BRK/></THD>
<BRK/>
  [<MET>35 MPa</MET><ENG> 5000 psi</ENG> at 28 days                [_____]]<BRK/>
  [<MET>27.5 MPa</MET><ENG> 4000 psi</ENG> at 28 days              [_____]]<BRK/>
  [<MET>20 MPa</MET><ENG> 3000 psi</ENG> at 28 days                [_____]]<BRK/>
  [[_____]<MET> MPa</MET><ENG> psi</ENG> at [_____] days           [_____]]<BRK/></TBL>
<BRK/>
<TXT>Concrete slabs on-grade shall have a 28-day flexural strength of<MET> [4.5] [_____] MPa</MET><ENG> [650] [_____] psi</ENG>.  Concrete 
made with high-early strength cement shall have a 7-day strength equal to the specified 28-day strength for concrete 
made with Type I or II portland cement.  Compressive strength shall be determined in accordance with <RID>ASTM C 39/C 39M</RID>
.  Flexural strength shall be determined in accordance with <RID>ASTM C 78</RID>.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Evaluation of Concrete Compressive Strength.  Compressive strength specimens (<MET>152 by 305 
mm</MET><ENG> 6 by 12 inch</ENG> cylinders) shall be fabricated by the Contractor and laboratory cured in accordance 
with <RID>ASTM C 31/C 31M</RID> and tested in accordance with <RID>ASTM C 39/C 39M</RID>.  The strength of the concrete 
will be considered satisfactory so long as the average of all sets of three consecutive test 
results equals or exceeds the specified compressive strength f'c and no individual test result 
falls below the specified strength f'c by more than<MET> 3.5 MPa</MET><ENG> 500 psi</ENG>.  A "test" is defined as 
the average of two companion cylinders, or if only one cylinder is tested, the results of the 
single cylinder test.  Additional analysis or testing, including taking cores and/or load tests 
may be required at the Contractor's expense when the strength of the concrete in the structure 
is considered potentially deficient.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Investigation of Low-Strength Compressive Test Results.  When any strength test of standard-cured 
test cylinders falls below the specified strength requirement by more than<MET> 3.5 MPa</MET><ENG> 500 psi</ENG> or 
if tests of field-cured cylinders indicate deficiencies in protection and curing, steps shall 
be taken to assure that the load-carrying capacity of the structure is not jeopardized.  When 
the strength of concrete in place is considered potentially deficient, cores shall be obtained 
and tested in accordance with <RID>ASTM C 42/C 42M</RID>.  At least three representative cores shall be 
taken from each member or area of concrete in place that is considered potentially deficient.  
The location of cores will be determined by the Contracting Officer to least impair the strength 
of the structure.  Concrete in the area represented by the core testing will be considered adequate 
if the average strength of the cores is equal to at least 85 percent of the specified strength 
requirement and if no single core is less than 75 percent of the specified strength requirement.  
Non-destructive tests (tests other than test cylinders or cores) shall not be used as a basis 
for acceptance or rejection.  The Contractor shall perform the coring and repair the holes.  
Cores will be tested by the Government.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Load Tests.  If the core tests are inconclusive or impractical to obtain or if structural 
analysis does not confirm the safety of the structure, load tests may be directed by the Contracting 
Officer in accordance with the requirements of<MET> <RID>ACI 318M</RID></MET><ENG> <RID>ACI 318</RID></ENG>.  Concrete work evaluated by 
structural analysis or by results of a load test as being understrength shall be corrected in 
a manner satisfactory to the Contracting Officer.  All investigations, testing, load tests, 
and correction of deficiencies shall be performed by and at the expense of the Contractor and 
must be approved by the Contracting Officer, except that if all concrete is found to be in compliance 
with the drawings and specifications, the cost of investigations, testing, and load tests will 
be at the expense of the Government.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Evaluation of Concrete Flexural Strength.  Flexural strength specimens (beams) shall be 
fabricated by the Contractor and laboratory cured in accordance with <RID>ASTM C 31/C 31M</RID> and tested 
in accordance with <RID>ASTM C 78</RID>.  The strength of the concrete will be considered satisfactory 
so long as the average of all sets of three consecutive test results equals or exceeds the specified 
flexural strength and no individual test result falls below the specified flexural strength 
by more than<MET> 350 kPa</MET><ENG> 50 psi</ENG>.  A "test" is defined as the average of two companion beams.  Additional 
analysis or testing, including taking cores and/or load tests may be required at the Contractor's 
expense when the strength of the concrete in the slab is considered potentially deficient.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.2.2   Water-Cement Ratio</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where durability or other factors are a major consideration, retain this 
paragraph limiting w/c; coordinate this subparagraph with paragraph MIXTURE 
PROPORTIONS and its subparagraphs before deleting any of the contents, otherwise 
delete.  When cementitious materials other than portland cement are used, retain 
the last two sentences.  Consult EM 1110-2-2000 to fill in the blanks and to 
select the appropriate w/c.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Maximum water-cement ratio (w/c) for normal weight concrete shall be as follows:</TXT><BRK/>
<TBL><THD><BRK/>
<HL4>WATER-CEMENT RATIO, BY WEIGHT        STRUCTURE OR PORTION OF STRUCTURE</HL4><BRK/></THD>
<BRK/>
               [0.40]                                 [_____]<BRK/>
               [0.45]                                 [_____]<BRK/>
               [0.50]                                 [_____]<BRK/>
               [0.55]                                 [_____]<BRK/>
               [_____]                                [_____]<BRK/></TBL>
<BRK/>
<TXT>These w/c's may cause higher strengths than that required above for compressive or flexural strength.  The maximum 
w/c required will be the equivalent w/c as determined by conversion from the weight ratio of water to cement 
plus pozzolan, silica fume, and ground granulated blast furnace slag (GGBF slag) by the weight equivalency method 
as described in <RID>ACI 211.1</RID>.  In the case where silica fume or GGBF slag is used, the weight of the silica fume 
and GGBF slag shall be included in the equations of <RID>ACI 211.1</RID> for the term P which is used to denote the weight 
of pozzolan.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.8.3   Air Entrainment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove last two sentences when lightweight concrete is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified for lightweight concrete, all normal weight concrete shall be air entrained to 
contain between 4 and 7 percent total air, except that when the nominal maximum size coarse aggregate is<MET> 19 mm</MET><ENG>
 3/4 inch</ENG> or smaller it shall be between 4.5 and 7.5 percent.  Concrete with specified strength over<MET> 35 MPa</MET><ENG> 5000 
psi</ENG> may have 1.0 percent less air than specified above.  Specified air content shall be attained at point of 
placement into the forms.  Air content for normal weight concrete shall be determined in accordance with <RID>ASTM C 231</RID>
.  Lightweight concrete in the [_____] parts of the structure shall be air-entrained with a total air content 
of 4.5 to 7.5 percent, except that if the nominal maximum size coarse aggregate is<MET> 9.5 mm</MET><ENG> 3/8 inch</ENG> or less, the 
air content shall be 5.5 to 8.5 percent.  Air content for lightweight concrete shall be determined in accordance 
with <RID>ASTM C 173/C 173M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.4   Slump</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the sentence in the first set of brackets when those admixtures are 
permitted by the specifications.  Add special slump requirements for Class 8 
and 9 floor slabs from ACI 302, when such floors are to be constructed.  Edit 
for lightweight concrete as required</NPR>.<BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Slump of the concrete, as delivered to the point of placement into the forms, shall be within the following limits.  
Slump shall be determined in accordance with <RID>ASTM C 143/C 143M</RID>.</TXT><BRK/>
<TBL><BRK/>
<THD><BRK/>
                                                  Slump<BRK/>
      Structural Element             Minimum                  Maximum<BRK/>
    _________________________        _______                  _______<BRK/></THD>
<BRK/>
  Walls, columns and beams           <MET>50 mm</MET><ENG> 2 in.</ENG>   <MET>100 mm</MET><ENG> 4 in.</ENG><BRK/>
<BRK/>
  Foundation walls, substructure<BRK/>
  walls, footings, slabs             <MET>25 mm</MET><ENG> 1 in.</ENG>   <MET>75 mm</MET><ENG> 3 in.</ENG><BRK/>
<BRK/>
  Any structural concrete approved<BRK/>
  for placement by pumping:<BRK/>
     At pump                         <MET>50 mm</MET><ENG> 2 in.</ENG>   <MET>150 mm</MET><ENG> 6 in.</ENG><BRK/>
     At discharge of line            <MET>25 mm</MET><ENG> 1 in.</ENG>   <MET>100 mm</MET><ENG> 4 in.</ENG><BRK/></TBL>
<BRK/>
<TXT>[When use of a plasticizing admixture conforming to <RID>ASTM C 1017/C 1017M</RID> or when a Type F or G high range water 
reducing admixture conforming to <RID>ASTM C 494/C 494M</RID> is permitted to increase the slump of concrete, concrete shall 
have a slump of<MET> 50 to 100 mm</MET><ENG> 2 to 4 inches</ENG> before the admixture is added and a maximum slump of<MET> 200 mm</MET><ENG> 8 inches</ENG>
 at the point of delivery after the admixture is added.] [For troweled floors, slump of structural lightweight 
concrete with normal weight sand placed by pump shall not exceed<MET> 125 mm</MET><ENG> 5 inches</ENG> at the point of placement.  
For other slabs, slump of lightweight concrete shall not exceed<MET> 100 mm</MET><ENG> 4 inches</ENG> at point of placement.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.5   Concrete Temperature</TTL><BRK/>
<BRK/>
<TXT>The temperature of the concrete as delivered shall not exceed<MET> 32 degrees C</MET><ENG> 90 degrees F</ENG>.  When the ambient temperature 
during placing is<MET> 5 degrees C</MET><ENG> 40 degrees F</ENG> or less, or is expected to be at any time within 6 hours after placing, 
the temperature of the concrete as delivered shall be between<MET> 12 and 25 degrees C</MET><ENG> 55 and 75 degrees F</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.6   Size of Coarse Aggregate</TTL><BRK/>
<BRK/>
<TXT>The largest feasible nominal maximum size aggregate (NMSA) specified in paragraph AGGREGATES shall be used in 
each placement.  However, nominal maximum size of aggregate shall not exceed any of the following: three-fourths 
of the minimum cover for reinforcing bars, three-fourths of the minimum clear spacing between reinforcing bars, 
one-fifth of the narrowest dimension between sides of forms, or one-third of the thickness of slabs or toppings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.7   Special Properties and Products</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the use of a particular type of admixture is required for certain 
parts of the structure, this paragraph should be revised accordingly.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete may contain admixtures other than air entraining agents, such as water reducers, superplasticizers, 
or set retarding agents to provide special properties to the concrete, if specified or approved.  Any of these 
materials to be used on the project shall be used in the mix design studies.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.8   Lightweight Aggregate Structural Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain this paragraph when lightweight aggregate structural concrete 
is required.  Use bracketed alternate strength inserts (compressive or splitting 
tensile strength) as appropriate.  Correlate strength versus unit weight requirements 
as determined from table in ASTM C 330, and as determined by consultation with 
local producers.  Remove last sentence when floor fill is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Lightweight aggregate structural concrete shall conform to the requirements specified for normal weight concrete 
except as specified herein.  [Specified compressive strength shall be at least [_____] at 28 days,] [Specified 
splitting tensile strength determined in accordance with <RID>ASTM C 496/C 496M</RID> shall be at least [_____] at 28 days,] 
as determined by test specimens that have been air dried at 50 percent relative humidity for the last 21 days.  
Air-dry unit weight shall be not over [_____] at 28 days as determined by <RID>ASTM C 567</RID>.  However, fresh unit weight 
shall be used for acceptance during concreting, using a correlation factor between the two types of unit weight 
as determined during mixture design studies.  Lightweight aggregate structural concrete floor fill shall have 
a 28-day compressive strength of at least<MET> 17.3 MPa</MET><ENG> 2500 psi</ENG> and an air-dry unit weight not exceeding<MET> 1850 kg/cubic 
meter</MET><ENG> 115 pcf</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.9   Technical Service for Specialized Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph when lightweight aggregate structural concrete is 
specified or for other specialized concretes like those containing silica fume.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The services of a factory trained technical representative shall be obtained to oversee proportioning, batching, 
mixing, placing, consolidating, and finishing of specialized structural concrete, such as [_____].  The technical 
representative shall be on the job full time until the Contracting Officer is satisfied that field controls indicate 
concrete of specified quality is furnished and that the Contractor's crews are capable of continued satisfactory 
work.  The technical representative shall be available for consultation with, and advice to, Government forces.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.9   <SUB>MIXTURE PROPORTIONS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph places the responsibility for mixture proportioning on 
the Contractor.  Where Government mix design is required, the entire paragraph 
will be revised accordingly.  Do not delete 15 percent minimum for pozzolan, 
unless pozzolan is prohibited.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete shall be composed of portland cement, other cementitious and pozzolanic materials as specified, aggregates, 
water and admixtures as specified.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.9.1   Proportioning Studies for Normal Weight Concrete</TTL><BRK/>
<BRK/>
<TXT>Trial design batches, mixture proportioning studies, and testing requirements for various classes and types of 
concrete specified shall be the responsibility of the Contractor.  Except as specified for flexural strength 
concrete, mixture proportions shall be based on compressive strength as determined by test specimens fabricated 
in accordance with <RID>ASTM C 192/C 192M</RID> and tested in accordance with <RID>ASTM C 39/C 39M</RID>.  Samples of all materials 
used in mixture proportioning studies shall be representative of those proposed for use in the project and shall 
be accompanied by the manufacturer's or producer's test reports indicating compliance with these specifications.  
Trial mixtures having proportions, consistencies, and air content suitable for the work shall be made based on 
methodology described in <RID>ACI 211.1</RID>, using at least three different water-cement ratios for each type of mixture, 
which will produce a range of strength encompassing those required for each class and type of concrete required 
on the project.  The maximum water-cement ratios required in subparagraph Water-Cement Ratio will be the equivalent 
water-cement ratio as determined by conversion from the weight ratio of water to cement plus pozzolan, silica 
fume, and ground granulated blast furnace slag (GGBF slag) by the weight equivalency method as described in <RID>ACI 211.1</RID>
.  In the case where silica fume or GGBF slag is used, the weight of the silica fume and GGBF slag shall be included 
in the equations in <RID>ACI 211.1</RID> for the term P, which is used to denote the weight of pozzolan.  If pozzolan is 
used in the concrete mixture, the minimum pozzolan content shall be 15 percent by weight of the total cementitious 
material, and the maximum shall be 35 percent.  Laboratory trial mixtures shall be designed for maximum permitted 
slump and air content.  Separate sets of trial mixture studies shall be made for each combination of cementitious 
materials and each combination of admixtures proposed for use.  No combination of either shall be used until 
proven by such studies, except that, if approved in writing and otherwise permitted by these specifications, 
an accelerator or a retarder may be used without separate trial mixture study.  Separate trial mixture studies 
shall also be made for concrete for any conveying or placing method proposed which requires special properties 
and for concrete to be placed in unusually difficult placing locations.  The temperature of concrete in each 
trial batch shall be reported.  For each water-cement ratio, at least three test cylinders for each test age 
shall be made and cured in accordance with<RID>ASTM C 192/C 192M</RID>.  They shall be tested at 7 and 28 days in accordance 
with <RID>ASTM C 39/C 39M</RID>.  From these test results, a curve shall be plotted showing the relationship between water-cement 
ratio and strength for each set of trial mix studies.  In addition, a curve shall be plotted showing the relationship 
between 7 day and 28 day strengths.  Each mixture shall be designed to promote easy and suitable concrete placement, 
consolidation and finishing, and to prevent segregation and excessive bleeding.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.9.2   Proportioning Studies for Flexural Strength Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain this paragraph only when the design requires flexural strength 
concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Trial design batches, mixture proportioning studies, and testing requirements shall conform to the requirements 
specified in paragraph Proportioning Studies for Normal Weight Concrete, except that proportions shall be based 
on flexural strength as determined by test specimens (beams) fabricated in accordance with <RID>ASTM C 192/C 192M</RID> 
and tested in accordance with <RID>ASTM C 78</RID>.  Procedures given in <RID>ACI 211.1</RID> shall be modified as necessary to accommodate 
flexural strength.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.9.3   Proportioning Studies for Lightweight Aggregate Structural Concrete</TTL><BRK/>
<BRK/>
<TXT>Trial design batches, mixture proportioning studies, and testing requirements shall conform to the requirements 
specified in paragraph Proportioning Studies for Normal Weight Concrete, except as follows.  Trial mixtures having 
proportions, consistencies and air content suitable for the work shall be made based on methodology described 
in <RID>ACI 211.2</RID>, using at least three different cement contents.  Trial mixes shall be proportioned to produce air 
dry unit weight and concrete strengths specified in paragraph GENERAL REQUIREMENTS.  Trial mixtures shall be 
proportioned for maximum permitted slump and air content.  Test specimens and testing shall be as specified for 
normal weight concrete except that [28-day compressive strength] [splitting tensile strength in accordance with <RID>
ASTM C 496/C 496M</RID>] shall be determined from test cylinders that have been air dried at 50 percent relative humidity 
for the last 21 days.  Air dry unit weight shall be determined in accordance with <RID>ASTM C 567</RID> and shall be designed 
to be at least<MET> 32 kg/cubic meter</MET><ENG> 2.0 pcf</ENG> less than the maximum specified air dry unit weight in paragraph GENERAL 
REQUIREMENTS.  Curves shall be plotted using these results showing the relationship between cement factor and 
strength and air dry unit weight.  Normal weight fine aggregate may be substituted for part or all of the lightweight 
fine aggregate, provided the concrete meets the strength and unit weight.  A correlation shall also be developed 
showing the ratio between air dry unit weight and fresh concrete unit weight for each mix.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.9.4   Average Compressive Strength Required for Mixtures</TTL><BRK/>
<BRK/>
<TXT>The mixture proportions selected during mixture design studies shall produce a required average compressive strength 
(f'cr) exceeding the specified compressive strength (f'c) by the amount indicated below.  This required average 
compressive strength, f'cr, will not be a required acceptance criteria during concrete production.  However, 
whenever the daily average compressive strength at 28 days drops below f'cr during concrete production, or daily 
average 7-day strength drops below a strength correlated with the 28-day f'cr, the mixture shall be adjusted, 
as approved, to bring the daily average back up to f'cr.  During production, the required f'cr shall be adjusted, 
as appropriate, based on the standard deviation being attained on the job.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.9.4.1   Computations from Test Records</TTL><BRK/>
<BRK/>
<TXT>Where a concrete production facility has test records, a standard deviation shall be established in accordance 
with the applicable provisions of <RID>ACI 214R</RID>.  Test records from which a standard deviation is calculated shall 
represent materials, quality control procedures, and conditions similar to those expected; shall represent concrete 
produced to meet a specified strength or strengths (f'c) within<MET> 7 MPa</MET><ENG> 1,000 psi</ENG> of that specified for proposed 
work; and shall consist of at least 30 consecutive tests.  A strength test shall be the average of the strengths 
of two cylinders made from the same sample of concrete and tested at 28 days.  Required average compressive strength 
f'cr used as the basis for selection of concrete proportions shall be the larger of the equations that follow 
using the standard deviation as determined above:</TXT><BRK/>
<BRK/>
<TXT><MET>f'cr = f'c + 1.34S where units are in MPa</MET><ENG> f'cr = f'c + 1.34S where units are in psi</ENG></TXT><BRK/>
<BRK/>
<TXT><MET>f'cr = f'c + 2.33S - 3.45 where units are in MPa</MET><ENG> f'cr = f'c + 2.33S - 500 where units are in psi</ENG></TXT><BRK/>
<BRK/>
<TXT>Where S = standard deviation</TXT><BRK/>
<BRK/>
<TXT>Where a concrete production facility does not have test records meeting the requirements above but does have 
a record based on 15 to 29 consecutive tests, a standard deviation shall be established as the product of the 
calculated standard deviation and a modification factor from the following table:</TXT><BRK/>
<TBL><THD><BRK/>
                            MODIFICATION FACTOR<BRK/>
  NUMBER OF TESTS           FOR STANDARD DEVIATION<BRK/></THD>
<BRK/>
      15                           1.16<BRK/>
      20                           1.08<BRK/>
      25                           1.03<BRK/>
   30 or more                      1.00<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>1.9.4.2   Computations without Previous Test Records</TTL><BRK/>
<BRK/>
<TXT>When a concrete production facility does not have sufficient field strength test records for calculation of the 
standard deviation, the required average strength f'cr shall be determined as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  If the specified compressive strength f'c is less than<MET> 20 MPa</MET><ENG> 3,000 psi</ENG>,</ITM><BRK/>
<BRK/>
<TXT><MET>f'cr = f'c + 6.9 MPa</MET><ENG> f'cr = f'c + 1000 psi</ENG></TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  If the specified compressive strength f'c is<MET> 20 to 35 MPa</MET><ENG> 3,000 to 5,000 psi</ENG>,</ITM><BRK/>
<BRK/>
<TXT><MET>f'cr = f'c + 8.3 MPa</MET><ENG> f'cr = f'c + 1,200 psi</ENG></TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  If the specified compressive strength f'c is over<MET> 35 MPa</MET><ENG> 5,000 psi</ENG>,</ITM><BRK/>
<BRK/>
<TXT><MET>f'cr = f'c + 9.7 MPa</MET><ENG> f'cr = f'c + 1,400 psi</ENG></TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.9.5   Average Flexural Strength Required for Mixtures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain this paragraph when flexural strength mixtures are used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The mixture proportions selected during mixture design studies for flexural strength mixtures and the mixture 
used during concrete production shall be designed and adjusted during concrete production as approved, except 
that the overdesign for average flexural strength shall simply be 15 percent greater than the specified flexural 
strength at all times.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.9.6   Mix Design for Bonded Topping for Heavy Duty Floors</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain this paragraph when design requires heavy duty floors.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The concrete mix design for bonded topping for heavy duty floors shall contain the greatest practical proportion 
of coarse aggregate within the specified proportion limits.  The mix shall be designed to produce concrete having 
a 28-day strength of at least<MET> 34.5 MPa</MET><ENG> 5000 psi</ENG>.  Concrete for the topping shall consist of the following proportions, 
by weight:</TXT><BRK/>
<BRK/>
<TXT>1.00 part portland cement</TXT><BRK/>
<TXT>1.15 to 1.25 parts fine aggregate</TXT><BRK/>
<TXT>1.80 to 2.00 parts coarse aggregate</TXT><BRK/>
<BRK/>
<TXT>Maximum w/c shall be 0.33.  The topping concrete shall not be air-entrained.  The concrete shall be mixed so 
as to produce a mixture of the driest consistency possible to work with a sawing motion of the strike-off and 
which can be floated and compacted as specified without producing water or excess cement at the surface.  In 
no case shall slump exceed<MET> 25 mm</MET><ENG> 1 inch</ENG> as determined by <RID>ASTM C 143/C 143M</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.10   STORAGE OF MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Cement and other cementitious materials shall be stored in weathertight buildings, bins, or silos which will 
exclude moisture and contaminants and keep each material completely separated.  Aggregate stockpiles shall be 
arranged and used in a manner to avoid excessive segregation and to prevent contamination with other materials 
or with other sizes of aggregates.  Aggregate shall not be stored directly on ground unless a sacrificial layer 
is left undisturbed.  Reinforcing bars and accessories shall be stored above the ground on platforms, skids or 
other supports.  Other materials shall be stored in such a manner as to avoid contamination and deterioration.  
Admixtures which have been in storage at the project site for longer than 6 months or which have been subjected 
to freezing shall not be used unless retested and proven to meet the specified requirements.  Materials shall 
be capable of being accurately identified after bundles or containers are opened.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.11   GOVERNMENT ASSURANCE INSPECTION AND TESTING</TTL><BRK/>
<BRK/>
<TXT>Day-to day inspection and testing shall be the responsibility of the Contractor Quality Control (CQC) staff.  
However, representatives of the Contracting Officer can and will inspect construction as considered appropriate 
and will monitor operations of the Contractor's CQC staff.  Government inspection or testing will not relieve 
the Contractor of any of his CQC responsibilities.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.11.1   Materials</TTL><BRK/>
<BRK/>
<TXT>The Government will sample and test aggregates, cementitious materials, other materials, and concrete to determine 
compliance with the specifications as considered appropriate.  The Contractor shall provide facilities and labor 
as may be necessary for procurement of representative test samples.  Samples of aggregates will be obtained at 
the point of batching in accordance with <RID>ASTM D 75</RID>.  Other materials will be sampled from storage at the jobsite 
or from other locations as considered appropriate.  Samples may be placed in storage for later testing when appropriate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.11.2   Fresh Concrete</TTL><BRK/>
<BRK/>
<TXT>Fresh concrete will be sampled as delivered in accordance with <RID>ASTM C 172</RID> and tested in accordance with these 
specifications, as considered necessary.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.11.3   Hardened Concrete</TTL><BRK/>
<BRK/>
<TXT>Tests on hardened concrete will be performed by the Government when such tests are considered necessary.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.11.4   Inspection</TTL><BRK/>
<BRK/>
<TXT>Concrete operations may be tested and inspected by the Government as the project progresses.  Failure to detect 
defective work or material will not prevent rejection later when a defect is discovered nor will it obligate 
the Government for final acceptance.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit this PART to include only those products which are locally available, 
are required by the project, and are acceptable to the designer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.1   CEMENTITIOUS MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  EPA recommends that procuring agencies use flowable fill containing coal 
fly ash (pozzolan) and/or ferrous foundry sands for backfill and other fill 
applications.  EPA further recommends that procuring agencies include provisions 
in all construction contracts involving backfill or other fill applications, 
to allow for the use of flowable fill containing coal fly ash and/or ferrous 
foundry sands, where appropriate.</NPR><BRK/>
<BRK/>
<NPR>Include the limits on soluble alkalies for portland cement and for pozzolan 
whenever there is a possibility of alkali-aggregate reactive aggregates being 
furnished.</NPR><BRK/>
<BRK/>
<NPR>Where alkali-bearing soil or groundwater is encountered, or where the concrete 
will be exposed to seawater, brackish water, or sewage, see ACI 201.2 R for 
guidance on selecting cementitious material.  See EM 1110-2-2000 for guidance 
when proposing to use any type of portland-pozzolan or portland-furnace-slag 
cement.</NPR><BRK/>
<BRK/>
<NPR>Edit bracketed items as required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cementitious Materials shall be portland cement, [portland-pozzolan cement,] [portland blast-furnace slag cement,] 
or portland cement in combination with [pozzolan] [or ground granulated blast furnace slag] [or silica fume] 
and shall conform to appropriate specifications listed below.  Use of cementitious materials in concrete which 
will have surfaces exposed in the completed structure shall be restricted so there is no change in color, source, 
or type of cementitious material.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Portland Cement</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 150</RID>, Type I [low alkali] with a maximum 15 percent amount of tricalcium aluminate, or Type II [low alkali] 
[including false set requirements] or [Type V].  White portland cement shall meet the above requirements except 
that it may be Type I, Type II or Type III [low alkali].  White Type III shall be used only in specific areas 
of the structure, when approved in writing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   High-Early-Strength Portland Cement</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 150</RID>, Type III with tricalcium aluminate limited to [5][8] percent, [low alkali].  Type III cement shall 
be used only in isolated instances and only when approved in writing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   Blended Cements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Never specify I(PM) or I(SM) cement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ASTM C 595</RID>, Type [IP][IP (MS)][IP (MH)][IS][IS (MS)][IS (MH)].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.4   Pozzolan (Fly Ash)</TTL><BRK/>
<BRK/>
<TXT>Pozzolan shall conform to <RID>ASTM C 618</RID>, Class C or F, including low alkali [multiple factor,] [drying shrinkage,] 
[uniformity,] [,and [moderate][severe] sulfate resistance] requirements in Table 3 of <RID>ASTM C 618</RID>.  [Requirement 
for maximum alkalies from Table 1A of <RID>ASTM C 618</RID> shall apply].  If pozzolan is used, it shall never be less than 
15 percent nor more than 35 percent by weight of the total cementitious material.  The Contractor shall comply 
with EPA requirements in accordance with Section <SRF>01 62 35</SRF> RECYCLED / RECOVERED MATERIALS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   Ground Granulated Blast-Furnace (GGBF) Slag</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 989</RID>, Grade 120.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6   Silica Fume</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Silica Fume Concrete should be used where low permeability and enhanced 
durability are necessary and justified by additional cost, such as marine structures, 
other places where low permeability is needed, and severe abrasion resistance.  
Finishing is more difficult than conventional concrete.  Proper curing is essential 
because there is a strong tendency for severe plastic shrinkage cracking.</NPR><BRK/>
<BRK/>
<NPR>Supervision by manufacturer's representative should be required during batching, 
finishing, and curing at start-up of the job.  A HRWR recommended by the manufacturer 
of the silica fume should be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Silica fume shall conform to <RID>ASTM C 1240</RID>.  Available alkalies shall conform to the optimal limit given in Table 
2 of <RID>ASTM C 1240</RID>.  Silica fume may be furnished as a dry, densified material or as a slurry.  In accordance with 
paragraph Technical Service for Specialized Concrete, the Contractor shall provide at no cost to the Government 
the services of a manufacturer's technical representative experienced in mixing, proportioning, placement procedures, 
and curing of concrete containing silica fume.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   AGGREGATES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit and fill in the blanks as appropriate.  Consideration should always 
be given to the local aggregate supply situation, quality, and availability.</NPR><BRK/>
<BRK/>
<NPR>This note may be disregarded for regions where Alkali-Silica Reactivity (ASR) 
is not a concern.  Some aggregate sources may exhibit an ASR potential.  ASR 
is a potentially deleterious reaction between alkalis present in concrete and 
some siliceous aggregates, reference EM 1110-2-2000 paragraph 2-3b(6) and appendix 
D.  Where ASR is known or suspected to pose a concern for concrete durability, 
it is recommended that aggregates proposed for use in concrete be evaluated 
to determine ASR potential and an effective mitigation.  EM 1110-2-2000, provides 
recommendations for evaluating and mitigating ASR in concrete mixtures.  Aggregate 
evaluations may not be practical for projects requiring small quantities of 
concrete (less than 250 cubic yards).<BRK/>
<BRK/>
UFGS Section 32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS 
MORE THAN 10,000 CUBIC YARDS, paragraph 2.2.1.2 Alkali-Silica Reactivity, provides 
a specification method for the Contractor to evaluate and mitigate ASR in concrete 
mixtures.  The expansion limits specified in UFGS Section 32 13 11 are requirements 
for pavements and exterior slab construction.  For structural concrete applications 
the measured expansion shall be less than 0.10 percent.  It may not be economical 
or practical to specify different test limit requirements for use on the same 
project.  In which case the lower limit required by the application should be used.<BRK/>
<BRK/>
The designer may use the specification method in UFGS Section 32 13 11 by incorporating 
the relevant paragraphs into this specification, or may use the following requirements 
(retain either the 0.10 or the 0.08 percent expansion limits as appropriate) 
included in the set of brackets highlighted thus "[.]".</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fine and coarse aggregates shall "[be tested and evaluated for alkali-aggregate reactivity in accordance with <RID>
ASTM C 1260</RID>.  The fine and coarse aggregates shall be evaluated separately and in combination, which matches 
the Contractor's proposed mix design proportioning.  All results of the separate and combination testing shall 
have a measured expansion less than 0.10 (0.08) percent at 16 days after casting.  Should the test data indicate 
an expansion of 0.10 (0.08) percent or greater, the aggregate(s) shall be rejected or additional testing using <RID>
ASTM C 1260</RID> and <RID>ASTM C 1567</RID> shall be performed.  The additional testing using <RID>ASTM C 1260</RID> and <RID>ASTM C 1567</RID> shall 
be performed using the low alkali portland cement in combination with ground granulated blast furnace (GGBF) 
slag, or Class F fly ash.  GGBF slag shall be used in the range of 40 to 50 percent of the total cementitious 
material by mass.  Class F fly ash shall be used in the range of 25 to 40 percent of the total cementitious material 
by mass.]" [conform to the following.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Fine Aggregate</TTL><BRK/>
<BRK/>
<TXT>Fine aggregate shall conform to the quality and gradation requirements of <RID>ASTM C 33</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Coarse Aggregate</TTL><BRK/>
<BRK/>
<TXT>Coarse aggregate shall conform to <RID>ASTM C 33</RID>, Class 5S, size designation [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   Lightweight Aggregate</TTL><BRK/>
<BRK/>
<TXT>Lightweight fine and coarse aggregate shall conform to the quality and gradation requirements of <RID>ASTM C 330</RID>, 
size [_____] for coarse aggregate.  Lightweight aggregate shall be prewetted in accordance with the Manufacturer's 
instructions unless otherwise specified.  For pumped concrete, prewetting shall be sufficient to ensure that 
slump loss through the pump line does not exceed<MET> 100 mm</MET><ENG> 4 inches</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4   Materials for Bonded Topping for Heavy Duty Floors</TTL><BRK/>
<BRK/>
<TXT>In addition to the requirements specified above, coarse aggregate used for this purpose shall be a well graded, 
hard, sound diabase, trap rock, emery, granite or other natural or manufactured aggregate having equivalent hardness 
and wearing qualities and shall have a percentage of loss not to exceed 30 after 500 revolutions when tested 
in accordance with <RID>ASTM C 131</RID>.  Gradation of the aggregates when tested in accordance with <RID>ASTM C 136</RID> shall be 
as follows:</TXT><BRK/>
<TBL><THD><BRK/>
                        Coarse Aggregate<BRK/>
<BRK/>
                                          Cumulative Percent<BRK/>
   Sieve Size                             By Weight Passing<BRK/>
   __________                             _________________<BRK/></THD>
<BRK/>
   <MET>19 mm</MET><ENG> 3/4 in.</ENG>                         100<BRK/>
   <MET>12.5 mm</MET><ENG> 1/2 in.</ENG>                       50-100<BRK/>
   <MET>9.5 mm</MET><ENG> 3/8 in.</ENG>                        25-50<BRK/>
   <MET>4.75 mm</MET><ENG> No. 4</ENG>                         0-15<BRK/>
   <MET>2.36 mm</MET><ENG> No. 8</ENG>                         0-8<BRK/></TBL>
<TBL><THD><BRK/>
                         Fine Aggregate<BRK/>
<BRK/>
                                          Cumulative Percent<BRK/>
   Sieve Size                             By Weight Passing<BRK/>
   __________                             __________________<BRK/></THD>
<BRK/>
   <MET>9.5 mm</MET><ENG> 3/8 in.</ENG>                        100<BRK/>
   <MET>4.75 mm</MET><ENG> No. 4</ENG>                         95-100<BRK/>
   <MET>2.36 mm</MET><ENG> No. 8</ENG>                         65-80<BRK/>
   <MET>1.18 mm</MET><ENG> No. 16</ENG>                        45-65<BRK/>
   <MET>0.600 mm</MET><ENG> No. 30</ENG>                       25-45<BRK/>
   <MET>0.300 mm</MET><ENG> No. 50</ENG>                       5-15<BRK/>
   <MET>0.150 mm</MET><ENG> No. 100</ENG>                      0-5<BRK/></TBL>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   CHEMICAL ADMIXTURES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit as appropriate for the project.  Do not permit the use of calcium 
chloride.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chemical admixtures, when required or permitted, shall conform to the appropriate specification listed.  Admixtures 
shall be furnished in liquid form and of suitable concentration for easy, accurate control of dispensing.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Air-Entraining Admixture</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 260</RID> and shall consistently entrain the air content in the specified ranges under field conditions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   Accelerating Admixture</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 494/C 494M</RID>, Type C or E, except that calcium chloride or admixtures containing calcium chloride shall 
not be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.3   Water-Reducing or Retarding Admixture</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 494/C 494M</RID>, Type A, B, or D, except that the 6-month and 1-year compressive and flexural strength tests 
are waived.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.4   High-Range Water Reducer</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph only when high-range water reducing admixture is allowed 
in paragraph SLUMP in PART 1.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ASTM C 494/C 494M</RID>, Type F or G, except that the 6-month and 1-year strength requirements are waived.  The admixture 
shall be used only when approved in writing, such approval being contingent upon particular mixture control as 
described in the Contractor's Quality Control Plan and upon performance of separate mixture design studies.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.5   <SUB>Surface Retarder</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>COE CRD-C 94</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.6   Expanding Admixture</TTL><BRK/>
<BRK/>
<TXT>Aluminum powder type expanding admixture conforming to <RID>ASTM C 937</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.7   Other Chemical Admixtures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph only when a plasticizing admixture is allowed in paragraph 
SLUMP in PART 1.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chemical admixtures for use in producing flowing concrete shall comply with <RID>ASTM C 1017/C 1017M</RID>, Type I or II.  
These admixtures shall be used only when approved in writing, such approval being contingent upon particular 
mixture control as described in the Contractor's Quality Control Plan and upon performance of separate mixture 
design studies.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   CURING MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.4.1   Impervious-Sheet</TTL><BRK/>
<BRK/>
<TXT>Impervious-sheet materials shall conform to <RID>ASTM C 171</RID>, type optional, except, that polyethylene sheet shall 
not be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Membrane-Forming Compound</TTL><BRK/>
<BRK/>
<TXT>Membrane-Forming curing compound shall conform to <RID>ASTM C 309</RID>, Type 1-D or 2, except that only a styrene acrylate 
or chlorinated rubber compound meeting Class B requirements shall be used for surfaces that are to be painted 
or are to receive bituminous roofing, or waterproofing, or floors that are to receive adhesive applications of 
resilient flooring.  The curing compound selected shall be compatible with any subsequent paint, roofing, waterproofing, 
or flooring specified.  Nonpigmented compound shall contain a fugitive dye, and shall have the reflective requirements 
in <RID>ASTM C 309</RID> waived.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.3   Burlap and Cotton Mat</TTL><BRK/>
<BRK/>
<TXT>Burlap and cotton mat used for curing shall conform to <RID>AASHTO M 182</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5   WATER</TTL><BRK/>
<BRK/>
<TXT>Water for mixing and curing shall be fresh, clean, potable, and free of injurious amounts of oil, acid, salt, 
or alkali, except that non-potable water may be used if it meets the requirements of <RID>COE CRD-C 400</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   NONSHRINK GROUT</TTL><BRK/>
<BRK/>
<TXT>Nonshrink grout shall conform to <RID>ASTM C 1107/C 1107M</RID>, Grade [A] [B] [C], and shall be a commercial formulation 
suitable for the proposed application.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7   NONSLIP SURFACING MATERIAL</TTL><BRK/>
<BRK/>
<TXT>Nonslip surfacing material shall consist of 55 percent, minimum, aluminum oxide or silicon-dioxide abrasive ceramically 
bonded together to form a homogeneous material sufficiently porous to provide a good bond with portland cement 
paste; or factory-graded emery aggregate consisting of not less than 45 percent aluminum oxide and 25 percent 
ferric oxide.  The aggregate shall be well graded from particles retained on the<MET> 0.6 mm</MET><ENG> No. 30</ENG> sieve to particles 
passing the<MET> 2.36 mm</MET><ENG> No. 8</ENG> sieve.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8   LATEX BONDING AGENT</TTL><BRK/>
<BRK/>
<TXT>Latex agents for bonding fresh to hardened concrete shall conform to <RID>ASTM C 1059/C 1059M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9   EPOXY RESIN</TTL><BRK/>
<BRK/>
<TXT>Epoxy resins for use in repairs shall conform to <RID>ASTM C 881/C 881M</RID>, Type V, Grade 2.  Class as appropriate to 
the existing ambient and surface temperatures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10   EMBEDDED ITEMS</TTL><BRK/>
<BRK/>
<TXT>Embedded items shall be of the size and type indicated or as needed for the application.  Dovetail slots shall 
be galvanized steel.  Hangers for suspended ceilings shall be as specified in Section <SRF>09 51 00</SRF> ACOUSTICAL CEILINGS.  
Inserts for shelf angles and bolt hangers shall be of malleable iron or cast or wrought steel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11   FLOOR HARDENER</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Floor hardener should only be specified on specialized indoor floors 
where dusting of concrete would present an unusual problem or where specially 
requested by the Using Service.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Floor hardener shall be a colorless aqueous solution containing zinc silicofluoride, magnesium silicofluoride, 
or sodium silicofluoride.  These silicofluorides can be used individually or in combination.  Proprietary hardeners 
may be used if approved in writing by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12   PERIMETER INSULATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show required K-value on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perimeter insulation shall be polystyrene conforming to <RID>ASTM C 578</RID>, Type II; polyurethane conforming to <RID>ASTM C 591</RID>
, Type II; or cellular glass conforming to <RID>ASTM C 552</RID>, Type I or IV.  The Contractor shall comply with EPA requirements 
in accordance with Section <SRF>01 62 35</SRF> RECYCLED / RECOVERED MATERIALS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13   VAPOR BARRIER</TTL><BRK/>
<BRK/>
<TXT>Vapor barrier shall be polyethylene sheeting with a minimum thickness of<MET> 0.15 mm</MET><ENG> 6 mils</ENG> or other equivalent material 
having a vapor permeance rating not exceeding<MET> 30 nanograms per Pascal per second per square meter</MET><ENG> 0.5 perms</ENG> as 
determined in accordance with <RID>ASTM E 96/E 96M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14   JOINT MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.14.1   Joint Fillers, Sealers, and Waterstops</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Do not use bituminous filler with non-bituminous sealer.  Designer will 
edit bracketed items for joint sealing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Expansion joint fillers shall be preformed materials conforming to [<RID>ASTM D 1751</RID>] [<RID>ASTM D 1752</RID>].  Materials for 
waterstops shall be in accordance with Section <SRF>03 15 13.00 10</SRF> EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS.  
Materials for and sealing of joints shall conform to the requirements of Section [<SRF>07 92 00</SRF> JOINT SEALANTS] [
<SRF>32 01 19</SRF> FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS] [<SRF>32 13 73</SRF> COMPRESSION JOINT SEALS FOR CONCRETE 
PAVEMENTS].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14.2   Contraction Joints in Slabs</TTL><BRK/>
<BRK/>
<TXT>Sawable type contraction joint inserts shall conform to <RID>COE CRD-C 540</RID>.  Nonsawable joint inserts shall have sufficient 
stiffness to permit placement in plastic concrete without undue deviation from a straight line and shall conform 
to the physical requirements of <RID>COE CRD-C 540</RID>, with the exception of Section 3.4 "Resistance to Sawing".  Plastic 
inserts shall be polyvinyl chloride conforming to the materials requirements of <RID>COE CRD-C 572</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.15   SYNTHETIC FIBERS FOR REINFORCING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use fiber reinforcement only when approved by the designer; in that case 
retain this paragraph.  Drawings should indicate where fiber reinforced concrete 
is located.  Fiber reinforcing is used to help control cracking due to drying 
shrinkage and thermal expansion/contraction; reduce permeability; and increase 
impact capacity, shatter and abrasion resistance, and toughness.  Fiber reinforcing 
will not: control cracking due to structural stresses, significantly increase 
strength, control curling or creeping, justify reducing structural members, 
eliminate control joints, or replace any moment or structural steel reinforcement.  
Include flexural toughness tests when synthetic reinforcement fibers are used 
to increase toughness and when justified by size and importance of the job, 
but not when fibers are used only to control shrinkage cracking.  Include technical 
representative requirement when warranted by size and importance of the job.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Synthetic fibers shall conform to <RID>ASTM C 1116/C 1116M</RID>, Type III, Synthetic Fiber, and as follows.  Fibers shall 
be 100 percent virgin polypropylene fibrillated fibers containing no reprocessed olefin materials.  Fibers shall 
have a specific gravity of 0.9, a minimum tensile strength of<MET> 480 MPa</MET><ENG> 70 ksi</ENG> graded in accordance with manufacturer, 
and specifically manufactured to an optimum gradation for use as concrete secondary reinforcement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16   DRY SHAKE FLOOR TOPPING MATERIAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit and supplement this paragraph for light reflective, spark resistant, 
static disseminating floors as applicable to the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Dry shake floor topping material shall be a premixed ready-to-use dry shake.  It shall be proportioned, mixed 
and packaged at the factory, and delivered to the jobsite in sealed, moisture resistant bags, ready to apply, 
finish and cure.  The manufacturer of the dry shake material shall have at least 10 years experience in the manufacture 
of such material.  Any material from a manufacturer who makes any disclaimer of the materials performance shall 
not be used.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   PREPARATION FOR PLACING</TTL><BRK/>
<BRK/>
<TXT>Before commencing concrete placement, the following shall be performed.  Surfaces to receive concrete shall be 
clean and free from frost, ice, mud, and water.  Forms shall be in place, cleaned, coated, and adequately supported, 
in accordance with Section <SRF>03 11 13.00 10</SRF> STRUCTURAL CONCRETE FORMWORK.  Reinforcing steel shall be in place, 
cleaned, tied, and adequately supported, in accordance with Section <SRF>03 20 01.00 10</SRF> CONCRETE REINFORCEMENT.  Transporting 
and conveying equipment shall be in-place, ready for use, clean, and free of hardened concrete and foreign material.  
Equipment for consolidating concrete shall be at the placing site and in proper working order.  Equipment and 
material for curing and for protecting concrete from weather or mechanical damage shall be at the placing site, 
in proper working condition and in sufficient amount for the entire placement.  When hot, windy conditions during 
concreting appear probable, equipment and material shall be at the placing site to provide windbreaks, shading, 
fogging, or other action to prevent plastic shrinkage cracking or other damaging drying of the concrete.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Foundations</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1.1   Concrete on Earth Foundations</TTL><BRK/>
<BRK/>
<TXT>Earth (subgrade, base, or subbase courses) surfaces upon which concrete is to be placed shall be clean, damp, 
and free from debris, frost, ice, and standing or running water.  Prior to placement of concrete, the foundation 
shall be well drained and shall be satisfactorily graded and uniformly compacted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.1.2   Preparation of Rock</TTL><BRK/>
<BRK/>
<TXT>Rock surfaces upon which concrete is to be placed shall be free from oil, standing or running water, ice, mud, 
drummy rock, coating, debris, and loose, semidetached or unsound fragments.  Joints in rock shall be cleaned 
to a satisfactory depth, as determined by the Contracting Officer, and to firm rock on the sides.  Immediately 
before the concrete is placed, rock surfaces shall be cleaned thoroughly by the use of air-water jets or sandblasting 
as specified below for Previously Placed Concrete.  Rock surfaces shall be kept continuously moist for at least 
24 hours immediately prior to placing concrete thereon.  All horizontal and approximately horizontal surfaces 
shall be covered, immediately before the concrete is placed, with a layer of mortar proportioned similar to that 
in the concrete mixture.  Concrete shall be placed before the mortar stiffens.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.1.3   Excavated Surfaces in Lieu of Forms</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph when forms are required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete for [footings] [and] [walls] may be placed directly against the soil provided the earth or rock has 
been carefully trimmed, is uniform and stable, and meets the compaction requirements of Section <SRF>31 00 00</SRF> EARTHWORK.  
The concrete shall be placed without becoming contaminated by loose material, and the outline of the concrete 
shall be within the specified tolerances.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.2   Previously Placed Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If structure has few construction joints to be bonded, none of them critical, 
remove the following requirements except for subparagraph Preparation of Previously 
Placed Concrete.  Otherwise, use the following requirements and remove subparagraph 
Preparation of Previously Placed Concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete surfaces to which additional concrete is to be bonded shall be prepared for receiving the next horizontal 
lift by cleaning the construction joint surface with either air-water cutting, sandblasting, high-pressure water 
jet, or other approved method.  Concrete at the side of vertical construction joints shall be prepared as approved 
by the Contracting Officer.  Air-water cutting shall not be used on formed surfaces or surfaces congested with 
reinforcing steel.  Regardless of the method used, the resulting surfaces shall be free from all laitance and 
inferior concrete so that clean surfaces of well bonded coarse aggregate are exposed and make up at least 10-percent 
of the surface area, distributed uniformly throughout the surface.  The edges of the coarse aggregate shall not 
be undercut.  The surface of horizontal construction joints shall be kept continuously wet for the first 12 hours 
during the 24-hour period prior to placing fresh concrete.  The surface shall be washed completely clean as the 
last operation prior to placing the next lift.  For heavy duty floors and two-course floors a thin coat of neat 
cement grout of about the consistency of thick cream shall be thoroughly scrubbed into the existing surface immediately 
ahead of the topping placing.  The grout shall be a 1:1 mixture of portland cement and sand passing the<MET> 2.36 
mm</MET><ENG> No. 8</ENG> sieve.  The topping concrete shall be deposited before the grout coat has had time to stiffen.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.2.1   Air-Water Cutting</TTL><BRK/>
<BRK/>
<TXT>Air-water cutting of a fresh concrete surface shall be performed at the proper time and only on horizontal construction 
joints.  The air pressure used in the jet shall be<MET> 700 kPa</MET><ENG> 100 psi</ENG> plus or minus, <MET>70 kPa</MET><ENG> 10 psi</ENG>, and the water 
pressure shall be just sufficient to bring the water into effective influence of the air pressure.  When approved 
by the Contracting Officer, a surface retarder complying with the requirements of <RID>COE CRD-C 94</RID> may be applied 
to the surface of the lift in order to prolong the period of time during which air-water cutting is effective.  
After cutting, the surface shall be washed and rinsed as long as there is any trace of cloudiness of the wash 
water.  Where necessary to remove accumulated laitance, coatings, stains, debris, and other foreign material, 
high-pressure waterjet or sandblasting shall be used as the last operation before placing the next lift.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.2   High-Pressure Water Jet</TTL><BRK/>
<BRK/>
<TXT>A stream of water under a pressure of not less than<MET> 20 MPa</MET><ENG> 3,000 psi</ENG> shall be used for cutting and cleaning.  
Its use shall be delayed until the concrete is sufficiently hard so that only the surface skin or mortar is removed 
and there is no undercutting of coarse-aggregate particles.  If the waterjet is incapable of a satisfactory cleaning, 
the surface shall be cleaned by sandblasting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.3   Wet Sandblasting</TTL><BRK/>
<BRK/>
<TXT>Wet sandblasting shall be used after the concrete has reached sufficient strength to prevent undercutting of 
the coarse aggregate particles.  After wet sandblasting, the surface of the concrete shall then be washed thoroughly 
to remove all loose materials.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.4   Waste Disposal</TTL><BRK/>
<BRK/>
<TXT>The method used in disposing of waste water employed in cutting, washing, and rinsing of concrete surfaces shall 
be such that the waste water does not stain, discolor, or affect exposed surfaces of the structures, or damage 
the environment of the project area.  The method of disposal shall be subject to approval.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.5   Preparation of Previously Placed Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the structure has few construction joints to be bonded, none of 
them critical, use this subparagraph and delete requirements of above subparagraphs 
and of paragraph Previously Placed Concrete.  Renumber this specification accordingly.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete surfaces to which other concrete is to be bonded shall be abraded in an approved manner that will expose 
sound aggregate uniformly without damaging the concrete.  Laitance and loose particles shall be removed.  Surfaces 
shall be thoroughly washed and shall be moist but without free water when concrete is placed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.3   Vapor Barrier</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When this paragraph is used, coordinate drawings and specifications ensuring 
that drawings indicate vapor barrier beneath slabs.  Retain the penultimate 
sentence unless experience in the area has shown it to be unnecessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Vapor barrier shall be provided beneath the interior on-grade concrete floor slabs.  The greatest widths and 
lengths practicable shall be used to eliminate joints wherever possible.  Joints shall be lapped a minimum of<MET>
 300 mm</MET><ENG> 12 inches</ENG>.  Torn, punctured, or damaged vapor barrier material shall be removed and new vapor barrier 
shall be provided prior to placing concrete.  For minor repairs, patches may be made using laps of at least<MET> 300 
mm</MET><ENG> 12 inches</ENG>.  Lapped joints shall be sealed and edges patched with pressure-sensitive adhesive or tape not less 
than<MET> 50 mm</MET><ENG> 2 inches</ENG> wide and compatible with the membrane.  Vapor barrier shall be placed directly on underlying 
subgrade, base course, or capillary water barrier, unless it consists of crushed material or large granular material 
which could puncture the vapor barrier.  In this case, a thin layer of approximately<MET> 13 mm</MET><ENG> 1/2 inch</ENG> of fine graded 
material should be rolled or compacted over the fill before installation of the vapor barrier to reduce the possibility 
of puncture.  Concrete placement shall be controlled so as to prevent damage to the vapor barrier.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Perimeter Insulation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When this paragraph is used, ensure that drawings indicate location and 
extent of perimeter insulation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perimeter insulation shall be installed at locations indicated.  Adhesive shall be used where insulation is applied 
to the interior surface of foundation walls and may be used for exterior application.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Embedded Items</TTL><BRK/>
<BRK/>
<TXT>Before placement of concrete, care shall be taken to determine that all embedded items are firmly and securely 
fastened in place as indicated on the drawings, or required.  Conduit and other embedded items shall be clean 
and free of oil and other foreign matter such as loose coatings or rust, paint, and scale.  The embedding of 
wood in concrete will be permitted only when specifically authorized or directed.  Voids in sleeves, inserts, 
and anchor slots shall be filled temporarily with readily removable materials to prevent the entry of concrete 
into voids.  Welding shall not be performed on embedded metals within<MET> 300 mm</MET><ENG> 12 inches</ENG> of the surface of the 
concrete.  Tack welding shall not be performed on or to embedded items.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   CONCRETE PRODUCTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph and its subparagraphs for all projects except where 
designer chooses to use the following optional paragraph CONCRETE PRODUCTION, 
SMALL PROJECTS, provided it meets the criteria described therein, in which case 
delete these.  Do not specify both options.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.2.1   General Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer must choose one of the two bracketed requirements and delete 
the other.  Do not use the first bracketed requirement if ready-mixed concrete 
is not wanted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Concrete shall either be batched and mixed onsite or shall be furnished from a ready-mixed concrete plant.  
Ready-mixed concrete shall be batched, mixed, and transported in accordance with <RID>ASTM C 94/C 94M</RID>, except as otherwise 
specified.  Truck mixers, agitators, and nonagitating transporting units shall comply with <RID>NRMCA TMMB 100</RID>.  Ready-mix 
plant equipment and facilities shall be certified in accordance with <RID>NRMCA QC 3</RID>.  Approved batch tickets shall 
be furnished for each load of ready-mixed concrete.  Site-mixed concrete shall conform to the following subparagraphs.] 
[Concrete shall be batched and mixed onsite, or close to onsite, and shall conform to the following subparagraphs.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Batching Plant</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose the desired bracketed options for plant locations.  Insert desired 
minimum capacity of plant, it should be sufficient to accommodate the largest 
placement within a reasonable time.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The batching plant shall be located [on site in the general area indicated on the drawings] [or] [off site close 
to the project].  The batching, mixing and placing system shall have a capacity of at least [_____] cubic<MET> meters</MET><ENG>
 yards</ENG> per hour.  The batching plant shall conform to the requirements of <RID>NRMCA CPMB 100</RID> and as specified; however, 
rating plates attached to batch plant equipment are not required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Batching Equipment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain the bracketed sentence concerning truck mixers unless it is desired 
to prohibit truck mixers.  Always retain bracketed item about silica fume when 
its use is allowed, otherwise delete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The batching controls shall be semiautomatic or automatic, as defined in <RID>NRMCA CPMB 100</RID>.  A semiautomatic batching 
system shall be provided with interlocks such that the discharge device cannot be actuated until the indicated 
material is within the applicable tolerance.  The batching system shall be equipped with accurate recorder or 
recorders that meet the requirements of <RID>NRMCA CPMB 100</RID>.  The weight of water and admixtures shall be recorded 
if batched by weight.  Separate bins or compartments shall be provided for each size group of aggregate and type 
of cementitious material, to prevent intermingling at any time.  Aggregates shall be weighed either in separate 
weigh batchers with individual scales or, provided the smallest size is batched first, cumulatively in one weigh 
batcher on one scale.  Aggregate shall not be weighed in the same batcher with cementitious material.  If both 
portland cement and other cementitious material are used, they may be batched cumulatively, provided that the 
portland cement is batched first, [except that silica fume shall always be batched separately].  Water may be 
measured by weight or volume.  Water shall not be weighed or measured cumulatively with another ingredient.  
Filling and discharging valves for the water metering or batching system shall be so interlocked that the discharge 
valve cannot be opened before the filling valve is fully closed.  Piping for water and for admixtures shall be 
free from leaks and shall be properly valved to prevent backflow or siphoning.  Admixtures shall be furnished 
as a liquid of suitable concentration for easy control of dispensing.  An adjustable, accurate, mechanical device 
for measuring and dispensing each admixture shall be provided.  Each admixture dispenser shall be interlocked 
with the batching and discharging operation of the water so that each admixture is separately batched and individually 
discharged automatically in a manner to obtain uniform distribution throughout the water as it is added to the 
batch in the specified mixing period.  [When use of truck mixers makes this requirement impractical, the admixture 
dispensers shall be interlocked with the sand batchers].  Different admixtures shall not be combined prior to 
introduction in water and shall not be allowed to intermingle until in contact with the cement.  Admixture dispensers 
shall have suitable devices to detect and indicate flow during dispensing or have a means for visual observation.  
The plant shall be arranged so as to facilitate the inspection of all operations at all times.  Suitable facilities 
shall be provided for obtaining representative samples of aggregates from each bin or compartment, and for sampling 
and calibrating the dispensing of cementitious material, water, and admixtures.  Filling ports for cementitious 
materials bins or silos shall be clearly marked with a permanent sign stating the contents.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Scales</TTL><BRK/>
<BRK/>
<TXT>The weighing equipment shall conform to the applicable requirements of CPMB Concrete Plant Standard, and of <RID>NIST HB 44</RID>
, except that the accuracy shall be plus or minus 0.2 percent of scale capacity.  The Contractor shall provide 
standard test weights and any other auxiliary equipment required for checking the operating performance of each 
scale or other measuring devices.  The tests shall be made at the specified frequency in the presence of a Government 
inspector.  The weighing equipment shall be arranged so that the plant operator can conveniently observe all 
dials or indicators.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.5   Batching Tolerances</TTL><BRK/>
<BRK/>
<ITM>(A)  Tolerances with Weighing Equipment</ITM><BRK/>
<BRK/>
<TBL><THD>                                    PERCENT OF REQUIRED<BRK/>
                 MATERIAL                  WEIGHT<BRK/></THD>
<BRK/>
          Cementitious materials         0 to plus 2<BRK/>
          Aggregate                      plus or minus 2<BRK/>
          Water                          plus or minus 1<BRK/>
          Chemical admixture             0 to plus 6<BRK/></TBL>
<BRK/>
<ITM>(B)  Tolerances with Volumetric Equipment</ITM><BRK/>
<BRK/>
<TXT>For volumetric batching equipment used for water and admixtures, the following tolerances shall apply to the 
required volume of material being batched:</TXT><BRK/>
<TBL><THD><BRK/>
                                PERCENT OF REQUIRED<BRK/>
              MATERIAL                 MATERIAL<BRK/></THD>
<BRK/>
             Water:                  plus or minus 1 percent<BRK/>
             Chemical admixtures:    0 to plus 6 percent<BRK/></TBL>
<BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.6   Moisture Control</TTL><BRK/>
<BRK/>
<TXT>The plant shall be capable of ready adjustment to compensate for the varying moisture content of the aggregates 
and to change the weights of the materials being batched.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.7   Concrete Mixers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain bracketed phrase unless it is desired to prohibit truck mixers, 
in which case delete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Mixers shall be stationary mixers [or truck mixers].  Mixers shall be capable of combining the materials into 
a uniform mixture and of discharging this mixture without segregation.  The mixers shall not be charged in excess 
of the capacity recommended by the manufacturer.  The mixers shall be operated at the drum or mixing blade speed 
designated by the manufacturer.  The mixers shall be maintained in satisfactory operating condition, and the 
mixer drums shall be kept free of hardened concrete.  Should any mixer at any time produce unsatisfactory results, 
its use shall be promptly discontinued until it is repaired.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.8   Stationary Mixers</TTL><BRK/>
<BRK/>
<TXT>Concrete plant mixers shall be drum-type mixers of tilting, nontilting, horizontal-shaft, or vertical-shaft type, 
or shall be pug mill type and shall be provided with an acceptable device to lock the discharge mechanism until 
the required mixing time has elapsed.  The mixing time and uniformity shall conform to all the requirements in <RID>
ASTM C 94/C 94M</RID> applicable to central-mixed concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.9   Truck Mixers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this subparagraph if truck mixers have been previously prohibited, 
otherwise retain.  Use bracketed item only for small jobs.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Truck mixers, the mixing of concrete therein, and concrete uniformity shall conform to the requirements of <RID>ASTM C 94/C 94M</RID>
.  A truck mixer may be used either for complete mixing (transit-mixed) or to finish the partial mixing done 
in a stationary mixer (shrink-mixed).  Each truck shall be equipped with two counters from which it is possible 
to determine the number of revolutions at mixing speed and the number of revolutions at agitating speed.  [Or, 
if approved in lieu of this, the number of revolutions shall be marked on the batch tickets.]  Water shall not 
be added at the placing site unless specifically approved; and in no case shall it exceed the specified w/c.  
Any such water shall be injected at the base of the mixer, not at the discharge end.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   CONCRETE PRODUCTION, SMALL PROJECTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph at the designer's option in lieu of the previous paragraph 
CONCRETE PRODUCTION and its subparagraphs, which must then be deleted, but only 
when all the following conditions exist:</NPR><BRK/>
<BRK/>
<NPR>(a) There are no particularly critical structural items.</NPR><BRK/>
<BRK/>
<NPR>(b) There are no items of particularly critical appearance.</NPR><BRK/>
<BRK/>
<NPR>(c) No concrete is required with a specified compressive strength greater than 
24.2 MPa (3500 psi).</NPR><BRK/>
<BRK/>
<NPR>(d) Not over 1150 cubic meters (1500 cubic yards) of concrete are required.</NPR><BRK/>
<BRK/>
<NPR>Otherwise, use the above listed previous paragraph and subparagraphs only.  
Do not specify both options.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Batch-type equipment shall be used for producing concrete.  Ready-mixed concrete shall be batched, mixed, and 
transported in accordance with <RID>ASTM C 94/C 94M</RID>, except as otherwise specified.  Truck mixers, agitators, and 
nonagitating transporting units shall comply with <RID>NRMCA TMMB 100</RID>.  Ready-mix plant equipment and facilities shall 
be certified in accordance with <RID>NRMCA QC 3</RID>.  Approved batch tickets shall be furnished for each load of ready-mixed 
concrete.  Site-mixed concrete shall be produced in accordance with <RID>ACI 301</RID>, and plant shall conform to <RID>NRMCA CPMB 100</RID>
. [In lieu of batch-type equipment, concrete may be produced by volumetric batching and continuous mixing, which 
shall conform to <RID>ASTM C 685/C 685M</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   <SUB>LIGHTWEIGHT AGGREGATE CONCRETE</SUB></TTL><BRK/>
<BRK/>
<TXT>In addition to the requirements specified for normal weight concrete, lightweight aggregate concrete shall conform 
to the following.  The batching and mixing cycle shall be as directed based on written recommendations from the 
aggregate supplier which the Contractor shall furnish.  Unless otherwise directed, the mixer shall be charged 
with approximately 2/3 of the total mixing water and all of the aggregate.  This shall be mixed for at least 
1.5 minutes in a stationary mixer or 15 revolutions at mixing speed in a truck mixer.  The remaining ingredients 
shall then be added and mixing continued as specified for normal weight concrete.  Lightweight aggregate concrete 
shall not be vibrated to the extent that large particles of aggregate float to the surface.  During finishing, 
lightweight aggregate concrete shall not be worked to the extent that mortar is driven down and lightweight coarse 
aggregate appears at the surface.  Lightweight aggregate concrete to be pumped shall have a cement content of 
at least<MET> 335 kg/cubic meter</MET><ENG> 564 lb/cu. yd</ENG>.  [A field trial run of lightweight aggregate concrete placement and 
finishing shall be made in accordance with <RID>ACI 213R</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   FIBER REINFORCED CONCRETE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Only use fiber reinforcing when approved by the structural designer.  
Drawings should indicate where fiber reinforced concrete is located.  Fiber 
reinforcing is used (1) to help control cracking due to drying shrinkage and 
thermal expansion and contraction, (2) to reduce permeability, (3) to increase 
impact capability, shatter resistance, abrasion resistance, and toughness.  
Fiber reinforcing will not:  control cracking due to structural stresses, significantly 
increase strength, control curling or creeping, justify reducing structural 
members, eliminate control joints, or replace any moment or structural steel 
reinforcement.  Include flexural toughness tests when synthetic reinforcement 
fibers are used to increase toughness and when justified by size and importance 
of job, but not when fibers are used only to control shrinkage cracking.  Include 
technical representative when warranted by size and importance of job.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fiber reinforced concrete shall conform to <RID>ASTM C 1116/C 1116M</RID> and as follows, using the fibers specified in 
PART 2.  A minimum of<MET> 0.9 kg of fibers per cubic m</MET><ENG> 1.5 pounds of fibers per cubic yard</ENG> of concrete shall be used.  
Fibers shall be added at the batch plant.  [Toughness indices shall meet requirements for performance level I 
of <RID>ASTM C 1116/C 1116M</RID>.]  The services of a qualified technical representative shall be provided to instruct 
the concrete supplier in proper batching and mixing of materials to be provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   TRANSPORTING CONCRETE TO PROJECT SITE</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be transported to the placing site in [truck mixers,] [agitators,] [nonagitating transporting 
equipment conforming to <RID>NRMCA TMMB 100</RID>] or by approved [pumping equipment] [conveyors].  Nonagitating equipment, 
other than pumps, shall not be used for transporting lightweight aggregate concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   CONVEYING CONCRETE ON SITE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete conveying equipment not wanted on the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete shall be conveyed from mixer or transporting unit to forms as rapidly as possible and within the time 
interval specified by methods which will prevent segregation or loss of ingredients using following equipment.  
Conveying equipment shall be cleaned before each placement.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.7.1   Buckets</TTL><BRK/>
<BRK/>
<TXT>The interior hopper slope shall be not less than 58 degrees from the horizontal, the minimum dimension of the 
clear gate opening shall be at least 5 times the nominal maximum-size aggregate, and the area of the gate opening 
shall not be less than<MET> 0.2 square meters</MET><ENG> 2 square feet</ENG>.  The maximum dimension of the gate opening shall not 
be greater than twice the minimum dimension.  The bucket gates shall be essentially grout tight when closed and 
may be manually, pneumatically, or hydraulically operated except that buckets larger than<MET> 1.5 cubic meters</MET><ENG> 2 
cubic yards</ENG> shall not be manually operated.  The design of the bucket shall provide means for positive regulation 
of the amount and rate of deposit of concrete in each dumping position.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.2   Transfer Hoppers</TTL><BRK/>
<BRK/>
<TXT>Concrete may be charged into nonagitating hoppers for transfer to other conveying devices.  Transfer hoppers 
shall be capable of receiving concrete directly from delivery vehicles and shall have conical-shaped discharge 
features.  The transfer hopper shall be equipped with a hydraulically operated gate and with a means of external 
vibration to effect complete discharge.  Concrete shall not be held in nonagitating transfer hoppers more than 
30 minutes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.3   Trucks</TTL><BRK/>
<BRK/>
<TXT>Truck mixers operating at agitating speed or truck agitators used for transporting plant-mixed concrete shall 
conform to the requirements of <RID>ASTM C 94/C 94M</RID>.  Nonagitating equipment shall be used only for transporting plant-mixed 
concrete over a smooth road and when the hauling time is less than 15 minutes.  Bodies of nonagitating equipment 
shall be smooth, watertight, metal containers specifically designed to transport concrete, shaped with rounded 
corners to minimize segregation, and equipped with gates that will permit positive control of the discharge of 
the concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.4   Chutes</TTL><BRK/>
<BRK/>
<TXT>When concrete can be placed directly from a truck mixer, agitator, or nonagitating equipment, the chutes normally 
attached to this equipment by the manufacturer may be used.  A discharge deflector shall be used when required 
by the Contracting Officer.  Separate chutes and other similar equipment will not be permitted for conveying 
concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.5   Belt Conveyors</TTL><BRK/>
<BRK/>
<TXT>Belt conveyors shall be designed and operated to assure a uniform flow of concrete from mixer to final place 
of deposit without segregation of ingredients or loss of mortar and shall be provided with positive means, such 
as discharge baffle or hopper , for preventing segregation of the concrete at the transfer points and the point 
of placing.  Belt conveyors shall be constructed such that the idler spacing shall not exceed<MET> 900 mm</MET><ENG> 36 inches</ENG>
.  The belt speed shall be a minimum of<MET> 90 meters</MET><ENG> 300 feet</ENG> per minute and a maximum of<MET> 225 meters</MET><ENG> 750 feet</ENG> per 
minute.  If concrete is to be placed through installed horizontal or sloping reinforcing bars, the conveyor shall 
discharge concrete into a pipe or elephant truck that is long enough to extend through the reinforcing bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.6   Concrete Pumps</TTL><BRK/>
<BRK/>
<TXT>Concrete may be conveyed by positive displacement pump when approved.  The pumping equipment shall be piston 
or squeeze pressure type; pneumatic placing equipment shall not be used.  The pipeline shall be rigid steel pipe 
or heavy-duty flexible hose.  The inside diameter of the pipe shall be at least 3 times the nominal maximum-size 
coarse aggregate in the concrete mixture to be pumped but not less than<MET> 100 mm</MET><ENG> 4 inches</ENG>.  Aluminum pipe shall 
not be used.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8   PLACING CONCRETE</TTL><BRK/>
<BRK/>
<TXT>Mixed concrete shall be discharged within 1-1/2 hours or before the mixer drum has revolved 300 revolutions, 
whichever comes first after the introduction of the mixing water to the cement and aggregates.  When the concrete 
temperature exceeds<MET> 30 degrees C</MET><ENG> 85 degrees F</ENG>, the time shall be reduced to 45 minutes.  Concrete shall be placed 
within 15 minutes after it has been discharged from the transporting unit.  Concrete shall be handled from mixer 
or transporting unit to forms in a continuous manner until the approved unit of operation is completed.  Adequate 
scaffolding, ramps and walkways shall be provided so that personnel and equipment are not supported by in-place 
reinforcement.  Placing will not be permitted when the sun, heat, wind, or limitations of facilities furnished 
by the Contractor prevent proper consolidation, finishing and curing.  Sufficient placing capacity shall be provided 
so that concrete can be kept free of cold joints.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.8.1   Depositing Concrete</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be deposited as close as possible to its final position in the forms, and there shall be no vertical 
drop greater than<MET> 1.5 meters</MET><ENG> 5 feet</ENG> except where suitable equipment is provided to prevent segregation and where 
specifically authorized.  Depositing of the concrete shall be so regulated that it will be effectively consolidated 
in horizontal layers not more than<MET> 300 mm</MET><ENG> 12 inches</ENG> thick, except that all slabs shall be placed in a single 
lift.  Concrete to receive other construction shall be screeded to the proper level.  Concrete shall be deposited 
continuously in one layer or in layers so that fresh concrete is deposited on in-place concrete that is still 
plastic.  Fresh concrete shall not be deposited on concrete that has hardened sufficiently to cause formation 
of seams or planes of weakness within the section.  Concrete that has surface dried, partially hardened, or contains 
foreign material shall not be used.  When temporary spreaders are used in the forms, the spreaders shall be removed 
as their service becomes unnecessary.  Concrete shall not be placed in slabs over columns and walls until concrete 
in columns and walls has been in-place at least two hours or until the concrete begins to lose its plasticity.  
Concrete for beams, girders, brackets, column capitals, haunches, and drop panels shall be placed at the same 
time as concrete for adjoining slabs.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.2   Consolidation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For large jobs, this paragraph may be expanded.  Consolidation equipment 
and procedures are described in detail in ACI 309.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Immediately after placing, each layer of concrete shall be consolidated by internal vibrators, except for slabs<MET>
 100 mm</MET><ENG> 4 inches</ENG> thick or less.  The vibrators shall at all times be adequate in effectiveness and number to 
properly consolidate the concrete; a spare vibrator shall be kept at the jobsite during all concrete placing 
operations.  The vibrators shall have a frequency of not less than 10,000 vibrations per minute, an amplitude 
of at least<MET> 0.6 mm</MET><ENG> 0.025 inch</ENG>, and the head diameter shall be appropriate for the structural member and the concrete 
mixture being placed.  Vibrators shall be inserted vertically at uniform spacing over the area of placement.  
The distance between insertions shall be approximately 1.5 times the radius of action of the vibrator so that 
the area being vibrated will overlap the adjacent just-vibrated area by a reasonable amount.  The vibrator shall 
penetrate rapidly to the bottom of the layer and at least<MET> 150 mm</MET><ENG> 6 inches</ENG> into the preceding layer if there is 
such.  Vibrator shall be held stationary until the concrete is consolidated and then vertically withdrawn slowly 
while operating.  Form vibrators shall not be used unless specifically approved and unless forms are constructed 
to withstand their use.  Vibrators shall not be used to move concrete within the forms.  Slabs<MET> 100 mm</MET><ENG> 4 inches</ENG>
 and less in thickness shall be consolidated by properly designed vibrating screeds or other approved technique.  
Excessive vibration of lightweight concrete resulting in segration or flotation of coarse aggregate shall be 
prevented.  Frequency and amplitude of vibrators shall be determined in accordance with <RID>COE CRD-C 521</RID>.  Grate 
tampers ("jitterbugs") shall not be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.3   Cold Weather Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the designer is especially concerned about corrosion of reinforcing 
steel or embedded items, or possibility of sulfate attack, (particularly to 
prestressing steel) the percentage of chloride ion in the mixture should be 
limited. See ACI Committee 201 report "Guide to Durable Concrete" and ACI Committee 
222 report "Corrosion of Metals in Concrete" for guidance on control of chloride 
ion.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Special protection measures, approved by the Contracting Officer, shall be used if freezing temperatures are 
anticipated before the expiration of the specified curing period.  The ambient temperature of the air where concrete 
is to be placed and the temperature of surfaces to receive concrete shall be not less than<MET> 5 degrees C</MET><ENG> 40 degrees 
F</ENG>.  The temperature of the concrete when placed shall be not less than<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG> nor more than<MET>
 25 degrees C</MET><ENG> 75 degrees F</ENG>.  Heating of the mixing water or aggregates will be required to regulate the concrete 
placing temperature.  Materials entering the mixer shall be free from ice, snow, or frozen lumps.  Salt, chemicals 
or other materials shall not be incorporated in the concrete to prevent freezing.  Upon written approval, an 
accelerating admixture conforming to <RID>ASTM C 494/C 494M</RID>, Type C or E may be used, provided it contains no calcium 
chloride.  Calcium chloride shall not be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.4   Hot Weather Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If desired, placement of floor slabs may be specified to be delayed until 
a roof is in place.  Additional information concerning hot weather concreting 
may be obtained from ACI 305R.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>When the ambient temperature during concrete placing is expected to exceed<MET> 30 degrees C</MET><ENG> 85 degrees F</ENG>, the concrete 
shall be placed and finished with procedures previously submitted and as specified herein.  The concrete temperature 
at time of delivery to the forms shall not exceed the temperature shown in the table below when measured in accordance 
with <RID>ASTM C 1064/C 1064M</RID>.  Cooling of the mixing water or aggregates or placing concrete in the cooler part of 
the day may be required to obtain an adequate placing temperature.  A retarder may be used, as approved, to facilitate 
placing and finishing.  Steel forms and reinforcements shall be cooled as approved prior to concrete placement 
when steel temperatures are greater than<MET> 49 degrees C</MET><ENG> 120 degrees F</ENG>.  Conveying and placing equipment shall be 
cooled if necessary to maintain proper concrete-placing temperature.</TXT><BRK/>
<TBL><THD><BRK/>
         Maximum Allowable Concrete Placing Temperature<BRK/>
<BRK/>
   Relative Humidity, Percent,      Maximum Allowable Concrete<BRK/>
         During Time of                 Temperature<BRK/>
      Concrete Placement                  Degrees<BRK/></THD>
<BRK/>
         Greater than 60               <MET>33 C</MET><ENG> 90 F</ENG><BRK/>
             40-60                     <MET>30 C</MET><ENG> 85 F</ENG><BRK/>
         Less than 40                  <MET>27 C</MET><ENG> 80 F</ENG><BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>3.8.5   Prevention of Plastic Shrinkage Cracking</TTL><BRK/>
<BRK/>
<TXT>During hot weather with low humidity, and particularly with appreciable wind, as well as interior placements 
when space heaters produce low humidity, the Contractor shall be alert to the tendency for plastic shrinkage 
cracks to develop and shall institute measures to prevent this.  Particular care shall be taken if plastic shrinkage 
cracking is potentially imminent and especially if it has developed during a previous placement.  Periods of 
high potential for plastic shrinkage cracking can be anticipated by use of Fig. 2.1.5 of <RID>ACI 305R</RID>.  In addition 
the concrete placement shall be further protected by erecting shades and windbreaks and by applying fog sprays 
of water, sprinkling, ponding or wet covering.  Plastic shrinkage cracks that occur shall be filled by injection 
of epoxy resin as directed, after the concrete hardens.  Plastic shrinkage cracks shall never be troweled over 
or filled with slurry.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.6   Placing Concrete Underwater</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph when not applicable.  If major underwater concrete 
placement is required, supplement this paragraph using guidance from ACI 304R.  
If appropriate, add special requirements for underwater concrete to paragraphs 
Concrete Proportioning Studies, Normal Weight Concrete and General Requirements 
both in PART 1.  If considered necessary, require a special technical representative 
in paragraph Technical Service for Specialized Concrete in PART 1.  Contractor 
will be required to submit proposed procedures.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete shall be deposited in water by a tremie or concrete pump.  The methods and equipment used shall be subject 
to approval.  Concrete buckets shall not be used for underwater placement of concrete except to deliver concrete 
to the tremie.  The tremie shall be watertight and sufficiently large to permit a free flow of concrete.  The 
concrete shall be deposited so that it enters the mass of the previously placed concrete from within, displacing 
water with a minimum disturbance to the surface of the concrete.  The discharge end of the pump line or tremie 
shaft shall be kept continuously submerged in the concrete.  The underwater seal at start of placing shall not 
produce undue turbulence in the water.  The tremie shaft shall be kept full of concrete to a point well above 
the water surface.  Placement shall proceed without interruption until the concrete has been brought to the required 
height.  The tremie shall not be moved horizontally during a placing operation, and a sufficient number of tremies 
shall be provided so that the maximum horizontal flow of concrete will be limited to<MET> 5 m</MET><ENG> 15 feet</ENG>.  Concrete shall 
not be deposited in running water or in water with a temperature below<MET> 2 degrees C</MET><ENG> 35 degrees F</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.7   Placing Concrete in Congested Areas</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the last sentence when not applicable.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Special care shall be used to ensure complete filling of the forms, elimination of all voids, and complete consolidation 
of the concrete when placing concrete in areas congested with reinforcing bars, embedded items, waterstops and 
other tight spacing.  An appropriate concrete mixture shall be used, and the nominal maximum size of aggregate 
(NMSA) shall meet the specified criteria when evaluated for the congested area.  Vibrators with heads of a size 
appropriate for the clearances available shall be used, and the consolidation operation shall be closely supervised 
to ensure complete and thorough consolidation at all points.  Where necessary, splices of reinforcing bars shall 
be alternated to reduce congestion.  Where two mats of closely spaced reinforcing are required, the bars in each 
mat shall be placed in matching alignment to reduce congestion.  Reinforcing bars may be temporarily crowded 
to one side during concrete placement provided they are returned to exact required location before concrete placement 
and consolidation are completed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.8   Placing Flowable Concrete</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph when flowable concrete is not permitted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>If a plasticizing admixture conforming to <RID>ASTM C 1017/C 1017M</RID> is used or if a Type F or G high range water reducing 
admixture is permitted to increase the slump, the concrete shall meet all requirements of paragraph GENERAL REQUIREMENTS 
in PART 1.  Extreme care shall be used in conveying and placing the concrete to avoid segregation.  Consolidation 
and finishing shall meet all requirements of paragraphs Placing Concrete, Finishing Formed Surfaces, and Finishing 
Unformed Surfaces.  No relaxation of requirements to accommodate flowable concrete will be permitted.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9   JOINTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  All joints should be indicated on the drawings.  When some of the joints 
are not shown, the Designer must edit this paragraph for conformance with job 
requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Joints shall be located and constructed as indicated or approved.  Joints not indicated on the drawings shall 
be located and constructed to minimize the impact on the strength of the structure.  In general, such joints 
shall be located near the middle of the spans of supported slabs, beams, and girders unless a beam intersects 
a girder at this point, in which case the joint in the girder shall be offset a distance equal to twice the width 
of the beam.  Joints in walls and columns shall be at the underside of floors, slabs, beams, or girders and at 
the tops of footings or floor slabs, unless otherwise approved.  Joints shall be perpendicular to the main reinforcement.  
All reinforcement shall be continued across joints; except that reinforcement or other fixed metal items shall 
not be continuous through expansion joints, or through construction or contraction joints in slabs on grade.  
Reinforcement shall be<MET> 50 mm</MET><ENG> 2 inches</ENG> clear from each joint.  Except where otherwise indicated, construction 
joints between interior slabs on grade and vertical surfaces shall consist of<MET> 1.5 kg per square meter</MET><ENG> 30 pound</ENG>
 asphalt-saturated felt, extending for the full depth of the slab.  The perimeters of the slabs shall be free 
of fins, rough edges, spalling, or other unsightly appearance.  Reservoir for sealant for construction and contraction 
joints in slabs shall be formed to the dimensions shown on the drawings by removing snap-out joint-forming inserts, 
by sawing sawable inserts, or by sawing to widen the top portion of sawed joints.  Joints to be sealed shall 
be cleaned and sealed as indicated and in accordance with Section <SRF>07 92 00</SRF> JOINT SEALANTS.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.1   Construction Joints</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Drawings must show details for construction joints, including any required 
dowels or keyways.  Drawings must indicate whether dowels are conventional smooth 
"paving" dowels or "structural" type deformed dowels (tie-bars).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>For concrete other than slabs on grade, construction joints shall be located so that the unit of operation does 
not exceed [_____]<MET> meters</MET><ENG> feet</ENG>.  Concrete shall be placed continuously so that each unit is monolithic in construction.  
Fresh concrete shall not be placed against adjacent hardened concrete until it is at least 24 hours old.  Construction 
joints shall be located as indicated or approved.  Where concrete work is interrupted by weather, end of work 
shift or other similar type of delay, location and type of construction joint shall be subject to approval of 
the Contracting Officer.  Unless otherwise indicated and except for slabs on grade, reinforcing steel shall extend 
through construction joints.  Construction joints in slabs on grade shall be keyed or doweled as shown.  Concrete 
columns, walls, or piers shall be in place at least 2 hours, or until the concrete begins to lose its plasticity, 
before placing concrete for beams, girders, or slabs thereon.  In walls having door or window openings, lifts 
shall terminate at the top and bottom of the opening.  Other lifts shall terminate at such levels as to conform 
to structural requirements or architectural details.  Where horizontal construction joints in walls or columns 
are required, a strip of<MET> 25 mm</MET><ENG> 1 inch</ENG> square-edge lumber, bevelled and oiled to facilitate removal, shall be 
tacked to the inside of the forms at the construction joint.  Concrete shall be placed to a point<MET> 25 mm</MET><ENG> 1 inch</ENG>
 above the underside of the strip.  The strip shall be removed 1 hour after the concrete has been placed, and 
any irregularities in the joint line shall be leveled off with a wood float, and all laitance shall be removed.  
Prior to placing additional concrete, horizontal construction joints shall be prepared as specified in paragraph 
Previously Placed Concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.2   Contraction Joints in Slabs on Grade</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Drawings must indicate desired location and detail for contraction joints.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Contraction joints shall be located and detailed as shown on the drawings.  Contraction Joints shall be produced 
by forming a weakened plane in the concrete slab by [use of rigid inserts impressed in the concrete during placing 
operations] [use of snap-out plastic joint forming inserts] [or] [sawing a continuous slot with a concrete saw].  
Regardless of method used to produce the weakened plane, it shall be 1/4 the depth of the slab thickness and 
between<MET> 3 and 5 mm</MET><ENG> 1/8 and 3/16 inch</ENG> wide.  For saw-cut joints, cutting shall be timed properly with the set 
of the concrete.  Cutting shall be started as soon as the concrete has hardened sufficiently to prevent ravelling 
of the edges of the saw cut.  Cutting shall be completed before shrinkage stresses become sufficient to produce 
cracking.  Reservoir for joint sealant shall be formed as previously specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.3   Expansion Joints</TTL><BRK/>
<BRK/>
<TXT>Installation of expansion joints and sealing of these joints shall conform to the requirements of Section 
<SRF>03 15 13.00 10</SRF> EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS and Section <SRF>07 92 00</SRF> JOINT SEALANTS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.4   Waterstops</TTL><BRK/>
<BRK/>
<TXT>Waterstops shall be installed in conformance with the locations and details shown on the drawings using materials 
and procedures specified in Section <SRF>03 15 13.00 10</SRF> EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.5   Dowels and Tie Bars</TTL><BRK/>
<BRK/>
<TXT>Dowels and tie bars shall be installed at the locations shown on the drawings and to the details shown, using 
materials and procedures specified in Section <SRF>03 20 01.00 10</SRF> CONCRETE REINFORCEMENT and herein.  Conventional 
smooth "paving" dowels shall be installed in slabs using approved methods to hold the dowel in place during concreting 
within a maximum alignment tolerance of<MET> 1 mm in 100 mm</MET><ENG> 1/8 inch in 12 inches</ENG>.  "Structural" type deformed bar 
dowels, or tie bars, shall be installed to meet the specified tolerances.  Care shall be taken during placing 
adjacent to and around dowels and tie bars to ensure there is no displacement of the dowel or tie bar and that 
the concrete completely embeds the dowel or tie bar and is thoroughly consolidated.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.10   FINISHING FORMED SURFACES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Formwork, form materials and form construction are specified in Section 
03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK.  Classes of finish to be used for 
various formed surfaces of the structure must be indicated on the drawings or 
clearly specified herein.  Criteria to use in choosing class of finish are as 
follows:</NPR><BRK/>
<BRK/>
<NPR>Class A Finish.  This finish is for surfaces permanently exposed to public view 
that require excellent appearance at close range.  Examples: Exterior walls 
of office and residential buildings, of warehouse/industrial type buildings 
where frequent public access occurs, and of other similar exposed structures; 
and interior walls, columns or beams of these same structures where no other 
finish treatment is to be added.</NPR><BRK/>
<BRK/>
<NPR>Class B Finish.  This finish is for surfaces exposed to public view that do 
not require the excellent appearance of Class A.  Exterior walls of warehouse/ 
industrial buildings where public access is infrequent, structures on combat 
training ranges, and other similar exposed structures; interior exposed surfaces 
of such structures, and interior surfaces of liquid containers.</NPR><BRK/>
<BRK/>
<NPR>Class C Finish.  This finish is for concealed surfaces not exposed to view and 
for all surfaces not covered by Class A, B, or D finish.  Examples: Interior 
surfaces that will be covered by dry wall or other applied surfaces, surfaces 
of mechanical rooms and elevator shafts.</NPR><BRK/>
<BRK/>
<NPR>Class D Finish.  This finish is for surfaces where roughness and irregularities 
are not objectionable.  Examples:  Walls and foundation surfaces against which 
backfill will be placed, exterior surfaces permanently submerged in water where 
no coating is to be applied.</NPR><BRK/>
<BRK/>
<NPR>When a Class A or B Finish is specified, add to paragraph FIELD TEST PANELS 
in PART 1 requirements for the Contractor to construct a sample panel for approval 
before start of construction.  Finishes for surfaces to be exposed to high velocity 
flow of water (above 40 ft per sec) will be designed and constructed in accordance 
with Civil Works criteria.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Forms, form materials, and form construction are specified in Section <SRF>03 11 13.00 10</SRF> STRUCTURAL CONCRETE FORMWORK.  
Finishing of formed surfaces shall be as specified herein.  Unless another type of architectural or special finish 
is specified, surfaces shall be left with the texture imparted by the forms except that defective surfaces shall 
be repaired.  Unless painting of surfaces is required, uniform color of the concrete shall be maintained by use 
of only one mixture without changes in materials or proportions for any structure or portion of structure that 
requires a Class A or B finish.  Except for major defects, as defined hereinafter, surface defects shall be repaired 
as specified herein within 24 hours after forms are removed.  Repairs of the so-called "plaster-type" will not 
be permitted in any location.  Tolerances of formed surfaces shall conform to the requirements of <RID>ACI 117</RID>.  These 
tolerances apply to the finished concrete surface, not to the forms themselves; forms shall be set true to line 
and grade.  Form tie holes requiring repair and other defects whose depth is at least as great as their surface 
diameter shall be repaired as specified in paragraph Damp-Pack Mortar Repair.  Defects whose surface diameter 
is greater than their depth shall be repaired as specified in paragraph Repair of Major Defects.  Repairs shall 
be finished flush with adjacent surfaces and with the same surface texture.  The cement used for all repairs 
shall be a blend of job cement with white cement proportioned so that the final color after curing and aging 
will be the same as the adjacent concrete.  Concrete with excessive honeycomb, or other defects which affect 
the strength of the member, will be rejected.  Repairs shall be demonstrated to be acceptable and free from cracks 
or loose or drummy areas at the completion of the contract and, for Class A and B Finishes, shall be inconspicuous.  
Repairs not meeting these requirements will be rejected and shall be replaced.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.10.1   Class A Finish and Class B Finish</TTL><BRK/>
<BRK/>
<TXT>Class A finish is required [where indicated on the drawings.]  [in the following areas, [_____].]  Class B finish 
is required [where indicated on the drawings] [in the following areas, [_____].]  Fins, ravelings, and loose 
material shall be removed, all surface defects over<MET> 12 mm</MET><ENG> 1/2 inch</ENG> in diameter or more than<MET> 12 mm</MET><ENG> 1/2 inch</ENG> deep, 
shall be repaired and, except as otherwise indicated or as specified in Section <SRF>03 11 13.00 10</SRF> STRUCTURAL CONCRETE 
FORMWORK, holes left by removal of form ties shall be reamed and filled.  Defects more than<MET> 12 mm</MET><ENG> 1/2 inch</ENG> in 
diameter shall be cut back to sound concrete, but in all cases at least<MET> 25 mm</MET><ENG> 1 inch</ENG> deep.  The Contractor shall 
prepare a sample panel for approval (as specified in PART 1) before commencing repair, showing that the surface 
texture and color match will be attained.  Metal tools shall not be used to finish repairs in Class A surfaces.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.2   Class C and Class D Finish</TTL><BRK/>
<BRK/>
<TXT>Class C finish is required [where indicated on the drawings.] [in the following areas, [_____].]  Class D finish 
is required [where indicated on the drawings.] [in the following areas, [_____].]  Fins, ravelings, and loose 
material shall be removed, and, except as otherwise indicated or as specified in Section <SRF>03 11 13.00 10</SRF> STRUCTURAL 
CONCRETE FORMWORK, holes left by removal of form ties shall be reamed and filled.  Honeycomb and other defects 
more than<MET> 12 mm</MET><ENG> 1/2 inch</ENG> deep or more than<MET> 50 mm</MET><ENG> 2 inches</ENG> in diameter shall be repaired.  Defects more than<MET> 50 
mm</MET><ENG> 2 inches</ENG> in diameter shall be cut back to sound concrete, but in all cases at least<MET> 25 mm</MET><ENG> 1 inch</ENG> deep.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3   Architectural and Special Finishes</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The specification writer must ensure that any areas to receive architectural 
and special finishes are indicated on the drawings or specified in Section 03 
33 00 CAST-IN-PLACE ARCHITECTURAL CONCRETE or herein.  Where these paragraphs 
require a finish to match a sample panel on display during the bidding period, 
the specification writer must ensure that such panel is fabricated and displayed.  
When considered appropriate, require a test panel to be fabricated for approval 
before start of construction.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Architectural concrete finishes are specified in Section <SRF>03 33 00</SRF> CAST-IN-PLACE ARCHITECTURAL CONCRETE.  Special 
finishes shall conform to the requirements specified herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.10.3.1   Smooth Finish</TTL><BRK/>
<BRK/>
<TXT>After other concrete construction is complete in each overall separate contiguous area of the structure, smooth 
finish shall be applied to [the areas indicated on the drawings] [the following areas, [_____]].  A mortar mix 
consisting of one part portland cement and two parts well-graded sand passing a<MET> 0.6 mm</MET><ENG> No. 30</ENG> sieve, with water 
added to give the consistency of thick paint, shall be used.  Where the finished surface will not receive other 
applied surface, white cement shall be used to replace part of the job cement to produce an approved color, which 
shall be uniform throughout the surfaces of the structure.  After the surface has been thoroughly wetted and 
allowed to approach surface dryness, the mortar shall be vigorously applied to the area by clean burlap pads 
or by cork or wood-floating, to completely fill all surface voids.  Excess grout shall be scraped off with a 
trowel.  As soon as it can be accomplished without pulling the mortar from the voids, the area shall be rubbed 
with burlap pads having on their surface the same sand-cement mix specified above but without any mixing water, 
until all of the visible grout film is removed.  The burlap pads used for this operation shall be stretched tightly 
around a board to prevent dishing the mortar in the voids.  The finish of any area shall be completed in the 
same day, and the limits of a finished area shall be made at natural breaks in the surface.  The surface shall 
be continuously moist cured for 48 hours commencing immediately after finishing operations in each area.  The 
temperature of the air adjacent to the surface shall be not less than<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG> for 24 hours 
prior to, and 48 hours after, the application.  In hot, dry weather the smooth finish shall be applied in shaded 
areas or at night, and shall never be applied when there is significant hot, dry wind.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3.2   Exposed Coarse-Aggregate Finish</TTL><BRK/>
<BRK/>
<TXT>Coarse aggregate shall consist of [_____] material, shall meet the specified quality requirements, and shall 
have a grading as follows: [_____].  Coarse aggregate shall be exposed by an approved method.  The finish shall 
be similar to and shall closely match the finish on the sample panel put on display during the bidding period, 
and the finish on the approved preconstruction test panel fabricated by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3.3   Sandblast Finish</TTL><BRK/>
<BRK/>
<TXT>The concrete surface shall be blasted at an approved age with approved wet sandblasting procedures to obtain 
a [brush] [light] [medium] [heavy] finish which will match the descriptive photographs in <RID>ACI 303R</RID>.  The finish 
shall be similar to and shall closely match the finish on the approved preconstruction test panel fabricated 
by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3.4   Tooled Finish</TTL><BRK/>
<BRK/>
<TXT>The thoroughly cured concrete shall be dressed at an approved age with approved electric, air, or hand tools 
to a uniform texture with a [hand-tooled] [rough] [fine-pointed] [crandalled] [or] [bush-hammered] surface texture.  
The finish shall be similar to and shall closely match the finish on the approved preconstruction test panel 
fabricated by the Contractor.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.11   REPAIRS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.11.1   Damp-Pack Mortar Repair</TTL><BRK/>
<BRK/>
<TXT>Form tie holes requiring repair and other defects whose depth is at least as great as their surface diameter 
but not over<MET> 100 mm</MET><ENG> 4 inches</ENG>shall be repaired by the damp-pack mortar method.  Form tie holes shall be reamed 
and other similar defects shall be cut out to sound concrete.  The void shall then be thoroughly cleaned, thoroughly 
wetted, brush-coated with a thin coat of neat cement grout and filled with mortar.  Mortar shall be a stiff mix 
of 1 part portland cement to 2 parts fine aggregate passing the<MET> 1.18 mm</MET><ENG> No. 16 mesh</ENG> sieve, and minimum amount 
of water.  Only sufficient water shall be used to produce a mortar which, when used, will stick together on being 
molded into a ball by a slight pressure of the hands and will not exude water but will leave the hands damp.  
Mortar shall be mixed and allowed to stand for 30 to 45 minutes before use with remixing performed immediately 
prior to use.  Mortar shall be thoroughly tamped in place in thin layers using a hammer and hardwood block.  
Holes passing entirely through walls shall be completely filled from the inside face by forcing mortar through 
to the outside face.  All holes shall be packed full.  Damp-pack repairs shall be moist cured for at least 48 
hours.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2   Repair of Major Defects</TTL><BRK/>
<BRK/>
<TXT>Major defects will be considered to be those more than<MET> 12 mm</MET><ENG> 1/2 inch</ENG> deep or, for Class A and B finishes, more 
than<MET> 12 mm</MET><ENG> 1/2 inch</ENG> in diameter and, for Class C and D finishes, more than<MET> 50 mm</MET><ENG> 2 inches</ENG> in diameter.  Also 
included are any defects of any kind whose depth is over<MET> 100 mm</MET><ENG> 4 inches</ENG> or whose surface diameter is greater 
than their depth.  Major defects shall be repaired as specified below.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.2.1   Surface Application of Mortar Repair</TTL><BRK/>
<BRK/>
<TXT>Defective concrete shall be removed, and removal shall extend into completely sound concrete.  Approved equipment 
and procedures which will not cause cracking or microcracking of the sound concrete shall be used.  If reinforcement 
is encountered, concrete shall be removed so as to expose the reinforcement for at least<MET> 50 mm</MET><ENG> 2 inches</ENG> on all 
sides.  All such defective areas greater than<MET> 7800 square mm</MET><ENG> 12 square inches</ENG> shall be outlined by saw cuts at 
least<MET> 25 mm</MET><ENG> 1 inch</ENG> deep.  Defective areas less than<MET> 7800 square mm</MET><ENG> 12 square inches</ENG> shall be outlined by a<MET> 25 
mm</MET><ENG> 1 inch</ENG> deep cut with a core drill in lieu of sawing.  All saw cuts shall be straight lines in a rectangular 
pattern in line with the formwork panels.  After concrete removal, the surface shall be thoroughly cleaned by 
high pressure washing to remove all loose material.  Surfaces shall be kept continually saturated for the first 
12 of the 24 hours immediately before placing mortar and shall be damp but not wet at the time of commencing 
mortar placement.  The Contractor, at his option, may use either hand-placed mortar or mortar placed with a mortar 
gun.  If hand-placed mortar is used, the edges of the cut shall be perpendicular to the surface of the concrete.  
The prepared area shall be brush-coated with a thin coat of neat cement grout.  The repair shall then be made 
using a stiff mortar, preshrunk by allowing the mixed mortar to stand for 30 to 45 minutes and then remixed, 
thoroughly tamped into place in thin layers.  If hand-placed mortar is used, the Contractor shall test each repair 
area for drumminess by firm tapping with a hammer and shall inspect for cracks, both in the presence of the Contracting 
Officer's representative, immediately before completion of the contract, and shall replace any showing drumminess 
or cracking.  If mortar placed with a mortar gun is used, the gun shall be a small compressed air-operated gun 
to which the mortar is slowly hand fed and which applies the mortar to the surface as a high-pressure stream, 
as approved.  Repairs made using shotcrete equipment will not be accepted.  The mortar used shall be the same 
mortar as specified for damp-pack mortar repair.  If gun-placed mortar is used, the edges of the cut shall be 
beveled toward the center at a slope of 1:1.  All surface applied mortar repairs shall be continuously moist 
cured for at least 7 days.  Moist curing shall consist of several layers of saturated burlap applied to the surface 
immediately after placement is complete and covered with polyethylene sheeting, all held closely in place by 
a sheet of plywood or similar material rigidly braced against it.  Burlap shall be kept continually wet.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.2   Repair of Deep and Large Defects</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph only for areas where the designer considers this degree 
of repair acceptable; otherwise require removal and replacement of concrete 
containing these types of defects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Deep and large defects will be those that are more than<MET> 150 mm</MET><ENG> 6 inches</ENG> deep and also have an average diameter 
at the surface more than<MET> 450 mm</MET><ENG> 18 inches</ENG> or that are otherwise so identified by the Project Office.  Such defects 
shall be repaired as specified herein or directed, except that defects which affect the strength of the structure 
shall not be repaired and that portion of the structure shall be completely removed and replaced.  Deep and large 
defects shall be repaired by procedures approved in advance including forming and placing special concrete using 
applied pressure during hardening.  Preparation of the repair area shall be as specified for surface application 
of mortar.  In addition, the top edge (surface) of the repair area shall be sloped at approximately 20 degrees 
from the horizontal, upward toward the side from which concrete will be placed.  The special concrete shall be 
a concrete mixture with low water content and low slump, and shall be allowed to age 30 to 60 minutes before 
use.  Concrete containing a specified expanding admixture may be used in lieu of the above mixture; the paste 
portion of such concrete mixture shall be designed to have an expansion between 2.0 and 4.0 percent when tested 
in accordance with <RID>ASTM C 940</RID>.  A full width "chimney" shall be provided at the top of the form on the placing 
side to ensure filling to the top of the opening.  A pressure cap shall be used on the concrete in the chimney 
with simultaneous tightening and revibrating the form during hardening to ensure a tight fit for the repair.  
The form shall be removed after 24 hours and immediately the chimney shall be carefully chipped away to avoid 
breaking concrete out of the repair; the surface of the repair concrete shall be dressed as required.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.11.3   Resinous and Latex Material Repair</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The portland cement type repairs specified above are considered appropriate 
for usual repairs.  The designer should use the materials specified herein only 
if there is a record of previous successful use or if the use has been discussed 
in detail with the Waterways Experiment Station (CEWES-SL-EP).  Additional requirements 
for their use must be added.  Color match may be a problem with this type of 
repair.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In lieu of the portland cement [bonding coats specified above, an epoxy resin or a latex bonding agent may be 
used.] [based mortars specified above, an epoxy resin mortar based on epoxy resin or a mortar based on latex 
bonding agent may be used in the following specific locations [_____].]  The following additional requirements 
shall be met in the use of these materials [_____].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12   FINISHING UNFORMED SURFACES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Type of finish of unformed surfaces should be indicated on the drawings.  
If not on the drawings, it must be specified here.  Correlate this paragraph 
with paragraph Tolerances in PART 1 and ACI 117.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The finish of all unformed surfaces shall meet the requirements of paragraph Tolerances in PART 1, when tested 
as specified herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.12.1   General</TTL><BRK/>
<BRK/>
<TXT>The ambient temperature of spaces adjacent to unformed surfaces being finished and of the base on which concrete 
will be placed shall be not less than<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG>.  In hot weather all requirements of paragraphs 
Hot Weather Requirements and Prevention of Plastic Shrinkage Cracking shall be met.  Unformed surfaces that are 
not to be covered by additional concrete or backfill shall have a float finish, with additional finishing as 
specified below, and shall be true to the elevation shown on the drawings.  Surfaces to receive additional concrete 
or backfill shall be brought to the elevation shown on the drawings, properly consolidated, and left true and 
regular.  Unless otherwise shown on the drawings, exterior surfaces shall be sloped for drainage, as directed.  
Where drains are provided, interior floors shall be evenly sloped to the drains.  Joints shall be carefully made 
with a jointing or edging tool.  The finished surfaces shall be protected from stains or abrasions.  Grate tampers 
or "jitterbugs" shall not be used for any surfaces.  The dusting of surfaces with dry cement or other materials 
or the addition of any water during finishing shall not be permitted.  If bleedwater is present prior to finishing, 
the excess water shall be carefully dragged off or removed by absorption with porous materials such as burlap.  
During finishing operations, extreme care shall be taken to prevent over finishing or working water into the 
surface; this can cause "crazing" (surface shrinkage cracks which appear after hardening) of the surface.  Any 
slabs with surfaces which exhibit significant crazing shall be removed and replaced.  During finishing operations, 
surfaces shall be checked with a 10 foot straightedge, applied in both directions at regular intervals while 
the concrete is still plastic, to detect high or low areas.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2   Rough Slab Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Rough-slab finish alone is used when a bonded surface course for heavy 
use industrial floor is specified, or where roof fill or thick mortar setting 
bed is used.  If the drawings do not indicate the slabs to receive only a rough 
slab finish, they must be specified here.  Rough slab finish must be retained 
as the first operation for all subsequent finishing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>As a first finishing operation for unformed surfaces and as final finish for slabs to receive mortar setting 
beds, the surface shall receive a rough slab finish prepared as follows.  [Areas indicated on the drawings] [The 
following areas [_____]] shall receive only a rough slab finish.  The concrete shall be uniformly placed across 
the slab area, consolidated as previously specified, and then screeded with straightedge strikeoffs immediately 
after consolidation to bring the surface to the required finish level with no coarse aggregate visible.  Side 
forms and screed rails shall be provided, rigidly supported, and set to exact line and grade.  Allowable tolerances 
for finished surfaces apply only to the hardened concrete, not to forms or screed rails.  Forms and screed rails 
shall be set true to line and grade.  "Wet screeds" shall not be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.3   Floated Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the drawings do not indicate the areas to receive a floated finish, 
they must be specified here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Slabs to receive more than a rough slab finish shall next be given a wood float finish.  [Areas as indicated 
on the drawings] [The following areas [_____]] shall be given only a float finish.  The screeding shall be followed 
immediately by darbying or bull floating before bleeding water is present, to bring the surface to a true, even 
plane.  Then, after the concrete has stiffened so that it will withstand a man's weight without imprint of more 
than<MET> 6 mm</MET><ENG> 1/4 inch</ENG> and the water sheen has disappeared, it shall be floated to a true and even plane free of 
ridges.  Floating shall be performed by use of suitable hand floats or power driven equipment.  Sufficient pressure 
shall be used on the floats to bring a film of moisture to the surface.  Hand floats shall be made of wood, magnesium, 
or aluminum.  Lightweight concrete or concrete that exhibits stickiness shall be floated with a magnesium float.  
Care shall be taken to prevent over-finishing or incorporating water into the surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.4   Troweled Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the drawings do not indicate the areas to receive a trowel finish, 
they must be specified here.  Edit accordingly.  A troweled finish will be specified 
for most wearing surfaces and where a smooth dense surface finish is required.  
Edit bracketed items as desired by designer.  Delete this paragraph when no 
troweled finish or subsequent finish is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall be given a trowel finish.  After floating 
is complete and after the surface moisture has disappeared, unformed surfaces shall be steel-troweled to a smooth, 
even, dense finish, free from blemishes including trowel marks.  In lieu of hand finishing, an approved power 
finishing machine may be used in accordance with the directions of the machine manufacturer.  Additional trowelings 
shall be performed, either by hand or machine until the surface has been troweled [2] [3] [4] times, with waiting 
period between each.  Care shall be taken to prevent blistering and if such occurs, troweling shall immediately 
be stopped and operations and surfaces corrected.  A final hard steel troweling shall be done by hand, with the 
trowel tipped, and using hard pressure, when the surface is at a point that the trowel will produce a ringing 
sound.  The finished surface shall be thoroughly consolidated and shall be essentially free of trowel marks and 
be uniform in texture and appearance.  The concrete mixture used for troweled finished areas shall be adjusted, 
if necessary, in order to provide sufficient fines (cementitious material and fine sand) to finish properly.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.5   Superflat Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the drawings do not indicate the areas to receive a superflat surface, 
they must be specified here.  Correlate this paragraph with the "Tolerances" 
paragraph in PART 1.  Primary locations where superflat floors are required 
are warehouse aisles where very high lift forklifts and other type stackers 
operate.  Delete this paragraph when superflat finish is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall be constructed as superflat floors.  
Extreme care shall be taken to meet specified tolerances.  If necessary, special heavy duty, laser guided machines 
built especially for this work shall be used and shall have experienced, factory-trained operators.  Finishing 
operations shall include use of long-handled<MET> 3 meter</MET><ENG> 10 foot</ENG> "highway type" cutting straightedges plus any other 
tools necessary to meet the surface tolerance requirements.  Surface finish shall conform to paragraph [Troweled 
Finish] [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.6   Non-Slip Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If drawings do not indicate the areas to receive non-slip finish, they 
must be specified here.  Broom finish is usually used for exterior slabs and 
abrasive aggregate for interior slabs, but such policy is not definite.  Edit 
bracketed items as appropriate.  Delete these paragraphs when Non-Slip Finish 
is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Non-slip floors shall be constructed in accordance with the following subparagraphs.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.12.6.1   Broomed</TTL><BRK/>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall be given a broomed finish.  After floating, 
the surface shall be lightly steel troweled, and then carefully scored by pulling a [hair] [coarse fiber] push-type 
broom across the surface.  Brooming shall be transverse to traffic or at right angles to the slope of the slab.  
After the end of the curing period, the surface shall be vigorously broomed with a coarse fiber broom to remove 
all loose or semi-detached particles.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.6.2   Abrasive Aggregate</TTL><BRK/>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall be given an abrasive aggregate finish.  
The concrete surface shall be given a float finish.  Abrasive aggregate shall then immediately be uniformly sprinkled 
over the floated surface at a total rate of not less than<MET> 1.25 kg per square meter</MET><ENG> 0.25 psf</ENG> spread in two applications 
at right angles to each other.  The surface shall then be troweled to a smooth, even finish that is uniform in 
texture and appearance and free from blemishes including trowels marks.  Immediately after curing, cement paste 
and laitance covering the abrasive aggregate shall be removed by steel brushing, rubbing with abrasive stone, 
or sandblasting to expose the abrasive particles.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.7   <SUB>Dry Shake Finish</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the drawings do not indicate the areas to receive a dry shake finish, 
they must be specified here.  When dry shake finish is required, add to paragraph 
Technical Service for Specialized Concrete a requirement that a manufacturer's 
representative be present during use of dry shake finish.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall be constructed with a dry shake finish.  
[Dry shake floor armoring topping] [Dry shake conductive and spark resistant floor topping] [Dry shake non-metallic, 
light reflective floor topping] shall be used to surface the floor.  The base slab shall be constructed and the 
dry shake material applied in accordance with the manufacturer's written instructions, which shall be furnished 
by the Contractor.  The dry shake material shall be applied in a two-stage application.  Total application shall 
be at the rate recommended by the manufacturer but at a rate not less than<MET> 7.5 kg per square meter</MET><ENG> 1.5 psf</ENG>.  
The first application shall be at the rate of two-thirds of the total and shall be applied immediately following 
floating of total area.  The dry shake material shall first be applied to the floated concrete adjacent to forms, 
entryways, columns, and walls where moisture will be lost first.  Dry shake material shall be distributed evenly 
using an approved mechanical spreader.  The material shall not be hand thrown on the surface.  Finishing machines 
with float shoes shall be used as soon as dry shake has absorbed moisture (indicated by darkening of surface); 
floating shall be done just sufficiently to bring moisture from base slab through the shake.  Immediately following 
floating of the first shake, the remaining one-third of the total specified shake shall be applied in the same 
manner and machine floated.  Surface shall be further compacted by a third mechanical floating if time and setting 
characteristics will allow.  At no time shall water be added to the surface.  As surface further stiffens, indicated 
by loss of sheen, it shall be hand or mechanically troweled with blades relatively flat.  All marks and pinholes 
shall be removed in the final raised trowel operation.  Floors finished with dry shake material shall be cured 
using a curing compound recommended by the manufacturer of the dry shake material.  Membrane curing compound 
shall be applied immediately after the floor surface has hardened sufficiently so surface will not be marred 
by the application.  Compound shall be applied uniformly over the entire surface at a coverage which will provide 
moisture retention in excess of the requirements of <RID>ASTM C 309</RID>.  When dry, the coating shall be protected from 
droppings of plaster, paint, dirt, and other debris by a covering of scuffproof, non-staining building paper.  
Floor shall remain covered and be kept free of traffic and loads for at least 10 days after completion.  Adequate 
provision shall be made for maintaining the concrete temperature at<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG> or above during 
the curing period.  The curing compound shall remain in place for not less than 30 days.  The curing compound 
shall be removed by a manufacturer recommended method prior to turning the facility over to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.8   Heavy Duty Floors</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Heavy duty floors are to be used only for floors that will receive major 
traffic of tracked vehicles or steel wheeled equipment when the designer is 
concerned about wear.  Moderate amounts of such traffic can be accommodated 
by ordinary concrete floors.  If drawings do not indicate areas to receive heavy 
duty finish, they must be specified here.  Delete this subparagraph if not required.  
Edit bracketed items.  Add to and strengthen this subparagraph as needed but 
do not delete any of the listed requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall have heavy duty floors constructed as 
follows:</TXT><BRK/>
<BRK/>
<SPT><TTL>3.12.8.1   General</TTL><BRK/>
<BRK/>
<TXT>Heavy duty floor shall be constructed by placing a heavy duty bonded topping on a base slab which has had a rough 
slab finish left<MET> 50 mm</MET><ENG> 2 inches</ENG> below final grade.  Concrete in the base slab shall be thoroughly hardened but 
not more than 30 hours old.  The temperature of the fresh concrete topping shall not vary more than<MET> 5 degrees 
C</MET><ENG> 10 degrees F</ENG> plus or minus from the temperature of the base slab.  The ambient temperature of the space adjacent 
to the concrete placement and of the base slab shall be between<MET> 10 and 30 degrees C</MET><ENG> 50 and 90 degrees F</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.8.2   Preparation of Base Slab</TTL><BRK/>
<BRK/>
<TXT>The base slab shall be kept continuously damp until topping is placed.  The surface of the base slab shall be 
thoroughly cleaned with an air-water jet immediately before placing the topping.  A thin coat of neat cement 
grout of about the consistency of thick cream shall be thoroughly scrubbed into the existing surface immediately 
ahead of the overlay placing.  At the time the neat cement grout is placed, the existing concrete surface shall 
be damp but shall have no free water present.  The overlay concrete shall be deposited before the grout coat 
has had time to stiffen.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.8.3   Placing and Finishing</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be placed, as nearly as practicable in final position, in a uniform layer.  The overlay shall 
be placed and screeded slightly above the required finished grade, compacted by rolling with rollers weighing 
not less than<MET> 4.5 kg/linear 25 mm</MET><ENG> 10 pounds/linear inch</ENG> of roller width or by approved tamping equipment and 
finish screeded to established grade.  Grid type tampers shall not be used.  The concrete, while still green 
but sufficiently hardened to bear a person's weight without deep imprint, shall be floated to a true even plane 
with no coarse aggregate visible.  Floating shall be performed with an approved disc-type mechanical float which 
has integral impact mechanism.  The surface of the overlay shall then be left undisturbed until the concrete 
has hardened enough to prevent excess fines from being worked to the top.  Joints shall be formed to match those 
in the base slab.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.8.4   Curing and Protection</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be maintained in a moist condition and shall be protected against rapid temperature change, mechanical 
injury, and injury from rain or flowing water, for a curing period of not less than 10 days.  Concrete shall 
be maintained in a moist condition at temperatures above<MET> 10 and below 30 degrees C</MET><ENG> 50 and below 90 degrees F</ENG> 
throughout the specified curing period.  Concrete shall be protected from a temperature change greater than<MET> 3 
degrees C</MET><ENG> 5 degrees F</ENG> per hour and from rapid drying for the first 24 hours following the removal of temperature 
protection.  Curing activities shall begin as soon as free water has disappeared from the concrete surface after 
placing and finishing.  Curing shall be moist curing accomplished by the following method.  Surfaces shall be 
covered with a double layer of burlap, wetted before placing, and overlapped at least<MET> 150 mm</MET><ENG> 6 inches</ENG>.  Burlap 
shall be kept continually wet and in intimate contact with the surface.  Burlap shall be kept covered with a 
polyethylene sheeting at least<MET> 0.1 mm</MET><ENG> 4 mils</ENG> thick.  All traffic shall be kept from the floor during the curing 
period and heavy traffic shall be kept off till 28-day age.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.9   Two-Course Floor Construction</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where it is anticipated that the surface of a floor slab may be damaged 
during construction operations, a two-course floor may be specified with the 
second course applied late in the contract.  If the drawings do not indicate 
areas to receive two-course floor construction, they must be specified here.  
Delete this subparagraph when two-course floor is not required.  Edit bracketed 
items.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall have floors constructed with two-course 
construction.  Two-course floor shall be constructed by placing a bonded topping on the thoroughly hardened concrete 
base slab which has been left with a rough slab finish left<MET> 50 mm</MET><ENG> 2 inches</ENG> below final grade as shown on the 
drawings.  Topping shall be applied at an approved time late in the contract period.  The floor topping mixture 
shall have a specified compressive strength of<MET> 34.5 MPa</MET><ENG> 5000 psi</ENG> at 28 days, a<MET> 50 mm</MET><ENG> 2 inch</ENG> maximum slump, <MET>12.5 
mm</MET><ENG> 1/2 inch</ENG> maximum size coarse aggregate, and shall be proportioned to obtain required finishability.  The surface 
of the base slab shall be thoroughly cleaned by sandblasting or high-pressure waterjet immediately before placing 
topping.  The temperature of the fresh concrete topping shall not vary more than<MET> 5 degrees C</MET><ENG> 10 degrees F</ENG> plus 
or minus from the temperature of the base slab.  The ambient temperature of the space adjacent to the concrete 
placement and of the base slab shall be between<MET> 10 and 30 degrees C</MET><ENG> 50 and 90 degrees F</ENG>.  The base slab shall 
be kept continuously wet for the first 12 hours during the 24 hour period immediately prior to placing the finished 
floor.  After all free water has evaporated or has been removed from the surface, a grout shall be scrubbed in.  
The grout shall be a 1:1 mixture of portland cement and sand passing the<MET> 2.36 mm</MET><ENG> No. 8</ENG> sieve mixed to a creamlike 
consistency.  The grout shall be scrubbed into the surface just ahead of the concrete topping placing operation.  
While the grout is still damp, the top course shall be spread and screeded and darbied or bull floated.  When 
the surface moisture has disappeared, the surface shall then be floated with disc-type power float with integral 
impact mechanism followed by a minimum of two power trowelings.  Trowel marks left by the machine shall be removed 
by a final, hard steel troweling by hand.  Joints shall be formed to match those in the base slab.  Concrete 
shall be maintained in a moist condition and shall be protected against rapid temperature change, mechanical 
injury, and injury from rain or water, for a curing period of not less than 10 days.  Concrete shall be maintained 
in a moist condition at temperatures above<MET> 10 and below 30 degrees F</MET><ENG> 50 and below 90 degrees F</ENG> throughout the 
specified curing period.  Concrete shall be protected from a temperature change greater than<MET> 3 degrees C</MET><ENG> 5 degrees 
F</ENG> per hour and from rapid drying for the first 24 hours following the removal of temperature protection.  Curing 
activities shall be started immediately as soon as free water has disappeared from the surface of the concrete 
after placing and finishing.  Curing shall be moist curing accomplished by the following method.  Surfaces shall 
be covered with a double layer of burlap, wetted before placing, and overlapped at least<MET> 150 mm</MET><ENG> 6 inches</ENG>.  Burlap 
shall be kept continually wet and in intimate contact with the surface.  Burlap shall be kept covered with a 
polyethylene sheeting at least<MET> 0.1 mm</MET><ENG> 4 mils</ENG> thick.  All traffic shall be kept from the topping during the curing 
period.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.13   FLOOR HARDENER</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the drawings do not indicate the areas to receive floor hardener, 
they must be specified here.  Normally, floor hardener is not needed.  Use only 
where extreme dust-free area is required or where requested by using service.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Areas as indicated on the drawings] [The following areas [_____]] shall be treated with floor hardener.  Floor 
hardener shall be applied after the concrete has been cured and then air dried for [14] [28] days.  Three coats 
shall be applied, each the day after the preceding coat was applied.  For the first application, <MET>0.5 kg</MET><ENG> one pound</ENG>
 of the silocofluoride shall be dissolved in<MET> 4 liters</MET><ENG> one gallon</ENG> of water.  For subsequent applications, the 
solution shall be<MET> 1.0 kg</MET><ENG> two pounds</ENG> of silicofluoride to each<MET> 4 liters</MET><ENG> gallon</ENG> of water.  Floor should be mopped 
with clear water shortly after the preceding application has dried to remove encrusted salts.  Proprietary hardeners 
shall be applied in accordance with the manufacturer's instructions.  During application, area should be well 
ventilated.  Precautions shall be taken when applying silicofluorides due to the toxicity of the salts.  Any 
compound that contacts glass or aluminum should be immediately removed with clear water.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14   EXTERIOR SLAB AND RELATED ITEMS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit bracketed statements and use these paragraphs only when minor amounts 
of specified items are required in the project.  Remove affected paragraph when 
pertinent Section (Ex: 32 13 13.03 AIRFIELDS AND HEAVY-DUTY CONCRETE PAVEMENT 
LESS THAN 10000 CUBIC YARDS, 32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS) 
is included in the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.14.1   Pavements</TTL><BRK/>
<BRK/>
<TXT>Pavements shall be constructed where shown on the drawings.  After forms are set and underlying material prepared 
as specified, the concrete shall be placed uniformly throughout the area and thoroughly vibrated.  As soon as 
placed and vibrated, the concrete shall be struck off and screeded to the crown and cross section and to such 
elevation above grade that when consolidated and finished, the surface of the pavement will be at the required 
elevation.  The entire surface shall be tamped with the strike off, or consolidated with a vibrating screed, 
and this operation continued until the required compaction and reduction of internal and surface voids are accomplished.  
Care shall be taken to prevent bringing excess paste to the surface.  Immediately following the final consolidation 
of the surface, the pavement shall be floated longitudinally from bridges resting on the side forms and spanning 
but not touching the concrete.  If necessary, additional concrete shall be placed and screeded, and the float 
operated until a satisfactory surface has been produced.  The floating operation shall be advanced not more than 
half the length of the float and then continued over the new and previously floated surfaces.  After finishing 
is completed but while the concrete is still plastic, minor irregularities and score marks in the pavement surface 
shall be eliminated by means of long-handled cutting straightedges.  Straightedges shall be<MET> 3.75 m</MET><ENG> 12 feet</ENG> in 
length and shall be operated from the sides of the pavement and from bridges.  A straightedge operated from the 
side of the pavement shall be equipped with a handle<MET> 1 m</MET><ENG> 3 feet</ENG> longer than one-half the width of the pavement.  
The surface shall then be tested for trueness with a<MET> 3.75</MET><ENG> 12 foot</ENG> straightedge held in successive positions parallel 
and at right angles to the center line of the pavement, and the whole area covered as necessary to detect variations.  
The straightedge shall be advanced along the pavement in successive stages of not more than one-half the length 
of the straightedge.  Depressions shall be immediately filled with freshly mixed concrete, struck off, consolidated, 
and refinished.  Projections above the required elevation shall also be struck off and refinished.  The straightedge 
testing and finishing shall continue until the entire surface of the concrete is true.  Before the surface sheen 
has disappeared and well before the concrete becomes nonplastic, the surface of the pavement shall be given a 
nonslip sandy surface texture by [belting with approved "belt" and procedures] [use of a burlap drag.  A strip 
of clean, wet burlap from<MET> 1.0 to 1.5 m</MET><ENG> 3 to 5 feet</ENG> wide and<MET> 0.7 m</MET><ENG> 2 feet</ENG> longer than the pavement width shall 
be carefully pulled across the surface].  Edges and joints shall be rounded with an edger having a radius of<MET> 
3 mm</MET><ENG> 1/8 inch</ENG>.  Curing shall be as specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14.2   Sidewalks</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be<MET> 100 mm</MET><ENG> 4 inches</ENG> minimum thickness.  Contraction joints shall be provided at<MET> 1.75 m</MET><ENG> 5 feet</ENG> spaces 
unless otherwise indicated.  Contraction joints shall be cut<MET> 25 mm</MET><ENG> 1 inch</ENG> deep with a jointing tool after the 
surface has been finished.  Transverse expansion joints<MET> 12 mm</MET><ENG> 1/2 inch</ENG> thick shall be provided at changes in 
direction and where sidewalk abuts curbs, steps, rigid pavement, or other similar structures.  Sidewalks shall 
be given a lightly broomed finish.  A transverse slope of<MET> 1 mm per 50 mm</MET><ENG> 1/4 inch per foot</ENG> shall be provided, 
unless otherwise indicated.  Variations in cross section shall be limited to<MET> 1 mm per 250 mm</MET><ENG> 1/4 inch in 5 feet</ENG>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14.3   Curbs and Gutters</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be formed, placed, and finished by hand using a properly shaped "mule" or constructed using a 
slipform machine specially designed for this work.  Contraction joints shall be cut<MET> 75 mm</MET><ENG> 3 inches</ENG> deep with 
a jointing tool after the surface has been finished.  Expansion joints (<MET>12 mm</MET><ENG> 1/2 inch</ENG> wide) shall be provided 
at<MET> 35 m</MET><ENG> 100 feet</ENG> maximum spacing unless otherwise indicated.  Exposed surfaces shall be finished using a stiff 
bristled brush.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14.4   Pits and Trenches</TTL><BRK/>
<BRK/>
<TXT>Pits and trenches shall be constructed as indicated on the drawings.  Bottoms and walls shall be placed monolithically 
or waterstops and keys, shall be provided as approved.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.15   CURING AND PROTECTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.15.1   General</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Do not allow membrane curing compound on surfaces where appearance is 
critical or that are maintained at curing temperature with free steam.  Moist 
curing should almost always be permitted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete shall be cured by an approved method for the period of time given below:</TXT><BRK/>
<BRK/>
<TXT>Concrete with Type III cement           3 days</TXT><BRK/>
<TXT>All other concrete                      7 days</TXT><BRK/>
<BRK/>
<TXT>Immediately after placement, concrete shall be protected from premature drying, extremes in temperatures, rapid 
temperature change, mechanical injury and damage from rain and flowing water for the duration of the curing period.  
Air and forms in contact with concrete shall be maintained at a temperature above<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG> for 
the first 3 days and at a temperature above<MET> 0 degrees C</MET><ENG> 32 degrees F</ENG> for the remainder of the specified curing 
period.  Exhaust fumes from combustion heating units shall be vented to the outside of the enclosure, and heaters 
and ducts shall be placed and directed so as not to cause areas of overheating and drying of concrete surfaces 
or to create fire hazards.  Materials and equipment needed for adequate curing and protection shall be available 
and at the site prior to placing concrete.  No fire or excessive heat, including welding, shall be permitted 
near or in direct contact with the concrete at any time.  Except as otherwise permitted by paragraph Membrane 
Forming Curing Compounds, moist curing shall be provided for any areas to receive floor hardener, any paint or 
other applied coating, or to which other concrete is to be bonded.  Concrete containing silica fume shall be 
initially cured by fog misting during finishing, followed immediately by continuous moist curing.  Except for 
plastic coated burlap, impervious sheeting alone shall not be used for curing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.2   Moist Curing</TTL><BRK/>
<BRK/>
<TXT>Concrete to be moist-cured shall be maintained continuously wet for the entire curing period, commencing immediately 
after finishing.  If water or curing materials used stain or discolor concrete surfaces which are to be permanently 
exposed, the concrete surfaces shall be cleaned as approved.  When wooden forms are left in place during curing, 
they shall be kept wet at all times.  If steel forms are used in hot weather, nonsupporting vertical forms shall 
be broken loose from the concrete soon after the concrete hardens and curing water continually applied in this 
void.  If the forms are removed before the end of the curing period, curing shall be carried out as on unformed 
surfaces, using suitable materials.  Surfaces shall be cured by ponding, by continuous sprinkling, by continuously 
saturated burlap or cotton mats, or by continuously saturated plastic coated burlap.  Burlap and mats shall be 
clean and free from any contamination and shall be completely saturated before being placed on the concrete.  
The Contractor shall have an approved work system to ensure that moist curing is continuous 24 hours per day.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.3   Membrane Forming Curing Compounds</TTL><BRK/>
<BRK/>
<TXT>Membrane forming curing compounds shall be used only on surfaces in the following areas, [_____].  Concrete in 
the following areas [may be cured with a pigmented curing compound in lieu of moist curing.] [may be cured with 
a nonpigmented curing compound containing a fugitive dye in lieu of moist curing.]  Membrane curing shall not 
be used on surfaces that are to receive any subsequent treatment depending on adhesion or bonding to the concrete, 
including surfaces to which a smooth finish is to be applied or other concrete to be bonded.  However, a styrene 
acrylate or chlorinated rubber compound meeting <RID>ASTM C 309</RID>, Class B requirements, may be used for surfaces which 
are to be painted or are to receive bituminous roofing or waterproofing, or floors that are to receive adhesive 
applications of resilient flooring.  The curing compound selected shall be compatible with any subsequent paint, 
roofing, waterproofing or flooring specified.  Membrane curing compound shall not be used on surfaces that are 
maintained at curing temperatures with free steam.  Curing compound shall be applied to formed surfaces immediately 
after the forms are removed and prior to any patching or other surface treatment except the cleaning of loose 
sand, mortar, and debris from the surface.  All surfaces shall be thoroughly moistened with water.  Curing compound 
shall be applied to slab surfaces as soon as the bleeding water has disappeared, with the tops of joints being 
temporarily sealed to prevent entry of the compound and to prevent moisture loss during the curing period.  The 
curing compound shall be applied in a two-coat continuous operation by approved motorized power-spraying equipment 
operating at a minimum pressure of<MET> 500 kPa</MET><ENG> 75 psi</ENG>, at a uniform coverage of not more than<MET> 10 cubic meters/L</MET><ENG> 400 
square feet/gallon</ENG> for each coat, and the second coat shall be applied perpendicular to the first coat.  Concrete 
surfaces which have been subjected to rainfall within 3 hours after curing compound has been applied shall be 
resprayed by the method and at the coverage specified.  Surfaces on which clear compound is used shall be shaded 
from direct rays of the sun for the first 3 days.  Surfaces coated with curing compound shall be kept free of 
foot and vehicular traffic, and from other sources of abrasion and contamination during the curing period.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.4   Impervious Sheeting</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use impervious sheeting only for surfaces that are horizontal or near 
horizontal.  Do not use on slab surfaces where appearance is critical.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The following concrete surfaces may be cured using impervious sheets: [_____].  However, except for plastic coated 
burlap, impervious sheeting alone shall not be used for curing.  Impervious-sheet curing shall only be used on 
horizontal or nearly horizontal surfaces.  Surfaces shall be thoroughly wetted and be completely covered with 
the sheeting.  Sheeting shall be at least<MET> 450 mm</MET><ENG> 18 inches</ENG> wider than the concrete surface to be covered.  Covering 
shall be laid with light-colored side up.  Covering shall be lapped not less than<MET> 300 mm</MET><ENG> 12 inches</ENG> and securely 
weighted down or shall be lapped not less than<MET> 100 mm</MET><ENG> 4 inches</ENG> and taped to form a continuous cover with completely 
closed joints.  The sheet shall be weighted to prevent displacement so that it remains in contact with the concrete 
during the specified length of curing.  Coverings shall be folded down over exposed edges of slabs and secured 
by approved means.  Sheets shall be immediately repaired or replaced if tears or holes appear during the curing 
period.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.5   Ponding or Immersion</TTL><BRK/>
<BRK/>
<TXT>Concrete shall be continually immersed throughout the curing period.  Water shall not be more than<MET> 10 degrees 
C</MET><ENG> 20 degrees F</ENG> less than the temperature of the concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.6   Cold Weather Curing and Protection</TTL><BRK/>
<BRK/>
<TXT>When the daily ambient low temperature is less than<MET> 0 degrees C</MET><ENG> 32 degrees F</ENG> the temperature of the concrete 
shall be maintained above<MET> 5 degrees C</MET><ENG> 40 degrees F</ENG> for the first seven days after placing.  During the period 
of protection removal, the air temperature adjacent to the concrete surfaces shall be controlled so that concrete 
near the surface will not be subjected to a temperature differential of more than<MET> 13 degrees C</MET><ENG> 25 degrees F</ENG> as 
determined by suitable temperature measuring devices furnished by [the Government][the Contractor], as required, 
and installed adjacent to the concrete surface and<MET> 50 mm</MET><ENG> 2 inches</ENG> inside the surface of the concrete.  The installation 
of the thermometers shall be made by the Contractor as directed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.16   SETTING BASE PLATES AND BEARING PLATES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Damp-pack bedding mortar will be specified for setting base and bearing 
plates, except that nonshrink grout will be specified for heavy machinery bases 
or where design requires precision setting of plates or requires that bedding 
material have high resistance to shear, impact, or vibration, and where good 
damp packing is difficult or impossible.  When using nonshrink grout on important 
structures, such as large machinery bases, the grout should be required to meet 
ASTM C 1107/C 1107M, Grade A, B, or C, grade or grades as selected by the designer.  
This nonshrink grout must not be used for embedding post-tensioned tendons or 
rock bolts.  Edit bracketed item as appropriate, and delete entire paragraph 
if not needed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After being properly positioned, column base plates, bearing plates for beams and similar structural members, 
and machinery and equipment base plates shall be set to the proper line and elevation with damp-pack bedding 
mortar, except where nonshrink grout is indicated.  The thickness of the mortar or grout shall be approximately 
1/24 the width of the plate, but not less than<MET> 19 mm</MET><ENG> 3/4 inch</ENG>.  Concrete and metal surfaces in contact with grout 
shall be clean and free of oil and grease, and concrete surfaces in contact with grout shall be damp and free 
of laitance when grout is placed.  Nonshrink grout shall be used for [_____].</TXT><BRK/>
<BRK/>
<SPT><TTL>3.16.1   Damp-Pack Bedding Mortar</TTL><BRK/>
<BRK/>
<TXT>Damp-pack bedding mortar shall consist of 1 part cement and 2-1/2 parts fine aggregate having water content such 
that a mass of mortar tightly squeezed in the hand will retain its shape but will crumble when disturbed.  The 
space between the top of the concrete and bottom of the bearing plate or base shall be packed with the bedding 
mortar by tamping or ramming with a bar or rod until it is completely filled.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.16.2   Nonshrink Grout</TTL><BRK/>
<BRK/>
<TXT>Nonshrink grout shall be a ready-mixed material requiring only the addition of water.  Water content shall be 
the minimum that will provide a flowable mixture and completely fill the space to be grouted without segregation, 
bleeding, or reduction of strength.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.16.2.1   Mixing and Placing of Nonshrink Grout</TTL><BRK/>
<BRK/>
<TXT>Mixing and placing shall be in conformance with the material manufacturer's instructions and as specified therein.  
Ingredients shall be thoroughly dry-mixed before adding water.  After adding water, the batch shall be mixed 
for 3 minutes.  Batches shall be of size to allow continuous placement of freshly mixed grout.  Grout not used 
within 30 minutes after mixing shall be discarded.  The space between the top of the concrete or machinery-bearing 
surface and the plate shall be filled solid with the grout.  Forms shall be of wood or other equally suitable 
material for completely retaining the grout on all sides and on top and shall be removed after the grout has 
set.  The placed grout shall be carefully worked by rodding or other means to eliminate voids; however, overworking 
and breakdown of the initial set shall be avoided.  Grout shall not be retempered or subjected to vibration from 
any source.  Where clearances are unusually small, placement shall be under pressure with a grout pump.  Temperature 
of the grout, and of surfaces receiving the grout, shall be maintained at<MET> 18 to 30 degrees C</MET><ENG> 65 to 85 degrees 
F</ENG> until after setting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.16.2.2   Treatment of Exposed Surfaces</TTL><BRK/>
<BRK/>
<TXT>For metal-oxidizing nonshrink grout, exposed surfaces shall be cut back <MET>25 mm </MET><ENG>1 inch</ENG> and immediately covered 
with a parge coat of mortar consisting of 1 part portland cement and 2-1/2 parts fine aggregate by weight, with 
sufficient water to make a plastic mixture.  The parge coat shall have a smooth finish.  For other mortars or 
grouts, exposed surfaces shall have a smooth-dense finish and be left untreated.  Curing shall comply with paragraph 
CURING AND PROTECTION.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.17   <SUB>TESTING AND INSPECTION FOR CONTRACTOR QUALITY CONTROL</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For non-critical small projects, less than 1200 cubic meters (1500 cu. 
yd.) of concrete, the designer may reduce, but not eliminate, the requirements 
of this paragraph, and edit it appropriately for the project specifications.  
Otherwise, retain complete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor shall perform the inspection and tests described below and, based upon the results of these inspections 
and tests, shall take the action required and shall submit specified reports.  When, in the opinion of the Contracting 
Officer, the concreting operation is out of control, concrete placement shall cease and the operation shall be 
corrected.  The laboratory performing the tests shall be onsite and shall conform with <RID>ASTM C 1077</RID>.  Materials 
may be subjected to check testing by the Government from samples obtained at the manufacturer, at transfer points, 
or at the project site.  The Government will inspect the laboratory, equipment, and test procedures prior to 
start of concreting operations and at least once per [_____] thereafter for conformance with <RID>ASTM C 1077</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.17.1   Grading and Corrective Action</TTL><BRK/>
<BRK/>
<SPT><TTL>3.17.1.1   Fine Aggregate</TTL><BRK/>
<BRK/>
<TXT>At least once during each shift when the concrete plant is operating, there shall be one sieve analysis and fineness 
modulus determination in accordance with <RID>ASTM C 136</RID> and <RID>COE CRD-C 104</RID> for the fine aggregate or for each fine 
aggregate if it is batched in more than one size or classification.  The location at which samples are taken 
may be selected by the Contractor as the most advantageous for control.  However, the Contractor is responsible 
for delivering fine aggregate to the mixer within specification limits.  When the amount passing on any sieve 
is outside the specification limits, the fine aggregate shall be immediately resampled and retested.  If there 
is another failure on any sieve, the fact shall immediately reported to the Contracting Officer, concreting shall 
be stopped, and immediate steps taken to correct the grading.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.1.2   Coarse Aggregate</TTL><BRK/>
<BRK/>
<TXT>At least once during each shift in which the concrete plant is operating, there shall be a sieve analysis in 
accordance with <RID>ASTM C 136</RID> for each size of coarse aggregate.  The location at which samples are taken may be 
selected by the Contractor as the most advantageous for production control.  However, the Contractor shall be 
responsible for delivering the aggregate to the mixer within specification limits.  A test record of samples 
of aggregate taken at the same locations shall show the results of the current test as well as the average results 
of the five most recent tests including the current test.  The Contractor may adopt limits for control coarser 
than the specification limits for samples taken other than as delivered to the mixer to allow for degradation 
during handling.  When the amount passing any sieve is outside the specification limits, the coarse aggregate 
shall be immediately resampled and retested.  If the second sample fails on any sieve, that fact shall be reported 
to the Contracting Officer.  Where two consecutive averages of 5 tests are outside specification limits, the 
operation shall be considered out of control and shall be reported to the Contracting Officer.  Concreting shall 
be stopped and immediate steps shall be taken to correct the grading.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.17.2   Quality of Aggregates</TTL><BRK/>
<BRK/>
<TXT>Thirty days prior to the start of concrete placement, the Contractor shall perform all tests for aggregate quality 
required by <RID>ASTM C 33</RID>.  In addition, after the start of concrete placement, the Contractor shall perform tests 
for aggregate quality at least every three months, and when the source of aggregate or aggregate quality changes.  
Samples tested after the start of concrete placement shall be taken immediately prior to entering the concrete 
mixer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.3   Scales, Batching and Recording</TTL><BRK/>
<BRK/>
<TXT>The accuracy of the scales shall be checked by test weights prior to start of concrete operations and at least 
once every three months.  Such tests shall also be made as directed whenever there are variations in properties 
of the fresh concrete that could result from batching errors.  Once a week the accuracy of each batching and 
recording device shall be checked during a weighing operation by noting and recording the required weight, recorded 
weight, and the actual weight batched.  At the same time, the Contractor shall test and ensure that the devices 
for dispensing admixtures are operating properly and accurately.  When either the weighing accuracy or batching 
accuracy does not comply with specification requirements, the plant shall not be operated until necessary adjustments 
or repairs have been made.  Discrepancies in recording accuracies shall be corrected immediately.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.4   Batch-Plant Control</TTL><BRK/>
<BRK/>
<TXT>The measurement of concrete materials including cementitious materials, each size of aggregate, water, and admixtures 
shall be continuously controlled.  The aggregate weights and amount of added water shall be adjusted as necessary 
to compensate for free moisture in the aggregates.  The amount of air-entraining agent shall be adjusted to control 
air content within specified limits.  A report shall be prepared indicating type and source of cement used, type 
and source of pozzolan or slag used, amount and source of admixtures used, aggregate source, the required aggregate 
and water weights per cubic<MET> meter</MET><ENG> yard</ENG> amount of water as free moisture in each size of aggregate, and the batch 
aggregate and water weights per cubic<MET> meter</MET><ENG> yard</ENG> for each class of concrete batched during each day's plant operation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.5   Concrete Mixture</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Air Content Testing.  Air content tests shall be made when test specimens are fabricated.  
In addition, at least two tests for air content shall be made on randomly selected batches of 
each separate concrete mixture produced during each 8-hour period of concrete production.  Additional 
tests shall be made when excessive variation in workability is reported by the placing foreman 
or Government inspector.  Tests shall be made in accordance with <RID>ASTM C 231</RID> for normal weight 
concrete and <RID>ASTM C 173/C 173M</RID> for lightweight concrete.  Test results shall be plotted on control 
charts which shall at all times be readily available to the Government and shall be submitted 
weekly.  Copies of the current control charts shall be kept in the field by testing crews and 
results plotted as tests are made.  When a single test result reaches either the upper or lower 
action limit, a second test shall immediately be made.  The results of the two tests shall be 
averaged and this average used as the air content of the batch to plot on both the air content 
and the control chart for range, and for determining need for any remedial action.  The result 
of each test, or average as noted in the previous sentence, shall be plotted on a separate control 
chart for each mixture on which an "average line" is set at the midpoint of the specified air 
content range from paragraph Air Entrainment.  An upper warning limit and a lower warning limit 
line shall be set 1.0 percentage point above and below the average line, respectively.  An upper 
action limit and a lower action limit line shall be set 1.5 percentage points above and below 
the average line, respectively.  The range between each two consecutive tests shall be plotted 
on a secondary control chart for range where an upper warning limit is set at 2.0 percentage 
points and an upper action limit is set at 3.0 percentage points.  Samples for air content may 
be taken at the mixer, however, the Contractor is responsible for delivering the concrete to 
the placement site at the stipulated air content.  If the Contractor's materials or transportation 
methods cause air content loss between the mixer and the placement, correlation samples shall 
be taken at the placement site as required by the Contracting Officer, and the air content at 
the mixer controlled as directed.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Air Content Corrective Action.  Whenever points on the control chart for percent air reach 
either warning limit, an adjustment shall immediately be made in the amount of air-entraining 
admixture batched.  As soon as practical after each adjustment, another test shall be made to 
verify the result of the adjustment.  Whenever a point on the secondary control chart for range 
reaches the warning limit, the admixture dispenser shall be recalibrated to ensure that it is 
operating accurately and with good reproducibility.  Whenever a point on either control chart 
reaches an action limit line, the air content shall be considered out of control and the concreting 
operation shall immediately be halted until the air content is under control.  Additional air 
content tests shall be made when concreting is restarted.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Slump Testing.  In addition to slump tests which shall be made when test specimens are fabricated, 
at least four slump tests shall be made on randomly selected batches in accordance with <RID>ASTM C 143/C 143M</RID>
 for each separate concrete mixture produced during each 8-hour or less period of concrete production 
each day.  Also, additional tests shall be made when excessive variation in workability is reported 
by the placing foreman or Government inspector.  Test results shall be plotted on control charts 
which shall at all times be readily available to the Government and shall be submitted weekly.  
Copies of the current control charts shall be kept in the field by testing crews and results 
plotted as tests are made.  When a single slump test reaches or goes beyond either the upper 
or lower action limit, a second test shall immediately be made.  The results of the two tests 
shall be averaged and this average used as the slump of the batch to plot on both the control 
charts for slump and the chart for range, and for determining need for any remedial action.  
Limits shall be set on separate control charts for slump for each type of mixture.  The upper 
warning limit shall be set at<MET> 12.5 mm</MET><ENG> 1/2 inch</ENG> below the maximum allowable slump specified in 
paragraph Slump in PART 1 for each type of concrete and an upper action limit line and lower 
action limit line shall be set at the maximum and minimum allowable slumps, respectively, as 
specified in the same paragraph.  The range between each consecutive slump test for each type 
of mixture shall be plotted on a single control chart for range on which an upper action limit 
is set at<MET> 50 mm</MET><ENG> 2 inches</ENG>.  Samples for slump shall be taken at the mixer.  However, the Contractor 
is responsible for delivering the concrete to the placement site at the stipulated slump.  If 
the Contractor's materials or transportation methods cause slump loss between the mixer and 
the placement, correlation samples shall be taken at the placement site as required by the Contracting 
Officer, and the slump at the mixer controlled as directed.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Slump Corrective Action.  Whenever points on the control charts for slump reach the upper 
warning limit, an adjustment shall immediately be made in the batch weights of water and fine 
aggregate.  The adjustments are to be made so that the total water content does not exceed that 
amount allowed by the maximum w/c ratio specified, based on aggregates which are in a saturated 
surface dry condition.  When a single slump reaches the upper or lower action limit, no further 
concrete shall be delivered to the placing site until proper adjustments have been made.  Immediately 
after each adjustment, another test shall be made to verify the correctness of the adjustment.  
Whenever two consecutive individual slump tests, made during a period when there was no adjustment 
of batch weights, produce a point on the control chart for range at or above the upper action 
limit, the concreting operation shall immediately be halted, and the Contractor shall take appropriate 
steps to bring the slump under control.  Additional slump tests shall be made as directed.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Temperature.  The temperature of the concrete shall be measured when compressive strength 
specimens are fabricated.  Measurement shall be in accordance with <RID>ASTM C 1064/C 1064M</RID>.  The 
temperature shall be reported along with the compressive strength data.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Strength Specimens.  At least one set of test specimens shall be made, for compressive or 
flexural strength as appropriate, on each different concrete mixture placed during the day for 
each<MET> 380 cubic meters</MET><ENG> 500 cubic yards</ENG> or portion thereof of that concrete mixture placed each 
day.  Additional sets of test specimens shall be made, as directed by the Contracting Officer, 
when the mixture proportions are changed or when low strengths have been detected.  A truly 
random (not haphazard) sampling plan shall be developed by the Contractor and approved by the 
Contracting Officer prior to the start of construction.  The plan shall assure that sampling 
is done in a completely random and unbiased manner.  A set of test specimens for concrete with 
a 28-day specified strength in accordance with paragraph Strength Requirements in PART 1 shall 
consist of four specimens, two to be tested at 7 days and two at 28 days.  [A set of test specimens 
for concrete with a 90-day strength in accordance with the same paragraph shall consist of six 
specimens, two tested at 7 days, two at 28 days, and two at 90 days.]  Test specimens shall 
be molded and cured in accordance with <RID>ASTM C 31/C 31M</RID> and tested in accordance with <RID>ASTM C 39/C 39M</RID>
 for test cylinders and <RID>ASTM C 78</RID> for test beams.  Results of all strength tests shall be reported 
immediately to the Contracting Officer.  Quality control charts shall be kept for individual 
strength "tests", ("test" as defined in paragraph Strength Requirements in PART 1) moving average 
of last 3 "tests" for strength, and moving average for range for the last 3 "tests" for each 
mixture.  The charts shall be similar to those found in <RID>ACI 214R</RID>.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.6   Inspection Before Placing</TTL><BRK/>
<BRK/>
<TXT>Foundations, construction joints, forms, and embedded items shall be inspected by the Contractor in sufficient 
time prior to each concrete placement in order to certify to the Contracting Officer that they are ready to receive 
concrete.  The results of each inspection shall be reported in writing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.7   Placing</TTL><BRK/>
<BRK/>
<TXT>The placing foreman shall supervise placing operations, shall determine that the correct quality of concrete 
or grout is placed in each location as specified and as directed by the Contracting Officer, and shall be responsible 
for measuring and recording concrete temperatures and ambient temperature hourly during placing operations, weather 
conditions, time of placement, volume placed, and method of placement.  The placing foreman shall not permit 
batching and placing to begin until it has been verified that an adequate number of vibrators in working order 
and with competent operators are available.  Placing shall not be continued if any pile of concrete is inadequately 
consolidated.  If any batch of concrete fails to meet the temperature requirements, immediate steps shall be 
taken to improve temperature controls.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.8   Vibrators</TTL><BRK/>
<BRK/>
<TXT>The frequency and amplitude of each vibrator shall be determined in accordance with <RID>COE CRD-C 521</RID> prior to initial 
use and at least once a month when concrete is being placed.  Additional tests shall be made as directed when 
a vibrator does not appear to be adequately consolidating the concrete.  The frequency shall be determined while 
the vibrator is operating in concrete with the tachometer being held against the upper end of the vibrator head 
while almost submerged and just before the vibrator is withdrawn from the concrete.  The amplitude shall be determined 
with the head vibrating in air.  Two measurements shall be taken, one near the tip and another near the upper 
end of the vibrator head, and these results averaged.  The make, model, type, and size of the vibrator and frequency 
and amplitude results shall be reported in writing.  Any vibrator not meeting the requirements of paragraph Consolidation, 
shall be immediately removed from service and repaired or replaced.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.9   Curing Inspection</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Moist Curing Inspections.  At least once each shift, and not less than twice per day on 
both work and non-work days, an inspection shall be made of all areas subject to moist curing.  
The surface moisture condition shall be noted and recorded.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Moist Curing Corrective Action.  When a daily inspection report lists an area of inadequate 
curing, immediate corrective action shall be taken, and the required curing period for those 
areas shall be extended by 1 day.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Membrane Curing Inspection.  No curing compound shall be applied until the Contractor has 
verified that the compound is properly mixed and ready for spraying.  At the end of each operation, 
the Contractor shall estimate the quantity of compound used by measurement of the container 
and the area of concrete surface covered, shall compute the rate of coverage in<MET> square meters/L</MET><ENG>
 square feet/gallon</ENG>, and shall note whether or not coverage is uniform.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Membrane Curing Corrective Action.  When the coverage rate of the curing compound is less 
than that specified or when the coverage is not uniform, the entire surface shall be sprayed 
again.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Sheet Curing Inspection.  At least once each shift and once per day on non-work days, an 
inspection shall be made of all areas being cured using impervious sheets.  The condition of 
the covering and the tightness of the laps and tapes shall be noted and recorded.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Sheet Curing Corrective Action.  When a daily inspection report lists any tears, holes, 
or laps or joints that are not completely closed, the tears and holes shall promptly be repaired 
or the sheets replaced, the joints closed, and the required curing period for those areas shall 
be extended by 1 day.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.10   Cold-Weather Protection</TTL><BRK/>
<BRK/>
<TXT>At least once each shift and once per day on non-work days, an inspection shall be made of all areas subject 
to cold-weather protection.  Any deficiencies shall be noted, corrected, and reported.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.11   Mixer Uniformity</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Stationary Mixers.  Prior to the start of concrete placing and once every 6 months when 
concrete is being placed, or once for every<MET> 60,000 cubic meters</MET><ENG> 75,000 cubic yards</ENG> of concrete 
placed, whichever results in the shortest time interval, uniformity of concrete mixing shall 
be determined in accordance with <RID>ASTM C 94/C 94M</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Truck Mixers.  Prior to the start of concrete placing and at least once every 6 months when 
concrete is being placed, uniformity of concrete mixing shall be determined in accordance with <RID>
ASTM C 94/C 94M</RID>.  The truck mixers shall be selected randomly for testing.  When satisfactory 
performance is found in one truck mixer, the performance of mixers of substantially the same 
design and condition of the blades may be regarded as satisfactory.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Mixer Uniformity Corrective Action.  When a mixer fails to meet mixer uniformity requirements, 
either the mixing time shall be increased, batching sequence changed, batch size reduced, or 
adjustments shall be made to the mixer until compliance is achieved.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.12   Reports</TTL><BRK/>
<BRK/>
<TXT>All results of tests or inspections conducted shall be reported informally as they are completed and in writing 
daily.  A weekly report shall be prepared for the updating of control charts covering the entire period from 
the start of the construction season through the current week.  During periods of cold-weather protection, reports 
of pertinent temperatures shall be made daily.  These requirements do not relieve the Contractor of the obligation 
to report certain failures immediately as required in preceding paragraphs.  Such reports of failures and the 
action taken shall be confirmed in writing in the routine reports.  The Contracting Officer has the right to 
examine all contractor quality control records.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>