USACE / NAVFAC / AFCESA / NASA      UFGS-08 34 49.00 20 (April 2006)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Replacing without change<BRK/>
                                    UFGS-13095N (September 1999)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 08 34 49.00 20</SCN><BRK/>
<BRK/>
<STL>HEMP SHIELDED DOOR</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>furnishing and installing 
high-altitude electromagnetic pulse (HEMP) shielded door</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show the following information on the project drawings:</NPR><BRK/>
<BRK/>
<NPR>a.  Location of HEMP shielded door.</NPR><BRK/>
<BRK/>
<NPR>b.  Location of alarm panel.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN WELDING SOCIETY (AWS)</ORG><BRK/><BRK/><RID>AWS D1.1/D1.1M</RID><RTL>(2008) Structural Welding Code - Steel</RTL><BRK/><BRK/><RID>AWS D9.1M/D9.1</RID><RTL>(2006) Sheet Metal Welding Code</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 1011/A 1011M</RID><RTL>(2008) Standard Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability</RTL><BRK/><BRK/><RID>ASTM A 36/A 36M</RID><RTL>(2008) Standard Specification for Carbon Structural Steel</RTL><BRK/><BRK/><RID>ASTM A 366/A 366M</RID><RTL>(1997e1) Standard Specification for Commercial Steel, Sheet, Carbon,(0.15 Maximum Percent Cold-Rolled</RTL><BRK/><BRK/><RID>ASTM A 568/A 568M</RID><RTL>(2007a) Standard Specifications for Steel, Sheet, Carbon, and High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, General Requirements for</RTL><BRK/><BRK/><RID>ASTM B 194</RID><RTL>(2008) Standard Specification for Copper-Beryllium Alloy Plate, Sheet, Strip, and Rolled Bar</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE Std 299</RID><RTL>(2006) Standard Method for Measuring the Effectiveness of Electromagnetic Shielding Enclosures</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 101</RID><RTL>(2008) Life Safety Code, 2006 Edition</RTL><BRK/><BRK/><RID>NFPA 80</RID><RTL>(2006; Errata 2008) Standard for Fire Doors and Other Opening Protectives</RTL><BRK/><BRK/><RID>NFPA 80A</RID><RTL>(2007) Recommended Practice for Protection of Buildings from Exterior Fire Exposures</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF DEFENSE (DOD)</ORG><BRK/><BRK/><RID>MIL-STD-188-125-1</RID><RTL>(Notice 1) High-Altitude Electromagnetic Pulse (HEMP) Protection for Ground-Based C41 Facilities Performing Critical, Time-Urgent Missions, Part I Fixed Facilities</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1   Regularly Engaged</TTL><BRK/>
<BRK/>
<TXT>As it applies to the testing company is defined to mean that the testing company has successfully performed electromagnetic 
shielding attenuation (SA) test and shielded enclosure leak detection system (SELDS) tests at least [six] [_____] 
times in the last [two] [_____] years.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Independent</TTL><BRK/>
<BRK/>
<TXT>As it applies to the testing company is defined to mean that the company has no financial interest and not directly 
or indirectly part of the shielding Contractor, subcontractor, or general contractor QC organization.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Shielding Attenuation</TTL><BRK/>
<BRK/>
<TXT>As it applies to this section is defined as the shielding effectiveness.  Shielding effectiveness at a test area 
for the purpose of this procedure is the ratio expressed in decibels (dB), of the received signal when the receiving 
antenna is illuminated by electromagnetic radiation in the test calibration configuration (no shield present) 
to the received signal through the electromagnetic barrier in the test measurement configuration.  Assuming that 
antenna voltage is detected.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">SE = 20 log(Vc/Vm)</ITM><BRK/>
<BRK/>
<TXT>Where Vm is the measured signal at the test area and Vc is the calibration signal at the same frequency and transmitting 
antenna polarization.  Shielding effectiveness values are test-method dependent and different values may be obtained 
when time-domain or other frequency-domain measurement techniques are used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Corrections and Repair</TTL><BRK/>
<BRK/>
<TXT>Replacing existing defective part(s) with identical parts which are shown in approved shop drawings, parts list, 
catalog, and maintenance manual.  This includes cleaning, adjustment, and tightening.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.5   Modification</TTL><BRK/>
<BRK/>
<TXT>Adding new part(s) like pieces or extra row(s) of finger-stocks, gasket (all shapes and sizes), bronze wool, 
microwave absorber which are not shown in drawings, parts list, catalog, and maintenance manual.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Typical installation of frames and HEMP shielded door(s) shall be based 
in accordance with manufacturer's installation drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM><SUB>HEMP shielded door installation</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Electric connectivity</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Installation details</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Shielded door and frame</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Hardware and accessories</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Hinges</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Panic hardware</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Swinging door static load test</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Swinging door sag test</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Door closure test</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Handle pull test</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Electromagnetic SA test</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Electromagnet (EM) shielded door tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit test reports for specified tests under paragraph entitled "Source Quality Control."  
Test reports shall contain as minimum, list of equipment used with calibration data, test point 
location, date, project title and location, location of signal source, dynamic range, noise 
floor, SA (required and actual), any repair performed, person performing the test and witness 
signature.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Certification of welders</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>Test compliance of <SUB>HEMP shielded door</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Test plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Welding procedure</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer should consult with the Engineering Service Center, Code 065, 
on DNA-TR-91-87 HM/HS Manual.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM><SUB>Hardness Maintenance and Hardness Surveillance (HM/HS) Manual</SUB>, Data Package 3; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Final acceptance test</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>EM shielded door tests</SUB></ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Check with using agency, if test report needs to be classified [secret] 
[top secret].</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>  Submit test reports for specified tests under paragraph entitled "Field Quality Control."  
Test reports shall contain as a minimum, list of equipment used with calibration data, test 
point location, date, project title and location, location of signal source, dynamic range, 
noise floor, SA (required and actual), any repair performed, person performing the test and 
witness signature.  [Test report is classified [secret] [top secret] [_____], therefore, the 
independent tester shall have the necessary security clearance].  Log the test data for each 
test point on the form as the test progresses.  Have the witness sign the data form at the end 
of each day.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Qualifications</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1.1   HEMP Shielded Door Manufacturer</TTL><BRK/>
<BRK/>
<TXT>Provide supervision and installation of work required under this section by the HEMP shielded door manufacturer.  
HEMP shielded door manufacturer shall have successfully manufactured and completed at least [3] [_____] similar 
HEMP shielded door projects of comparable size in the last [1] [_____] year.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4.2   Regulatory Requirements</TTL><BRK/>
<BRK/>
<TXT>Fire rated HEMP shielded door and assemblies shall meet <RID>NFPA 80</RID> and <RID>NFPA 80A</RID> requirements and bear the identifying 
label of a nationally recognized testing agency qualified to perform certification programs.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.3   <SUB>Certification of Welders</SUB></TTL><BRK/>
<BRK/>
<TXT>Before assigning welders to work covered by this section, submit the names of the welders to be employed, together 
with certification that each welder has passed the qualification tests in the process specified in <RID>AWS D1.1/D1.1M</RID>
and <RID>AWS D9.1M/D9.1</RID>.  Contractor shall require a welder to retake the tests when, in the opinion of the Contracting 
Officer, the work of the welder creates a reasonable doubt as to the proficiency of the welder. Recertification 
of the welder shall be made to the Contracting Officer only after welder has taken and passed the required tests.  
The Contracting Officer may require specimens to be cut from any location in any joint for testing. Sections 
of welds found defective shall be chipped, ground, or cut out to base metal, and properly rewelded before proceeding 
with the work. Should [2] [_____] specimens cut from the work of welder show test strengths less than that of 
the base metal, it shall be considered as evidence of negligence or incompetence and such welder shall be permanently 
removed from this project.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.4   <SUB>Welding Procedure</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit welding procedure statement which shall show the details of MIG welding procedure, materials  used, current 
and voltage settings, gas mixture, and welding rate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.5   <SUB>Installation Details</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide shop drawings in accordance with manufacturer's installation drawings to include the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Overall dimensions</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Controls</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Typical front view</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Typical cross sectional view</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Typical side view</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Typical assembly</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Material</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Connection of door frame to shield</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Clearances</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.6   <SUB>HEMP Shielded Door</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit certification indicating HEMP shielded door being provided has been tested for compliance with <RID>MIL-STD-188-125-1</RID>
.  Submit test data supporting these certifications.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Package HEMP shielded door for shipment.  HEMP shielded door shall be shipped assembled with the door frame to 
hold the door and frame in alignment.  Packaging shall include physical, temperature, and moisture protection, 
so that door is delivered to jobsite in an undamaged condition. HEMP shielded door shall not be accepted at the 
jobsite with visible damage.  Provide special physical, temperature, and moisture protection upon door arrival 
at jobsite; before, during, and after door installation through completion of building construction. Provide 
protection instructions from HEMP shielded door specialist (manufacturer) when special protection is required 
after installation but before building completion. Provide adequate protection prior to beneficial occupancy.  
Do not allow materials to be exposed to extreme temperature and humidity.  Ship the door assembled with the door 
frame.  Exercise great care when packing, shipping, unpacking and installing the HEMP shielded door and frame 
assembly.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   COORDINATION</TTL><BRK/>
<BRK/>
<TXT>Avoid unauthorized penetrations.  Repair work damaged as a result of unauthorized penetrations, discontinuities 
or other adverse changes to SA of the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   WARRANTY</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The warranty clause in this guide specification may require Level I Contracting 
Officer approval.  Designer should consult the appropriate Engineering Field 
Division/Activity for guidance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>HEMP shielded door shall be warranted to provide the required SA, for a period of [15] [_____] years.  Parts 
and labor for operating mechanisms, including the interlocking components, shall be warranted by the Contractor 
for at least [3] [_____] years following the date of beneficial use.  Any part of these mechanisms or component(s) 
causing operating or attenuation degradation of 5 dB or more during the warranty period shall be repaired or 
replaced, including the required reinstallation and testing by the Contractor. HEMP shielded door assemblies 
shall be suitable for repetitious use.  Adequate structural strength and permanent sealing is required to meet 
the total specification, usage, and [15] [_____] year service life requirements.  Assemblies including doors, 
hardware, shielding devices, sealing operating mechanisms, and other components shall function properly through 
[10,000] [_____] cycles of use.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8   MAINTENANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.1   <SUB>Hardness Maintenance and Hardness Surveillance (HM/HS) Manual</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit HEMP HM/HS manual.  HM/HS are the combined routine and preventive maintenance, inspection, test, and repair 
activities performed on HEMP door to ensure that HEMP hardness is retained throughout system life cycle of HEMP 
shielded door installed under this contract.  HEMP shielded door is a hardness critical item which shall survive 
day to day use.  Consult with Engineering Service Center, Code 065 before preparation of the HM/HS manual.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.2   Spare Parts</TTL><BRK/>
<BRK/>
<TXT>Furnish one set of finger-stock and HEMP shielding gaskets (if door provided uses finger-stocks and gaskets) 
for each type, style, and size hinged HEMP shielded door provided under this contract.  Furnish one set of manufacturer 
recommended and Contracting Officer approved spare parts for each HEMP shielded door of each style installed 
under this contract.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   HEMP <SUB>SHIELDED DOOR AND FRAME</SUB></TTL><BRK/>
<BRK/>
<TXT>Steel conforming to <RID>ASTM A 36/A 36M</RID> or <RID>ASTM A 366/A 366M</RID> or <RID>ASTM A 568/A 568M</RID> or <RID>ASTM A 1011/A 1011M</RID>, and be 
stretcher leveled, and shall be installed free of mill scale.  Metals shall be thicker where indicated or required.  
Provide metal thresholds of the type for proper shielding at the floor, rising not more than<MET> 6.35 mm</MET><ENG> 1/4 inch</ENG>
 above finished flooring.  Supply assemblies complete with a rigid structural frame, hinges, latches, and all 
parts necessary for operation.  Products supplied shall duplicate assemblies that have been in satisfactory use 
for not less than [1] [_____] year.  Door frame shall be made of steel and shall be suitable for welding to surrounding 
structure and shield.  HEMP shielded door shall be non-sagging, and non-warping.  The HEMP shielded door shall 
provide a minimum SA of 20 dB greater than minimum requirements per <RID>MIL-STD-188-125-1</RID> when tested in the factory.  
The door shall have a clear opening of<MET> [915] [_____] mm wide and [2134] [_____] high</MET><ENG> [36] [_____] inches wide 
and [84] [_____] inches high</ENG>.  When the shielded door has knife edge and when it is exposed to moist air containing 
salt (near the sea coast), uncontrolled environment or corrosive environment; knife edge shall be made out of 
stainless steel 430  (magnetic type) series.  For security reason, locate controls and locking mechanism inside 
HEMP space so that unauthorized personnel cannot tamper.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Pneumatic Type Door</TTL><BRK/>
<BRK/>
<TXT>Door and door periphery shall form a continuous conductive continuity seal by direct metal to metal contact.  
Continuity seal shall be implemented by exertion of force from the pneumatic pressure system that shall maintain 
adequate sealing pressure on entire face of the independently hung door panel, sealing each panel to the mating 
surfaces on the door frame.  Door compartment shall be constructed in a manner such that each door panel forms 
an independent shield.  Provide factory prepared mating surfaces of the door and frame to offer a corrosion-resistant, 
conductive, long-life finish.  Finished area shall form adequate peripheral margin on door panel and frame.  
Provide stand-alone, redundant compressed air system to support the HEMP shielded door.  Provide emergency power 
to compressed air system.  Design the system for fail-safe mode of operation.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1.1   Sealing System</TTL><BRK/>
<BRK/>
<TXT>Pneumatic sealing system shall be actuated by a single, air control valve, operable from inside or outside.  
Outside control panel shall include a pressure regulator and filter.  Normal operation of the air control valve 
shall unseal and allow manual operation of door within [15] [_____] seconds.  Each door shall have a separate 
control-valve system.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.2   Sliding Type Door</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Ensure door openings and operating direction are shown on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Sliding HEMP shielded door shall be of the size and operating direction indicated.  Clear openings indicated 
shall not require dismantling of any part of the door.  Door shall be manually operable from either side, inside 
or outside, with a maximum pull(force) of<MET> [156] [_____] Newton</MET><ENG> [35] [_____] pounds</ENG> to set HEMP shielded door 
in motion.  Construct HEMP shielded door face panels and frames from reinforced steel suitable for achieving 
the specified SA.  Construct frame from steel welded together to form a true rectangular opening.  In the sealed 
position, shielded door shall provide minimum attenuation specified without any derating.  Design door for long 
life and reliability and shall not use RF gaskets, RF finger-stocks or other sealing devices other than specified 
direct metal to metal contact.  Provide label attached to sliding door warning against painting of the mating 
surfaces.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   Electromagnetic Type Door (Swinging or Sliding)</TTL><BRK/>
<BRK/>
<TXT>Form HEMP seal by a solid metal to metal contact around the periphery of the door frame.  Materials at the contact 
area shall be compatible and corrosion resistant.  Only electromagnets (permanent magnet unacceptable) shall 
provide contact force.  Provide minimum of two (2) electromagnets.  When the electromagnets are energized, door 
leaf shall be magnetically attracted to ensure a solid and continuous contact with the door frame.  When electromagnets 
are deenergized, the door leaf shall be free to [swing] [slide].  The electromagnetic type HEMP shielded door 
shall use exclusively electromagnets.  Provide emergency power to the system.  Design for fail-safe operation.  
The door manufacturer shall provide HEMP filter(s) with surge arrestors, card access system, control panel, alarm 
panel, cipher or combination lock, any other hardwares if required and electrical penetration.  The door shall 
have minimum of three hinges.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.4   Latching Type</TTL><BRK/>
<BRK/>
<TXT>Latching type HEMP shielded door shall have a three point minimum latching mechanism to provide proper compressive 
force for the radio frequency(RF) finger-stock.  Operating handle shall not mechanically interfere with the door 
frame when the HEMP shielded door is opened or closed.  Force necessary to operate the lever (handle) to latch 
and release (unlatch) the HEMP shielded door shall not exceed<MET> [98] [_____] Newton</MET><ENG> [22] [_____] pounds</ENG>.  HEMP 
shielded door handles fitted with lever opening, shall be designed so that a force of<MET> [1112.5] [_____] Newton</MET><ENG>
 [250] [_____] pounds</ENG> may be applied at the free end in any direction without permanently deforming or damaging 
operating mechanism or degrading SA by 5 [_____] dB or more.  Door latches and hinges shall be rated for a minimum 
of [10,000] [_____] cycles without loss of SA and without adjustments.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.4.1   Finger-Stock (Contact Finger)</TTL><BRK/>
<BRK/>
<TXT>Contacts shall be copper beryllium, phosphor bronze, or stainless steel finger-stock (contact finger) conforming 
to <RID>ASTM B 194</RID>.  Finger stock shall be secured to the HEMP shielded door or frame without using special tools 
or adhesives and shall have a minimum of<MET> [50] [_____] mm</MET><ENG> [2] [_____] inches</ENG> of overlap.  Door RF seals shall, 
after [10,000] [_____] cycles of opening and closing, continue to provide SA specified in <RID>MIL-STD-188-125-1</RID> and 
sealing components shall not need to be replaced.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.5   Door and Frame Assembly</TTL><BRK/>
<BRK/>
<TXT>Provide each type of HEMP shielded door as an assembly with a frame that shall be welded into place in the primary 
shield.  Accurately position door in frame.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   <SUB>HINGES</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide each type of HEMP shielded door except the sliding type with a minimum of three well balanced, adjustable 
sealed ball bearing or adjustable radial, thrust-bearing hinges suitable for equal weight distribution of the 
HEMP shielded door.  Hinges shall allow adjustment in two directions.  Force necessary to set the HEMP shielded 
door in motion shall comply with <RID>NFPA 101</RID>.  Provide lubricating fitting at each hinge unless not required by 
the design of the hinge or the bearing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   <SUB>HARDWARE AND ACCESSORIES</SUB></TTL><BRK/>
<BRK/>
<TXT>The door manufacturer shall provide all hardware and accessories including electrical filters if required.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Power Assist</TTL><BRK/>
<BRK/>
<TXT>Should HEMP shielded door mechanism preclude the manual operation of the HEMP shielded door with a specified 
maximum pull (force) of<MET> [156] [_____] Newton</MET><ENG> [35] [_____] pounds</ENG> to set the HEMP shielded door in motion, provide 
a power assist system to meet the<MET> [156] [_____] Newton</MET><ENG> [35] [_____] pound</ENG> requirement.  Install power assist 
system in such a manner that the clear opening of the door is not obstructed.  Provide redundant compressed air 
system.  Provide emergency power to the control and redundant compressed air system.</TXT><BRK/>
<BRK/>
<TXT>Power assist system shall include the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Pressure regulator and air control valve to control the speed and direction of the door.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Provide pneumatic mechanism to power assist.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Air control valve operable from inside or outside.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Allowance for manual operation within [15] [_____] seconds should loss of air pressure occur.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   Threshold Protectors</TTL><BRK/>
<BRK/>
<TXT>Provide threshold protectors for each of the HEMP shielded door.  Protectors shall consist of portable ramps 
that protect the threshold when equipment carts or other wheeled vehicles are used to move articles across threshold.  
Ramps may be asymmetrical to account for different floor elevations on each side, but slope of ramp shall not 
exceed 4:1 on either side.  Ramps shall be designed to support a<MET> [227] [_____] kg</MET><ENG> [500] [_____] pound</ENG> force applied 
to a<MET> 75-mm by 12.7-mm</MET><ENG> 3-inch by 1/2-inch</ENG> footprint for cargo loading.  Footprint contact area  shall be anywhere 
on the threshold seal area covered by threshold protector.  Provide mounting brackets, convenient to the entry, 
to store ramp when not in use.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.3   Locks and Interlocks</TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.3.1   Cipher Locks</TTL><BRK/>
<BRK/>
<TXT>When specified by system design, provide cipher locks furnished by the door manufacturer to ensure compatibility 
of the electric bolt/strike and the controller.  Cipher locks shall have the following features:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Exterior push button panel with a minimum of 10 numbered buttons(a combination of [4] [_____] 
of these buttons in proper sequence will activate the door opener).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Adjustable time penalty to block efforts to activate the door opener when incorrect or out-of-sequence 
button is pushed.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Adjustable door-open time control.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Ease in changing the combination.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Local alarm contact with manual reset to activate a bell if an incorrect or out-of-sequence 
button is pushed.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Latch bolt to be electrically operated on low voltage directly from the door control unit.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Adjustable volume bell to operate from the door control alarm unit.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Adjustable volume buzzer to be activated by a separate push button and a low voltage AC 
power source (with associated transformer and connection).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Provide emergency power or battery backup power to comply with Life Safety Code <RID>NFPA 101</RID>
.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.3.2   Interlocks</TTL><BRK/>
<BRK/>
<TXT>Provide interlocks for vestibule HEMP shielded door pairs.  Design interlocks so that both doors cannot be opened 
at the same time during normal operation.  Provide a manual override to allow emergency egress.  Provide audible 
alarm, which continues to sound as long as both doors are open. Provide a low-voltage alarm in a tamper proof 
enclosure and with a sound intensity of [85] [_____] dB minimum at<MET> [3050] [_____] mm</MET><ENG> [10] [_____] feet</ENG>.  Provide 
lights on inside of HEMP space and on outside of exterior door to indicate that the other door is open. Integrate 
interlock system into the cipher lock system.  Interlock system shall be in a fail-safe unlocked condition in 
the event of power failure.  Ensure activation of fire alarm shall override the interlock system.  Provide emergency 
power to interlock control.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3.4   Threshold Alarm</TTL><BRK/>
<BRK/>
<TXT>Provide press-it-any-point ribbon switches for use with threshold to enunciate alarm when pressure is applied 
to the threshold of HEMP shielded door.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.5   Hold Open Device</TTL><BRK/>
<BRK/>
<TXT>Provide each HEMP shielded door leaf with a hold open device permanently attached to the door leaf.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.6   Counting Device</TTL><BRK/>
<BRK/>
<TXT>Provide electric or electronic device for counting open, close cycles of HEMP shielded door.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.7   Door Stop</TTL><BRK/>
<BRK/>
<TXT>Provide door stop to prevent HEMP shielded door from hitting the wall.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   EMERGENCY EXIT HEMP SHIELDED DOOR</TTL><BRK/>
<BRK/>
<TXT>Equip emergency exit HEMP shielded door with <SUB>panic hardware</SUB>.  The force required to latch and unlatch the emergency 
exit HEMP shielded door shall meet Life Safety Code <RID>NFPA 101</RID>.  Alterations or modifications in the field to panic 
hardware are prohibited.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   PAINTING</TTL><BRK/>
<BRK/>
<TXT>Paint HEMP shielded door in accordance with Section <SRF>09 90 00</SRF> PAINTS AND COATINGS with an environmentally acceptable, 
OSHA approved rust inhibiting primer that will provide corrosion resistance.  HEMP shielded door may be factory 
finish painted; provided damaged paint is touched-up.  Do not paint stainless steel surfaces and grounding contacts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   TOOLS</TTL><BRK/>
<BRK/>
<TXT>Furnish one full set of special tools that are required to maintain each type of door provided under this contract 
and that are not typically available from tool vendors.  Furnish environmentally safe lubricants, cleaning solvents 
or coatings which meet OSHA regulations in sufficient quantities to last for [3] [_____] years.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7   <SUB>ELECTRIC CONNECTIVITY</SUB></TTL><BRK/>
<BRK/>
<TXT>Install sensors, alarms, interlocks and filters in accordance with HEMP shielded door manufacturer's instructions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8   MAINTENANCE SUPPLIES AND PROCEDURES</TTL><BRK/>
<BRK/>
<TXT>Deliver for each door maintenance supplies sufficient for a [3] [_____] year period or [50,000] [_____] cycles, 
whichever is greater.  Include the activity and entry location for certifying that the maintenance was undertaken.  
Provide a counting device to show the number of door open close cycles.  Prominently display maintenance instructions 
required to maintain the door through the cycle count.  Maintenance procedures shall be such that the HEMP SA 
meets the requirements of <RID>MIL-STD-188-125-1</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9   SOURCE QUALITY CONTROL</TTL><BRK/>
<BRK/>
<TXT>Test of HEMP shielded door at factory will require shielded room. Factory test of HEMP shielded door shall comply 
with requirements of this specification and <RID>MIL-STD-188-125-1</RID>.  Government reserves the right to witness all 
factory tests.  Provide [30] [_____] days notice for test performed in Continental United States and [45] [_____] 
days for overseas locations.  Conduct the swinging door static load test, swinging door sag test, door closure 
test, and handle pull test on each door of each size and each type provided including electromagnetic type.  
Use the HEMP filter(s) with surge arrestors, card access system, control panel, alarm panel, cipher or combination 
lock(s), and any other hardwares to ensure the entire system meets the specification requirements.  Submit a <SUB>
Test Plan</SUB> for the test specified herein."</TXT><BRK/>
<BRK/>
<SPT><TTL>2.9.1   <SUB>Swinging Door Static Load Test</SUB></TTL><BRK/>
<BRK/>
<TXT>Mount and latch swinging HEMP shielded door to its frame and then set down in a horizontal position so that the 
door opens downward and only the frame is rigidly and continuously supported from the bottom.  With door closed, 
apply a load of<MET> [195] [_____] kg/m2</MET><ENG> [40] [_____] pound per square foot</ENG> uniformly over the entire surface of the 
door for at least [30] [_____] minute.  Door will not be acceptable when this test causes breakage, failure, 
or permanent deformation that results in the clearance between door leaf and stops to vary more than<MET> 1.58 mm</MET><ENG> 
1/16 inch</ENG>, or reduction of SA by 5 dB.  This test shall be performed on all door types, including electromagnet 
type.  The same door leaf shall be subjected to the door closure, handle pull and door sag tests.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.2   <SUB>Swinging Door Sag Test</SUB></TTL><BRK/>
<BRK/>
<TXT>Install HEMP shielded door and its frame normally and open 90 degrees. Suspend two<MET> [45.4] [_____] kg</MET><ENG> [100] [_____] 
pounds</ENG> weights from door, one on each side of door, within<MET> [125] [_____] mm</MET><ENG> [5] [_____] inches</ENG> of the outer edge 
for at least [30] [_____] minutes.  Door will not be acceptable when this test causes any breakage, failure, 
or permanent deformation that results in the clearance between door leaf and door frame to vary more than<MET> 1.58 
mm</MET><ENG> 1/16 inch</ENG> from its original dimension, or reduction of SA by 5 dB.  This test shall be performed on all door 
types, including electromagnet type.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.3   <SUB>Door Closure Test</SUB></TTL><BRK/>
<BRK/>
<TXT>Operate HEMP shielded door of each size, type, design [10,000] [_____] complete open-close cycles.  HEMP shielded 
door will not be acceptable when this test causes any breakage, failure, or permanent damage or deformation that 
results in clearance between door and frame to vary more than <MET> 1.58 mm</MET><ENG> 1/16 inch</ENG> from its original dimension, 
or reduction of SA by 5 dB.  This test shall be performed on all door types, including electromagnet type.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.4   <SUB>Handle Pull Test</SUB></TTL><BRK/>
<BRK/>
<TXT>Mount and latch HEMP shielded door to its original frame.  Apply a force of <MET> [1112.5] [_____] Newton</MET><ENG> [250] [_____] 
pound</ENG> perpendicular (outward) to handle within<MET> [50] [_____] mm</MET><ENG> [2] [_____] inch</ENG> of the end for at least [30] 
[_____] minutes.  Door will not be acceptable when this test causes any breakage, failure, or permanent damage 
or deformation exceeding <MET> 3.17 mm</MET><ENG> 1/8 inch</ENG> from its original dimension, or reduction of SA by 5 dB.  This test 
shall be performed on all door types, including electromagnet type.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5   <SUB>Electromagnetic SA Test</SUB></TTL><BRK/>
<BRK/>
<TXT>Perform this test on each size, and type shielded door after performing the following test:  swinging door static 
load, swinging door sag, door closure and handle pull tests.  Door shall not be acceptable when this test causes 
in the reduction of SA by 5 dB.  Test HEMP shielded door for SA in the factory or independent lab prior to shipping 
to jobsite.  HEMP shielded door shall comply with minimum requirements of <RID>MIL-STD-188-125-1</RID>.  Measurements for 
SA shall be made at [6] [_____] number of test points required by <RID>MIL-STD-188-125-1</RID> for HEMP single leaf personnel 
shielded door, [9] [_____] test points for HEMP double leaf shielded door, and all penetrations of door.  Number 
of test points shall be scaled up proportionately for larger doors.  Test points shall be located around periphery 
of door and at center of astragal. Testing shall be performed in accordance with <RID>MIL-STD-188-125-1</RID> and modified 
(orient magnetic loop antenna co-axial or co-planar or cross which ever gives least SA or maximum signal pick-up) <RID>
IEEE Std 299</RID>.  Required SA shall be 20 dB above minimum of <RID>MIL-STD-188-125-1</RID> at each test frequency for each 
test point.  Repair is allowed, however, modification is prohibited.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.9.5.1   Test Frequencies (Factory Test)</TTL><BRK/>
<BRK/>
<TXT>Magnetic field, electric field, and plane wave measurements shall be made at the following seven test frequencies.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Magnetic field (low impedance):  One frequency at 14 KHz, one frequency at 100 KHz, one 
frequency at 1 MHz, and one frequency at 10 MHz.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Electric field (high impedance):  One frequency at 30 MHz.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Plane wave (377 ohm):  One frequency at 100 MHz, one frequency at 400 MHz, one frequency 
at 750 MHz, and one frequency at 1 GHz.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5.2   Test Methodology</TTL><BRK/>
<BRK/>
<TXT>Regardless of test methodology or procedure used, orient antenna for maximum signal pickup or least SA.  Orient 
magnetic loop antennas for co-axial, co-planar, or cross for maximum signal pick up or least SA.  Orient horn 
antenna vertically or horizontally for maximum signal pick up or least SA.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5.3   Test Instruments and Equipment</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Instruments and equipment used shall have current, non-expired calibration tags.  Traceable 
to the National Institute of Standards and Technology (NIST).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Spectrum analyzer used shall be of direct reading, digital type.  Use slow sweep, and sweep 
at least three times prior to taking measurements.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Signal generator used shall be frequency synthesized.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Dynamic range shall be a minimum of 10 dB above the SA requirement.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5.4   Calibration and Recalibration</TTL><BRK/>
<BRK/>
<TXT>Calibrate test set up and signal each time power is turned off or set up is moved.  During test, Government representative 
or Government witness reserves the right to verify the test signal.   Calibrate prior to each test, and at the 
end of each test.  Only the equipments, cables, antennas, amplifiers, attenuators used for calibration of transmitters 
and receivers respectively shall be used for testing.  At the end of each day, recalibrate if the dynamic range 
varies more than 3 dB compared to the beginning of the calibration of each day.  Retest all test points.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5.5   Inspection</TTL><BRK/>
<BRK/>
<TXT>In-plant quality control procedures shall be required to ensure that HEMP shielded door shall provide required 
SA.  Inspection efforts shall include:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Measurement of all dimensions and spacings.  Dimensions on approved shop drawings shall 
be held to within allowable tolerances.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Inspection of material, construction methods, and finishes.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5.6   Independent Tester</TTL><BRK/>
<BRK/>
<TXT>Furnish testing by an independent tester who is regularly engaged in performing SA tests conforming to the procedures 
contained in <RID>IEEE Std 299</RID> and <RID>MIL-STD-188-125-1</RID>.  Independent tester shall not offer advice or suggestions to 
correct problem.  Only HEMP shielded door manufacturer shall offer suggestions or advice to correct problems.  
General Contractor shall hire the independent tester.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9.6   <SUB>ELECTROMAGNET (EM) SHIELDED DOOR TESTS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following tests are required for EM shielded door only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.9.6.1   EM R.F. Seal Breaking Force</TTL><BRK/>
<BRK/>
<TXT>The shielded door shall be mounted in a horizontal position with the door capable of opening downward and support 
the door frame rigidly.  Energize the EM coils.  Load one corner of the shielded door, weights shall be applied 
in an area not to exceed<MET> 0.2075 square meter</MET><ENG> 324 square inches</ENG>, opposite to hinged corner (not supported by hinges) 
by weights.  With the EM coils energized, the force required to break EM R.F. seal shall be not less than<MET> 2003 
N</MET><ENG> 450 pounds</ENG>.  Subject the same door leaf of each size to SA due to residual magnetism, and SA due to inner and 
outer coil tests.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.6.2   SA Due to Residual Magnetism (RM)</TTL><BRK/>
<BRK/>
<TXT>Perform in-factory tests for all test points to determine the SA due to residual RM by disconnecting the power 
by unplugging/deenergizing the power source, vice activating "Open Door Switch."  Activating "Open Door Switch" 
will reverse the polarity of EM resulting in reduced RM, hence, reduces the force required to open the shielded 
door.  Perform this test in the factory in the installed position.  The SA for each test point and for each frequency, 
shall be not less than 50 percent to minimum required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.6.3   SA Due to Inner or Outer or Both EM Coils</TTL><BRK/>
<BRK/>
<TXT>Perform this in-factory test by energizing one at a time inner, outer, and both EM coils to determine the SA 
provided by inner, outer , and both EM coils.  Perform this test in the factory for each test point and for each 
frequency.  The SA for each test point due to inner or outer coil shall be not less than 80 percent of minimum 
required.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<TXT>HEMP shielded door manufacturer shall furnish supervision and installation of work performed under this section.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1   HEMP SHIELDED DOOR FRAME AND ASSEMBLIES</TTL><BRK/>
<BRK/>
<TXT>Weld door frame to HEMP shield using Metal Inert Gas (MIG) method.  Install HEMP shielded door under direct supervision 
of HEMP shielded door specialist and per manufacturer's recommendations.  Adopt skip welding technique to minimize 
warpage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   HEMP DOOR FRAME ACCESSIBILITY</TTL><BRK/>
<BRK/>
<TXT>Entire periphery including threshold of HEMP shielded door frame where attached to HEMP shield shall be accessible 
from inside and outside of shield for access and future removal with minimum demolition.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   <SUB>HEMP SHIELDED DOOR INSTALLATION</SUB></TTL><BRK/>
<BRK/>
<TXT>HEMP shielded door manufacturer shall install the frame and shielded door(s).  Install HEMP shielded door assemblies 
as complete assemblies in pre-existing prepared openings.  Install in accordance with the approved shop drawings, 
and peripherally MIG weld HEMP shielded door to HEMP shield.  Exercise care during installation to prevent damage, 
especially to finger-stock (contact fingers) and or RF gaskets.  Doors, frames, thresholds, and associated hardware 
shall be furnished as preassembled matched units.  Install each unit in its respective door openings in accordance 
with the approved shop drawings.  Maintain alignment within tolerances as shown in the approved shop drawings 
during installation and tack welding and final welding of the HEMP shielded door assembly to preclude warpage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   POST INSTALLATION PROTECTION</TTL><BRK/>
<BRK/>
<TXT>During construction phase, opening and closing of HEMP shielded door shall be kept to a minimum, in order to 
limit wear on door components, particularly contact surfaces.  Plan operations to keep HEMP shielded door in 
a permanently open position, with protection over the sensitive components, during construction activities.  
Secure temporary covers of not less than<MET> 15.87-mm</MET><ENG> 5/8-inch</ENG> thick plywood to protect exposed RF contacts from 
physical damage.  Apply easily removable masking or stripable coatings over contact surfaces to eliminate soiling 
and corrosion.  Remove coatings, clean contact surfaces with an appropriate environmentally safe and OSHA approved 
solvent prior to final acceptance testing.  Place threshold protective ramps over threshold when doors are blocked 
open.  Replace components that have been damaged during construction phase.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Tests</TTL><BRK/>
<BRK/>
<TXT>Shielded door manufacturer shall supervise and install HEMP shielded door to ensure that HEMP shielded door and 
frame is installed without misalignment or warpage that would degrade the performance of the HEMP shielded door.  
The HEMP shielded door specialist shall be present to witness field tests including retests to correct problems.  
Following tests shall be performed on-site after HEMP shielded door is installed in completed HEMP shield.  Prior 
to performing repair, Contracting Officer shall approve corrective, recommended, or adopted measures.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1.1   <SUB>Final Acceptance Test</SUB></TTL><BRK/>
<BRK/>
<TXT>Government reserves the right to witness and field testing.  Provide [30] [_____] days advance notice for field 
testing within Continental United States.   A [45] [_____] day notice is required for testing conducted outside 
Continental United States.  Engineering Service Center, Code 065, will witness all  tests and repair on the shielded 
door.  Final acceptance testing of HEMP shielded door shall be made at construction site as part of acceptance 
test of HEMP protection system.  HEMP shielded door manufacturer can perform corrections and repairs necessary 
to bring HEMP shielded door into compliance with <RID>MIL-STD-188-125-1</RID>, however, modification is prohibited.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  EM SA test:  HEMP shielded door shall comply with the minimum requirements of <RID>MIL-STD-188-125-1</RID>
.  Measurements for SA shall be made at [6] [_____] test points required by <RID>MIL-STD-188-125-1</RID>
 for single leaf personnel HEMP shielded door, [9] [_____] test points for double leaf HEMP 
shielded door, and all penetrations of shielded door.  Number of test points shall be scaled 
up proportionately for larger HEMP shielded door.  Locate test points around periphery of HEMP 
shielded door and at center of astragal.  Perform testing in accordance with <RID>MIL-STD-188-125-1</RID>
 and modified (orient magnetic loop antenna co-axial or co-planar or cross whichever gives least 
SA or maximum signal pick-up) <RID>IEEE Std 299</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Test frequencies:  Make magnetic field, electric field, and plane wave measurements at the 
following 7 test frequencies.</ITM><BRK/>
<BRK/>
<ITM>(1)  Magnetic field (low impedance):  One frequency at 14 KHz, one frequency at 100 KHz, one 
frequency at 1 MHz, and one frequency at 20 MHz.</ITM><BRK/>
<BRK/>
<ITM>(2)  Electric field (high impedance):  One frequency at 30 MHz.</ITM><BRK/>
<BRK/>
<ITM>(3) Plane wave (377 Ohm):  One frequency at 100 KHz, one frequency at 400 MHz, one frequency 
at 750 MHz, and one frequency at 1 GHz.</ITM><BRK/>
<BRK/>
<ITM>Sweep each test point<MET> 610 mm</MET><ENG> 2 feet</ENG> around test point.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Test methodology:  Regardless of test methodology or procedure used, orient antennas for 
maximum signal pickup or least SA. Orient magnetic loop antennas for co-axial, co-planar, or 
cross for maximum signal pick up or least SA.  Orient horn antenna vertically or horizontally 
for maximum signal pick up or least SA.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Test instruments and equipment:</ITM><BRK/>
<BRK/>
<ITM>(1)  Instruments and equipment:  Shall have current, non-expired calibration tags traceable 
to NIST.</ITM><BRK/>
<BRK/>
<ITM>(2)  Spectrum analyzer:  Direct reading and digital.  Use slow sweep, and sweep at least 3 times 
prior to taking measurements.</ITM><BRK/>
<BRK/>
<ITM>(3)  Signal generator:  Frequency synthesized.</ITM><BRK/>
<BRK/>
<ITM>(4)  Dynamic range:  Minimum of 10 dB above SA requirement of <RID>MIL-STD-188-125-1</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Independent tester:  SA tests shall be performed by an independent tester regularly engaged 
in SA testing and tests shall conform to the procedures contained in modified(orient magnetic 
loop antenna co-axial or co-planar or cross whichever gives least SA or maximum signal pick-up) <RID>
IEEE Std 299</RID> and <RID>MIL-STD-188-125-1</RID>. Independent tester shall not offer advice or suggestions 
to correct problem.  General Contractor shall hire the independent tester.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Calibration:  Calibrate test set up and signal each time power is turned off or set up is 
moved.  During test, Government representative or Government witness reserves the right to verify 
the test signal.  Calibrate prior to each test, and at the end of each test.  Only the equipments, 
cables, antennas, amplifiers, attenuators used for calibration of transmitters and receivers 
respectively shall be used for testing.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Interlock alarm configuration tests (field):  Test electrical and functional operation of 
interlock alarm system, [including cipher locks (when included)], to verify performance of interlock 
system.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Force tests (field):  Perform test for force required to latch and release (unlatch) each 
HEMP shielded door in installed position (field) in the presence of the Contracting Officer 
or the Contracting Officer's representative.  Perform test by using a calibrated force measuring 
device, which shall record and retain maximum force required to latch and release (unlatch) 
until reset.  Modifications or alterations to panic hardware of emergency exit HEMP shielded 
door to meet<RID>NFPA 101</RID> force requirements for latching and releasing (unlatching) are prohibited.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Recalibration:  At the end of each day, recalibrate if the dynamic range varies more than 
3 dB compared to the beginning of the calibration of each day.  Retest all test points.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.2   <SUB>EM Shielded Door Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following test are required for EM shielded door only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.5.2.1   SA Due to RM</TTL><BRK/>
<BRK/>
<TXT>Perform tests for all test points to determine the SA due to residual RM by disconnecting the power by unplugging/deenergizing 
the power source, vice activating "Open Door Switch."  Activating "Open Door Switch" will reverse the polarity 
of EM resulting in reduced RM, hence, reduces the force required to open the shielded door.  Perform this test 
in the field in the installed position.  The SA shall be not less than 50 percent of minimum required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.2   SA Due to Inner or Outer or Both EM Coils</TTL><BRK/>
<BRK/>
<TXT>Perform this test by energizing one at a time inner, outer, and both EM coils to determine the SA provided by 
inner, outer , and both EM coils.  Perform this test in the field in the installed position.  The SA for each 
test point, due to inner or outer coil, shall be not less than 80 percent of minimum required.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.6   TRAINING</TTL><BRK/>
<BRK/>
<TXT>Provide a minimum of [8] [_____] hours of hands on maintenance training to each person designated by the Contracting 
Officer.  Training shall include but shall not be limited to routine, preventive and corrective maintenance, 
cleaning of knife edge, finger-stock, alignment of doors, adjustment of latching mechanism, replacement of gaskets 
and finger-stocks, lubrication, interlock, locking (latching) mechanism, and adjustment of hinges.  Provide [6] 
[_____] [VHS] [_____] video cassette tapes which shall show details and procedures of hardness critical item 
HEMP shielded door in accordance with HM/HS manual.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   SITE SPECIFIC REPAIRS AND TEMPORARY FIXES</TTL><BRK/>
<BRK/>
<TXT>Corrections and repairs are allowed, however, modification is prohibited. Use of bronze wool, conductive tape, 
conductive calking, pieces of RF gaskets all shapes and sizes, rope gasket, and microwave absorber, which are 
normal troubleshooting aids are prohibited as permanent solution (fix) to correct design or manufacturing deficiencies 
of HEMP shielded door.  Only the use of materials such as RF gasket, finger-stock shown in approved shop drawings, 
catalog, HM/HS manual, and list of material shall be acceptable.  Each HEMP shielded door of similar design shall 
contain identical RF gasket material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8   RETESTS</TTL><BRK/>
<BRK/>
<TXT>Retest each repair, adjustment, corrective action including cleaning or HEMP shielded door at each frequency 
for each test point.  If retest is scheduled for a later date, Contractor shall provide [30] [_____] days notice 
for Continental United States and [45] [_____] days notice for overseas locations for Government to witness the 
retests.  Recalibrate if the dynamic range varies more than 3 dB compared to the beginning of the calibration 
of each day.  Retest each test points.  Recalibrate if any hardware is changed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9   EMERGENCY EXIT PANIC HARDWARE FIELD MODIFICATION</TTL><BRK/>
<BRK/>
<TXT>Equip emergency exit with panic hardware.  Force required to release (unlatch) emergency exit HEMP shielded door 
shall meet <RID>NFPA 101</RID>. Modifications or alterations to panic hardware and latching mechanism in the field is prohibited 
in order to meet <RID>NFPA 101</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10   WELDING</TTL><BRK/>
<BRK/>
<TXT><RID>AWS D1.1/D1.1M</RID>, certified welders.  When specimens are removed from part of an assembly, repair cut members at 
no additional cost to Government, with joints of proper type to maintain SA and to develop full strength of members 
and joints cut, with peelings as necessary or directed to relieve residual stress.  Provide welder identification 
next to weld.</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>