<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA      UFGS-10 22 26.13 (October 2007)<BRK/>
                                    -------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Superseding <BRK/>
                                    UFGS-10 22 26.13    (April 2006)<BRK/>
                                    UFGS-10 22 26.13 40 (October 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 10 22 26.13</SCN><BRK/>
<BRK/>
<STL>ACCORDION FOLDING PARTITIONS</STL><BRK/>
<DTE>10/07</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>accordion folding 
partitions, manually and/or electrically operated</SCP>.</NPR><BRK/>
<BRK/>
<NPR>Accordion partitions are folding partitions with independent covers enclosing 
a dead-air space and separated by an internal mechanism operating laterally 
across the face of the opening to a stack or closed position.  Do not confuse 
accordion partitions with serpentine folding partitions which contain no internal 
operating mechanism or dead-air space between independent covers.</NPR><BRK/>
<BRK/>
<NPR>Folding partitions may be a sight barrier (noninsulated), or sound barrier (with 
sound liner), or both.  Accordion-folding partitions have fabric covers which 
are joined to reflect a pantographic movement of the door surfaces when the 
door is either manually or electrically operated.</NPR><BRK/>
<BRK/>
<NPR>This section does not include folding or operable walls and partitions whose 
rigid panels are individually moved or hinged along their vertical edges to 
fold in serpentine fashion.</NPR><BRK/>
<BRK/>
<NPR>Associated work found in other sections includes:</NPR><BRK/>
<BRK/>
<NPR>Steel supporting members or hanger rods, Section[ Section <SRF>05 50 13</SRF> MISCELLANEOUS 
METAL FABRICATIONS][ Section <SRF>05 51 33</SRF> METAL LADDERS][ Section <SRF>05 52 00</SRF> METAL 
RAILINGS][ Section <SRF>05 51 00</SRF> METAL STAIRS].</NPR><BRK/>
<BRK/>
<NPR>Wood blocking, rough bucks, and headers, Section <SRF>06 10 00</SRF> ROUGH CARPENTRY.</NPR><BRK/>
<BRK/>
<NPR>Wood trim, wood or hardboard ceiling guard, or soffits, Section <SRF>06 20 00</SRF> FINISH 
CARPENTRY.</NPR><BRK/>
<BRK/>
<NPR>Lock cylinders, Section <SRF>08 71 00</SRF> DOOR HARDWARE.</NPR><BRK/>
<BRK/>
<NPR>Operator field connections to power sources and inner connection to control 
switches, Division 16, "Electrical."</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable item(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/></NPR>
<BRK/>
<AST/><BRK/></NTE>
<NTE><AST/><BRK/>
<NPR>NOTE:  The following information should be shown on the drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Location, size, and folding area of accordion partitions.</NPR><BRK/>
<BRK/>
<NPR>2.  Direction of operation, header conditions indicating height, track anchorage, 
track channel, and jamb conditions.</NPR><BRK/>
<BRK/>
<NPR>3.  Partition supporting structure.  The structural support for the partition 
is not part of this section; it must be indicated and specified separately.</NPR><BRK/>
<BRK/>
<NPR>4.  A schedule of partitions by type, sizes, and stack space and identified 
by mark number or letter</NPR><BRK/>
<BRK/>
<NPR>5.  For electrically operated partitions, show power source and desired switch 
location.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 653/A 653M</RID><RTL>(2008) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process</RTL><BRK/><BRK/><RID>ASTM B 221</RID><RTL>(2008) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes</RTL><BRK/><BRK/><RID>ASTM B 221M</RID><RTL>(2007) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)</RTL><BRK/><BRK/><RID>ASTM C 423</RID><RTL>(2008a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method</RTL><BRK/><BRK/><RID>ASTM D 751</RID><RTL>(2006) Coated Fabrics</RTL><BRK/><BRK/><RID>ASTM E 336</RID><RTL>(2008) Measurement of Airborne Sound Insulation in Buildings</RTL><BRK/><BRK/><RID>ASTM E 413</RID><RTL>(2004) Rating Sound Insulation</RTL><BRK/><BRK/><RID>ASTM E 557</RID><RTL>(2000; R 2006) Installation of Operable Partitions</RTL><BRK/><BRK/><RID>ASTM E 84</RID><RTL>(2008a) Standard Test Method for Surface Burning Characteristics of Building Materials</RTL><BRK/><BRK/><RID>ASTM E 90</RID><RTL>(2004) Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements</RTL><BRK/><BRK/></REF><REF><ORG>CHEMICAL FABRICS &amp; FILM ASSOCIATION (CFFA)</ORG><BRK/><BRK/><RID>CFFA-W-101-D</RID><RTL>(2002) Vinyl Coated Fabric Wallcovering</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 101</RID><RTL>(2008) Life Safety Code, 2006 Edition</RTL><BRK/><BRK/><RID>NFPA 286</RID><RTL>(2006) Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire Growth</RTL><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 10B</RID><RTL>(2008) Fire Tests of Door Assemblies</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Qualifications</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Sample Warranty</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Code Compliance</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Standards Conformity</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Verification of Field Measurements</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Existing Electrical Data</SUB></ITM>]<BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM>  Submit <SUB>Fabrication Drawings</SUB> for <SUB>Accordion Folding Partitions</SUB> consisting of fabrication and 
assembly details to be performed in the factory.</ITM><BRK/>
<BRK/>
<ITM>  Submit <SUB>Installation Drawings</SUB> for the following items in accordance with paragraph entitled, 
"Installation," of this section.</ITM><BRK/>
<BRK/>
<ITM><SUB>Accordion Folding Partition Layouts</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Suspension System</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Finish Hardware</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Jamb Panels</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Accessories</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Electrical Operators</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>]<BRK/>
<BRK/>
[<ITM><SUB>Wiring diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>]<BRK/>
<BRK/>
<ITM>  Submit drawings for the system that include dimensions and weight of stacked partition, layout 
of the work including stacking area, track and jamb fastening methods, seal details, and installation 
details.  [Submit wiring diagram and installation details for electrical operator.]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Framework</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Suspension system</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Finish Hardware</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Sound Seals and Sweepstrips</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Covering</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Ceiling Guard</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Meeting Posts</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Jamb Panels</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Rolling Post</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Pull-In Latch</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Electrical Operator</SUB></ITM>]<BRK/>
<BRK/>
[<ITM><SUB>Switches</SUB></ITM>]<BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Covering</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Laboratory Acoustical Requirements</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Acoustical test</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM>  Submit Certificates to the Contracting Officer for this installation clearly indicating:</ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Code Compliance</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Standards Conformity</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Folding partitions</SUB>, Data Package 1; [; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Electrical operators</SUB>, Data Package 5; [; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>]<BRK/>
<BRK/>
<ITM>  Submit in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Guarantee</SUB></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   PRE-INSTALLATION REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Preconstruction Requirements</TTL><BRK/>
<BRK/>
<TXT>No less than 30 calendar days prior to the scheduled commencement of installation of <SUB>Accordion Folding Partitions</SUB>
, submit the following to the Contracting Officer:</TXT><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Qualifications</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Sample Warranty</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Code Compliance</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Standards Conformity</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Verification of Field Measurements</SUB>and <SUB>Existing Electrical Data</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Fabrication Drawings</SUB> and <SUB>Installation Drawings</SUB></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Product Data</TTL><BRK/>
<BRK/>
<TXT>Submit the following information for review:</TXT><BRK/>
<BRK/>
<ITM><SUB>Finish Hardware</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Jamb Panels</SUB> and <SUB>Accessories</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Sound Seals and Sweepstrips</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Ceiling Guard</SUB>, <SUB>Meeting Posts</SUB>, <SUB>Rolling Post</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Pull-In Latch</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Electrical Operator</SUB> and <SUB>Switches</SUB></ITM>]<BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Manufacturer's Guarantee</TTL><BRK/>
<BRK/>
<TXT>Provide <SUB>Manufacturer's Guarantee</SUB> for partitions against defects in material and workmanship for a period of two 
years from date of installation.  In addition, provide ten year guarantee for the pantographs, trolleys and tracks 
from date of acceptance for beneficial use.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   DELIVERY, HANDLING AND STORAGE</TTL><BRK/>
<BRK/>
<TXT>Deliver materials to project site in manufacturer's original, unopened, and undamaged packages with labels legible 
and intact.  Labels must indicate the manufacturer, brand name, size, finish, and placement location.  Store 
folding partitions and accessories in unopened packages in a manner that will prevent damage.  Handle partition 
materials in accordance with manufacturer's instructions.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>FOLDING PARTITIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide full accordion type partitions, factory finished, supported from overhead track without floor guides, 
and complete with all hardware, track, and accessories necessary for operation.  Provide partition framework 
with a mechanism that gives stability and maintains uniform spacing of partition folds in all partition positions.  
Provide completely concealed framework with a [vinyl-coated fabric covering][_____].  Provide partitions [manually] 
[and] [electrically] operated, [bi-parting] [and] [one-way] type as indicated.  Provide patterns and colors of 
[fabric][_____] [approved by the Contracting Officer] [as indicated ].  [Provide manufacturer's standard pendant 
pull on leading edge of manually operated partitions over<MET> 3600 mm</MET><ENG> 12 feet</ENG> high.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Aluminum Extrusions</TTL><BRK/>
<BRK/>
<TXT><MET><RID>ASTM B 221M</RID></MET><ENG><RID>ASTM B 221</RID></ENG>, Alloy 3003.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Steel Sheets</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 653/A 653M</RID>, [<MET>Z 180</MET><ENG>G90</ENG> coating designation].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   Fabric Covering</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify minimum total weight and minimum coating weight for the fabric 
covering type selected using the listing below:</NPR><BRK/>
<BRK/>
<MET><NPR>Total Weight (kilograms per square meter):  Type I - 0.237; Type II - 0.442; 
Type III - 0.748</NPR><BRK/>
<NPR>Coating Weight (kilograms per square meter):  Type I - 0.170; Type II - 0.237; 
Type III - 0.407</NPR></MET><ENG><NPR>Total Weight (ounces per square yard):  Type I - 7; Type II 
- 13; Type III - 22</NPR><BRK/>
<BRK/>
<NPR>Coating Weight (ounces per square yard):  Type I - 5; Type II - 7; Type III 
- 12</NPR></ENG><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>CFFA-W-101-D</RID>, Type II.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4   Seals and Sweepstrips</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Accordion partitions need a floor and ceiling seal to avoid gaps that 
will lower the advertised sound transmission rating.  For any partition that 
requires a sound rating, use seals and ceiling guards provided by  the manufacturer 
of the partition.  Provide a baffle in the ceiling plenum above the partition 
with a STC rating equal to the partition.  Provide a floor surface that will 
allow the bottom sweep to make a positive seal.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide perimeter seals of manufacturer's standard product, without crack or craze when subjected to severe usage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.5   Ceiling Guards</TTL><BRK/>
<BRK/>
<TXT>Furnish partitions with ceiling guards or integral track and ceiling guards as recommended by the manufacturer.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   PERFORMANCE REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Fire Endurance</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select flame spread and smoke developed criteria to suit project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>For partitions more than<MET> 5.6 square meters</MET><ENG> 60 square feet</ENG> in area, provide fabric and lining with flame spread 
rating of 25 or less, fuel contribution rating of 15 or less, smoke generation of 50 or less when tested in accordance 
with <RID>ASTM E 84</RID>.  Complete assembly must also meet or surpass the requirements of <RID>NFPA 101</RID> and <RID>UL 10B</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   <SUB>Laboratory Acoustical Requirements</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify sound transmission class as determined by project requirements.  
The requested rating should be between 35 and 45 STC.  39 and 40 STC are widely 
available.  If more is required, another type of moveable partition should be 
used. Specify a panel weight of no less than<MET> 14 kg per square meter</MET><ENG> 3 psf</ENG> for 
STC of 35,<MET> 24 kg per square meter</MET><ENG> 5 psf</ENG> for STC of 45.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>Provide certificates verifying folding partitions have been tested in accordance with <RID>ASTM C 423</RID> and <RID>ASTM E 90</RID>
 by a laboratory accredited by the U.S. Bureau of Standards and have attained a sound transmission class (STC) 
of not less than [40] [_____] in a fully extended position.</TST>  Partition tested must be of the same construction, 
materials, and model number as the partition to be provided and  be fully operable.  Test specimen must be not 
less than<MET> [12 square meters in area] [4200 by 2700 mm]</MET><ENG> [126 square feet in area] [14 feet by 9 feet]</ENG>.  Panel 
weight must be<MET> [14] [24] kg per square meter</MET><ENG> [3] [5] lbs per square ft</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT>[<SPT><TTL>2.4   <SUB>ELECTRICAL OPERATORS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify electrical operators for those partitions whose size and weight 
preclude manual operation.  Refer to manufacturers' literature. Indicate those 
partitions requiring electrical operation on the project drawings.  Delete this 
paragraph when electrically operated partitions are not required in the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide manufacturer's recommended standard electrical operator for [each partition] [partitions indicated].  
Provide <SUB>wiring diagrams</SUB>.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>2.5   FABRICATION</TTL><BRK/>
<BRK/>
<SPT><TTL>2.5.1   <SUB>Framework</SUB></TTL><BRK/>
<BRK/>
<TXT>Fabricate framework, including posts, pantographs, hinges, hinge plates, and rods from either extruded aluminum 
or ferrous metal.  Arrange frames requiring pantographs for horizontal pantograph action with pantographs located 
at top and bottom of the frame.  Provide pantographs spaced not over<MET> 1200 mm</MET><ENG> 4 feet</ENG> apart.  Provide intermediate 
pantograph at center of doors less than<MET> 2400 mm</MET><ENG> 8 feet</ENG> high unless the door has vertical metal reinforcing.  
The pantographs must operate smoothly with positive folding action and  have a control device to prevent flattening 
of the folds when the panel is fully extended.  Ferrous metal must be either cadmium plated or zinc coated.Posts, 
at the option of the door manufacturer, may have phosphate treatment and manufacturer's shop finish paint.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   <SUB>Suspension System</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide a suspension system consisting of steel or aluminum track and trolleys designed to support the weight 
of the partition. Provide steel track of<MET> 1.5 mm</MET><ENG> 16 gage</ENG> minimum, phosphate treated and finished, or zinc or cadmium 
coated.  Provide extruded aluminum track with minimum thickness of<MET> 3 mm</MET><ENG> 1/8 inch</ENG>.  Tracks may have an integral 
ceiling guard.  Trolleys must have at least two ball bearing nylon or steel tired wheels spaced according to 
manufacturer's design criteria and four at an end post.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.3   <SUB>Covering</SUB></TTL><BRK/>
<BRK/>
<TXT>Covering fabrics must conform to the requirements of <RID>ASTM D 751</RID> and <RID>NFPA 286</RID>.</TXT><BRK/>
<BRK/>
<TXT>Attach fabric to the framework with fasteners that permit easy removal of the cover but prevent sagging or separation.  
Position vertical seams in the bottoms of valleys and reinforce.  Provide top and bottom edges of cover fabrics 
with<MET> 12 mm</MET><ENG> 1/2 inch</ENG> minimum turned hems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4   Sound Insulation</TTL><BRK/>
<BRK/>
<TXT>Provide sound insulation as necessary to achieve the specified sound transmission mission class, conforming to <RID>
ASTM E 413</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.5   Air Release</TTL><BRK/>
<BRK/>
<TXT>Provide an air release system which allows trapped air within the partition to be released during the stacking 
process.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.6   Seals</TTL><BRK/>
<BRK/>
<TXT>Provide perimeter seals as necessary to produce the sound transmission class specified [and to pass the visual 
field test specified].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.7   Hardware</TTL><BRK/>
<BRK/>
<TXT>Provide hardware of the heavy-duty type standard with the manufacturer.  Provide pulls and latches for all partitions.  
Provide partitions with [keyed locks] [privacy latches] [magnetic contact latches] [foot bolts].  </TXT><BRK/></SPT>
<SPT><TTL>2.5.8   Accessories</TTL><BRK/>
<BRK/>
<TXT>Provide [multiple meeting posts] [rolling posts] [switches] [ceiling guards] [recessed tracks] [curved tracks] 
as indicated.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Existing Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show the structural support necessary to accommodate the size and weight 
of the partition. ASTM E 557 has design as well as installation criteria.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Check openings scheduled to receive <SUB>accordion-folding partitions</SUB> for correct dimensions.</TXT><BRK/>
<BRK/>
<TXT>Install partitions in accordance with the approved <SUB>Accordion Folding Partition Layouts</SUB>, manufacturer's directions, 
and <RID>ASTM E 557</RID>.  Provide structural support for the track support elements as indicated.</TXT><BRK/>
<BRK/>
<TXT>Submit to the Contracting Officer a certification of the following:</TXT><BRK/>
<BRK/>
<ITM><SUB>Statement of Code Compliance</SUB> for the completed partition installation.</ITM><BRK/>
<BRK/>
<ITM><SUB>Statement of Standards Conformity</SUB></ITM><BRK/>
<BRK/></SPT>
[<SPT><TTL>3.1.2   <SUB>Electrical Operators</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph when electrically operated partitions are not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conform Electrical components and installation to the requirements of <RID>NFPA 70</RID>.  Provide the partition manufacturer's 
standard drive and control components required to operate the partition properly.  Power source is as indicated.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>3.1.3   Adjustment</TTL><BRK/>
<BRK/>
<TXT>[Adjust manually operated partitions to open and close from any position with a maximum horizontal force of<MET> 130 
N</MET><ENG> 30 pounds</ENG> applied to pendant pull, box or handle.]  [Adjust drive components and limit switches of electrically 
operated partitions to ensure the partitions operate properly upon activation of the control switch.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   FIELD TESTS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Operational Test</TTL><BRK/>
<BRK/>
<TXT><TST>Operate partition at least three times to demonstrate that partition is capable of being moved from the stored 
position to the fully extended position smoothly and quietly [and without overloading the drive components].</TST>  
[Activate the emergency release mechanism and demonstrate proper operation of the partition in the manual mode.]  
Adjust partitions which do not operate properly and retest.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Visual Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph when light leakage will not be objectionable.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>Conduct visual field tests for light leakage with all room lights turned on in the space on one side of the partition.</TST>
  Darken space on the other side of the partition.  Light leakage from the lighted space to the darkened space 
is not acceptable.  If light leakage does occur, adjust the partition to correct the problem and retest.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   <SUB>Acoustical Test</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph in projects requiring STC ratings of less than 
40.  Noise Isolation Class (NIC) is a number that can measured, and usually 
runs up to 10 points below laboratory results, i.e.  lab STC 40, field NIC 30.  
This test is rarely necessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>Field sound performance</TST>:  provide partition testing by an independent certified acoustical consultant in accordance 
with <RID>ASTM E 336</RID>, and achieve a Noise Isolation Class (NIC) of [_____] plus or minus two.  Adjust and/or modify 
partitions which do not comply, and retest.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   CLEANING</TTL><BRK/>
<BRK/>
<TXT>Clean any soiled parts of the partition according to manufacturer's instructions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   SUPPORT SERVICE</TTL><BRK/>
<BRK/>
<TXT>Equipment and component maintenance must be supported by a service organization which is reasonably convenient 
to the site of installation.</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>