<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA          UFGS-23 08 00.00 10 (January 2008)<BRK/>
                                        ----------------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>              Superseding<BRK/>
                                        UFGS-23 08 00.00 10 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 23 08 00.00 10</SCN><BRK/>
<BRK/>
<STL>COMMISSIONING OF HVAC SYSTEMS</STL><BRK/>
<DTE>01/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>commissioning of 
HVAC systems</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use of this specification is mandatory for all projects.  A properly 
functioning HVAC system assures a comfortable, healthy and productive environment 
for the user.  The "Design Agent's Representative" will be a member of the HVAC 
design team, i.e. from the AE or Engineering Division.  The "Design Agent's 
Representative" will actively participate in the process, including review of 
all submittals contained herein.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced. The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASSOCIATED AIR BALANCE COUNCIL (AABC)</ORG><BRK/><BRK/><RID>ACG Commissioning Guideline</RID><RTL>(2005) Commissioning Guideline</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)</ORG><BRK/><BRK/><RID>NEBB Commissioning Standard</RID><RTL>(1999) Procedural Standards for Building Systems Commissioning</RTL><BRK/><BRK/></REF><REF><ORG>SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)</ORG><BRK/><BRK/><RID>SMACNA 1429</RID><RTL>(1994, 1st Ed) HVAC Systems Commissioning Manual</RTL><BRK/><BRK/></REF><REF><ORG>U.S. GREEN BUILDING COUNCIL (USGBC)</ORG><BRK/><BRK/><RID>LEED</RID><RTL>(2002; R 2005) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<BRK/>
<TXT>In some instances, terminology differs between the Contract and the Commissioning Standard primarily because 
the intent of this Section is to use the industry standards specified, along with additional requirements listed 
herein to produce optimal results.  The following table of similar terms is provided for clarification only.  
Contract requirements take precedent over the corresponding ACG, NEBB, or TABB requirements where differences 
exist.</TXT><BRK/>
<TBL><BRK/>
<HL4><THD><HL1>SIMILAR TERMS</HL1></THD></HL4><BRK/>
<BRK/>
     <HL1>Contract Term</HL1>      <HL1>ACG</HL1>            <HL1>NEBB</HL1>                 <HL1>TABB</HL1><BRK/>
<BRK/>
     Commissioning      ACG            Procedural        SMACNA HVAC<BRK/>
      Standard          Commissioning   Standards for     Commissioning<BRK/>
                        Guideline       Building Systems  Guideline<BRK/>
                                        Commissioning<BRK/>
<BRK/>
     Commissioning      ACG Certified  NEBB Qualified    TABB Certified<BRK/>
      Specialist        Commissioning   Commissioning     Commissioning<BRK/>
                        Agent           Administrator     Supervisor</TBL><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   General</TTL><BRK/>
<BRK/>
<TXT>Perform Commissioning in accordance with the requirements of the standard under which the Commissioning Firm's 
qualifications are approved, i.e., <RID>ACG Commissioning Guideline</RID>, <RID>NEBB Commissioning Standard</RID>, or <RID>SMACNA 1429</RID> unless 
otherwise stated herein.  Consider mandatory all recommendations and suggested practices contained in the Commissioning 
Standard.  Use the Commissioning Standard for all aspects of Commissioning, including qualifications for the 
Commissioning Firm and Specialist and calibration of Commissioning instruments.  Where the instrument manufacturer 
calibration recommendations are more stringent than those listed in the Commissioning Standard, the manufacturer's 
recommendations shall be adhered to.  All quality assurance provisions of the Commissioning Standard such as 
performance guarantees shall be part of this contract.  For systems or system components not covered in the Commissioning 
Standard, Commissioning procedures shall be developed by the Commissioning Specialist.  Where new procedures, 
requirements, etc., applicable to the Contract requirements have been published or adopted by the body responsible 
for the Commissioning Standard used (ACG, NEBB, or TABB), the requirements and recommendations contained in these 
procedures and requirements shall be considered mandatory.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Energy</TTL><BRK/>
<BRK/>
<TXT>Formal <RID>LEED</RID> certification is not required; however, the Contractor is required to provide documentation that 
meets the <RID>LEED</RID> Energy &amp; Atmosphere (EA) Prerequisite 1, Fundamental Commissioning.  For New Construction 
and Major Revisions provide, also, documentation that meets EA Credit 3; Enhanced Commissioning.  Provide documentation 
for as many LEED credits as possible to support LEED Silver certification of the project.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Commissioning Plan</SUB>[; <SUB>G,</SUB>][;<SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Commissioning Plan prepared in accordance with Commissioning Standard, no later than 28 days 
after the approval of the Commissioning Specialist.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Pre-Functional Performance Test Checklists</SUB>[; <SUB>G,</SUB>][;<SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  At least 28 days prior to the start of Pre-Functional Performance Test Checks.  Submit the 
schedule for the test checks at least 14 days prior to the start of Pre-Functional Performance 
Test Checks.</ITM><BRK/>
<BRK/>
<ITM><SUB>Functional Performance Tests</SUB>[; <SUB>G,</SUB>][;<SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Test procedures at least 28 days prior to the start of Functional Performance Tests.  The 
schedule for the tests at least 14 days prior to the start of Functional Performance Tests.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Commissioning Report</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  No later than 14 days after completion of Functional Performance Tests.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Commissioning Firm</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Certification of the proposed Commissioning Firm's qualifications by one of the following 
ACG, NEBB, or TABB to perform the duties specified herein and in other related Sections, no 
later than 21 days after the Notice to Proceed.  Include in the documentation the date that 
the Certification was initially granted and the date when the current Certification expires.  
Any lapses in Certification of the proposed Commissioning Firm or disciplinary action taken 
by ACG, NEBB, or TABB against the proposed Commissioning Firm shall be described in detail.</ITM><BRK/>
<BRK/>
<ITM><SUB>Commissioning Specialist</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Certification of the proposed Commissioning Specialist's qualifications by one of the following 
ACG, NEBB, or TABB to perform the duties specified herein and in other related Sections, no 
later than 21 days after the Notice to Proceed.  The documentation shall include the date that 
the Certification was initially granted and the date when the current Certification expires.  
Any lapses in Certification of the proposed Commissioning Specialist or disciplinary action 
taken by ACG, NEBB, or TABB against the proposed Commissioning Specialist shall be described 
in detail.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Commissioning Firm</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide a Commissioning Firm that is either a member of ACG or certified by the NEBB or the TABB and certified 
in all categories and functions where measurements or performance are specified on the plans and specifications.  
The certification shall be maintained for the entire duration of duties specified herein.  If, for any reason, 
the firm loses subject certification during this period, immediately notify the Contracting Officer and submit 
another Commissioning Firm for approval.  Any firm that has been the subject of disciplinary action by the ACG, 
the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related 
to the HVAC systems, including Commissioning.  All work specified in this Section and in other related Sections 
to be performed by the Commissioning Firm shall be considered invalid if the Commissioning Firm loses its certification 
prior to Contract completion and must be performed by an approved successor.  These Commissioning services are 
to assist the prime Contractor in performing the quality oversight for which it is responsible.  The Commissioning 
Firm shall be a subcontractor of the prime Contractor and shall be financially and corporately independent of 
all other subContractors.  The Commissioning Firm shall report to and be paid by the prime Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>Commissioning Specialist</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.2.1   General</TTL><BRK/>
<BRK/>
<TXT>The Commissioning Specialist shall be an ACG Certified Commissioning Agent, a NEBB Qualified Commissioning Administrator, 
or a TABB Certified Commissioning Supervisor and shall be an employee of the approved Commissioning Firm.  The 
certification shall be maintained for the entire duration of duties specified herein.  If, for any reason, the 
Commissioning Specialist loses subject certification during this period, immediately notify the Contracting Officer 
and submit another Commissioning Specialist for approval.  Any individual that has been the subject of disciplinary 
action by the ACG, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform 
any duties related to the HVAC systems, including Commissioning.  All work specified in this Section and in other 
related Sections performed by the Commissioning Specialist shall be considered invalid if the Commissioning Specialist 
loses his certification prior to Contract completion and must be performed by the approved successor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2.2   Responsibilities</TTL><BRK/>
<BRK/>
<TXT>Perform all Commissioning work specified herein and in related sections under the direct guidance of the Commissioning 
Specialist.  The Commissioning Specialist shall prepare the <SUB>Commissioning Plan</SUB>, which will be a comprehensive 
schedule and will include all submittal requirements for procedures, notifications, reports and the Commissioning 
Report.  After approval of the Commissioning Plan, revise the Contract NAS schedule to reflect the schedule requirements 
in the Commissioning Plan.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.6   SEQUENCING AND SCHEDULING</TTL><BRK/>
<BRK/>
<TXT>Begin the work described in this Section only after all work required in related Sections has been successfully 
completed, and all test and inspection reports and operation and maintenance manuals required in these Sections 
have been submitted and approved.  Pre-Functional Performance Test Checklists shall be performed at appropriate 
times during the construction phase of the Contract.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS   (Not Applicable)</TTL><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   COMMISSIONING TEAM AND TEST FORMS AND CHECKLISTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The "Design Agent's Representative" will be included as a member of the 
commissioning team for the pre-commissioning checklists and will participate 
in the functional performance tests.</NPR><BRK/>
<BRK/>
<NPR>The checklists provided are to be used as guides for the preparation of project 
checklists.  The appropriate checklist should be included in the project specification 
for each HVAC equipment component.  The designer will add additional checklists 
for equipment or systems not included in this guide specification or modify 
the checklists where necessary for specific project requirements.  If, for example, 
a system needs to be tested with certain internal load, each appropriate checklist 
should be modified to include this requirement along with specifics on how load 
should be generated.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Designate Contractor team members to participate in the Pre- Functional Performance Test Checklists and the Functional 
Performance Tests specified herein.  In addition, the Government team members will include a representative of 
the Contracting Officer, the Design Agent's Representative, and the Using Agency's Representative.  The team 
members shall be as follows:</TXT><BRK/>
<BRK/>
<TXT>Designation                      Function</TXT><BRK/>
<BRK/>
<ITM>A              Contractor's Commissioning Specialist</ITM><BRK/>
<ITM>M              Contractor's Mechanical Representative</ITM><BRK/>
<ITM>E              Contractor's Electrical Representative</ITM><BRK/>
<ITM>T              Contractor's Testing, Adjusting, and Balancing (TAB) Specialist</ITM><BRK/>
<ITM>C              Contractor's Controls Representative</ITM><BRK/>
<ITM>D              Design Agency Representative</ITM><BRK/>
<ITM>O              Contracting Officer's Representative</ITM><BRK/>
<ITM>U              Using Agency's Representative</ITM><BRK/>
<BRK/>
<TXT>Appendices A and B shall be completed by the commissioning team.  Acceptance by each commissioning team member 
of each Pre- Functional Performance Test Checklist item shall be indicated by initials and date unless an "X" 
is shown indicating that participation by that individual is not required.  Acceptance by each commissioning 
team member of each functional performance test item shall be indicated by signature and date.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   TESTS</TTL><BRK/>
<BRK/>
<TXT>Perform the pre-functional performance test checklists and functional performance tests in a manner that essentially 
duplicates the checking, testing, and inspection methods established in the related Sections.  Where checking, 
testing, and inspection methods are not specified in other Sections, establish methods which will provide the 
information required.  Testing and verification required by this section shall be performed during the Commissioning 
phase.  Requirements in related Sections are independent from the requirements of this Section and shall not 
be used to satisfy any of the requirements specified in this Section.  Provide all materials, services, and labor 
required to perform the pre- functional performance tests checks and functional performance tests.  A functional 
performance test shall be aborted if any system deficiency prevents the successful completion of the test or 
if any participating non-Government commissioning team member of which participation is specified is not present 
for the test.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   <TST><SUB>Pre-Functional Performance Test Checklists</SUB></TST></TTL><BRK/>
<BRK/>
<TXT>Perform Pre-Functional Performance Test Checklists for the items indicated in Appendix A.  Correct and re-inspect 
deficiencies discovered during these checks in accordance with the applicable contract requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   <TST><SUB>Functional Performance Tests</SUB></TST></TTL><BRK/>
<BRK/>
<TXT>Perform Functional Performance Tests for the items indicated in Appendix B.  Begin Functional Performance Tests 
only after all Pre-Functional Performance Test Checklists have been successfully completed.  Tests shall prove 
all modes of the sequences of operation, and shall verify all other relevant contract requirements.  Begin Tests 
with equipment or components and progress through subsystems to complete systems.  Upon failure of any Functional 
Performance Test item, correct all deficiencies in accordance with the applicable contract requirements.  The 
item shall then be retested until it has been completed with no errors.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   <SUB>COMMISSIONING REPORT</SUB></TTL><BRK/>
<BRK/>
<TXT>The Commissioning Report shall consist of completed Pre- Functional Performance Test Checklists and completed 
Functional Performance Tests organized by system and by subsystem and submitted as one package.  The Commissioning 
Report shall also include all HVAC systems test reports, inspection reports (Preparatory, Initial and Follow-up 
inspections), start-up reports, TAB report, TAB verification report, Controls start-up test reports and Controls 
Performance Verification Test (PVT) report. The results of failed tests shall be included along with a description 
of the corrective action taken.</TXT><BRK/>
<BRK/></SPT>
<BRK/>
<BRK/>
<PGE/><BRK/>
<TXT>APPENDIX A<BRK/>
<BRK/>
PRE-FUNCTIONAL PERFORMANCE TEST CHECKLISTS<BRK/></TXT>
<BRK/>
<PGE/><TXT>Pre-Functional Performance Test Checklist - Multizone Air Handling Unit<BRK/>
<BRK/>
For Air Handling Unit:  [_____]<BRK/>
<BRK/>
Checklist Item                                   A   M   E   T   C   O<BRK/>
<BRK/>
Installation<BRK/>
                    <BRK/>
a. Inspection and access doors are operable<BRK/>
    and sealed.                                 ___ ___  X  ___  X  ___ <BRK/>
<BRK/>
b. Condensate drainage is unobstructed.<BRK/>
   (Visually verify pan drains completely by<BRK/>
    pouring a cup of water into drain pan.)     ___ ___  X   X   X  ___ <BRK/>
   <BRK/>
c. Fan belt adjusted.                           ___ ___  X  ___  X  ___ <BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to unit disconnect.         ___  X  ___  X   X  ___ <BRK/>
<BRK/>
b.  Power available to unit control panel.      ___  X  ___  X   X  ___ <BRK/>
   <BRK/>
c.  Proper motor rotation verified.             ___  X  ___ ___  X  ___ <BRK/>
<BRK/>
d.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.       ___  X  ___  X   X  ___ <BRK/>
 <BRK/>
[e. Power available to electric heating coil.   ___  X  ___  X   X  ___ ]<BRK/>
<BRK/>
<BRK/>
Coils                                             A   M   E   T   C   O<BRK/>
<BRK/>
[a.  Chilled water piping properly connected.    ___ ___  X   X   X  ___ ]<BRK/>
   <BRK/>
[a.  Refrigerant piping properly connected.      ___ ___  X   X   X  ___ ]<BRK/>
      <BRK/>
[b.  Hot water piping properly connected.        ___ ___  X   X   X  ___ ]<BRK/>
<BRK/>
[b.  Steam and condensate piping properly<BRK/>
     connected.                                  ___ ___  X   X   X  ___ ]<BRK/>
<BRK/>
<BRK/>
Controls                                          A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves/actuators properly<BRK/>
    installed.                                   ___  X   X   X  ___ ___ <BRK/>
<BRK/>
b.  Control valves/actuators operable.           ___  X   X   X  ___ ___ <BRK/>
<BRK/>
c.  O/A dampers/actuators properly installed.    ___  X   X   X  ___ ___ <BRK/>
<BRK/>
d.  O/A dampers/actuators operable.              ___  X   X   X  ___ ___ </TXT><BRK/>
<BRK/>
<TXT>Pre-Functional Performance Test Checklist - Multizone Air Handling Unit (cont)                                 <BRK/>
<BRK/>
                                                 A   M   E   T   C   O<BRK/>
<BRK/>
e.  Zone dampers/actuators properly<BRK/>
    installed &amp; dampers leak checked.            ___  X   X   X  ___ ___ <BRK/>
<BRK/>
f.  Zone dampers/actuators operable.             ___  X   X   X  ___ ___ <BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)           A   M   E   T   C   O<BRK/>
<BRK/>
a.  Construction filters removed and<BRK/>
    replaced.                                    ___ ___  X  ___  X  ___ <BRK/>
<BRK/>
b.  TAB report approved.                             ___  X   X  ___  X <BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Variable Volume Air Handling Unit<BRK/>
<BRK/>
For Air Handling Unit:  [_____]<BRK/>
<BRK/>
Checklist Item                                   A   M   E   T   C   O<BRK/>
<BRK/>
Installation                      <BRK/>
<BRK/>
a.  Inspection and access doors are operable <BRK/>
and sealed.                                     ___ ___  X  ___  X  ___ <BRK/>
<BRK/>
b.  Condensate drainage is unobstructed.<BRK/>
    (Visually verify drainage by pouring a<BRK/>
    cup of water into drain pan.)               ___ ___  X   X   X  ___ <BRK/>
<BRK/>
c.  Fan belt adjusted.                          ___ ___  X  ___  X  ___ <BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O  <BRK/>
<BRK/>
a.  Power available to unit disconnect.         ___  X  ___  X   X  ___ <BRK/>
<BRK/>
b.  Power available to unit control panel.      ___  X  ___  X   X  ___ <BRK/>
<BRK/>
c.  Proper motor rotation verified.             ___  X  ___ ___  X  ___ <BRK/>
<BRK/>
d.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.       ___  X  ___  X   X  ___ <BRK/>
<BRK/>
[e. Power available to electric heating coil.   ___  X  ___  X   X  ___]<BRK/>
<BRK/>
<BRK/>
Coils                                            A   M   E   T   C   O <BRK/>
<BRK/>
[a.  Chilled water piping properly connected.   ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[a.  Refrigerant piping properly connected.     ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[b.  Hot water piping properly connected.       ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[b.  Steam and condensate piping properly<BRK/>
     connected.                                 ___ ___  X   X   X  ___]<BRK/>
<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Variable Volume Air Handling Unit<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O <BRK/>
<BRK/>
a.  Control valves/actuators properly<BRK/>
    installed.                                  ___  X   X   X  ___ ___<BRK/>
<BRK/>
b.  Control valves/actuators operable.          ___  X   X   X  ___ ___<BRK/>
<BRK/>
c.  Dampers/actuators properly installed.       ___  X   X   X  ___ ___<BRK/>
<BRK/>
d.  Dampers/actuators operable.                 ___  X   X   X  ___ ___<BRK/>
<BRK/>
e.  Verify proper location, installation and<BRK/>
    calibration of duct static pressure<BRK/>
    sensor.                                     ___  X   X   X  ___ ___<BRK/>
<BRK/>
f.  Fan air volume controller operable.         ___  X   X   X  ___ ___<BRK/>
<BRK/>
g.  Air handler controls system operational.    ___  X   X   X  ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)          A   M   E   T   C   O <BRK/>
<BRK/>
a.  Construction filters removed and<BRK/>
    replaced.                                   ___ ___  X  ___ ___ ___<BRK/>
   <BRK/>
b.  TAB report approved.                        ___  X   X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - VAV Terminal<BRK/>
<BRK/>
For VAV Terminal:  [_____]<BRK/>
<BRK/>
Checklist Item                                   A   M   E   T   C   O<BRK/>
                               <BRK/>
Installation                    <BRK/>
<BRK/>
[a.  Reheat coil connected to hot water pipe.   ___ ___  X  ___  X  ___]<BRK/>
<BRK/>
[b.  Electric reheat coil connected to local<BRK/>
     disconnect.                                ___  X  ___ ___  X  ___]<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O <BRK/>
<BRK/>
a.  Cooling only VAV terminal controls set.     ___  X   X   X  ___ ___<BRK/>
<BRK/>
b.  Cooling only VAV controls verified.         ___  X   X   X  ___ ___<BRK/>
<BRK/>
c.  Reheat VAV terminal controls set.           ___  X   X   X  ___ ___<BRK/>
<BRK/>
d.  Reheat terminal/coil controls verified.     ___  X   X   X  ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)         A   M   E   T   C   O <BRK/>
<BRK/>
a.  TAB report approved.                       ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - DX Air Cooled Condensing Unit<BRK/>
<BRK/>
For Condensing Unit:  [_____]<BRK/>
<BRK/>
Checklist Item                                  A    M   E   T   C   O<BRK/>
<BRK/>
Installation                    <BRK/>
<BRK/>
a.  Check condenser fans for proper rotation.   ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O <BRK/>
<BRK/>
a.  Power available to unit disconnect.         ___  X  ___  X   X  ___<BRK/>
<BRK/>
b.  Power available to unit control panel.      ___  X  ___  X  ___ ___<BRK/>
<BRK/>
c.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls        ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O <BRK/>
<BRK/>
a.  Unit safety/protection devices tested.      ___ ___  X   X  ___ ___<BRK/>
<BRK/>
b.  Control system and interlocks installed.    ___ ___  X   X  ___ ___<BRK/>
<BRK/>
c.  Control system and interlocks<BRK/>
 operational.                                   ___ ___  X   X  ___ ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Pumps<BRK/>
<BRK/>
For Pump:  [_____]<BRK/>
<BRK/>
Checklist Item                                   A   M   E   T   C   O<BRK/>
<BRK/>
Installation                   <BRK/>
<BRK/>
a.  Piping system installed.                    ___ ___  X   X   X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                        A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to pump disconnect.          ___  X  ___  X   X  ___<BRK/>
<BRK/>
b.  Pump rotation verified.                      ___  X  ___  X   X  ___<BRK/>
<BRK/>
c.  Control system interlocks functional.        ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)          A   M   E   T   C   O<BRK/>
<BRK/>
a.  Pressure/temperature gauges installed.      ___ ___  X  ___  X  ___<BRK/>
<BRK/>
b.  TAB Report approved.                        ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Packaged Air Cooled Chiller<BRK/>
<BRK/>
For Chiller:  [_____]<BRK/>
<BRK/>
Checklist Item                                    A   M   E   T   C   O<BRK/>
<BRK/>
Installation                                     <BRK/>
<BRK/>
a.  Chiller properly piped.                      ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Electrical                                        A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to unit disconnect.           ___  X  ___  X  ___ ___<BRK/>
<BRK/>
b.  Power available to unit control panel.        ___  X  ___  X  ___ ___<BRK/>
<BRK/>
c.  Separate power is supplied to electric<BRK/>
    heating tape.                                 ___  X  ___  X  ___ ___<BRK/>
<BRK/>
d.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.         ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Controls                                           A   M   E   T   C   O<BRK/>
<BRK/>
a.  Factory startup and checkout complete.        ___ ___  X   X  ___ ___<BRK/>
<BRK/>
b.  Chiller safety/protection devices tested.     ___ ___  X   X  ___ ___<BRK/>
<BRK/>
c.  Chilled water flow switch installed.          ___ ___  X   X  ___ ___<BRK/>
<BRK/>
d.  Chilled water flow switch tested.             ___ ___  X   X  ___ ___<BRK/>
<BRK/>
e.  Chilled water pump interlock installed.       ___ ___  X   X   X  ___<BRK/>
<BRK/>
f.  Chilled water pump interlock tested.          ___ ___ ___  X  <BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Centrifugal Chiller<BRK/>
<BRK/>
For Chiller:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                       A   M   E   T   C   O <BRK/>
<BRK/>
a.  Chilled water connections properly piped.     ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Condenser water connections properly          ___ ___  X  ___ ___ ___<BRK/>
    piped<BRK/>
<BRK/>
c.  Refrigerant leak detector installed.          ___ ___ ___ ___ ___ ___<BRK/>
<BRK/>
[d.  Oxygen sensor installed and tested.          ___ ___ ___ ___ ___ ___]<BRK/>
<BRK/>
e.  Mechanical room ventilation installed as<BRK/>
    specified.                                     ___ ___ ___ ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Electrical                                         A   M   E   T   C   O <BRK/>
<BRK/>
a.  Power available to unit starter.              ___  X  ___  X  ___ ___<BRK/>
<BRK/>
b.  Power available to unit control panel.        ___  X  ___  X  ___ ___<BRK/>
<BRK/>
c.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.         ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Controls                                           A   M   E   T   C   O <BRK/>
<BRK/>
a.  Factory startup and checkout complete.        ___ ___  X   X  ___ ___<BRK/>
<BRK/>
b.  Chiller safety/protection devices tested.     ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Chilled water flow switch installed and<BRK/>
    tested.                                        ___ ___  X   X  ___ ___<BRK/>
<BRK/>
e.  Chilled water pump interlock installed <BRK/>
    and tested.                                    ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
g.  Condenser water flow switch installed<BRK/>
    and tested.                                    ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
i.  Condenser water pump interlock installed <BRK/>
    and tested.                                    ___ ___ ___  X  ___ ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Cooling Tower<BRK/>
<BRK/>
For Cooling Tower:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                  A   M   E   T   C   O <BRK/>
<BRK/>
a.  Cooling tower properly piped.            ___ ___  X   X  ___ ___<BRK/>
<BRK/>
b.  Cooling tower fan drive adjusted.        ___ ___ ___ ___  X  ___<BRK/>
<BRK/>
c.  Cooling tower makeup water supply piped. ___ ___  X   X  ___ ___<BRK/>
<BRK/>
d.  Verify makeup control valve shutoff.     ___ ___  X  ___  X  ___<BRK/>
<BRK/>
e.  Fan lubricated and blade pitch adjusted. ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                    A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to tower disconnect.     ___  X  ___  X  ___ ___<BRK/>
<BRK/>
b.  Power available to electric sump heater. ___  X  ___  X  ___ ___<BRK/>
<BRK/>
c.  Control system interlocks functional.    ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
d.  Motor and fan rotation checked.          ___  X  ___  X  ___ ___<BRK/>
<BRK/>
e.  Verify that power disconnect is located<BRK/>
    within sight of the unit is controls.    ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Piping                                        A   M   E   T   C   O<BRK/>
<BRK/>
a.  Condenser water treatment functional.    ___ ___  X   X   X  ___<BRK/>
<BRK/>
b.  All required temperature sensing wells,<BRK/>
    pressure ports and flow sensors have<BRK/>
    been installed for performance tests.      ___ ___ ___ ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)        A   M   E   T   C   O <BRK/>
<BRK/>
a.  TAB report approved.                      ___ ___  X  ___  X  _____ <BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Hot Water Boiler<BRK/>
<BRK/>
For Boiler:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                      A   M   E   T   C   O <BRK/>
<BRK/>
a.  Boiler hot water piping installed.           ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Boiler makeup water piping installed.        ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
c.  Boiler fuel oil piping installed.            ___ ___  X   X   X  ___<BRK/>
<BRK/>
d.  Boiler gas piping installed.                 ___ ___  X   X   X  ___<BRK/>
<BRK/>
<BRK/>
Startup                                           A   M   E   T   C   O<BRK/>
<BRK/>
a.  Boiler safety/protection devices,<BRK/>
    including high temperature burner shut-off,<BRK/>
    low water cutoff, flame failure, pre- and<BRK/>
    post-purge, have been tested.                 ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Verify that PRV rating conforms to boiler<BRK/>
    rating.                                       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Boiler water treatment system functional.     ___ ___  X   X  ___ ___<BRK/>
<BRK/>
d.  Boiler startup and checkout complete.         ___ ___  X   X  ___ ___<BRK/>
<BRK/>
e.  Combustion efficiency demonstrated.           ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                         A   M   E   T   C   O<BRK/>
<BRK/>
a.  Verify that power disconnect is located<BRK/>
    within sight of the unit served.              ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Controls                                           A   M   E   T   C   O<BRK/>
<BRK/>
a.  Hot water pump interlock installed <BRK/>
    and tested.                                   ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Hot water proof-of-flow switch<BRK/>
    installed and tested                          ___ ___  X   X  ___ ___<BRK/>
<BRK/>
c.  Hot water heating controls operational.       ___ ___  X   X  ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)            A   M   E   T   C   O <BRK/>
<BRK/>
a.  TAB report approved.                          ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Steam Boiler<BRK/>
<BRK/>
For Boiler:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
a.  Boiler steam piping installed.              ___ ___  X   X   X  ___<BRK/>
<BRK/>
b.  Boiler makeup water piping installed.       ___ ___  X  ___  X  ___<BRK/>
<BRK/>
c.  Boiler fuel oil piping installed.           ___ ___  X   X   X  ___<BRK/>
<BRK/>
d.  Boiler gas piping installed.                ___ ___  X   X   X  ___<BRK/>
<BRK/>
<BRK/>
Startup                                          A   M   E   T   C   O<BRK/>
<BRK/>
a.  Boiler safety/protection devices,<BRK/>
    including high temperature burner shut-<BRK/>
    off, low water cutoff, flame failure,<BRK/>
    pre and post purge, have been tested.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Verify that PRV rating conforms to boiler<BRK/>
    rating.                                     ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Boiler feed water system operational.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
d.  Boiler water treatment system functional.   ___ ___  X   X   X  ___<BRK/>
<BRK/>
e.  Boiler startup and checkout complete.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
f.  All steam traps operational.                ___ ___  X   X   X  ___<BRK/>
<BRK/>
g.  All condensate return pumps operational.    ___ ___ ___ ___  X  ___<BRK/>
<BRK/>
h.  Combustion efficiency demonstrated.         ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O<BRK/>
<BRK/>
a.  Verify that power disconnect is located<BRK/>
    within sight of the unit served.            ___  X  ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)          A   M   E   T   C   O <BRK/>
<BRK/>
a.  TAB report approved.                        ___ ___  X  ___  X  ___<BRK/></TXT>
 <BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Steam/Hot Water Converter<BRK/>
<BRK/>
For Converter:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
a.  Converter steam piping installed.           ___ ___  X  ___  X  ___<BRK/>
<BRK/>
b.  Hot water piping installed.                 ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
c.  Makeup water piping installed.              ___ ___  X   X   X  ___<BRK/>
<BRK/>
d.  Vacuum breaker installed on shell of<BRK/>
    shell and tube unit.                        ___ ___  X   X   X  ___<BRK/>
<BRK/>
<BRK/>
Startup                                          A   M   E   T   C   O<BRK/>
<BRK/>
a.  All steam traps operational.                ___ ___  X   X   X  ___<BRK/>
<BRK/>
b.  All condensate return pumps operational.    ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Converter safety/protection devices<BRK/>
    tested.                                     ___ ___  X   X   X  ___<BRK/>
<BRK/>
d.  Converter startup and checkout complete.    ___ ___  X   X   X  ___<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves/actuators properly<BRK/>
    installed.                                  ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Control valves/actuators operable.          ___ ___  X  ___ ___ ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Fan Coil Unit<BRK/>
<BRK/>
For Fan Coil Unit:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
a.  Access doors/removable panels are operable<BRK/>
    and sealed.                                 ___ ___  X  ___  X  ___<BRK/>
<BRK/>
b.  Condensate drainage is unobstructed.        ___ ___  X   X   X  ___<BRK/>
<BRK/>
c.  Fan belt adjusted.                          ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to unit disconnect.         ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Power available to unit control panel.      ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Proper motor rotation verified.             ___ ___ ___ ___  X  ___<BRK/>
<BRK/>
d.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
[e.  Power available to electric heating<BRK/>
     coil.                                      ___ ___ ___  X   X  ___]<BRK/>
<BRK/>
<BRK/>
Coils                                            A   M   E   T   C   O<BRK/>
<BRK/>
[a.  Dual temperature piping properly<BRK/>
     connected.                                 ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
[b.  Chilled water piping properly connected.   ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[c.  Hot water piping properly connected.       ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves/actuators properly<BRK/>
    installed.                                  ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Control valves/actuators operable.          ___ ___  X   X  ___ ___<BRK/>
<BRK/>
c.  Verify proper location and installation<BRK/>
    of thermostat.                              ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)          A   M   E   T   C   O<BRK/>
<BRK/>
a.  TAB Report approved.                        ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Unit Heater<BRK/>
<BRK/>
For Unit Heater:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
[a.  Hot water piping properly connected.       ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
[a.  Steam and condensate piping properly<BRK/>
     connected.                                ___ ___  X   X   X  ___]<BRK/>
<BRK/>
<BRK/>
Electrical                                      A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to unit disconnect.        ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Proper motor rotation verified.            ___ ___ ___  X   X  ___<BRK/>
<BRK/>
c.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.      ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
d.  Power available to electric heating coil.  ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Controls                                        A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves properly installed.          ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Control valves operable.                    ___ ___  X   X  ___ ___<BRK/>
<BRK/>
c.  Verify proper location and installation of<BRK/>
    thermostat.                                 ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)          A   M   E   T   C   O<BRK/>
<BRK/>
a.  TAB Report approved.                        ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Exhaust Fan<BRK/>
<BRK/>
For Exhaust Fan:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
a.  Fan belt adjusted.                          ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to fan disconnect.          ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Proper motor rotation verified.             ___ ___ ___ ___  X  ___<BRK/>
<BRK/>
c.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control interlocks properly installed.      ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  Control interlocks operable.                ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Dampers/actuators properly installed.       ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
d.  Dampers/actuators operable.                 ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
e.  Verify proper location and installation of<BRK/>
    thermostat.                                 ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)         A   M   E   T   C   O<BRK/>
<BRK/>
a.  TAB Report approved.                        ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Computer Room Unit<BRK/>
<BRK/>
For Computer Room Unit:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
a.  Access doors are operable and sealed.       ___ ___  X  ___  X  ___<BRK/>
<BRK/>
b.  Condensate drainage is unobstructed and<BRK/>
    routed to floor drain.                      ___ ___  X   X   X  ___<BRK/>
<BRK/>
c.  Fan belt adjusted.                          ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                       A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to unit disconnect.         ___  X  ___  X   X  ___<BRK/>
<BRK/>
b.  Proper motor rotation verified.             ___  X  ___ ___  X  ___<BRK/>
<BRK/>
c.  Proper motor rotation verified.             ___  X  ___ ___  X  ___<BRK/>
<BRK/>
d.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.       ___  X  ___  X  ___ ___<BRK/>
<BRK/>
[e.  Power available to reheat coils.           ___  X  ___ ___  X  ___]<BRK/>
<BRK/>
<BRK/>
Coils/Humidifier                                 A   M   E   T   C   O<BRK/>
<BRK/>
[a.  Chilled water piping properly connected.   ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
[a.  Refrigerant piping properly connected.     ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[b.  Hot water piping properly connected.       ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
[b.  Steam piping properly connected.           ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[c.  Humidifier makeup water connected.         ___ ___  X   X   X  ___]<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves operable.                    ___ ___  X   X  ___ ___<BRK/>
<BRK/>
b.  Unit control system operable and<BRK/>
    verified.                                   ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Verify proper location and installation of <BRK/>
    thermostat.                                 ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)           A   M   E   T   C   O<BRK/>
<BRK/>
a.  TAB Report submitted.                        ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - HVAC System Controls<BRK/>
<BRK/>
For HVAC System:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O  <BRK/>
<BRK/>
a.  Layout of control panel matches drawings.   ___ ___  X   X  ___ ___<BRK/>
<BRK/>
b.  Framed instructions mounted in or near<BRK/>
    control panel.                              ___ ___  X   X  ___ ___<BRK/>
<BRK/>
c.  Components properly labeled (on inside and<BRK/>
    outside of panel).                          ___ ___  X   X  ___ ___<BRK/>
<BRK/>
d.  Control components piped and/or wired to<BRK/>
    each labeled terminal strip.                ___ ___  X   X  ___ ___<BRK/>
<BRK/>
e.  EMCS connection made to each labeled<BRK/>
    terminal strip as shown.                    ___ ___  X   X  ___ ___<BRK/>
<BRK/>
f.  Control wiring and tubing labeled at all<BRK/>
    terminations, splices, and junctions.       ___ ___  X   X  ___ ___<BRK/>
<BRK/>
<BRK/>
Main Power and Control Air<BRK/>
<BRK/>
a.  120 volt AC power available to panel.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
b.  <MET>138 kPa gauge</MET><ENG>20 psig</ENG> <BRK/>
    compressed air available to panel.          ___ ___  X   X  ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)           A   M   E   T   C   O<BRK/>
<BRK/>
a.  TAB Report submitted.                        ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Single Zone Air Handling Unit<BRK/>
<BRK/>
For Air Handling Unit:  [_____]<BRK/>
<BRK/>
Checklist Item                                <BRK/>
<BRK/>
Installation                                      A   M   E   T   C   O <BRK/>
<BRK/>
a.  Inspection and access doors are operable<BRK/>
    and sealed.                                  ___ ___  X  ___  X  ___<BRK/>
<BRK/>
b.  Condensate drainage is unobstructed.         ___ ___  X   X   X  ___<BRK/>
<BRK/>
c.  Fan belt adjusted.                           ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Electrical                                        A   M   E   T   C   O<BRK/>
<BRK/>
a.  Power available to unit disconnect.          ___ ___ ___  X   X  ___<BRK/>
<BRK/>
b.  Power available to unit control panel.       ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
c.  Proper motor rotation verified.              ___ ___ ___ ___  X  ___ <BRK/>
<BRK/>
d.  Verify that power disconnect is located<BRK/>
    within sight of the unit it controls.        ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
e.  Power available to electric heating coil.    ___ ___ ___  X  ___ ___<BRK/>
<BRK/>
<BRK/>
Coils                                             A   M   E   T   C   O<BRK/>
<BRK/>
[a.  Chilled water piping properly connected.    ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
[a.  Refrigerant piping properly connected.      ___ ___  X   X   X  ___]<BRK/>
<BRK/>
[c.  Hot water piping properly connected.        ___ ___  X  ___ ___ ___]<BRK/>
<BRK/>
[c.  Steam and condensate piping properly<BRK/>
     connected.                                  ___ ___  X   X   X  ___]<BRK/>
<BRK/>
<BRK/>
Controls                                          A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves/actuators properly<BRK/>
    installed.                                   ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Control valves/actuators operable.           ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
c.  Dampers/actuators properly installed.        ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
d.  Dampers/actuators operable.                  ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
e.  Verify proper location and installation<BRK/>
    of thermostat.                               ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
<BRK/>
Testing, Adjusting, and Balancing (TAB)           A   M   E   T   C   O<BRK/>
<BRK/>
a.  TAB Report approved.                         ___ ___  X  ___  X  ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Pre-Functional Performance Test Checklist - Energy Recovery System<BRK/>
<BRK/>
For Energy Recovery System:  [_____]<BRK/>
<BRK/>
Checklist Item                                 <BRK/>
<BRK/>
Installation                                     A   M   E   T   C   O <BRK/>
<BRK/>
a.  Recovery system piping installed.            ___ ___  X  ___  X  ___<BRK/>
<BRK/>
<BRK/>
Startup                                          A   M   E   T   C   O<BRK/>
<BRK/>
a.  Startup and checkout complete.              ___ ___  X   X   X  ___<BRK/>
<BRK/>
<BRK/>
Controls                                         A   M   E   T   C   O<BRK/>
<BRK/>
a.  Control valves/actuators properly<BRK/>
    installed.                                   ___ ___  X  ___ ___ ___<BRK/>
<BRK/>
b.  Control valves/actuators operable.           ___ ___  X  ___ ___ ___<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>- End of Appendix A -</TXT> <BRK/>
<PGE/><BRK/>
<TXT>APPENDIX B<BRK/>
<BRK/>
FUNCTIONAL PERFORMANCE TESTS CHECKLISTS<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL3><HL1>Functional Performance Test - Pump [_____]</HL1></HL3><BRK/>
<BRK/>
  NOTE:  Prior to performing this test, for closed loop systems ensure that the system is pressurized and the 
make-up water system is operational, or for open loop systems ensure that the sumps are filled to the proper level.<BRK/>
<BRK/>
1.   Activate pump start using control system commands.<BRK/>
<BRK/>
   a. Verify correct operation in:<BRK/>
<BRK/>
<BRK/>
HAND__________   OFF__________   AUTO__________<BRK/>
<BRK/>
<BRK/>
b. Verify pressure drop across strainer:<BRK/>
<BRK/>
Strainer inlet pressure __________  <MET>kPa gauge</MET><ENG>psig</ENG><BRK/>
<BRK/>
Strainer outlet pressure _________  <MET>kPa gauge</MET><ENG>psig</ENG><BRK/>
<BRK/>
<BRK/>
c. Verify pump inlet/outlet pressure reading, compare to Testing,    Adjusting, and Balancing (TAB) Report and 
pump design conditions.<BRK/>
<BRK/>
                                       DESIGN        TAB         ACTUAL   <BRK/>
<BRK/>
Pump inlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>      _________   __________   __________<BRK/>
<BRK/>
Pump outlet pressure <MET>kPa gauge</MET><ENG>psig</ENG> _________   __________   __________<BRK/>
<BRK/>
<BRK/>
d. Operate pump at shutoff and at 100 percent of designed flow when all    components are in full flow.  Plot 
test readings on pump curve and    compare results against readings taken from flow measuring devices.<BRK/>
<BRK/>
                                         SHUTOFF     100 percent<BRK/>
<BRK/>
Pump inlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>       __________   __________<BRK/>
<BRK/>
Pump outlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>      __________   __________<BRK/>
<BRK/>
Pump flow rate <MET>L/s</MET><ENG>gpm</ENG>                   __________   __________<BRK/>
<BRK/>
<BRK/>
                                         SETPOINT<BRK/>
Differential Pressure Transmitter        ________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test (cont) -  Pump [_____]</HL3></HL1> <BRK/>
<BRK/>
<BRK/>
e. For variable speed pumps, operate pump at shutoff (shutoff to be done in manual on var1able speed drive at 
the minimum rpm that the system is being controlled at) and at minimum flow or when all components are in full 
by-pass.  Plot test readings on pump curve and compare results against readings taken from flow measuring devices.<BRK/>
<BRK/>
                                         SHUTOFF     100 percent<BRK/>
  Pump inlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>      __________   __________<BRK/>
<BRK/>
  Pump outlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>     __________   __________<BRK/>
<BRK/>
  Pump flow rate <MET>L/s</MET><ENG>gpm</ENG>                  __________   __________<BRK/>
<BRK/>
                                         SETPOINT<BRK/>
  Differential Pressure Transmitter      ________<BRK/>
<BRK/>
<BRK/>
2.   Measure motor amperage each phase and voltage phase to phase and phase to ground for both the full flow 
and the minimum flow conditions.  Compare amperage to nameplate FLA<BRK/>
<BRK/>
a.    Full flow:<BRK/>
<BRK/>
  Nameplate FLA     __________<BRK/>
<BRK/>
  Amperage  Phase 1 __________    Phase 2__________     Phase 3__________<BRK/>
<BRK/>
  Voltage   Ph1-Ph2 __________    Ph1-Ph3__________     Ph2-Ph3__________<BRK/>
                <BRK/>
  Voltage   Ph1-gnd __________    Ph2-gnd__________      Ph3-gnd__________<BRK/>
<BRK/>
<BRK/>
     b. Minimum flow:<BRK/>
<BRK/>
  Amperage  Phase 1 __________    Phase 2__________     Phase 3__________<BRK/>
<BRK/>
  Voltage   Ph1-Ph2 __________    Ph1-Ph3__________     Ph2-Ph3__________ <BRK/>
               <BRK/>
  Voltage   Ph1-gnd __________    Ph2-gnd__________      Ph3-gnd__________<BRK/>
<BRK/>
<BRK/>
3.   Note unusual vibration, noise, etc.<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test (cont) - Pump [_____]</HL3></HL1><BRK/>
<BRK/>
<BRK/>
4.   Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test - Centrifugal Chiller  [_____]</HL3></HL1><BRK/>
<BRK/>
Note: If water-cooled chiller perform in conjunction with Cooling Tower test.<BRK/>
<BRK/>
1.      Demonstrate operation of chilled water system in accordance with specifications including the following:  
Start building air handler to provide load for chiller.  Activate controls system chiller start sequence as follows:<BRK/>
<BRK/>
      a.  Time of day startup program initiates chiller start: ____________<BRK/>
<BRK/>
      b.  Start condenser water pump and establish condenser water flow.  Verify chiller condenser water proof-of-flow 
switch operation._____<BRK/>
<BRK/>
      c.  Start chilled water pump and establish chilled water flow.  Verify chiller chilled water proof-of-flow 
switch operation.  ____________<BRK/>
<BRK/>
      d.  Verify control system energizes chiller start sequence.__________<BRK/>
<BRK/>
      e.  Verify chiller senses chilled water temperature above set point and control system activates chiller 
start.   _________________________<BRK/>
<BRK/>
      f.   Verify functioning of "soft start" sequence.  __________________<BRK/>
<BRK/>
      g. Record data in 2, 3 and 4 below on fully load chiller.<BRK/>
<BRK/>
      h.  Shut off air handling equipment to remove load on chilled water  system.  Verify chiller shutdown sequence 
is initiated and                  accomplished after load is removed.   _____________________________<BRK/>
<BRK/>
      i.   Restart air-handling equipment one minute after chiller shut down.  Verify condenser water pump, cooling 
tower, and chiller restart sequence. _________________________________________________________<BRK/>
<BRK/>
<BRK/>
2.   Verify chiller inlet/outlet pressure and flow reading, compare to Testing, Adjusting, and Balancing (TAB) 
Report, chiller design conditions, and    chiller manufacturer's performance data.<BRK/>
<BRK/>
                                           DESIGN      TAB REPORT   ACTUAL<BRK/>
<BRK/>
Chiller inlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>     __________  ____________________<BRK/>
<BRK/>
Chiller outlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>    __________  ____________________<BRK/>
<BRK/>
Chiller flow               <MET>L/sec</MET><ENG>GPM</ENG>      __________  __________  __________<BRK/>
<BRK/>
<BRK/>
3.   Measure chiller amperage each phase and voltage phase to phase and phase to ground for both the fully loaded condition.                <BRK/>
                                                             Motor F/L AMPS<BRK/>
 Amperage  Phase 1 __________  Phase 2__________  Phase 3_______  _________<BRK/>
<BRK/>
  Voltage  Ph1-Ph2 __________  Ph1-Ph3__________  Ph2-Ph3_______<BRK/>
<BRK/>
  Voltage  Ph1-gnd __________  Ph2-gnd__________  Ph3-gnd_______<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test (cont) - Centrifugal Chiller  [_____]</HL3></HL1><BRK/>
<BRK/>
<BRK/>
4.     a. Record the following information:                      Design<BRK/>
<BRK/>
       Ambient dry bulb temperature ___________ deg <MET>C</MET><ENG>F</ENG>          __________<BRK/>
       Entering chilled water temperature _____ deg <MET>C</MET><ENG>F</ENG>          __________<BRK/>
       Leaving chilled water temperature ______ deg <MET>C</MET><ENG>F</ENG>          __________<BRK/>
<BRK/>
<BRK/>
b. Calculate chiller load at ambient conditions and compare to chiller rated capacity from manufacturer's literature.  
Calculated ________ <MET>KWs</MET><ENG>Ton</ENG> Rated ________ <MET>KWs</MET><ENG>Ton</ENG>.<BRK/>
<BRK/>
<BRK/>
5.   Unusual vibration, noise, etc.<BRK/>
   _______________________________________________________________________<BRK/>
<BRK/>
   _______________________________________________________________________<BRK/>
<BRK/>
<BRK/>
6.   Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test - Cooling Tower   [_____]</HL3></HL1><BRK/>
<BRK/>
1.   Demonstrate operation of the cooling tower in accordance with specification and the following:<BRK/>
<BRK/>
      a.  Activate cooling tower fan start using control system command.  This should first start condenser water 
pump, establish flow, delay fan start, as specified, to equalize flow in distribution basin and sump.  Verify 
fan start after timed delay._____________________________________<BRK/>
<BRK/>
      b.  After chiller startup, control system should modulate bypass valve and two-speed fan motor to maintain 
condenser water set point.  Verify function of bypass valve under varying loads. __________________<BRK/>
<BRK/>
      c.  Verify cooling tower interlock with chiller._____________________<BRK/>
<BRK/>
d.   Verify makeup water float valve is functioning. ___________________<BRK/>
<BRK/>
e.   Activate chemical treatment feed valve, verify makeup of chemical treatment system, pump, and controls.______________________________ <BRK/>
<BRK/>
f.  Record the following: <BRK/>
<BRK/>
      Entering water temperature     _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Leaving water temperature:     _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Measured water flow:           _____ <MET>L/s</MET><ENG>gpm</ENG><BRK/>
      Entering air wet bulb temperature: _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
2.   Compare results with test results from cooling tower specification test.<BRK/>
<BRK/>
3.<BRK/>
      a.   Stop all building cooling equipment so that cooling tower pumps stop. Observe tower for at least 15 
minutes and verify no overflow          occurs___________.<BRK/>
      b.   Start cooling tower pumps in hand and observe pumps for air binding/cavitation , none allowed __________.<BRK/>
<BRK/>
4.Certification:  We the undersigned have witnessed the above functional performance tests and certify that the 
item tested has met the performance requirements in this section of the specifications.<BRK/>
                                                     Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - VAV Terminals</HL3></HL1><BRK/>
<BRK/>
The Contracting officer will select VAV terminals to be spot-checked during the functional performance test.  
The number of terminals selected shall not exceed 10 percent.<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of selected VAV boxes in accordance 
with specifications including the following:<BRK/>
<BRK/>
<BRK/>
      a.  Cooling only VAV boxes:<BRK/>
<BRK/>
(1)   Verify VAV box response to room temperature set point adjustment.  Turn thermostat to <MET>3 degrees C</MET><ENG>5 degrees 
F</ENG> below ambient and measure maximum airflow.  Turn thermostat to <MET>3 degrees C</MET><ENG>5 degrees F</ENG> above ambient and measure 
minimum airflow.<BRK/>
                          Setting    Measured   Design<BRK/>
      Maximum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
      Minimum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
<BRK/>
<BRK/>
     b.  Cooling with reheat VAV boxes:<BRK/>
<BRK/>
(1)   Verify VAV box response to room temperature set point adjustment.  Turn thermostat to <MET>3 degrees C</MET><ENG>5 degrees 
F</ENG> above ambient and measure maximum airflow.  Turn thermostat to <MET>3 degrees C</MET><ENG>5 degrees F</ENG> below ambient and measure 
minimum airflow.<BRK/>
<BRK/>
                          Setting    Measured   Design<BRK/>
      Maximum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
      Minimum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
<BRK/>
(2) Verify reheat coil operation range (full closed to full open) by turning room thermostat <MET>3 degrees C</MET><ENG>5 degrees 
F</ENG> above ambient _______. <BRK/>
<BRK/>
   With heating water system and boiler in operation providing design supply hot water temperature record the following:<BRK/>
<BRK/>
      Design HW supply temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Actual HW supply temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      AHU supply air temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      VAV supply air temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Calculate coil capacity and compare to design:<BRK/>
                        Design ______ <MET>W</MET><ENG>BTU/hr</ENG> Actual _____<MET>W</MET><ENG>BTU/hr</ENG><BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont)- VAV Terminals</HL3></HL1><BRK/>
<BRK/>
     c. Parallel Fan powered VAV boxes:<BRK/>
<BRK/>
          (1) Verify VAV box responses to call for heating via set point adjustment.  Change from cooling set 
point to heating set point.  Verify cooling damper closes to minimum position, blower fan energizes according 
to sequence of operation, and upon further drop in space temperature, heating coil activation.  __________<BRK/>
<BRK/>
With heating water system in operation providing design supply hot water temperature record the following:<BRK/>
<BRK/>
      Design HW supply temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Actual HW supply temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      AHU supply air temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      VAV supply air temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Calculate coil capacity and compare to design:<BRK/>
                        Design ______ <MET>W</MET><ENG>BTU/hr</ENG> Actual _____<MET>W</MET><ENG>BTU/hr</ENG><BRK/>
<BRK/>
          (2) Check primary air damper maximum/minimum flow settings and compare to actual measured flows.<BRK/>
<BRK/>
                         Setting    Measured   Design<BRK/>
     Maximum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
     Minimum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
<BRK/>
          (3) Check blower fan flow. [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
<BRK/>
          (4) Verify free operation of fan backdraft damper (insure no primary air is being discharged into plenum space).<BRK/>
 _____________________________________________________________________________<BRK/>
<BRK/>
<BRK/>
   d.  Series Fan Powered VAV boxes<BRK/>
<BRK/>
(1) Ensure VAV fan starts prior to AHU fan<BRK/>
<BRK/>
(2) Verify VAV box response to sensor call for heating via set point adjustment.  Change from cooling set point 
to heating set point.  Verify cooling damper closes to minimum position and upon further drop in space temperature, 
heating coil activation. With heating water system and boiler in operation providing design supply hot water 
temperature record the following:<BRK/>
<BRK/>
      Design HW supply temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Actual HW supply temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      AHU supply air temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      VAV supply air temperature______ deg <MET>C</MET><ENG>F</ENG><BRK/>
      Calculate coil capacity and compare to design:<BRK/>
               Design ______ <MET>W</MET><ENG>BTU/hr</ENG> Actual _____<MET>W</MET><ENG>BTU/hr</ENG><BRK/>
<BRK/>
(3) Check primary air damper maximum/minimum flow settings and compare to actual measured flows.<BRK/>
<BRK/>
                         Setting    Measured   Design<BRK/>
     Maximum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/>
     Minimum flow        [______]   [_____]    [_____] <MET>L/s</MET><ENG>cfm</ENG><BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont)- VAV Terminals</HL3></HL1><BRK/>
<BRK/>
<BRK/>
(4) Verify that minimal primary air is discharging into the plenum space when in full cooling mode.<BRK/>
<BRK/>
(5) Verify that no plenum air is being induced from the plenum space into the supply air during full cooling 
by measuring supply air temperature and comparing to primary air temperature<BRK/>
<BRK/>
   Primary air temp  _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
   Supply air temp   _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
<BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                    Signature and Date <BRK/>
Contractor's Commissioning Specialist        ___________________________<BRK/>
                                       <BRK/>
Contractor's Mechanical Representative       _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative       _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative              _____________________________<BRK/>
                                           <BRK/>
Contractor's Controls Representative         _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative         _____________________________<BRK/>
<BRK/>
Design Agency Representative                 _____________________________<BRK/>
<BRK/>
Using Agency's Representative                _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Variable Volume Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
For Air Handling Unit:  [_____]<BRK/>
<BRK/>
<BRK/>
1.   Functional Performance Test:  Contractor shall verify operation of air handling unit in accordance with 
specification including the following:<BRK/>
<BRK/>
     a. Ensure that a slight negative pressure exists on inboard side of the outside air dampers throughout the 
operation of the dampers.  Modulate OA, RA, and EA dampers from fully open to fully closed positions__________.<BRK/>
<BRK/>
      b.  The following shall be verified [supply fan operating][supply and return fans operating] mode is initiated:<BRK/>
<BRK/>
          (1) All dampers in normal position prior to fan start___________.<BRK/>
<BRK/>
          (2) All valves in normal position prior to fan start____________.<BRK/>
<BRK/>
          (3) System safeties allow start if safety conditions are met.____<BRK/>
<BRK/>
          (4) VAV fan controller shall "soft-start" fan. __________________<BRK/>
<BRK/>
          (5) Modulate all VAV boxes to minimum air flow and verify that the static pressure does not exceed 
the high static pressure shutdown setpoint_____________.<BRK/>
<BRK/>
          (6) Return all VAV boxes to auto _______________.<BRK/>
<BRK/>
      c.  Occupied mode of operation - economizer de-energized.<BRK/>
<BRK/>
          (1) Outside air damper at minimum position. _____________________<BRK/>
<BRK/>
          (2) Return air damper open. _____________________________________<BRK/>
<BRK/>
          (3) Relief air damper [at minimum position] [closed]. ___________<BRK/>
<BRK/>
          (4) Chilled water control valve modulating to maintain leaving air temperature set point.  Setpoint 
_______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
          (5) Fan VAV controller receiving signal from duct static pressure sensor and modulating fan to maintain 
supply duct static pressure set point. <BRK/>
Setpoint _______<MET>kpa</MET><ENG>inches-wg</ENG> Actual _____<MET>kpa</MET><ENG>inches-wg</ENG><BRK/>
<BRK/>
      d.  Occupied mode of operation - economizer energized.<BRK/>
<BRK/>
          (1) Outside air damper modulated to maintain mixed air temperature set point.  Setpoint _______deg <MET>
C</MET><ENG>F</ENG>, Actual _____deg <MET>C</MET><ENG>F</ENG>, Outside air damper position ________%.<BRK/>
<BRK/>
          (2) Relief air damper modulates with outside air damper according to sequence of operation.  Relief 
air damper position_____________%.<BRK/>
<BRK/>
          (3) Chilled water control valve modulating to maintain leaving air temperature set point. Setpoint 
_______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
          (4) Hot water control valve modulating to maintain leaving air temperature set point. Setpoint _______deg <MET>
C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG><BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Variable Volume Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
          (5) Fan VAV controller receives signal from duct static pressure sensor and modulates fan to maintain 
supply duct static pressure set point.  Setpoint <MET>kpa</MET><ENG>inches-wg</ENG>________________ Actual <MET>kpa</MET><ENG>inches-wg</ENG>___________<BRK/>
<BRK/>
e. Unoccupied mode of operation<BRK/>
<BRK/>
(1)   Observe fan starts when space temperature calls for heating and/or cooling. _________ Note: This does not 
apply to series boxes. <BRK/>
(2)   All dampers in normal position.  _____________________________<BRK/>
(3)   Verify space temperature is maintained as specified in sequence of operation. _______________<BRK/>
<BRK/>
      f.  The following shall be verified when the [supply fan off][supply and return fans off] mode is initiated:<BRK/>
<BRK/>
          (1) All dampers in normal position. _____________________________<BRK/>
<BRK/>
          (2) All valves in normal position. ______________________________<BRK/>
<BRK/>
          (3) Fan de-energizes. ___________________________________________<BRK/>
<BRK/>
      g.  Verify the chilled water coil control valve operation by setting all VAV's to maximum and minimum cooling.<BRK/>
<BRK/>
           Max Cooling<BRK/>
                                                    <BRK/>
Supply air temp.  _____ deg <MET>C</MET><ENG>F</ENG> Verify cooling valve operation_______.     <BRK/>
<BRK/>
            Min cooling<BRK/>
<BRK/>
Supply air temp.  _____ deg <MET>C</MET><ENG>F</ENG> Verify cooling valve operation_______.<BRK/>
<BRK/>
      h.   Verify safety shut down initiated by low temperature protection thermostat. _________<BRK/>
<BRK/>
      i.   Verify occupancy schedule is programmed into time clock/UMCS________.<BRK/>
<BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Single Zone Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
For Air Handling Unit:  [_____]<BRK/>
<BRK/>
1.   Functional Performance Test:  Contractor shall verify operation of air handling unit in accordance with 
specification including the following:<BRK/>
<BRK/>
a.   Ensure that a slight negative pressure exists on inboard side of the outside air dampers throughout the 
operation of the dampers.  Modulate OA, RA, and EA dampers from fully open to fully closed positions.<BRK/>
<BRK/>
<BRK/>
      a.  The following shall be verified when the [supply fan operating] [supply and return fans operating] 
mode is initiated:<BRK/>
<BRK/>
          (1) All dampers in normal position prior to fan start___________.<BRK/>
<BRK/>
          (2) All valves in normal position prior to fan start____________.<BRK/>
<BRK/>
          (3) System safeties allow start if safety conditions are met. ___<BRK/>
<BRK/>
      b.  Occupied mode of operation - economizer de-energized.<BRK/>
<BRK/>
          (1) Outside air damper at minimum position.______________________<BRK/>
<BRK/>
          (2) Return air damper open.______________________________________<BRK/>
<BRK/>
          (3) Relief air damper [at minimum position][closed].____________<BRK/>
<BRK/>
          (4) Chilled water control valve modulating to maintain space cooling temperature set point. Setpoint 
_______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
          (5) Hot water control valve modulating to maintain space heating temperature set point input from outside 
air temperature controller. ______<BRK/>
<BRK/>
      c.  Occupied mode of operation - economizer energized.<BRK/>
<BRK/>
          (1)   Outside air damper modulated to maintain mixed air temperature set point.  Setpoint _______deg <MET>
C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG>  O/A damper position ___________% Return Air Temperature_____deg <MET>C</MET><ENG>F</ENG> Outside Air Temperature 
_______ deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
          (2) Relief air damper modulates with outside air damper according to sequence of operation. Relief 
air damper position ________%<BRK/>
<BRK/>
          (3) Chilled water control valve modulating to maintain space cooling temperature set point. Setpoint 
_______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG> Return sensor overrides to normal operation.<BRK/>
<BRK/>
      d. Unoccupied mode of operation. <BRK/>
          (1)   Observe fan starts when space temperature calls for heating/cooling ____.<BRK/>
          (2)   All dampers in normal position.  _________________________<BRK/>
          (3)   Verify low limit space temperature is maintained as specified in sequence of operation. ______________________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Single Zone Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
      e.  The following shall be verified when the [supply fan off][supply and return fans off] mode is initiated:<BRK/>
<BRK/>
          (1) All dampers in normal position.______________________________<BRK/>
<BRK/>
          (2) All valves in normal position._______________________________<BRK/>
<BRK/>
          (3) Fan de-energizes. ___________________________________________<BRK/>
<BRK/>
      f.  Verify cooling coil and heating coil operation by varying thermostat set point from cooling set point 
to heating set point and returning to cooling set point________.<BRK/>
<BRK/>
      g.   Verify safety shut down initiated by low temperature protection thermostat________.<BRK/>
<BRK/>
      h.   Verify occupancy schedule is programmed into time clock/UMCS________.<BRK/>
<BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                    Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         ____________________________ <BRK/>
                                   <BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Multi-zone Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
For Air Handling Unit:  [_____]<BRK/>
<BRK/>
<BRK/>
1.   Functional Performance Test:  Contractor shall verify operation of air handling unit in accordance with 
specification including the following:<BRK/>
<BRK/>
       a.   Ensure that a slight negative pressure exists on inboard side of the outside air dampers throughout 
the operation of the dampers.  Modulate OA, RA, and EA dampers from fully open to fully closed positions.<BRK/>
<BRK/>
       b.   The following shall be verified when the supply and return fans operating mode is initiated:<BRK/>
<BRK/>
          (1) All dampers in normal position. _____________________________<BRK/>
<BRK/>
          (2) All valves in normal position. ______________________________<BRK/>
<BRK/>
          (3) System safeties allow start if safety conditions are met. ___<BRK/>
<BRK/>
      b.  Occupied mode of operation - economizer de-energized.<BRK/>
<BRK/>
          (1) Outside air damper at minimum position. _____________________<BRK/>
<BRK/>
          (2) Return air damper open. _____________________________________<BRK/>
<BRK/>
          (3) Relief air damper [at minimum position] [closed]. ___________<BRK/>
<BRK/>
          (4) Chilled water control valve modulating to maintain cold deck supply air temperature set point. 
Setpoint ______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
          (5) Hot water control valve modulating to maintain hot deck supply air temperature set point input 
from outside air temperature controller. Setpoint _______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG> O/A ________deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
      c.  Occupied mode of operation - economizer energized. Note outside air and return air temperature sensors 
may need to be simulated.<BRK/>
<BRK/>
          (1) Outside air damper modulates to maintain mixed air temperature set point. Setpoint _______deg <MET>C</MET><ENG>
F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG> Return Air Temperature _______deg <MET>C</MET><ENG>F</ENG> Outside Air Temperature _______deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
          (2) Relief air damper modulates with outside air damper according to sequence of operation.__________________________________________________<BRK/>
<BRK/>
    (3)Chilled water control valve modulating to maintain cold deck supply air temperature set point. Setpoint 
______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG><BRK/>
          <BRK/>
          (4)Hot water control valve modulating to maintain hot deck supply air temperature set point input from 
outside air temperature controller. Setpoint _______deg <MET>C</MET><ENG>F</ENG> Actual _____deg <MET>C</MET><ENG>F</ENG> O/A ______ deg <MET>C</MET><ENG>F</ENG><BRK/>
Return temperature sensors to normal operation.<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Multi-zone Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
     d.   Unoccupied mode of operation note time clock and space temperature sensor may require simulation.<BRK/>
(4)   Observe fan starts when space temperature calls for heating/cooling. <BRK/>
(5)   All dampers in normal position.  ___________________________<BRK/>
(6)   Verify low limit space temperature is maintained as specified in sequence of operation. _____________________________________<BRK/>
<BRK/>
      e.  The following shall be verified when the supply and return fans off mode is initiated:<BRK/>
<BRK/>
          (1) All dampers in normal position.  ____________________________<BRK/>
<BRK/>
          (2) All valves in normal position.  _____________________________<BRK/>
<BRK/>
          (3) Fan de-energizes.  __________________________________________<BRK/>
Note: return time clock and space temperature sensors to normal operation.<BRK/>
<BRK/>
      f.  Verify zone damper operation by varying zone thermostat set points from cooling set point to heating 
set point and returning to cooling set point.  ________________________________________________________________<BRK/>
<BRK/>
      g.  Verify safety shut down initiated by low temperature protection thermostat. _____________________________________________________________<BRK/>
<BRK/>
      h.  Index room thermostats to full cooling then to full heating.  Measure and record cold deck, hot deck, 
and supply air temperatures and determine damper leakage for a minimum of 2 zones.<BRK/>
<BRK/>
Cold deck temperature __________ degrees <MET>C</MET><ENG>F</ENG><BRK/>
Hot deck temperature  __________ degrees <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
Zone  _______<BRK/>
Zone ____ Supply Air Temperature at Max Cooling _______deg <MET>C</MET><ENG>F</ENG><BRK/>
Zone ____ Supply Air Temperature at Max Heating _______deg <MET>C</MET><ENG>F</ENG><BRK/>
Zone ____Hot Deck Damper leakage at Max cooling _______<MET>l/S</MET><ENG>CFM</ENG><BRK/>
Zone ____Cold Deck Damper leakage at Max heating _______<MET>l/S</MET><ENG>CFM</ENG><BRK/>
<BRK/>
Zone  _______<BRK/>
Zone ____ Supply Air Temperature at Max Cooling _______deg <MET>C</MET><ENG>F</ENG><BRK/>
Zone ____ Supply Air Temperature at Max Heating _______deg <MET>C</MET><ENG>F</ENG><BRK/>
Zone ____Hot Deck Damper leakage at Max cooling _______<MET>l/S</MET><ENG>CFM</ENG><BRK/>
Zone ____Cold Deck Damper leakage at Max heating _______<MET>l/S</MET><ENG>CFM</ENG><BRK/>
<BRK/>
       i. Verify occupancy schedule is programmed into time clock/UMCS________.<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Multi-zone Air Handling Unit</HL3></HL1><BRK/>
<BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Packaged Air Cooled Chiller</HL3></HL1><BRK/>
<BRK/>
For Chiller:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of chilled water system in accordance 
with specifications including the following:  Start building air handler to provide load for chiller.  Activate 
controls system chiller start sequence as follows.<BRK/>
<BRK/>
      a.  Start chilled water pump and establish chilled water flow.  Verify chiller-chilled water proof-of-flow 
switch operation.   ____________<BRK/>
<BRK/>
      b.  Verify control system energizes chiller start sequence.  ________<BRK/>
<BRK/>
      c.  Verify chiller senses chilled water temperature above set point and control system activates chiller 
start. Setpoint_____deg <MET>C</MET><ENG>F</ENG> Actual_____ deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
      d.  Verify functioning of "soft start" sequence.  ___________________<BRK/>
   <BRK/>
e.  Verify and record chiller data in accordance with 2, 3 and 4 below on fully loaded chiller.<BRK/>
<BRK/>
      f.  Shut off air handling equipment to remove load on chilled water system.  Verify chiller shutdown sequence 
is initiated and accomplished after load is removed.          ___________________________________________<BRK/>
<BRK/>
      g.  Restart air handling equipment one minute after chiller shut down.  Verify chiller restart sequence.    ________________________________<BRK/>
<BRK/>
  2.  Verify chiller inlet/outlet pressure reading, compare to Testing, Adjusting, and Balancing (TAB) Report, 
chiller design conditions, and chiller manufacturer's performance data.<BRK/>
<BRK/>
                                       DESIGN      TAB TEST      ACTUAL<BRK/>
<MET>Chiller inlet pressure   (kPa gauge)   __________  __________  __________</MET><BRK/>
<ENG>Chiller inlet pressure   (psig)        __________  __________  __________</ENG><BRK/>
<BRK/>
<MET>Chiller outlet pressure   (kPa gauge)  __________  __________  __________</MET><BRK/>
<ENG>Chiller outlet pressure   (psig)       __________  __________  __________</ENG><BRK/>
<BRK/>
Chiller flow            <MET>L/sec</MET><ENG>GPM</ENG>       __________  __________  __________<BRK/>
<BRK/>
  3.  Verify chiller amperage each phase and voltage phase-to-phase and phase-to-ground.<BRK/>
                                                             Motor F/L AMPS<BRK/>
  Amperage  Phase 1 __________ Phase 2__________ Phase 3_______  _____<BRK/>
<BRK/>
  Voltage   Ph1-Ph2 __________ Ph1-Ph3__________ Ph2-Ph3_______<BRK/>
                <BRK/>
  Voltage   Ph1-gnd __________ Ph2-gnd__________ Ph3-gnd_______<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Packaged Air Cooled Chiller</HL3></HL1><BRK/>
<BRK/>
  4.  <BRK/>
      a. Record the following information:<BRK/>
<BRK/>
                                                        Design<BRK/>
Ambient dry bulb temperature ___________ degrees <MET>C</MET><ENG>F</ENG> _____degrees <MET>C</MET><ENG>F</ENG><BRK/>
Entering chilled water temperature _____ degrees <MET>C</MET><ENG>F</ENG> _____degrees <MET>C</MET><ENG>F</ENG><BRK/>
Leaving chilled water temperature ______ degrees <MET>C</MET><ENG>F</ENG> _____degrees <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
   b. Calculate chiller load at ambient conditions and compare to chiller rated capacity from manufacturer's 
literature.  Calculated ________ <MET>KWs</MET><ENG>Ton</ENG> Rated ________ <MET>KWs</MET><ENG>Ton</ENG>.<BRK/>
<BRK/>
  5.  Unusual vibration, noise, etc.<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  6.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                   Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Air Cooled Condensing Unit</HL3></HL1><BRK/>
<BRK/>
For Condensing Unit:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of refrigeration system in accordance 
with specifications including the following:  Start building air handler to provide load for condensing unit.  
Activate controls system start sequence as follows.<BRK/>
<BRK/>
      a.  Start air handling unit.  Verify control system energizes condensing unit start sequence.  __________________________________________<BRK/>
<BRK/>
      b. Verify and record data in 2 and 3 below.<BRK/>
      c.  Shut off air handling equipment to verify condensing unit de-energizes.  ___________________________________________________________<BRK/>
<BRK/>
      d.  Restart air handling equipment one minute after condensing unit shut down.  Verify condensing unit 
restart sequence.  _____________________<BRK/>
<BRK/>
  2.  Verify condensing unit amperage each phase and voltage phase to phase and phase to ground.<BRK/>
  Motor Full-Load Amps __________                                 <BRK/>
  <BRK/>
  Amperage  Phase 1 __________    Phase 2__________     Phase 3_______  <BRK/>
<BRK/>
  Voltage   Ph1-Ph2 __________    Ph1-Ph3__________     Ph2-Ph3_______<BRK/>
                <BRK/>
  Voltage   Ph1-gnd __________    Ph2-gnd__________      Ph3-gnd_______<BRK/>
<BRK/>
  3.  Record the following information: <BRK/>
    Ambient dry bulb temperature       __________ degrees <MET>C</MET><ENG>F</ENG><BRK/>
    Suction pressure                   __________ <MET>kPa gauge</MET><ENG>psig</ENG><BRK/>
    Discharge pressure                 __________ <MET>kPa gauge</MET><ENG>psig</ENG>    <BRK/>
    <BRK/>
  4.  Unusual vibration, noise, etc.<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  5.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications. <BRK/>
                                                       Signature and Date<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative       _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative              _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Functional Performance Test Checklist - Hot Water Boiler<BRK/>
<BRK/>
For Boiler:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of hot water system in accordance 
with specifications including the following:  Start building heating equipment to provide load for boiler.  Activate 
controls system boiler start sequence as follows.<BRK/>
<BRK/>
      a.  Start hot water pump and establish hot water flow.  Verify boiler hot water proof-of-flow switch operation.      ____________________________<BRK/>
<BRK/>
      b.  Verify control system energizes boiler start sequence.  _________<BRK/>
<BRK/>
      c.  Verify boiler senses hot water temperature below set point and control system activates boiler start. 
Setpoint_________deg <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
<BRK/>
  2.  Verify boiler inlet/outlet pressure reading, compare to Test and Balance (TAB) Report, boiler design conditions, 
and boiler manufacturer's performance data.<BRK/>
<BRK/>
                                           DESIGN     SYSTEM TEST   ACTUAL<BRK/>
Boiler inlet water temperature deg <MET>C</MET><ENG>F</ENG>      __________  _________  _________<BRK/>
Boiler outlet water temperature deg <MET>C</MET><ENG>F</ENG>     __________  _________  _________<BRK/>
Boiler outlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>       __________  _________  _________<BRK/>
Boiler flow rate <MET>L/s</MET><ENG>gpm</ENG>                    __________  _________  _________<BRK/>
Flue-gas temperature at boiler outlet deg <MET>C</MET><ENG>F</ENG>           _________  _________<BRK/>
Percent carbon dioxide in flue-gas                     _________  _________<BRK/>
Draft at boiler flue-gas exit <MET>kpa</MET><ENG>inches-wg</ENG>             _________  _________<BRK/>
Stack emission pollutants concentration    __________  _________  _________<BRK/>
Fuel type                                  __________  _________  _________<BRK/>
Combustion efficiency                      __________  _________  _________<BRK/>
<BRK/>
                                           <BRK/>
  3.  Record the following information:<BRK/>
<BRK/>
Ambient dry bulb temperature to determine reset schedule_____degrees <MET>C</MET><ENG>F</ENG><BRK/>
Building Entering hot water temperature                 _____degrees <MET>C</MET><ENG>F</ENG><BRK/>
Building Leaving hot water temperature                  ____ degrees <MET>C</MET><ENG>F</ENG><BRK/>
<BRK/>
  4.  Verify temperatures in item 3 are in accordance with the reset schedule.    ______________________________________________________________<BRK/>
<BRK/>
 5.   Verify proper operation of boiler safeties.  ________________________<BRK/>
        a.   Low water_____<BRK/>
        b.   Water flow____<BRK/>
        c.   Flame failure____<BRK/>
        d.   Pilot failure____<BRK/>
        e.   Pre and Post Purge failure____<BRK/>
        f.   Pressure relief___<BRK/>
        g.   High temperature____<BRK/>
<BRK/>
6.    Shut off building heating equipment to remove load on hot water system. Verify boiler shutdown sequence 
is initiated and accomplished after load is removed.    _______________________________________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Hot Water Boiler</HL3></HL1><BRK/>
<BRK/>
<BRK/>
7.   Unusual vibration, noise, etc.<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  8.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date <BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Steam Boiler</HL3></HL1> <BRK/>
<BRK/>
For Boiler:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of steam heating system in accordance 
with specifications including the following:  Start building heating equipment to provide load for boiler.  Activate 
controls system boiler start sequence as follows.<BRK/>
<BRK/>
      a.  Start steam heating system.  Verify control system energizes boiler start sequence.   __________________________________________________<BRK/>
<BRK/>
      b.  Verify boiler senses steam pressure below set point and control system activates boiler start.   __________________________________________<BRK/>
<BRK/>
      c.  Shut off building heating equipment to remove load on steam heating system.  Verify boiler shutdown 
sequence is initiated and accomplished after load is removed.   _____________________________________<BRK/>
<BRK/>
      d.  Verify that water level and makeup water system are operational.  _____________________________________________________________________________<BRK/>
<BRK/>
  2.  Verify boiler inlet/outlet pressure reading, compare to boiler design conditions and manufacturer's performance data.<BRK/>
<BRK/>
<BRK/>
                                         DESIGN       SYSTEM TEST  ACTUAL<BRK/>
  Boiler inlet feedwater temp deg <MET>C</MET><ENG>F</ENG>      __________  __________ __________<BRK/>
  Boiler outlet pressure <MET>kPa gauge</MET><ENG>psig</ENG>    __________  __________ __________<BRK/>
  Flue-gas temperature at boiler outlet deg <MET>C</MET><ENG>F</ENG>        __________ __________<BRK/>
  Percent carbon dioxide in flue-gas                  __________ __________<BRK/>
  Draft at boiler flue-gas exit <MET>kpa</MET><ENG>inches-wg</ENG>          __________ __________<BRK/>
  Stack emission pollutants concentration __________  __________ __________<BRK/>
  Fuel type                               __________  __________ __________<BRK/>
  Combustion efficiency                   __________  __________ __________<BRK/>
<BRK/>
  3.  Record the following information:<BRK/>
<BRK/>
        Ambient temperature __________ deg <MET>C</MET><ENG>F</ENG><BRK/>
        <BRK/>
  4.  Verify proper operation of boiler safeties.__________________________<BRK/>
<BRK/>
  5.  Unusual vibration, noise, etc.<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  ___________________________________________________________________________<BRK/>
<BRK/>
  6.  Visually check refractory for cracks or spalling and refractory and tubes for flame impingement._______________________________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist (cont) - Steam Boiler</HL3></HL1> <BRK/>
<BRK/>
<BRK/>
  7.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Fan Coil Units</HL3></HL1><BRK/>
<BRK/>
  The Contracting Officer will select fan coil units to be spot-checked during the functional performance test.  
The number of terminals shall not exceed 10 percent.  Hot water and chilled water systems must be in operation 
providing design water temperatures.<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of selected fan coils in accordance 
with specifications including the following:<BRK/>
<BRK/>
      a.  Cooling only fan coils:<BRK/>
<BRK/>
          (1) Verify fan coil unit response to room temp set point adjustment.<BRK/>
           1.   Check blower fan airflow. _____ <MET>L/s</MET><ENG>cfm</ENG><BRK/>
           2.   Check cooling coil water flow. _____ <MET>L/s</MET><ENG>gpm</ENG><BRK/>
           3.   Verify proper operation of cooling water control valve.______<BRK/>
           4.   Cooling mode inlet air temperature ______deg <MET>C</MET><ENG>F</ENG><BRK/>
           5.   Cooling mode outlet air temperature______deg <MET>C</MET><ENG>F</ENG><BRK/>
           6.   Calculate coil sensible capacity and compare to design:<BRK/>
           Calculated _______<MET>Watts</MET><ENG>BTU/hr</ENG> Design______<MET>Watts</MET><ENG>BTU/hr</ENG><BRK/>
<BRK/>
      b.  Cooling/heating fan coils:<BRK/>
<BRK/>
         (1) Verify fan coil unit response to room temp set point adjustment.  <BRK/>
          1.  Check blower fan airflow.  _____ <MET>L/s</MET><ENG>cfm</ENG><BRK/>
          2.  Check cooling coil water flow. _____ <MET>L/s</MET><ENG>gpm</ENG><BRK/>
          3.  Verify proper operation of cooling water control valve.  ____<BRK/>
          4.  Check cooling mode inlet air temperature. _____deg <MET>C</MET><ENG>F</ENG><BRK/>
          5.  Check cooling mode outlet air temperature. _____deg <MET>C</MET><ENG>F</ENG><BRK/>
          6.  Calculate cooling coil sensible capacity and compare to  design:<BRK/>
          7.  Calculated _________<MET>Watts</MET><ENG>BTU/hr</ENG> Design_____<MET>Watts</MET><ENG>BTU/hr</ENG><BRK/>
          8.  Check heating coil water flow.  _____ <MET>L/s</MET><ENG>gpm</ENG><BRK/>
          9.  Verify proper operation of heating water control valve. _____<BRK/>
         10.  Check heating mode inlet air temperature. _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
         11.  Check heating mode outlet air temperature. _____deg <MET>C</MET><ENG>F</ENG><BRK/>
         12.  Calculate heating coil capacity and compare to design:<BRK/>
              Calculated______<MET>Watts</MET><ENG>BTU/hr</ENG> design_______<MET>Watts</MET><ENG>BTU/hr</ENG><BRK/>
                <BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
                                                  Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist        ____________________________<BRK/>
 <BRK/>
Contractor's Mechanical Representative       _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative       ______________________________<BRK/>
<BRK/>
Contractor's TAB Representative              ______________________________<BRK/>
<BRK/>
Contractor's Controls Representative         _____________________________<BRK/>
<BRK/>
Design Agency Representative                 _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Unit Heaters</HL3></HL1><BRK/>
<BRK/>
  The Contracting Officer will select unit heaters to be spot-checked during the functional performance test.  
The number of terminals shall not exceed 10 percent. Hot water systems {for hot water unit heaters} must be in 
operation and supplying design hot water supply temperature water.<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of selected unit heaters:<BRK/>
<BRK/>
      a.   Verify unit heater response to room temperature set point adjustment.___________________________________<BRK/>
      b.   Check heating mode inlet air temperature. _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
      c.   Check heating mode outlet air temperature. _____ deg <MET>C</MET><ENG>F</ENG><BRK/>
      d.   Record manufacturer's submitted fan capacity _____<MET>L/s</MET><ENG>cfm</ENG><BRK/>
      e.   Calculate unit heater capacity using manufacturer's fan capacity and recorded temperatures and compare 
to design.<BRK/>
      f.   Calculated_____<MET>Watts</MET><ENG>BTU/hr</ENG> Design______<MET>Watts</MET><ENG>BTU/hr</ENG><BRK/>
<BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                   Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         _____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>Functional Performance Test Checklist - Steam/Hot Water Converter<BRK/>
<BRK/>
For Converter:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of heating system in accordance with 
specifications including the following:  Start building heating equipment to provide load for converter.<BRK/>
<BRK/>
      a.  Verify control system energizes.  _______________________________<BRK/>
<BRK/>
      b.  Verify converter senses hot water temperature below set point and control system modulates steam valve.  ____________________________________<BRK/>
<BRK/>
      c.  Shut off building heating equipment to remove load on heating system.  Verify converter steam valve 
closes after load is removed.  ______<BRK/>
<BRK/>
  2.  Verify converter inlet/outlet pressure reading, compare to converter design conditions and manufacturer's 
performance data.<BRK/>
                                                      DESIGN      ACTUAL<BRK/>
        Converter inlet water temp deg <MET>C</MET><ENG>F</ENG>          __________  __________<BRK/>
        Converter outlet water temp deg <MET>C</MET><ENG>F</ENG>         __________  __________<BRK/>
        Converter inlet steam pressure <MET>kpa</MET><ENG>psig</ENG>     __________  __________<BRK/>
        Determine water flow rate based<BRK/>
        on pressure drop through converter (<MET>L/S</MET><ENG>GPM</ENG>)__________  __________<BRK/>
        Determine water flow rate with flow<BRK/>
        measuring device <MET>L/S</MET><ENG>GPM</ENG>                    __________  __________<BRK/>
        Verify that temperature of water             Current   Actual<BRK/>
        is in accordance with outdoor air           Setpoint Temperature<BRK/>
        reset schedule                             __________  __________<BRK/>
<BRK/>
          <BRK/>
  3.  Verify proper operation of converter safeties.  _____________________<BRK/>
<BRK/>
  4.  Check and report unusual vibration, noise, etc. <BRK/>
___________________________________________________________________________<BRK/>
<BRK/>
___________________________________________________________________________<BRK/>
<BRK/>
  5.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date <BRK/>
<BRK/>
Contractor's Commissioning Specialist         ____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Computer Room Unit</HL3></HL1><BRK/>
<BRK/>
For Computer Room Unit:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall verify operation of computer room unit in accordance with 
specification including the following:<BRK/>
<BRK/>
      a.  System safeties allow start if safety conditions are met.  ______<BRK/>
<BRK/>
      b.  Verify cooling and heating operation by varying thermostat set point from space set point to space 
set point plus <MET>5.5</MET><ENG>10</ENG> degrees, space set point minus <MET>5.5</MET><ENG>10</ENG> degrees, and returning to space set point.  ________________<BRK/>
<BRK/>
      c.  Verify humidifier operation by varying humidistat set point from space set point to space set point 
plus 20 percent RH, and returning to space set point.  _________________________________________________________________<BRK/>
<BRK/>
      d.  Verify that airflow is within tolerance specified in Section <SRF>23 05 93</SRF> TESTING, ADJUSTING, AND BALANCING 
OF HVAC SYSTEMS.  _____________________________________________________________________________<BRK/>
<BRK/>
      <BRK/>
  2.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist         ____________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative        _____________________________<BRK/>
<BRK/>
Contractor's Electrical Representative        _____________________________<BRK/>
<BRK/>
Contractor's TAB Representative               _____________________________<BRK/>
<BRK/>
Contractor's Controls Representative          _____________________________<BRK/>
<BRK/>
Design Agency Representative                  _____________________________<BRK/>
<BRK/>
Contracting Officer's Representative          _____________________________<BRK/>
<BRK/>
Using Agency's Representative                 _____________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - HVAC Controls</HL3></HL1><BRK/>
<BRK/>
For HVAC System:  [_____]<BRK/>
<BRK/>
The Contracting Officer will select HVAC control systems to undergo functional performance testing.  The number 
of systems shall not exceed 10 percent. Perform this test simultaneously with FPT for AHU or other controlled equipment.<BRK/>
<BRK/>
   1.   Functional Performance Test:  Contractor shall verify operation of HVAC controls by performing the Performance 
Verification Test {PVT} test for that system. Contractor to provide blank PVT test procedures previously done 
by the controls Contractor.<BRK/>
<BRK/>
   2.   Verify interlock with UMCS system______.<BRK/>
<BRK/>
   3.   Verify all required I/O points function from the UMCS system_____. <BRK/>
<BRK/>
   4.   Certification:  We the undersigned have witnessed the Performance Verification Test and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist           _________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative          ___________________________<BRK/>
<BRK/>
Contractor's Electrical Representative          ___________________________<BRK/>
<BRK/>
Contractor's TAB Representative                 ___________________________<BRK/>
   <BRK/>
Contractor's Controls Representative            ___________________________<BRK/>
<BRK/>
Design Agency Representative                    ___________________________<BRK/>
<BRK/>
Contractor's Officer's Representative           ___________________________<BRK/>
      <BRK/>
Using Agency's Representative                   ___________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT><HL1><HL3>Functional Performance Test Checklist - Energy Recovery System</HL3></HL1><BRK/>
<BRK/>
For Energy Recovery System:  [_____]<BRK/>
<BRK/>
  1.  Functional Performance Test:  Contractor shall demonstrate operation of energy recovery system in accordance 
with specifications including the following:  Start equipment to provide energy source for recovery system.<BRK/>
<BRK/>
      a.  Verify energy source is providing recoverable energy.____________<BRK/>
<BRK/>
      b.  Verify recovery system senses available energy and activates.____<BRK/>
<BRK/>
  2.  Verify recovery system inlet/outlet readings, compare to design conditions and manufacturer's performance data.<BRK/>
<BRK/>
<BRK/>
                                               Design      Actual<BRK/>
 Primary loop inlet temp (degrees <MET>C</MET><ENG>F</ENG>)        __________   __________<BRK/>
 Primary loop outlet temp (degrees <MET>C</MET><ENG>F</ENG>)       __________   __________<BRK/>
 Primary loop flow rate <MET>L/s</MET>[<ENG>gpm</ENG>][<ENG>cfm</ENG>]        __________   __________<BRK/>
 Secondary loop inlet temp (degrees <MET>C</MET><ENG>F</ENG>)      __________   __________<BRK/>
 Secondary loop outlet temp (degrees <MET>C</MET><ENG>F</ENG>)     __________   __________<BRK/>
 Secondary loop flow rate <MET>L/s</MET>[<ENG>gpm</ENG>][<ENG>cfm</ENG>]      __________   __________<BRK/>
 Primary loop energy <MET>Watts</MET><ENG>BTU/hr</ENG>             __________   __________<BRK/>
 Secondary loop energy <MET>Watts</MET><ENG>BTU/hr</ENG>           __________   __________<BRK/>
<BRK/>
3. Verify that recovery system deactivates when recoverable energy is no longer available.       __________________________________________________<BRK/>
<BRK/>
4.  Check and report unusual vibration, noise, etc.  ___________________________________________________________________________<BRK/>
<BRK/>
___________________________________________________________________________<BRK/>
<BRK/>
  5.  Certification:  We the undersigned have witnessed the above functional performance tests and certify that 
the item tested has met the performance requirements in this section of the specifications.<BRK/>
<BRK/>
                                                       Signature and Date<BRK/>
<BRK/>
Contractor's Commissioning Specialist           __________________________<BRK/>
<BRK/>
Contractor's Mechanical Representative          ___________________________<BRK/>
<BRK/>
Contractor's Electrical Representative          ___________________________<BRK/>
<BRK/>
Contractor's TAB Representative                 ___________________________<BRK/>
<BRK/>
Contractor's Controls Representative            ___________________________<BRK/>
<BRK/>
Design Agency Representative                    __________________________<BRK/>
<BRK/>
Contractor's Officer's Representative           ___________________________<BRK/>
<BRK/>
Using Agency's Representative                   ___________________________<BRK/></TXT>
<BRK/>
<PGE/><BRK/>
<TXT>- End of Appendix B -</TXT><BRK/>
<PGE/><BRK/>
<TXT>-End of document</TXT><BRK/></PRT>
    <END/><BRK/></SEC>