USACE / NAVFAC / AFCESA / NASA            UFGS-27 15 19.00 10 (April 2006)<BRK/>
                                          --------------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                Superseding<BRK/>
                                          UFGS-27 15 19.00 10 (April 2004)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 27 15 19.00 10</SCN><BRK/>
<BRK/>
<STL>WIRE LINE DATA TRANSMISSION SYSTEM</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>underground, aerial, 
direct burial, and interior wire line data transmission systems for communication 
between a local device and a central processor, and covers the requirements 
for a half or full duplex wire line data transmission system (DTS)</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This section will be used in conjunction with Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM; Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION; 
Section <SRF>33 70 02.00 10</SRF> ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND; Section 
<SRF>28 23 23.00 10</SRF> CLOSED CIRCUIT TELEVISION SYSTEMS; Section <SRF>28 20 01.00 10</SRF> ELECTRONIC 
SECURITY SYSTEM; Section <SRF>26 09 13</SRF> POWER MONITORING SYSTEM; Section 
<SRF>28 16 00.00 20</SRF> BASIC INTRUSION DETECTION SYSTEMS (IDS); 
<SRF>Section 28 20 00.00 20</SRF> COMMERCIAL INTRUSION DETECTIN SYSTEM (IDS); Section 
<SRF>28 16 01.00 10</SRF> SMALL INTRUSION DETECTION SYSTEM; Section <SRF>25 10 10</SRF> UTILITY MONITORING 
AND CONTROL SYSTEM (UMCS); and any other guide specification sections required 
by the design.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE C62.41.1</RID><RTL>(2002) IEEE Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits</RTL><BRK/><BRK/><RID>IEEE C62.41.2</RID><RTL>(2002) IEEE Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits</RTL><BRK/><BRK/></REF><REF><ORG>INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)</ORG><BRK/><BRK/><RID>ICEA S-84-608</RID><RTL>(2007) Telecommunications Cable, Filled Polyolefin Insulated Copper Conductor</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL TELECOMMUNICATION UNION (ITU)</ORG><BRK/><BRK/><RID>ITU H.222.0</RID><RTL>(2006; AMD 1 2007; AMD 2 2007) Information Technology - Generic Coding of Moving Pictures and Associated Audio Information</RTL><BRK/><BRK/><RID>ITU V.44</RID><RTL>(2000; CORR 1 2002) Pre-published Data Compression Procedures</RTL><BRK/><BRK/><RID>ITU V.92</RID><RTL>(2000; AMD 2001, AMD 2002 and CORR 2003) Enhancements to Recommendation V.90 Series: V, with Amendments 1 and 2</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA 250</RID><RTL>(2003) Enclosures for Electrical Equipment (1000 Volts Maximum)</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF AGRICULTURE (USDA)</ORG><BRK/><BRK/><RID>RUS Bull 345-67</RID><RTL>(1998) REA Specification for Filled Telephone Cables, PE-39</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>47 CFR 15</RID><RTL>Radio Frequency Devices</RTL><BRK/><BRK/><RID>47 CFR 68</RID><RTL>Connection of Terminal Equipment to the Telephone Network</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1   General</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer must show on drawings the DTS selected for each link and the 
systems to be interconnected.  NEC (e.g., Sections 300.11(A) and 800.5) does 
not permit communication circuits to be supported by suspended ceiling panels 
or suspended ceiling support grids.  Thus, give consideration for proper support 
of cables and raceways.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A half or full duplex wire line data transmission system (DTS) for communication between a local device and a 
central processor shall be provided.  The local device is used to process locally generated information and communicates 
that information to the central processor.  The central processor is a computer-based system that takes the information 
received from the local processor and processes that information.  The DTS shall consist of MODEMS (headend and 
remote) or line drivers, or both, connected to the local device and the central processor.  The MODEMS are connected 
by transmission lines and terminal devices such as connectors and terminal strips.  Communication links surge 
protection and powerline surge protection shall be provided at both ends of the transmission line.  All computing 
devices, as defined in <RID>47 CFR 15</RID>, shall be certified to comply with the requirements for Class B computing devices 
and labeled as set forth in <RID>47 CFR 15</RID>.  Components and wiring located in areas where fire or explosion hazards 
may exist because of flammable gases or vapors, flammable liquids, combustible dust or ignitable fibers or flyings, 
shall be rated for the Classes, Divisions, Groups and suitable for the operating temperatures and shall be installed 
in accordance with Chapter 5 of <RID>NFPA 70</RID> and as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Electrical Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will show characteristics of each voltage source on the 
drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The equipment shall operate from a voltage source as shown, plus or minus 10 percent.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Power Line Surge Protection</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will determine if any additional inputs or outputs require 
surge protection and show the requirement for them on the drawings, or in a 
schedule.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All equipment connected to AC circuits shall be protected from power line surges.  Equipment shall withstand 
surge test waveforms described in <RID>IEEE C62.41.1</RID> and <RID>IEEE C62.41.2</RID>.  Surge protection devices shall be selected 
based on voltages and current ratings of components to be protected.  Fuses shall not be used for surge protection.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Communications Circuit Surge Protection</TTL><BRK/>
<BRK/>
<TXT>All communications equipment shall be protected against surges induced on any communications circuit.  All cables 
and conductors which serve as communications circuit between the local processor and the central processor shall 
have surge protection devices installed at each end.  Protection shall be provided at the equipment and additional 
triple electrode gas surge protectors rated for the application on each wireline circuit shall be installed within<MET>
 1 m</MET><ENG> 3 feet</ENG> of the building cable entrance.  Surge protection devices shall be selected based on voltages and 
current ratings of components to be protected.  Fuses shall not be used for surge protection.  The inputs and 
outputs shall be tested in both normal mode and common mode using the following two waveforms:</TXT><BRK/>
<BRK/>
<LST>a. A waveform with a 10 microsecond rise time, a 1000 microsecond width, a peak voltage of 1500 volts 
and a peak current of 60 amperes.</LST><BRK/>
<BRK/>
<LST>b. A waveform with an 8 microsecond rise time, a 20 microsecond waveform, a peak voltage of 1000 volts 
and a peak current of 500 amperes.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   DELIVERY OF TECHNICAL DATA</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The wireline DTS will be used with either the electronic security systems 
(ESS), small intrusion detection system (IDS), closed circuit television systems 
(CCTV) the utility monitoring control system (UMCS), the power monitoring system, 
or the supervisory control and data acquisition (SCADA) system.  The designer 
will select the system and supply the correct section title where appropriate:  
Section <SRF>28 16 00.00 20</SRF> BASIC INTRUSION DETECTION SYSTEMS (IDS), Section 
<SRF>28 20 00.00 20</SRF> COMMERCIAL INTRUSION DETECTION SYSTEMS (IDS), Section 
<SRF>28 20 01 .00 10</SRF> ELECTRONIC SECURITY SYSTEM, Section <SRF>28 16 01.00 10</SRF> SMALL INTRUSION 
DETECTION SYSTEM, or Section <SRF>28 23 23.00 10</SRF> CLOSED CIRCUIT TELEVISION SYSTEMS.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All items of technical data which are specifically identified in this specification will be delivered strictly 
in accordance with the CONTRACT CLAUSES, SPECIAL CONTRACT REQUIREMENTS, Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES 
and the Contract Data Requirements List, DD Form 1423, which is attached to and made a part of this contract.  
Technical data submitted shall be coordinated with the requirements of Section [_____].  All data delivered shall 
be identified by reference to the particular specification paragraph against which it is furnished [_____] hard 
copies and [_____] electronic copies (CD-ROM or DVD-R) of the Technical Data Package(s) shall be submitted.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Group I Technical Data Package</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1.1   System Drawings</TTL><BRK/>
<BRK/>
<TXT>The data package shall include the following:</TXT><BRK/>
<BRK/>
<LST>a. Data Transmission system block diagram.</LST><BRK/>
<BRK/>
<LST>b. MODEMS or line drivers or both, installation, block diagrams, and wiring diagrams.</LST><BRK/>
<BRK/>
<LST>c. MODEMS or line drivers or both, physical layout and schematics.</LST><BRK/>
<BRK/>
<LST>d. Details of connections to power sources, including grounding.</LST><BRK/>
<BRK/>
<LST>e. Details of interconnection with served system components.</LST><BRK/>
<BRK/>
<LST>f. Details of surge protection device installation.</LST><BRK/>
<BRK/>
<LST>g. Details of cable splicing and connector installation.</LST><BRK/>
<BRK/>
<LST>h. Details of underground, aerial, and messenger cable installation on poles, cable entrance to building.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.2   Manufacturers' Data</TTL><BRK/>
<BRK/>
<TXT>The data package shall include manufacturers' data for all materials including field and system equipment provided 
under this specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.3   DTS Description and Analyses</TTL><BRK/>
<BRK/>
<TXT>The data package shall include complete system descriptions, analyses, and calculations used in selecting equipment 
required by these specifications.  Descriptions and calculations shall show how the equipment will operate as 
a system to meet the performance of this specification.  The data package shall include the following:</TXT><BRK/>
<BRK/>
<LST>a. MODEM or line driver receive and transmit levels, signal-to-noise ratio calculations and assumed losses 
in decibels (dB) on each communication circuit.  Use manufacturer's minimum and maximum signal-to-noise 
ratio (db) of the actual equipment being furnished for the DTS.</LST><BRK/>
<BRK/>
<LST>b. Communication speed and protocol description.</LST><BRK/>
<BRK/>
<LST>c. Data transmission system expansion capability and method of implementation.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.4   Certifications</TTL><BRK/>
<BRK/>
<TXT>All specified manufacturer's certifications shall be included with the data package.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.2   Group II Technical Data Package</TTL><BRK/>
<BRK/>
<TXT>Verify that site conditions are in agreement with the design package.  Submit a report to the Government documenting 
changes to the site, or conditions that affect performance of the system to be installed.  For those changes 
or conditions which affect system installation or performance, provide (with the report) specification sheets, 
or written functional requirements to support the findings, and a cost estimate to correct the situation.  Do 
not perform any corrections without written permission from the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Group III Technical Data Package</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert section number and title for the specification.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare a test plan and test procedures in accordance with Section [_____] for the factory test.  The test plan 
shall describe the applicable tests to be performed, and other pertinent information such as specialized test 
equipment required, length of factory test, and location of the factory test/predelivery test.  The procedures 
shall explain in detail, step-by-step, actions and expected results to demonstrate compliance with the requirements 
of this specification, and the methods for simulating the necessary conditions of operation to demonstrate performance 
of the system.  Deliver the test plan for the factory test/predelivery test to the Government.  After receipt 
of written approval of the test plan, deliver the factory test/predelivery test procedures to the Government 
for approval.  After receipt of written approval of the factory test/predelivery test procedures, the Contractor 
may schedule the factory test/predelivery test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   Group IV Technical Data Package</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.4.1   Performance Verification Testing and Endurance Testing Data</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert section number and title for the appropriate specifications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare a test plan and test procedures in accordance with Section [_____] for the performance verification test 
and endurance test.  The test plan shall describe the applicable tests to be performed, and other pertinent information 
such as specialized test equipment required, and length of performance verification test.  The test procedures 
shall explain in detail, step-by-step actions and expected results to demonstrate compliance with the requirements 
of this specification.  Deliver test plans for the performance verification test and endurance test to the Government.  
After receipt of written approval of the test plans, deliver the performance verification test and endurance 
test procedures for approval.  Written approval by the Government of the performance verification test procedures 
shall be one of the prerequisites for commencing the performance verification test as specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4.2   Operation and Maintenance Data</TTL><BRK/>
<BRK/>
<TXT>A draft copy of the operation and maintenance data, shall be delivered to the Government prior to beginning the 
performance verification test for use during site testing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4.3   Training Data</TTL><BRK/>
<BRK/>
<TXT>Lesson plans and training data in manual format for the training phases, including type of training to be provided, 
with a list of reference material, shall be delivered for approval.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.5   Group V Technical Data Package</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.5.1   Manuals</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Unless the installation has a specific requirement, specify two copies 
of all manuals; except for the Operator's Manual, which should be specified 
to be six copies.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Final copies of the manuals bound in hardback, loose-leaf binders, shall be delivered to the Government within 
30 days after completing the endurance test.  The draft copy used during site testing shall be updated with any 
changes required prior to final delivery of the manuals.  Each manual's contents shall be identified on the cover.  
The manuals shall include the names, addresses, and telephone numbers of each subcontractor installing equipment 
and systems, and of the nearest service representative for each item of equipment and each system.  The manuals 
shall have a table of contents and tab sheets.  Tab sheets shall be placed at the beginning of each chapter or 
section and at the beginning of each appendix.  The final copies delivered after completion of the endurance 
test shall include all modifications made during installation, checkout, and acceptance.  Manuals delivered shall 
include:</TXT><BRK/>
<BRK/>
<LST>a. Functional Design Manual:  [2] [_____] copies [1] [_____] CD-ROM or DVR-R.</LST><BRK/>
<BRK/>
<LST>b. Hardware Manual:  [2] [_____] copies [1] [_____] CD-ROM or DVR-R.</LST><BRK/>
<BRK/>
<LST>c. Maintenance Manual:  [2] [_____] copies [1] [_____] CD-ROM or DVR-R.</LST><BRK/>
<BRK/>
<LST>d. Operator's Manual:  [6] [_____] copies [1] [_____] CD-ROM or DVR-R.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5.2   Functional Design Manual</TTL><BRK/>
<BRK/>
<TXT>The functional design manual shall identify the operational requirements for the data transmission system and 
explain the theory of operation, design philosophy, and specific functions.  A description of hardware functions, 
interfaces, and requirements shall be included for all system operating modes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5.3   Hardware Manual</TTL><BRK/>
<BRK/>
<TXT>A manual describing all equipment furnished, including:</TXT><BRK/>
<BRK/>
<LST>a. General description and specifications</LST><BRK/>
<BRK/>
<LST>b. Installation and checkout procedures.</LST><BRK/>
<BRK/>
<LST>c. Equipment electrical schematics and layout drawings.</LST><BRK/>
<BRK/>
<LST>d. Data transmission system schematics.</LST><BRK/>
<BRK/>
<LST>f. Manufacturer's repair parts list indicating sources of supply.</LST><BRK/>
<BRK/>
<LST>g. Interface definition.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5.4   Operator's Manual</TTL><BRK/>
<BRK/>
<TXT>The operator's manual shall fully explain all procedures and instructions for operation of the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5.5   Maintenance Manual</TTL><BRK/>
<BRK/>
<TXT>The maintenance manual shall include descriptions of maintenance for all equipment including inspection, provide 
preventive maintenance, fault diagnosis, and repair or replacement of defective components.  Software description, 
use of all diagnostic tools, loading software on the system and to the memory shall be included.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.6   Group VI Technical Data Package</TTL><BRK/>
<BRK/>
<TXT>The Group VI Technical Data Package shall consist of the as-built drawings revised to include system revisions 
and modifications.  Copies of the updated as-built drawings shall be delivered to the Government following approval 
of the PVT and endurance test.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   ENVIRONMENTAL REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select equipment and cable temperature ratings within ambient temperature 
conditions at the project location.  State additional requirements when ambient 
conditions are more extreme than manufacturers' equipment ratings (e.g. conformal 
coatings for 100% relative humidity or condensing atmospheres, enclosure heaters 
or coolers, etc.).  The designer will show hazardous (classified) environmental 
area(s), type of hazard(s) and hazard classification (Class I, II, or III or 
combination; Division 1 or 2; Groups A, B, C, D, E, F, or G or combinations; 
and operating temperatures).  Whenever possible, avoid placement of equipment 
and cables within the hazardous location to reduce installation costs, and to 
simplify maintenance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Equipment and cable to be used indoors shall be rated for continuous operation under ambient environmental conditions 
of<MET> 0 to 50 degrees C</MET><ENG> 35 to 122 degrees F</ENG> dry bulb and 10 to 95 percent relative humidity, noncondensing.  Equipment 
and cable to be used outdoors shall be rated for continuous operation under ambient environmental conditions 
of<MET> minus 40 to plus 70 degrees C</MET><ENG> minus 40 to plus 158 degrees F</ENG> and humidity of up to 100 percent condensing 
or as normally encountered for the installed location.  All equipment shall be rated for continuous operation 
under the ambient vibration conditions encountered for the installed location.  Components located in areas where 
fire or explosion hazards may exist because of flammable gases or vapors, flammable liquids, combustible dust 
or ignitable fibers or flyings, shall be rated and installed in accordance with Chapter 5 of <RID>NFPA 70</RID> and as shown.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   COMMUNICATIONS EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Communications equipment for circuits between sensors and field processors, and between the field processors 
and central processor, shall be capable of transmitting data within the error rate specified over the distances 
shown.  For wireline equipment, the maximum permissible error rate shall be 1 in 100,000.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Modems</TTL><BRK/>
<BRK/>
<TXT>[MODEMS shall conform to <RID>ITU H.222.0</RID> for a data rate of at least 9600 bits per second (bps)] [MODEMS shall provide 
and operate at 48,000 bps, both upstream and downstream, full duplex on circuits using asynchronous communications.  
MODEM shall have error detection auto answer/autodial, and call-in-progress detection.  The MODEM shall meet 
the requirements of <RID>ITU V.92</RID> and <RID>ITU V.44</RID> for data compression standards, and shall be suitable for operating 
on unconditioned voice grade telephone lines in conformance with <RID>47 CFR 68</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Line Drivers</TTL><BRK/>
<BRK/>
<TXT>Line drivers shall transmit data at a minimum of 9600 bps over the distances as shown, and be compatible with 
the selected or existing wireline modems and telecommunications equipment that is operational at the installation.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   WIRELINE CABLE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The National Electrical Code has changed the classification of data cable 
from "Appliance Wiring Material" to "Building Wire."<BRK/>
<BRK/>
The designer shall closely coordinate the drawings with the specifications to 
make sure that the number of pair and gauge size of conductors required by the 
design is available through the RUS program.  If not available, delete references 
to RUS and specify a cable type (e.g., Type TC) that is suitable for installation 
in damp or wet locations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Wireline cable shall be insulated solid copper type conforming to the following specifications.  A minimum of 
No. 22 AWG shall be used for all applications.  All interior cables' insulation and jacketing material shall 
not contain any poly vinyl chloride (PVC) compounds.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Cable Components</TTL><BRK/>
<BRK/>
<TXT>All cable components shall be able to withstand the environment the cable is installed in for a minimum of 20 
years.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Underground Cable</TTL><BRK/>
<BRK/>
<TXT>Underground cable as specified in <RID>ICEA S-84-608</RID> covers mechanical and electrical requirements for filled, polyolefin 
insulated, copper conductor telecommunications cable.  It provides alternative choices for type of insulation, 
type of filling compound, core lay-ups, color code, sheath design (shielding materials, single or double jackets, 
and jacket thickness), and screened or non-screened core.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   Aerial Cable</TTL><BRK/>
<BRK/>
<TXT>Aerial cable as specified in <RID>ICEA S-84-608</RID> covers mechanical and electrical requirements for filled, polyolefin 
insulated, copper conductor telecommunications cable.  It provides alternative choices for type of insulation, 
type of filling compound, core lay-ups, color code, sheath design (shielding materials, single or double jackets, 
and jacket thickness), and screened or non-screened core.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4   Direct Burial Cable</TTL><BRK/>
<BRK/>
<TXT>Direct burial cable as specified in <RID>RUS Bull 345-67</RID> covers mechanical and electrical requirements for filled, 
polyolefin insulated, copper conductor.  It provides alternative choices for type of insulation, type of armor 
jacket, filling compound, core lay-ups, color code, sheath design (shielding materials, single or double jackets, 
and jacket thickness), and screened or non-screened core.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.5   Interior Cable</TTL><BRK/>
<BRK/>
<TXT>Interior cable, as specified in <RID>NFPA 70</RID> covers mechanical and electrical requirements for filled, polyolefin 
insulated copper conductor communications cable.  It provides alternative choices for type of insulation, type 
of jacket, filling compound, core lay-ups, color code, sheath design (shielding materials, single or double jackets, 
and jacket thickness), and screened or non-screened core.  All interior cables' insulation and jacketing material 
shall not contain any poly vinyl chloride (PVC) compounds.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   RACEWAY SYSTEMS</TTL><BRK/>
<BRK/>
<TXT>Raceway systems as specified in Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM and Section <SRF>33 70 02.00 10</SRF> ELECTRICAL 
DISTRIBUTION SYSTEM, UNDERGROUND and as shown shall be furnished and installed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   ENCLOSURES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will show the specific type of enclosure required on the 
drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Enclosures shall conform to the requirements of <RID>NEMA 250</RID> for the types specified.  Finish color shall be the 
manufacturer's standard, unless otherwise indicated.  Damaged surfaces shall be repaired and refinished using 
original type finish.  Provide metallic enclosures to house the wireline DTS equipment.  The enclosures shall 
be as specified or shown.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.4.1   Interior</TTL><BRK/>
<BRK/>
<TXT>Enclosures to house wireline DTS equipment in an interior environment shall meet the requirements of <RID>NEMA 250</RID>
, Type 12.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Exterior</TTL><BRK/>
<BRK/>
<TXT>Enclosures to house wireline DTS equipment in an outdoor environment shall meet the requirements of <RID>NEMA 250</RID>, 
Type 4.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.3   Corrosion Resistant</TTL><BRK/>
<BRK/>
<TXT>Enclosures to house wireline DTS equipment in a corrosive environment shall meet the requirements of <RID>NEMA 250</RID>
, Type 4X.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.4   Hazardous Environment</TTL><BRK/>
<BRK/>
<TXT>Enclosures in a hazardous environment shall meet the requirements as specified in paragraph ENVIRONMENTAL REQUIREMENTS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5   MESSENGER CABLE</TTL><BRK/>
<BRK/>
<TXT>A messenger cable system to support all aerial cable shall be furnished and installed.  The messenger system 
shall include all guys, hardware and appurtenances needed to install the messenger cable.  The messenger system 
shall be capable of supporting the weight of the DTS cable with the required messenger cable tensioning without 
exceeding 30 percent of its rated breaking strength under<MET> 16 degrees C</MET><ENG> 60 degrees F</ENG> conditions of no ice and 
no wind.  The messenger shall be sized so that ice and wind loading normally encountered at the site does not 
cause the messenger to exceed 50 percent of its rated breaking strength.  All appurtenances, guys, and hardware 
shall be sized to exceed the required strength of the messenger cable.  Messenger cables shall be galvanized 
zinc coated steel or aluminum clad steel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   TAMPER PROVISIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph when using this section with Small Intrusion Detection 
Systems.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Enclosures, cabinets, housings, boxes, raceways, conduits, and fittings of every description having hinged doors 
or removable covers, and which contain any part of the DTS circuit, connection, splices, or power supplies, shall 
be provided with cover operated, corrosion-resistant tamper switches, arranged to initiate an alarm signal when 
the door or cover is moved.  Tamper switches shall be mechanically mounted to maximize the defeat time when enclosure 
covers are opened or removed.  The enclosure and the tamper switch shall function together to disallow direct 
line of sight to any internal components and tampering with the switch or the circuits before the switch activates.  
Tamper switches shall be inaccessible until the switch is activated; have mounting hardware concealed so that 
the location of the switch cannot be observed from the exterior of the enclosure; be connected to circuits which 
are under electrical supervision at all times, irrespective of the protection mode in which the circuit is operating; 
shall be spring loaded and held in the closed position by the door cover; and shall be wired so that they break 
the circuit when the door or cover is disturbed.  Tamper switches on the doors which must be opened to make routine 
maintenance adjustments to the system and to service the power supplies shall be push/pull-set, automatic reset 
type.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.6.1   Enclosure Covers</TTL><BRK/>
<BRK/>
<TXT>Covers of pull and junction boxes provided to facilitate installation of the system need not be provided with 
tamper switches if they contain no splices, connections, or power supplies, but shall be protected by tack welding 
or brazing the covers in place.  Zinc labels shall be affixed to such boxes indicating they contain no connections.  
These labels shall not indicate that the box is part of the security system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.2   Conduit-Enclosure Connections</TTL><BRK/>
<BRK/>
<TXT>All conduit-enclosure connections shall be protected by tack welding or brazing the conduit to the enclosure.  
Tack welding or brazing shall be done in addition to standard conduit-enclosure connection methods as described 
in <RID>NFPA 70</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3   Locks and Key-Lock Switches</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Either round key or conventional key type locks as defined in this specification 
are acceptable.  Selection should be based on hardware availability at the time 
of design.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.6.3.1   Locks</TTL><BRK/>
<BRK/>
<TXT>All locks required to be installed on system enclosures for maintenance purposes shall be UL listed, [round-key 
type, with three dual, one mushroom, and three plain pin tumblers] [or] [conventional key type lock having a 
combination of five cylinder pin and five-point three position side bar].  Keys shall be stamped "U.S. GOVT. 
DO NOT DUP."  The locks shall be so arranged that the key can only be withdrawn when in the locked position.  
All maintenance locks shall be keyed alike and only two keys shall be furnished for all of these locks.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3.2   Key-Lock-Operated Switches</TTL><BRK/>
<BRK/>
<TXT>All key-lock-operated switches required to be installed on system components shall be UL listed, [round-key type, 
with three dual, one mushroom, and three plain pin tumblers] [or] [conventional key type lock having a combination 
of five cylinder pin and five-point three position side bar].  Keys shall be stamped "U.S. GOVT. DO NOT DUP." 
Key-lock-operated switches shall be two position, with the key removable in either position.  All key-lock-operated 
switches shall be keyed differently and only two keys shall be furnished for each key-lock-operated-switch.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>System components and appurtenances shall be installed in accordance with the manufacturer's instructions and 
as shown.  All necessary interconnections, services, and adjustments required for a complete and operable data 
transmission system shall be provided.  Loading coils shall not be installed on cables provided for use with 
line drivers.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Enclosure Penetrations</TTL><BRK/>
<BRK/>
<TXT>Enclosure penetrations shall be from the bottom unless the system design specifically requires penetrations from 
other directions.  Penetrations of interior enclosures involving transitions of conduit from interior to exterior, 
and all penetrations on exterior enclosures shall be sealed with rubber silicone sealant to preclude entry of 
water.  The conduit riser shall terminate in a hot-dipped galvanized metal cable terminator.  The terminator 
shall be filled with an approved sealant as recommended by the cable manufacturer, and in such a manner that 
the cable is not damaged.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Interior Electrical Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Wireline DTS cable should not be used for, or routed through, Sensitive 
Compartmented Information Facilities (SCIFs).  The designer will not show any 
wireline DTS cable routed through a SCIF.  The designer should check DCID 1/21 
for further direction.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified, interior electrical work shall be installed as specified in Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM and as shown.  In locations where corrosion and soil conditions are a concern, seek approval 
from Government before using steel or rigid galvanized conduit.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Exterior Electrical Work</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.3.1   Underground</TTL><BRK/>
<BRK/>
<TXT>Except as otherwise specified, underground electrical and communications work shall be installed as specified 
in Section <SRF>33 70 02.00 10</SRF> ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND and as shown.</TXT><BRK/>
<BRK/>
<LST>a. Minimum burial depth for cable shall be<MET> 762 mm</MET><ENG> 30 inches</ENG>, but not less than the depth of the frost 
line.</LST><BRK/>
<BRK/>
<LST>b. Where direct burial cable will pass under sidewalks, roads, or other paved areas, the cable shall 
be placed in minimum<MET> 25 mm</MET><ENG> 1 inch</ENG> diameter zinc coated steel, rigid galvanized, or schedule 40 conduit 
or concrete encased PVC.  Conduit may be installed by jacking or trenching, as approved.</LST><BRK/>
<BRK/>
<LST>c. All buried cable shall be placed below a minimum<MET> 76.2 mm</MET><ENG> 3 inch</ENG> wide plastic warning tape buried in 
the same trench or slot.  The tape shall be<MET> 300 mm</MET><ENG> 12 inches</ENG> above the cable.  The warning tape shall 
be continuously imprinted with the words "WARNING - COMMUNICATION CABLE BELOW" at not more than<MET> 1.2 m</MET><ENG>
 48 inch</ENG> intervals.  The plastic tape shall be acid and alkali resistant polyethylene film, <MET>76.2 mm</MET><ENG> 3 
inches</ENG> wide with a minimum thickness of<MET> 102 micrometers</MET><ENG> 0.004 inch</ENG>.  Tape shall have a minimum strength 
of<MET> 12.1 MPa</MET><ENG> 1750 psi</ENG> lengthwise and<MET> 10.3 MPa</MET><ENG> 1500 psi</ENG> crosswise.</LST><BRK/>
<BRK/>
<LST>d. Transitions from underground cable to aerial cable shall be as specified in paragraph CONNECTIONS 
BETWEEN AERIAL AND UNDERGROUND SYSTEMS in Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION</LST><BRK/>
<BRK/>
<LST>e. Splices shall be installed in cable boxes.  A cable length of at least<MET> 1 m</MET><ENG> 3 ft</ENG> shall be provided 
in each splicing location for future cable relocation, splicing, and re-racking.  All splice enclosures 
(manholes, handholes, above-ground pedestals, etc.) shall have a length, width, and depth of at least 
twice (2X) the initial size requirement ot accommodate future system work (i.e., splices).  All cable 
ends shall be protected at all times with end caps except during actual splicing.  During the splicing 
operations, means shall be provided to protect the unspliced portions of the cable from the intrusion 
of moisture and other foreign matter.</LST><BRK/>
<BRK/>
<LST>f. For cable installed in duct and conduit, a cable feeder guide shall be used between the cable reel 
and the face of the duct and conduit to protect the cable and guide it into the duct and conduit as it 
is played off the reel.  As the cable is played off the reel, it shall be carefully inspected for jacket 
defects.  Precautions shall be taken during installation to prevent the cable from being "kinked" or 
"crushed."  A pulling eye shall be attached to the cable and used to pull the cable through the duct 
and conduit system.  Cable shall be hand fed and guided through each manhole.  As the cable is played 
off the reel into the cable feeder guide, it shall be sufficiently lubricated with a type of lubricant 
recommended by the cable manufacturer.  Where the cable is pulled through a manhole, additional lubricant 
shall be applied at all intermediate manholes.  Dynamometers or load-cell instruments shall be used to 
ensure that the pulling line tension does not exceed the installation tension value specified by the 
cable manufacturer.  The mechanical stress placed upon a cable during installation shall be such that 
the cable is not twisted or stretched.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3.2   Aerial Cables</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Aerial cable should be installed on existing poles where height, clearance 
requirements, and structure loading allow addition of cables.  Where this is 
not possible, requirements for new poles must be shown on drawings. Installations 
will comply with ANSI C2 and NFPA 70.<BRK/>
<BRK/>
Common lashing machines provide 1 turn per 380 linear mm (15 linear inches) 
in a single pass, which is acceptable for locations where loading due to weather 
conditions is moderate.  Other locations may require multiple passes with the 
lashing machine.</NPR><BRK/>
<BRK/>
<NPR>The designer will verify local electrical installation requirements to determine 
if new grounding conductors and electrodes are required at each messenger cable 
ground connection and will select the first, or second, or both bracketed entries 
as determined to be necessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified or shown, aerial communications work shall be installed as specified in Section 
<SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION.</TXT><BRK/>
<BRK/>
<LST>a. Messanger cable System<BRK/>
<BRK/>
Furnish and install a messenger cable system to support aerial cables.  Messengers shall be attached 
to poles with approved clamps with not less than<MET> 15.9 mm</MET><ENG> 5/8 inch</ENG> through bolts.  Messenger cable tensioning 
shall not exceed 30 percent of its rated breaking strength under<MET> 16 degrees C</MET><ENG> 60 degrees F</ENG> conditions 
of no ice and no wind.  The messenger cable shall be stressed prior to lashing the cables to a tension 
higher than the final tension.  This will prestretch the cable and ensure that there are minimum variations 
from the calculated values when the messenger is dead-ended under its final tension and sag.  Messengers 
shall be grounded and guyed at all corners, dead-ends, entrances to each facility, and grounded at intervals 
not exceeding<MET> 305 m</MET><ENG> 1000 feet</ENG>.  [New grounding conductors and electrodes shall be provided at each ground 
connection.] [Where grounding connections are made in the vicinity of existing grounding conductors and 
electrodes, the grounding connection may be made by a bolted or welded connection to the existing grounding 
conductor.]  Ground conductors shall be soft drawn copper, having a current capacity of at least 20 percent 
of that of the messenger to which it is connected.  Ground conductors shall not be smaller than No. 6 
AWG.  The ground conductor shall be connected to a copper or copper-clad steel ground rod not less than<MET>
 19.1 mm</MET><ENG> 3/4 inch</ENG> in diameter, and length shall be as needed to achieve the specified ground resistance.  
After installation is completed, the top of the ground rod shall be approximately<MET> 300 mm</MET><ENG> 1 foot</ENG> below 
finished grade.  The ground conductor shall be protected by half-round wood, plastic, or fiber molding 
from the ground to a point at least<MET> 2.4 m</MET><ENG> 8 feet</ENG> above the ground.  Ground resistance shall be measured 
in normally dry conditions, not less than 48 hours after a rainfall, and the total ground resistance 
shall not exceed [25] [_____] ohms.</LST><BRK/>
<BRK/>
<LST>b. Transitions from Aerial Cable to Underground:  Transitions from aerial cable to underground cable 
shall be as specified (and consistent with those specified) in CONNECTIONS BETWEEN AERIAL AND UNDERGROUND 
SYSTEMS in Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION.</LST><BRK/>
<BRK/>
<LST>c. Aerial Cable Splices:  All splices in aerial cable shall be within<MET> 1 m</MET><ENG> 3 feet</ENG> of a pole and placed 
inside a watertight enclosure.  Drip loops shall be formed at the cable entrance to the enclosure.  Lashing 
clamps shall be placed within<MET> 300 mm</MET><ENG> 12 inches</ENG> of the enclosure.</LST><BRK/>
<BRK/>
<LST>d. Lashing Wire:  Lashing wire shall be wound tightly around both the communication cable and the messenger 
cable by machine methods.  The lashing wire shall have a minimum of 1 turn per<MET> 380 linear mm</MET><ENG> 15 linear 
inches</ENG> and not less than the number of turns per<MET> linear mm</MET><ENG> linear foot</ENG> that is recommended by the cable 
manufacturer for the distance between cable support points and the combined ice and wind loading and 
extreme wind loading specified or normally encountered for the installed location.  Lashing clamps shall 
be placed at all poles and splices.</LST><BRK/>
<BRK/>
<LST>e. Stress Loops:  Loops shall be formed in the aerial DTS cable at all points of connection and at all 
poles to prevent damage from thermal stress and wind loading.  The DTS cable shall be protected from 
chafing and physical damage with the use of spiral cut tubing and PVC tape, or plastic sleeves.  The 
ground clearance of installed cabling shall be as shown.</LST><BRK/>
<BRK/>
<LST>f. Enclosure Penetrations:  All enclosure penetrations shall be from the bottom and shall be sealed with 
rubber silicone sealant to preclude the entry of water.</LST><BRK/>
<BRK/>
<LST>g. Identification and Labeling:  Supply identification tags or labels for each cable.  The labeling format 
shall be identified and a complete record shall be provided to the Government with the final documentation.  
Each cable shall be identified by type of signal being carried and termination points.  All labels shall 
be non-fading when exposed to moisture, sunlight, soil minerals, chemicals, and other environmental elements.</LST><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will include the data listing, the loading conditions, including 
radial thickness of ice, horizontal wind pressure, and temperature, for both 
combined ice and wind loading and extreme wind loading encountered at the project 
site.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>h. Design Parameters<BRK/>
<BRK/>
The following conditions to be encountered at this installation are as follows:</LST><BRK/>
<BRK/>
<ITM>aa.  Combined Ice and wind loading:<BRK/>
     (1)  radial thickness of ice [_____]<MET> mm</MET><ENG> inch</ENG><BRK/>
     (2)  horizontal wind pressure [_____]<MET> Pa</MET><ENG> psf</ENG><BRK/>
     (3)  constant to be added to the resultant [_____]<MET> N/m</MET><ENG> lb/ft</ENG></ITM><BRK/>
<BRK/>
<ITM>bb.  Extreme wind loading:<BRK/>
     (1)  velocity pressure exposure coefficient, wire [_____]<BRK/>
     (2)  basic wind speed [_____]<MET> m/s</MET><ENG> mi/h</ENG><BRK/>
     (3)  gust response factor, wire [_____]<BRK/>
     (4)  importance factor [1.0] [_____]<BRK/>
     (5)  shape factor [1.0] [_____]</ITM><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.2   TESTING</TTL><BRK/>
<BRK/>
<TXT>Provide all personnel, equipment, instrumentation, and supplies necessary to perform all testing.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Wire Line Test</TTL><BRK/>
<BRK/>
<TXT>Test each wire line pair.  Prepare reports containing test results and shall certify in the reports conformance 
to the following requirements.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1.1   Attenuation</TTL><BRK/>
<BRK/>
<TXT>Measurements shall be made with test tone of 1004 Hz at 0 dBm.  Attenuation distortion not to exceed minus 3 
dB to plus 12 dB from 300 to 3,000 Hz, and minus 2 dB to plus 8 dB from 500 to 2,500 Hz referenced to the attenuation 
of the 1004 Hz test tone.  Attenuation at 1004 Hz of less than 40 dB.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.1.2   Envelope Delay</TTL><BRK/>
<BRK/>
<TXT>Envelope delay distortion shall be no greater than 1,750 microseconds over a range of 800 to 2,600 Hz.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.1.3   Insulation Resistance</TTL><BRK/>
<BRK/>
<TXT>Insulation resistance wire to wire of wireline pair of at least<MET> 16,093 megohm-km</MET><ENG> 10,000 megohm-miles</ENG> measured 
at<MET> 22 degrees C</MET><ENG> 72 degrees F</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.1.4   Loop Resistance</TTL><BRK/>
<BRK/>
<TXT>Loop resistance of less than 1,500 ohms.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2.2   Contractor's Field Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer must insert the title of the appropriate specification.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Verify complete operation of the DTS during Contractor's Field Testing as specified in Section [_____].  Field 
test shall include a bit error rate test.  Perform the test by sending a minimum of 100,000 bits of data on each 
communication link and measuring errors.  The bit error rate shall be not greater than 1 out of 100,000 for each 
link.  Prepare a report containing results of the field test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Verification Test and Endurance</TTL><BRK/>
<BRK/>
<TXT>The wire line data transmission system shall be tested during the Performance Verification Test and Endurance 
Test as specified in Section [_____].</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>   <END/><BRK/></SEC>