USACE / NAVFAC / AFCESA / NASA         UFGS-28 05 26.00 40 (November 2008)<BRK/>
                                       -----------------------------------<BRK/>
Preparing Activity:  <PRA>NASA</PRA>              Superseding<BRK/>
                                       UFGS-28 05 26.00 40 (August 2008)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 28 05 26.00 40</SCN><BRK/>
<BRK/>
<STL>GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY</STL><BRK/>
<DTE>11/08</DTE><BRK/>
<NTE><BRK/>
<NPR>NOTE:  This specification covers the requirements for <SCP>electrical system and 
equipment grounding including ground rods, grounding conductors, connectors, 
and other accessories</SCP>.  Section excludes instrumentation and static grounding 
systems.</NPR><BRK/>
<BRK/>
<NPR>Drawings should show plan layout of each grounding electrode, ground mat, ground 
grid, substation ground bus, interconnecting grounding conductor, and tap connections 
to steel building columns and outdoor electrical equipment.  Detail drawings 
of ground mats and ground grids should show configuration, ground rod spacings, 
interconnecting cable and tap connections to substation yard fence, substation 
ground bus, and interior equipment.</NPR><BRK/>
<BRK/>
<NPR>When grounding systems as shown fail to achieve the desired measured resistance 
to ground, additional ground rods may be required.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.</NPR><BRK/>
<BRK/>
<NPR>Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.</NPR><BRK/>
<BRK/>
<NPR>Recommended changes to a UFGS should be submitted as a <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN WELDING SOCIETY (AWS)</ORG><BRK/><BRK/><RID>AWS A5.8/A5.8M</RID><RTL>(2004; Errata 2004) Specification for Filler Metals for Brazing and Braze Welding</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM B 3</RID><RTL>(2001; R 2007) Standard Specification for Soft or Annealed Copper Wire</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE Std 81</RID><RTL>(1983) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System (Part 1)Normal Measurements</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF DEFENSE (DOD)</ORG><BRK/><BRK/><RID>MIL-STD-889</RID><RTL>(Rev B, Notice 3) Dissimilar Metals</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 467</RID><RTL>(2007) Standard for Grounding and Bonding Equipment</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   GENERAL REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section <SRF>26 00 00.00 20</SRF> BASIC ELECTRICAL MATERIALS AND METHODS is not 
included in the project specification, applicable requirements therefrom should 
be inserted and the first paragraph deleted.  If Section <SRF>05 05 23</SRF> WELDING, STRUCTURAL 
is not included in the project specification, applicable requirements therefrom 
should be inserted and the second paragraph deleted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Section <SRF>26 00 00.00 20</SRF> BASIC ELECTRICAL MATERIALS AND METHODS applies to work specified in this section.]</TXT><BRK/>
<BRK/>
<TXT>[Section <SRF>05 05 23</SRF> WELDING, STRUCTURAL applies to work specified in this section.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review Submittal Description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  Submit the following 
in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM>Submit material, equipment, and fixture lists for <SUB>Grounding Systems</SUB>including manufacturer's 
style or catalog numbers, specification and drawing reference numbers, warranty information, 
and fabrication site information.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM>Submit <SUB>Record Drawings</SUB> in accordance with paragraph entitled, "Drawings," of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM>Submit equipment and performance data for the following items including life, test, system functional 
flows, safety features, and mechanical automated details.</ITM><BRK/>
<BRK/>
<ITM>Submit Manufacturer's catalog data for the following items:</ITM><BRK/>
<BRK/>
<ITM><SUB>Ground Rods</SUB></ITM><BRK/>
<ITM><SUB>Ground Wires</SUB></ITM><BRK/>
<ITM><SUB>Connectors and Fasteners</SUB></ITM><BRK/>
<ITM><SUB>Bonding</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM>Submit Test Reports for the following tests on grounding systems in accordance with the paragraph 
entitled, "Field Tests," of this section.  Within the report include certified record of ground-resistance 
tests on each driven ground rod, ground rod assembly, and other grounding electrodes.  Include 
within the record the number of rods driven and their depth at each location to meet the required 
resistance-to-ground measurements specified.  Include a statement describing the condition of 
the soil at the time of measurement.</ITM><BRK/>
<BRK/>
<ITM><SUB>Bond Resistance Test</SUB></ITM><BRK/>
<ITM><SUB>Ground Resistance Tests</SUB></ITM><BRK/>
<ITM><SUB>Ground Isolation Test</SUB></ITM><BRK/>
<ITM><SUB>Continuity Isolation Test</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM>Submit Manufacturer's instructions for the <SUB>Grounding Systems</SUB> including special provisions required 
to install equipment components and system packages.  Within special notices, detail impedances, 
hazards and safety precautions.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   DRAWINGS</TTL><BRK/>
<BRK/>
<TXT><SUB>Record Drawings</SUB> must indicate the location of ground rods, mats, grids, building ground bus, supplementary grounding 
electrodes, steel building columns, and other metal structures connected to the grounding system.</TXT><BRK/>
<BRK/>
<TXT>Identify the location of each ground rod and ground-rod assembly and other grounding electrodes by letter in 
alphabetical order and keyed to the record of ground-resistance tests.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>GROUND RODS</SUB></TTL><BRK/>
<BRK/>
<TXT>[Ground rods must conform to the requirements of [<RID>NFPA 70</RID>] [<RID>UL 467</RID>] [_____].]</TXT><BRK/>
<BRK/>
<TXT>[Ground rods must be copper-clad steel rods not less than<MET> 20 millimeter</MET><ENG> 3/4 inch</ENG> in diameter and not less than<MET>
 [3000] [_____] millimeter</MET><ENG> [10] [_____]-feet</ENG> long per section.  Ground rods must be clean and smooth and have 
a cone-shaped point on the first section and be die-stamped near the top with the name or trademark of the manufacturer 
and the length of the rod in<MET> millimeter</MET><ENG> feet</ENG>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   <SUB>GROUND WIRES</SUB></TTL><BRK/>
<BRK/>
<TXT>Ground wires must be in accordance with Section <SRF>26 05 00.00 40</SRF> COMMON WORK RESULTS FOR ELECTRICAL.</TXT><BRK/>
<BRK/>
<TXT>Ground and bond wires for substations, main panels and distribution points, and ground rod connections must be 
annealed bare copper conforming to <RID>ASTM B 3</RID>, stranded, with 98 percent conductivity.  Wire size must be in accordance 
with the grounding requirements of <RID>NFPA 70</RID>.</TXT><BRK/>
<BRK/>
<TXT>Ground wires for equipment receptacles for noncurrent carrying hardware, installed in conduit must be soft drawn 
copper, in accordance with <RID>ASTM B 3</RID>, stranded, with green insulation.  Note wire size.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   <SUB>CONNECTORS AND FASTENERS</SUB></TTL><BRK/>
<BRK/>
<TXT>Grounding and bonding fasteners and connectors must conform to the requirements of <RID>UL 467</RID>, and Section 
<SRF>26 05 00.00 40</SRF> COMMON WORK RESULTS FOR ELECTRICAL.</TXT><BRK/>
<BRK/>
<TXT>Grounding and bonding fasteners must be [copper] [bronze].</TXT><BRK/>
<BRK/>
<TXT>Bonding straps and jumpers must be copper and have a cross-sectional area of not less than<MET> 4.12 millimeter diameter 
(No. 6 AWG)</MET><ENG> No. 6 AWG</ENG>.  Bonding straps and jumpers for shock-mounted devices with [pivot] [hinged] [swivel] joints 
must be made of [flat] [tinned-copper] [woven-wire braid] [flexible stranded] wire.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   BONDING AND GROUNDING</TTL><BRK/>
<BRK/>
<TXT>Bonding and grounding requirements must be in accordance with <RID>NFPA 70</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   GROUNDING ELECTRODES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In locations where existing underground utilities, equipment or structures 
may be damaged, ground rod installation should be accomplished using the water 
jetting method.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Grounding electrodes must include ground rods installed expressly for grounding systems.  [Install ground rods 
using a water jetting procedure.]</TXT><BRK/>
<BRK/>
<TXT>Minimum ground rod section must be<MET> [3000] [_____] millimeter</MET><ENG> [10] [_____] feet</ENG>.  Thread sections together and 
exothermically fusion weld.</TXT><BRK/>
<BRK/>
<TXT>[Install ground rods so that the top of the rod is<MET> [100] [_____] millimeter</MET><ENG> [4] [_____] inches</ENG> above grade.]</TXT><BRK/>
<BRK/>
<TXT>[Install ground rods so that the top of the rod is not less than<MET> [450] [_____] millimeter</MET><ENG> [18] [_____] inches</ENG>
 below finished grade.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   GROUND GRIDS</TTL><BRK/>
<BRK/>
<TXT>Ground grids must consist of a series of ground rods installed with interconnecting grounding conductors between 
ground rods.  Space ground rods as noted.<BRK/>
<BRK/>
Do not bury ground grid less than<MET> [450] [_____] millimeter</MET><ENG> [18] [_____] inches</ENG> below the finish grade.  Grounding 
conductors must not be less than<MET> [11.7] [_____] millimeter diameter (No. [4/0] [_____] AWG)</MET><ENG> No. [4/0] [_____] 
AWG</ENG> and must be exothermically fusion welded together at crossover points and to ground rods.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   BUILDING GROUNDS</TTL><BRK/>
<BRK/>
<TXT>Steel framework of the building must be grounded with a driven ground rod at the base of every corner column 
and intermediate exterior columns at distances not greater than<MET> [18,000] [_____] millimeter</MET><ENG> [60] [_____] -feet</ENG>
 apart.  Electrically connect grounding conductor to each ground rod and to each steel column and extend around 
the perimeter of the building.  Grounding-conductor loop around the perimeter of the building must not be less 
than<MET> [11.7] [_____] millimeter diameter (No. [4/0] [_____] AWG)</MET><ENG> No. [4/0] [_____] AWG</ENG>.  Tap connections from 
the ground loop to the building steel must not be less than<MET> [11.7] [_____] millimeter diameter (No. [4/0] [_____] 
AWG)</MET><ENG> No. [4/0] [_____] AWG</ENG>.</TXT><BRK/>
<BRK/>
<TXT>Bury building ground no less than<MET> 450 millimeter</MET><ENG> 18 inches</ENG> below grade and<MET>[600] [_____] millimeter</MET><ENG> [2] [_____] 
feet</ENG> from the building foundation.  Interconnecting grounding conductor between ground grid and building grounds 
must not be less than<MET> [11.7] [_____] millimeter diameter (No. [4/0] [_____] AWG)</MET><ENG> No. [4/0] [_____] AWG</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   EQUIPMENT GROUNDING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph specifies a "Case" ground.  A Case ground is where grounding 
is critical such as fueling areas, pads, etc.  A modification such as an office 
building or an administrative area would not require the additional ground.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[In addition to the green colored equipment grounding conductor required in each raceway and sized in accordance 
with Table 250.122 of the NEC, each panelboard/ switchboard enclosure, transformer housing, motor housing, disconnect, 
starter, and other electrical equipment, addressed under this contract, must be bonded to the grounding system 
with a stranded copper conductor, routed external to the feeder raceway.]</TXT><BRK/>
<BRK/>
<TXT>Metallic raceway systems must have electrical continuity with equipment individually and be directly connected 
to the building ground, independent of the raceway system.</TXT><BRK/>
<BRK/>
<TXT>Individually and directly connect enclosures for panelboards to the building ground.  Grounding conductor must 
not be less than<MET> [6.54] [_____] millimeter diameter (No. [2] [_____] AWG)</MET><ENG> No. [2] [_____] AWG</ENG> and be connected 
from the building ground to a copper ground-bus terminal strip located in each panelboard.</TXT><BRK/>
<BRK/>
<TXT>Polarized receptacles, lighting fixtures, and equipment enclosures must be grounded with an identified (green 
color) insulated conductor, not smaller than<MET> [2.03] [_____] millimeter diameter (No. [12] [_____] AWG)</MET><ENG> No. [12] 
[_____] AWG</ENG>, connected to the branch circuit ground-bus terminal strip.  Ground-bus terminal strip in each panelboard 
enclosure must be isolated and independent of the system neutral terminal strip.</TXT><BRK/>
<BRK/>
<TXT>Indoor substations, transformers, switchboard frames, switchgear assemblies, motors, motor control centers, air 
compressors, air handlers, refrigerated air dryers, generators, frames and tracks of cranes, and [_____] must 
be individually and directly connected to the building ground. Current-carrying capacity of the grounding conductor 
must be the same as the current-carrying capacity of the power conductors for circuits utilizing power lines 
size<MET> [6.54] [_____] millimeter diameter (No. [2] [_____] AWG)</MET><ENG> No. [2] [_____] AWG</ENG> and smaller.  For circuits 
with power wiring larger than<MET> [6.54] [_____] millimeter diameter (No. [2] [_____] AWG)</MET><ENG> No. [2] [_____] AWG</ENG>, the 
grounding conductor must be in accordance with <RID>NFPA 70</RID>, except that the grounding conductor must not be smaller 
than<MET> [6.54] [_____] millimeter diameter (No. [2] [_____] AWG)</MET><ENG> No. [2] [_____] AWG</ENG>.</TXT><BRK/>
<BRK/>
<TXT>Noncurrent carrying metallic parts of electrical equipment, including metallic cable sheaths, conduit, raceways, 
and electrical structural members, must be bonded together and connected to the ground grid or ground connection 
rods.</TXT><BRK/>
<BRK/>
<TXT>Install secure ground systems for power and instrumentation.  Independently connect each system to the building 
counterpoise as shown.</TXT><BRK/>
<BRK/>
<TXT>Secure ground systems must consist of unspliced ground wires in individual welded or epoxied conduit runs from 
the secure area to the building counterpoise.  Welding and epoxying must conform to Section <SRF>26 05 00.00 40</SRF> COMMON 
WORK RESULTS FOR ELECTRICAL.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   GROUNDING CONNECTIONS</TTL><BRK/>
<BRK/>
<TXT>Ground connections must be bonded connections in accordance with paragraph entitled, "Bonding."</TXT><BRK/>
<BRK/>
<TXT>[Weld] [Silver-solder] ground connections that are buried or in inaccessible locations.</TXT><BRK/>
<BRK/>
<TXT>Bolt connections in accessible locations.  Connections to steel building columns in accessible locations must 
be cast-copper-alloy clamp lugs [bolted] [exothermically fusion-welded] to the structure.</TXT><BRK/>
<BRK/>
<TXT>Clean, grease, and remove foreign matter from ground connection surfaces.  Do not penetrate clad material in 
the cleaning process.  Make connection between like metals where possible.  Where dissimilar metals are welded, 
brazed, or clamped, follow the weld kit manufacturer's instructions.  Connections between dissimilar metals must 
not produce galvanic action in accordance with <RID>MIL-STD-889</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   <SUB>BONDING</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>3.7.1   Type of Bonds</TTL><BRK/>
<BRK/>
<TXT>Accomplish bonding of metal surfaces by [brazing] [welding] [clamping] [structural joining methods].</TXT><BRK/>
<BRK/>
<SPT><TTL>3.7.1.1   Brazing</TTL><BRK/>
<BRK/>
<TXT>Brazing solder must conform to <RID>AWS A5.8/A5.8M</RID> [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.1.2   Welding</TTL><BRK/>
<BRK/>
<TXT>Welding must be by the exothermic process.  Within the welding procedure, include the proper mold and powder 
charge and conform to the manufacturer's recommendations.</TXT><BRK/>
<BRK/>
<TXT>Welding processes must be of the exothermic fusion type that will make a connection without corroding or loosening.  
Process must join all strands and not cause the parts to be damaged or weakened.  Completed connection or joint 
must be equal or larger in size than the conductors joined and have the same current-carrying capacity as the 
largest conductor.  Paint buried ground connections with a bitumastic paint.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.1.3   Clamping</TTL><BRK/>
<BRK/>
<TXT>In external locations, use clamping only where a disconnect type of connection is required.  Connection device 
may utilize [spring-loaded jaws] [threaded fasteners].  Construct device such that positive contact pressure 
is maintained at all times.  Use machine bolts with [tooth-type] [spring-type] lockwashers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.1.4   Structural Joining Methods</TTL><BRK/>
<BRK/>
<TXT>Consider joints made with high-strength structural bolts, and clean unpainted faying surfaces sufficiently bonded.  
Install a jumper across the joint in the form of a<MET> [5.19] [_____] millimeter diameter (No. [4] [_____] AWG)</MET><ENG> No. 
[4] [_____] AWG</ENG> bare copper wire [exothermically welded] [bond welded with a<MET> 6 millimeter</MET><ENG> 1/4 inch</ENG> or larger 
fillet weld, with a<MET> [50] [_____] millimeter</MET><ENG> [2] [_____] inch</ENG> minimum length across the connection] at each end 
to the surfaces involved spanning the connection wire jumpers used across joints employing miscellaneous machine 
bolts.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7.2   Cleaning of Bonding Surfaces</TTL><BRK/>
<BRK/>
<TXT>Thoroughly clean surfaces that comprise the bond before joining.  Apply an appropriate abrasive with gentle and 
uniform pressure to ensure a smooth and uniform surface.  Do not remove excessive metal from the surface.  Clean 
clad metals in such a manner that the cladding material is not penetrated by the cleaning process.  Then clean 
bare metal with an appropriate solvent to remove any grease, oil, dirt, corrosion preventives, and other contaminants.  
Bond to the cleaned area must be made within one hour after cleaning.  Seal joint and refinish the exposed surfaces 
within two hours of exposure to prevent oxidation.  When additional time is required, apply a corrosion preventive 
compound until the area can be refinished.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.3   Bonding Straps and Jumpers</TTL><BRK/>
<BRK/>
<TXT>Install jumpers such that the vibration by the shock-mounted device will not change its electrical characteristics.</TXT><BRK/>
<BRK/>
<TXT>[Braze] [Weld] bonds for outdoor locations unless a disconnect type of connection is required.  When a disconnect 
is required, use clamping with bolts.  Insert a tooth-type lockwasher between the strap and metallic member for 
each bolt.</TXT><BRK/>
<BRK/>
<TXT>Bond straps directly to the basic structure and do not penetrate any adjacent parts.  Install straps in an area 
that is accessible for maintenance.</TXT><BRK/>
<BRK/>
<TXT>Use single straps for the bonds and install such that they will not restrict movement of structural members.  
Do not connect two  or more straps in series.</TXT><BRK/>
<BRK/>
<TXT>Install straps such that they will not weaken structural members to which they are attached.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.4   Equipment and Enclosure Bonding</TTL><BRK/>
<BRK/>
<TXT>Each metallic enclosure and all electrical equipment must be bonded to ground.  At least one copper connection 
must be made from the system ground point to one or more enclosures in the area such that all enclosures and 
equipment provide a low-impedance path to ground when properly bonded together.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.5   Bonding of Conduit and Raceway Systems</TTL><BRK/>
<BRK/>
<TXT>Bond all metal conduit, fittings, junction boxes, outlet boxes, armored and metal sheathed cable, and other raceways.  
Take care to ensure adequate electrical contact at the joints and terminations.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.7.5.1   Rigid Metal Conduit and Terminations</TTL><BRK/>
<BRK/>
<TXT>Threaded connections must be wrench-tight and there must be no exposed threads.  Ream all ends of the conduit 
to remove burrs and rough edges.  Conduits entering boxes and enclosures must be bonded to the box with [bonding-type 
locknuts, one outside and one inside.] [locknuts and grounding-type bushings.]  Locknuts that gouge into the 
metal box when tightened are not acceptable.</TXT><BRK/>
<BRK/>
<TXT>Conduit systems that are interrupted by PVC dielectric links must be bonded separately on either side of the 
link.  Dielectric link must not be jumpered.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.5.2   Flexible Metal Conduit</TTL><BRK/>
<BRK/>
<TXT>Flexible conduit must have an integral grounding conductor.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7.6   Cable Tray Bonding</TTL><BRK/>
<BRK/>
<TXT>Bond cable tray sections together.  Cable tray sections in tandem assembly must be considered as having electrical 
continuity when these sections are bonded with the appropriate bolts.  Install bond straps across expansion joints.  
Bond cable trays to the building ground system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.7   Protection of Finished Bonds</TTL><BRK/>
<BRK/>
<TXT>Protect finished bonds by painting to match the original finish after the bond is made.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8   FIELD TESTS</TTL><BRK/>
<BRK/>
<TXT>Perform the following tests in the Contractor in the presence of the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.8.1   <SUB>Bond Resistance Test</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Resistance of any bond connection must not exceed [0.5] [_____] milliohm.</TST>  Rework bonds that exceed this resistance  
at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.2   <SUB>Ground Resistance Tests</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Test <SUB>Grounding systems</SUB> for ground resistance.  Total resistance from any point on the ground network to the building 
counterpoise must not exceed [50] [_____] milliohms.</TST></TXT><BRK/>
<BRK/>
<TXT>Ground resistance and counterpoise tests must be made during dry weather, and no sooner than [48] [_____] hours 
after rainfall.  Conduct tests using the ratio method that measures the ratio of the resistance to earth of an 
auxiliary test electrode to the series resistance of the electrode under test and a second auxiliary electrode.  
Perform measurements in accordance with <RID>IEEE Std 81</RID>.</TXT><BRK/>
<BRK/>
<TXT>Indicating instrument must be self-contained and include a direct-current generator, synchronized current and 
potential reversers, crossed-current and potential coils, direct-reading ohmmeter, series resistors, and range-selector 
switch.  Calibrate direct-reading ohmmeter for ranges of 0 to 20 ohms and 0 to 200 ohms.</TXT><BRK/>
<BRK/>
<TXT>Place auxiliary grounding electrodes in accordance with instrument manufacturer's recommendations but not less 
than<MET> [15,000] [_____] millimeter </MET><ENG>[50] [_____] feet</ENG> apart, in accordance with <RID>IEEE Std 81</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.3   <SUB>Ground Isolation Test</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Test ground systems for isolation from other ground systems.</TST></TXT><BRK/>
<BRK/></SPT>
<NED/><SPT><TTL>3.8.4   <SUB>Continuity Isolation Test</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Perform continuity test on all power receptacles to ensure that the ground terminals are properly grounded to 
the facility ground system.</TST></TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>     <END/><BRK/></SEC>