<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA              UFGS-32 01 26.71 (August 2008)<BRK/>
                                            ------------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                  Superseding<BRK/>
                                            UFGS-32 01 26 71 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 32 01 26.71</SCN><BRK/>
<BRK/>
<STL>GROOVING FOR AIRFIELD PAVEMENTS</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>providing grooves 
in airfield pavements to increase the safe performance of aircraft</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If an active runway is to be grooved, allowances such as Contractor reaction 
time, minimum distance equipment must be removed from the runway, and an estimated 
cost to the Contractor for each interruption must be addressed.</NPR><BRK/>
<BRK/>
<NPR>If unit prices are used, the following are designer options:</NPR><BRK/>
<BRK/>
<NPR>The unit of measurement for grooving the [runway] [taxiway] surface will be 
the lump sum.  The unit of measurement for aircraft traffic interruptions will 
be each.</NPR><BRK/>
<BRK/>
<NPR>A lump sum price will be paid for grooving and cleaning the pavement.  The minimum 
payment for each interruption will be one hour.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.1   Grooving Machine</TTL><BRK/>
<BRK/>
<TXT>Provide a grooving machine of a type equipped with diamond-saw cutting blades, and capable of making at least<MET>
 457 mm</MET><ENG> 18 inches</ENG> in width of multiple parallel grooves in one pass of the machine.  Thickness of the cutting 
blades shall be capable of making the required width and depth of grooves in one pass of the machine.  The cutting 
head shall not contain a mixture of new and worn blades or blades of unequal wear or diameter.  The wheels on 
the grooving machine shall be of a design that will not scar or spall the pavement.  Provide the machine with 
devices to control depth of groove and alignment within the specified tolerances.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2   Water Supply</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If transportation of the water by surface laid pipe is permitted, routing 
of the pipe should be shown.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Water for the grooving operation shall be provided by the [Contractor] [Government].  The water source will be 
described on the drawings so the Contractor can determine what <SUB>Equipment</SUB> will be required and the transportation 
means to the job.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Equipment</SUB></ITM><BRK/>
<BRK/>
<ITM>  List of proposed equipment to be used in performance of construction work, including descriptive 
data.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   ENVIRONMENTAL REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Grooving operations will not be permitted when freezing conditions prevent the immediate removal of debris and/or 
drainage of water from the grooved area.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS (Not Applicable)</TTL><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   PREPARATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Limits of the grooved area should be as described in UFC 3-260-01.  For 
Army airfields, grooving should not be allowed within the first 457 m (1,500 
feet) from the thresholds or the first 152 m (500 feet) either side of an arrest 
barrier cable which requires hook engagement for operation.  For Air Force airfields, 
grooving will be allowed in the first 457 m (1,500 feet) from thresholds and 
within 91.4 m (300 feet) of arrest barrier cables.</NPR><BRK/>
<BRK/>
<NPR>Normally, pavements of Army airfields are not grooved within the first 457 m 
(1,500 feet) of the thresholds; permission from the Corps of Engineers Division 
office must be obtained to groove this area of joint occupied airfields.</NPR><BRK/>
<BRK/>
<NPR>Figures 2-10 and 2-11 of -FAAAC 150/5320-12A- show examples of saw-cut step 
patterns at the intersection of secondary runways and exit taxiways to primary 
runways, respectively.</NPR><BRK/>
<BRK/>
<NPR>Characteristics of the existing pavement will be described in sufficient detail 
to allow the Contractor to select the most economical and effective cutting 
blades for grooving the pavement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.1.1   Existing Pavements</TTL><BRK/>
<BRK/>
<TXT>Bumps, depressed areas, bad or faulted joints, and badly cracked and/or spalled areas in the pavement shall not 
be grooved until such areas are adequately repaired or replaced, as specified in Section <SRF>[_____]</SRF>.  If the existing 
pavement is not suitable because of its strength, an overlay, flexible or rigid, will be required using the procedures 
specified in Section <SRF>[_____]</SRF>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   New Pavements</TTL><BRK/>
<BRK/>
<TXT>Allow new asphalt concrete pavements to cure for a minimum of 30 days before grooving, to allow the material 
to become stable enough to prevent closing of the grooves under normal use.  Permit new portland cement concrete 
pavements to cure for a minimum of 28 days before grooving.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   GROOVING</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Procedures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Grooving should be terminated within 1.5 m (5 feet) of the pavement edge 
to allow adequate space for operation of the grooving equipment.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cut grooves in the [asphalt] [portland cement] areas as indicated on the drawings.  Begin the grooving at one 
side of the usable [runway] [taxiway] and continue for the full width of the area.  Take all reasonable precautions 
to prevent damage to or roughening of the pavement between grooves.  Spalling along or tearing or raveling of 
the groove edges shall not be allowed.  The grooves shall be<MET> 6 mm</MET><ENG> 1/4 inch</ENG> plus or minus<MET> 1.2 mm</MET><ENG> 1/16 inch</ENG> wide 
by<MET> 6 mm</MET><ENG> 1/4 inch</ENG> plus or minus<MET> 1.2 mm</MET><ENG> 1/16 inch</ENG> deep and<MET> 38 mm</MET><ENG> 1-1/2 inches</ENG> plus or minus<MET> 3 mm</MET><ENG> 1/8 inch</ENG> center 
to center spacing.  The groove length shall be [_____]<MET> meters</MET><ENG> feet</ENG> plus or minus<MET> 75 mm</MET><ENG> 3 inches</ENG> long and normal 
to the longitudinal axis of the centerline of the [runway] [taxiway].  The transverse alignment of the grooves 
shall not vary more than<MET> 75 mm</MET><ENG> 3 inches</ENG> plus or minus on a<MET> 23 m</MET><ENG> 75 foot</ENG> length of grooving.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Clean-Up</TTL><BRK/>
<BRK/>
<TXT>Clean-up shall be continuous.  Flush debris produced by the machine to the edge of the grooved area or pick it 
up as it forms.  The dust coating remaining shall be flushed to the edge of the area if the resultant accumulation 
is not detrimental to the vegetation or storm drainage system.  Accomplish all flushing operations in a manner 
to prevent erosion on the shoulders.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Repair of Damaged Pavement</TTL><BRK/>
<BRK/>
<TXT>Repair at the Contractor's expense, and as specified in Section <SRF>[_____]</SRF>, any damage, which in the opinion of 
the Contracting Officer will be detrimental to aircraft tires, occurring to the pavement as a result of the grooving 
operations.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>