<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA                 UFGS-32 11 10 (August 2008)<BRK/>
                                               ---------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                     Superseding<BRK/>
                                               UFGS-32 11 10 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 32 11 10</SCN><BRK/>
<BRK/>
<STL>DRAINAGE LAYER</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>a drainage layer 
under roads, streets and airfield pavements.</SCP><BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
This guide specification includes tailoring options for RDM, cement or bituminous 
stabilized OGM, and OGM with choke stone.  The notes under Table I should be 
renumbered accordingly.  Selection or deselection of a tailoring option will 
include or exclude that option in the section, but editing the resulting section 
to fit the project is still required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph will be deleted when the work is covered by a lump-sum 
contract price.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.1   Measurement</TTL><BRK/>
<BRK/>
<TXT>Deductions will be made for any material wasted, unused, rejected, or used for the convenience of the Contractor.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.1.1   Aggregate Drainage Layer Material</TTL><BRK/>
<BRK/>
<TXT>Measure the quantity of aggregate drainage layer material, completed and accepted, in cubic<MET> meters</MET><ENG> yards</ENG>.  Determine 
the volume of aggregate drainage layer material, in place and accepted, by the average job thickness obtained 
in accordance with paragraph THICKNESS CONTROL and the dimensions indicated.<TAI OPT="OGM (CHOKE STONE STABILIZED)">  The choke stone shall be considered 
as part of the drainage layer thickness and shall not be measured separately.</TAI></TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.1.1.2   Bituminous or Cement Stabilized Drainage Layer</TTL><BRK/>
<BRK/>
<TXT>Measure the quantity of bituminous or cement stabilized drainage layer material, completed and accepted, in<MET> metric</MET><ENG>
 2000 pound</ENG> tons, excluding the weight of the asphalt or portland cement used in the mix.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.1.1.3   Bituminous Material</TTL><BRK/>
<BRK/>
<TXT>Measure the quantity of asphalt cement, used in the bituminous stabilized mix, by the number of<MET> liters</MET><ENG> gallons</ENG>
 of material used in the accepted work corrected to<MET> liters at 16 degrees C</MET><ENG> gallons at 60 degrees F</ENG> in accordance 
with <RID>ASTM D 1250</RID>.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.1.1.4   Cementitious Material</TTL><BRK/>
<BRK/>
<TXT>Measure the quantity of portland cement, used in the cement stabilized mix, by the number of<MET> 50 kilogram</MET><ENG> short 
hundred-weight (cwt)</ENG> units of cement used in the accepted work.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.1.2   Payment</TTL><BRK/>
<BRK/>
<TXT>The quantities of drainage layer aggregates <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">and bituminous or cementitious</TAI> materials, as specified above, will 
be paid for at the contract unit prices, which will constitute full compensation for the construction and completion 
of the drainage layer, including the test section, and the furnishing of all other necessary labor and incidentals.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3   <SUB>Waybills and Delivery Tickets</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit copies of waybills and delivery tickets during the progress of the work.  Before the final payment is 
allowed, file certified waybills and certified delivery tickets for all aggregates<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">, bituminous, and cementitious</TAI>
 materials actually used.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)</ORG><BRK/><BRK/><RID>AASHTO M 320</RID><RTL>(2005) Performance-Graded Asphalt Binder</RTL><BRK/><BRK/><RID>AASHTO T 102</RID><RTL>(1983; R 2004) Spot Test of Asphaltic Materials</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM C 117</RID><RTL>(2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing</RTL><BRK/><BRK/><RID>ASTM C 131</RID><RTL>(2006)Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 29/C 29M</RID><RTL>(2007) Standard Test Method for Bulk Density ("Unit Weight") and Voids in Aggregate</RTL><BRK/><BRK/><RID>ASTM C 595</RID><RTL>(2008) Standard Specification for Blended Hydraulic Cements</RTL><BRK/><BRK/><RID>ASTM C 88</RID><RTL>(2005) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate</RTL><BRK/><BRK/><RID>ASTM D 1250</RID><RTL>(2007) Standard Guide for Use of the Petroleum Measurement Tables</RTL><BRK/><BRK/><RID>ASTM D 140</RID><RTL>(2001; R 2007) Sampling Bituminous Materials</RTL><BRK/><BRK/><RID>ASTM D 1856</RID><RTL>(1995a; R 2003) Recovery of Asphalt from Solution by Abson Method</RTL><BRK/><BRK/><RID>ASTM D 2172</RID><RTL>(2005) Quantitative Extraction of Bitumen from Bituminous Paving Mixtures</RTL><BRK/><BRK/><RID>ASTM D 2487</RID><RTL>(2006e1) Soils for Engineering Purposes (Unified Soil Classification System)</RTL><BRK/><BRK/><RID>ASTM D 3381</RID><RTL>(2005) Viscosity-Graded Asphalt Cement for Use in Pavement Construction</RTL><BRK/><BRK/><RID>ASTM D 4791</RID><RTL>(2005e1) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate</RTL><BRK/><BRK/><RID>ASTM D 5</RID><RTL>(2006e1) Penetration of Bituminous Materials</RTL><BRK/><BRK/><RID>ASTM D 6938</RID><RTL>(2007a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)</RTL><BRK/><BRK/><RID>ASTM D 75</RID><RTL>(2003) Standard Practice for Sampling Aggregates</RTL><BRK/><BRK/><RID>ASTM D 946</RID><RTL>(1982; R 2005) Penetration-Graded Asphalt Cement for Use in Pavement Construction</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)</ORG><BRK/><BRK/><RID>NIST IR 91-4756</RID><RTL>(1998) Laboratory Accreditation Activities in the United States</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Designer will select the appropriate drainage layer materials, delete 
the other subparagraphs, and edit the specification accordingly.  The intent 
is to allow the Contractor all possible material options.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Build a drainage layer under the pavements, as indicated on drawings, consisting of <TAI OPT="RDM">[Rapid Draining Material 
(RDM)]</TAI><TAI OPT="OGM (CHOKE STONE STABILIZED)">[Open Graded Material stabilized with a choke stone]</TAI><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">[Open Graded Material stabilized with cement or bituminous]</TAI>
.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Equipment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If desirable, include requirements for specific types of equipment applicable 
to methods of construction based on local conditions.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All plant, equipment, and tools used in the performance of the work will be subject to approval before the work 
is started and shall be maintained in satisfactory working condition at all times.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Placement Equipment</TTL><BRK/>
<BRK/>
<TXT>Use an asphalt paving machine to place drainage layer material.  Alternate methods may be used if it can be demonstrated 
in the test section that these methods obtain the specified results.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Compaction Equipment</TTL><BRK/>
<BRK/>
<TXT>Use a dual or single smooth 10<MET> metric-</MET><ENG> 2000 lb-</ENG> tons (min.) vibratory drum roller, which provides a maximum compactive 
effort without crushing the drainage layer aggregate, to compact drainage layer material.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.3.4   Bituminous Mixing Plant</TTL><BRK/>
<BRK/>
<TXT>Provide a bituminous mixing plant that is an automatic or semiautomatic controlled, commercially manufactured 
unit capable of producing a bituminous stabilized aggregate mixture consistent with the job-mix formula (JMF).  
Drum mixers shall be prequalified at the production rate to be used during full scale operations.  Include with 
the prequalification tests extraction methods in accordance with <RID>ASTM D 2172</RID> and recovery of the asphalt cement 
in accordance with <RID>ASTM D 1856</RID>.  The penetration of the recovered asphalt binder shall not be less than 60 percent 
of the original penetration in accordance with <RID>ASTM D 5</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   Cementitious Mixing Plant</TTL><BRK/>
<BRK/>
<TXT>Provide a cementitious mixing plant that is an automatic or semiautomatic controlled, commercially manufactured 
unit capable of producing a cement stabilized aggregate mixture consistent with the job mix formula determined 
by the Government.  Aggregate and cement shall be dry mixed sufficiently to prevent cement balls from forming 
when water is added.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Waybills and Delivery Tickets</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certified waybills and delivery tickets for all aggregates<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">, bituminous, and cementitious</TAI> materials 
actually used.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Sampling and Testing</SUB></ITM><BRK/>
<BRK/>
<ITM>  Copies of field test results within 24 hours of completion of tests.</ITM><BRK/>
<BRK/>
<ITM><SUB>Approval of Materials</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Material sources and material test results prior to field use.</ITM><BRK/>
<BRK/>
<ITM><SUB>Evaluation</SUB></ITM><BRK/>
<BRK/>
<ITM>  Test section construction report.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Sampling and Testing</SUB></TTL><BRK/>
<BRK/>
<TXT>Sampling and testing are the responsibility of the Contractor to be performed by an approved commercial testing 
laboratory, or by the Contractor subject to approval.  If the Contractor elects to establish testing facilities 
of its own, approval of such facilities will be based on compliance with <RID>NIST IR 91-4756</RID>, and no work requiring 
testing will be permitted until the Contractor's facilities have been inspected and approved.  The first inspection 
of the facilities will be at the expense of the Government and any subsequent inspections required because of 
failure of the first inspection shall be at the expense of the Contractor.  Such costs will be deducted from 
the total amount due the Contractor.  Test drainage layer materials to establish compliance with the specified 
requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   Sampling</TTL><BRK/>
<BRK/>
<TXT>Take aggregate samples in accordance with <RID>ASTM D 75</RID>.<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">  Take bituminous samples in accordance with <RID>ASTM D 140</RID>.  
Take bituminous or cement stabilized mixture samples using methods approved by the Contracting Officer.</TAI></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   Test Methods</TTL><BRK/>
<BRK/>
<SPT><TAI OPT="OGM (CHOKE STONE STABILIZED),RDM"><TTL>1.5.3.1   <TST>Sieve Analyses</TST></TTL><BRK/>
<BRK/>
<TXT>Make sieve analyses in accordance with <RID>ASTM C 117</RID> and <RID>ASTM C 136</RID>.</TXT></TAI><BRK/>
<BRK/></SPT>
<TAI OPT="RDM"><SPT><TTL>1.5.3.2   <TST>Density Tests</TST></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Nuclear gauge density testing may not be accurate for gradations of RDM 
with a small percentage of fines.  The testing may still indicate segregation 
or consistency in placement of the material.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform field density tests for RDM drainage layers in accordance with <RID>ASTM D 6938</RID> by Direct Transmission Method 
for the full depth of the lift, use <RID>ASTM D 6938</RID> to determine the moisture content of the aggregate drainage layer 
material.  Check the calibration curves furnished with the moisture gauges along with density calibration checks 
as described in <RID>ASTM D 6938</RID>.  The calibration checks of both the density and moisture gauges shall be made by 
the prepared containers of material method, as described in paragraph "Calibration" of <RID>ASTM D 6938</RID>, on each different 
type of material being tested at the beginning of a job and at intervals as directed by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>1.5.3.3   <TST>Soundness Test</TST></TTL><BRK/>
<BRK/>
<TXT>Perform soundness tests in accordance with <RID>ASTM C 88</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3.4   <TST>Los Angeles Abrasion Test</TST></TTL><BRK/>
<BRK/>
<TXT>Perform Los Angeles abrasion tests in accordance with <RID>ASTM C 131</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3.5   <TST>Flat or Elongated Particles Tests</TST></TTL><BRK/>
<BRK/>
<TXT>Perform flat and/or elongated particles tests in accordance with <RID>ASTM D 4791</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3.6   <TST>Fractured Faces Tests</TST></TTL><BRK/>
<BRK/>
<TXT>When aggregates are supplied from crushed gravel, use approved test methods to ensure the aggregate meets the 
requirements for fractured faces in paragraph AGGREGATES.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.5.3.7   <TST>Bitumen Extraction</TST></TTL><BRK/>
<BRK/>
<TXT>Perform bitumen extraction tests in accordance with <RID>ASTM D 2172</RID>.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.5.4   Initial Tests</TTL><BRK/>
<BRK/>
<TXT>Perform one of each of the following tests on the proposed material, prior to commencing construction, to demonstrate 
that the proposed material meets all specified requirements when furnished.  If materials from more than one 
source are going to be utilized, complete the following tests for each source.</TXT><BRK/>
<BRK/>
<ITM>a.  Sieve Analysis including<MET> 0.02 mm</MET><ENG> 0.02mm</ENG> size material.</ITM><BRK/>
<BRK/>
<ITM>b.  Flat and/or elongated particles</ITM><BRK/>
<BRK/>
<ITM>c.  Fractured Faces </ITM><BRK/>
<BRK/>
<ITM>d.  Los Angeles abrasion.</ITM><BRK/>
<BRK/>
<ITM>e.  Soundness.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.5   Testing Frequency</TTL><BRK/>
<BRK/>
<TAI OPT="OGM (CHOKE STONE STABILIZED),RDM"><SPT><TTL>1.5.5.1   Aggregate Layer</TTL><BRK/>
<BRK/>
<TXT><TAI OPT="RDM">Perform field density and moisture content tests at a rate of at least one test for every [2000] [_____] square<MET>
 meters</MET><ENG> yards</ENG> of completed area and not less than one test for each day's production.</TAI>   Sieve analyses shall 
be performed at a rate of at least one test for every [6000] [_____] square<MET> meters</MET><ENG> yards</ENG> of completed area.  
Perform soundness tests, Los Angeles abrasion tests, fractured faces tests and flat and/or elongated particles 
tests at the rate of one test for every 12,000<MET> square meters</MET><ENG> square yards</ENG> of production.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.5.5.2   Stabilized Layer</TTL><BRK/>
<BRK/>
<TXT>Perform sieve analyses on aggregates prior to addition of asphalt or portland cement, at a rate of at least one 
test for every [6000 ] [_____] square<MET> meters</MET><ENG> yards</ENG> of completed area and not less than one test for each days 
production.  Make extraction tests on bituminous stabilized material at the same frequency.  Perform soundness 
tests, Los Angeles abrasion tests, fractured faces tests, and flat and/or elongated particles tests at the rate 
of one test for every 12,000 square<MET> meters</MET><ENG> yards</ENG> of production.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.5.6   <SUB>Approval of Materials</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.6.1   Aggregate</TTL><BRK/>
<BRK/>
<TXT>Select the aggregate source at least [60] [_____] days prior to field use in the test section.  Tentative approval 
of the source will be based on certified test results to verify that materials proposed for use meet the contract 
requirements.  Final approval of both the source and the material will be based on test section performance and 
tests for gradation, soundness, Los Angeles abrasion, flat and/or elongated particles tests and fractured faces 
tests.  For aggregate drainage layer materials, perform these tests on samples taken from the completed and compacted 
drainage layer course within the test section.  <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">For bituminous or cement stabilized drainage layer material, 
perform these tests on aggregate samples taken prior to addition of bituminous or cementitious material and subsequent 
placement in the test section.</TAI></TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>1.5.6.2   Bituminous or Cementitious Materials</TTL><BRK/>
<BRK/>
<TXT>Submit bituminous or cementitious sources and certified material test results for approval not less than [60] 
[_____] days prior to field use in the test section.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT></SPT><SPT><TTL>1.6   ENVIRONMENTAL REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Place drainage layer material when the atmospheric temperature is above<MET> 2 degrees C</MET><ENG> 35 degrees F</ENG>.  Correct areas 
of completed drainage layer or underlying courses that are damaged by freezing, rainfall, or other weather conditions 
or by contamination from sediments, dust, dirt, or foreign material to meet specified requirements.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>2.1   GOVERNMENT APPROVAL</TTL><BRK/>
<BRK/>
<TXT>Asphalt or cement stabilized material will require Government notification and delivery of approved materials 
in accordance with paragraph BITUMINOUS OR CEMENT STABILIZED JOB-MIX FORMULA.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>2.2   AGGREGATES</TTL><BRK/>
<BRK/>
<TXT>Provide aggregates consisting of clean, sound, hard, durable, angular particles of crushed stone, crushed slag, 
or crushed gravel which meet the specification requirements.  Slag shall be an air-cooled, blast-furnace product 
having a dry weight of not less than<MET> 1040 kg per cubic meter</MET><ENG> 65 pcf</ENG> determined by <RID>ASTM C 29/C 29M</RID>.  Provide aggregates 
free of silt and clay as defined by <RID>ASTM D 2487</RID>, vegetable matter, and other objectionable materials or coatings.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Aggregate Quality</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  A percentage of loss on abrasion of 40 will be used except that a value 
up to 50 percent may be used where experience with local materials indicates 
such an increase is justified.  A percentage of soundness loss of 18 has proven 
effective in many localities.  The Designer will insert in the blank spaces 
the applicable losses in percent for the specific job based on the knowledge 
of both coarse and fine aggregates in the areas that have been previously approved 
and have a satisfactory service record for at least 5 years.  The percent of 
fractured faces may be reduced to 75 if the required CBR is 50 or less.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The aggregate shall have a soundness loss not greater than [18] [_____] percent weighted averaged at 5 cycles 
when tested in magnesium sulfate in accordance with <RID>ASTM C 88</RID> and a percentage of loss on abrasion not to exceed 
[40] [_____] after 500 revolutions as determined by <RID>ASTM C 131</RID>.  Determine the percentage of flat and/or elongated 
particles by <RID>ASTM D 4791</RID> with the following modifications:  1) The aggregates shall be separated into 2 size 
fractions, particles greater than<MET> 12.5 mm</MET><ENG> 1/2 inch</ENG> sieve and particles passing the<MET> 12.5 mm</MET><ENG> 1/2 inch</ENG> sieve and 
retained on the<MET> 4.75 mm</MET><ENG> No. 4</ENG> sieve. 2) The percentage of flat and/or elongated particles in either fraction 
shall not exceed 20. 3) A flat particle is one having a ratio of width to thickness greater than 3; an elongated 
particle is one having a ratio of length to width greater than 3. 4) When the aggregate is supplied from more 
than one source, aggregate from each source shall meet the specified requirements.  When the aggregate is supplied 
from crushed gravel it shall be manufactured from gravel particles, 90 percent of which by weight are retained 
on the maximum-size sieve listed in TABLE I.  In the portion retained on each sieve specified, the crushed gravel 
shall contain at least [90] [75] percent by weight of crushed pieces having two or more freshly fractured faces 
with the area of each face being at least equal to 75 percent of the smallest midsectional area of the face.  
When two fractures are contiguous, the angle between planes of the fractures must be at least 30 degrees in order 
to count as 2 fractured faces.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Gradation Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The gradation or gradations applicable to the specific job will be specified.  
The designer will select rapid draining material (RDM) and/or open graded material 
(OGM) depending on the required permeability and material availability.  RDM 
should provide a permeability of 300 to 1500 meters (1000 to 5000 feet) per 
day. OGM should provide a permeability greater than 1500 meters (5000 feet) 
per day.  RDM is well graded enough to be stable to work on, however OGM will 
require choke stone, asphalt cement, or portland cement for stability.  The 
gradation for the choke stone matches ASTM gradation No. 8.</NPR><BRK/>
<BRK/>
<TAI OPT="RDM">  For roads, where the drainage path is short and a permeability of 300 meters (1000 feet) per day is adequate, 
the Contractor can be permitted to use the following Optional Table I.    Add the following "Note 5. The Optional 
Table I gradation can be meet in some areas with 77% #57 stone and 23% concrete sand blend."<BRK/>
       <BRK/>
<HL4><BRK/>
<BRK/>
OPTIONAL TABLE I <BRK/>
GRADATION OF DRAINAGE LAYER MATERIAL<BRK/>
Percentage by Weight Passing Square-Mesh Sieve</HL4><BRK/>
<BRK/>
<HL4>               Sieve       Rapid Draining    </HL4><BRK/>
      Designation    Material (RDM)     <BRK/>
    50.OO mm              100                       <BRK/>
    37.50 mm             95-100 <BRK/>
    25.00 mm             70-100<BRK/>
    19.00 mm             60-100               <BRK/>
    12.50 mm             50-76             <BRK/>
     9.50 mm             40-65          <BRK/>
     4.75 mm             20-45              <BRK/>
     2.36 mm             17-30              <BRK/>
     1.18 mm              5-16<BRK/>
     0.30 mm              0-5<BRK/>
     0.15 mm              0-2.5               <BRK/>
<ENG><TBL><BRK/>
<THD><BRK/>
<HL4> OPTIONAL TABLE I.  <BRK/>
GRADATION OF DRAINAGE LAYER MATERIAL</HL4><BRK/>
<BRK/>
<HL4>Percentage by Weight Passing Square-Mesh Sieve</HL4><BRK/>
<BRK/>
<HL4>         Sieve       Rapid Draining   </HL4><BRK/>
   Designation    Material (RDM)    <BRK/>
<BRK/>
        2 inch            100</THD><BRK/>
      1-1/2 inch         95-100               <BRK/>
      1 inch             70-100            <BRK/>
      3/4 inch           60-100             <BRK/>
      1/2 inch           50-76             <BRK/>
      3/8 inch           40-65              <BRK/>
      No. 4              20-45              <BRK/>
      No. 8              12-30              <BRK/>
      No. 16              5-16<BRK/>
      No. 50              0-5<BRK/>
      No. 100             2-2.5               <BRK/></TBL>
</ENG>    </TAI><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drainage layer aggregates shall be well graded within the limits specified in TABLE I.</TXT><BRK/>
<MET><TBL><THD><BRK/>
<HL4>TABLE I.  GRADATION OF DRAINAGE LAYER MATERIAL</HL4><BRK/>
<BRK/>
<HL4>Percentage by Weight Passing Square-Mesh Sieve<BRK/></HL4>
<BRK/>
      Sieve      <TAI OPT="RDM"> Rapid  draining</TAI>  <TAI OPT="OGM (CHOKE STONE STABILIZED)">Open Graded     Choke</TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">  OGM   </TAI>        <BRK/>
    Designation  <TAI OPT="RDM"> Material (RDM)</TAI>   <TAI OPT="OGM (CHOKE STONE STABILIZED)">Material (OGM)  Stone </TAI>   <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">Stabilized</TAI></THD><BRK/>
    37.50 mm       <TAI OPT="RDM">     100    </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   100          100</TAI>      <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">100</TAI><BRK/>
    25.00 mm       <TAI OPT="RDM">    70-100  </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">  95-100        100</TAI>     <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">95-100 </TAI><BRK/>
    19.00 mm       <TAI OPT="RDM">    55-100  </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   ---          100 </TAI>     <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">---</TAI><BRK/>
    12.50 mm       <TAI OPT="RDM">    40-80   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">  25-80         100 </TAI>     <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">25-80</TAI><BRK/>
     9.50 mm       <TAI OPT="RDM">    30-65   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   ---         80-100</TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">---</TAI><BRK/>
     4.75 mm       <TAI OPT="RDM">    10-50   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   0-10        10-100</TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> 0-10</TAI><BRK/>
     2.36 mm       <TAI OPT="RDM">     0-25   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   0-5          5-40 </TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> 0-5</TAI><BRK/>
     1.18 mm       <TAI OPT="RDM">     0-5    </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   ---          0-10 </TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">---</TAI><BRK/>
<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>TABLE I.  GRADATION OF DRAINAGE LAYER MATERIAL</HL4><BRK/>
<BRK/>
<HL4>Percentage by Weight Passing Square-Mesh Sieve</HL4><BRK/></THD>
<BRK/>
       Sieve      <TAI OPT="RDM"> Rapid  draining</TAI>  <TAI OPT="OGM (CHOKE STONE STABILIZED)">Open Graded     Choke</TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">  OGM  </TAI>        <BRK/>
    Designation  <TAI OPT="RDM"> Material (RDM)</TAI>   <TAI OPT="OGM (CHOKE STONE STABILIZED)">Material (OGM)  Stone </TAI>   <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">Stabilized</TAI><BRK/>
    1-1/2 inch       <TAI OPT="RDM">     100    </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   100          100</TAI>      <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">100</TAI><BRK/>
      1 inch        <TAI OPT="RDM">    70-100  </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">  95-100        100</TAI>     <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">95-100 </TAI><BRK/>
    3/4 inch        <TAI OPT="RDM">    55-100  </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   ---          100 </TAI>     <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> ---</TAI><BRK/>
    1/2 inch        <TAI OPT="RDM">    40-80   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">  25-80         100 </TAI>     <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">25-80</TAI><BRK/>
    3/8 inch        <TAI OPT="RDM">    30-65   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   ---         80-100</TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> ---</TAI><BRK/>
      No. 4         <TAI OPT="RDM">    10-50   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   0-10        10-100</TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> 0-10</TAI><BRK/>
      No. 8         <TAI OPT="RDM">     0-25   </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   0-5          5-40 </TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> 0-5</TAI><BRK/>
      No. 16        <TAI OPT="RDM">     0-5    </TAI>    <TAI OPT="OGM (CHOKE STONE STABILIZED)">   ---          0-10 </TAI>    <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"> ---</TAI><BRK/></TBL>
</ENG><BRK/>
<TXT>NOTE 1:  The values are based on aggregates of uniform specific gravity, and the percentages passing the various 
sieves may require appropriate correction by the Contracting Officer when aggregates of varying specific gravities 
are used.</TXT><BRK/>
<BRK/>
<TAI OPT="OGM (CHOKE STONE STABILIZED)"><TXT>NOTE 2:  Choke stone is required to stabilize the OGM for constructability of the overlying layer.  If approved 
by the COR, the OGM can be constructed without choke stone, provided equipment is not operated on the finished 
surface of the OGM.  Choke stone shall be made up of hard, durable, crushed aggregate having 90 percent of the 
stone with fractured faces.  The gradation for the choke stone shall be based on the following criteria:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  The ratio of the D15 of the OGM to the D15 of the choke stone shall be less than 5.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  The ratio of the D50 of the OGM to the D50 of the choke stone shall be greater than 2.</ITM></TAI><BRK/>
<BRK/>
<TAI OPT="RDM"><TXT>NOTE 3:  For RDM, the coefficient of uniformity (CU) shall be greater than 3.5.  (CU = D60/D10).  The Contractor 
is responsible for adjusting the RDM gradation within the ranges listed in Table I to provide a stable construction 
surface for the proposed equipment and method of transporting materials or the drainage layer can be stabilize 
with portland cement or asphalt at no additional cost to the government, if approved during the test section.</TXT></TAI><BRK/>
<BRK/>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><TXT><BRK/>
NOTE 4:  Asphalt cement or portland cement will be required to stabilize the OGM.</TXT></TAI><BRK/>
<BRK/></SPT>
</SPT><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>2.3   BITUMINOUS MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The appropriate type and grade of bituminous material will be based on 
information provided in UFC 3-250-03.  Use a grade of asphalt that is available 
in the project location.  A stiff asphalt is desirable.  On performance graded 
asphalt modifiers should not be required and the low temperature grade of -28 
should be adequate for typical projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Asphalt cement to be mixed with aggregates shall conform to [<RID>ASTM D 946</RID>Penetration Grade [____]] [<RID>ASTM D 3381</RID>
 viscosity Grade <RID>AASHTO M 320</RID>PG [____]].  In addition, the asphalt cement shall show a negative spot when subjected 
to the spot test in accordance with <RID>AASHTO T 102</RID>, using the standard naphtha specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   CEMENTITIOUS MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Portland cement to be mixed with aggregates shall conform to [ <RID>ASTM C 150</RID>, Type I, IA, II or IIA] [<RID>ASTM C 595</RID>
, Type IS or IS (A)].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   BITUMINOUS OR CEMENT STABILIZED JOB-MIX FORMULA</TTL><BRK/>
<BRK/>
<TXT>The bituminous stabilized mix shall consist of a mixture of OGM and a minimum of 2 percent asphalt cement by 
weight.  Tolerances for bituminous stabilized material shall be maintained for field production at plus or minus 
0.25 percent for asphalt cement and plus or minus<MET> 14 degrees C</MET><ENG> 25 degrees F</ENG> for mixing temperatures.  The cement 
stabilized mix shall consist of OGM and a minimum of<MET> 90 kg</MET><ENG> 200 pounds</ENG> of portland cement per cubic<MET> meter</MET><ENG> yard</ENG>
 with a water/cement ratio of 0.37.  Based on the test section performance, the Contractor shall be responsible 
for adjustments (increases) in asphalt cement or portland cement quantities to ensure the stabilized drainage 
layer will not rut or be disturbed by the Contractor's proposed paving method.  Submit a job-mix formula (JMF) 
with the test section report for Contracting Officer approval.</TXT><BRK/>
<BRK/></SPT>
</TAI></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   STOCKPILING AGGREGATES</TTL><BRK/>
<BRK/>
<TXT>Stockpile aggregates at locations designated by the Contracting Officer.  Clear and level stockpile areas prior 
to stockpiling aggregates to prevent segregation and contamination.  Aggregates obtained from different sources 
shall be stockpiled separately.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   TEST SECTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Data</TTL><BRK/>
<BRK/>
<TXT>Construct a test section to evaluate the ability to carry traffic, including placement of overlaying material 
and the constructability of the drainage layer including required mixing, placement, and compaction procedures.  
Test section data will be used by the Contracting Officer to validate the required number of compaction passes 
given in paragraph Compaction Requirements <TAI OPT="RDM">and the field dry density requirements </TAI>for full scale production.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Scheduling</TTL><BRK/>
<BRK/>
<TXT>Construct the test section a minimum of [30] [_____] days prior to the start of full scale production to provide 
sufficient time for an evaluation of the proposed materials, equipment and procedures including Government QA 
testing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Location and Size</TTL><BRK/>
<BRK/>
<TXT>Place the test section [inside the production paving limits][outside production paving limits in an area with 
similar subgrade and subbase conditions approved by the Contracting Officer].  The underlying courses and subgrade 
preparation, required for the pavement section, shall be completed, inspected and approved in the test section 
prior to constructing the drainage layer.  The test section shall be a minimum of<MET> [30] [_____] m</MET><ENG> [100] [_____] 
feet</ENG> long and two full paving lanes wide side by side.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Initial Testing</TTL><BRK/>
<BRK/>
<TXT>Provide certified test results, approved by the Contracting Officer prior to the start of the test section, to 
verify that the materials proposed for use in the test section meet the contract requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.5   Mixing, Placement, and Compaction</TTL><BRK/>
<BRK/>
<TXT>Accomplish mixing, placement, and compaction using equipment meeting the requirements of paragraph EQUIPMENT.  
Compaction equipment speed shall be no greater than<MET> 2.4 km/hour</MET><ENG> 1.5 mph</ENG>.  Start compaction from the outside edges 
of the paving lane and proceed to the centerline of the lift being placed.  The roller shall stay a minimum of 
one half the roller width from the outside edge of the drainage layer being placed until the desired density 
is obtained.  The outside edge shall then be rolled.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.6   Procedure</TTL><BRK/>
<BRK/>
<TAI OPT="RDM"><SPT><TTL>3.2.6.1   RDM Aggregate Drainage Layer Tests</TTL><BRK/>
<BRK/>
<TXT>Construct the test section with aggregate in a wet state so as to establish a correlation between number of roller 
passes and dry density achievable during field production.  Designate three separate areas within the test section, 
test each area for density, moisture, and gradation.  Complete all testing in the middle third of the test section 
being placed.  Conduct density and moisture content tests in accordance with <RID>ASTM D 6938</RID>.  Conduct sieve analysis 
tests on samples, taken adjacent to the density test locations.  Take one set of tests (i.e. density, moisture, 
and sieve analysis) before the third compaction pass and after each subsequent compaction pass at three separate 
locations as directed by the Contracting Officer.  Define a pass as the movement of a roller over the drainage 
layer area for one direction only.  Compaction for the RDM shall consist of a maximum of 5 passes in the vibrating 
state and one final pass in the static state.  Continue compaction passes and density readings until the difference 
between the average dry densities of any two consecutive passes is less than or equal to<MET> 16 kg per cubic meter</MET><ENG>
 1.0 pcf</ENG>.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>3.2.6.2   Bituminous/Cement Stabilized Drainage Layer</TTL><BRK/>
<BRK/>
<TXT>Construct the test section with the same equipment used for production.  Designate three separate areas within 
the test section for sampling.  Complete all testing in the middle third of the test section being placed.  The 
Contracting Officer will perform visual examination of each sample to determine if and when crushing of aggregate 
occurs.  Take one sample before compaction and after each subsequent compaction pass at three separate locations 
as directed by the Contracting Officer.  Continue compaction for a maximum of 6 passes.  Define a pass as the 
movement of a roller over the drainage layer area for one direction only.  Placement procedures and equipment 
shall be as described herein.  The Contracting Officer will determine the number of passes required for compaction 
from the test section.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="OGM (CHOKE STONE STABILIZED)"><SPT><TTL>3.2.6.3   OGM with Choke Stone</TTL><BRK/>
<BRK/>
<TXT>Construct the test section with aggregate in a moist state.  When the OGM gradation is used, density testing 
is not required, only gradation testing is required.  Designate three separate areas within the test section 
for sampling.  Complete all testing in the middle third of the test section being placed.  The maximum number 
of passes per lift shall be 8.  Define a pass as the movement of a roller over the drainage layer area for one 
direction only.  Placement procedures and equipment will be as described herein.  Conduct sieve analysis tests 
on samples.  Take one set of sieve tests before the third compaction pass and after each subsequent compaction 
pass at three separate locations as directed by the Contracting Officer.  Compaction for the OGM shall consist 
of first 5 passes in the vibrating state and one final pass in the static state.  The Contracting Officer will 
determine the number of passes required for production from the results of the test section.  If choke stone 
is used to stabilize the surface of OGM, place the choke stone after final static compaction of the OGM.  Spread 
the choke stone in a thin layer no thicker than<MET> 13 mm</MET><ENG> 1/2 inch</ENG> and worked into the surface of the OGM using two 
additional passes of a vibratory roller and wetting.  Sieve testing is not required after the compaction of the 
choke stone.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>3.2.7   <SUB>Evaluation</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Designer will evaluate the data from the test section.  To do this 
for RDM aggregate drainage layer material, it is suggested that the in-place 
density and percent passing the 4.75 mm (No. 4) and 1.18 mm (No. 16) sieve sizes 
be plotted against cumulative passes.   With these results, the designer should 
try to maximize dry density while minimizing aggregate degradation.  Generally, 
after between 3 and 6 passes, only slight increases in dry density (16 kg per 
cubic meters (1.0 pcf)) will be achieved.  At this point the measured field 
density is at or near the optimum density obtainable for this material, for 
the given field conditions and the number of roller passes at this point can 
be determined.  If local experience indicates more than 6 passes maybe required, 
edit the specification accordingly.  The Contractor is required by the specification 
to to use 4 vibratory and one static  roller passes on the drainage material.  
If the test section indicated more or less is rolling is appropriate, a field 
modification should be written..  The required field dry density should be set 
slightly lower than this optimum field dry density.  It is suggested that the 
field dry density be set at 98 percent of the optimum density obtained in the 
test section.  The data on the percent passing should be looked at closely to 
determine if degradation of the aggregate is occurring.  If the percent passing 
the given sieve sizes is increasing, then the aggregate is being broken down 
by the compaction effort.  If this is occurring, selection of a field control 
density will be more difficult.  The  field density selected will have to be 
balanced between aggregate degradation, dry density and stability of the drainage 
layer surface.  Stability of the layer surface should take precedence. For OGM 
material with a choke stone drainage layer, plot cumulative passes against sieve 
analyses and watch for degradation similar to the RDM.  For bituminous or cement 
stabilized drainage layer material, the required number of passes should be 
based on visual observations by the designer in the field test section of degradation 
in lieu of sieve analyses.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Within 10 days of completion of the test section, submit to the Contracting Officer a Test Section Construction 
Report complete with all required test data and correlations.  The Contracting Officer will evaluate the data 
and validate the required number of passes of the roller, the need for a final static pass of the roller<TAI OPT="RDM">, and 
provide the dry density for field density control during construction</TAI>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   PREPARATION OF UNDERLYING COURSE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain only the reference to the specification section that covers the 
preparation of the underlying course for the particular project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prior to constructing the drainage layer, clean the underlying course of all foreign materials.  During construction, 
the underlying course shall contain no frozen material.  The underlying course shall conform to Section 
<SRF>32 11 16.16</SRF> SUBBASE COURSES.  Correct ruts or soft yielding spots in the underlying courses having inadequate 
compaction and deviations of the surface from the requirements set forth herein by loosening and removing soft 
or unsatisfactory material and by adding approved material, reshaping to line, and grade, and recompacting to 
specified density.  The finished underlying course shall not be disturbed by traffic or other operations and 
shall be maintained in a satisfactory condition until the drainage layer is placed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   TRANSPORTING MATERIAL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Aggregate Drainage Layer Material</TTL><BRK/>
<BRK/>
<TXT>Transport aggregate drainage layer material to the site in a manner which prevents segregation and contamination 
of materials.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>3.4.2   Bituminous Stabilized Material</TTL><BRK/>
<BRK/>
<TXT>Transport bituminous stabilized material from the mixing plant to the site in trucks having tight, clean, smooth 
beds lightly coated with an approved releasing agent to prevent adhesion of the stabilized material to the truck 
beds.  Drain excessive releasing agent prior to loading.  Cover each load with canvas or other approved material 
of ample size to protect the stabilized material from the weather and to prevent loss of heat.  Loads that have 
crusts of cold, unworkable material or have become wet will be rejected.  Hauling over freshly placed material 
will not be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.3   Cement Stabilized Material</TTL><BRK/>
<BRK/>
<TXT>Transport cement stabilized material from the mixing plant to the site in trucks equipped with protective covers.  
Loads that have crusts of unworkable material or have become excessively wet will be rejected. Hauling over freshly 
placed material will not be permitted.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>3.5   PLACING</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.1   General Requisites</TTL><BRK/>
<BRK/>
<TXT>Place drainage layer material on the underlying course in lifts of uniform thickness using equipment meeting 
the requirements of paragraph EQUIPMENT.  When a compacted layer<MET> 150 mm</MET><ENG> 6 inches</ENG> or less in thickness is required, 
place the material in a single lift.  When a compacted layer in excess of<MET> 150 mm</MET><ENG> 6 inches</ENG> is required, place 
the material in lifts of equal thickness.  No lift shall exceed<MET> 150 mm</MET><ENG> 6 inches</ENG> or be less than<MET> 75 mm</MET><ENG> 3 inches</ENG>
 when compacted.  The lifts when compacted after placement shall be true to the grades or levels required with 
the least possible surface disturbance.  Where the drainage layer is placed in more than one lift, clean the 
previously constructed lift of loose and foreign material.  Such adjustments in placing procedures or equipment 
shall be made to obtain true grades and minimize segregation and degradation of the drainage layer material.  <TAI OPT="OGM (CHOKE STONE STABILIZED)">
Spread choke stone used to stabilize the surface of the OGM in a thin layer no thicker than<MET> 13 mm</MET><ENG> 1/2 inch</ENG>.  
The OGM shall be brought to grade and the choke stone placed and rolled as described in paragraph; TEST SECTION.</TAI></TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>3.5.2   Placement of Stabilized Material</TTL><BRK/>
<BRK/>
<TXT>Bituminous stabilized material having temperatures less than<MET> 80 degrees C</MET><ENG> 175 degrees F</ENG> when dumped into the 
asphalt paving machine will be rejected.  Adjust the paving machine so that the surface of the lift being laid 
will be smooth and continuous without tears and pulls.  Correct irregularities in alignment of the lift left 
by the paving machine by trimming directly behind the machine.  Immediately after trimming, thoroughly compact 
the edges of the lift by a method approved by the Contracting Officer.  Distortion of the lift during tamping 
will not be permitted.  If more than one lift is required, offset the longitudinal joint in one lift that in 
the lift immediately below by at least<MET> 300 mm</MET><ENG> 1 foot</ENG>; however, the joint in the top layer shall be at the centerline 
of the pavement.  Offset transverse joints in one layer by at least<MET> 600 mm</MET><ENG> 2 feet</ENG> from transverse joints in the 
previous layer.  Transverse joints in adjacent strips shall be offset a minimum of<MET> 3 meters</MET><ENG> 10 feet</ENG>.  At the 
end of each day's construction, form a straight transverse construction joint by cutting back into the completed 
work to form a true vertical face free of loose or shattered material.  Remove material along construction joints 
not properly compacted. </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3   Placing Adjacent Stabilized Strips</TTL><BRK/>
<BRK/>
<TXT>Place the stabilized material in consecutive adjacent strips having a minimum width of<MET> 3 meters</MET><ENG> 10 feet</ENG>, except 
where edge lanes require strips less than<MET> 3 meters</MET><ENG> 10 feet</ENG> to complete the area.  In placing adjacent strips, 
the screed of the paving machine shall overlap the previously placed strip<MET> 75 to 100 mm</MET><ENG> 3 to 4 inches</ENG> and shall 
be sufficiently high so that compaction will produce a smooth, dense joint.  The stabilized material placed on 
the edge of the previously placed strip by the paver shall be pushed back to the edge of the strip being placed.  
Remove and waste excess stabilized material.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>3.5.4   Hand Spreading</TTL><BRK/>
<BRK/>
<TXT>Spread by hand drainage layer material in areas where machine spreading is impractical.  The material shall be 
spread uniformly in a loose layer to prevent segregation.  The material shall conform to the required grade and 
thickness after compaction.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   COMPACTION REQUIREMENTS</TTL><BRK/>
<BRK/>
<TAI OPT="RDM"><SPT><TTL>3.6.1   Field Compaction</TTL><BRK/>
<BRK/>
<TXT>Base field compaction requirements on the results of the test section, using the materials, methods, and equipment 
proposed for use in the work.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>3.6.2   Number of Passes</TTL><BRK/>
<BRK/>
<TXT>Accomplish compaction using rollers meeting the requirements of paragraph EQUIPMENT and operating at a rolling 
speed of no greater than<MET> 2.4 km</MET><ENG> 1.5 miles</ENG> per hour.  Compact each lift of drainage material, including shoulders 
when specified under the shoulders, with the number of passes of the roller as follows: <TAI OPT="RDM">for RDM material use 
4 passes in the vibratory state and one in the static.  </TAI><TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">For cement or Bituminous stabilized OGM material use 
3 passes in the vibratory state and one in the static state.  </TAI><TAI OPT="OGM (CHOKE STONE STABILIZED)">For OGM stabilized with choke stone use 4 passes 
in the vibratory state on OGM and 2 additional roller passes on the choke stone in the vibratory state with wetting.</TAI>
  The Contracting Officer will validate the number of roller passes after the test section is evaluated and before 
production starts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.3   Dry Density</TTL><BRK/>
<BRK/>
<TXT><TAI OPT="RDM">In addition, maintain a minimum field dry density as specified by the Contracting Officer.  If the required field 
dry density is not obtained, adjust the number of roller passes in accordance with paragraph DEFICIENCIES.  Compact 
aggregate in a moisture state as determined in the test section.  </TAI>Excessive rolling resulting in crushing of 
aggregate particles shall be avoided.  <TAI OPT="OGM (CHOKE STONE STABILIZED)">Choke stone used to stabilize the surface of the OGM shall be worked into 
the surface of the OGM by two passes of a vibratory roller and wetting.</TAI>  <TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)">Begin compaction of bituminous stabilized 
material immediately when the material has cooled to<MET> 77 degrees C</MET><ENG> 170 degrees F</ENG>.  Not more than 30 minutes shall 
elapse between the start of moist mixing of cement stabilized material and the start of field compaction, which 
shall be completed within 60 minutes.</TAI>  In all places not accessible to the rollers, compact the drainage layer 
material with mechanical hand operated tampers.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7   FINISHING</TTL><BRK/>
<BRK/>
<TXT>Finish the top surface of the drainage layer after final compaction, as determined from the test section.  Make 
adjustments in rolling and finishing procedures to obtain grades and minimize segregation and degradation of 
the drainage layer material.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="OGM (CEMENT &amp; BITUMINOUS STABILIZED)"><SPT><TTL>3.8   CURING OF CEMENT STABILIZED MATERIAL</TTL><BRK/>
<BRK/>
<TXT>Cure the completed cement stabilized drainage layer with water for a period of 12 hours following completion 
of compaction.  Commence curing operations within 3 hours after compaction.  Curing shall consist of one of the 
following:  1)  Sprinkling the surface of the drainage layer with a fine spray of water every 2 hours for the 
required 12 hour period,  2) by continuously saturated burlap or cotton mats, or by continuously saturated plastic 
coated burlap, 3)  Impervious sheet curing.  Curing water shall be applied so that the cement paste on the surface 
of the mixture will not be eroded.  Water trucks will not be permitted on the completed cement stabilized drainage 
layer.  Impervious sheeting curing shall consist of all surfaces being thoroughly wetted and then completely 
covered with the sheeting.  Sheeting shall be at least<MET> 450 mm</MET><ENG> 18 inches</ENG> wider than the stabilized drainage layer 
surface to be covered.  Lay covering with light-colored side up.  Lap covering not less than<MET> 300 mm</MET><ENG> 12 inches</ENG>
; securely weight covering to prevent displacement so that it remains in contact with the surface during the 
specified length of curing.  Coverings shall be folded down over exposed edges of slabs and secured by approved 
means.  Sheets shall be immediately repaired or replaced if tears of holes appear during the curing period </TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>3.9   EDGES OF DRAINAGE LAYER</TTL><BRK/>
<BRK/>
<TXT>Place shoulder material along the edges of the drainage layer course in a quantity that will compact to the thickness 
of the layer being constructed.  At least<MET> 1 m</MET><ENG> 3 feet</ENG> width of the shoulder shall be rolled and compacted simultaneously 
with the rolling and compacting of each lift of the drainage layer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10   <TST>SMOOTHNESS TEST</TST></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  A 3.66 m (12 foot) straightedge with the deviations unchanged may be 
specified instead of a 3.05 m (10 foot) straightedge, especially if the paving 
specifications call for a 3.66 m (12 foot) straight edge.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The surface of the top lift shall not deviate more than<MET> 10 mm</MET><ENG> 3/8 inch</ENG> when tested with either a<MET> 3.05 or 3.66 
m</MET><ENG>10 or 12 foot</ENG> straightedge applied parallel with and at right angles to the centerline of the area to be paved.  
Correct deviations exceeding<MET> 10 mm</MET><ENG> 3/8 inch</ENG> in accordance with paragraph DEFICIENCIES.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11   THICKNESS CONTROL</TTL><BRK/>
<BRK/>
<TXT>The completed thickness of the drainage layer shall be within<MET> 13 mm</MET><ENG> 1/2 inch</ENG> of the thickness indicated.  Measure 
thickness at intervals providing at least one measurement for each 500 square<MET> meters</MET><ENG> yards</ENG> of drainage layer.  
Make measurements in test holes at least<MET> 75 mm</MET><ENG> 3 inches</ENG> in diameter unless the Contractor can demonstrate, for 
COR approval, that a steel rod pushed through the drainage layer clearly stops at the material interface.  Where 
the measured thickness is more than<MET> 13 mm</MET><ENG> 1/2 inch</ENG> deficient, such areas shall be corrected in accordance with 
paragraph DEFICIENCIES.  Where the measured thickness is<MET> 13 mm</MET><ENG> 1/2 inch</ENG> more than indicated, it will be considered 
as conforming to the requirements plus<MET> 13 mm</MET><ENG> 1/2 inch</ENG>, provided the surface of the drainage layer is within<MET> 13 
mm</MET><ENG> 1/2 inch</ENG> of established grade.  The average job thickness shall be the average of all job measurements as 
specified above but within<MET> 8 mm</MET><ENG> 1/4 inch</ENG> of the thickness shown on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12   DEFICIENCIES</TTL><BRK/>
<BRK/>
<SPT><TTL>3.12.1   Grade and Thickness</TTL><BRK/>
<BRK/>
<TXT>Correct deficiencies in grade and thickness so that both grade and thickness tolerances are met.  Thin layers 
of material shall not be added to the top surface of the drainage layer to meet grade or increase thickness.  
If the elevation of the top of the drainage layer is more than<MET> 13 mm</MET><ENG> 1/2 inch</ENG> above the plan grade it shall be 
trimmed to grade and finished in accordance with paragraph FINISHING.  If the elevation of the top surface of 
the drainage layer is<MET> 13 mm</MET><ENG> 1/2 inch</ENG> or more below the required grade, the surface of the drainage layer shall 
be scarified to a depth of at least<MET> 75 mm</MET><ENG> 3 inches</ENG>, new material shall be added, and the layer shall be blended 
and recompacted to bring it to grade.  Where the measured thickness of the drainage layer is more than<MET> 13 mm</MET><ENG> 
1/2 inch</ENG> deficient, such areas shall be corrected by excavating to the required depth and replaced with new material 
to obtain a compacted lift thickness of at least<MET> 75 mm</MET><ENG> 3 inches</ENG>.  The depth of required excavation shall be controlled 
to keep the final surface elevation within grade requirements and to preserve layer thicknesses of materials 
below the drainage layer.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="RDM"><SPT><TTL>3.12.2   Density</TTL><BRK/>
<BRK/>
<TXT>Density will be considered deficient if the field dry density test results are below the dry density specified 
by the Contracting Officer.  If the densities are deficient, the layer shall be rolled with 2 additional passes 
of the specified roller.  If the dry density is still deficient, work will be stopped until the cause of the 
low dry densities can be determined and reported to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>3.12.3   Smoothness</TTL><BRK/>
<BRK/>
<TXT>Correct deficiencies in smoothness as if they are deficiencies in grade or thickness.  All tolerances for grade 
and thickness shall be maintained while correcting smoothness deficiencies.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>