USACE / NAVFAC / AFCESA / NASA                 UFGS-33 20 00 (April 2008)<BRK/>
                                               ---------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                     Superseding<BRK/>
                                               UFGS-33 20 00 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 33 20 00</SCN><BRK/>
<BRK/>
<STL>WATER WELLS</STL><BRK/>
<DTE>04/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>drilling of water 
supply wells in addition to extraction, and injection wells at hazardous, toxic, 
and radioactive waste (HTRW) sites, and furnishing and installing the pump, 
and associated testing</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  TO DOWNLOAD UFGS GRAPHICS<BRK/>
<BRK/>
Go to <URL HREF="http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf">http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf</URL>.</NPR><BRK/>
<BRK/>
<NPR><HL4>DRAWINGS</HL4><BRK/>
<BRK/>
Drawings should include the following and any other information necessary to 
indicate layout and general configuration of the well.<BRK/>
<BRK/>
   Diameter of drilled hole<BRK/>
<BRK/>
   Casing sizes - outside casing, inside casing<BRK/>
<BRK/>
   Well screen size<BRK/>
<BRK/>
   Minimum depth of outer casing and minimum depth of well screen<BRK/>
<BRK/>
   Limits of gravel envelope around inside casing and screens<BRK/>
<BRK/>
   Limits of neat cement grout around outer casing<BRK/>
<BRK/>
   Location of air line and altitude gage<BRK/>
<BRK/>
   Type of cap, cover, or seal required at top of well<BRK/>
<BRK/>
   Required well capacity in gallons per minute.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Separate pay items for test holes and water wells must be included in 
the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment for each specified item will be made at the contract unit price for that item.  Payment will include 
full compensation for equipment, materials and labor for drilling; removal and disposal of temporary casing, 
cuttings, and drill fluid; preparation of borehole logs; and sample handling, containers, storage, and testing.  
Depth, logging, installation, casing, riser pipe, and well screen shall be measured by linear distance.  Payment 
will not be allowed for test holes or wells abandoned due to construction practices not in accordance with this 
specification, faulty construction practices or for the convenience of the Contractor.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.1   Test Hole</TTL><BRK/>
<BRK/>
<TXT>Compensation for the test hole will be made at the contract unit price and will include material, equipment, 
and labor required to drill and perform tests on the test hole.  Depth shall be measured as the total linear 
distance between ground surface and bottom of hole.  If the total depth of hole is greater than that specified 
on the contract for "Test Hole," the additional depth will be paid for at the contract unit price for "Additional 
Test Hole Depth."  If the test hole is developed into the permanent well with no increase in diameter, the Contractor 
will be compensated as described below, and separate payment will not be made for the test hole.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2   Water Well</TTL><BRK/>
<BRK/>
<TXT>Compensation for the water well will be made at the contract unit price and will include material, equipment, 
and labor required to drill, develop, perform tests, and complete the permanent well.  Depth shall be measured 
as the total linear distance between ground surface and bottom of hole.  If the total depth of well is greater 
than that specified in the contract for "Water Well," the additional depth will be paid for at the contract unit 
price for "Additional Water Well Depth."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3   Observation Well</TTL><BRK/>
<BRK/>
<TXT>Compensation for an observation well will be made at the contract unit price and will include material, equipment 
and labor required to drill, install, and complete the observation well, as well as perform tests and permanently 
grout it after use.  Depth shall be measured as the total linear distance between ground surface and bottom of 
hole.  If the total combined depth of observation wells is greater than that specified in the contract for "Observation 
Wells," the additional depth will be paid for at the contract unit price for "Additional Observation Well Depth." </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4   Geophysical Logging</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The "Geophysical Logging" unit price will include interpretation of the logs and their delivery to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.5   Well or Test Hole Decommissioning/Abandonment</TTL><BRK/>
<BRK/>
<TXT>Permanent decommissioning/abandonment of wells or test holes will be paid for only if it becomes necessary to 
abandon a well or test hole as specified, and only for work completed and accepted as specified.  Payment will 
include compensation for drilling, casing removal, well sampling, materials, cement, mixing of cement, bentonite, 
and water, pumping of grout, equipment, removal of foreign objects, and transportation necessary to abandon the 
well or test hole and for the required well or test hole abandonment records.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6   Site Cleanup</TTL><BRK/>
<BRK/>
<TXT>Separate payment will not be made for cleanup of the site.  Cleanup will mean restoring the site to its pre-construction 
condition, in accordance with paragraph SITE CLEANUP.  Cleanup will be considered part of and incidental to the 
drilling, construction, and/or decommissioning of the well.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN WATER WORKS ASSOCIATION (AWWA)</ORG><BRK/><BRK/><RID>AWWA 10084</RID><RTL>(2005) Standard Methods for the Examination of Water and Wastewater</RTL><BRK/><BRK/><RID>AWWA A100</RID><RTL>(2006; Errata 2007) Water Wells</RTL><BRK/><BRK/><RID>AWWA B300</RID><RTL>(2004) Hypochlorites</RTL><BRK/><BRK/><RID>AWWA B301</RID><RTL>(2004) Liquid Chlorine</RTL><BRK/><BRK/><RID>AWWA C200</RID><RTL>(2005) Steel Water Pipe - 6 In. (150 mm) and Larger</RTL><BRK/><BRK/><RID>AWWA C206</RID><RTL>(2003) Field Welding of Steel Water Pipe</RTL><BRK/><BRK/><RID>AWWA C654</RID><RTL>(2003) Disinfection of Wells</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 139/A 139M</RID><RTL>(2004) Standard Specification for Electric-Fusion (ARC)-Welded Steel Pipe (NPS 4 and over)</RTL><BRK/><BRK/><RID>ASTM A 312/A 312M</RID><RTL>(2008a) Standard Specification for Seamless, Welded, and Heavily Worked Austenitic Stainless Steel Pipes</RTL><BRK/><BRK/><RID>ASTM A 53/A 53M</RID><RTL>(2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM D 1586</RID><RTL>(2008a) Penetration Test and Split-Barrel Sampling of Soils</RTL><BRK/><BRK/><RID>ASTM D 1587</RID><RTL>(2008) Thin-Walled Tube Sampling of Soils for Geotechnical Purposes</RTL><BRK/><BRK/><RID>ASTM D 1785</RID><RTL>(2006) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120</RTL><BRK/><BRK/><RID>ASTM D 2216</RID><RTL>(2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass</RTL><BRK/><BRK/><RID>ASTM D 2239</RID><RTL>(2003) Standard Specification for Polyethylene (PE) Plastic Pipe (SIDR-PR) Based on Controlled Inside Diameter</RTL><BRK/><BRK/><RID>ASTM D 2487</RID><RTL>(2006e1) Soils for Engineering Purposes (Unified Soil Classification System)</RTL><BRK/><BRK/><RID>ASTM D 2488</RID><RTL>(2006) Description and Identification of Soils (Visual-Manual Procedure)</RTL><BRK/><BRK/><RID>ASTM D 4318</RID><RTL>(2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils</RTL><BRK/><BRK/><RID>ASTM D 4750</RID><RTL>(1987; R 2001) Determining Subsurface Liquid Levels in a Borehole or Monitoring Well (Observation Well)</RTL><BRK/><BRK/><RID>ASTM D 5079</RID><RTL>(2008) Preserving and Transporting Rock Core Samples</RTL><BRK/><BRK/><RID>ASTM D 5088</RID><RTL>(2002; R 2008) Decontamination of Field Equipment Used at Nonradioactive Waste Sites</RTL><BRK/><BRK/><RID>ASTM D 5299</RID><RTL>(1999; R 2005) Decommissioning of Ground Water Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities</RTL><BRK/><BRK/><RID>ASTM D 5521</RID><RTL>(2005) Development of Ground-Water Monitoring Wells in Granular Aquifers</RTL><BRK/><BRK/><RID>ASTM D 5608</RID><RTL>(2001; R 2006) Decontamination of Field Equipment Used at Low Level Radioactive Waste Sites</RTL><BRK/><BRK/><RID>ASTM F 480</RID><RTL>(2006b) Thermoplastic Well Casing Pipe and Couplings Made in Standard Dimension Ratios (SDR), SCH 40 and SCH 80</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>CED TR GL-85-3</RID><RTL>(1985) Geotechnical Descriptions of Rock and Rock Masses</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)</ORG><BRK/><BRK/><RID>EPA 600/4-79/020</RID><RTL>(1983) Methods for Chemical Analysis of Water and Wastes</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>49 CFR 172</RID><RTL>Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The  geologist must be aware of the approximate depth of well and length 
of screen required to provide sufficient water to fulfill project requirements 
and the quality of water to be expected at that depth.  (The Post, or Resident 
Engineers office, or local USGS office is a good source for this information.)  
This knowledge is necessary to estimate well drilling costs and to determine 
what type of treatment is required to make the water usable.  Any such site-specific 
conditions or criteria for individual projects should be included in this paragraph.  
The geologist must ensure that well design meets or exceeds Federal, state, 
and local installation requirements.  Additional criteria may apply for wells 
at radioactive, mixed, biological, solid, or medical waste sites.  Guidance 
on water well construction may be found in Environmental Protection Agency (EPA) 
Manual of Water Well Construction Practices (570/9-75/001).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The well shall be located [as shown] [where directed], and be constructed in accordance with these specifications.  
Each well shall be installed to prevent aquifer contamination by the drilling operation and equipment, intra- 
and inter-aquifer contamination, and vertical seepage of surface water adjacent to the well into the subsurface, 
especially the well intake zone.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Notification</TTL><BRK/>
<BRK/>
<TXT>The [Installation Environmental Coordinator (IEC)] [_____] [and the] Contracting Officer shall be notified [_____] 
days prior to drilling.  The [Contracting Officer] [Contractor] [Installation Environmental Coordinator (IEC)] 
[_____] shall be responsible for contacting the [State of [_____]] [USEPA] in accordance with the applicable 
reporting requirements.  Before beginning work, the local United States Geological Survey office (USGS) [and 
the] [State Environmental Protection office] [State Geological Agency] [state health department] [local health 
department] shall be notified of the type and location of wells to be constructed, the method of construction 
and anticipated schedule for construction of the wells.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Abandonment of Wells</TTL><BRK/>
<BRK/>
<TXT>If the Contractor fails to construct a well of the required capacity, or if the well is abandoned because of 
loss of tools, or for any other cause, abandon the hole as specified in paragraph WELL DECOMMISSIONING/ABANDONMENT.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Installation Diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>].</ITM><BRK/>
<BRK/>
<ITM>  As-built installation diagram for each well installed, prepared by the geologist present during 
well installation operations, within [_____] working days of the completion of the well installation 
procedure.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Well Installation Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>].</ITM><BRK/>
<BRK/>
<ITM>  A plan as specified in paragraph WELL INSTALLATION PLAN describing the drilling methods, sampling, 
and well construction and well development [30] [_____] calendar days prior to beginning drilling 
operations.  Mobilization activities may start prior to submittal of the plan.  The plan shall 
be approved and signed by an experienced geologist as specified in paragraph QUALIFICATIONS.</ITM> <BRK/>
<BRK/>
<ITM><SUB>Well Material</SUB></ITM><BRK/>
<BRK/>
<ITM>  Catalog data, and name of supplier, for  well screens (to include the screen slot size), casing, 
riser pipe, filter pack material, bentonite, cement, centralizers, surface protective covers, 
well vaults, locking caps, airline oil filters for pneumatic drilling, dedicated sampling equipment, 
pumps, and chemical specifications on drill lubricants, tracers, disinfecting agents, and drill 
fluid additives, if used.  Catalog data shall include any information, written or otherwise, 
supplied by the manufacturers or suppliers of the above listed items.</ITM><BRK/>
<BRK/>
<ITM><SUB>Qualifications</SUB></ITM><BRK/>
<BRK/>
<ITM>  Personnel qualification documentation.</ITM><BRK/>
<BRK/>
<ITM><SUB>Site Conditions</SUB></ITM><BRK/>
<BRK/>
<ITM>  A copy of all permits, licenses, or other legal requirements necessary for execution of the 
work shall be furnished [_____] working days before commencement of the work.</ITM><BRK/>
<BRK/>
<ITM><SUB>Geophysical Logging</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Five] [_____] prints of the graphic boring log prepared to scale showing the required details, 
within [_____] working days after completion of the test hole.  This drawing shall be used for 
determining the well design, design of the filter pack, well screen location and screen openings.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Survey Maps and Notes</SUB></ITM><BRK/>
<BRK/>
<ITM>  Survey maps and notes, including a tabulated list of all wells and monuments, copies of all 
field books, maps showing the locations, and elevations of all wells, datum used (e.g. state 
plane NAD27, NAD83, UTM, etc.), elevation datum, units of measurement, and all computation sheets, 
within [_____] working days after completion of the survey.  Also, a diagram showing where on 
the top of the well the elevation was determined by the surveyor.</ITM><BRK/>
<BRK/>
<ITM><SUB>Well Development Records</SUB></ITM><BRK/>
<BRK/>
<ITM>  A well development record, for each well, within [_____] working days of the completion of 
development.</ITM><BRK/>
<BRK/>
<ITM><SUB>Geophysical Logs</SUB></ITM><BRK/>
<BRK/>
<ITM>  Interpreted geophysical logs, within [_____] working days of the completion of said logging.</ITM><BRK/>
<BRK/>
<ITM><SUB>Decommissioning/Abandonment Records</SUB></ITM> <BRK/>
<BRK/>
<ITM>  A well decommissioning record, for each well, or test hole abandoned, within [_____] working 
days of the completion of the abandonment procedure.</ITM><BRK/>
<BRK/>
<ITM><SUB>Project Photographs</SUB></ITM><BRK/>
<BRK/>
<ITM>  Before, during, and after completion of the work, take photographs of each well installation 
site.  Photographs shall also be taken of any rock that is cored at the site.</ITM><BRK/>
<BRK/>
<ITM><SUB>Water Source</SUB></ITM><BRK/>
<BRK/>
<ITM>  Decontamination and drilling water source analytical test results, within [____] working days 
before beginning drilling operations.</ITM><BRK/>
<BRK/>
<ITM><SUB>Filter Pack</SUB></ITM><BRK/>
<BRK/>
<ITM>  Filter pack material test results; sieve and chemical analyses, within [____] working days 
after completion of the test hole.</ITM><BRK/>
<BRK/>
<ITM><SUB>Tests</SUB>.</ITM><BRK/>
<BRK/>
<ITM>  Test Reports within [_____] [24] hours following the conclusion of each test.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit the submittal requirements based on the type of well (consolidated 
or unconsolidated).  If the specification is written for a consolidated well, 
delete the well components which are not normally required in consolidated formations, 
such as inner casing, well screen, and gravel fill.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM><SUB>Casing</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Cement and Bentonite Grout</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Air line and gauge</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Drilling mud</SUB></ITM><BRK/>
<BRK/>
<ITM>[<SUB>Well Screens</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Water removed</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Graveling equipment</SUB> list</ITM><BRK/>
<BRK/>
<ITM><SUB>Construction of Filter Pack</SUB></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Well Installation Plan</SUB></TTL><BRK/>
<BRK/>
<TXT>Incorporate the following requirements into the Contractor's Well Installation Plan and follow them in the field.  
The plan shall include, but shall not be limited to, a discussion of the following:</TXT><BRK/>
<BRK/>
<LST>a.  Description of well drilling methods, and installation procedures, including any temporary casing 
used, placement of filter pack and seal materials, drill cuttings and fluids disposal, and soil/rock 
sample disposition.</LST><BRK/>
<BRK/>
<LST>b.  Description of well construction materials, including well screen, riser pipe, centralizers, <SUB>air 
line and gauge</SUB>, tailpiece (if used), filter pack and filter pack gradation, bentonite or <SUB>drilling mud</SUB>
, drilling fluid additives (if used), drilling water, cement, and well protective measures.</LST><BRK/>
<BRK/>
<LST>c.  Description of quality control procedures to be used for placement of filter pack and seals in the 
boring, including depth measurements.</LST><BRK/>
<BRK/>
<LST>d.  Forms to be used for written boring logs, installation diagrams of wells, geophysical logs, well 
development records, well sampling data records, state well registration forms, and well abandonment 
records.</LST><BRK/>
<BRK/>
<LST>e.  Description of contamination prevention and well materials and equipment decontamination procedures.</LST><BRK/>
<BRK/>
<LST>f.  Description of protective cover surface completion procedures, including any special design criteria/features 
relating to frost heave prevention.  The maximum frost penetration for the site shall be included in 
this description.</LST><BRK/>
<BRK/>
<LST>g.  Description of well development methods to be used.</LST><BRK/>
<BRK/>
<LST>h.  List of applicable publications, including state and local regulations and standards.</LST><BRK/>
<BRK/>
<LST>i.  List of personnel assignments for this project, and personnel qualifications.</LST><BRK/>
<BRK/>
<LST>j.  Description of well decommissioning/abandonment procedures.</LST><BRK/>
<BRK/>
<LST>k.  Description of well capacity testing techniques.</LST><BRK/>
<BRK/>
<LST>l.  Description and discussion of geophysical techniques to be employed at the site.</LST><BRK/>
<BRK/>
<LST>m.  Description of permanent pump to be installed, and discussion of pump operating tests to be employed 
at the site.</LST><BRK/>
<BRK/>
<LST>n.  Description of specific methods to be employed to control potential contamination or pollution arising 
from well installation activities.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>Qualifications</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When installing extraction, or injection wells for environmental purposes, 
it is important that the Contractor have personnel experienced in hazardous 
waste projects, and have the proper safety  training in accordance with 29 CFR 
1910.120.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A geologist with at least [3] [_____] years experience in [hazardous waste projects,] soil and rock logging, 
and well installation, [registered in the state of [_____],] shall be on site and responsible for all geophysical 
and borehole logging, drilling, well installation, developing and testing activities.  The driller shall be licensed 
in the state of [_____], according to the state requirements.  Geophysical log interpretation shall be done by 
a qualified log analyst.  The log analyst shall be able to demonstrate competence through background, training, 
and experience when so called upon.  The Contractor shall have a minimum of [_____] years of  well installation 
experience.  [The Contractor's staff shall include appropriate health and safety personnel as specified in Section 
<SRF>01 35 29.13</SRF> HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES, and personnel qualified 
to perform the necessary chemical sampling as presented in the approved Sampling and Analysis Plan, prepared 
as specified in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   <TST>Test Holes</TST></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The test hole and capacity test should be specified if there is reason 
to believe that the well may not produce the required yield at the design depth.  
If the required yield is not obtained, the test hole may be drilled deeper or 
the location changed before the complete well is constructed.  Requirements 
for the test hole may be deleted if the well is to be constructed in an area 
where other wells of similar depth and design are performing adequately.  However, 
a drill log should be made and capacity test should be performed for all wells 
to provide an "as-built" record.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Before starting construction of the well, a test hole of at least<MET> [100][_____] mm</MET><ENG> [4] [_____] inches</ENG> in diameter 
shall be drilled at the location of the well into the target water bearing [stratum] [strata] as directed by 
the Contracting Officer.  Test holes should be drilled in a manner to protect the subsurface from surface contamination.  
Test holes should be carefully advanced and sampled to determine the presence of the upper aquiclude if one exists.  
The boring should then be properly cased, grouted, and sealed into the aquiclude before the boring is advanced 
through the aquiclude into the aquifer.  The test hole shall be used to determine the expected yield from the 
well, water quality, optimum depth, and to log the strata encountered.  Before conducting a capacity test, the 
well shall be cased, and screened in accordance with these specifications.  Test holes shall be logged in accordance 
with paragraph BOREHOLE LOGS.  A temporary casing [may] [shall] be used.  If used, the temporary casing shall 
be seated [into the top of the rock] [at the top of the stratum being tested].  The test hole may be converted 
to the permanent well, in accordance with these specifications.  If the test hole is not used for the permanent 
well, the test hole shall be abandoned as specified in paragraph WELL DECOMMISSIONING/ABANDONMENT.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4   Sampling</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Sampling for chemical and geotechnical analysis may be combined to allow 
for obtaining samples for both if that accomplishes project requirements.  If 
this is done, however, the geotechnical sampling must be coordinated with the 
requirements in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALIFY CONTROL for sampling 
for chemical analysis.  When sampling at an HTRW site, properly decontaminated 
stainless steel samplers should always be used.  If rock is cored at the site, 
properly decontaminated stainless steel samplers should always be used.  If 
rock is cored at the site, and it is determined that it should be retained, 
it should be boxed, and photographed.  Its storage, and later disposal should 
be in accordance with ER 1110-1-1901, and the proper storage and handling protocol 
for such material as may be required by other Federal, state, or local laws, 
regulations and permits.  Sampling procedures are described in EM 200-1-3, Requirements 
for the Preparation of Sampling and Analysis Plans.  Guidance for preserving 
and preparing core samples for transport can be found in ASTM D 5079.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.5.4.1   Sampling for Chemical Analysis</TTL><BRK/>
<BRK/>
<TXT>Sampling requirements for obtaining and preserving samples for chemical analysis shall be included in the Sampling 
and Analysis Plan as required in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4.2   Sampling for Geotechnical Analysis</TTL><BRK/>
<BRK/>
<TXT>Samples shall be taken of all materials penetrated by each drilled well/test hole.  Soil sampling shall be done 
with a [split] [thin-walled] tube sampler using standard sampling techniques in accordance with [<RID>ASTM D 1586</RID>] 
[<RID>ASTM D 1587</RID>].  Samples shall be extracted from their in-situ environment in as near an intact, minimally disturbed 
condition as technically practical.  Samples shall be obtained continuously through the area expected to be screened.  
Provide sieve analyses of all drive-sampled material.  Sieve analyses shall be conducted in accordance with <RID>ASTM C 136</RID>
.  The gradation of the natural formation shall be determined through the use of sieve analyses performed on 
formation samples taken from the areas to be screened.  Drive-sampled materials shall be placed in airtight containers 
and labeled as specified in paragraph SAMPLE CONTAINERS.  Samples shall be delivered to the Contracting Officer 
designated facility.  Representative soil samples s hall be tested for grain-size distribution by mechanical 
means (sieves down to the<MET> 0.074 mm</MET><ENG> No. 200</ENG> size according to <RID>ASTM C 136</RID>), moisture content according to <RID>ASTM D 2216</RID>
 and Atterberg limits according to <RID>ASTM D 4318</RID>.  Description and identification of soils shall be done in accordance 
with <RID>ASTM D 2488</RID>.  Laboratory classification of soils shall be done in accordance with <RID>ASTM D 2487</RID>.  Sampling 
shall be performed to allow completion of the documents described in paragraph BOREHOLE LOGS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5.5   Observation Wells</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In some cases an observation well or wells should be drilled an appropriate 
distance from the test hole or pump well.  The observation wells (piezometers) 
should be monitored during the yield test of the test hole and/or capacity test 
of the pump well so that valid information of aquifer potential and character 
may be obtained.  The observation wells must be designed, installed and removed 
from service in a manner that precludes the possibility of future groundwater 
contamination resulting from their existence.  If the decision is made to keep 
the observation well for future sampling, or for use in future pumping tests, 
the observation wells must be properly completed as specified in this section, 
or other USACE guidance, such as Section <SRF>33 24 13</SRF> GROUND-WATER MONITORING WELLS.  
When installing extraction, or injection wells at an HTRW site, consideration 
should also be given to leaving some observation wells inplace, to be used for 
longterm operation and maintenance (O&amp;M) of the extraction, and injection 
wells </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After completion of the [test hole] [pump well] [_____], [1] [____] observation well(s) [, or more as directed], 
at least<MET> [45] [_____] mm</MET><ENG> [1-3/4] [_____] inches</ENG> in diameter shall be drilled to the target water bearing stratum, 
[at the location(s) indicated on the drawings] [at a location [_____]<MET> m</MET><ENG> feet</ENG> from]   [at an appropriate location 
near] the [test hole] [pump well] [_____].  The observation well shall be used in conjunction with the [yield 
test of the test hole] [and] [capacity test of the pump well].  After final acceptance of the pump well by the 
Contracting Officer, the observation well shall be [abandoned as specified in paragraph WELL DECOMMISSIONING/ABANDONMENT][left 
in place for future monitoring of the well system].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.6   <SUB>Geophysical Logging</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The requirement to obtain borehole geophysical surveys is optional.  
While it may not be necessary to require a borehole geophysical survey at a 
site where a great deal is known about the subsurface, at another site, where 
very little, or nothing is known, it may be prudent to require a borehole geophysical 
survey.  When it is deemed necessary to require a borehole geophysical survey, 
the specific type of survey should be specified.  This recommendation is made 
by the project geologist.  The project geologist should also determine what 
geophysical logging may not be allowed by state regulations, before specifying 
them.  See EM 1110-1-1802, Geophysical Exploration. Guidance for planning and 
conducting borehole geophysical logging may be found in ASTM D 5753.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The total depth of each test hole drilled shall be geophysically logged.  Geophysical logging shall be documented 
in accordance with paragraph Geophysical Logs.  Run [one successful natural gamma ray or gamma-gamma for the 
full depth, (top to bottom of test hole);] [one successful neutron in the fluid filled portion of the hole, (top 
to bottom of test hole);] [one successful (top to bottom of test hole) spontaneous potential (self-potential);] 
[and,] [one successful (top to bottom of test hole) resistivity log], for each test hole.  Log analyses and interpretations 
shall be made by a person qualified in accordance with paragraph QUALIFICATIONS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Store and maintain well materials in a clean, uncontaminated condition throughout the course of the project.  
Filter pack material shall not be allowed to freeze before installation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   <SUB>SITE CONDITIONS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If needed, edit and add Section <SRF>31 11 00</SRF> CLEARING AND GRUBBING.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Access to each well site, including any utility clearance, permits, licenses, or other requirements and the payment 
thereof necessary for execution of the work, is the responsibility of the [Contractor] [Government].  Obtaining 
rights-of-entry is the responsibility of the [Contractor] [Government].  Visit each proposed well location to 
observe any condition that may hamper transporting equipment or personnel to the site.  If clearing, or relocation 
is necessary, the Contractor, [Installation Environmental Coordinator,] and the Contracting Officer shall agree 
on a suitable clearing, or relocation plan, and the location of any required access road.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>CASING</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Well components do not have to be made of the same materials to be compatible.  
With the proper connectors, different materials can be used together without 
causing detrimental results.  When using different materials together, the manufacturer 
should be consulted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All casing, screen, and other <SUB>well material</SUB> shall be of compatible materials to prevent galvanic reaction between 
components of the completed well.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Steel Casing and Couplings</TTL><BRK/>
<BRK/>
<TXT>Steel casing shall be new [carbon steel, conforming to <RID>ASTM A 139/A 139M</RID> Grade B][standard weight [galvanized] 
[black] steel pipe, conforming to <RID>ASTM A 53/A 53M</RID>] [steel pipe conforming to <RID>AWWA C200</RID>][[type 304] [or] [type 
316] stainless steel] and shall be nominal [_____]<MET> mm</MET><ENG> inch</ENG> diameter, [_____]<MET> mm</MET><ENG> inch</ENG> wall thickness [schedule 
5S meeting the requirements of <RID>ASTM A 312/A 312M</RID>], as applicable.  Joints shall be either threaded and coupled, 
or field welded in accordance with <RID>AWWA C206</RID>.  [Casings shall be provided with [drive shoes] [_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Plastic Casing and Couplings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  ASTM F 480 covers several different types of pipe materials and coupling 
configurations.  If any of these materials or couplings are to be prohibited, 
this paragraph should clearly point out which are or are not allowed.  When 
installing extraction or injection wells, for environmental purposes, thermal 
or solvent welded couplings on plastic pipe should not be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Plastic casing pipe and couplings shall be schedule [80][___], threaded flush joint (or other joint type as approved 
by the Contracting Officer) and conform to <RID>ASTM F 480</RID> and <RID>ASTM D 1785</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   <SUB>WELL SCREENS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Well screens will be specified when the developed well requires assurance 
of relatively free entry of water into the casing at low velocity, when surrounding 
sand from the unconsolidated formation must be prevented from entering the intake, 
or when a structural retainer is required to support the borehole in the unconsolidated 
material.  Type of screen and casing will be designer's option and nonapplicable 
type of screen will be deleted.  Metal screens and casings will be specified 
when strength of screen and casing must be greater than that provided by plastic 
or when maximum open area for the screen diameter is required.  Plastic screens 
and casing may be specified when water quality is such that screen selection 
requires corrosive-resistant materials, or when economy is of prime importance.  
Blanks in the well screen may be appropriate if more than one water bearing 
zone is encountered in an aquifer, or when it is necessary to place a centering 
device (centralizer) in the screened area.  However, screening more than one 
aquifer in the same well should be avoided whenever possible due to the possibility 
of cross-contamination.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Well Screens shall be a minimum of<MET> [100] [_____] mm</MET><ENG> [4] [_____] inches</ENG> nominal diameter, and shall be directly 
connected to the bottom of the inner casing by an approved method.  The length of the screen shall be sufficient 
to provide an intake area capable of passing not less than the minimum required yield of the well, at an entrance 
velocity not exceeding<MET> 30.5 mm/s</MET><ENG> 0.1 fps</ENG>.  The opening, or slot size of the screen, shall be [[_____]<MET> mm</MET><ENG> inch</ENG>
][determined by the Contractor][designed based on analysis of the distribution of the grain size of the [aquifer 
materials encountered during drilling][artificial filter pack]], be compatible with the material surrounding 
the screen, and shall be submitted for approval as part of the well installation plan.  The well screen shall 
be of sufficient size and design to hold back and support the [gravel used in the filter pack  envelope] [and] 
[in-situ material surrounding the screen].  The screen and all accessories required for satisfactory operation 
shall be essentially standard products of manufacturers regularly engaged in the production of such equipment.  
Field constructed screen is not acceptable.  "Blanks" in the well screen may be utilized in nonproductive zones, 
or where centering devices are needed in the screened area, and shall be considered "casing."  The bottom section, 
below the screen, shall be sealed watertight by means of a [flush threaded] [welded] end cap of the same material 
as the well screen.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Metal Screen</TTL><BRK/>
<BRK/>
<TXT>Metal screen shall be of an approved wire-wound type and  shall be [type 304] [or] [type 316] stainless steel, 
conforming to the applicable requirements of <RID>AWWA A100</RID>.  A wire-wound screen manufactured with supporting bars 
or core of material different from the wire will not be acceptable.  Joints shall be made of threaded couplings 
of the same material as the screens or by brazing or welding in accordance with <RID>AWWA C206</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Plastic Screen</TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.2.1   Plastic Pipe</TTL><BRK/>
<BRK/>
<TXT>Plastic pipe  shall be thermoplastic manufactured by a molding, extrusion or sonic welding process.  The plastic 
compounds shall be uniform in composition and shall not contain additives or foreign matter.  The molding or 
extrusion process shall produce pipe that is homogeneous throughout and free from visible cracks, holes, foreign 
inclusions or other defects.  Pipe produced by simultaneous multiple extrusion shall have strong uniform bonds 
between any two layers so that the layers cannot be separated.  Plastic pipe shall be uniform in color, opacity, 
density and other physical properties.  Plastic pipe, and screen material shall conform to <RID>ASTM F 480</RID>.  All PVC 
plastic pipe shall conform to <RID>ASTM D 1785</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.2   Bonding Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When sampling for trace level contaminants in a well, the use of any 
solvents to join casing should not be allowed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Bonding materials, proportions and preparation of adhesives, the method of application, and the procedure used 
for making and curing the connections shall conform to the recommendations of the plastic pipe manufacturer and <RID>
ASTM F 480</RID>.  The pot life, initial setting time and external heating requirements for curing of the adhesive 
shall be suitable for the procedure and climatic and other conditions and shall be varied as required to suit 
changes in climatic and other conditions.  The system for making joints at the well site shall provide a curing 
period adequate to develop the ultimate strength of the completed joint.  Self-tapping screws or other devices 
for holding adhesive-coated pipe in the couplings during the setting period [may] [shall not] be utilized.  Newly-made 
joints in the casing shall not be stressed, lowered into the well or submerged in water prior to complete curing 
of the adhesive.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.3   Plastic Well Screen</TTL><BRK/>
<BRK/>
<TXT>Plastic well screen shall be provided with perforations which shall consist of either machine-sawed slots, continuous 
wrap or wound, or drilled, formed, or molded openings, and which shall have smooth, sharp-edged openings free 
of burns, chipped edges, or broken pieces on the interior and exterior surfaces of the pipe.  The pattern of 
the openings shall be uniformly spaced around the periphery of the well screen.  Compatible slot sizes of screens 
and [filter-pack gradations] [surrounding material] shall be designed and furnished to the Contracting Officer 
[, with a representative sample of materials in which the screen is to be placed].  The plastic pipe screen strength 
properties shall be equivalent to those for the plastic casing with which the screen is used.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.3   <SUB>FILTER PACK</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The use of artificial filter-pack construction is recommended in formations 
where the screen slot opening, selected on the basis of a naturally developed 
well, is smaller than 0.25 mm (0.010 inch) (No. 10 slot).  Artificial filter-pack 
material should also be specified when fine uniform material, or extensively 
laminated, non-homogenous formations are encountered.  Guidance for designing 
and selecting the screen slot size, and filter pack gradation may be found in 
EPA's "Handbook of Suggested Practices for the Design and Installation of Ground-Water 
Monitoring Wells", (EPA document number 600/4-89/034); or "Groundwater and Wells", 
by Fletcher G. Driscoll, published by Johnson Well Screens, 1986.<BRK/>
<BRK/>
If the well is not a filter pack type, this paragraph should be deleted in its 
entirety, along with other references to filter pack wells throughout the specification.  
Sterilizing the filter material before being placed is not required for extraction 
and injection wells installed at hazardous, toxic, and radioactive waste (HTRW) 
sites.  When requiring sterilization, the strength of the sterilizing agent 
should be stated, and how much is required per cubic yard of filter pack.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Filter pack material shall be a product of a commercial sand and gravel supplier, shall be properly sized and 
graded for the surrounding soil encountered, and shall be composed of clean, round, hard, waterworn siliceous 
material, free of flat or elongated pieces, organic matter, or other foreign matter.  The filter material shall 
be of a size which will allow the maximum flow of water into the well and prevent the infiltration of sand and 
silt.  The gradation of the filter material shall be such that the uniformity coefficient is not more than 2.5.  
The filter material shall be [thoroughly sterilized with chlorine or hypochlorite immediately before being placed] 
[placed as directed].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   BENTONITE SEAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Before installing an annular seal, the state regulatory agency should 
be consulted.  The state, or local municipality, where the well is being installed, 
may have specific requirements for sanitary, and/or wellhead  protection.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The bentonite seal, intended to keep grout from entering the filter pack, shall consist of hydrated granular, 
or pelletized, sodium montmorillonite furnished in sacks or buckets from a commercial source and shall be free 
of impurities which adversely impact the water quality.  If the bentonite seal is located above any borehole 
fluid levels, a layer of fine sand shall be placed at the top of the bentonite seal, to provide an additional 
barrier to any downward migration of grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   <SUB>CEMENT AND BENTONITE GROUT</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.5.1   Cement Grout</TTL><BRK/>
<BRK/>
<TXT>Cement grout shall consist of Portland cement conforming to <RID>ASTM C 150</RID>, Type I or II, sand and water.  Cement 
grout shall be proportioned not to exceed 2 parts, by weight, of sand to 1 part of cement with not more than<MET> 
23 liters</MET><ENG> 6 gallons</ENG> of water per<MET> 42.6 kg</MET><ENG> 94 lb bag</ENG> of Portland cement, with a mixture of such consistency that 
the well can be properly grouted.  No more than 5 percent by weight of bentonite powder may be added to reduce 
shrinkage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   Bentonite Grout</TTL><BRK/>
<BRK/>
<TXT>High-solids bentonite grout shall be made from sodium bentonite powder and/or granules.  Water from an approved 
source shall be mixed with these powders or granules to form a thick bentonite slurry.  The slurry shall consist 
of a mixture of bentonite and the manufacturer's recommended volume of water to achieve an optimal seal.  The 
slurry shall contain at least 20 percent solids by weight and have a density of<MET> 4.3 kg/L</MET><ENG> 9.4 lb/gallon</ENG> of water 
or greater.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6   PERMANENT PUMP</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The pump and motor diameter should be at least 25 mm (1 inch) smaller 
than the inside diameter of the well screen or casing, whichever is smaller, 
in order to allow it to be removed for servicing after buildup of scale on the 
outside of the pump and inside of the well screen and casing. Pump components 
need to be compatible with the contaminants of concern, when installed at an 
HTRW site.  A permanent pump should not be specified until it is known how much 
the well will produce.  The installation of the permanent pump may need to be 
in a separate section, (refer to Section <SRF>43 21 39</SRF> PUMPS: WATER, VERTICAL TURBINE).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Permanent pump shall be an approved [submersible] [jet] [or] [_____] type with a capacity sufficient to deliver 
[_____]<MET> L/s</MET><ENG> gpm</ENG>.  The pump shall be connected to the pump controls by a three-wire drop line.  Piping for the 
well drop line shall be [polyethylene plastic pipe conforming to <RID>ASTM D 2239</RID>][galvanized steel pipe conforming 
to <RID>ASTM A 53/A 53M</RID>].  The pump shall operate on [208] [_____] volts, 60 Hz, [3] [single]-phase power, and the 
motor shall be of sufficient size to operate the pump under the maximum operating conditions without exceeding 
its rating.  Pump shall be equipped with necessary controls to provide for automatic operation of the pump.  
The pump and motor unit shall be no larger than [_____]<MET> mm</MET><ENG> inches</ENG> in diameter at any point.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7   CONTAINERIZATION OF DEVELOPMENT WATER, AND DRILL CUTTINGS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If installing extraction, or injection wells at a hazardous waste site, 
the investigation-derived waste (IDW) such as development water, or drill cuttings 
may have to be containerized.  If this is not the case, this paragraph may be 
deleted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><SUB>Water removed</SUB> during development and testing operations, and cuttings from the drilling operations shall be contained 
in D.O.T.-approved drums, containers, or vessels as specified in <RID>49 CFR 172</RID>.  Furnish polyethylene and steel 
drums with lids, lid gaskets, bolts, chain of custody forms and drum labels.  Mark each drum label in accordance 
with <RID>49 CFR 172</RID> in addition to the following information:  drum number, site name, well name and number, contents 
and date, approximate depth of material contained in each drum and the name and phone number of the [Installation 
Environmental Coordinator (IEC)] [Contracting Officer] [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8   SAMPLE CONTAINERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete requirements for boxing core, if rock coring is not anticipated 
at the site.  Rock core samples should be containerized, boxed and stored in 
accordance with ER 1110-1-1901, EM 200-1-3, EM 1110-1-1804, and EM 1110-1-4000.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drill cuttings and driven samples for geotechnical purposes shall be placed in air-tight<MET> liter</MET><ENG> pint</ENG> size [plastic] 
[glass] containers and labeled with the project name, date of sample, well number and depth at which the sample 
was taken.  Both the container and lid shall be labeled in permanent indelible ink.  Jars shall be placed in 
partitioned [cardboard] [_____] boxes.  Boxes shall be labeled with project number and well number.  Containers 
and boxes shall be furnished by the Contractor.  Core samples shall be preserved and prepared for transport as 
described in <RID>ASTM D 5079</RID>. Cored rock samples shall be placed in [wooden] [_____] core boxes as indicated on the 
drawings.  Spacers shall be placed in the proper positions in the core boxes to show the location and actual 
extent of voids and core losses as clearly as possible.  The spacers shall be made of [wood] [_____] [or some 
other relatively light material] which is of sufficient strength to withstand jarring and crushing in handling.  
Spacers shall be of a strongly contrasting color pattern so that core losses will be accented either by direct 
observation or in photographs.  In the smaller sizes, up to and including<MET> 150 mm</MET><ENG> 6 inches</ENG>, the spacers shall 
be the same width as the cores.  The outside and the inside of the core box lid shall be labeled with the project 
name, hole number, date sampled, location, surface elevation, core box number, and interval of depth of core.  
The information on the label shall be such that it can clearly be read in photographs of the core box.  Both 
ends of the core box shall also be labeled with the hole number and box number.  The core shall be placed in 
the core box starting at the left hand corner on the hinge side and running to the right.  Successive cores down 
the hole shall be placed in successive troughs, starting from the back and working toward the front of the box 
so that the core can be read in the same manner as a printed page, from left to right, when standing in front 
of the open box.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   PROTECTION OF EXISTING CONDITIONS</TTL><BRK/>
<BRK/>
<TXT>Maintain existing survey monuments and wells, and protect them from damage from equipment and vehicular traffic.  
Any items damaged by the Contractor shall be repaired by the Contractor.  Wells requiring replacement due to 
Contractor negligence shall be re-installed according to these specifications.  Wells scheduled for abandonment 
shall be protected from damage so that abandonment may be performed according to these specifications.  Prior 
to excavation, obtain written approval from the local utility companies to drill at each site, to avoid disturbing 
buried utilities.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   PREPARATION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Decontamination</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  It may not be necessary to decontaminate the drilling equipment if not 
installing wells at an HTRW site.  However, given that drilling equipment can 
be, and is used at both HTRW, as well as non-HTRW sites, it may be prudent to 
also require that the equipment be decontaminated before use at a non-HTRW site.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The drill rig, drill rods, drill bits, augers, temporary casing, well developing equipment, tremie pipes, grout 
pumping lines, and other associated equipment shall be cleaned with high-pressure hot water/steam prior to drilling 
at each  well location.  Decontamination shall be done in accordance with <RID>ASTM D 5088</RID> or <RID>ASTM D 5608</RID>.  Decontamination 
shall be performed at a central decontamination station.  Cleaning shall be performed in an area that is remote 
from, and cross- or down-gradient from the well being drilled.  Screen and well casing shall be cleaned with 
high-pressure hot water immediately prior to installation in the well.  The use of factory sealed (plastic wrapped) 
screen and well casing does not waive this requirement for pre-installation cleaning.  Samplers shall be decontaminated 
in accordance with the Sampling and Analysis Plan as required in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY 
CONTROL.  The water used for cleaning shall be from a Government approved source.  The water source used for 
cleaning shall be sampled and tested for the constituents specified in the Sampling and Analysis Plan prior to 
use at the site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Decontamination Station</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Construct a temporary decontamination pad onsite.  The pad shall be bermed and slightly inclined towards a sump 
located in one of the back corners of the pad.  Plastic sheeting shall line the pads and berms to contain decontamination 
water.  Plywood sheeting, exterior grade, shall be placed over the plastic sheeting to prevent damage to the 
plastic and allow the drill rig and heavy equipment to use the pad.  The minimum dimensions of the pad shall 
be the length and width of the drill rig, plus<MET> 1.2 meters</MET><ENG> 4 feet</ENG> per side to allow access and steam cleaning.  
Yellow ribbon shall be used to encircle the decontamination pad.  Water collected in the sump shall be pumped 
using a "trash" pump to transfer water to a<MET> 200 liter</MET><ENG> 55 gallon</ENG> drum labeled "Decontamination Pad Sump Water."  
Solid waste shall be transferred to a separate<MET> 200 liter</MET><ENG> 55 gallon</ENG> drum labeled "Decontamination Pad Sump Sludge."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   <SUB>Water Source</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>If well drilling/installation requires the use of water, prior to its use at the site, the water source shall 
be sampled and tested, and approved by the Contracting Officer for the constituents specified in the Sampling 
and Analysis Plan as required in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL.  The Contractor is responsible 
for locating the source, obtaining the water from the source, transporting it to, and storing it at the site.  
A water sample shall be obtained from the container used in transporting the water to the site before the water 
is used for decontamination.  This sample shall be tested and approved in accordance with the above requirements.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   WELL CONSTRUCTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete prohibition against organic drilling fluid, and grease, oil, and 
fuel leaks on equipment if not installing wells at an HTRW site, or if not applicable 
for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The drilling method shall be as approved by the Contracting Officer and shall conform to all state and local 
standards for water well construction.  The execution of the work shall be by competent workmen and shall be 
performed under the direct supervision of an experienced well driller.  The drilling method shall prevent the 
collapse of formation material against the well screen and casing during installation of the well.  The inside 
diameter of any temporary casing used shall be sufficient to allow accurate placement of the screen, riser, centralizer(s), 
filter pack, seal and grout.  [Any drilling fluid additive used shall be inorganic in nature, but be phosphate 
free.  Grease or oil on drill rods, casing, or auger joints are not permitted; however, PTFE tape or vegetable 
oil (in solid phase form) are acceptable.  The drill rig shall be free from leaks of fuel, hydraulic fluid, and 
oil which may contaminate the borehole, ground surface or drill tools.]  Casing pipe, well screens, and joint 
couplings shall be of compatible materials throughout each well.  The well shall be a [filter pack well] [naturally 
developed well] activated in the [overburden] [water-bearing stratum] [stratum based on test hole data].  The 
well shall be drilled straight, plumb, and circular from top to bottom.  The well shall be initially drilled 
from the ground surface to the [uppermost level of the water bearing strata] [top of rock] [_____] and the bottom 
of the outer casing set at this elevation.  The hole below the outer casing shall penetrate the water bearing 
stratum a sufficient depth to produce the required amount of water without causing excessive velocities through 
the aquifer.  During construction of the wells, precautions shall be used to prevent tampering with the well 
or entrance of foreign material.  Runoff shall be prevented from entering the well during construction.  If there 
is an interruption in work, such as overnight shutdown or inclement weather, the well opening shall be closed 
with a watertight uncontaminated cover.  The cover shall be secured in place or weighted down so that it cannot 
be removed except with the aid of the drilling equipment or through the use of drill tools.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Setting Outer Casing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  There is a provision for temporary casing, as extraction and/or injection 
wells may not require a permanent outer casing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The outer casing shall not be less than<MET> [200] [_____] mm</MET><ENG> [8] [_____] inches</ENG> in diameter.  The hole shall be of 
sufficient size to leave a concentric annular space of not less than<MET> [65] [_____] mm</MET><ENG> [2-1/2] [_____]inches</ENG> and 
not more than<MET> [150] [_____] mm</MET><ENG> [6] [_____]inches</ENG> between the outside of the outer casing and the walls of the 
hole.  The annular space between the outer casing and the walls of the holes shall be filled with cement grout.  
Acceptable methods of grouting are detailed in <RID>AWWA A100</RID>; the approved method shall specify the forcing of grout 
from the bottom of the space to be grouted towards the surface.  A suitable grout retainer, packer, or plug shall 
be provided at the bottom of the inner casing so that grout will not leak into the bottom of the well.  Grouting 
shall be done continuously to ensure that the entire annular space is filled in one operation.  After grouting 
is completed, drilling operations shall not be resumed for at least [72] [_____]hours to allow proper setting 
of the grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   [Temporary Casing</TTL><BRK/>
<BRK/>
<TXT>Temporary well casing of either iron or steel of sufficient length to case to the bottom of all borings shall 
be available at the construction site.  The Contracting Officer will direct the use of a temporary casing to 
the bottom of the boring during drilling and placement of screen, riser, and filter pack when he believes it 
is necessary to provide adequate support to the sides of the hole.  When the walls of the boring will require 
support only during development operations a temporary casing will be required to extend only to a depth<MET> 1 m</MET><ENG> 
3 feet</ENG> below the top of the filter pack.  The temporary casing, shall have an inside diameter of not less than 
[_____]<MET> mm</MET><ENG> inches</ENG>, shall have sufficient thickness to retain its shape and maintain a true section throughout 
its depth, and may be in sections of any convenient length.  The temporary casing shall be such as to permit 
its removal without disturbing the filter pack, riser, or well screen.  The setting of temporary casing shall 
be such that no cavity will be created outside of it at any point along its length.  In the event the temporary 
casing should become unduly distorted or bent it should be discarded and a new casing should be used during installation 
of any additional well.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Construction of Inner Casing and Screen</TTL><BRK/>
<BRK/>
<TXT>After the grout has set, the hole below the outer casing shall be reamed at the required diameter, to the required 
depth, by an approved method which will prevent caving of the hole before or during installation of the filter 
pack, well screen and inner casing.  In lieu of reaming, the entire well may be drilled to the diameter of the 
filter pack with an annular space between the inner casing and outer casing equal to the thickness of the filter 
pack.  The outer casing shall be increased in size to provide for this space, if this option is elected.  The 
well screen and inner casing shall be firmly attached, and lowered into the hole by a method which will allow 
for control of the rate of fall of the well screen and inner casing at all times.  Well screen and inner casing 
shall not be dropped or allowed to fall uncontrolled into the hole.  The inner casing shall extend up through 
the outer casing to [_____]<MET> meters</MET><ENG> feet</ENG> [above][below]the ground surface.  Approved centering devices shall be 
installed at a spacing of 120 degrees, between the outer casing and inner casing prior to well construction at 
[intervals not exceeding<MET> [8] [_____] m</MET><ENG> [25] [_____]feet</ENG> along the length] [the top of the inner casing and the 
bottom of the outer casing].  If the screen length is greater than<MET> [8] [_____] meters</MET><ENG> [25] [_____] feet</ENG>, a<MET> [1] 
[_____] meter</MET><ENG> [3] [_____] foot</ENG> length of blank casing shall be placed in the middle of the screen interval for 
placement of centering devices.  Centering devices shall not be placed on the screened interval, or within the 
bentonite seal, if used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.4   <SUB>Construction of Filter Pack</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the natural formation is developed as the well filter, then this paragraph 
may be deleted.  If development of the well is done after the filter pack is 
installed, but before the bentonite, or annular seal is installed, additional 
filter pack material may have to be added, if the level of the top of the filter 
pack drops below the specified elevation for the top of the filter pack.  When 
installing extraction, or injection wells at HTRW sites, the top of the filter 
pack should be no more than 1.5 m (5 feet) above the top of the screen.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After the screen and inner casing have been concentrically set in the hole below the outer casing, the approved 
filter pack shall be constructed around the screen by filling the entire space between the screen and the wall 
of the hole in the water bearing stratum with filter pack material.  A tremie pipe having an inside nominal diameter 
of not less than<MET> [40] [_____] mm</MET><ENG> [1-1/2] [_____] inches</ENG> shall be lowered to the bottom of the well between the 
hole and screen.  The tremie pipe shall be arranged and connected, at the surface of the ground, to water pumping 
and <SUB>graveling equipment</SUB> so that water and filter material, fed at uniform rates, are discharged as the filter 
material fills the hole from the bottom up.  The tremie pipe shall be raised at a rate that will keep the bottom 
of the pipe no more than<MET> [1] [_____] m</MET><ENG> [3] [_____] feet</ENG> above the filter material level at all times.  If the 
Contractor desires to use methods of placing filter material other than those specified, the details of the method 
and equipment proposed shall be submitted to the Contracting Officer, before filter pack placement is begun; 
however, dumping filter pack material from the surface of the ground and agitating the well in an effort to settle 
the filter will not be allowed.  The filter pack shall be installed continuously and without interruption until 
the filter pack has been placed to within [<MET>300 mm</MET><ENG> 1 foot</ENG> of the top of the inner casing] [<MET>1.5 m</MET><ENG> 5 feet</ENG> of the 
ground surface] [<MET> [10] [_____] m</MET><ENG> [30] [_____] feet</ENG> above the top of the screen]. The depth to the top of the 
filter pack shall be directly measured, and recorded.  Any water added to the filter pack material shall be obtained 
in accordance with paragraph Water Source.  Filter pack material shall be protected from contamination prior 
to placement by either storing it in plastic lined bags, or in a location protected from the weather and contamination 
on plastic sheeting.  Filter pack material shall not be allowed to freeze before installation.  Filter pack material 
shall be transported to the well site in a manner which prevents contamination by other soils, oils, grease, 
and other chemicals.  Temporary drill casing, if installed, or hollow stem auger, shall be removed simultaneously 
with the above operation.  Filter pack material shall be placed in no greater than<MET> 1 m</MET><ENG> 3 foot</ENG> lifts prior to 
retraction of the temporary casing/auger.  A minimum of<MET> 150 mm</MET><ENG> 6 inches</ENG> of filter pack shall remain in the temporary 
casing/auger at all times during filter pack installation.  Frequent measurements shall be made inside the annulus 
during retraction to ensure that the filter pack is properly placed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.5   Bentonite Seal</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Sufficient time should be allowed for the bentonite seal to hydrate and 
form a low permeable seal before grout is placed in the annular space above 
the bentonite seal.  By not allowing enough time, grout material could infiltrate 
into the seal and possibly into the filter pack.  It is recommended waiting 
a minimum of 3 to 4 hours for hydration of bentonite pellets, or tablets.  If 
bentonite chips are used, the minimum hydration time could be twice as long.  
Normally bentonite chips should only be used if it is necessary to install a 
seal in a deep water column.  Because of their high moisture content and slow 
swelling tendencies, chips can be dropped through a water column more readily 
than a material with low moisture content, such as pellets or tablets.  It is 
recommended that the bentonite seal be placed in lifts, with each lift allowed 
to hydrate for a minimum period of time. Slurry seals may be used when the seal 
location is too far below water to allow for pellet or other containerized-bentonite 
placement, or within a narrow well-borehole annulus.  For more guidance consult 
EM 1110-1-4000.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After the inner casing and [well screen] [and filter pack] have been installed,[and after predevelopment of the 
well,] the annular space between the inner and outer casings shall be sealed by use of a bentonite seal. A minimum<MET>
 1 m</MET><ENG> 3 foot</ENG> thick hydrated bentonite seal shall be placed on top of the filter pack in a manner which prevents 
bridging of the bentonite in the annulus.  The bottom of the bentonite seal shall be a minimum of<MET> 2 m</MET><ENG> 5 feet</ENG> 
above the top of the well screen.  The depth to the top of the bentonite seal shall be directly measured, and 
recorded immediately after placement, without allowance for swelling.  If the bentonite seal is located above 
any borehole fluid levels, a<MET> [300] [_____] mm</MET><ENG> [1] [_____] foot</ENG> layer of fine sand shall be placed at the top 
of the bentonite seal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6   Grout Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Before installing an annular seal, the state regulatory agency should 
be consulted.  The state, or local municipality, where the well is being installed, 
may have specific requirements for sanitary, and/or wellhead  protection.  There 
is a provision for placing a high-solids bentonite grout in the annulus above 
the bentonite seal rather than cement grout.  Advantages and disadvantages of 
using a bentonite grout instead of cement grout are discussed in EM 1110-1-4000.  
There may be a need for a provision to grout the annular space in lifts in deep 
wells to ensure that any PVC or other type casing will not be collapsed by the 
weight and/or heat created by the chemical reaction of cement grout.  If grouting 
in lifts is for some reason not acceptable, the well should be designed to withstand 
greater external pressures.  This may mean using higher schedule casing, or 
steel instead of PVC, for example.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After the inner casing and [well screen] [filter pack] have been installed, a [non-shrinking cement] [high-solids 
bentonite] grout, shall be mechanically mixed in accordance with paragraph CEMENT AND BENTONITE GROUT, and placed 
by tremie pipe, in one continuous operation into the annulus between the inner and outer casings above the bentonite 
seal to [within [_____]<MET> mm</MET><ENG> feet</ENG> of] [the ground surface] [the maximum depth of frost penetration (frost line)].  
Grout injection shall be in accordance with <RID>AWWA A100</RID>.  If the casing interval to be grouted is less than<MET> 4.5 
m</MET><ENG> 15 feet</ENG>, and without fluids after any drill casing is removed, the grout may be placed either by pouring or 
pumping.  The tremie pipe shall be thoroughly cleaned with high pressure hot water/steam before use in each well.  
The bottom of the tremie pipe shall be constructed to direct the discharge to the sides rather than downward.  
The discharge end of the tremie pipe shall be submerged at all times.  Additional grout shall be added from the 
surface to maintain the level of the grout [within [_____]<MET> mm</MET><ENG> feet</ENG> of the ground surface] [at the land surface] 
as settlement occurs.  Work shall not be conducted in the well within [24] [_____] hours after cement grouting.  
The alignment of the well shall be verified by passing a<MET> 1.5 m</MET><ENG> 5 foot</ENG> long section of rigid [PVC] [stainless 
steel] [PTFE] [_____] pipe<MET> 6 mm</MET><ENG> 1/4 inch</ENG> smaller in diameter than the inside diameter of the casing through the 
entire well.  If the pipe does not pass freely, the well will not be accepted.  The pipe section shall be thoroughly 
cleaned with high pressure hot water/steam prior to each test.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   WELL DEVELOPMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  There is a provision for predevelopment, or development after the filter 
pack is installed, but before the bentonite seal is installed.<BRK/>
<BRK/>
Well development criteria, such as the measurement of certain ground-water parameters, 
may be deleted if the well is not installed at an HTRW site.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Within 7 days of completion of each well, but no sooner than [48] [_____] hours after cement grouting is completed,  
the well shall be developed. [Predevelopment, or development after the filter pack has been installed, but before 
the annular seal is installed, may be initiated before this minimum 48 hour period.]  The well shall be developed 
in accordance with the Well Installation Plan, by approved methods until the water pumped from the well is substantially 
free from sand, and until the turbidity is less than 5 on the Jackson Turbidity Scale specified in <RID>AWWA 10084</RID>
.  Developing equipment shall be of an approved type and of sufficient capacity to remove all cutting fluids, 
sand, rock cuttings, and any other foreign material.  The well shall be thoroughly cleaned from top to bottom 
before beginning the well tests.  Development shall be performed using only mechanical surging, over pumping, 
or jetting, or a combination thereof in accordance with <RID>ASTM D 5521</RID>.  Details of the proposed development method 
shall be included in the Well Installation Plan.  At the time of development of any  well, the well shall be 
free of drawdown or surcharge effects due to pump testing, developing or drilling at another location.  The Contractor 
is responsible for maintaining at the  well site the needed access and work area and clearance, necessary to 
accomplish development.  Furnish, install, or construct the necessary discharge line and troughs to conduct and 
dispose of the discharge [a sufficient distance from the work areas to prevent damage] [as directed in paragraph 
CONTAINERIZATION OF DEVELOPMENT WATER, AND DRILL CUTTINGS].  Development shall be conducted to achieve a stable 
well of maximum efficiency and shall be continued until a satisfactory sand test, as specified in paragraph Sand 
Test, is obtained.  During predevelopment of the well, filter pack material shall be added to the annular space 
around the screen to maintain the top elevation of the filter pack to the specified elevation.  Provide an open 
tube or other approved means for accurately determining the water level in the well under all conditions.  If, 
at any time during the development process it becomes apparent in the opinion of the Contracting Officer that 
the well may be damaged, development operations shall be immediately terminated.  The Contracting Officer may 
require a change in method if the method selected does not accomplish the desired results.  The Contracting Officer 
may order that wells which continue to produce excessive amounts of fines after development for [6][___] hours 
be abandoned, plugged, and backfilled, and may require the Contractor to construct new wells nearby.  All materials 
pulled into the well by the development process shall be removed prior to performing the pumping test.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Jetting</TTL><BRK/>
<BRK/>
<TXT>Jetting should be performed using either a single or double ring jet.  If a double ring jet is used the rings 
should be<MET> 600 mm</MET><ENG> 2 feet</ENG> apart.  The jetting tool shall be constructed of high-strength material and conservatively 
designed and proportioned so that it will withstand high pressures.  The jetting tool shall have [two<MET> [7][8][10] 
mm</MET><ENG> [3/16] [1/4][3/8] inch</ENG> diameter hydraulically balanced nozzles spaced 180 degrees] [four<MET> [7][8][10] mm</MET><ENG> [3/16][1/4][3/8] 
inch</ENG> diameter holes spaced 90 degrees] apart and which shall exert the jetting force horizontally through the 
screen slots.  The rings shall be constructed such that the tips of the jets shall be within<MET> 13 mm</MET><ENG> 1/2 inch</ENG> from 
the inner surface of the well screen.  The pump used in conjunction with the jetting tool shall be capable of 
providing [pressures up to<MET> [1700] [_____] kPa</MET><ENG> [250][_____] psi</ENG>.] [a minimum jetting fluid exit velocity of<MET> 45 
m/s</MET><ENG> 150 f/s</ENG>].  Prior to commencing jetting, and following each jetting cycle, all sand and/or other materials 
shall be removed from inside the screen.  The jetting process shall start at the bottom of the screen and consist 
of rotating the jetting tool [slowly] [1 cycle per 30 seconds] [[_____] cycles per [_____] seconds] while rotating 
the pipe [180][90] degrees for two minutes at each location then raising the pipe<MET> [150][_____] mm</MET><ENG> [6] [_____] 
inches</ENG>.  All wells, more than<MET> 100 mm</MET><ENG> 4 inches</ENG> in diameter, shall be pumped during the jetting cycle to remove 
incoming sand and other material.  Such pumping shall be at a rate not less than 115 percent of the rate at which 
fluid is introduced through the jetting tool.  This will allow a flow of material into the well as it is being 
developed.  Water used for development shall be free of sand.  The contracting officer may require other means 
of developing the well such as intermittent pumping method, variation of the intermittent pumping method, or 
surge block if it appears that the development of the well is not producing the desired results.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Intermittent Pumping</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Backflow through the pump, while starting and stopping a pump intermittently, 
with the check valve removed, to produce rapid changes in the pressure head 
within the well during development, called "rawhiding," is allowed for developing 
extraction and injection wells at HTRW sites.  The alternate lifting and dropping 
of a column of water in the pump discharge pipe creates a surging action in 
the well.  For more information on this development process, consult ASTM D 
5521.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Intermittent pumping shall be performed by pumping the well at a capacity sufficient to produce a rapid drawdown 
of approximately [_____]<MET> m</MET><ENG> feet</ENG> stopping the pump (backflow through pump will not be permitted) to permit the 
water surface to rise to its former elevation, and repeating this procedure.  Cycle time for this procedure will 
vary as directed but will not be more than 3 cycles per minute.  A pump discharge in excess of [_____]<MET> L/s</MET><ENG> gpm</ENG>
 will be required.  A deep well turbine pump, or electric submersible pump with check valve, shall be used with 
any attachment necessary to accomplish rapid starting and stopping for intermittent pumping.  The intake shall 
be set at least<MET> 3 m</MET><ENG> 10 feet</ENG> below the maximum expected drawdown in the well.  Prior to commencing intermittent 
pumping, and periodically during development by this method, all sand and/or other materials shall be removed 
from inside the screen.  The amount of drawdown may be decreased if, in the opinion of the Contracting Officer, 
the efficiency of the well might otherwise be impaired.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.3   Surging</TTL><BRK/>
<BRK/>
<TXT>Surging of the well shall require use of a circular block, or multiple blocks, which are approximately<MET> 25 mm</MET><ENG> 
1 inch</ENG> smaller in diameter than the inside diameter of the well and is constructed of a material which will not 
damage the screen if the block comes in contact with the screen, and a bailer or pump to remove materials drawn 
into the well.  The surging shall be continued for a period of approximately [one][____] hour, or until little 
or no additional material from the foundation or filter pack can be pulled through the screen.  The surge block 
shall be moved by a steady motion up and down the full length of the well screen.  Prior to commencing surging, 
and periodically during development by this method, all sand and/or other materials shall be removed from inside 
the screen.  All materials pulled into the well by the surging process shall be removed by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<TTL>3.4.4   Well Development Criteria</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The U.S. Environmental Protection Agency (EPA) may, according to their 
Technical Enforcement Guidance Document (TEGD), 530/R-93/001, consider a well 
installed at an HTRW site improperly completed if a well yields turbid samples 
(turbidity greater than or equal to 5 NTUs) after development.  If the local 
EPA Region enforces this criteria, it may be necessary to include a requirement 
that the well be developed until a turbidity of less than or equal to 5 NTUs 
is achieved.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A well development record shall be maintained in accordance with paragraph Well Development Records.  Development 
is complete when all of the following criteria are met:</TXT> <BRK/>
<BRK/>
<LST>a.  Well water is clear to the unaided eye [,and turbidity less than or equal to [5] [____] Nephelometric 
Turbidity Units (NTUs)],</LST><BRK/>
<BRK/>
<LST>b.  Sediment thickness in the well is less than [1 percent of the screen length] [<MET>30 mm</MET><ENG> 0.1 foot</ENG>],</LST><BRK/>
<BRK/>
<LST>c.  A minimum of  three times the standing water volume in the well is removed plus  three times the 
volume of all added water and drilling fluid lost during drilling and installation of the well is removed, 
and</LST><BRK/>
<BRK/>
<LST>d.  [Temperature, specific conductivity, pH,oxidation-reduction potential (ORP), dissolved oxygen (DO), 
and turbidity readings, measured before, twice during and after development operations, have stabilized.  
Stabilization shall mean [variation of less than 0.2 pH units, variation of plus or minus <HL1>+</HL1><MET> 0.5 degrees 
C</MET><ENG> 1 degree F</ENG>,<HL1>+</HL1> 3 percent change in specific conductance; and less than a <HL1>+</HL1> 10mV for ORP; and <HL1>+</HL1> 10 percent 
for DO, and turbidity, measured between three consecutive readings with one casing volume of water removed 
between each reading] [_____].  ORP shall be determined in accordance with <RID>AWWA 10084</RID>.  Temperature, 
specific conductance, DO, turbidity, and pH readings shall be conducted in accordance with <RID>EPA 600/4-79/020</RID>
.  At completion of well development, approximately<MET> 0.5 liter</MET><ENG> 1 pint</ENG> of well water shall be collected 
in a clear glass jar.  The jar shall be labeled with project name, well number and date; and photographed 
using 35 mm color print film.  The photograph (minimally<MET> 125 x 174 mm</MET><ENG> 5 x 7 inch</ENG>) shall be a suitably 
backlit close-up which shows the clarity of the water and any suspended sediment.  The photograph and 
negative shall become a part of the well development record.  Water removed during development and testing 
operations shall be [contained in D.O.T. approved drums, containers or vessels and disposed of by [_____], 
in accordance with paragraphs CONTAINERIZATION OF DEVELOPMENT WATER, AND DRILL CUTTINGS, and Drilling 
Waste Disposal] [discharged to the ground surface at least [_____]<MET> m</MET><ENG> feet</ENG> from the well in a down gradient 
area].]</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   <TST><SUB>TESTS</SUB></TST></TTL><BRK/>
<BRK/>
<TXT>After the wells have been developed, notify the Government and make the necessary arrangements for conducting 
the capacity tests.  If the capacity test indicates that the required capacity can be obtained, the tests for 
quality of water shall be made.  If the capacity and quality tests indicate that the required capacity and quality 
can be obtained, the permanent well, as specified, shall be completed at that depth.  Prior to making quality 
tests, drilling equipment, tools and pumps contacting well water shall be cleaned with live steam.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   <TST>Capacity Test</TST></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This test should be used to verify that the well is  developed properly 
and will produce the required yield.  Test pump should be capable of a range 
of pumping rates, varying from about 50 percent to about 200 percent of the 
design capacity of the well.  Since there are a wide variety of pump test methods, 
the designer should refer to a good water wells reference book (such as  "Ground 
Water and Wells," by Fletcher G. Driscoll, published by  Johnson Well Screens, 
1986 ) for test procedures which best apply.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Furnish and install an approved temporary test pump, with discharge piping of sufficient size and length to conduct 
the water being pumped to [point of discharge][_____], and equipment necessary for measuring the rate of flow 
and water level in the well.  An [8] [_____] hour [constant-rate] [step-drawdown] capacity test shall be run 
with the pumping rate and drawdown at the pump well and observation wells recorded every [[30] [_____] minutes] 
[1/2 minute during the first 5 minutes after starting the pump; then every 5 minutes for an hour; then every 
20 minutes for 2 hours.  From this point on, readings taken at hourly intervals, until the water level stabilizes, 
shall be sufficient].[Observation wells (piezometers) shall be read on the same schedule as the pump well.] [During 
the step-drawdown test, the pumping rate shall be increased in steps at [regular][[2][____] hour] intervals.  
Specific capacity shall be measured for each step.]  The test shall begin at the rate of [the expected capacity 
of well] [[_____]<MET> L/s</MET><ENG> gpm</ENG>] and at least that rate maintained throughout the duration of the [test] [step interval].  
[The well shall be "step" tested at rates of approximately [1/2, 3/4, 1 and 1 1/2] [_____] times the design capacity 
of [_____]<MET> L/s</MET><ENG> gpm</ENG>.]  If this capacity cannot be maintained for the test period, the capacity test shall be terminated 
and the test hole drilled deeper or relocated as directed.  When the pump is shut off, water level readings shall 
be taken during the rebound period for the same intervals of time as the drawdown test.  The record of the test, 
in triplicate, shall be delivered to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   <TST>Test for Plumbness and Alignment</TST></TTL><BRK/>
<BRK/>
<TXT>Upon completion of the permanent well, plumbness and alignment shall be tested by lowering into the well, to 
the total depth of the well, a plumb<MET> [12] [_____] m</MET><ENG> [40] [_____] feet</ENG> long or a dummy of the same length.  The 
outer diameter of the plumb shall not be more than<MET> 13 mm</MET><ENG> 1/2 inch</ENG> smaller than the diameter of that part of the 
hole being tested.  If a dummy is used, it shall consist of a rigid spindle with three rings, each ring being<MET>
 [300] [_____] mm</MET><ENG> [12] [_____] inches</ENG> wide.  The rings shall be cylindrical and shall be spaced one at each end 
of the dummy and one in the center.  The central member of the dummy shall be rigid so that it will maintain 
the alignment of the axis of the rings.  The dummy shall be decontaminated as specified in paragraph Decontamination, 
before use.  If the plumb or dummy fail to move freely throughout the length of the casing or well screen for 
the depth of well or should the well vary from the vertical in excess of two-thirds the inside diameter of that 
part of the well being tested for each<MET> 30 m</MET><ENG> 100 feet</ENG> of depth, the plumbness and alignment of the well shall 
be corrected.  If the faulty alignment and plumbness is not correctable, as determined by the Contracting Officer, 
the well shall be abandoned as specified in paragraph WELL DECOMMISSIONING/ABANDONMENT and a new well drilled 
at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3   <TST>Test for Quality of Water</TST></TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Post, or Resident Engineer, or the USGS should be consulted to determine 
if any additions or deletions should be made to the Water Quality Analysis table.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<BRK/>
<TXT>When the capacity test in the test hole has been completed, and again after the yield in the permanent well and 
drawdown test or capacity test have been completed, secure samples of the water in suitable containers, and of 
sufficient quantity, to have bacterial, physical, and chemical analyses made by [a recognized testing laboratory][____], 
except that the bacterial analysis may be made by the applicable State Board of Health, if desired.  Water Quality 
Analysis shall address each item specified in the Water Quality Analysis Table at the end of this section.  Expenses 
incident to these analyses shall be borne by the Contractor and the results of the analyses shall be furnished 
to the Contracting Officer.  All sampling and analyses shall be performed using EPA and State approved methods, 
procedures, and holding times.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4   Sand Test</TTL><BRK/>
<BRK/>
<TXT>As part of each capacity test, or at the end of each intermittent pumping, a determination of the amount of sand 
(filter pack and/or foundation material) a well is producing shall be performed.  Prior to starting the sand 
test all material shall be removed from the bottom of the tailpipe.  Test each well by pumping at a rate [of 
[_____]<MET> L/s</MET><ENG> gpm</ENG>] [sufficient to produce approximately [_____]<MET> m</MET><ENG> feet</ENG> of draw-down].  After the pump is at the 
desired pumping rate the flow from the discharge shall be diverted [into a container that will collect all the 
sand being carried by the water][through a Rossum Sand Tester].  Development of the well is satisfactory if the 
amount of sand collected is less than<MET> 0.5 L per 100,000 L</MET><ENG> 1 pint per 25,000 gallons</ENG> of water pumped at the specified 
rate.  Upon completion of the test the amount of sand in the tailpipe shall be determined to verify that no material 
is being deposited in the bottom of the well.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   INSTALLATION OF PERMANENT PUMP</TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The yearly change in the regional water table should be determined before 
specifying the minimum pump depth.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<BRK/>
<TXT>The permanent well pump shall be installed in the well at a minimum depth of<MET> [8] [_____] m</MET><ENG> [25] [_____] feet</ENG> 
below the maximum drawdown groundwater level after the drawdown test has been completed.  The pump shall be secured 
at the required elevation as recommended by the pump manufacturer.  After installation of the pumping units and 
appurtenances is complete, operating tests shall be carried out to assure that the pumping installation operates 
properly.  Tests shall assure that the pumping units and appurtenances have been installed correctly, that there 
is no objectionable heating, vibration, or noise from any parts, and that all manual and automatic controls function 
properly.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   DISINFECTING</TTL><BRK/>
<BRK/>
<TXT>After completion of tests of well, or installation of permanent pump, or at time of tests for yield and drawdown 
test, whichever is later, the wells shall be disinfected by adding chlorine, conforming to <RID>AWWA B301</RID>, or hypochlorite, 
conforming to <RID>AWWA B300</RID>, in sufficient quantity so that a concentration of at least 50 ppm of chlorine shall 
be obtained in all parts of the well.  Chlorine solution shall be prepared and introduced into the well in an 
approved manner and shall remain in the well for period of at least 12 hours but not more than 24 hours.  Information 
on methods for preparing chlorine solution and introducing it into the well may be found in <RID>AWWA C654</RID>.  After 
the contact period, the well shall be pumped until the residual chlorine content is not greater than 1.0 ppm.  
The well shall be pumped to waste for an additional 15 minutes with less than 1 ppm chlorine residual after which 
two samples shall be taken not less than 30 minutes apart and tested for the presence of coliform bacteria.  
The well shall be disinfected and redisinfected as may be required until two consecutive samples of water are 
found upon test to be free from Coli Acrogenes group of organisms.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8   PUMPHOUSE AND SLAB</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In some instances, a pumphouse and base slab may not be appropriate.  
In such cases, alternate designs must ensure that surface water cannot infiltrate 
into the well and that the pump and well head are protected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Pumphouse and slab shall be constructed preventing the infiltration of surface water or precipitation into the 
well.  The slab shall be<MET> [1.2] [_____] m square by [150] [_____] mm thick</MET><ENG> [4] [_____] feet square by [6] [_____] 
inches thick</ENG> and constructed of reinforced concrete.  The top of the outer casing shall extend<MET> [300] [_____] 
mm</MET><ENG> [12] [______] inches</ENG> above the top of the slab.  The top of the slab shall be at elevation [_____] or higher.  
The pumphouse shall be constructed on the slab and thermally insulated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9   SITE CLEAN-UP</TTL><BRK/>
<BRK/>
<TXT>After completion of the work, tools, appliances, surplus materials, temporary drainage, rubbish, and debris incidental 
to work shall be removed.  Excavation and vehicular ruts shall be backfilled and dressed to conform with the 
existing landscape.  Utilities, structures, roads, fences, or any other pre-existing item which must be repaired 
or replaced due to the Contractor's negligence shall be the Contractor's responsibility; repair or replacement 
shall be accomplished prior to completion of this contract.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10   DRILLING WASTE DISPOSAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer must address disposal of drill cuttings, rock core, grout 
or bentonite slurry, and other solid or liquid materials bailed, pumped, or 
otherwise removed from the borehole during drilling, well installation, completion, 
and well development procedures within all appropriate regulatory requirements.  
The nature of these wastes (whether hazardous or not) will potentially vary 
between well sites on a single project.  On an HTRW remedial action project, 
it may be prudent to dispose of drilling and well installation waste in coordination 
with other project waste streams.  In some instances, rock core may be determined 
to be contaminated and must be handled accordingly.  Refer to EPA/540/G-91/009, 
Management of Investigation-Derived Waste From Site Investigations and EPA OSWER 
Directive 9345.3-03FS, April 1992, Guide to Management of Investigation-Derived 
Wastes, for discussion of some issues relevant to Superfund projects.  State/local 
regulations must also be considered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Slurry, drill cuttings, rock core; other solid or liquid material bailed, pumped, or otherwise removed from the 
borehole during drilling, installation, completion, and well development procedures; and fluids from material/equipment 
decontamination activities shall be disposed of by [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11   SURVEYS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Guidance for installing survey markers can be found in EM 1110-1-1002 
Survey Markers and Monumentation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Coordinates and elevations shall be established for each well/test hole.  Horizontal coordinates shall be determined 
to the closest<MET> 300 mm</MET><ENG> 1.0 foot</ENG> and referenced to the State Plane Coordinate System, or Universal Transverse Mercator 
(UTM).  If the State Plane Coordinate System/UTM is not readily available, an existing local grid system shall 
be used.  A ground elevation to the closest<MET> 30 m</MET><ENG> 0.1 foot</ENG> shall be obtained at each well.  The highest point 
on the top of the riser pipe will serve as a measurement point.  The elevation of the well shall reference this 
point, and shall be surveyed to the nearest<MET> 3 mm</MET><ENG> 0.01 foot</ENG> using the [National Geodetic Vertical Datum of 1929] 
[North American Vertical Datum of 1988].  If the datum is not readily available, the existing local vertical 
datum shall be used.  The location, identification, coordinates, and elevations of the well and monuments shall 
be plotted on maps with a scale large enough to show their location with reference to other structures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12   WELL DECOMMISSIONING/ABANDONMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Guidance for decommissioning of  wells may also be found in EM 1110-1-4000.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Any well disapproved by the Contracting Officer, or any well decommissioned/abandoned by the Contractor for any 
reason shall be decommissioned/abandoned according to the requirements of the State of [_____], [<RID>ASTM D 5299</RID>,] 
and the requirements of these specifications.  Well decommissioning/abandonment includes the removal of all materials 
left in the borehole/well, excluding the filter pack, and including backfill materials, casing, screen, and any 
other material placed into the hole before the decision was made to abandon the borehole/well.  Test holes decommissioned/abandoned 
for any reason shall be grouted from the bottom to within [_____]<MET> mm</MET><ENG> feet</ENG> of the top of the ground surface according 
to the protocol for grout/bentonite placement established in paragraph Grout Placement, using the grout mix specified 
in paragraph CEMENT AND BENTONITE GROUT.  The top [_____]<MET> mm</MET><ENG> feet</ENG> shall be backfilled with [material appropriate 
for the intended land use] [_____].  Mmaintain a well decommissioning/abandonment record as specified in paragraph 
Well <SUB>Decommissioning/Abandonment Records</SUB>.  Groundwater levels, if encountered before the decision is made for 
decommissioning/abandonment, shall be measured in all borings prior to backfilling.  These water levels shall 
be included in the well decommissioning/abandonment records.  No well shall be decommissioned/abandoned without 
the approval of the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13   DOCUMENTATION AND QUALITY CONTROL REPORTS</TTL><BRK/>
<BRK/>
<TXT>Establish and maintain documentation and quality control reports for well construction and development to record 
the desired information and to assure compliance with contract requirements, including, but not limited to, the 
following:</TXT><BRK/>
<BRK/>
<SPT><TTL>3.13.1   Borehole Logs</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Borehole logging requirements can be found in EM 1110-1-4000.  Requirements 
can also be found in ASTM D 2113 and ASTM D 5434.  If rock is cored at the site, 
and it is deemed necessary to determine the rock quality designation (RQD) of 
the core for design purposes, the RQD should also be shown on the boring log.  
Guidance for determining the RQD may be found in ASTM D 6032.  Item o. has a 
provision for recording the level of non-aqueous phase liquids (NAPLs).  This 
only pertains to wells installed at a hazardous waste site.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A borehole log shall be completed for each boring drilled.  Borehole logs shall be prepared by the geologist 
present onsite during all well drilling and installation activities.  The log scale shall be<MET> [10] [_____] mm 
equals [300] [_____] mm</MET><ENG> [1] [_____] inch equals [1] [_____] foot</ENG>.  Copies of complete well logs shall be kept 
current in the field at each well site and shall be available at all times for inspection by the Contracting 
Officer.  Information provided on the logs shall include, but not be limited to, the following:</TXT><BRK/>
<BRK/>
<LST>a.  Name of the project and site.</LST><BRK/>
<BRK/>
<LST>b.  Boring/well identification number.</LST><BRK/>
<BRK/>
<LST>c.  Location of boring (coordinates, if available).</LST><BRK/>
<BRK/>
<LST>d.  Make and manufacturer's model designation of drilling equipment and name of drilling firm.</LST><BRK/>
<BRK/>
<LST>e.  Date boring was drilled.</LST><BRK/>
<BRK/>
<LST>f.  Reference data for all depth measurements.</LST><BRK/>
<BRK/>
<LST>g.  Name of driller and name and signature of geologist preparing log.</LST><BRK/>
<BRK/>
<LST>h.  Nominal hole diameter and depth at which hole diameter changes.</LST><BRK/>
<BRK/>
<LST>i.  Total depth of boring.</LST><BRK/>
<BRK/>
<LST>j.  Method of drilling, including sampling methods and sample depths, including those attempted with 
no recovery.  Indication of penetration resistance such as drive hammer blows given in blows per<MET> 150 
mm</MET><ENG> 6 inches</ENG> of driven sample tubes.  Information shall include hammer weight and drop distance.  Information 
such as rod size, bit type, pump type, etc., shall be recorded.  A description of any temporary casing 
used, drill fluids and fluid additives used, if any, including brand name and amount used, along with 
the reason for and start (by depth) of its use shall be included.  If measured, mud viscosities and weight 
shall be recorded.</LST><BRK/>
<BRK/>
<LST>k.  Depth of each change of stratum.  If location of strata change is approximate, it shall be so stated.</LST><BRK/>
<BRK/>
<LST>l.  Description of the material of which each stratum is composed, in accordance with [<RID>ASTM D 2488</RID>] [_____], 
and/or standard rock nomenclature in accordance with [<RID>CED TR GL-85-3</RID>][_____], as necessary.  Soil parameters 
for logging shall include, but shall not be limited to, classification, depositional environment and 
formation, if known, Unified Soil Classification Symbol, secondary components and estimated percentages, 
color, plasticity, consistency (cohesive soil), density (non-cohesive soil), moisture content, structure 
and orientation, and grain angularity.  Rock core parameters for logging shall include, but shall not 
be limited to, rock type, formation, modifier denoting variety (shaly, calcareous, siliceous, etc.), 
color, hardness, degree of cementation, texture, crystalline structure and orientation, degree of weathering, 
solution or void conditions, primary and secondary permeability, and lost core.  The results of any chemical 
field screening shall also be included on the boring log.  Classification shall be prepared in the field 
at the time of sampling.  The results of visual observation of the material encountered, and any unusual 
odor detected shall also be duly noted and recorded.</LST><BRK/>
<BRK/>
<LST>m.  Depth of any observed fractures, weathered zones, or any abnormalities encountered.</LST><BRK/>
<BRK/>
<LST>n.  Depth and estimated percent of drill fluid loss or lost circulation.  Measures taken to regain drill 
water circulation.  Significant color changes in the drilling fluid return.</LST><BRK/>
<BRK/>
<LST>o.  Depth to water, and any non-aqueous phase liquids (NAPLs) and date measured before, during, and after 
each drilling shift, and prior to well installation.  Provide and maintain at each well under construction 
a portable water [,and NAPL] level measuring device of sufficient length to measure the water [/NAPL] 
level to<MET> [50] [_____] meter</MET><ENG> [165] [_____] foot</ENG> depth.  The device shall be available onsite at all times 
and measuring wire shall be graduated in<MET> mm</MET><ENG> 0.01 foot</ENG>.  The method of measuring the liquid level shall 
be noted on the boring log.  Water [and NAPL] level measurements shall be taken to the nearest<MET> mm</MET><ENG> 0.01 
foot</ENG>.  It shall be noted on the boring log if the boring was purged and allowed to recover at intervals 
during the installation, or that water used in drilling was allowed to dissipate into the formation prior 
to measuring the water level.</LST><BRK/>
<BRK/>
<LST>p.  Box or sample number.  Depths and the number of the core boxes and/or samples shall be recorded at 
the proper interval.</LST><BRK/>
<BRK/>
<LST>q.  Percent Rock Core Recovery.  The percent core recovery for the individual drill runs, if rock is 
cored, shall be shown.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.2   <SUB>Installation Diagrams</SUB></TTL><BRK/>
<BRK/>
<TXT>The well will not be accepted before the geologic logs and installation diagrams are received.  The diagram shall 
illustrate the as-built condition of the well and include, but not be limited to, the following items:</TXT><BRK/>
<BRK/>
<LST>a.  Name of the project and site.</LST><BRK/>
<BRK/>
<LST>b.  Well identification number.</LST><BRK/>
<BRK/>
<LST>c.  Name of driller and name and signature of the geologist preparing diagram.</LST><BRK/>
<BRK/>
<LST>d.  Date of well installation.</LST><BRK/>
<BRK/>
<LST>e.  Description of material from which the well is constructed, including well casing/riser pipe and 
screen material, centralizer composition, if used, diameter and schedule of casing and screen, gradation 
of filter pack, lithologic description, brand name (if any), source, and processing method, and method 
of placement of the filter pack, bentonite seal type (pellets, granules, chips, or slurry), grout type 
(cement or high-solids bentonite) and type of protective cover (protective casing or flush-to-ground),if 
used.</LST><BRK/>
<BRK/>
<LST>f.  Total depth of well.</LST><BRK/>
<BRK/>
<LST>g.  Nominal hole diameter.</LST><BRK/>
<BRK/>
<LST>h.  Depth to top and bottom of screen, and filter pack.</LST><BRK/>
<BRK/>
<LST>i.  Depth to top and bottom of any seals installed in the well boring (grout or bentonite).</LST><BRK/>
<BRK/>
<LST>j.  Type of cement and/or bentonite used, mix ratios of grout, method of placement and quantities used.</LST><BRK/>
<BRK/>
<LST>k.  Elevations/depths/heights of key features of the well, such as top of well casing/riser pipe, top 
and bottom of protective casing (if used), ground surface, the depth of maximum frost penetration (frost 
line), bottom of well screen, top and bottom of filter pack, and top and bottom of seal.</LST><BRK/>
<BRK/>
<LST>l.  Other pertinent construction details, such as slot size and percent open area of screen, type of 
screen, and manufacturer of screen.</LST><BRK/>
<BRK/>
<LST>m.  Well location by coordinates.  A plan sheet shall also be included showing the coordinate system 
used and the location of each well.  A plan sheet is not required for each well installation diagram; 
multiple wells may be shown on the same sheet.</LST><BRK/>
<BRK/>
<LST>n.  Static water level upon completion of the well.</LST><BRK/>
<BRK/>
<LST>o.  Special problems and their resolutions; e.g., grout in wells, lost casing, or screens, bridging, 
etc.</LST><BRK/>
<BRK/>
<LST>p.  Description of surface completion.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.3   <SUB>Well Development Records</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete item k. if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A well development record shall be prepared for each well installed under the supervision of the geologist present 
during well installation operations.  Information provided on the well development record shall include, but 
not be limited to, the following:</TXT><BRK/>
<BRK/>
<LST>a.  Date, time, and elevation of water level in the well, before development.</LST><BRK/>
<BRK/>
<LST>b.  Depth to bottom of well, name of project and site, well identification number, and date of development.</LST><BRK/>
<BRK/>
<LST>c.  Method used for development, to include size, type and make of equipment, bailer, and/or pump used 
during development.</LST><BRK/>
<BRK/>
<LST>d.  Time spent developing the well by each method, to include typical pumping rate, if pump is used in 
development.</LST><BRK/>
<BRK/>
<LST>e.  Volume and physical character of water removed, to include changes during development in clarity, 
color, particulates, and odor.</LST><BRK/>
<BRK/>
<LST>f.  Volume of water added to the well, if any.</LST><BRK/>
<BRK/>
<LST>g.  Volume and physical character of sediment removed, to include changes during development in color, 
and odor.</LST><BRK/>
<BRK/>
<LST>h.  Source of any water added to the well.</LST><BRK/>
<BRK/>
<LST>i.  Clarity of water before, during, and after development.  Nephelometric turbidity unit (NTU) measurements.</LST><BRK/>
<BRK/>
<LST>j.  Total depth of well and the static water level as in accordance with <RID>ASTM D 4750</RID>from top of the casing, 
immediately after pumping/development, and 24 hours after development.</LST><BRK/>
<BRK/>
<LST>k.  [Readings of pH, specific conductance, DO, ORP, and temperature taken before, during, and after development.]</LST><BRK/>
<BRK/>
<LST>l.  Name and job title of individual developing well.</LST><BRK/>
<BRK/>
<LST>m.  Name and/or description of the disposal facility/area, for the waters removed during development.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.4   <SUB>Geophysical Logs</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Geophysical logs shall be prepared and completed for each well/test hole installed.  Information provided on 
the logs shall include, as a minimum, the following:</TXT><BRK/>
<BRK/>
<LST>a.  Project name.</LST><BRK/>
<BRK/>
<LST>b.  Test hole/well identification number.</LST><BRK/>
<BRK/>
<LST>c.  Location of test hole (coordinates, and state, and county name).</LST><BRK/>
<BRK/>
<LST>d.  Date test hole was drilled.</LST><BRK/>
<BRK/>
<LST>e.  Fluid level in test hole before logging.</LST><BRK/>
<BRK/>
<LST>f.  Fluid type and temperature.</LST><BRK/>
<BRK/>
<LST>g.  Fluid resistance in ohm-m.</LST><BRK/>
<BRK/>
<LST>h.  Casing type, diameter, and elevation (top and bottom).</LST><BRK/>
<BRK/>
<LST>i.  Cement type and elevation (top and bottom).</LST><BRK/>
<BRK/>
<LST>j.  Screen type, diameter, and elevation (top and bottom).</LST><BRK/>
<BRK/>
<LST>k.  Date and time test hole was logged.</LST><BRK/>
<BRK/>
<LST>l.  Reference elevation for all depth measurements.</LST><BRK/>
<BRK/>
<LST>m.  Operator's name.</LST><BRK/>
<BRK/>
<LST>n.  Equipment name and address.</LST><BRK/>
<BRK/>
<LST>o.  Logger type and number.</LST><BRK/>
<BRK/>
<LST>p.  Tool type.</LST><BRK/>
<BRK/>
<LST>q.  Detector type (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>r.  Source type (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>s.  Source size (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>t.  Source spacing (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>u.  Tool length, cable head to detector.</LST><BRK/>
<BRK/>
<LST>v.  Calibration.</LST><BRK/>
<BRK/>
<LST>w.  Logging speed<MET> cm/min</MET><ENG> ft/min</ENG>.</LST><BRK/>
<BRK/>
<LST>x.  Log vert. scale<MET> m/cm</MET><ENG> ft/in</ENG>.</LST><BRK/>
<BRK/>
<LST>y.  Module settings.</LST><BRK/>
<BRK/>
<LST>z.  Recorder settings.</LST><BRK/>
<BRK/>
<LST>aa.  Document all field problems, including equipment malfunctions.  This should include the steps taken 
to solve the problem and how the log might have been affected.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.5   Well Decommissioning/Abandonment Records</TTL><BRK/>
<BRK/>
<TXT>Decommissioning/abandonment records shall include, as a minimum, the following:</TXT><BRK/>
<BRK/>
<LST>a.  Project name.</LST><BRK/>
<BRK/>
<LST>b.  Well or test hole number.</LST><BRK/>
<BRK/>
<LST>c.  Well/boring location, depth and diameter.</LST><BRK/>
<BRK/>
<LST>d.  Date of decommissioning/abandonment.</LST><BRK/>
<BRK/>
<LST>e.  Method of decommissioning/abandonment.</LST><BRK/>
<BRK/>
<LST>f.  All materials used in the decommissioning/abandonment procedure and the interval in which test materials 
were placed.</LST><BRK/>
<BRK/>
<LST>g.  Casing, and or other items left in hole by depth, description, and composition.</LST><BRK/>
<BRK/>
<LST>h.  Description and total quantity of grout used initially.</LST><BRK/>
<BRK/>
<LST>i.  Description and daily quantities of grout used to compensate for settlement.</LST><BRK/>
<BRK/>
<LST>j.  Water or mud level (specify) prior to grouting and date measured.</LST><BRK/>
<BRK/>
<LST>k.  The reason for decommissioning/abandonment of the well/test hole.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.6   <SUB>Project Photographs</SUB></TTL><BRK/>
<BRK/>
<TXT>Before, during, and after completion of work, the Contractor shall take a minimum of [one view] [[_____] views] 
of each well installation.  If rock is cored at the site, after the core has been logged, the core shall be dampened, 
if it has dried, neatly arranged in the core box, and photographed.  Photographs shall be<MET> [80] [_____] by [120] 
[_____] mm</MET><ENG> [3] [_____] by [5] [_____] inch</ENG> color prints.  The photographs shall be mounted and enclosed back-to-back 
in a double face clear plastic sleeve punched to fit standard three ring binders.  Each color print shall show 
an information box, <MET>[20] [_____] by [50] [_____] mm</MET><ENG> [1-1/2] [_____] by [3-1/2] [_____] inches</ENG>.  The box shall 
be typewritten and arranged as follows:</TXT> <BRK/>
<BRK/>
<LST>   Project No.                  Contract No.</LST><BRK/>
<BRK/>
<LST>   Contractor/Photographer:</LST><BRK/>
<BRK/>
<LST>   Photograph No.               Date/Time:</LST><BRK/>
<BRK/>
<LST>   Description:</LST><BRK/>
<BRK/>
<LST>   Direction of View:</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.7   <SUB>Survey Maps and Notes</SUB></TTL><BRK/>
<BRK/>
<TXT>A tabulated list of all wells and monuments, copies of all field books, maps showing the locations, and elevations 
of all wells, datum used (e.g. state plane NAD27, NAD83, UTM, etc.), elevation datum, units of measurement, and 
all computation sheets shall be prepared as a submittal.  The tabulation shall consist of the designated number 
of the well or monument, the X and Y coordinates, and all the required elevations.  Also, a diagram showing where 
on the top of the well the elevation was determined by the surveyor shall be prepared.</TXT><BRK/>
<TBL><BRK/>
<HL4>WATER QUALITY ANALYSIS TABLE</HL4><BRK/>
<THD><BRK/>
<HL4>Physical Characteristics</HL4><BRK/>
<HL4>_________________________</HL4><BRK/>
<BRK/></THD>
<BRK/>
        Color                        Resistivity in ohms per cubic<BRK/>
        Taste                        centimeter and 25 degrees C.<BRK/>
        Threshold odor number        pH value<BRK/>
        Turbidity                    Temperature<BRK/>
<THD><BRK/>
<HL4>Chemical Characteristics (Expressed as mg/L)</HL4><BRK/>
<HL4>____________________________________________</HL4><BRK/></THD>
<BRK/>
        Arsenic                      Total Hardness as CaCO(3)<BRK/>
        Barium                       Endrin<BRK/>
        Cadmium                      Lindane<BRK/>
        Chromium                     Methoxychlor<BRK/>
        Copper                       Toxaphene<BRK/>
        Lead                         2-4-D<BRK/>
        Mercury                      2, 4, 5 TP Silvex<BRK/>
        Selenium                     Total Organic Halogens<BRK/>
        Silver                       TOC<BRK/>
        Zinc                         Sulphates as SO(4)  <BRK/>
        Fluoride as F                Chlorides as C1<BRK/>
        Manganese as Mn (dissolved   Bicarbonates as HCO(3)<BRK/>
         and total)                  <BRK/>
        Iron as Fe (dissolved and    Carbonates as CO(3)<BRK/>
        total)                       <BRK/>
        Suspended Solids             Nitrates as NO(3)        <BRK/>
        Total Dissolved Solids       Alkalinity (methyl-orange)<BRK/>
        Calcium as Ca                  (Phenolphthalein) as CaCO(3)<BRK/>
        Magnesium as Mg              Silica as SiO(2)<BRK/>
        Sodium and Potassium as Na    <BRK/>
<BRK/></TBL>
</SPT></SPT></PRT>    <END/><BRK/></SEC>