USACE / NAVFAC / AFCESA / NASA           UFGS-33 52 90.00 20 (August 2008)<BRK/>
                                         ---------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>              Superseding<BRK/>
                                         UFGS-33 52 90.00 20 (April 2007)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 33 52 90.00 20</SCN><BRK/>
<BRK/>
<STL>WELDING FOR POL SERVICE PIPING</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>welding of piping 
and piping system components used for petroleum, oil and lubricants (POL) under 
pressure, including modification to existing hydrant fueling systems</SCP>.New hydrant 
fueling systems are not covered by this specification. <BRK/>
<BRK/>
The following guidance is offered the designer. ANSI/ASME B31.3 - Chemical Plant 
and Petroleum Refinery Piping is applied to on-installation POL farm and fuel 
distribution systems.   ANSI/ASME B31.4 - Pipeline Transportation Systems for 
Liquid Hydrocarbons and Other Liquids applies to off-installation transport 
pipelines or pipelines delivering fuel to the installation.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
Use of electronic communication is encouraged.<BRK/>
<BRK/>
Brackets are used in the text to indicate designer choices or locations where 
text must be supplied by the designer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Do not use the Reference Wizard's Check Reference feature 
to update the issue dates, as this document is specific to the standards listed.  
This guide specification will be updated when the standards are updated.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)</ORG><BRK/><BRK/><RID>ASNT RP SNT-TC-1A</RID><RTL>(2006) Recommended Practice</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN WELDING SOCIETY (AWS)</ORG><BRK/><BRK/><RID>AWS A2.4</RID><RTL>(2007) Standard Symbols for Welding, Brazing and Nondestructive Examination</RTL><BRK/><BRK/><RID>AWS A3.0</RID><RTL>(2001) Standard Welding Terms and Definitions Including Terms for Adhesive Bonding, Brazing, Soldering, Thermal Cutting and Thermal Spraying</RTL><BRK/><BRK/><RID>AWS A5.1/A5.1M</RID><RTL>(2004; Errata 2004) Carbon Steel Electrodes for Shielded Metal Arc Welding</RTL><BRK/><BRK/><RID>AWS A5.10/A5.10M</RID><RTL>(1999; R 2007) Bare Aluminum and Aluminum Alloy Welding Electrodes and Rods</RTL><BRK/><BRK/><RID>AWS A5.18/A5.18M</RID><RTL>(2005) Carbon Steel Filler Metals for Gas Shielded Arc Welding</RTL><BRK/><BRK/><RID>AWS A5.20</RID><RTL>(2005) Carbon Steel Electrodes for Flux Cored Arc Welding</RTL><BRK/><BRK/><RID>AWS A5.22</RID><RTL>(1995; R 2005) Stainless Steel Electrodes for Flux Cored Arc Welding and Stainless Steel Flux Cored Rods for Tungsten Arc Welding</RTL><BRK/><BRK/><RID>AWS A5.3/A5.3M</RID><RTL>(1999; R 2007) Specification for Aluminum and Aluminum-Alloy Electrodes for Shielded Metal Arc Welding</RTL><BRK/><BRK/><RID>AWS A5.32/A5.32M</RID><RTL>(1997; R 2007) Welding Shielding Gases</RTL><BRK/><BRK/><RID>AWS A5.4/A5.4M</RID><RTL>(2006) Stainless Steel Electrodes for Shielded Metal Arc Welding</RTL><BRK/><BRK/><RID>AWS A5.9/A5.9M</RID><RTL>(2006) Specification for Bare Stainless Steel Welding Electrodes and Rods</RTL><BRK/><BRK/><RID>AWS C5.5/C5.5M</RID><RTL>(2003) Recommended Practices for Gas Tungsten Arc Welding</RTL><BRK/><BRK/><RID>AWS D1.1/D1.1M</RID><RTL>(2008) Structural Welding Code - Steel</RTL><BRK/><BRK/><RID>AWS D10.10/D10.10M</RID><RTL>(1999) Local Heat Treatment of Welds in Piping and Tubing</RTL><BRK/><BRK/><RID>AWS D10.11/D10.11M</RID><RTL>(2007) Recommended Practices for root Pass Welding of Pipe Without Backing</RTL><BRK/><BRK/><RID>AWS D10.12/D10.12M</RID><RTL>(2000) Recommended Practices and Procedures for Welding Plain Carbon Steel Pipe</RTL><BRK/><BRK/><RID>AWS D10.4</RID><RTL>(1986; R 2000) Recommended Practices for Welding Austenitic Chromium-Nickel Stainless Steel Piping and Tubing</RTL><BRK/><BRK/><RID>AWS D10.7/D10.7M</RID><RTL>(2008) Guide for Shielded Arc Welding of Aluminum and Aluminum Alloy Pipe</RTL><BRK/><BRK/><RID>AWS QC1</RID><RTL>(2007) AWS Certification of Welding Inspectors</RTL><BRK/><BRK/><RID>AWS WHB-4.8</RID><RTL>(1998) Welding Handbook, vol II, Materials and Applications</RTL><BRK/><BRK/><RID>AWS Z49.1</RID><RTL>(2005) Safety in Welding, Cutting and Allied Processes</RTL><BRK/><BRK/></REF><REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B31.3</RID><RTL>(2008) Process Piping</RTL><BRK/><BRK/><RID>ASME B31.4</RID><RTL>(2006) Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquid</RTL><BRK/><BRK/><RID>ASME BPVC SEC V</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section V, Nondestructive Examination</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM E 329</RID><RTL>(2008) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction</RTL><BRK/><BRK/><RID>ASTM E 94</RID><RTL>(2004) Radiographic Examination</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NAVAL SEA SYSTEMS COMMAND (NAVSEA)</ORG><BRK/><BRK/><RID>NAVSEA T9074-AS-GIB-010/271</RID><RTL>(1999; Notice 1) Requirements for Nondestructive Testing Methods</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<BRK/>
<TXT>Definitions shall be in accordance with <RID>AWS A3.0</RID> except as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Weld slag is defined as the crystalline residue remaining on the weld surface following 
a weld procedure which uses flux as a shielding method.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  POL service piping consists of piping and components used for petroleum, oil and lubricants 
(POL) under pressure or gravity force including modifications to existing hydrant fueling systems. </ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><NPR>NOTE:  Submittals must be limited to those necessary for adequate quality control.  
The importance of an item in the project should be one of the primary factors 
in determining if a submittal for the item should be required.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy projects.<BRK/>
<BRK/>
Submittal items not designated with a "G" are considered as being for information 
only for Army projects and for Contractor Quality Control approval for Navy 
projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Welding procedure qualification</SUB>; [<SUB>G</SUB>][; <SUB>G, [_____]]</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Welding Operations</SUB>; [<SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Detailed procedures which define methods of compliance to contract drawings and specifications.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>POL Service Piping</SUB>; [<SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Detail drawings showing location, length, and type of welds; and indicating preweld and postweld 
heat treatment and NDE as required.  The drawings shall show the welding procedure specification 
(WPS) to be used at each weld location.</ITM><BRK/>
<BRK/>
<ITM><SUB>Pigging Plan</SUB>; [<SUB>G</SUB>][; <SUB>G, [_____]]</SUB></ITM> <BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM>Welding Reports</ITM><BRK/>
<BRK/>
<ITM>  Written records and drawings indicating location of welds made by each welder or welding operator.</ITM><BRK/>
<BRK/>
<ITM><SUB>Examinations, Inspections and Tests</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Qualifications</SUB>; [<SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Welder and welding operator performance qualification certificates.  Welding inspectors and 
NDE personnel certificates.  Qualifications of testing laboratory or the Contractor's quality 
assurance organization.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   GENERAL REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The drawings should be checked to ensure that any supplementary information 
required has been shown and that there is no conflict between the drawings and 
the specifications.</NPR><BRK/>
<BRK/>
<NPR>Project drawings must indicate, or text of project specifications must specify, 
the welding procedures, and size, length, type, and location of the welds, as 
necessary.  Project drawings and/or specifications must indicate that factory 
applied internal and external coatings be stopped one (1) inch from a girth 
weld leaving a 2" uncoated area for welding.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This section covers the welding of Petroleum, Oil and Lubricant (POL) Service systems.  Deviations from applicable 
codes, approved procedures, and approved detail drawings will not be permitted without prior written approval 
by the Contracting Officer.  Materials or components with welds made offsite will not be accepted if the welding 
does not conform to the requirements of this specification, unless otherwise specified.  Procedures shall be 
developed by the Contractor for welding all metals included in the work.  Welding shall not be started until 
welding procedures, welders, and welding operators have been qualified.  Qualification testing shall be performed 
by an approved testing laboratory, or by the Contractor if approved by the Contracting Officer.  Costs of such 
testing shall be borne by the Contractor.  The Contracting Officer shall be notified at least 1 week in advance 
of the time and place of the tests.  If the Contracting Officer elects to witness the tests, the qualification 
tests shall be performed at or near the worksite.  The Contractor shall maintain current records of the test 
results obtained in the welding procedure, welding operator, welder performance qualifications, and nondestructive 
examination (NDE) procedures readily available at the site for examination by the Contracting Officer.  The procedures 
for making transition welds between different materials or between plates or pipes of different wall thicknesses 
shall be qualified.  Unless otherwise specified, the choice of welding process shall be the responsibility of 
the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   PERFORMANCE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:</NPR><BRK/>
<BRK/>
<NPR>The paragraphs will be edited and bracketed portions inserted if necessary to 
ensure proper implementation of the CONTRACTOR QUALITY CONTROL PROGRAM.  The 
specification writer or design engineer must indicate how much quality control 
of welding is needed for each project and who is to be responsible; i.e., primarily 
the Contractor or the Government.<BRK/>
<BRK/>
In many cases a project may not require 100 percent testing of welds by NDE 
methods.  The designer must determine the required methods and the extent of 
inspection and testing, and must indicate the extent in this or other sections 
of the project specifications or on the project drawings by notes, NDE symbols, 
or other means.  The referenced applicable publications will be used for guidance 
in determining inspection and testing requirements.<BRK/>
<BRK/>
The specifications or drawings must clearly indicate which joints require 100 
percent NDE inspection, (all underground joints require 100% Radiographic Testing 
(RT) which joints require random NDE inspection, and which NDE methods are to 
be employed for each joint.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor shall be responsible for the quality of all joint preparation, welding, and examination.  All 
materials used in the welding operations shall be clearly identified and recorded.  The inspection and testing 
defined in this specification are minimum requirements.  Additional inspection and testing shall be the responsibility 
of the Contractor when he deems it necessary to achieve the quality required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   <SUB>QUALIFICATIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Welding procedures, welders, and welding operators previously qualified by test may be accepted for the work 
without requalification, provided that all of the following conditions are fulfilled:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Copies of the welding procedure specifications, the <SUB>welding procedure qualification</SUB> record, 
and the welder and welding operator certifications are submitted and approved in accordance 
with paragraph SUBMITTALS.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Testing was performed by an approved testing laboratory or approved technical consultant 
or by the Contractor's approved quality assurance organization.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  The welding procedures, welders, and welding operators were qualified in accordance with 
[<RID>ASME B31.3</RID>], [<RID>ASME B31.4</RID>],  and base materials, filler materials, electrodes, equipment, and 
processes conformed to the applicable requirements of this specification.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  The requirements of paragraph "Renewal of Qualification" below are met and records showing 
name of employer and period of employment using the process for which qualified are submitted 
as evidence of conformance.</ITM><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Welding Operations</TTL><BRK/>
<BRK/>
<TXT>The Contractor shall provide a description of how the critical welding operations will be accomplished.  Provide 
the welding procedures to be used for each operation, the sequence of welding to minimize heat distortion, sequence 
of welding piping sections both in the trench and outside, machine welding if used, and multiple welders on same 
pipe weld.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   Welding Procedure Specification and Qualification Records</TTL><BRK/>
<BRK/>
<TXT>The Contractor shall record in detail and shall qualify the Welding Procedure Specifications for every proposed 
welding procedure.  Qualification for each welding procedure shall conform to the requirements of [<RID>ASME B31.3</RID>
,] [<RID>ASME B31.4</RID>,]  and to this specification.  The welding procedures shall specify back purge gas requirements, 
end preparation for butt welds including cleaning, alignment, and root openings.  Preheat, interpass temperature 
control, and postheat treatment of welds shall be as required by approved welding procedures, unless otherwise 
indicated or specified.  Copies of the welding procedure specifications and weld procedure qualification record 
results for each type of welding required shall be submitted in accordance with paragraph SUBMITTALS.  Approval 
of any procedure does not relieve the Contractor of the sole responsibility for producing acceptable welds.  
Welding procedures shall be identified individually and shall be referenced on the <SUB>POL service piping</SUB> shop drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3   Welder and Welding Operator Performance</TTL><BRK/>
<BRK/>
<TXT>Each welder and welding operator assigned to work shall be qualified in accordance with [<RID>ASME B31.3</RID>,] [<RID>ASME B31.4</RID>
].</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.3.1   Certification</TTL><BRK/>
<BRK/>
<TXT>Before assigning welders or welding operators to the work, the Contractor shall provide the Contracting Officer 
with their names together with certification that each individual is performance-qualified as specified.  The 
certification shall state the type of welding and positions for which each is qualified, the code and welding 
procedure specification under which each is qualified, date qualified, and the firm and individual certifying 
the qualification tests.  The Contractor shall provide a summary table showing all welders and the WPS with which 
they are qualified to weld.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3.2   Identification</TTL><BRK/>
<BRK/>
<TXT>Each particular weld shall be identified with the personal number, letter, or symbol assigned to each welder 
or welding operator.  To identify welds, written records indicating the location of welds made by each welder 
or welding operator shall be submitted, and each welder or welding operator shall apply the personal mark adjacent 
to the welds using a rubber stamp or felt-tipped marker with permanent, weatherproof ink or other methods approved 
by the Contracting Officer that do not deform the metal.  Identification by die stamps or electric etchers will 
not be allowed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3.3   Renewal of Qualification</TTL><BRK/>
<BRK/>
<TXT>Requalification of a welder or welding operator shall be required under any of the following conditions:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  When a welder or welding operator has not used the specific welding procedure for a period 
of 3 months; the period may be extended to 6 months if the welder or welding operator has been 
employed on another welding procedure.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  When a welder or welding operator has not welded with any procedureduring a period of 3 
months, all the personal qualifications shall be considered expired, including any extension 
by virtue of a. above.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  There is specific reason to question the person's ability to make welds that will meet the 
requirements of the specifications.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  The welder or welding operator was qualified by an employer, other than those firms performing 
work under this contract, and a qualification test has not been taken within the preceding 12 
months.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Renewal of qualification for a specific welding procedure under conditions a., b., and d., 
above, needs to be made on only a single test joint or pipe of a thickness, position, or material 
required by the welding procedure specifications to reestablish the welder's or welding operator's 
qualification for the previous qualification.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.4   Test Reports</TTL><BRK/>
<BRK/>
<TXT>Test reports shall consist of the following.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Records made by the AWS certified inspector for all duties performed per paragraph 4.2 of <RID>
AWS QC1</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  All NDE (radiograph, ultrasound, etc.) reports with unique weld ID for each weld tested.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  "Weld Maps".  These maps/drawings correlate the shop drawings submitted to the NDE reports.  
The NDE report that shows a weld number as acceptable is correlated with weld number on the 
drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Provide the location of each weld, what procedure was used, which welder did the weld, the 
results of the visual test, and the results of the NDE.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5   Inspection and NDE Personnel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  </NPR><BRK/>
<NPR>Coordinate with paragraph Performance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All inspection and NDE personnel shall be qualified in accordance with the following requirements.  The contractor 
shall submit the qualifications of all the testing personnel that will perform all field tests for review by 
the Contracting Officer.  The qualifications of all personnel on the job site that will perform welding inspections 
and NDE shall be submitted for approval.  All inspectors and NDE personnel shall have a minimum of one (1) year 
experience inspecting the piping material being used and five (5) years in military or commercial aircraft hydrant 
fueling systems or truck fueling systems, petroleum refineries, power generating plants, or chemical process 
plants.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.5.1   Inspector Certification</TTL><BRK/>
<BRK/>
<TXT>Welding inspectors shall be qualified in accordance with [<RID>AWS QC1</RID>],[<RID>ASME B31.3</RID>, Chapter VI].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5.2   NDE Personnel</TTL><BRK/>
<BRK/>
<TXT>NDE personnel shall be certified in accordance with Chapter VI, <RID>ASME B31.3</RID> for each NDE procedure he is required 
to use, and a written procedure for the control and administration of NDE personnel training, examination, and 
certification shall be established.  The procedures shall be based on appropriate specific and general guidelines 
of training and experience recommended by <RID>ASNT RP SNT-TC-1A</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5.3   Testing Agency</TTL><BRK/>
<BRK/>
<TXT>The testing agency, testing laboratory, technical consultant or contractor's approved quality assurance organization 
shall meet the requirements of <RID>ASTM E 329</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.7   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>All filler metals, electrodes, and other welding materials shall be delivered to the site in manufacturers' original 
packages and stored in a dry space until used.  Packages shall be properly labeled and designed to give maximum 
protection from moisture and to insure safe handling.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.7.1   Material Control</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If additional requirements are necessary regarding limits on out-of-oven 
exposure time, refer to AWS D1.1/D1.1M.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Materials shall be stored in a controlled access and clean, dry area that is weathertight and is maintained at 
a temperature recommended by the manufacturer.  The materials shall not be in contact with the floor and shall 
be stored on wooden pallets or cribbing.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.7.1.1   Damaged Containers</TTL><BRK/>
<BRK/>
<TXT>Low-hydrogen steel electrodes shall be stored in their sealed shipping container.  If the seal is damaged during 
shipment or storage, and the damage is not immediately detected, the covered electrodes in that container shall 
be rebaked in accordance with the manufacturer's instructions prior to issuance or shall be discarded.  If a 
container is damaged in storage and the damage is witnessed, the electrodes from that container shall be immediately 
placed in a storage oven.  The storage oven temperature shall be as recommended by the manufacturer or the welding 
material specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.1.2   Partial Issues</TTL><BRK/>
<BRK/>
<TXT>When a container of covered electrodes is opened and only a portion of the content is issued, the remaining portion 
shall, [within 1/2 hour]; [within the limits established by <RID>AWS D1.1/D1.1M</RID>] be placed in a storage oven.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.7.2   Damaged Materials</TTL><BRK/>
<BRK/>
<TXT>Materials which are damaged shall be discarded.  Covered electrodes which are oil or water-soaked, dirty, or 
on which the flux has separated from the wire shall be discarded.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.8   SYMBOLS</TTL><BRK/>
<BRK/>
<TXT>Symbols shall be in accordance with <RID>AWS A2.4</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.9   SAFETY</TTL><BRK/>
<BRK/>
<TXT>Safety precautions shall conform to <RID>AWS Z49.1</RID>.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   WELDING MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normally, selection of the electrodes is done by the Contractor.  In 
special cases, if the selection of the proper electrode is critical to the design, 
the designer may specify the electrodes to be used.  In special cases it also 
may be necessary to specify the welding process.<BRK/>
<BRK/>
The selection of electrodes should be limited to non covered for all root passes.  
Covered electrodes may be allowed for fill passes after the root pass is completed.  
This will eliminate formation of weld slag on the interior of the pipe.  Weld 
process for root passes is restricted to Gas Tungsten or Gas Metal Arc Welding 
to provide for a clean weld on the initial pass.<BRK/>
<BRK/>
In tight or confined spaces where oxygen supply may be a concern, use of a back 
purge gas may be re-evaluated and a covered electrode may be allowed. This condition 
should be addressed by the Designer and the Contracting Officer on a case by 
case basis.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Welding materials for carbon steel, stainless steel and aluminum shall comply with <RID>AWS WHB-4.8</RID>.  Welding equipment, 
electrodes, welding wire, and fluxes shall be capable of producing satisfactory welds when used by a qualified 
welder or welding operator using qualified welding procedures.  All field girth root pass welds shall be made 
with non-covered electrodes or welding wire. External welds on the pipe such as attaching pipe supports may be 
made with covered electrodes or welding wire.  Electrodes, welding wire and/or fluxes shall be in accordance 
with Table 1. Welding materials for aluminum and aluminum alloy shall comply with <RID>AWS D10.7/D10.7M</RID>.</TXT><BRK/>
<BRK/>
<TBL><HL4>TABLE I.  </HL4><BRK/>
<BRK/>
 <BRK/>
   AWS                Process    Alloy         Consumable     Use<BRK/>
                                                 Example (1) <BRK/>
<BRK/>
<RID>AWS A5.1/A5.1M</RID>    SMAW         Low Carbon   E7018, E6010   Fill<BRK/>
<RID>AWS A5.4/A5.4M</RID>    SMAW         Stainless    E308L, E309L   Fill<BRK/>
<RID>AWS A5.3/A5.3M</RID>    SMAW         Aluminum                    Fill<BRK/>
<RID>AWS A5.9/A5.9M</RID>    GTAW/GMAW    Stainless    ER308L,ER309L  Root and Fill  <BRK/>
<RID>AWS A5.10/A5.10M</RID>  GTAW/GMAW    Aluminum                    Root and Fill<BRK/>
<RID>AWS A5.18/A5.18M</RID>  GTAW/GMAW    Low Carbon   E70S-3,E70S-6  Root and Fill<BRK/>
<RID>AWS A5.20</RID>         FCAW         Low Carbon   E71T1-1        Fill<BRK/>
<RID>AWS A5.22</RID>         GTAW/FCAW    Stainless    E308LT1-1      FCAW Fill<BRK/>
                                                             GTAW-Root <BRK/>
<RID>AWS A5.32/A5.32M</RID>  GTAW/GMAW    All                         Shielding Gas</TBL>  <BRK/>
__________________________________________________________________<BRK/>
<LST>Note(1):  The consumable material designations shown are examples only and are not intended to limit 
the Contractor's selection of consumable materials.</LST><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   <SUB>WELDING OPERATIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Welding shall be performed in accordance with qualified procedures using qualified welders and welding operators.  
Welding shall not be done when the quality of the completed weld could be impaired by the prevailing working 
or weather conditions.  The Contracting Officer shall determine when weather or working conditions are unsuitable 
for welding.  Welding of hangers, supports, and plates to structural members shall conform to Section 
<SRF>05 05 23</SRF> WELDING, STRUCTURAL.</TXT><BRK/>
<BRK/>
<TXT>Welding shall be performed in accordance with [<RID>ASME B31.3</RID>]; [<RID>ASME B31.4</RID>] and the applicable portions of [<RID>AWS D10.4</RID>
]; [<RID>AWS D10.7/D10.7M</RID>]; [<RID>AWS D10.10/D10.10M</RID>]; [<RID>AWS D10.11/D10.11M</RID>]; [<RID>AWS D10.12/D10.12M</RID>]; [<RID>AWS C5.5/C5.5M</RID></TXT>]<BRK/>
<BRK/>
<TXT>All joints unless indicated otherwise, in carbon steel, aluminum and stainless steel piping systems shall be 
welded.  Unless otherwise approved, all girth welds shall be complete penetration groove welds made in accordance 
with qualified welding procedures.  The root pass on stainless steel and carbon steel pipe shall be by the GMAW 
or GTAW process.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Weld Preparation shall comply with the requirements of <RID>ASME B31.3</RID> and the qualified Welding 
Procedure Specification.  The use of "rice paper" as purge blocks is not permitted.  Contractor 
shall submit alternate method for approval.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Backing Rings.  The use of backing rings for making or repairing welds will not be permitted.</ITM><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Base Metal Preparation</TTL><BRK/>
<BRK/>
<TXT>Oxy-fuel cutting shall not be used on austenitic stainless steel or nonferrous materials.</TXT><BRK/>
<BRK/>
<TXT>Mechanical grinding of thermal cut ends shall be used to remove the heat affected area but should be limited 
to maximum 1/8".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Weld Joint Fit-Up</TTL><BRK/>
<BRK/>
<TXT>Parts that are to be joined by welding shall be fitted, aligned, and retained in position during the welding 
operation by the use of bars, jacks, clamps, or other mechanical fixtures.  End welds shall be properly aligned 
prior to welding in accordance with Chapter V of <RID>ASME B31.3</RID>.  Welded temporary attachments shall not be used 
except when it is impractical to use mechanical fixtures. When temporary attachments are used, they shall be 
the same material as the base metal, and shall be completely removed by grinding or thermal cutting after the 
welding operation is completed.  If thermal cutting is used, the attachment shall be cut to not less than <MET>6 mm </MET><ENG>
1/4 inch</ENG> from the member and the balance removed by grinding.  After the temporary attachment has been removed, 
the area shall be visually examined.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Preheat and Interpass Temperatures</TTL><BRK/>
<BRK/>
<TXT>Preheat temperatures shall meet the requirements specified by [<RID>ASME B31.3</RID>,] [<RID>ASME B31.4</RID>].  However, in no case 
shall the preheat be below <MET>10 degrees C </MET><ENG>50 degrees F</ENG> for ferritic steel or austenitic stainless steel, or <MET>0 degrees 
C </MET><ENG>32 degrees F</ENG> for nonferrous alloys.  The maximum interpass temperatures shall not exceed <MET>149 degrees C </MET><ENG>300 
degrees F</ENG> for austenitic stainless steels, nickel alloys, and copper alloys; and <MET>260 degrees C </MET><ENG>500 degrees F</ENG> 
for carbon steels.  Preheat techniques shall be such as to ensure that the full thickness of the weld joint preparation 
and/or adjacent base material, at least <MET>75 mm </MET><ENG>3 inches</ENG> in all directions, is at the specified temperature.  Preheating 
by induction or resistance methods is preferred.  When flame heating is used, only a neutral flame shall be employed.  
Oxy-fuel heating shall not be used on austenitic stainless steel; however, air-fuel heating is acceptable if 
controlled to insure that the surface temperature does not exceed <MET>66 degrees C </MET><ENG>150 degrees F</ENG>.  Interpass temperatures 
shall be checked on the surface of the component within <MET>25 mm </MET><ENG>1 inch</ENG> of the weld groove and at the starting location 
of the next weld pass, and for a distance of about <MET>150 mm </MET><ENG>6 inches</ENG> ahead of the weld, but not on the area to 
be welded.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Production Welding Instructions</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Welding shall not be done when the ambient temperature is lower than <MET>minus 18 degrees C </MET><ENG>
0 degree F</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Welding is not permitted on surfaces that are wet or covered with ice, when snow or rain 
is falling on the surfaces to be welded, or during periods of high winds, unless the welders 
and the work are properly protected.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Gases for purging and shielding shall be welding grade and shall have a dew point of <MET>minus 
40 degrees C </MET><ENG>minus 40 degrees F</ENG> or lower.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Back purges are required for austenitic stainless steels and nonferrous alloys welded from 
one side and shall be set up such that the flow of gas from the inlet to the outlet orifice 
passes across the area to be welded.  The oxygen content of the gas exiting from the purge vent 
shall be less than 2 percent prior to welding.  The flow rate shall be that required by the 
approved weld procedure specification.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  The purge on groove welds shall be maintained for at least two passes or <MET>5 mm </MET><ENG>3/16 inch</ENG> 
whichever is greater.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Removable purge dam materials shall be made of expandable or flexible plugs, such as Plexiglas, 
plywood (which shall be dry when used), etc.  Wood dams shall be kiln-dried quality.  Nonremovable 
purge dams and purge dam adhesives shall be made of water soluble materials.  Purge dams shall 
not be made of polyvinyl alcohol.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Any welding process which requires the use of external gas shielding shall not be done in 
a draft or wind unless the weld area is protected by a shelter.  This shelter shall be of material 
and shape appropriate to reduce wind velocity in the vicinity of the weld to a maximum of <MET>8 
km/hour </MET><ENG>5 mph (440 fpm)</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Tack welds to be incorporated in the final welds shall have their ends tapered by grinding 
or welding technique.  Tack welds that are cracked or defective shall be removed and the groove 
shall be retacked prior to welding.  Temporary tack welds shall be removed, the surface ground 
smooth, and visually inspected.  For low-alloy and hardenable high-alloy steels, the area shall 
be magnetic particle examination inspected.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Grinding of completed welds is to be performed only to the extent required for NDE, including 
any inservice examination, and to provide weld reinforcement within the requirements of [<RID>ASME B31.3</RID>
,] [<RID>ASME B31.4</RID>,].  If the surface of the weld requires grinding, reducing the weld or base material 
below the minimum required thickness shall be avoided.  Minimum weld external reinforcement 
shall be flush between external surfaces.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  Each qualified welder shall be assigned an identification symbol.  All welds shall be permanently 
marked with the symbol of the individual who made the weld.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer to include Specification Section <SRF>33 52 43.00 20</SRF> and 
<SRF>33 52 10</SRF> if carbon steel and stainless steel are to be connected</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">k.  Direct welded connection of carbon steel and stainless steel shall not be made.  [See Section 
<SRF>33 52 43.00 20</SRF>, AVIATION FUEL DISTRIBUTION AND DISPENSING and Section <SRF>33 52 10</SRF> SERVICE PIPING, 
FUEL SYSTEMS for method of connection.]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Postweld Heat Treatment</TTL><BRK/>
<BRK/>
<LST>a.  Postweld heat treatment shall be performed in accordance with [<RID>ASME B31.3</RID>,] [<RID>ASME B31.4</RID>,].  Temperatures 
for local postweld heat treatment shall be measured continuously by thermocouples in contact with the 
weldment.</LST><BRK/>
<BRK/>
<LST>b.  Postweld heat treatment of low-alloy steels, when required, shall be performed immediately upon completion 
of welding and prior to the temperature of the weld falling below the preheat temperature.  However, 
postweld heat treatment may be postponed after the completion of the weld, if, immediately after the 
weld is completed, it is maintained at a minimum temperature of <MET>149 degrees C </MET><ENG>300 degrees F</ENG> or the preheat 
temperature, whichever is greater, for 2 hours per <MET>25 mm </MET><ENG>inch</ENG> of weld thickness.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   <SUB>EXAMINATIONS, INSPECTIONS, AND TESTS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate with paragraph Performance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Weld inspection and NDE shall be performed by the Contractor to detect surface and internal discontinuities in 
completed welds.  The services of a qualified commercial inspection or testing laboratory or technical consultant 
meeting the requirements of paragraph "Inspection and NDE Personnel", approved by the Contracting Officer, shall 
be employed by the Contractor.  All tack welds, weld passes, and completed welds shall be visually inspected.  
In addition, [magnetic particle] [liquid penetrant] examination shall be performed on root passes.  [Radiographic] 
[Liquid penetrant] [Magnetic particle] [or] [Ultrasonic] examination shall be required as indicated below.  When 
inspection and testing indicates disqualifying defects in a weld joint, the weld shall be repaired by a qualified 
welder in accordance with paragraph CORRECTIONS AND REPAIRS.  The Contractor shall submit weld inspection and 
NDE field testing reports to the Contracting Officer.</TXT><BRK/>
<BRK/>
<TXT>The person performing the weld inspection shall perform the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Verify that the base materials and consumable welding materials conform to the specifications 
and that welding filler metals used are as specified for each base material.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Verify that the welding equipment to be used for the work is appropriate for use with the 
welding procedure specification and has the capability to meet the applicable requirements of 
the welding procedure.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Verify that only approved or qualified welding procedures are used for the work.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Verify that the edge preparation or joint geometry meet the requirements of the welding 
procedure and drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Verify that the specified filler metals are used and that filler metals are maintained in 
proper condition, per requirements, or as recommended by the manufacturer.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Verify that the technique and performance of each welder, welding <BRK/>
operator, and tack welder are as specified.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Verify that the work conforms to requirements of the applicable <BRK/>
standards, drawings, or other documents.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Verify that the work inspected is identified and documented in <BRK/>
accordance with specified requirements.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Prepare clear and concise reports and verify that records of the <BRK/>
results of examinations are maintained.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  Verify the approved WPS pre-heat and post heat procedures are being used.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For modifications to existing stainless steel hydrant systems iinsert 
the following paragraph:</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Welders found making defective welds shall be removed from the work or shall be required to be requalified in 
accordance with <RID>ASME B31.3</RID>.]</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate with Paragraph Performance</NPR><BRK/>
<BRK/>
This paragraph is to be edited based on the piping code used for design.  Both B31.3 and B31.4 allow for different 
percentages of additional testing with B31.3 generally being more stringent.  The selection of B31.3 or B31.4 
should be consistent with the application.  See UFC 3-460-01 "Design:  Petroleum Fuel Facilities".  For modification 
to existing hydrant systems at paragraph 3.2.2 insert the following lst paragraph.<BRK/>
<AST/><BRK/>
<BRK/></NTE>
<SPT><TTL>3.2.1   Visual Inspection</TTL><BRK/>
<BRK/>
<TXT>Weld joints shall be inspected visually as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Before welding - for compliance with requirements for joint preparation,  alignment and 
fit-up, and cleanliness.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  During welding - for cracks and conformance to the approved welding procedure.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  After welding - for cracks, contour and finish, bead reinforcement, undercutting, overlap, 
weld slag on the interior of the pipe and size of welds.  Visual examination of the interior 
of the pipe may be performed by any of the remote means allowed by <RID>ASME BPVC SEC V</RID>, visual inspection.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   NDE Testing Frequency</TTL><BRK/>
<BRK/>
<TXT>[All pipe field welds, including high point vent pipe tees, weld-o-lets, sock-o-lets and low point drain pipe, 
shall be examined by radiographic methods to determine conformance to the paragraph "Acceptance Standards."  
The services of a qualified commercial or testing laboratory approved by the Contracting Officer shall be employed 
by the Contractor for testing of piping welds.  Costs of testing, including retesting of repaired welds, shall 
be borne by the Contractor.]</TXT><BRK/>
<BRK/>
<BRK/>
<TXT>Provide 100% radiographic testing for all underground piping.  Provide random ragiographic testing in accordance 
with [<RID>ASME B31.3</RID>]; [<RID>ASME B31.4</RID>] for all aboveground piping.  The inspection shall include an examination of welds 
made by each welding operator or welder.  If the testing reveals that any welds fail to meet minimum quality 
requirements, an additional percent of the welds in that same group shall be inspected in accordance with [<RID>ASME B31.3</RID>
]; [<RID>ASME B31.4</RID>].  If all of the additional welds inspected meet the quality requirements, the entire group of 
welds represented shall be accepted and the defective welds shall be repaired.  If any of the additional welds 
inspected also fail to meet the quality requirements, that entire group of welds shall be rejected.  The rejected 
welds shall be removed and rewelded, or the rejected welds shall be 100 percent inspected and all defective weld 
areas removed and rewelded.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   <TST>NDE Testing</TST></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete any NDE method not required.  If magnetic particle inspection 
is required, specify whether wet or dry particle method is appropriate.<BRK/>
<BRK/>
For modifications to existing Hydrant Systems choose only radiographic from 
the lst paragraph and include the 2nd paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>NDE shall be as required by [<RID>ASME B31.3</RID>], [<RID>ASME B31.4</RID>] and in accordance with written procedures.  Procedures 
for [radiographic] [liquid penetrant] [magnetic particle] [or] [ultrasonic] tests and methods shall conform to <RID>
ASME BPVC SEC V</RID>.  The approved procedure shall be demonstrated to the satisfaction of the Contracting Officer.  
In addition to the information required in <RID>ASME BPVC SEC V</RID>, the written procedures shall include the timing of 
the NDE in relation to the welding operations and safety precautions.</TXT><BRK/>
<BRK/>
<TXT>[The services of a qualified testing agency approved by the Contracting Officer shall be employed by the Contractor 
for testing of piping welds.  Costs of testing, including retesting of repaired welds, shall be borne by the 
Contractor.  Procedures for radiographic inspection shall be in accordance with <RID>NAVSEA T9074-AS-GIB-010/271</RID> or <RID>
ASTM E 94</RID>.  Weld ripples or surface irregularities that might mask or be confused with the radiographic image 
of any objectionable defect shall be removed by grinding [and], [or] other suitable mechanical means.  The weld 
surface shall be merged smoothly with the base metal surface.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Inspection and Tests by the Government</TTL><BRK/>
<BRK/>
<TXT>The Government may perform inspection and supplemental nondestructive or destructive tests as deemed necessary.  
The cost of supplemental NDE will be borne by the Government.  The correction and repair of defects and the reexamination 
of weld repairs shall be performed by the Contractor at no additional cost to the Government.  Inspection and 
tests will be performed as required for visual inspection and NDE, except that destructive tests may be required 
also.  When destructive tests are ordered by the Contracting Officer and performed by the Contractor and the 
specimens or other supplemental examinations indicate that the materials and workmanship do not conform to the 
contract requirements, the cost of the tests, corrections, and repairs shall be borne by the Contractor.  When 
the specimens or other supplemental examinations of destructive tests indicate that materials or workmanship 
do conform to the specification requirements, the cost of the tests and repairs will be borne by the Government.  
When destructive tests are made, repairs shall be made by qualified welders or welding operators using welding 
procedures which will develop the full strength of the members cut.  Welding shall be subject to inspection and 
tests in the mill, shop, and field.  When materials or workmanship do not conform to the specification requirements, 
the work may be rejected at any time before final acceptance of the system containing the weldment.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   ACCEPTANCE STANDARDS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  These acceptance standards were taken from ASME B31.3 and B31.4 and are 
suitable for most jobs.  Evaluations of indications, as given in ASME B31.3 
and B31.4, are applicable to these standards.  Specific project design requirements 
may necessitate revision or expansion to cover different items of work and varying 
standards of acceptance.  In no case shall the acceptance criteria be less conservative 
than the criteria specified by the standard applicable to the work.  If actual 
conditions exceed these limits of ASME B31.3 or B31.4, this requirement shall 
be expanded or revised as required.  For modifications to existing hydrant systems 
and stainless steel systems select the 2nd paragraph below and delete the first 
paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Acceptance standards shall be in accordance with ASME B31.3 paragraph 341.3.2, Chapter VI in addition to the 
following specified items.]</TXT><BRK/>
<BRK/>
<TXT>[Interpretation of test results and limitations on imperfections in welds shall comply with the requirements 
of 100% radiography, per <RID>ASME B31.3</RID>. Chapter IX, Table K341.3.2A.  For hydrant systems and stainless steel systems 
the evaluation shall be based on severe cyclic conditions in addition to the following-specified items.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Visual</TTL><BRK/>
<BRK/>
<TXT>The following indications are unacceptable:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Weld Slag on the interior of the pipe.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   <TST>Magnetic Particle Examination</TST></TTL><BRK/>
<BRK/>
<TXT>The following relevant indications are unacceptable:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Any cracks and linear indications.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Rounded indications with dimensions greater than <MET>5 mm </MET><ENG>3/16 inch</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Four or more rounded indications in a line separated by <MET>2 mm </MET><ENG>1/16 inch</ENG> or less edge-to-edge.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Ten or more rounded indications in any <MET>3870 square mm </MET><ENG>6 square inches</ENG> of surface with the 
major dimension of this area not to exceed <MET>150 mm </MET><ENG>6 inches</ENG> with the area taken in the most unfavorable 
location relative to the indications being evaluated.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   <TST>Liquid Penetrant Examination</TST></TTL><BRK/>
<BRK/>
<TXT>Indications with major dimensions greater than <MET>2 mm </MET><ENG>1/16 of an inch</ENG> shall be considered relevant.  The following 
relevant indications are unacceptable:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Any cracks or linear indications.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Rounded indications with dimensions greater than <MET>5 mm </MET><ENG>3/16 inch</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Four or more rounded indications in a line separated by <MET>2 mm </MET><ENG>1/16 inch</ENG> or less edge-to-edge.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Ten or more rounded indications in any <MET>3870 square mm </MET><ENG>6 square inches</ENG> of surface with the 
major dimension of this area not to exceed <MET>150 mm </MET><ENG>6 inches</ENG> with the area taken in the most unfavorable 
location relative to the indications being evaluated.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   CORRECTIONS AND REPAIRS</TTL><BRK/>
<BRK/>
<TXT>Disqualifying defects shall be removed and repaired as specified in [<RID>ASME B31.3</RID>,] [<RID>ASME B31.4</RID>,] unless otherwise 
specified.  Disqualifying defects discovered between weld passes shall be repaired before additional weld material 
is deposited.  After defect removal is complete and before rewelding, the area shall be examined by the same 
test method which first revealed the defect to ensure that the defect has been eliminated.  After rewelding, 
the repaired area shall be reexamined by the same test method originally used for that area.  Any indication 
of a defect shall be regarded as a defect unless reevaluation by NDE or by surface conditioning shows that no 
disqualifying defects are present.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Defect Removal</TTL><BRK/>
<BRK/>
<TXT>Defective or unsound weld joints shall be corrected by removing and replacing the entire weld joint, or for the 
following defects corrections shall be made as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Excessive Convexity and Overlap:  Reduce by removal of excess metal.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Excessive Concavity of Weld, Undersized Welds, Undercutting:  Clean and deposit additional 
weld metal.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Excessive Weld Porosity, Inclusions, Lack of Fusion, Incomplete Penetration:  Remove defective 
portions and reweld.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Crack in Weld or Base Metal:  Remove crack throughout its length, including sound weld metal 
for a distance of twice the thickness of the base metal or two inches, whichever is less, beyond 
each end of the crack, followed by the required rewelding.  Complete removal shall be confirmed 
by magnetic particle inspection for carbon steel or liquid penetrant inspection for stainless 
steel.  Inspection procedures shall comply with the requirements of <RID>ASME B31.3</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Poor Fit-Up:  Cut apart improperly fitted parts, and reweld.</ITM><BRK/>
<BRK/>
<SPT><TTL>3.4.1.1   Methods of Defect Removal</TTL><BRK/>
<BRK/>
<TXT>The removal of weld metal or portions of the base metal shall be done preferably by chipping, grinding, sawing, 
machining, or other mechanical means.  Defects also may be removed by thermal cutting techniques.  If thermal 
cutting techniques are used, the cut surfaces shall be cleaned and smoothed by mechanical means to remove the 
heat affected zone.  In addition, a maximum of 1/8-inch of metal shall be removed by mechanical means from the 
cut surfaces of stainless steel.</TXT><BRK/>
<BRK/>
<TXT>Wherever a defect is removed, and repair by welding is not required, the affected area shall be blended into 
the surrounding surface eliminating sharp notches, crevices, or corners.  </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.2   Rewelding</TTL><BRK/>
<BRK/>
<TXT>Repair welds shall be made using an electrode or filler wire smaller than that used in making the original weld.  
Rewelding shall be done using qualified welding procedures.  The surface shall be cleaned before rewelding.  
Repair welds shall meet the requirements of this specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.3   Peening or Caulking</TTL><BRK/>
<BRK/>
<TXT>The use of force (peening) or foreign materials to mask, fill in, seal, or disguise any welding defects shall 
not be permitted.</TXT><BRK/></SPT>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The intent of the following paragraph is to require cleaning of the piping 
system as it is being installed.  The designer shall include Section 15899 for 
modifications to hydrant systems and Section 13004 for other POL service piping 
systems.</NPR><BRK/>
<AST/><BRK/></NTE>
</SPT></SPT><SPT><TTL>3.5   MAINTAINING CLEANLINESS OF PIPING</TTL><BRK/>
<BRK/>
<TXT>The Contractor shall keep the interior and ends of all new piping affected by the Contractor's operations thoroughly 
cleaned of foreign matter and water before and after being installed.  Piping systems shall be kept clean during 
installation by means of plugs or other approved methods.  When work is not in progress, open ends of piping 
and fittings shall be closed so that no water or other foreign substance will enter the pipes or fittings.  Piping 
shall be inspected before placing into position.  The interior of each length of pipe shall be cleaned after 
welding; A swab, with a leather or canvas belt disc to fit the inside diameter of pipe, shall be pulled through 
each length of pipe after welding in place.  It shall be the Contractor's responsibility for insuring that the 
interior of the piping is free of foreign matter including weld slag when it is connected into the system.</TXT><BRK/>
<BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE:  Select the following paragraph if a high degree of cleanliness is required 
such as modifications to an existing hydrant fueling system.  For existing systems 
review piping details and devices to determine if the system can be pigged or 
modified so it can be pigged.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.5.1   [Pigging Plan</TTL><BRK/>
<BRK/>
<TXT>The <SUB>pigging plan</SUB> shall be submitted for approval by the Contracting Officer.  The pigging plan shall provide 
a minimum of two runs through the system with each set of pigs.  There shall be a minimum of two types of pigs, 
polyurethane and foam.  More types of pigs (brushes, scrapers etc.) or runs may be required depending on the 
type of debris found in the system.  The pigging plan shall be submitted to the Contracting Officer for approval.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   COMMISSIONING</TTL><BRK/>
<BRK/>
<TXT>For commissioning of POL service piping systems see section <SRF>33 08 55</SRF> COMMISSIONING OF FUEL FACILITY SYSTEMS.  
For repairs or modifications to hydrant systems see Section <SRF>15899</SRF> "Commissioning of Hydrant Fuel Systems."</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>