USACE / NAVFAC / AFCESA / NASA                UFGS-35 41 00 (January 2008)<BRK/>
                                              ----------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA> (CW)               Superseding<BRK/>
                                              UFGS-35 41 00 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>35 41 00</SCN><BRK/>
<BRK/>
<STL>LEVEE CONSTRUCTION</STL><BRK/>
<DTE>01/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>levee construction</SCP>
.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<BRK/>
<NPR>This Guide Specification includes tailoring options, as listed below, for specific 
construction requirements.  Tailoring tags should be selected based upon project 
requirements; i.e., if the proposed project requires only embankments for levee 
construction, select only the tailoring option for embankment (TAI OPT=EMBANK); 
if the proposed project requires clearing, grubbing, stripping, and excavation 
for levee construction, select tailoring options for these requirements (TAI 
OPT=CLEAR-GRUB-STRIP, TAI OPT=EXCAV), etc.</NPR><BRK/>
<BRK/>
<TBL>           TAI OPT=CLEAR-GRUB-STRIP      CLEARING, GRUBBING,<BRK/>
                                           AND STRIPPING<BRK/>
           TAI OPT=EXCAVAT               EXCAVATION<BRK/>
           TAI OPT=EMBANK                EMBANKMENT</TBL><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  <TAI OPT="EMBANK">  This guide specification provides for the installation of settlement 
gages for the determination of increases in quantities of embankment materials 
resulting from settlement of the embankment foundation during construction and 
for payment to the Contractor for such increases in quantities.  These provisions 
will be included in a project specification when it is determined that settlement 
in the range of 5 percent or more of the planned embankment height is anticipated 
over a considerable portion of the embankment foundation area.  They will also 
be used when gages are needed for engineering control purposes.  When settlement 
gages are to be used the following information will be indicated on the plans:</TAI></NPR><BRK/>
<BRK/>
<TAI OPT="EMBANK"><NPR>1.  The location of the gages as well as the stations at which zero settlement 
will be assumed.</NPR><BRK/>
<BRK/>
<NPR>2.  The detail construction of the foundation settlement gages to be used.  
Any applicable type of gage may be selected.</NPR><BRK/>
<BRK/>
<NPR>The requirements for rock as prescribed herein are intended to be used on embankments 
involving rock  fill sections.  Where rock for slope protection is specified, 
Section <SRF>35 31 19</SRF> STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES 
should be used.</NPR></TAI><BRK/>
<BRK/>
<TAI OPT="EMBANK"><NPR>Approval of testing laboratory is addressed in ER 1110-1-8100, dated 31 Dec 
1997, Laboratory Investigations and Testing.</NPR></TAI><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   [LUMP SUM] [UNIT] PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section <SRF>01 22 00.00 10</SRF> MEASUREMENT AND PAYMENT is included in the 
project specifications, this paragraph title ([LUMP SUM] [UNIT] PRICES) should 
be deleted from this section and the remaining appropriately edited subparagraphs 
below should be inserted into Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TAI OPT="CLEAR-GRUB-STRIP"><SPT><TTL>1.1.1   Clearing, Grubbing, and Stripping</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.1.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for clearing, grubbing and stripping at the contract [lump sum] [unit price] for clearing, 
grubbing and stripping.  This price shall constitute full compensation for all equipment, labor, materials and 
incidentals necessary to complete the work specified herein.  Payment for refilling of holes resulting from grubbing 
[and removal or plugging of existing drainage structures] will be included in the contract [lump sum] [unit price] 
for clearing, grubbing and stripping.  No separate or direct payment will be made for stockpiling and disposition 
of stripped materials.  All costs in connection therewith will be considered as a subsidiary obligation of the 
Contractor.  If regrowth of vegetation or trees occurs after clearing and grubbing and before placement of embankment, 
and the Contractor is required to clear and grub again prior to embankment construction, no payment will be made 
for this additional clearing and grubbing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.1.2   [Measurement </TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>Note:  If clearing, grubbing, and stripping is to be paid for with a unit price 
bid item include the method of measurement.  Delete this paragraph if payment 
is by lump sum.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Clearing, grubbing, stripping, stockpiling and the disposition of the materials from these operations[ and plugging 
or removal of existing drainage structures] will not be measured for payment.]  Refilling of grubbing holes will 
not be measured for payment.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.1.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  [lump sum] [unit price].</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EXCAVAT"><SPT><TTL>1.1.2   Excavation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If excavation will not be measured or paid for separately, select the 
following paragraph and delete subparagraphs PAYMENT, MEASUREMENT, and UNIT 
OF MEASURE.  Delete the following paragraph if excavation is to be measured 
and paid for separately.  If significant quantities of rock excavation is anticipated 
measurement and payment for rock excavation should be addressed separately.  
A definition of rock excavation should also be included.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[No separate measurement or payment will be made for Excavation.  All costs in connection with excavation will 
be considered a subsidiary obligation of the Contractor.]</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.2.1   [Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for Excavation at the contract unit price which includes full compensation for all equipment, 
labor, materials, and incidentals necessary to complete the work specified.  No separate payment will be made 
for stockpiling.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2.2   [Measurement</TTL><BRK/>
<BRK/>
<TXT>Excavation will be measured for payment by use of the average end area method.  The basis of measurement will 
be a survey of the area prior to the excavation[ and clearing and grubbing] and a second survey of the same area 
after the completion of the excavation.  For areas where lines and grades are shown on the drawings, measurement 
will be limited to those lines and grades.  Slides caused by fault of the Contractor, over excavation, and excavation 
performed for the convenience of the Contractor shall not be measured for payment.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2.3   [Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meters</MET><ENG> yards</ENG>.]</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EMBANK"><SPT><TTL>1.1.3   Fill Material</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.3.1   Payment For Embankment Fill</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for material placed as required in embankments, backfills and ramps, and including additional 
material placed by reason of foundation settlement and by reason of soft material in the foundation being forced 
outward from the section during construction, for [Embankment Material Type [____],] [Semicompacted Fill] [Uncompacted 
Fill] [Hydraulic Fill].  Payment shall constitute full compensation for furnishing all plant, labor, equipment 
and material, [except earth material, ]and performing all operations necessary for foundation preparation and 
placing and compacting the material [, materials testing,] [and moisture control].  [This payment is in addition 
to any payment for excavating and transporting of the material as required in paragraph [_____] EXCAVATION.] 
[ When directed to perform additional rolling for compaction, it will be paid for under the unit price item for 
additional rolling for compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3.2   <SUB>Measurement of Fill Material</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The last sentence of the following paragraph (in brackets) should be 
deleted if surveys are taken "after" clearing and grubbing operations.  The 
last sentence should be included if surveys are taken "prior" to clearing and 
grubbing operations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Fill materials specified for embankment will be measured for payment by the cubic<MET> meter</MET><ENG> yard</ENG>, and 
quantities will be determined by the average end area method.  The basis for measurement will be cross 
sections of the areas to be filled taken [prior to] [after] clearing, grubbing, and stripping operations 
and the [theoretical cross sections] [actual cross sections] of the embankments constructed within the 
specified tolerance[ plus additional fill placed as the result of displacement or settlement of foundation 
material as calculated below].[  Cross sections shall be performed at significant breaks in grade except 
that the maximum distance between cross sections shall not exceed [_____]<MET> meters</MET><ENG> feet</ENG>.]  Embankments 
not constructed to design grade and section including allowable tolerance as indicated on the Contractor's 
compliance survey will not be accepted.[  Volumes occupied by drainage structures will not be included 
in measurement of embankment for payment.] [ Material removed as a result of the clearing, grubbing, 
and stripping operations will not be included in measurement of embankment for payment.]</LST><BRK/>
<BRK/>
<LST>b.  The basis for measurement of fill placed by reason of soft material in the foundation being forced 
outward from the section will be a survey of the area taken prior to fill placement and a second survey 
of the same area after completion of fill placement.  The cross sections will extend [_____]<MET> meters</MET><ENG> feet</ENG>
 beyond the toes of the fills.[  A cross section will be taken at each settlement measurement location.]</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The engineer can select one of the two methods of settlement measurement 
as described below; one based on using settlement gages, and the other based 
on using core borings.  Core borings should only be used when the embankment 
material and the foundation material are easily distinguishable such that the 
interface between the embankment and foundation can be easily located.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>c.  Levee Settlement.  Measurement of additional fill material placed in each settlement measurement 
range, shown on the drawings by reason of foundation settlement, will be based on measurements [taken 
on the respective settlement gage] [obtained from the respective core borings] at the respective settlement 
measurement locations as specified and will be determined as follows:</LST><BRK/>
<BRK/>
<ITM>(1)  The settlement measured at each settlement measurement location will be considered to apply 
to the foundation area throughout the length of the settlement ranges shown on the drawings.</ITM><BRK/>
<BRK/>
<ITM>(2)  The foundation settlement under the embankment at each transverse cross section within 
a settlement range will be considered to vary uniformly between break points in the cross section.</ITM><BRK/>
<BRK/>
<ITM>(3)  At each breakpoint, the settlement allowance will be based upon the proportion that the 
specified fill height at the break point bears to the specified fill height at the settlement 
measurement locations, in accordance with the following formula.</ITM><BRK/>
<BRK/>
<ITM>(4)  Symbols used in the formula and the break points are [shown on a typical settlement cross 
section on the drawing] [included in these specifications].</ITM><BRK/>
<TBL><BRK/>
          S = h X sm/hm, where<BRK/>
<BRK/>
                 S = settlement to be computed at a break point;<BRK/>
                 h = specified gross fill height at S;<BRK/>
                 sm = measured or adjusted vertical change at settlement<BRK/>
                      measurement location ;<BRK/>
                 hm = specified gross fill height at settlement<BRK/>
                      measurement location.<BRK/></TBL>
<BRK/>
<LST>d.  Forfeiture of Payment for Settlement of Foundation.  Failure to utilize settlement gages in strict 
accordance with the specifications and drawings will result in total forfeiture of any payment which 
will otherwise be due the Contractor for settlement of the foundation.  Payment for settlement of the 
foundation will be totally forfeited for the reach attributable to the each settlement measurement location 
in each case for the following reasons: embankment over a settlement measurement location is constructed 
to a height in excess of the specified construction lines plus the tolerance permitted; settlement plates 
have been set and cannot be found after completion of the embankment; failure to take the settlement 
measurement within [_____] hours after the final cross sections have been taken over the completed embankment.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meters</MET><ENG> yards</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.4   Mortar and Concrete</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.4.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with mortar and concrete used in foundation and abutment preparation, 
which includes full compensation for furnishing all labor, equipment, material, and incidentals, and performing 
all operations necessary for placement of concrete and mortar for foundation and abutment preparation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Mortar and concrete used in filling spaces beneath rock overhangs and around protrusions will be measured for 
payment as the actual volumes of such mortar and concrete in cubic<MET> meters</MET><ENG> yards</ENG> as determined by field surveys 
made before and after placement of the mortar and concrete.[  No measurement will be made for the mortar used 
in filling the open joints and cracks in the rock surface.][  Measurement of mortar or concrete used in filling 
the open joints and cracks in the rock surface will be made by the square<MET> meter</MET><ENG> yard</ENG> based on the horizontal 
projection of the area obtained from a survey performed before application.][  Measurement of mortar or concrete 
used in filling the open joints and cracks in the rock surface will be the bags of cement used.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meters</MET><ENG> yards</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.5   [Settlement Gages</TTL><BRK/>
<BRK/>
<TXT>No separate payment will be made for furnishing, installing, and maintaining settlement gages during embankment 
construction as specified herein, if used, including measurements required to be made by the Contractor, and 
shall be at the expense of the Contractor.  No separate payment will be made for compaction of fill around and 
over the settlement gages or for interference with the Contractor's operations resulting from the settlement 
gage installations.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6   [Core Borings Utilized to Measure Foundation Settlement</TTL><BRK/>
<BRK/>
<TXT>No separate payment will be made for core borings performed for measurement of foundation settlement and shall 
be at the expense of the Contractor.]</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)</ORG><BRK/><BRK/><RID>AASHTO M 43</RID><RTL>(2005) Sizes of Aggregate for Road and Bridge Construction</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM C 33</RID><RTL>(2007) Standard Specification for Concrete Aggregates</RTL><BRK/><BRK/><RID>ASTM D 1556</RID><RTL>(2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method</RTL><BRK/><BRK/><RID>ASTM D 1557</RID><RTL>(2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)</RTL><BRK/><BRK/><RID>ASTM D 2167</RID><RTL>(2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method</RTL><BRK/><BRK/><RID>ASTM D 2216</RID><RTL>(2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass</RTL><BRK/><BRK/><RID>ASTM D 2487</RID><RTL>(2006e1) Soils for Engineering Purposes (Unified Soil Classification System)</RTL><BRK/><BRK/><RID>ASTM D 2937</RID><RTL>(2004) Density of Soil in Place by the Drive-Cylinder Method</RTL><BRK/><BRK/><RID>ASTM D 422</RID><RTL>(1963; R 2007) Particle-Size Analysis of Soils</RTL><BRK/><BRK/><RID>ASTM D 4253</RID><RTL>(2000; R 2006) Maximum Index Density and Unit Weight of Soils Using a Vibratory Table</RTL><BRK/><BRK/><RID>ASTM D 4254</RID><RTL>(2000e1; R 2006) Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density</RTL><BRK/><BRK/><RID>ASTM D 4318</RID><RTL>(2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils</RTL><BRK/><BRK/><RID>ASTM D 4643</RID><RTL>(2008) Determination of Water (Moisture) Content of Soil by the Microwave Oven Method</RTL><BRK/><BRK/><RID>ASTM D 5195</RID><RTL>(2008) Density of Soil and Rock In-Place at Depths Below the Surface by Nuclear Methods</RTL><BRK/><BRK/><RID>ASTM D 6938</RID><RTL>(2007a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)</RTL><BRK/><BRK/><RID>ASTM D 698</RID><RTL>(2007e1) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>EM 385-1-1</RID><RTL>(2008) Safety and Health Requirements Manual</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   DEFINITIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Add applicable definitions.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TAI OPT="CLEAR-GRUB-STRIP"><SPT><TTL>1.3.1   Clearing</TTL><BRK/>
<BRK/>
<TXT>Clearing consists of the removal and satisfactory disposal of all [above ground and below ground ]trees, downed 
timber, snags, slash, brush, garbage, trash, debris, fencing, and other items occurring in the designated areas 
to be cleared.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Grubbing</TTL><BRK/>
<BRK/>
<TXT>Grubbing consists of the removal and satisfactory disposal of stumps, roots larger than [_____]<MET> mm</MET><ENG> inches</ENG> in 
diameter, and matted roots from the designated grubbing areas.  Grubbing also includes filling of holes from 
the grubbing operation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Stripping</TTL><BRK/>
<BRK/>
<TXT>Stripping consists of the removal and satisfactory disposal of crops, weeds, grass, and other vegetative materials 
to the ground surface[ and topsoil to a depth of [_____]<MET> mm</MET><ENG> inches</ENG>].</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EMBANK,EXCAVAT"><SPT><TTL>1.3.4   Satisfactory Materials</TTL><BRK/>
<TAI OPT="EMBANK"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use of CH material should be avoided if possible.  As a minimum, constraints 
should be set governing their use.</NPR><BRK/>
<AST/><BRK/></NTE>
</TAI><BRK/>
<TXT>Satisfactory materials consists of materials classified in accordance with <RID>ASTM D 2487</RID> as CL,[ CH,] CL-ML, ML, 
SC, SP, SW, [_____] free from:  roots and other organic matter; contamination from hazardous, toxic or radiological 
substances; trash, debris; and  frozen materials.  Not all satisfactory materials can be used in levee.  Only 
the satisfactory materials stated above, meeting the additional or modified  requirements of paragraph TYPES 
OF FILL MATERIALS, can be used for levee construction.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EMBANK,EXCAVAT"><SPT><TTL>1.3.5   Unsatisfactory Materials</TTL><BRK/>
<BRK/>
<TXT>Unsatisfactory materials shall not be used in any levee or other required fill.  Unsatisfactory materials includes 
all other materials that are not defined above as satisfactory materials.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EMBANK"><SPT><TTL>1.3.6   Embankment</TTL><BRK/>
<BRK/>
<TXT>The terms "levee" or "embankment" as used in these specifications are defined as the earth [and rock ]fill portions 
of the levee structure or other fills related to the levee structure, including [cut-off trench] and includes 
all types of earth fill [and filter materials ]for the levee [and cut-off trench,] and all other fills within 
the limits of the levee [, excepting those stone and filter materials used for slope protection, which are described 
in paragraph [_____]].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.7   Backfill </TTL><BRK/>
<BRK/>
<TXT>Backfill as used in this section is defined as that fill material which cannot be placed around or adjacent to 
a structure until the structure is completed or until a specified time interval has elapsed after completion.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.8   Excavation </TTL><BRK/>
<BRK/>
<TXT>Excavation consists of removal of material to the lines and grades shown on the drawings, or as otherwise directed 
or approved by the Contracting Officer and as described in paragraph [_____] EXCAVATION in PART 3 EXECUTION.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.9   Classification of Soils</TTL><BRK/>
<BRK/>
<TXT>Materials used to construct the embankments and for backfills shall be classified in accordance with <RID>ASTM D 2487</RID>
 (Unified Soil Classification System).  Cohesionless materials include materials classified in <RID>ASTM D 2487</RID> as 
GW, GP, SW, and SP.  Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH.  Materials 
classified as GM and SM will be identified as cohesionless only when the fines are nonplastic.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.10   Degree of Compaction</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.10.1   Cohesive Material</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>Note:  If a higher compactive effort than is attainable by ASTM D 698 is desired, 
ASTM D 1557 may be utilized and references to ASTM D 698, relative to compactive 
effort, should be changed to ASTM D 1557.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented 
in [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>], abbreviated hereinafter as percent laboratory maximum density.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.10.2   Cohesionless Material</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>Note:  Factors such as (but not limited to) site specific materials, availability 
of testing equipment and local practice may make it more practical to utilize 
methods other than ASTM D 4253 and ASTM D 4254 to control the degree of compaction 
of cohesionless material.  If other methods are utilized the appropriate sections 
of the specifications should be modified to reflect method selected.  The other 
methods used include comparison of in-place density to either the maximum Proctor 
density or the maximum density obtained by ASTM 4253 (if vibratory table is 
available).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Degree of compaction is expressed as a percentage of the relative density in accordance with <RID>ASTM D 4253</RID> and <RID>
ASTM D 4254</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI></SPT><SPT><TTL>1.4   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<TXT>The work covered by this section consists of furnishing all equipment, labor, materials, and incidentals, and 
performing all operations necessary for<TAI OPT="CLEAR-GRUB-STRIP"> the clearing, grubbing, and stripping of the areas specified herein or 
indicated on the drawings, and for the removal and disposal of cleared, grubbed, and stripped materials,[ removal 
or plugging of existing drainage structures,] and refilling of holes resulting from grubbing;</TAI><TAI OPT="EXCAVAT"> excavation of borrow 
areas [and existing levees,] and for all other excavations incidental to the construction of levees[, channels] 
[, ditches] [, structures] [, and ponding areas] as specified and shown;</TAI><TAI OPT="EMBANK"> foundation preparation and the construction 
of levee embankments, including new levee, enlargement of existing levee, backfill of inspection trenches, cutoff 
trenches, berms, road crossings, backfill at drainage structures, and other incidental earthwork as may be necessary 
to complete the levee as specified herein and as shown on the drawings.</TAI>  All work under this section shall comply 
with the requirements of <RID>EM 385-1-1</RID>.</TXT><BRK/>
<BRK/>
<TAI OPT="EMBANK"><SPT><TTL>1.4.1   <SUB>Embankment and Backfill Materials</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  All available sources of materials for embankment and backfill should 
be designated.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Materials for embankment and backfill construction will be obtained from [the borrow sources] [sources provided 
by the Contractor] [required excavation].  Materials obtained from required excavation which meet or which can 
be processed to meet the requirements for each embankment material, or any other material required for this project, 
as specified herein, may be utilized [in the appropriate zone of] [in] the embankment or as backfill.  All roots, 
limbs, and wood fragments shall be removed from embankment materials.  Materials containing sod, other organic 
or perishable material, trash, debris, and frozen materials shall not be used in the embankment.  Submit to the 
Contracting Officer the source or sources intended to provide materials for embankment construction.  If a source 
is selected other than a commercial quarry or other commercial entity from which earth or rock material will 
be directly purchased and where the Contractor or his subcontractor will perform the borrow excavation, a written 
statement will be provided to the Contracting Officer indicating permission to utilize the area.  It is the Contractor's 
responsibility to obtain Federal, State, and local permits which may be required for excavation and reclamation 
of the borrow area.  A copy of the plan and procedures to be utilized for reclamation shall be furnished to the 
Contracting Officer as required in Section [_____], paragraph [_____].  The Contracting Officer will require 
material samples from any proposed borrow source to be submitted as indicated in paragraph Quality Control.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   Haul Roads</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Haul roads are highly project specific.  Contractor should be given as 
much latitude as feasible to determine his traffic patterns.  Haul roads must 
be safe, not interfere with public traffic, environmentally friendly and generally 
must be restored to preconstruction conditions.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Haul roads shall be located and constructed [as shown on the drawings and] [as] [approved by the Contracting 
Officer] [within the project boundaries shown on the drawings].[  Prior to the commencement of construction submit 
for approval a site plan detailing the location of all haul roads within the project limits.] [ Haul road[s] 
between the borrow site[s] and the levee embankment shall be located within the limits [shown on the drawings] 
[approved by the Contracting Officer].] [ The limits of the borrow haul road shall be clearly marked in the field 
using construction fencing or similar methods approved by the Contracting Officer.  Areas on each side of the 
borrow haul road corridor shall not be disturbed.]  Haul roads shall be constructed to maintain the intended 
traffic, be free draining, and be maintained in good condition throughout the contract period.[  Any haul road 
which crosses any creek or drainage channel shall be constructed, and maintained so as to not flood either upstream 
areas by restricting stream flows or flood downstream areas by the release of any stored water in the event that 
the crossing fails for any cause.]  Haul roads constructed during the contract duration shall be removed after 
work is completed and the impacted area restored to its preconstruction conditions.[  Plow and/or scarify or 
otherwise loosen all access and haul roads other than existing roads to a minimum of [_____]<MET> mm</MET><ENG> inches</ENG> deep and 
the surface shall be left in a smooth condition.]  All haul roads within the right-of-way that will remain as 
public thoroughfares after construction shall be cleaned daily and maintained in the preconstruction condition.  
All costs associated with these haul roads shall be considered as a subsidiary obligation of the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.3   Ramps and Crossings</TTL><BRK/>
<BRK/>
<TXT>Ramps and crossings shall be constructed at the locations shown on the drawings by placement of a fill as specified 
in paragraph [_____].  Ramps and crossings shall be constructed only by adding material to the levee crown and 
slopes.  Ramps shall have a [_____]<MET> meter</MET><ENG> foot</ENG> crown width, a grade not to exceed [_____] percent, and 1V on 
[_____]H side slopes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.4   Runways</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Runways are temporary haul roads over a levee.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Where material is hauled over an existing levee for construction, the Contractor, at no extra cost, will be permitted 
to construct temporary runways over the levee by the addition of material to the levee cross section.  For the 
construction of runways, if the Contractor so desires, the existing levee may be cut, [but not to exceed a depth 
of [_____]<MET> meters</MET><ENG> feet</ENG> below the crown] [not to exceed [_____]<MET> meters</MET><ENG> feet</ENG> below the project flowline] [or 100-year 
level] [not to excavate below elevation [_____] or one half the height of the levee, whichever is less], and 
provided that the cut is made with side slopes not steeper than 1V on 1H, and with a minimum width of haul road 
of<MET> [_____] [7.6] m</MET><ENG> [_____] [25] feet</ENG> for one-way traffic, and<MET> [_____] [18.3] m</MET><ENG> [_____] [60] feet</ENG> for two-way 
traffic.  Cutting into the existing levee at intervals of less than<MET> [_____] [152] m</MET><ENG> [_____] [500] linear feet</ENG>
 for the<MET> [_____] [7.6]-m</MET><ENG> [_____] [25]-foot</ENG> bottom widths or less than<MET> [_____] [304] m</MET><ENG> [_____] [1,000] linear 
feet</ENG> for the<MET> [_____] [18.3]-m</MET><ENG> [_____] [60]-foot</ENG> bottom  widths will not be allowed, and no more than [_____] 
runways shall be open at one time.  Stockpile, as directed by the Contracting Officer, sufficient suitable levee 
embankment material to construct emergency closure of the cuts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.5   Closure of Runways</TTL><BRK/>
<BRK/>
<TXT>Where runways have been cut through the levee, the Contracting Officer reserves the right to order their closure 
at no additional cost to the Government at any time that such runways may endanger the security of the levee.  
Just prior to restoration of the runway, the bottom of any cut made in the levee shall be broken to a depth of<MET>
 [_____] [300] mm</MET><ENG> [_____] [6] inches</ENG> and the side slopes thoroughly scarified.  The restoration shall be made 
with suitable embankment material, placed and compacted as provided in paragraph [_____].  Material used in the 
construction of the approach ramps of the runways shall be removed and may be used for fill, if satisfactory.  
If not used for fill, the material shall be disposed of by placing it in abandoned portions of the borrow areas 
or by any other method specified in paragraph disposal of material.[  No section of the levee shall be degraded 
or weakened to provide runways nor shall existing runways remain open during the nonwork season described in 
[Section <SRF>[_____]</SRF>] [GENERAL CONTRACT REQUIREMENTS], [paragraph] [Clause] EXCLUSION OF PERIODS IN COMPUTING COMPLETION 
SCHEDULES, unless otherwise approved in writing by the Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.6   Stockpiling</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Cost of stockpiling embankment fill material should be included in the 
price for placing fill in the levee embankment.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Any on-site stockpiling of embankment materials shall be in accordance with paragraph [_____] Stockpiles.[  No 
payment will be made for such stockpiling nor for the reloading and hauling of these materials to their final 
position.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.7   Slides and Foundation Failures</TTL><BRK/>
<BRK/>
<TXT>When sliding occurs in any part of the embankment and backfills prescribed in this section after they have been 
placed, but prior to final acceptance of all work under the contract, repair the slide as directed by the Contracting 
Officer.  When the slide is caused through the fault of the Contractor, the repair shall be made at no cost to 
the Government.  When the slide is not the fault of the Contractor, an equitable adjustment in the contract price 
shall be made pursuant to the Contract Clause CHANGES to cover the cost of the repairs.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.8   <SUB>Drainage Requirements</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify the following paragraph for specific job conditions such as fill 
placed in/under water.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Do not block or restrict the flow in a natural drain, existing culvert, ditch or channel at any time without 
obtaining prior written approval from the Contracting Officer.  This approval will not relieve the Contractor 
from responsibility for any damage caused by the operation.  Monitor the [river] [canal] [stream] flow and provide 
sufficient free discharge areas so that conditions are not worsened upstream or downstream by possible floods 
during construction.  Surface water shall be directed away from excavations and construction sites so as to prevent 
erosion and undermining of foundations.  Diversion ditches, dikes, and grading shall be provided and maintained 
as necessary during construction.  Excavated slopes and backfill surfaces shall be protected to prevent erosion 
and sloughing.  Excavation shall be performed so that the site and the area immediately surrounding the site 
and affecting operations at the site shall be continually and effectively drained.  If private property is to 
be used for drainage, submit written evidence that the right has been obtained from the property owner for drainage 
on his property.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>1.5   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<TAI OPT="EXCAVAT"><LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Drainage Requirements</SUB></ITM><BRK/>
<BRK/>
<ITM>  Written evidence consisting of an authenticated copy of the [conveyance] [easement] under 
which the Contractor acquired the property rights and access thereto, prepared and executed 
in accordance with applicable State and local requirements.</ITM></TAI><BRK/>
<BRK/>
<TAI OPT="EMBANK,EXCAVAT"><LST><SUB>SD-03 Product Data</SUB></LST></TAI><BRK/>
<BRK/>
<TAI OPT="EXCAVAT"><ITM><SUB>Shoring, Sheeting, and Bracing</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Add applicable minimum requirements for the shoring, sheeting and bracing 
plan based upon site specific conditions.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>  A detailed shoring, sheeting and bracing plan [_____] days prior to the beginning of any excavation 
so supported.  The plan for shoring, sheeting and bracing shall be prepared and certified by 
licensed professional engineer.  Include in the plan drawings and design computations of the 
proposed shoring, sheeting, and bracing, and documentation, showing details of the coordination 
and approval of shoring, sheeting, and bracing by the applicable parties.  Approval of the detailed 
plan shall be obtained from the Contracting Officer prior to starting the work.  If necessary, 
modify the plan as required to meet field conditions, and the modifications shall be approved 
prior to use.</ITM><BRK/>
<BRK/>
<ITM><SUB>Excavation</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A written excavation plan [_____] days prior to the beginning of any excavation.  Approval 
of the detailed plan shall be obtained from the Contracting Officer prior to starting the work.  
If necessary, modify the plan as required to meet field conditions, and the modifications shall 
be approved prior to use.  As a minimum, the plan shall contain, the following:</ITM><BRK/>
<BRK/>
<ITM>a.  Proposed methods for preventing interference with, or damage to, existing underground or 
overhead utility lines, trees designated to remain and other man-made facilities or natural 
features designated to remain within or adjacent to the construction rights-of-way.</ITM><BRK/>
<BRK/>
<ITM>b.  Provision for coordinating the work with other Contractors working in the construction rights-of-way 
or on facilities crossing or adjacent to this work.</ITM><BRK/>
<BRK/>
<ITM>c.  The proposed methods for controlling surface and ground water in the borrow areas and required 
excavations.</ITM><BRK/>
<BRK/>
<ITM>d. Stockpiling plan for embankment material before it is transported to the project site showing 
locations, stockpile heights, slopes, limits, and drainage around the stockpile areas.</ITM><BRK/>
<BRK/>
<ITM>e.  A complete listing of equipment used for excavation and to transport the excavated material.</ITM><BRK/>
<BRK/>
<ITM>f.  The proposed sequence of work for excavating the borrow areas with plan and cross sectional 
views showing starting and final work locations and clearing, grubbing and stripping limits.</ITM><BRK/>
<BRK/>
<ITM>g.  The proposals for conserving arable land and for making optimum use of available borrow, 
including the Contractor's proposed methods for grading the bottom of the borrow areas after 
completing use of the borrow areas.</ITM><BRK/>
<BRK/>
<ITM>h.  The proposed road pattern, and plan for implementing dust control measures.</ITM><BRK/>
<BRK/>
<ITM><SUB>Borrow Areas</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A written statement to the Government not later than [_____] days after receipt of Notice 
to Proceed indicating the Contractor's intention to use the specified Government-furnished borrow 
area(s), Contractor-furnished borrow area(s), dredged borrow areas, or a combination of these 
borrow areas.</ITM></TAI><BRK/>
<BRK/>
<TAI OPT="EMBANK"><ITM><SUB>Plan of Operations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tie this back to Section <SRF>01 45 01</SRF> USACE QUALITY CONTROL requirement for 
inspection and validation of CQC laboratories by the government.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>  Thirty (30) days prior to commencement of haul road construction or placing embankment and 
backfill which ever is earlier, submit for approval a Plan of Operations for accomplishing all 
embankment and backfill construction and for the location and construction of haul roads.  This 
plan shall include, but not be limited to, the proposed sequence of construction for embankment 
and backfill items, and methods and types of equipment to be utilized for all embankment and 
backfill operations, including transporting, placing, and compaction.  This plan shall also 
include the names and addresses of the [commercial testing labs] [engineering firms] which will 
perform the soil testing and inspection and describe how all required soils testing will be 
performed.</ITM><BRK/>
<BRK/>
<ITM>[<SUB>Embankment and Backfill Materials</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>.<BRK/>
<BRK/>
<ITM>  At least [30] [_____] days prior to delivery of any Contractor-furnished material to the site 
of the work, submit soil classification test results, moisture-density curves, gradation curves, 
and laboratory results of the required tests of the proposed material.]</ITM><BRK/>
<BRK/>
<ITM>[<SUB>Filter Sand</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  At least [30] [_____] days prior to delivery of any Contractor-furnished material to the site 
of the work, submit soil classification test results and a gradation curve for each of the proposed 
filter materials to be used.]</ITM><BRK/>
<BRK/>
<ITM>[<SUB>Nuclear Density</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Use nuclear density testing equipment in accordance with <RID>ASTM D 6938</RID>.  In addition, the following 
condition shall apply:</ITM><BRK/>
<BRK/>
<ITM>a.  Prior to using the nuclear density testing equipment on the site, submit to the Contracting 
Officer a certification that the operator has completed a training course approved by the nuclear 
density testing equipment manufacturer[, the most recent data sheet from the manufacturer's 
calibration, and a copy of the most recent statistical check of the standard count precision].</ITM><BRK/>
<BRK/>
<ITM>b.  The nuclear density testing equipment shall be capable of extending a probe a minimum of<MET>
 150 mm</MET><ENG> 6 inches</ENG> down into a hole.]</ITM><BRK/>
<BRK/></TAI>
<TAI OPT="EXCAVAT"><LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Measurement of Fill Material</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A copy of the records of each compliance survey the next work day following the survey.</ITM></TAI><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   REGULATORY REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the applicable state highway department document title in which 
an acceptable gradation for the concrete aggregate is presented.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The [state statutory and regulatory requirements] [_____] listed below form a part of this specification to the 
extent referenced.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   PERMITS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Reference applicable Federal, State and Local permit requirements such 
as permits for disposal and hauling of materials, erosion control, burning, 
etc.  The terms and conditions in any permits and environmental commitments 
obtained by the Government must be made a part of the contract.  The designer 
must include technical requirements necessary to comply with these terms and 
commitments.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In accordance with Contract Clause PERMITS AND RESPONSIBILITIES, obtain all necessary permits required for disposal, 
hauling, erosion control, burning, [_____], and pay all fees associated with permitting and compliance.[  In 
addition, the Government has obtained permits for storm water discharge[ and [_____]],as specified in Section 
<SRF>01 57 23</SRF> TEMPORARY STORM WATER POLLUTION CONTROL.  Comply with the terms of these permits and with the requirements 
of Sections <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION, Section <SRF>01 57 23</SRF> TEMPORARY STORM WATER POLLUTION CONTROL, 
and this section.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8   PROJECT SITE CONDITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.1   Protection of Cultural and Natural Resources</TTL><BRK/>
<BRK/>
<TXT>All work and operations shall comply with the requirements of Section <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION 
and with the requirements of this section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TAI OPT="CLEAR-GRUB-STRIP,EXCAVAT"><TTL>1.8.2   Protection of Man-Made Facilities and Natural Features</TTL></TAI><BRK/>
<BRK/>
<TXT><TAI OPT="CLEAR-GRUB-STRIP">Trees within the clearing area shall be felled in such a manner as to avoid damage to trees left standing and 
trees outside the clearing area, existing buildings, man-made facilities and natural features, with due regard 
to the safety of employees and others, and in compliance with <RID>EM 385-1-1</RID>.  </TAI><TAI OPT="EXCAVAT">Excavation shall follow the same requirements 
specified above for felling trees and shall be in compliance with <RID>EM 385-1-1</RID>.  Existing utility lines that are 
shown on the drawings or the locations of which are made known to the Contractor prior to excavation and that 
are to be retained shall be protected from damage during excavation.  When utility lines that are to be removed 
are encountered within the area of operations, notify the applicable utility companies in sufficient time for 
measures to be taken to prevent interruption of the services.</TAI></TXT><BRK/>
<BRK/></SPT>
<TAI OPT="CLEAR-GRUB-STRIP"><SPT><TTL>1.8.3   Historical, Archeological, and Cultural Resources</TTL><BRK/>
<BRK/>
<TXT>Historical, archeological, and cultural resources within the Contractor's work limits [are known to exist] [may 
exist].  If, during construction activities, the Contractor observes items that may have historical or archeological 
value, such observations shall be reported immediately to the Contracting Officer so that appropriate authorities 
may be notified and a determination made as to their significance and what, if any, special disposition of the 
finds should be made.  Cease all activities that may result in the destruction of these resources and prevent 
the workers from trespassing on or otherwise damaging such resources.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EXCAVAT"><SPT><TTL>1.8.4   Subsurface Data</TTL><BRK/>
<BRK/>
<TXT>Subsurface soil boring logs are [shown on the drawings] [included in these specifications].  Subsurface investigation 
reports and samples of materials obtained from subsurface investigations may be examined at the [_____] District 
Office.  These data represent subsurface information at the boring locations; however, variations may exist in 
the subsurface between boring locations.  Groundwater levels indicated on the soil boring logs were levels found 
at the time of exploration.  The groundwater table can vary significantly depending on time of year, variation 
from normal precipitation, and river stage or tide level.</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><TAI OPT="CLEAR-GRUB-STRIP"><SPT><TTL>1.9   MERCHANTABLE TIMBER</TTL><BRK/>
<BRK/>
<TXT>Merchantable timber remaining within the areas to be cleared on or after the date of award of this contract may 
be disposed of as the Contractor sees fit, as long as such merchantable timber is either removed from the rights-of-way 
or is satisfactorily disposed of in accordance with the paragraph DISPOSITION OF CLEARED, GRUBBED, AND STRIPPED 
MATERIAL<TAI OPT="EXCAVAT"> DISPOSITION OF EXCAVATED MATERIAL </TAI>and the Contractor complies with all applicable State and local regulations 
and laws.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.10   SEQUENCING</TTL><BRK/>
<BRK/>
<SPT><TTL>1.10.1   Clearing and Grubbing</TTL><BRK/>
<BRK/>
<TXT>All clearing and grubbing work shall be completed at least<MET> [100] [_____] meters</MET><ENG> [300][_____] feet</ENG> in advance 
of embankment construction.[  In locations where work on drainage structures is performed prior to embankment 
construction, all clearing and grubbing shall be completed for the structure at least [_____]<MET> meters</MET><ENG> feet</ENG> on 
each side of the structure, measured along the levee centerline and [_____]<MET> meters</MET><ENG> feet</ENG> perpendicular to the 
structure.]  If regrowth of vegetation or trees occurs after clearing and grubbing and before placement of embankment, 
the Contractor will be required to clear and grub again prior to embankment construction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.10.2   Stripping</TTL><BRK/>
<BRK/>
<TXT>After inspection and acceptance of cleared and grubbed areas, stripping may proceed.  All stripping work shall 
be completed not more than [_____]<MET> meters</MET><ENG> feet</ENG> in advance of embankment construction.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  <TAI OPT="CLEAR-GRUB-STRIP,EXCAVAT">After "PART 2 PRODUCTS" above, insert the following "(NOT APPLICABLE)", 
if there are no subparagraphs in PART 2.</TAI>  <TAI OPT="EMBANK">PART 2 material requirements should 
be added for contracts in which the Contractor is required to supply materials.</TAI></NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TAI OPT="EXCAVAT"><SPT><TTL>2.1   HAUL ROAD MATERIALS</TTL><BRK/>
<BRK/>
<TXT>[_____].</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EMBANK"><SPT><TTL>2.2   TYPES OF FILL MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE 1:  The types of fill materials used for levee construction usually depend 
on the availability of materials from required construction excavation and the 
nearby borrow sources.  The material types listed below as satisfactory materials 
are often used in levee construction.</NPR><BRK/>
<BRK/>
<NPR>2:  Separate paragraphs, such as those below, should be included for each material 
type that is to be placed under a contract.  The plans should clearly show, 
with labels, the location of the fill types.  Embankment fills should include, 
but not be limited to, the levee, berms, inspection trench, cutoff trenches 
and any other specified fill.  This allows the Designer and Specifications Engineer 
to use multiple fill types within the same contract and clearly indicate locations 
of each type.  The types of satisfactory materials should be edited for each 
type of fill.  The bid schedule should include a line for each type of fill.  
Where multiple fills are placed in layers, the measurement, payment and tolerance 
paragraphs should be edited to specify the interfaces of the multiple fill types.</NPR><BRK/>
<BRK/>
<NPR>Omit the following soil types which are not applicable to the specific project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.2.1   [Select Fill</TTL><BRK/>
<BRK/>
<TXT>Select fill embankment material shall be obtained from [the borrow site provided by the Government] [sources 
provided by the Contractor] [required excavation].  The select fill material shall consist of satisfactory materials 
classified in accordance with <RID>ASTM D 2487</RID> as [_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   [Impervious Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Caution should be exercised regarding the use of high plasticity clay 
and silt (CH, MH) soils with Plasticity Indices greater than about 40 (30 in 
dry climates and 50 in humid climates).  Spreading and compacting CH or MH materials 
can also present constructability problems due to difficulty maintaining proper 
moisture content.  These soils are susceptible to shrinkage and cracking upon 
drying.  Seasonal cycles of swelling and shrinkage can also result in loss of 
shear strength, which may ultimately result in slope instability.  Chemical 
treatment, such as lime, has been used to reduce the PI and potential for cracking.</NPR><BRK/>
<BRK/>
<NPR>Impervious Fill material shall not be compacted using vibratory rollers.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This material shall consist of satisfactory impervious material classified as lean clay (CL),[ fat clay (CH),] 
low plasticity silt (ML),[ high plasticity silt (MH),] [sand containing more than 30 percent of clay (CL),] and 
borderline clay and silt (CL-ML) in accordance with <RID>ASTM D 2487</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   [Pervious Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer should define the types of material which are acceptable 
as Random Fill.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This material shall consist of satisfactory pervious material classified as well graded sand (SW), poorly graded 
sand (SP) in accordance with <RID>ASTM D 2487</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4   [Random Fill</TTL><BRK/>
<BRK/>
<TXT>Random fill shall consist of any satisfactory  materials[ other than those classified in <RID>ASTM D 2487</RID> as [_____]] 
[and any silt or sand with a uniformity coefficient (Cu) less than 6].[  Random fill may consist of select fill, 
impervious fill, and pervious fill, or a combination of them.]]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.5   Random Rock</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Random rock is sometimes used in levee construction to build up an underwater 
levee toe foundation or to buttress a slope in a constricted area.  Due to its 
high permeability, random rock or pervious fill should not be used alone as 
levee fill material.  The designer should select the types of acceptable rock 
material and the maximum allowable percent fines.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Random rock shall consist primarily of [_____] (shale, siltstone, sandstone, granite or limestone) obtained from 
a source provided by the Contractor.  The random rock shall be free of silt, clay, or other earth material in 
quantities greater than [_____] [5] percent by weight, and shall contain no debris or organic material.  Random 
rock shall be reasonably well-graded and the largest stones shall have a maximum dimension not exceeding<MET> [_____] 
[450] mm</MET><ENG> [_____] [18] inches</ENG>.  Rock production at the source shall be controlled such that not more than 20 percent 
of the material has a maximum dimension between adjacent earth fill shall be choked off with a layer of finer 
random rock material.  Random rock placed within<MET> 1 meter</MET><ENG> 3 feet</ENG> of any structure shall have a maximum size of<MET>
 125 mm</MET><ENG> 5 inches</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.6   [Coarse Drainage Gravel</TTL><BRK/>
<BRK/>
<TXT>Coarse gravel material for the [rectangular and trapezoidal] toe drains shall be obtained from a source provided 
by the Contractor.  Coarse drainage gravel shall be non-calcareous, composed of tough durable particles, and 
shall not contain any organic material or soft, friable particles in quantities.  Blast furnace slag will not 
be permitted.  The gravel material in-place shall meet the requirements of <RID>AASHTO M 43</RID>, Size No. 57, with the 
following gradation:</TXT><BRK/>
<TBL><THD><BRK/>
                     SIEVE SIZE                PERCENTAGE BY<BRK/>
                     U.S. STANDARD             WEIGHT PASSING<BRK/>
                     SQUARE MESH               INDIVIDUAL SIEVE<BRK/></THD>
<BRK/>
                     [_____] (1-1/2 inches)    [_____] (100)<BRK/>
                     [_____] (1 - inch )       [_____] (95-100)<BRK/>
                     [_____] (1/2 - inch)      [_____] (25-60)<BRK/>
                     [_____] (No. 4)           [_____] (0-10)<BRK/>
                     [_____] (No. 8)           [_____] (0-5)]<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>2.2.7   [Fine Drainage Gravel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Identify source of materials.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fine drainage gravel shall be obtained from a source [provided by the Contractor].  Fine drainage gravel material 
shall be non-calcareous, composed of tough durable particles, and shall not contain organic material.  The fine 
drainage gravel in-place shall meet the requirements of <RID>AASHTO M 43</RID>, Size No. 8, with the following gradation:</TXT><BRK/>
<TBL><THD><BRK/>
                     SIEVE SIZE                PERCENTAGE BY<BRK/>
                     U.S. STANDARD             WEIGHT PASSING<BRK/>
                     SQUARE MESH               INDIVIDUAL SIEVE<BRK/></THD>
<BRK/>
                     [_____] (1/2-inch)        [_____] (100)<BRK/>
                     [_____] (3/8-inch)        [_____] (85-100)<BRK/>
                     [_____] (No. 4)           [_____] (10-30)<BRK/>
                     [_____] (No. 8)           [_____] (0-10)<BRK/>
                     [_____] (No. 16)          [_____] (0-5)]<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>2.2.8   [<SUB>Filter Sand</SUB></TTL><BRK/>
<BRK/>
<TXT>Fine aggregate for the filter sand in-place shall meet the quality requirements of <RID>ASTM C 33</RID> grading for fine 
aggregate with additional limits on the allowable percentage passing the No. 200 sieve as specified below.</TXT><BRK/>
<TBL><THD><BRK/>
                     SIEVE SIZE                PERCENTAGE BY<BRK/>
                     U.S. STANDARD             WEIGHT PASSING<BRK/>
                     SQUARE MESH               INDIVIDUAL SIEVE<BRK/></THD>
<BRK/>
                     [_____] (3/8-inch)        [_____] (100)<BRK/>
                     [_____] (No. 4)           [_____] (95-100)<BRK/>
                     [_____] (No. 16)          [_____] (50-85)<BRK/>
                     [_____] (No. 100)         [_____] (2-10)<BRK/>
                     [_____] (No. 200)         [_____] (0-5)<BRK/></TBL>
<BRK/>
<TXT>Additionally, the filter sand shall not contain any organic matter or soft friable particles.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.9   [Bedding</TTL><BRK/>
<BRK/>
<TXT>Bedding material, placed as a backing layer shall consist of satisfactory pervious fill material satisfying the 
material requirements presented in [Section <SRF>31 36 00</SRF> WIRE MESH GABIONS [AND MATTRESSES]] and [Section 
<SRF>35 31 19</SRF> STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.10   [Topsoil</TTL><BRK/>
<BRK/>
<TXT>Topsoil consists of organic soil and shall be placed on the levee slopes as shown on the contract drawings and 
as specified in Section [<SRF>32 92 23</SRF> SODDING] [_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.11   [Semicompacted Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer should list the material types that are acceptable for semicompacted 
fill, which can be defined in terms of previously defined fill types or basic 
material types.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Material for semicompacted fill shall consist of satisfactory materials classified in accordance with <RID>ASTM D 2487</RID>
 as [_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.12   [Uncompacted Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer should list the material types that are acceptable for uncompacted 
fill, which can be defined in terms of previously defined fill types or basic 
material types.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Material for uncompacted fill shall consist of satisfactory materials classified in accordance with <RID>ASTM D 2487</RID>
 as [_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.13   [Hydraulic Fill for Berms and Depressed Areas</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Caution should be used when specifying hydraulic fill.  Hydraulic fill 
is to be used only in stability berms, pit fills, and seepage berms.  Hydraulic 
fill will normally not be used in construction for levee embankment.  In addition 
to requiring a large levee footprint, the levee embankment constructed by hydraulic 
fill is susceptible to soil liquefaction, and excessive seepage.  Hydraulic 
fill also erodes quickly in a situation where a levee is overtopped or where 
an impervious covering is penetrated.  See the appropriate Engineering Manuals 
for further guidance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fill shown on the drawings as hydraulic fill shall be placed by hydraulic methods in accordance with the <SUB>plan 
of operations</SUB> approved by the Contracting Officer.  The dredged material shall have, as placed, not less than 
[_____] percent by weight passing U.S. Standard Sieve No. [_____] and not less than [_____] percent by weight 
passing a U.S. Standard Sieve No. [_____].]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   [MANUFACTURED PRODUCTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Add applicable requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   GROUTS AND DENTAL CONCRETE</TTL><BRK/>
<BRK/>
<TXT>Grouts and dental concrete shall be as specified in concrete Section [_____], except that the slump shall be 
[_____]<MET> mm</MET><ENG> inches</ENG> for dental concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   [STABILIZERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Add applicable requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   SETTLEMENT GAGES</TTL><BRK/>
<BRK/>
<TXT>Settlement gages shall be as shown.</TXT><BRK/>
<BRK/></SPT>
</TAI></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<TAI OPT="EMBANK"><SPT><TTL>3.1   CONSTRUCTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Lines and Grades</TTL><BRK/>
<BRK/>
<TXT>The embankment and backfill shall be constructed to the lines, grades, and cross sections indicated on the drawings, 
unless otherwise directed by the Contracting Officer.  The Government reserves the right to increase or decrease 
the foundation widths and embankment slopes or to make such other changes in the embankment or backfill sections 
as may be deemed necessary to produce a safe structure.  Changes in quantities resulting from such revisions 
will not constitute justification for change in contract unit prices, except as provided for in the Variations 
in Estimated Quantities Clause.  Increases in height of section, made to compensate for settlement or consolidation 
of the embankment material subsequent to the completion of the embankment, will not exceed [_____] percent of 
the height above the foundation at the levee centerline indicated.  The end slopes and side slopes of partial 
fill sections shall not be steeper than [one vertical on [____] horizontal] [, unless otherwise shown on the 
drawings].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Conduct of the Work</TTL><BRK/>
<BRK/>
<TXT>Maintain and protect the embankment and backfill in a satisfactory condition at all times until final completion 
and acceptance of all work under the Contract.[  If, in the opinion of the Contracting Officer, the hauling equipment 
causes horizontal shear planes or slicken sides, rutting, quaking, heaving, cracking, or excessive deformation 
of the embankment or backfill, limit the type, load, or travel speed of the hauling equipment on the embankment 
or backfill.]  The Contractor may be required to remove, at no additional payment, any embankment material placed 
outside of prescribed slope lines.  Any approved embankment or backfill material which is lost in transit or 
rendered unsuitable after being placed in the embankment or backfill and before final acceptance of the work 
shall be replaced in a satisfactory manner and no additional payment will be made therefor.  Excavate and remove 
from the embankment or backfill any material which is unsatisfactory, dispose of such material, and refill the 
excavated area as directed, all at no cost to the Government.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="CLEAR-GRUB-STRIP"><SPT><TTL>3.2   CLEARING</TTL><BRK/>
<BRK/>
<TXT>Clearing shall be accomplished within the limits of existing ground to receive embankment [and structures], together 
with strips<MET> [1.5] [_____] meters</MET><ENG> [5] [_____] feet</ENG> wide, beyond and contiguous thereto, existing levees to be 
degraded, ponding areas, ditches, structures, traverses, channels, riprap, revetment, borrow areas and ramps.  
Trees, downed timber, snags, slash, brush, garbage, trash, debris, fencing and other items shall be cleared [[_____]<MET>
 mm</MET><ENG> inches</ENG> above] [flush with] the existing ground surface.  Trees and vegetation designated to be left standing 
or to remain shall be protected from damage from construction operations.  Clearing of borrow areas shall be 
limited to the minimum area required for construction operations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   GRUBBING</TTL><BRK/>
<BRK/>
<TXT>Grubbing shall be accomplished within the limits of existing ground to receive embankment [and structures], together 
with strips<MET> [1.5] [_____] meters</MET><ENG> [5] [_____] feet</ENG> wide, beyond and contiguous thereto, existing levees to be 
degraded, ponding areas, ditches, structures, traverses, channels, riprap, revetment, borrow areas and ramps.  
Grubbing shall be accomplished to a depth of at least<MET> [1] [_____] m</MET><ENG> [3] [_____] feet</ENG> below the existing ground 
surface.  All holes caused by grubbing operations and removal of pipes and drains, excluding holes in borrow 
areas, channels and ditches [above required grade], shall be filled with satisfactory material as specified in 
paragraph [_____].  This material shall be placed in [_____]<MET> mm</MET><ENG> inch</ENG> layers to the elevation of the adjacent 
ground surface and each layer compacted to a density at least equal to that of the adjoining undisturbed material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   STRIPPING</TTL><BRK/>
<BRK/>
<TXT>  The entire area within the limits of existing ground to receive embankment and structures, together with strips<MET>
 [1.5] [_____] meters</MET><ENG> [5] [_____] feet</ENG> wide, beyond and contiguous thereto, existing levees to be degraded, ponding 
areas, and ditches [shown on the drawing shall be stripped to remove crops, weeds, grass, and other vegetative 
materials to the ground surface [and topsoil to a depth of [_____]<MET> mm</MET><ENG> inches</ENG>]].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   DISPOSITION OF CLEARED, GRUBBED, AND STRIPPED MATERIAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete undesirable options for Disposition of Cleared, Grubbed, and Stripped 
Materials.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified or indicated on the drawings, all materials resulting from clearing and grubbing 
operations shall, at the Contractor's option, be disposed of either by windrowing or stockpiling within construction 
limits, burying within construction limits, burning, chipping, removal from the site, or a combination thereof.  
In no case shall any material resulting form clearing and grubbing operations be buried or permanently placed 
within the levee foundation or any structural foundation.  Make a reasonable effort to channel merchantable material 
into the commercial market and to make beneficial use of the materials resulting from clearing and grubbing.  
[The topsoil material resulting from the stripping operations shall be temporarily stockpiled within the rights-of-way.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Windrows</TTL><BRK/>
<BRK/>
<TXT>Cleared, grubbed and stripped material shall be placed [as shown on the drawings] in a neat windrow or in piles 
with tree limbs trimmed sufficiently to make the windrow as small as practicable.  No cleared, grubbed or stripped 
material shall extend beyond the construction limits.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   Burning</TTL><BRK/>
<BRK/>
<TXT>Subject to applicable Federal, State and local burning restrictions, the Contractor may burn material within 
the contract rights-of-way.  Burning operations shall be conducted so as to prevent damage to adjacent man-made 
facilities and natural features.  The Contractor is responsible for any damage to life and property resulting 
from fires that are started by the Contractor's employees or as a result of the Contractor's operations.  Furnish, 
at the site of burning operations, adequate fire fighting equipment to properly equip personnel for fighting 
fires.  Fires shall be guarded at all times and shall be under constant surveillance until they have been extinguished.  
All unburned material (material not reduced to ash) shall be removed from the site or disposed of by [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3   Burying</TTL><BRK/>
<BRK/>
<TXT>Subject to applicable Federal, State and local burying restrictions, the Contractor may bury the cleared and 
grubbed material in the area(s) as shown on the drawings or in [_____].  No material shall be buried within [_____]<MET>
 meters</MET><ENG> feet</ENG> of any standing timber.  All material disposed of by burying shall be covered with a minimum of 
[_____]<MET> mm</MET><ENG> inches</ENG> of earth.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4   Chipping</TTL><BRK/>
<BRK/>
<TXT>All cut timber, down timber, dead timber, branches, and brush may be chipped.  The chips shall be hauled either 
to stockpiles indicated on the drawings or to other locations approved by the Contracting Officer or removed 
from site of work.  The chips shall be deposited in these areas in either piles or windrows [above] [below] elevation 
[_____] NGVD.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5   Removal from Site of Work</TTL><BRK/>
<BRK/>
<TXT>The Contractor may elect to remove all or part of the cleared and grubbed materials from the site of the work 
in accordance with Section <SRF>01 57 20.00 10</SRF> ENVIRONMENTAL PROTECTION.  The Contractor may opt either to retain 
any such materials of value or dispose of them by sale or otherwise.  The Government is not responsible for the 
protection and safekeeping of any materials retained by the Contractor.  Such materials shall be removed from 
the site of the work before the date of completion of the work.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   REMOVAL OR PLUGGING OF ABANDONED PIPE AND CONDUITS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The terms and conditions in any permits and environmental commitments 
obtained by the Government must be made a part of the contract.  The designer 
must include technical requirements necessary to comply with these terms and 
commitments.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Abandoned pipes and conduits shall be removed to the limits shown on the drawings or plugged with concrete a 
minimum distance of [_____]<MET> meters</MET><ENG> feet</ENG> from [_____].  Prior to plugging, clean the interior of the pipe to be 
plugged and place the concrete in such a manner as to insure a dense, well bonded plug.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EXCAVAT"><SPT><TTL>3.7   <SUB>SHORING, SHEETING, AND BRACING</SUB></TTL><BRK/>
<BRK/>
<TXT>Shoring, sheeting, and bracing shall be installed where required for the protection of existing natural features 
and man-made facilities, for the safety of workers and the public, in compliance with <RID>EM 385-1-1</RID>, and to insure 
the integrity of the embankment.  Shoring, sheeting and bracing shall not be used in lieu of the required excavation 
slopes.  Shoring, sheeting, and bracing shall be adequately designed and properly installed to withstand anticipated 
loads.  Shoring, sheeting and bracing shall be planned and designed by a registered professional engineer.  Submit 
a plan for shoring, sheeting, and bracing in accordance with paragraph SUBMITTALS.  All shoring, sheeting and 
bracing shall be removed as embankment and backfill operations progress.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8   DEWATERING AND DIVERSION</TTL><BRK/>
<BRK/>
<TXT>Surface and groundwater control shall be accomplished in coordination with the required excavation and embankment 
construction.  Surface and/or groundwater control may necessitate the use of temporary diversion ditches, cofferdams 
and/or dewatering by the use of pumping.  Methods for care of surface water and for controlling the surface and 
groundwater levels shall be subject to approval of the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9   <SUB>EXCAVATION</SUB></TTL><BRK/>
<BRK/>
<TXT>Excavation shall consist of removal of material in preparing the foundations to the lines and grades shown on 
the drawings, removal of material from ditches and channels to the lines and grades shown on the drawings, removal 
of objectionable materials and obtaining required fill materials from the borrow areas.[  Blasting will [not] 
be permitted.]  Over excavation shall be backfilled to grade with similar over excavated material or satisfactory 
material and compacted to a density of at least that of the surrounding material.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.1   Over Excavation</TTL><BRK/>
<BRK/>
<SPT><TTL>3.9.1.1   Outside Limits of Levee Foundations or Structures</TTL><BRK/>
<BRK/>
<TXT>Over excavation outside the limits of the foundations of levees or structures shall be backfilled to grade with 
similar over excavated material or satisfactory material and compacted to a density of at least that of the surrounding 
material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.1.2   Within Limits of Levee Foundations or Structures</TTL><BRK/>
<BRK/>
<TXT>Over excavation within the limits of the foundations of levees or structures shall be backfilled to grade in 
accordance with paragraph PREPARATION OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9.2   Inspection Trench</TTL><BRK/>
<BRK/>
<TXT>An inspection trench shall be excavated and maintained free of standing water to the dimensions and locations 
shown on the drawings.  The trench shall be excavated at least [_____]<MET> meters</MET><ENG> feet</ENG> in advance of but not more 
than [_____] <MET>meters </MET><ENG>feet</ENG> in advance of construction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.3   Structures</TTL><BRK/>
<BRK/>
<TXT>Excavations for structures shall conform to the dimensions and elevations indicated for each structure and footing, 
except as specified hereinafter, and shall include trenching for utility and foundation drainage systems to a 
point [_____]<MET> meters</MET><ENG> feet</ENG> beyond each structure and all work incidental thereto.  Excavation shall extend a sufficient 
distance from walls and footings to allow for placing and removal of forms.  Satisfactory material removed below 
the depths indicated without specific direction of the Contracting Officer shall be replaced at no additional 
cost to the Government and filled in accordance with paragraph OVER EXCAVATION above.[  Over excavation below 
required invert elevations or bottoms of footings shall be backfilled with lean concrete at no additional cost 
to the Government.  No footings shall be constructed on unsatisfactory material as determined by the Contracting 
Officer.] [ Excessively wet and/or soft material in subgrades resulting from water ponding in footing excavations 
shall be removed and replaced with [lean concrete] [satisfactory material compacted to the density of the surrounding 
undisturbed material]].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.4   Channels</TTL><BRK/>
<BRK/>
<TXT>Channels shall be excavated at the locations and to the lines and grades shown on the drawings and in accordance 
with paragraph TOLERANCES.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.5   Ditches</TTL><BRK/>
<BRK/>
<TXT>Drainage ditches shall be excavated at the locations and to the lines and grades shown on the drawings and in 
accordance with paragraph TOLERANCES.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.6   Slopes and Surcharges</TTL><BRK/>
<BRK/>
<TXT>Temporary excavation slopes for any channel, structure excavation, or other required excavation shall not be 
steeper than the specified finished slope or the specified construction slope, as applicable, and subject to 
the approval of the Contracting Officer.  This may be accomplished by benching the temporary slope so that the 
average slope is not steeper than the specified slope.  In addition, no temporary, permanent, or construction 
slope shall be surcharged with excavated or stockpiled material or with heavy construction equipment which would 
have the same effect as the surcharge material.  The toe of stockpiled material shall be maintained a minimum 
distance back from the top of the finished excavation equal to the depth of the excavation.  Determine the maximum 
height of such stockpile without causing instability of the excavation slope.  Any slide or other adverse conditions 
caused by failure of the Contractor to maintain these conditions shall be considered the responsibility of the 
Contractor and remedial measures shall be at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.7   <SUB>Borrow Areas</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>3.9.7.1   Government-Furnished</TTL><BRK/>
<BRK/>
<TXT>Borrow areas shall be excavated to the extent necessary to obtain satisfactory material within the lines and 
grades as shown on the drawings.  When the material necessary for the construction of the embankment and berms 
cannot be obtained from adjacent borrow areas, it shall be obtained from other Government-furnished borrow areas. 
[ The permissible depth(s) in the borrow areas are indicated on the drawings.]  Any excavation below the depths 
and slopes specified herein or shown on the drawings shall be backfilled by the Contractor, at the Contractor's 
expense, to the specified permissible excavation line, with satisfactory [material(s)] [cohesive material] [or] 
[other material] as specified by the Contracting Officer to a density of at least that of the surrounding material.  
Borrow areas shall be drained and kept dry during excavation.  Where possible, unsatisfactory materials in borrow 
areas shall not be removed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.7.2   Contractor-Furnished</TTL><BRK/>
<BRK/>
<TXT>Borrow areas proposed by the Contractor shall be subject to approval by the Contracting Officer.  Any borrow 
sources proposed, accepted and approved by the Contracting Officer shall meet all applicable Federal, State and 
local requirements. [ Proposed sources located within [_____]<MET> meters</MET><ENG> feet</ENG> landward and [_____]<MET> meters</MET><ENG> feet</ENG> riverward 
of the levee between Stations [_____] and [_____] will not be permitted.]  No payment will be made for Contractor-furnished 
borrow areas.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.7.3   Dredged</TTL><BRK/>
<BRK/>
<TXT>The Contractor has the option of using dredging operations to obtain material for the pervious zones or the random 
zones subject to the requirements and the conditions specified herein.  Dredging operations may be conducted 
at approved locations in the present stream bed of [_____] or as shown on the drawings.  Dredging operations 
will not be permitted within [_____]<MET> meters</MET><ENG> feet</ENG> of the levee centerline and no material shall be obtained within 
[_____]<MET> meters</MET><ENG> feet</ENG> of any revetment, stabilized channel line, bridge pier and/or abutment.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9.8   Cut-Off Trenches</TTL><BRK/>
<BRK/>
<TXT>A cutoff trench shall be excavated and maintained free of standing water to the dimensions and locations shown 
on the drawings.  The trench shall be excavated at least [_____]<MET> meters</MET><ENG> feet</ENG> in advance of but not more than 
[_____]<MET> meters</MET><ENG> feet</ENG> of construction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.9   Existing Levees and Spoil Banks</TTL><BRK/>
<BRK/>
<TXT>Existing levees and spoil banks shall be removed as shown on the drawings.  In areas where the existing levee 
is located within the random or berm zone of the levee, it shall be incorporated into the embankment.  Portions 
of existing embankments which lie within the impervious zone of the levee shall be removed.  Existing levees 
located within the rights-of-way landward of the levee and berms to be constructed, may be utilized as borrow 
material, but only after equal protection has been provided by construction of the new levee.  When excavated 
for borrow material, the existing levee shall be removed to the adjacent ground surface in a uniform manner, 
and shaped to maintain drainage in accordance with the adjacent natural drainage pattern. [ When lower levels 
of flood protection would be caused by levee construction provide the Contracting Officer a plan to maintain 
existing levels of protection during the construction period.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.10   Toe Drains</TTL><BRK/>
<BRK/>
<TXT>Toe drains shall be excavated to the dimensions and the locations indicated on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.11   Utilities</TTL><BRK/>
<BRK/>
<TXT>Excavations for pipe beds shall be shaped to fit the contour of the pipe over a width of not less than 0.6 of 
the pipe diameter, or as shown on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.12   Rock</TTL><BRK/>
<BRK/>
<TXT>Rock and other hard foundation materials shall be cleaned of loose debris and cut to a firm surface, either level, 
stepped, or serrated, as shown on the drawings.  Loose disintegrated rock and thin strata shall be removed.  
Rock excavation will not be measured for payment.  Rock excavation will not be paid for as a separate bid item.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.13   Riprap and Bedding</TTL><BRK/>
<BRK/>
<TXT>Excavations for riprap and bedding shall be performed at the locations and to the lines and grades shown.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EMBANK,EXCAVAT"><SPT><TTL>3.10   TOLERANCES</TTL><BRK/>
<BRK/>
<TAI OPT="EXCAVAT"><TXT>A tolerance of [_____]<MET> mm</MET><ENG> inches</ENG> above or below the prescribed grade will be allowed in the excavation for channels, 
ditches, inspection trenches, cutoff trenches, excavations for riprap and bedding, and mandatory borrow areas.  
A tolerance of [_____]<MET> mm</MET><ENG> inches</ENG> below the prescribed grade will be allowed in the excavation for all other borrow 
areas.</TXT><BRK/>
<BRK/></TAI>
<TAI OPT="EMBANK"><TXT>All embankments and backfills shall be constructed to the grades, lines, and cross-sections shown on the drawings.  
At all points a tolerance of<MET> [100] [_____] mm</MET><ENG> [4] [_____] inches</ENG> above or below the prescribed grade will be 
permitted in the final dressing, provided that any excess material is so distributed that the crown of the levee 
drains and that there are no abrupt humps or depressions in any surfaces.  For topsoil, a tolerance of [_____]<MET>
 mm</MET><ENG> inches</ENG> above the thickness as shown on the drawings will be permitted.</TXT><BRK/>
<BRK/></TAI>
</SPT></TAI><TAI OPT="EXCAVAT"><SPT><TTL>3.11   SLIDES</TTL><BRK/>
<BRK/>
<TXT>In case sliding occurs in any part of the excavations prescribed in this section after they have been excavated, 
but prior to final acceptance of all work under the contract, repair the slide as directed by the Contracting 
Officer.  In case the slide is caused through the fault of the Contractor, it shall be repaired at no cost to 
the Government.  In case the slide is due to no fault of the Contractor, an equitable adjustment in the contract 
price will be made for the repairs in accordance with the Contract Clause CHANGES.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12   TRAVERSES</TTL><BRK/>
<BRK/>
<TXT>Traverses shall be left unexcavated between borrow areas at the locations [and to the cross sections] shown on 
the drawings. [ The traverses shall have minimum top widths of [_____]<MET> meters</MET><ENG> feet</ENG> with side slopes no steeper 
than 1 on 3 or as shown on the drawings.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13   STOCKPILES</TTL><BRK/>
<BRK/>
<TXT>Provisions of paragraph SLOPES AND SURCHARGES are applicable to all stockpiled materials.  Upon completion of 
construction operations, all remaining stockpiled material shall be removed and disposed of by the disposal methods 
specified in paragraph DISPOSITION OF EXCAVATED MATERIALS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14   SURFACE DRAINAGE OF COMPLETED AREAS</TTL><BRK/>
<BRK/>
<TXT>The areas shown on the drawings designated as "GRADE FOR SURFACE DRAINAGE", the borrow areas, and the finished 
embankment areas shall be graded to the lines and grades shown on the drawings.  The surface shall be free from 
sharp ridges, gullies, potholes, sinkholes, and any other surface irregularities.  A tolerance of [_____]<MET> mm</MET><ENG> 
inches</ENG> above or below the prescribed grade will be allowed provided that the surface drains in the direction 
as indicated on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15   MAINTENANCE OF WORK</TTL><BRK/>
<BRK/>
<SPT><TTL>3.15.1   Debris Removal</TTL><BRK/>
<BRK/>
<TXT>Maintain all ditch and channel excavations free from leaves, brush, sticks, trash, and other debris until final 
acceptance of all work under the contract at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.2   Sediment Removal</TTL><BRK/>
<BRK/>
<TXT>Prior to final acceptance of all work under this contract, the removal of sediments from ditch or channel excavations 
shall be required to restore design grade and section at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.16   DISPOSITION OF EXCAVATED MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.16.1   Satisfactory Materials</TTL><BRK/>
<BRK/>
<TXT>Satisfactory excavated material shall be incorporated in the appropriate zones of the embankment.  Satisfactory 
material shall consist of material as defined in paragraph DEFINITIONS, subparagraph SATISFACTORY MATERIALS.  
When direct placement is not practicable, satisfactory material from the excavation [may] [shall] be stockpiled 
for subsequent use in parts of the work for which it is specified herein and/or as indicated on the drawings.  
Satisfactory materials in excess of the quantity necessary to construct backfills and embankments shall be disposed 
of as specified for unsatisfactory materials.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.16.2   Unsatisfactory Materials</TTL><BRK/>
<BRK/>
<TXT>Unsatisfactory materials shall be as defined in paragraph DEFINITIONS, subparagraph UNSATISFACTORY MATERIALS.  
Unsatisfactory materials from the excavations prescribed in this section shall be permanently disposed of by 
[removal from the site to a Contractor-furnished disposal area] [placing in the disposal area shown on the drawings] 
[placing in abandoned portions of the borrow areas]. [ The material shall be shaped so that its surface is free 
from abrupt changes in grade and shall be sloped to drain.] [ No additional payment will be made for [Contractor-furnished 
disposal areas] [placing in abandoned portions of the borrow areas].] [ The material shall be shaped so that 
its surface is free from abrupt changes in grade and shall be sloped to drain.] [ No additional payment will 
be made for Contractor-furnished disposal areas.]</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EMBANK"><SPT><TTL>3.17   PREPARATION OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.17.1   Earth</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify and or add to this paragraph to be compatible with the embankment 
construction procedure.  If uncompacted or semicompacted fill is being utilized 
major modifications may be required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After excavation (as described in paragraph EXCAVATION) or stripping (as described in paragraph CLEARING, GRUBBING 
AND STRIPPING) of the embankment foundation [and excavation of the cut-off trench] to the extent indicated or 
otherwise required, the sides of stump holes, test pits, and other similar cavities or depressions shall be broken 
down so as to flatten out the slopes, and the sides of the cut or hole shall be scarified to provide bond between 
the foundation material and the fill. [ The slopes and bottom of the cut-off trench shall be scarified, as directed.]  
Unless otherwise directed, each depression shall be filled with the same material type that is to be placed immediately 
above the foundation.  The fill shall be placed in layers, moistened, and compacted in accordance with the applicable 
provisions of paragraphs PLACEMENT, MOISTURE CONTROL, and COMPACTION for the specific material type.  Materials 
which cannot be compacted by roller equipment because of inadequate clearances shall be compacted with power 
tampers in accordance with the paragraph COMPACTION for the specific material type.  After filling of depressions 
[and cut-off trench] and immediately prior to placement of compacted fill in any section of the embankment, the 
foundation of such section shall be loosened thoroughly by scarifying, plowing, discing or  harrowing to a minimum 
depth of [_____]<MET> mm</MET><ENG> inches</ENG>, and the moisture content shall be adjusted to the amount specified in paragraph MOISTURE 
CONTROL for the appropriate type of material. [ After removal of roots or other debris turned up in the process 
of loosening, the entire surface of the embankment foundation area shall be compacted by [_____] complete coverages 
of the compaction equipment as specified for the appropriate type of fill.]  Immediately prior to placement of 
compacted fill on or against the surfaces of any partial fill section, all soft or loose  material, all material 
containing cracks or gullies, and all material that does not conform with the specified zoning of the embankment 
shall be removed.  The remaining surface of the partial fill shall be loosened by scarifying, plowing, discing 
or harrowing to a minimum depth of<MET> [_____] [150] mm</MET><ENG> [_____] [6] inches</ENG>, and the moisture content shall be adjusted 
as specified in paragraph MOISTURE CONTROL for the appropriate type of material.  The surface of the partial 
fill section upon which fill is to be placed shall then be compacted as hereinafter specified for the appropriate 
type of fill.  No separate payment will be made for loosening and rolling the foundation area, the abutment area, 
or the surfaces of partial fill sections, but the entire cost thereof shall be included in the applicable contract 
price for fill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.2   Rock Foundation</TTL><BRK/>
<BRK/>
<TXT>All rock surfaces upon which or against which embankment materials are to be placed shall be excavated (as described 
in paragraph EXCAVATION) or stripped (as described in paragraph CLEARING, GRUBBING AND STRIPPING).  Prior to 
the placement of embankment material upon or against a rock surface, all open joints and cracks in that surface 
shall be filled with mortar to the depths cleaned.  Those portions of such rock surfaces where, in the opinion 
of the Contracting Officer, the compaction of the embankment materials cannot be accomplished satisfactorily 
with power tampers or other specified compaction equipment, shall be filled with mortar or concrete as directed 
to the extent necessary to permit satisfactory use of the compaction equipment.  In no case shall a thin coat 
of mortar be left on smooth, intact rock surfaces.  Large rock overhangs and protrusions shall be removed and 
rock surfaces shall be laid back to a slope no steeper than 4V on 1H by the use of pre-splitting or line drilling 
techniques in such a manner as to minimize damage to the  underlying rock, or the spaces beneath overhangs and 
around protrusions shall be filled with tamped concrete so that satisfactory compaction of embankment materials 
can be accomplished.  Rock surfaces shall not be more than<MET> 0.67 m</MET><ENG> 2 feet</ENG> in height, and benches of sufficient 
width shall be provided as necessary so that the average slope of any rock face is not steeper than [_____]V 
on [_____]H.  Mortar and concrete, including forming as necessary, shall conform with the applicable provisions 
of Section [<SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE] [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.3   [Benching</TTL><BRK/>
<BRK/>
<TXT>Benching into existing levee embankment and abutments is required in order to place and compact the material 
in horizontal layers.  The vertical face cut into the existing embankment or abutment resulting from the benching 
operation shall be a minimum of [_____]<MET> mm</MET><ENG> inches</ENG> in height but shall not exceed [_____]<MET> mm</MET><ENG> inches</ENG> in height.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.4   [Preloading</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert applicable language for preloading as required.  Identify the 
extent of the area over which preloading will be required by designating the 
stationing along the centerline of the levee.  Indicate the length of time the 
preload will be left in place or define the settlement conditions which must 
occur before construction in the preloaded area can proceed.  Address whether 
or not the preload embankment will become part of the permanent levee.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Preloading of the levee foundation will be required between Station [_____] and Station [_____].  The preload 
embankment will be constructed to the cross section shown on the drawings for the applicable location.  After 
completion of the construction of the preload embankment no additional construction shall take place in the preloaded 
areas [for [_____] days] [until the required settlement has occurred]].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.5   [Settlement of Foundation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify the following to the method of determining foundation settlement, 
which may be achieved by installing settlement gages or performing core borings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor [shall] [may elect to] [furnish and install settlement gages] [perform core borings], at the settlement 
measurement locations shown on the plans, for determination of settlement of the foundation during construction 
within the settlement measurement ranges shown on the drawings. [ Each settlement measurement location shall 
be located on the prepared foundation at a point directly under the crown of the planned levee section prior 
to placing of fill material.  The gages shall be maintained and extended, if necessary, during the construction.  
The type and arrangement of the gages shall be as shown on the drawings.  Make such measurements and determine 
such elevations on the gages prior to the placing of fill material and again within [72] [_____] hours after 
final cross sections have been taken over the completed embankment at the locations of the gages.] [ Perform 
a cross section at the settlement measurement location prior to the placing of fill material to establish the 
elevation of the foundation/embankment interface.  Within [72] [_____] hours after final cross sections have 
been taken over the completed embankment at the settlement measurement location perform the core boring to determine 
foundation settlement.]  Settlement measurements will be [verified] [subject to verification] by the Contracting 
Officer.]</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EMBANK"><SPT><TTL>3.18   [TEST FILL STRIPS]</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Test strips are needed when the volume of the project is large, the compaction 
requirement will be obtained by specifying the type of compaction equipment 
and the number of passes on each lift (i.e. a method or procedure specification 
is being utilized) and there is not sufficient information on the compaction 
characteristics of the proposed fill materials and equipment to be used for 
the project.  On projects where the levees are small (greater than 5 meters 
(15 feet) high) and on levee raising projects where fill placement zones are 
narrow (3.3 meters (10 feet), some of the larger compaction equipment specified 
herein (such as 50-ton rubber tired roller and some tamping rollers) are not 
appropriate.  Consistently Contractors propose using smaller equipment with 
shorter tamping feet.  Test fills, therefore, may also be an appropriate means 
of evaluating performance and setting placement and compaction criteria to assure 
satisfactory result.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.18.1   [General</TTL><BRK/>
<BRK/>
<TXT>Before beginning embankment construction, construct test strip(s) for [_____] fill materials to demonstrate that 
the equipment and compaction procedure will achieve the moisture-dry density relationship as specified.  The 
test strips may be incorporated as part of the final embankment, if the fills meet the requirements of the specifications.  
The test strips shall be constructed using materials from the borrow sources which have been approved by the 
Contracting Officer.  A test strip shall be performed for each of the following type of fill materials [_____].  
Each test strip shall be of sufficient size to allow compaction equipment to achieve normal operating speed over 
a<MET> [_____] [17] meter</MET><ENG> [_____] [50] foot</ENG> length.  The test strip shall be a minimum of two (2) times wider than 
the compaction equipment.  Each test strip shall be constructed with a minimum of 4 lifts.  Prior to the construction 
of the test strips, the foundation (subgrade) shall be proof rolled as specified in paragraph [_____] and an<MET> 
200 mm</MET><ENG> 8 inch</ENG> thick subbase layer installed.  The subbase layer shall consist of the same material to be used 
in the test strip and shall be spread and compacted to the same  requirements.  The test strips shall be constructed 
in accordance with the applicable provisions of paragraphs PLACEMENT, MOISTURE CONTROL, and COMPACTION for the 
specific material type.  The fill material shall be placed and spread in layers in accordance with the applicable 
provisions of paragraphs PLACEMENT for the specific material type.  Each layer of the fill shall be compacted 
with a minimum of four (4) complete coverages using the specified compaction equipment, and as many additional 
coverages as may be required to achieve the specified density.  Even if the results from the test strips show 
that the required densities can be obtained with less than four coverages by the compaction equipment, the Contractor 
shall still be required to compact the impervious and random fills with a minimum of (4) complete coverages.  
If the use of the proposed compaction equipment causes shearing of the fill, laminations in the fill, or results 
in inadequate compaction, the Contracting Officer may direct that such roller be removed from the fill and that 
another appropriate tamping roller be used.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.18.2   [Testing and Reporting Requirements for Test Strips</TTL><BRK/>
<BRK/>
<TXT>Prior to construction of the test strips, perform one laboratory compaction test for each type of material used 
in test strips.  The compaction tests shall be performed in accordance with the requirements specified in paragraph 
MATERIALS TESTING.  Test results shall be submitted to the Contracting Officer before construction of the test 
strips.  After placement and spreading of the fill in the test strip, but prior to compaction, five samples shall 
be obtained from each lift for moisture content determination in accordance with <RID>ASTM D 2216</RID>.  After compaction 
of the fill, a minimum of [_____] [5] in-place <SUB>nuclear density</SUB> and moisture content tests (in accordance with <RID>
ASTM D 6938</RID>) and one (1) sand cone density test (in accordance with <RID>ASTM D 1556</RID>) shall be performed on each lift.  
One sample shall be obtained from each test strip for classification testing as specified in paragraph MATERIALS 
TESTING.  All testing and sampling locations shall be determined by the Contracting Officer.  The Contractor's 
QC personnel shall monitor and document construction and testing of the test strips.  Documentation shall include 
weather conditions, soil type, spreading and compaction equipment type, lift thickness, number of coverages, 
moisture content, dry density, and a plan showing approximate location of sampling and testing.  Documentation 
of the test strip construction procedures and results of all testing shall be provided to the Contracting Officer.  
Full scale embankment construction shall not commence until the equipment and placement methods are approved 
by the Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EMBANK"><SPT><TTL>3.19   PLACEMENT AND SPREADING</TTL><BRK/>
<BRK/>
<SPT><TTL>3.19.1   General</TTL><BRK/>
<BRK/>
<TXT>[Prior to beginning embankment placement on the levee foundation, notify the Government that the foundation is 
ready to receive fill.] [ No fill shall be placed on any part of the embankment foundation until such areas have 
been inspected and given final approval by the Contracting Officer.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.19.1.1   Gradation and Distribution</TTL><BRK/>
<BRK/>
<TXT>The gradation and distribution of materials throughout each zone of the levee shall be such that the embankment 
will be free from lenses, pockets, streaks, and layers of material differing substantially in texture or gradation 
from surrounding material of the same class.  If lenses, pockets, or layers of materials differing substantially 
in texture or gradation from surrounding material occur in the spread material, the layer shall be mixed by harrowing 
or any other approved method to blend the materials.  During the placing and spreading process, maintain at all 
times a force of workers adequate to remove all roots, debris, and oversize stone from all embankment materials.  
All stones and rock fragments larger than [2/3 of the placement lift thickness measured by the greatest dimension] 
[<MET>75 mm</MET><ENG> 3 inches</ENG> in any dimension] shall be removed [at the source prior to hauling to] [from] the fill.  No fill 
shall be placed upon a frozen surface, nor shall snow, ice, or frozen earth be incorporated in the embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.1.2   Foundations and Partial Embankment Fills</TTL><BRK/>
<BRK/>
<TXT>The foundations and all partial embankment receiving fills shall be kept thoroughly drained.  Placing operations 
will be such as to avoid mixing of materials from adjacent sections as much as practicable.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.1.3   Equipment Traffic</TTL><BRK/>
<BRK/>
<TXT>Equipment traffic on any embankment zone shall be routed to distribute the compactive effort as much as practicable.  
Ruts formed in the surface of any layer of spread material will be filled before that material is compacted.  
If, in the opinion of the Contracting officer, the compacted surface of any layer of material is too smooth to 
bond properly with the succeeding layer, the surface shall be loosened by scarifying or other approved methods 
before material from the succeeding layer is placed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.19.2   Placement on Surfaces Containing Frozen Materials</TTL><BRK/>
<BRK/>
<TXT>Embankment shall not be placed on a foundation which contains frozen material, [or which has been subjected to 
freeze-thaw action].  This prohibition encompasses all foundation types, including the natural ground, all prepared 
subgrades (whether in an excavation or on an embankment, and all layers of previously placed and compacted earth 
fill which become the foundations for successive layers of earth fill.  All material that freezes or has been 
subjected to freeze-thaw action during the construction work, or during periods of temporary shutdowns, such 
as, but not limited to nights, holidays, weekends, or winter shutdowns of earthwork operations, shall be removed 
to a depth that is acceptable to the Contracting Officer and replaced with new material.  Alternatively, the 
material shall be thawed, dried, reworked and recompacted to the specified criteria before additional material 
is placed.  The Contracting Officer will determine when placement of fill shall cease due to cold weather.  The 
Contracting Officer may elect to use average daily air temperatures, and/or physical observation of the soils 
for the determination.  Levee embankment material shall not contain frozen clumps of soil, snow or ice.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.3   Placement of Embankment and Backfill Against Rock</TTL><BRK/>
<BRK/>
<TXT>All rock surfaces upon which or against which embankment materials are to be placed shall be cleaned in accordance 
with Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS [and shall be prepared in accordance with paragraph PREPARATION 
OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS, subparagraph ROCK].  In restricted areas where material can 
not be placed in large lifts with normal spreading and compaction equipment material shall be spread in lifts 
not exceeding [_____]<MET> mm</MET><ENG> inches</ENG> and compacted with mechanical hand tampers, vibrating plates, or other approved 
methods and equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.4   Placement of Embankment and Backfill Against Structures</TTL><BRK/>
<BRK/>
<TXT>No embankment or backfill shall be placed on or against concrete less than 7 days after placement or 70 percent 
of the design strength, without prior approval of the Contracting Officer.  Crawler-type tractors, vibratory 
equipment and other similar compaction equipment shall not be used within<MET> [____] [1] meter</MET><ENG> [_____] [4] feet</ENG> of 
any completed or partially completed structure.  Compaction within<MET> [_____] [1] meter</MET><ENG> [_____] [4] feet</ENG> of completed 
or partially completed structures shall be accomplished by the use of mechanical hand tampers, vibrating plates, 
or other approved methods and equipment.  Ensure that compaction operations do not damage any existing utilities.  
Any damage caused by the Contractor's operation shall be repaired at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.5   Select Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If it is desired that the first layer of fill over the foundation be 
of a different thickness than subsequent layers, then the last bracketed sentence 
should be selected and the following should be substituted into the appropriate 
paragraphs below.  [The materials for [_____] fill shall be placed or spread 
in layers, the first layer not more than [_____] [mm] [_____] inches in thickness 
and the succeeding layers not more than [_____] mm [_____] inches in thickness 
prior to compaction.]</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Select fill material shall be placed and spread in layers not more than<MET> 200 mm</MET><ENG> 8 inches</ENG> in uncompacted thickness, 
except that within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> of [______] structures, the uncompacted layer thickness shall 
be reduced to<MET> [150] [_____] mm</MET><ENG> [6] [_____] inches</ENG>.  [Layers should be started full out to the slope stakes and 
shall be carried substantially horizontal and parallel to the levee centerline with sufficient crown or slope 
to provide satisfactory drainage during construction.]  [The materials for [_____] fill shall be placed or spread 
in layers, the first layer not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness and the succeeding layers not more than 
[_____]<MET> mm</MET><ENG> inches</ENG> in thickness prior to compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.6   Coarse Drainage Gravel and Filter Sand</TTL><BRK/>
<BRK/>
<TXT>Coarse drainage gravel and filter sand shall be placed and spread in layers not more than<MET> [_____] [300] mm</MET><ENG> [_____] 
[12] inches</ENG> in uncompacted thickness, except that within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> of the [_____] structures, 
the uncompacted layer thickness shall be reduced to<MET> [_____] [150] mm</MET><ENG> [_____] [6] inches</ENG>.  The method of placement 
of all gravel and sand material shall be controlled to minimize segregation of particle sizes and contamination 
with other embankment materials.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.7   Impervious Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If it is desired that the first layer of fill over the foundation be 
of a different thickness than subsequent layers, then the last bracketed sentence 
should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The impervious fill material shall be placed and spread in layers not more than<MET> [_____] [200] mm</MET><ENG> [_____] [8] 
inches</ENG> in uncompacted thickness, except that within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> of [______] structures, the 
uncompacted layer thickness shall be reduced to<MET> [_____] [100] mm</MET><ENG> [_____] [4] inches</ENG>.  [Layers should be started 
full out to the slope stakes and shall be carried substantially horizontal and parallel to the levee centerline 
with sufficient crown or slope to provide satisfactory drainage during construction.]  [The materials for [_____] 
fill shall be placed or spread in layers, the first layer not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness and the 
succeeding layers not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness prior to compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.8   Pervious Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If it is desired that the first layer of fill over the foundation be 
of a different thickness than subsequent layers, then the last bracketed sentence 
should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The pervious fill material shall be placed and spread in layers not more than<MET> [_____] [200] mm</MET><ENG> [_____] [8] inches</ENG>
 in uncompacted thickness, except that within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> of [______] structures, the uncompacted 
layer thickness shall be reduced to<MET> [_____] [150] mm</MET><ENG> [_____] [6] inches</ENG>.  [Layers should be started full out 
to the slope stakes and shall be carried substantially horizontal and parallel to the levee centerline with sufficient 
crown or slope to provide satisfactory drainage during construction.]  [The materials for [_____] fill shall 
be placed or spread in layers, the first layer not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness and the succeeding 
layers not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness prior to compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.9   Random Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If it is desired that the first layer of fill over the foundation be 
of a different thickness than subsequent layers, then the last bracketed sentence 
should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Random fill material shall be placed and spread in layers not more than<MET> [_____] [200] mm</MET><ENG> [_____] [8] inches</ENG> in 
uncompacted thickness, except that within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> of [_____]structures, the uncompacted 
layer thickness shall be reduced to<MET> [_____] [150] mm</MET><ENG> [_____] [6] inches</ENG>.  [Layers should be started full out 
to the slope stakes and shall be carried substantially horizontal and parallel to the levee centerline with sufficient 
crown or slope to provide satisfactory drainage during construction.]  [The materials for [_____] fill shall 
be placed or spread in layers, the first layer not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness and the succeeding 
layers not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness prior to compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.10   [Random Rock</TTL><BRK/>
<BRK/>
<TXT>Random rock shall be placed within the limits indicated on the drawings in such a manner as to produce a reasonably 
well graded mass of stone with a minimum percentage of voids.  The random rock shall be placed in layers that 
will will produce a compacted<MET> [_____] [600] mm</MET><ENG> [_____] [24] inch</ENG> thick layer as shown on the drawings.[  Dewatering 
of the foundation beneath the random rock zone shall be sufficient to allow the random rock material to be placed 
and compacted as specified herein to produce a firm, dense surface upon which to place select earth fill.]  The 
outside slope of the random rock zone shall be graded to produce a reasonably even surface, within a tolerance 
of plus or minus<MET> [_____] [300] mm</MET><ENG> [_____] [12] inches</ENG> measured [vertical] [normal] to the slope from the lines 
indicated on the he drawings, upon which slope protection layers can be placed.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.11   [Fine Drainage Gravel Placed Around Structures</TTL><BRK/>
<BRK/>
<TXT>Fine drainage gravel placed for drainage around [_____] structures shall be placed in horizontal layers not exceeding 
[_____]<MET> mm</MET><ENG> inches</ENG> in loose lift thickness, or within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> when hand operated compactors 
are used.  After placing, each layer shall be uniformly spread, moistened or aerated as necessary to obtain the 
specified moisture content, thoroughly mixed and compacted as specified.  Backfilling shall not begin until construction 
below finish grade has been approved, forms removed, and the excavation cleaned of trash and debris.  Power driven 
hand operated compactors shall be used along the closure structure for compaction within<MET> [_____] [0.7] m</MET><ENG> [_____] 
[2] feet</ENG> of concrete structures.  Backfill shall not be placed against concrete prior to 7 days after placement.  
As far as practicable, backfill shall be brought up evenly on each side of the structure and sloped to drain 
away from the structure.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.12   [Semicompacted Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If it is desired that the first layer of fill over the foundation be 
of a different thickness than subsequent layers, then the last bracketed sentence 
should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The location and extent of the semicompacted fill shall be as shown on the drawings.  Semicompacted fill shall 
not be placed in water.  Semicompacted fill material shall be placed and spread in layers not more than<MET> [_____] 
[300] mm</MET><ENG> [_____] [12] inches</ENG> in uncompacted thickness, [except that within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG> of 
[_____] structures, the uncompacted layer thickness shall be reduced to<MET> [_____] [150] mm</MET><ENG> [_____] [6] inches</ENG>].[  
Layers shall be started full out to the slope stakes and shall be carried substantially horizontal and parallel 
to the levee centerline with sufficient crown or slope to provide satisfactory drainage during construction.] 
[ The materials for [_____] fill shall be placed or spread in layers, the first layer not more than [_____]<MET> mm</MET><ENG>
 inches</ENG> in thickness and the succeeding layers not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness prior to compaction.]]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.13   [Uncompacted Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If it is desired that the first layer of fill over the foundation be 
of a different thickness than subsequent layers, then the second bracketed sentence 
should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Uncompacted fill shall be placed in approximately horizontal layers not exceeding [_____]<MET> mm</MET><ENG> inches</ENG> in thickness.  
The layers shall be uniformly spread, distributed, and otherwise manipulated during placement to such an extent 
that individual loads of material deposited on the fill will not remain intact, and large, open voids in the 
fill will be eliminated.  Lifts shall not be placed in a manner which causes shrinkage cracks and open voids 
from developing in previously placed lifts.[  Layers shall be started full out to the slope stakes and shall 
be carried in lifts approximately horizontal and parallel to the centerline with sufficient crown or slope to 
provide satisfactory drainage during construction.] [ The materials for [_____] fill shall be placed or spread 
in layers, the first layer not more than [_____]<MET> mm</MET><ENG> inches</ENG> in thickness and the succeeding layers not more than 
[_____]<MET> mm</MET><ENG> inches</ENG> in thickness prior to compaction.][  Compaction other than that obtained by the controlled 
movement of the hauling and spreading equipment over the area will not be required.][  Where material must be 
placed in water, it shall be dumped therein until it reaches an elevation [_____]<MET> mm</MET><ENG> foot</ENG> above the water surface, 
or until a stable fill surface is obtained before layer construction will be required.  The material deposited 
under water shall be placed in such a manner to ensure that any soft material will be forced progressively outward 
from the section and not be trapped within the base of the embankment.][  Material containing more than [_____] 
[15] percent fines passing the No. 200 sieve shall not be placed below the water surface.]]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.14   Hydraulic Fill</TTL><BRK/>
<BRK/>
<SPT><TTL>3.19.14.1   Discharge Pipe</TTL><BRK/>
<BRK/>
<TXT>At all times when the dredge discharge pipe is being washed out or when the discharge consists of a high percentage 
of water with only a minimum amount of solid material being pumped, all control plates at the bottom openings 
along the spill-pipe sections of the discharge pipe lines shall be closed immediately and shall remain in a closed 
position until the pumping operation produces a minimum of [10] [_____] percent solid materials in the discharge.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.14.2   Discharge Pipe Outlets</TTL><BRK/>
<BRK/>
<TXT>During placement operations of the fill, free outlets to conduct discharge water away from the embankment shall 
be provided at intervals of not more than<MET> [610] [_____] m</MET><ENG> [2,000] [_____] feet</ENG>, for<MET> 300-mm</MET><ENG> 12-inch</ENG> dredges or 
smaller; <MET>[915] [_____] m</MET><ENG> [3,000] [_____] feet</ENG>, for<MET> 325 to 400 mm</MET><ENG> 13- to 16-inch</ENG> dredges; and<MET> [1219] [_____] m</MET><ENG>
 [4,000] [_____] feet</ENG>, for dredges over<MET> 400 mm</MET><ENG> 16 inches</ENG>.  The size of dredges are determined by the minimum 
inside diameter of the discharge pipe.  No obstruction to free flow will be permitted in these outlets or at 
any point in the fill area, between the end of the discharge pipe and the outlet.  A retaining dike, transverse 
to the fill area center line, shall be constructed immediately beyond each outlet and shall not be breached until 
the end of the discharge pipe has approached the retaining dike to within<MET> 76 m</MET><ENG> 250 feet</ENG>, in the case of<MET> 300 mm</MET><ENG>
 12-inch</ENG> dredges or smaller; <MET>114 m</MET><ENG> 375 feet</ENG>, in case of<MET> 325 to 400 mm</MET><ENG> 13- to 16-inch</ENG> dredges; or<MET> 152 m</MET><ENG> 500 feet</ENG>
, in the case of dredges over<MET> 400 mm</MET><ENG> 16 inches</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.14.3   Control of Materials in Hydraulic Construction</TTL><BRK/>
<BRK/>
<TXT>In general, the materials in the fill shall be distributed in such a way as to produce a section of relatively 
uniform permeability.  In order to maintain uniform permeability of the fill, do not place strata and large pockets 
of gravel, not containing sufficient fines.  Whenever they occur they shall be promptly blended with finer materials.  
Take necessary precautions to prevent damage from discharge water or other causes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.19.14.4   Rehandling Hydraulic Material</TTL><BRK/>
<BRK/>
<TXT>Rehandling of hydraulic material to bring the fill area to required grade and cross section shall conform to 
paragraph [_____].  If, in the opinion of the Contracting Officer, the rehandled material is too dry to permit 
its placement by compacted fill method, then the soil placement shall conform to paragraph [_____].</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></TAI><TAI OPT="EMBANK"><SPT><TTL>3.20   MOISTURE CONTROL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.20.1   General</TTL><BRK/>
<BRK/>
<TXT>The materials in each layer of the fill shall contain the amount of moisture, within the limits specified below 
or as directed by the Contracting Officer, necessary to obtain the required compaction.  Material that is not 
within the specified moisture content limits after compaction shall be reworked to obtain the specified moisture 
content, regardless of density.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.20.1.1   Insufficient Moisture for Suitable Bond</TTL><BRK/>
<BRK/>
<TXT>If the top or contact surfaces of a partial fill section become too dry to permit suitable bond between these 
surfaces and the additional fill to be placed thereon, loosen the dried materials by scarifying or discing to 
such depths as may be directed by the Contracting Officer, shall dampen the loosened material to an acceptable 
moisture content, and shall compact this layer in accordance with the applicable requirements of paragraph COMPACTION.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.1.2   Excessive Moisture for Suitable Bond</TTL><BRK/>
<BRK/>
<TXT>If the top or contact surfaces of a partial fill section become too wet to permit suitable bond between these 
surfaces and the additional fill to be placed thereon, the wet material shall be scarified and permitted to dry, 
assisted by discing or harrowing, if necessary, to such depths as may be directed by the contracting officer.  
The material shall be dried to an acceptable moisture content, and shall be compacted in accordance with the 
applicable requirements of paragraph COMPACTION.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.1.3   Drying Wet Material</TTL><BRK/>
<BRK/>
<TXT>Material that is too wet shall [be spread on the embankment and permitted to dry,] [be dried in the borrow area 
prior to bringing to the levee embankment] be assisted by discing or harrowing, if necessary, until the moisture 
content is reduced to an amount within the specified limits.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.1.4   Increasing Moisture in Dry Material</TTL><BRK/>
<BRK/>
<TXT>The moisture content of material that is too dry, [will be adjusted on the levee embankment] [will be adjusted 
in the borrow area prior to bringing to the levee embankment].  Add water to the fill material and by harrowing, 
or other approved methods, work the moisture into the material until a uniform distribution of moisture within 
the specified limits is obtained.  Water applied on a layer of fill on the levee embankment shall be accurately 
controlled in amount so that free water will not appear on the surface during or subsequent to rolling.  Should 
too much water be added to any part of the embankment, the rolling on that section of the embankment shall be 
delayed until the moisture content of the materials is reduced to an amount within the specified limits.  If 
it is impracticable to obtain the specified moisture content by wetting or drying the material on the fill, the 
Contractor may be required to pre-wet or dry back the material at the source of excavation or in the borrow area.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.20.2   Select Fill</TTL><BRK/>
<BRK/>
<TXT>The moisture content after compaction shall be within the limits of [_____] percentage points above optimum to 
[_____] percentage point below optimum moisture content as determined by <RID>ASTM D 698</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.3   Impervious Fill</TTL><BRK/>
<BRK/>
<TXT>The moisture content after compaction shall be within the limits of [2] [_____] percentage points above optimum 
to [2] [_____] percentage point below optimum moisture content as determined by <RID>ASTM D 698</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.4   Pervious Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Saturation of the pervious fill may not be appropriate if the fill is 
placed in a zone or area (trenches, etc.) which can not readily drain.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each layer of material shall be placed, worked, and compacted in a saturated condition.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.5   Random Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The moisture control of random earth shall be conformed to the requirements 
of the material type it most closely approximates in behavior.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[The moisture content after compaction shall be within the limits of [_____] percentage points above optimum 
to [_____] percentage point below optimum moisture content as determined by <RID>ASTM D 698</RID>.]  [The moisture content 
shall be that which will facilitate obtaining the specified compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.6   Coarse Drainage Gravel and Filter Sand</TTL><BRK/>
<BRK/>
<TXT>The moisture content shall be controlled such that hauling, spreading, and compacting equipment can operate with 
normal procedure without excessive rutting of the fill.  If the material is too wet or too dry to facilitate 
proper compaction, the coarse drainage gravel or filter sand shall be wetted or dried as required by the procedures 
specified in paragraph [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.7   Fine Drainage Gravel</TTL><BRK/>
<BRK/>
<TXT>Fine drainage gravel shall be placed, worked, and compacted in a saturated condition.  The moisture content after  
compaction shall be as uniform as practicable throughout any one layer of fine drainage gravel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.8   Semicompacted Fill</TTL><BRK/>
<BRK/>
<TXT>[Semicompacted fill shall be placed within plus or minus [_____] percent of optimum moisture content.]  [Semicompacted 
fill will be placed at their in situ moisture content.]  [The moisture content of semicompacted fill shall be 
controlled such that hauling, spreading, and compacting equipment can operate with normal procedure without excessive 
rutting of the fill.]  [The moisture content shall be that which will facilitate obtaining the specified compaction.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.9   Uncompacted Fill</TTL><BRK/>
<BRK/>
<TXT>Uncompacted fill will be placed at their in situ water content.[  The moisture content shall be controlled such 
that hauling, spreading, and compacting equipment can operate with normal procedure without excessive rutting 
of the fill.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.20.10   Hydraulic Fill</TTL><BRK/>
<BRK/>
<TXT>No moisture control is required for Hydraulic Fill.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EMBANK"><SPT><TTL>3.21   COMPACTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer should edit the following paragraphs to account for the 
use of either an end product specification (i.e., the Contractor is required 
to obtain a specified degree of compaction) or a method specification (i.e., 
when the Contractor is required to compact the embankment by a specified number 
of coverages of a specified/approved roller and is not responsible for the obtained 
degree of compaction).  If the method specification is used and the required 
degree of compaction is not achieved, the Contractor should be paid for additional 
rolling for compaction under a separate bid item as specified in paragraph ADDITIONAL 
ROLLING FOR COMPACTION.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.21.1   Compaction Equipment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  With reference to the use of compaction equipment in this paragraph, 
the following precautions should be noted:</NPR><BRK/>
<BRK/>
<NPR>1.  Specifications should be written to insure that the type of compaction equipment 
will be used which, is best suited to obtain the desired compaction of the material 
being utilized.  When the size of the contract can justify the costs a requirement 
should be included in the specifications for the performance evaluation of each 
type of compaction equipment conforming with the specifications and intended 
for use by the Contractor at an early stage of embankment construction.  This 
equipment evaluation should be accomplished through analysis of test fill areas 
that are carefully constructed under representative working conditions with 
materials and moisture contents as specified.  Test fill areas may either be 
separate or part of the permanent work, and for clarity to prospective bidders, 
payment under a separate item is recommended to equitably cover costs of required 
variations in equipment coverages, possible changes in equipment loading or 
foot sizes, as well as intensified field soils testing.</NPR><BRK/>
<BRK/>
<NPR>2.  For tamping rollers that are either towed or self-propelled, with drums 
capable of being ballasted with fluid, the provision for a pressure relief valve 
and safety head is optional, and should be included at the discretion of the 
designer based on local experience and practice.  Over-pressurization of fluid 
ballasted compaction drums to the level of a safety hazard has been rare, but 
has occurred on several occasions at locations of high elevation and temperature.</NPR><BRK/>
<BRK/>
<NPR>3.  In compacting materials consisting of shales, sandstones, weathered rock 
and similar random materials, consideration should be given to specifying sheepfoot-type 
tamping equipment that has been modified by replacing the standard feet with 
"chisel" point tamper feet generally referred to as "shale breakers".  The end 
areas of these modified tamper feet range from 650 to 1000 square mm (1 to 1-1/2 
square inches) and tend to break up weathered rock to prevent the bridging effect 
sometimes created by large rock particles.</NPR><BRK/>
<BRK/>
<NPR>4.  For compaction of sand and gravel fills or filter and drainage layers, equipment 
characteristics for both a large and small vibratory roller have been provided 
for optional selection by the designer, depending upon location, selected lift 
thickness, gradation, grain shape, and durability properties of the materials.  
The smaller roller, which utilizes an upper limit of 40 kN/m (9000 lbs. per 
foot) of drum length applied force, should be specified for materials which 
exhibit degradation under compaction.  Other options, based on construction 
experience may also be exercised.  For example, it has been found that improved 
trafficability can often be achieved when compacting clean, fine grained, uniform 
sands by specifying a drum driven self-propelled vibratory roller.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST> Compaction equipment shall conform to the following requirements and shall be used as prescribed in 
subsequent paragraphs.</LST><BRK/>
<BRK/>
<SPT><TTL>3.21.1.1   Tamping Rollers</TTL><BRK/>
<BRK/>
<TXT>Tamping rollers shall be as follows:</TXT><BRK/>
<BRK/>
<LST>a.  Towed -Tamping rollers shall consist of a heavy duty double drum unit, with a drum diameter not less 
than<MET> 1.5 m</MET><ENG> 60 inches</ENG>, and an individual drum length of not less than<MET> 1.5 m</MET><ENG> 60 inches</ENG>.  The drums shall 
be capable of being ballasted with water or a combination of sand and water.  Each drum shall have staggered 
feet uniformly spaced over the cylindrical surface such as to provide approximately three tamping feet 
for each<MET> 0.19 square meter</MET><ENG> 2 square feet</ENG> of drum surface.  The tamping feet shall be<MET> 175 to 225 mm</MET><ENG> 7 
to 9 inches</ENG> in clear projection from the cylindrical surface of the roller and shall have a face area 
of not less than<MET> 3226 square mm</MET><ENG> 5 square inches</ENG> nor more than<MET> 4516 square mm</MET><ENG> 7 square inches</ENG>.  The roller 
shall be equipped with cleaning fingers, so designed and attached as to prevent the accumulation of material 
between the tamping feet, and these cleaning fingers shall be maintained at their full length throughout 
the periods of use of the roller.  The weight of the roller shall not be less than<MET> 5200 kg/m</MET><ENG> 3500 psf</ENG>
 of linear drum length weighted, and shall not be more than<MET> 2975 kg/m</MET><ENG> 2000 psf</ENG> of drum length empty.  
The two drums comprising one roller unit shall be yoked such that they will oscillate when traversing 
uneven surfaces.  The design and operation of the tamping roller shall be subject to the approval of 
the Contracting Officer who shall have the right at any time during the prosecution of the work to direct 
such repairs to the tamping feet, minor alterations in the roller and variations in the weight as may 
be found necessary to secure optimum compaction of the earth fill materials.  The Contractor may be required 
to add ballast to the roller to the maximum capacity specified by the manufacturer of the roller.  The 
roller shall be drawn by a crawler-type or a rubber-tired tractor at a speed not to exceed<MET> 5.6 km</MET><ENG> 3.5 
miles</ENG> per hour.  The use of the rubber-tired tractor shall be discontinued if the tires leave ruts that 
prevent uniform compaction by the tamping roller. If tamping rollers are used in tandem, not more than 
two rollers in tandem will be permitted and in such case, one trip of the tandem rollers over any surface 
will be considered as two passes.  When tamping rollers are used in tandem, the tamper foot spacing shall 
be offset so that the circumferential rows on the rear drums are in line with the mid-point of the circumferential 
rows on the forward drums.</LST><BRK/>
<BRK/>
<LST>b.  Self-propelled - [Conditioned upon satisfactory performance, self-propelled tamping rollers may be 
used in lieu of tractor-drawn tamping rollers.  Self-propelled rollers exceeding the empty weight requirement 
may be used provided that by the substitution of tamping feet, having a face area not exceeding [_____] 
[<MET>9030 square mm</MET><ENG> 14 square inches</ENG>], the nominal foot pressure on the tamping feet of the self-propelled 
roller can be adjusted to approximate the nominal foot pressure of the towed roller for the particular 
working condition required for the towed rollers.  The tamping feet shall be<MET> 175 to 225 mm</MET><ENG> 7 to 9 inches</ENG>
 in clear projection from the cylindrical surface of the roller.  For self-propelled rollers, in which 
steering is accomplished through use of rubber-tired wheels, the tire pressure shall not exceed [_____] 
[<MET>276 kPa</MET><ENG> 40 psi</ENG>].  Self-propelled rollers shall be operated at a speed not to exceed<MET> 5.6 km</MET><ENG> 3.5 miles</ENG>
 per hour.]  [Self-propelled tamping rollers may be used in lieu of tractor drawn tamping rollers provided 
the foot pressure on the tamping feet of the self-propelled roller are approximately the same as the 
foot pressure on the towed roller.  For self-propelled rollers steered with rubber-tired wheels, the 
tire pressure shall not exceed [_____] [<MET>276 kPa</MET><ENG> 40 psi</ENG>].  Self-propelled rollers shall be operated at 
speeds not exceeding<MET> 5.6 km</MET><ENG> 3.5 miles</ENG> per hour.  The Contracting Officer has the authority to limit or 
eliminate the use of self-propelled rollers if they are found to cause shearing or laminations of the 
compacted fill.]</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.1.2   Vibratory Rollers</TTL><BRK/>
<BRK/>
<TXT>Vibratory rollers for compacting rock fills, pervious sand and gravel fills, or filter and transition drainage 
layers shall be equipped with a smooth steel compaction drum and shall be operated at a frequency of vibration 
during compaction operations between 1100 and 1500 vpm.  Vibratory rollers may be either towed or self-propelled 
and shall have an unsprung drum weight that is a minimum of 60 percent of the rollers' static weight.  Towed 
rollers shall have at least 90 percent of their weight transmitted to the ground through the compaction drum 
when the roller is standing in a level position hitched to the towing vehicle.  Rollers for compacting rockfill, 
[sand and gravel fills, or filter and drainage layers] shall have a minimum static  weight of<MET> 90 kN</MET><ENG> 20,000 pounds</ENG>
, a minimum dynamic force of<MET> 180 kN</MET><ENG> 40,000 pounds</ENG> when operating at 1400 vpm, and an applied force not less than<MET>
 130 kN/m</MET><ENG> 9,000 pounds per foot</ENG> of compaction drum length.[  Rollers for compacting sand and gravel fills or 
filter and drainage layers shall have a minimum static weight of<MET> 36 kN</MET><ENG> 8,000 pounds</ENG>, a minimum dynamic force 
of<MET> 71 kN</MET><ENG> 16,000 pounds</ENG> when operating at 1400 vpm, and an applied force not less than<MET> 22 kN</MET><ENG> 5,000 pounds</ENG> nor 
greater than<MET> 130 kN/m</MET><ENG> 9,000 pounds per foot</ENG> of compaction drum length.]  The level of amplitude and vibration 
frequency during compaction will be maintained uniform throughout the embankment zone within which it is operating.  
Rollers shall be operated at speeds not to exceed<MET> 2.4 km/h</MET><ENG> 1.5 mph</ENG>.  The equipment manufacturer shall furnish 
sufficient data, drawings, and computation for verification of the above specifications, and the character and 
efficiency of this equipment shall be subject to approval.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.1.3   Rubber-tired Rollers</TTL><BRK/>
<BRK/>
<TXT>Rubber-tired rollers shall have a minimum of four wheels equipped with pneumatic tires.  The tires shall be of 
such size and ply as to be capable of being operated at tire pressures between<MET> 550 and 690 kPa</MET><ENG> 80 and 100 psi</ENG>
 at an<MET> 11,340 kg</MET><ENG> 25,000 pound</ENG> wheel load.  The roller wheels shall be located abreast and so designed that each 
wheel will carry approximately equal load in traversing uneven ground.  The spacing of the wheels shall be such 
that the distance between the nearest edges of adjacent tires will not be greater than 50 percent of the rated 
tire width of a single tire at the operating pressure for an<MET> 11,340 kg</MET><ENG> 25,000 pound</ENG> wheel load.  The roller shall 
be provided with a body suitable for ballast loading such that the load per wheel may be varied, as directed 
by the Contracting Officer, from<MET> 8,165 to 11,340 kg</MET><ENG> 18,000 to 25,000 pounds</ENG>.  The roller shall be towed at a 
speed not to exceed<MET> 8 km</MET><ENG> 5 miles</ENG> per hour.  The character and efficiency of this equipment shall be subject to 
the approval of the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.1.4   Hand Operated Compactors</TTL><BRK/>
<BRK/>
<TXT>Compaction of material, in areas where it is impracticable to use a roller or tractor compaction shall be performed 
by the use of approved hand operated power compactors.</TXT><BRK/>
<BRK/>
<LST>a.  Power Tampers:  Power tampers shall be hand operated equipment capable of compacting material in 
confined areas.  The compactors shall be either an internal combustion or pneumatic activated tamper.  
Tampers shall have sufficient weight and striking power to produce the specified compaction.  The character 
and efficiency of this equipment shall be subject to the approval of the Contracting Officer.</LST><BRK/>
<BRK/>
<LST>b.  Vibratory Plate Compactor:  Vibratory compactors operated by hand in confined areas shall utilize 
the oscillating cam principal and shall deliver an impact of not less than<MET> 9 kN</MET><ENG> 2000 lbf</ENG> at a rate of 
approximately 2000 impulses per minute.  The character and efficiency of this equipment shall be subject 
to the approval of the Contracting Officer.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.1.5   Crawler-type Tractors</TTL><BRK/>
<BRK/>
<TXT>Crawler-type tractors used for spreading or compaction shall weigh not less than<MET> [_____] [9,070] kg</MET><ENG> [_____] [20,000] 
pounds</ENG>, shall exert a unit tread pressure of not less than<MET> [_____] [41.4] kPa</MET><ENG> [_____] [6] psi</ENG>, and shall be operated 
at a speed not to exceed<MET> [_____] [5.6] km</MET><ENG> [_____] [3.5] miles</ENG> per hour.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.1.6   Sprinkling Equipment</TTL><BRK/>
<BRK/>
<TXT>Sprinkling equipment shall consist of tank trucks, pressure distributors or other equipment designed to apply 
water uniformly and in controlled quantities to variable width of surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.1.7   Miscellaneous Equipment</TTL><BRK/>
<BRK/>
<TXT>Scarifiers, disks, spring-tooth or spike-tooth harrows, spreaders, and other equipment shall be suitable for 
use in embankment construction and approved by the Contracting Officer.  Equipment used for blending fill material 
shall be capable of penetrating the full loose lift thickness of the specific material type.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.21.2   Compaction of Select Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Experience indicates that by the time the surface lift has been laid 
down, sufficient compactive effort has occurred due to hauling and spreading 
equipment such that one, two, or even three passes of a heavy disk plow is not 
sufficient for penetrating the full depth of lift.  A harrow equipped with closely 
spaced spikes (teeth) has been found to effectively penetrate the semi-compacted 
surface lift in one pass, but this type of device has minimal ability to blend 
and mix the fill material.  It was found that a suitably designed spiked-tooth 
harrow working in combination with a heavy disk plow can reliably produce the 
desired result.  This note applies to all types of fill placement for which 
moisture and blending are required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After a layer of material has been dumped and spread, it shall be harrowed to break up and blend the fill materials 
and to obtain uniform moisture distribution.  Harrowing shall be performed with a heavy disk plow, or other approved 
harrow, to the full depth of the layer.  If one pass of the harrow does not accomplish the breaking up and blending 
of the materials, additional passes of the harrow shall be required, but in no case will more than [_____] [three] 
passes of the harrow on any one layer be required for this purpose.  When the moisture content and the condition 
of the layer are satisfactory, the lift shall be compacted [to a minimum of [95] [_____] percent of the maximum 
dry density as determined by the Contractor in accordance with <RID>ASTM D 698</RID>] [with not less than [six] [_____] 
complete coverages of an approved tamping roller or [four] [_____] complete coverages of an approved<MET> 45 metric 
ton</MET><ENG> 50-ton</ENG> rubber-tired roller traversing in a direction parallel to the axis of the levee].  In areas which 
are not accessible by roller, the fill shall be placed in layers not more than<MET> 100 mm</MET><ENG> 4 inches</ENG> in uncompacted 
depth and compacted with an approved hand operated compactor to a density equal to that obtained in other areas 
which are accessible to rollers.  Dumping, spreading, sprinkling, and compacting may be performed at the same 
time at different points along a section when there is sufficient area to permit these operations to proceed 
simultaneously.  Compaction equipment shall be operated such that the strip being traversed by the roller shall 
overlap the rolled adjacent strip by not less than<MET> [_____] [1] m</MET><ENG> [_____] [3] feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.3   Compaction of Random Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Random fill shall be compacted in accordance with the requirements of 
the material type it most closely approximates in behavior.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After a layer of material has been dumped and spread, it shall be harrowed to break up and blend the fill materials 
and to obtain uniform moisture distribution.  Harrowing shall be performed with a heavy disk plow, or other approved 
harrow, to the full depth of the layer.  If one pass of the harrow does not accomplish the breaking up and blending 
of the materials, additional passes of the harrow shall be required, but in no case will more than [_____] [three] 
passes of the harrow on any one layer be required for this purpose.  When the moisture content and the condition 
of the layer are satisfactory, the lift shall be compacted [to a minimum of [95] [_____] percent of the maximum 
dry density as determined by the Contractor in accordance with <RID>ASTM D 698</RID>] [with not less than [six] [_____] 
complete coverages of an approved tamping roller or [four] [_____] complete coverages of an approved<MET> 45 metric 
ton</MET><ENG> 50-ton</ENG> rubber-tired roller traversing in a direction parallel to the axis of the levee].  In areas which 
are not accessible by roller, the fill shall be placed in layers not more than<MET> 100 mm</MET><ENG> 4 inches</ENG> in uncompacted 
depth and compacted with an approved hand operated compactor to a density equal to that obtained in other areas 
which are accessible to rollers.  Dumping, spreading, sprinkling, and compacting may be performed at the same 
time at different points along a section when there is sufficient area to permit these operations to proceed 
simultaneously.  Compaction equipment shall be operated such that the strip being traversed by the roller shall 
overlap the rolled adjacent strip by not less than<MET> [_____] [1] m</MET><ENG> [_____] [3] feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.4   Compaction of Impervious Fill</TTL><BRK/>
<BRK/>
<TXT> After a layer of material has been dumped and spread, it shall be harrowed to break up and blend the fill materials 
and to obtain uniform moisture distribution.  Harrowing shall be performed with a heavy disk plow, or other approved 
harrow, to the full depth of the layer.  If one pass of the harrow does not accomplish the breaking up and blending 
of the materials, additional passes of the harrow shall be required, but in no case will more than [_____][three] 
passes of the harrow on any one layer be required for this purpose.  When the moisture content and the condition 
of the layer are satisfactory, the lift shall be compacted with not less than [six][_____] complete coverages 
of an approved tamping roller traversing in a direction parallel to the axis of the levee.  If the desired compaction 
to a minimum of [95][_____] percent of the maximum dry density as determined by the Contractor in accordance 
with <RID>ASTM D 698</RID> is not achieved, additional rolling will be required.  In areas which are not accessible by roller, 
the fill shall be placed in layers not more than 4 inches in uncompacted depth and compacted with an approved 
hand operated compactor to a density equal to that obtained in other areas which are accessible to rollers.  
Dumping, spreading, sprinkling, and compacting may be performed at the same time at different points along a 
section when there is sufficient area to permit these operations to proceed simultaneously. Compaction equipment 
shall be operated such that the strip being traversed by the roller shall overlap the rolled adjacent strip by 
not less than<MET> [_____] [1] meter</MET><ENG> [_____] [3] feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.5   Compaction of Pervious Fill</TTL><BRK/>
<BRK/>
<TXT>After a layer of material has been dumped and spread it shall be harrowed as required to break up and blend the 
fill materials and to obtain uniform moisture distribution.  Harrowing shall be performed with a heavy disk plow, 
or other approved harrow, to the full depth of the layer.  If one pass of the harrow does not accomplish the 
breaking up and blending of the materials, additional passes of the harrow shall be required, but in no case 
will more than [_____] [three] passes of the harrow on any one layer be required for this purpose.  When the 
moisture content and the condition of the layer are satisfactory, the lift shall be compacted to a [minimum [80] 
[_____] percent relative density in accordance with <RID>ASTM D 4253</RID> and <RID>ASTM D 4254</RID>] [with not less than [six] [_____] 
complete coverages of an approved vibratory roller].  In areas which are not accessible by roller, the fill shall 
be placed in layers not more than<MET> 100 mm</MET><ENG> 4 inches</ENG> in uncompacted depth and compacted with an approved hand operated 
compactor to a density equal to that obtained in other areas which are accessible to rollers.  Dumping, spreading, 
sprinkling, and compacting may be performed at the same time at different points along a section when there is 
sufficient area to permit these operations to proceed simultaneously.  Compaction equipment shall be operated 
such that the strip being traversed by the roller shall overlap the rolled adjacent strip by not less than<MET> [____] 
[1] m</MET><ENG> [_____] [3] feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.6   [Compaction of Random Rock]</TTL><BRK/>
<BRK/>
<TXT>After the random rock has been placed and spread to the thickness specified herein, and oversized rock has been 
removed or broken down, compaction shall be accomplished by not less than [_____] [3-6] complete coverages of 
the specified [crawler tractor] [vibratory roller]. [ Each coverage of the tractor shall consist of sufficient 
trips to provide complete coverage of the area by the treads of the tractor.  The tractor coverages specified 
shall be in addition to spreading operations.] [ The vibratory roller shall be operated such that the strip being 
traversed by the roller shall overlap the rolled adjacent strip by not less than<MET> [_____] [1] m</MET><ENG> [_____] [3] feet</ENG>
.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.7   Compaction of Semicompacted Fill</TTL><BRK/>
<BRK/>
<TXT>[After a layer of material has been dumped and spread it shall be harrowed as required to break up and blend 
the fill materials and to obtain uniform moisture distribution.  Harrowing shall be performed with a heavy disk 
plow, or other approved harrow, to the full depth of the layer. If one pass of the harrow does not accomplish 
the breaking up and blending of the materials, additional passes of the harrow shall be required, but in no case 
will more than [_____] [three] passes of the harrow on any one layer be required for this purpose.] [ When the 
moisture content and the condition of the layer are satisfactory, the lift shall be compacted by not less than 
[four] [_____] complete coverages of a tamper-type roller, or by not less than [three] [_____] complete coverages 
of a crawler-type tractor, or by not less than [two] [_____] complete coverages of a rubber-tired roller, all 
conforming to the requirements of paragraph EQUIPMENT.]  [In areas which are not accessible by roller, the fill 
shall be placed in layers not more than<MET> 100 mm</MET><ENG> 4 inches</ENG> in uncompacted depth and compacted with an approved hand 
operated compactor to a density equal to that obtained in other areas which are accessible to rollers.]  [After 
preparation of the previous compacted layer to receive the new layer of fill the new layer shall be compacted 
by the controlled movement of the hauling equipment over the area of the fill.]  Equipment shall be routed so 
as to prevent excessive rutting of the fill surface.  Dumping, spreading, sprinkling, and compacting may be performed 
at the same time at different points along a section when there is sufficient area to permit these operations 
to proceed simultaneously.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.8   Compaction of Uncompacted Fill</TTL><BRK/>
<BRK/>
<TXT>No compaction other than that obtained by the controlled movement of the hauling equipment over the area of the 
fill is required.  Equipment shall be routed so as to prevent excessive rutting of the fill surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.9   Compaction of Hydraulic Fill</TTL><BRK/>
<BRK/>
<TXT>Hydraulic fill shall be compacted as uncompacted fill.  If the rehandled hydraulic fill is too dry to permit 
its placement by uncompacted full method, then the fill material shall be compacted using the method specified 
in paragraph [_____] [COMPACTION OF SEMICOMPACTED FILL].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.10   [Compaction of Random Fill Within the MSE Walls</TTL><BRK/>
<BRK/>
<TXT>Random earth fill within the limits of the Mechanically Stabilized Earth (MSE) walls shall be placed and compacted 
in accordance with [the vendor's requirements, subject to the approval of the Contracting Officer] [requirements 
specified in Section [_____]].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.11   Compaction of Coarse Drainage Gravel and Filter Sand</TTL><BRK/>
<BRK/>
<TXT>Coarse drainage gravel placed in the drains shall be placed in maximum<MET> [_____] [300] mm</MET><ENG> [_____] [12] inch</ENG> loose 
lifts and compacted by not less than four (4) complete coverages with a [static] [vibratory] roller.  Each lift 
of gravel within confined spaces which is not accessible to rollers shall be compacted by at least [_____] [3] 
complete coverages with a vibratory plate compactor [and as many additional coverages as necessary to achieve 
the same density obtained with full-size compaction equipment].  Filter sand placed along the existing rock fill 
shall be compacted in accordance with the requirements for the adjacent select earth fill material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.12   Compaction of Fine Drainage Gravel</TTL><BRK/>
<BRK/>
<TXT>Fine drainage gravel placed in the drains shall be placed in maximum<MET> [_____] [300] mm</MET><ENG> [_____] [12] inch</ENG> loose 
lifts and compacted by not less than four (4) complete coverages with a [static] [vibratory] roller.  Each lift 
of gravel within confined spaces which is not accessible to rollers shall be compacted by at least three [_____] 
[3] complete coverages with a vibratory plate compactor [and as many additional coverages as necessary to achieve 
the same density obtained with full-size compaction equipment].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.13   Compaction Adjacent to Structures and Utilities</TTL><BRK/>
<BRK/>
<TXT>Heavy equipment for spreading and compacting fill shall not be operated within<MET> [_____] [1] m</MET><ENG> [_____] [4] feet</ENG>
 of structures or utilities, except as otherwise specified herein.  Material within<MET> [_____] [1] m</MET><ENG> [_____] [4] 
feet</ENG> shall be compacted using appropriate hand operated compactors specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.14   [Additional Rolling for Compaction</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following paragraph only when a method specification is utilized.  
A bid item for "Additional Rolling for Compaction" should be included in the 
bid form so that payment can be made.  Measurement and payment information should 
also be added to paragraph [UNIT][LUMP SUM] PRICES or Section 
<SRF>01 22 00.00 10</SRF> MEASUREMENT AND PAYMENT as applicable.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>If the Contracting Officer determines that the desired compaction of any portion of the embankment is not achieved 
by the number of coverages specified, additional complete coverages shall be made over the surface area as directed 
by the Contracting Officer.  Payment for additional rolling directed by the Contracting officer shall be made 
in accordance with Bid Item No. [_____] ADDITIONAL ROLLING FOR COMPACTION; however, no payment will be made for 
additional rolling not specifically directed by the Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.21.15   [Topsoil</TTL><BRK/>
<BRK/>
<TXT>Topsoil shall be placed on the embankment surfaces as shown on the contract drawings and as specified in SECTION 
[<SRF>32 92 23</SRF> SODDING] [_____]].</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><SPT><TTL>3.22   FIELD QUALITY CONTROL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  FAR Part 46.312 establishes a requirement for Contractor Quality Control 
(CQC) in construction contracts and ER 1180-1-6 requires that a CQC section 
based on Section <SRF>01 45 01</SRF> USACE QUALITY CONTROL be included in contracts of 
$1,000,000 or more.  Use of Section <SRF>01 45 01</SRF> for contracts of less than $1,000,000 
is discretionary.  This part of the specifications must be consistent with the 
CQC section.</NPR><BRK/>
<BRK/>
<TAI OPT="EMBANK"><NPR>Use caution when applying nuclear gages for in-place density measurement of 
cohesive and cohesionless soils.  Soils consisting of mica, halloysite, some 
other chemical composition, or oversize rocks and large voids would affect the 
measurement accuracy of wet density.  The chemical composition and "non-free" 
water of the sample may also dramatically (sometimes over 10 percent) affect 
the measurement of moisture content (see the paragraph entitled "Interferences" 
in ASTM D2922 and D3017.  Also see paragraph 5-10.d.(2).(b). entitled "Nuclear 
Method" in EM 1110-2-1911).  When water content can not be accurately measured 
using nuclear method, a computer controlled microwave oven system for water 
content measurement combined with nuclear method for wet density has been successfully 
used by some districts.  Sand Cone or similar field density tests should be 
performed periodically at the same location as Nuclear Tests to assure nuclear 
testing is providing accurate information.</NPR></TAI><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TAI OPT="CLEAR-GRUB-STRIP"><SPT><TTL>3.22.1   Clearing, Grubbing, and Stripping</TTL><BRK/>
<BRK/>
<TXT>Establish and maintain quality control for clearing, grubbing, and stripping operations to assure compliance 
with contract requirements, and maintain records of the quality control for all construction operations including 
but not limited to the items indicated below.  These records, as well as the records of corrective actions taken, 
shall be furnished to the Government in accordance with Section <SRF>01 45 01</SRF> USACE QUALITY CONTROL.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.22.1.1   Clearing</TTL><BRK/>
<BRK/>
<TXT>Station to station limits, transverse clearing limits from applicable centerline; percentage of area complete; 
types of materials cleared.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.1.2   Grubbing</TTL><BRK/>
<BRK/>
<TXT>Station to station limits, transverse grubbing limits from applicable centerline; percentage of area complete; 
type of material; filling of grubbed holes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.1.3   Stripping</TTL><BRK/>
<BRK/>
<TXT>Station to station limits, transverse stripping limits from applicable centerline; percentage of area complete; 
type of material; depth of stripping.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI><TAI OPT="EXCAVAT"><SPT><TTL>3.22.2   Excavation</TTL><BRK/>
<BRK/>
<TXT>Establish and maintain quality control for excavation operations to assure compliance with contract requirements, 
and maintain records of the Contractor's quality control for all construction operations including but not limited 
to the following:</TXT><BRK/>
<BRK/>
<LST>a.  Lines, grades and tolerances,</LST><BRK/>
<BRK/>
<LST>b.  Segregation of materials,</LST><BRK/>
<BRK/>
<LST>c.  Disposal and/or stockpiling of materials,</LST><BRK/>
<BRK/>
<LST>d.  Unsatisfactory materials,</LST><BRK/>
<BRK/>
<LST>e.  Conditions that may induce seepage or weaken the foundation or embankment,</LST><BRK/>
<BRK/>
<LST>f.  Stability of excavations.</LST><BRK/>
<BRK/>
<TXT>Records of inspections and tests, as well as the records of corrective actions taken, shall be furnished to the 
Government in accordance with Section <SRF>01 45 01</SRF> USACE QUALITY CONTROL.</TXT><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="EMBANK"><SPT><TTL>3.22.3   Embankment</TTL><BRK/>
<BRK/>
<SPT><TTL>3.22.3.1   General</TTL><BRK/>
<BRK/>
<TXT>As a part of the Contractor Quality Control (CQC) system required by SECTION <SRF>01 45 01</SRF> USACE QUALITY CONTROL, 
establish and maintain field quality control for foundation preparation, embankment and backfill operations to 
assure compliance with contract requirements and maintain detailed records of field quality control for all operations 
including but not limited to the following:</TXT><BRK/>
<BRK/>
<LST>a.  Earthwork Equipment</LST><BRK/>
<BRK/>
<ITM>Type, size, number of units and suitability for construction of the prescribed work.</ITM><BRK/>
<BRK/>
<LST>b.  Foundation Preparation</LST><BRK/>
<BRK/>
<ITM>Methods of preparing the foundations in advance of embankment and backfill construction and 
methods for providing drainage of the foundation and partially completed fills.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.3.2   Materials Testing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Types of tests and frequency of testing should be detailed below.  Types 
of tests and frequency of testing will be dependent upon the types of materials 
utilized, configuration of foundation and embankment, placement and compaction 
procedures required, moisture control requirements etc.  Testing requirements 
are material type specific rather than embankment fill type specific.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform sufficient testing to insure that the fill is being constructed as specified.  The testing program specified 
below shall be considered the minimum acceptable frequency of testing.  This does not relieve the Contractor 
from the responsibility of performing additional testing, if required to ensure compliance with these specifications.</TXT><BRK/>
<BRK/>
<LST>[a.  Soil Classification Tests</LST><BRK/>
<BRK/>
<ITM>Soil classification tests shall be performed in accordance with <RID>ASTM D 2487</RID>.  One initial classification 
test shall be required for each different classification of material to be utilized as embankment 
fill or backfill.  As prescribed in <RID>ASTM D 2487</RID>, grain size analyses in accordance with <RID>ASTM D 422</RID>
 and Atterberg limits in accordance with <RID>ASTM D 4318</RID> shall be performed on each different classification.  
Submit additional tests for every [_____]<MET> cubic m</MET><ENG> cubic yards</ENG> of embankment or backfill material.  
Soil classification tests shall be performed on foundation material as required to determine 
the acceptability of the in-situ soils.  Additional tests will be required if noticeable changes 
in the material occur.]</ITM><BRK/>
<BRK/>
<LST>b.  Cohesive Material Testing</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit the following to comply with the method selected to determine the 
optimum properties (i.e., density and moisture content).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>(1)  Moisture Density Relationships.  The moisture-density relations for each different classification 
of cohesive material utilized shall be determined in accordance with [_____] [<RID>ASTM D 698</RID>], [Method 
A] [Method B] [Method C].[  Prior to placing any fill material containing cohesive material, 
a minimum of [_____] (5) five-point [_____] compaction test shall be performed on representative 
samples of the material to be used as fill.]  During fill placement a minimum of one additional 
moisture-density test shall be performed for every [_____]<MET> cubic m</MET><ENG> cubic yard</ENG> placed.  Additional 
tests will be required each time a new material is encountered.[  The moisture-density curves 
will be compiled to form a family of curves which will be utilized to estimate optimum properties 
(maximum dry density and optimum moisture content) to be used with field density test.]</ITM><BRK/>
<BRK/>
<ITM>(2)  Water (Moisture) Content Tests.  Determination of water content shall be performed in accordance 
with <RID>ASTM D 2216</RID>.[  <RID>ASTM D 4643</RID> may be used when rapid moisture content results are needed.  
All rapid results obtained by <RID>ASTM D 4643</RID> shall be confirmed by a test on a duplicate sample 
performed in accordance with <RID>ASTM D 2216</RID>.  In the event of disagreement between the results, <RID>
ASTM D 2216</RID> shall govern.]  One water content test will be performed for each [_____]<MET> cubic 
m</MET><ENG> cubic yards</ENG> of material placed [or each lift of material whichever is less].[  These test 
will be in addition to the water content tests performed in conjunction with in-place density 
tests.]  Backfill and fills not meeting the required specifications for water content shall 
be retested after corrective measures have been applied.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  The designer should pick the method or methods of In-place density which 
are acceptable.  If uncompacted fill is specified density control may not be 
required.</NPR><BRK/>
<BRK/>
<NPR>Use caution when applying nuclear gages for in-place density measurement of 
cohesive and cohesionless soils.  Soils consisting of certain chemical composition, 
or oversize rocks and large voids would affect the measurement accuracy of wet 
density.  The chemical composition and "non-free" water of the sample may also 
dramatically (sometimes over 10 percent) affect the measurement of moisture 
content (see the paragraph entitled "Interferences" in ASTM D2922 and D3017.  
Also see paragraph 5-10.d.(2).(b). entitled "Nuclear Method" in EM 1110-2-1911).  
When water content can not be accurately measured using nuclear method, a computer 
controlled microwave oven system for water content measurement combined with 
nuclear method for wet density has been successfully used by some districts.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>(3)  In-place Density Testing for Cohesive Materials.  The in-place density of the cohesive 
materials shall be determined in accordance with [<RID>ASTM D 1556</RID>] [, <RID>ASTM D 2167</RID>] [, <RID>ASTM D 6938</RID>
] [, <RID>ASTM D 2937</RID>] [, or ] [<RID>ASTM D 5195</RID>].  At least one (1) in-place density test shall be performed 
on [each lift of material or] every [_____]<MET> cubic m</MET><ENG> cubic yards</ENG> of completed fill whichever 
is more frequent with the horizontal locations randomly staggered in the fill.[  At each field 
density test location, soil samples shall be obtained and one [one-point] [two-point] compaction 
test, one moisture content, [one grain size analysis,] [ and one Atterberg limits test,] [if 
applicable,] shall be performed on the sample.] [ The results of the [one-point] [two-point] 
compaction test and the moisture content test will be utilized to obtain the optimum properties 
to compare to the results of the in-place density test.] [ For use with the family of curves 
to determine the optimum properties of the material a [one-point] [two-point] compaction tests 
shall be performed in conjunction with each in-place density.  A portion of the soil from the 
in-place field density test and soil obtained immediately adjacent to the field density test 
location shall be used for a [one-point] [two-point] compaction test.  The minus<MET> 19 mm</MET><ENG> 3/4-inch</ENG>
 portion of the soil shall be subjected to [_____] compactive effort using a<MET> 150 mm</MET><ENG> 6-inch</ENG> compaction 
mold in accordance with the procedures presented in ASTM D [_____] [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>
]].  Fill not meeting the required specifications for in-place density shall be retested after 
additional compaction has been completed.[  When nuclear method is used for in-place density 
testing according to <RID>ASTM D 6938</RID>, the first test and every tenth test thereafter for each material 
type shall include a sand cone correlation test in accordance with <RID>ASTM D 1556</RID>.  The sand cone 
test shall be performed adjacent to the location of the nuclear test, shall include a nominal<MET>
 150 mm</MET><ENG> 6 inch</ENG> diameter sand cone, and shall include a minimum wet soil weight of<MET> 2.7 kg</MET><ENG> 6 pounds</ENG>
 extracted from the hole.  Nuclear density testing equipment shall not be used during rain.  
The density correlations shall be submitted with test results.  Each transmittal including density 
test data shall include a summary of all density correlations for the job neatly prepared on 
a summary sheet including at a minimum:</ITM><BRK/>
<BRK/>
<ITM>(i)   Meter serial number and operators initials.</ITM><BRK/>
<ITM>(ii)  Standard count for each test.</ITM><BRK/>
<ITM>(iii) Material type.</ITM><BRK/>
<ITM>(iv)  Probe depth.</ITM><BRK/>
<ITM>(v)   Moisture content by each test method and the deviation.</ITM><BRK/>
<ITM>(vi)  Wet density by each test method and the deviation.]</ITM><BRK/>
<BRK/>
<LST>[c.  Cohesionless Material Testing</LST><BRK/>
<BRK/>
<ITM>(1)  Compaction Tests.  Run not less than one relative density test for every<MET> [3,000] [_____] 
cubic m</MET><ENG> 3,900 [_____] cubic yards</ENG> of cohesionless fill in accordance with <RID>ASTM D 4253</RID> and <RID>ASTM D 4254</RID>
.</ITM><BRK/>
<BRK/>
<ITM>(2)  In-Place Density Tests.  The in-place density of the cohesionless materials shall be determined 
in accordance with [<RID>ASTM D 1556</RID>] [, <RID>ASTM D 2167</RID>] [, <RID>ASTM D 6938</RID>] [, <RID>ASTM D 2937</RID>] [, or] [<RID>ASTM D 5195</RID>
].  Run not less than one (1) field in-place density test on [each lift of material or] every 
[_____]<MET> cubic m</MET><ENG> cubic yards</ENG> of completed embankment fill or backfill whichever is less.  Horizontal 
locations shall be randomly staggered in the fill.[  When nuclear method is used for in-place 
density testing according to <RID>ASTM D 6938</RID>, the first test and every tenth test thereafter for 
each material type shall include a sand cone correlation test in accordance with <RID>ASTM D 1556</RID>
.  The sand cone test shall be performed adjacent to the location of the nuclear test, and shall 
include a nominal<MET> 150 mm</MET><ENG> 6 inch</ENG> diameter sand cone, and shall include a minimum wet soil weight 
of<MET> 2.7 kg</MET><ENG> 6 pounds</ENG> extracted from the hole.  The density correlations shall be submitted with 
test results.  Each transmittal including density test data shall include a summary of all density 
correlations for the job neatly prepared on a summary sheet including at a minimum:</ITM><BRK/>
<BRK/>
<ITM>(i)   Meter serial number and operators initials.</ITM><BRK/>
<ITM>(ii)  Standard count for each test.</ITM><BRK/>
<ITM>(iii) Material type.</ITM><BRK/>
<ITM>(iv)  Probe depth.</ITM><BRK/>
<ITM>(v)   Moisture content by each test method and the deviation.</ITM><BRK/>
<ITM>(vi)  Wet density by each test method and the deviation.]</ITM><BRK/>
<BRK/>
<ITM>[(3)  Water (Moisture) Content Tests.  Determination of water content shall be performed in 
accordance with <RID>ASTM D 2216</RID>.[  <RID>ASTM D 4643</RID> may be used when rapid moisture content results are 
needed.  All rapid results obtained by <RID>ASTM D 4643</RID> shall be confirmed by a test on a duplicate 
sample performed in accordance with <RID>ASTM D 2216</RID>.  In the event of disagreement between the results, <RID>
ASTM D 2216</RID> shall govern.]  One water content test will be performed for each [_____]<MET> cubic 
m</MET><ENG> cubic yards</ENG> of material placed [or each lift of material whichever is less].[  These test 
will be in addition to the water content tests performed in conjunction with in-place density 
tests.]  Backfill and fills not meeting the required specifications for water content shall 
be retested after corrective measures have been applied.]]</ITM><BRK/>
<BRK/>
<LST>d.  Additional Testing</LST><BRK/>
<BRK/>
<ITM>The Contracting Officer may request additional tests if there is reason to doubt the adequacy 
of the compaction, or special compaction procedures are being used, or materials change or if 
the Contracting Officer determines that the Contractor's testing is inadequate or the Contractor 
is concentrating backfill and fill operations in a relatively small area.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.3.3   Materials</TTL><BRK/>
<BRK/>
<TXT>Suitability of materials for use in embankment and backfill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.3.4   Fill Placement</TTL><BRK/>
<BRK/>
<TXT>Layout, maintaining existing drainage, moisture control, thickness of layers, removal of oversized material, 
spreading and compaction for embankment and backfill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.3.5   Grade and Cross Section</TTL><BRK/>
<BRK/>
<TXT>Surveys to verify that the dimensions, slopes, lines and grades conform to those shown on the drawings.[  Surveys 
to monitor settlement gages to measure foundation settlement.] [ Surveys to locate core boring locations and 
elevations to determine foundation settlement.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.3.6   Testing by the Government</TTL><BRK/>
<BRK/>
<TXT>During the life of this contract, the Government [or its Contractors] will perform quality assurance tests.  
Make available to the government [or its Contractors] the equipment to perform these test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.22.3.7   Reporting</TTL><BRK/>
<BRK/>
<TXT>On a daily basis, furnish the inspection records and all material testing results, [the quantity of fill placed,] 
as well as the records of corrective action taken, in accordance with Section <SRF>01 45 01</SRF> USACE QUALITY CONTROL.</TXT><BRK/>
<BRK/></SPT>
</SPT></TAI></SPT></PRT>   <END/><BRK/></SEC>