<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA         UFGS-40 17 30.00 40 (February 2009)<BRK/>
                                       -----------------------------------<BRK/>
Preparing Activity:  <PRA>NASA</PRA>              Superseding<BRK/>
                                       UFGS-23 31 13.20 40 (July 2007)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 40 17 30.00 40</SCN><BRK/>
<BRK/>
<STL>WELDING GENERAL PIPING</STL><BRK/>
<DTE>02/09</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This specification covers the requirements for <SCP>welding of metals for 
mechanical use</SCP>.</NPR><BRK/>
<BRK/>
<NPR>This section covers work requiring steel welding.  Accordingly, the specifier 
shall include Section <SRF>05 05 23</SRF> WELDING, STRUCTURAL; in this specification if 
any such welding is required.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.</NPR><BRK/>
<BRK/>
<NPR>Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.</NPR><BRK/>
<BRK/>
<NPR>Recommended changes to a UFGS should be submitted as a <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B31.1</RID><RTL>(2007; Addenda 2008) Power Piping</RTL><BRK/><BRK/><RID>ASME B31.3</RID><RTL>(2008) Process Piping</RTL><BRK/><BRK/><RID>ASME B31.5</RID><RTL>(2006) Refrigeration Piping and Heat Transfer Components</RTL><BRK/><BRK/><RID>ASME BPVC SEC IX</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section IX, Welding and Brazing Qualifications</RTL><BRK/><BRK/><RID>ASME BPVC SEC V</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section V, Nondestructive Examination</RTL><BRK/><BRK/><RID>ASME BPVC SEC VIII D1</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VIII, Pressure Vessels Division 1 - Basic Coverage</RTL><BRK/><BRK/><RID>ASME BPVC SEC VIII D2</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VIII, Rules for Construction of Pressure Vessels Division 2 - Alternatives Rules</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL CODE COUNCIL (ICC)</ORG><BRK/><BRK/><RID>ICC IPC</RID><RTL>(2006; Supplement 2007) International Plumbing Code</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS (NBBPVI)</ORG><BRK/><BRK/><RID>NBBPVI NB-23</RID><RTL>(2004) National Board Inspection Code</RTL><BRK/><BRK/></REF><REF><ORG>PIPE FABRICATION INSTITUTE (PFI)</ORG><BRK/><BRK/><RID>PFI ES 1</RID><RTL>(2004) Internal Machining and Solid Machined Backing Rings for Circumferential Butt Welds</RTL><BRK/><BRK/><RID>PFI ES 21</RID><RTL>(2004) Internal Machining and Fit-up of GTAW Root Pass Circumferential Butt Welds</RTL><BRK/><BRK/><RID>PFI ES 3</RID><RTL>(2004) Fabricating Tolerances</RTL><BRK/><BRK/><RID>PFI ES 31</RID><RTL>(1992; R 2004) Standard for Protection of Ends of Fabricated Piping Assemblies</RTL><BRK/><BRK/><RID>PFI ES 35</RID><RTL>(1998; R 2004) Nonsymmetrical Bevels and Joint Configurations for Butt Welds</RTL><BRK/><BRK/><RID>PFI ES 7</RID><RTL>(2004) Minimum Length and Spacing for Welded Nozzles</RTL><BRK/><BRK/><RID>PFI TB1</RID><RTL>(1994; R 1999) Pressure Temperature Ratings of Seamless Pipe Used in Power Plant Piping Systems</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review Submittal Description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  Submit the following 
in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM>Manufacturer's catalog data shall be submitted for <SUB>Welding Equipment</SUB> and <SUB>Welding Rods and Accessories</SUB>
 in accordance with paragraph entitled, "Welding Equipment," of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Welder's Pre-Qualification Samples</SUB> shall be submitted prior to start.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM>Test reports shall be submitted for <SUB>Radiographs</SUB>.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM>Certificates for the following shall be submitted in accordance with paragraph entitled, "Quality 
Assurance," of this section.</ITM><BRK/>
<BRK/>
<ITM><SUB>Certified Welding Procedure Specifications</SUB> (WPS)</ITM><BRK/>
<ITM><SUB>Certified Brazing Procedure Specifications</SUB> (BPS)</ITM><BRK/>
<ITM><SUB>Certified Procedure Qualification Records</SUB> (PQR)</ITM><BRK/>
<ITM><SUB>Certified Welder Performance Qualifications</SUB> (WPQ)</ITM><BRK/>
<ITM><SUB>Certified Brazer Performance Qualifications</SUB> (BPQ)</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<TXT>Within [fifteen] [  ] calendar days after receipt of Notice to Proceed, the Contractor shall submit for [approval] 
[review] to the Contracting Officer <SUB>Certified Welding Procedure Specifications</SUB> (WPS),  <SUB>Certified Brazing Procedure 
Specifications</SUB> (BPS) and <SUB>Certified Procedure Qualification Records</SUB>. (PQR)</TXT><BRK/>
<BRK/>
<TXT>[Fifteen] [_____] calendar days prior to any employee welding on project material, the Contractor shall submit 
for [approval] [review] to the Contracting Officer [two] [_____] copies of each <SUB>Certified Welder Performance 
Qualifications</SUB> (WPQ) and <SUB>Certified Brazer Performance Qualifications</SUB> (BPQ).</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Personnel Qualifications</TTL><BRK/>
<BRK/>
<TXT>This specification contains the minimum requirements for qualifying welding procedures, welders, and welding 
operators for making and inspecting welds in mechanical fabrications of carbon steel, low alloy steel, extra-high-strength 
quenched and tempered low alloy steels, and austenitic stainless steel materials.</TXT><BRK/>
<BRK/>
<TXT>[No pre-qualified welding procedures are allowed.  Contractor shall qualify the welding procedures and welders 
by tests prescribed in accordance with <RID>ASME BPVC SEC IX</RID>, not withstanding the fact the code or specification 
may allow pre-qualified procedures.]</TXT><BRK/>
<BRK/>
<TXT><SUB>Welder's Pre-Qualification Samples</SUB> shall be submitted by qualified welding operators performing work on contract 
prior to start.  Only after acceptance of samples, will qualified welding operator be permitted to begin work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Pressure Vessels Qualification</TTL><BRK/>
<BRK/>
<TXT>Qualification documents [WPS] [BPS], PQR and [WPQ] [BPQ] shall be in accordance with <RID>ASME BPVC SEC IX</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Piping Qualifications</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.3.1   High Pressure Piping</TTL><BRK/>
<BRK/>
<TXT>Qualification documents for<MET> 860 kilopascal (125 psig)</MET><ENG> 125 psig</ENG> or above, [(WPS] [BPS], PQR and [WPQ)] [BPQ] shall 
be in accordance with <RID>ASME BPVC SEC IX</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3.2   Low Pressure Piping</TTL><BRK/>
<BRK/>
<TXT>Refrigeration Piping:  Qualification documents for below<MET> 860 kilopascal (125 psig)</MET><ENG> 125 psig</ENG>, [WPS] [BPS], PQR 
and [WPQ] [BPQ] for "Refrigeration Piping" shall be in accordance with <RID>ASME B31.5</RID>.</TXT><BRK/>
<BRK/>
<TXT>Plumbing:  Plumbing work shall be performed by a state licensed plumber registered in the state where the work 
is being performed.</TXT><BRK/>
<BRK/>
<TXT>Other Low Pressure Piping:  Qualification documents, [WPS] [BPS], PQR and [WPQ] [BPQ] shall be in accordance 
with <RID>ASME BPVC SEC IX</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.4   <SUB>WELDING EQUIPMENT</SUB></TTL><BRK/>
<BRK/>
<TXT>Manufacturer's catalog data shall be provided for welding equipment and <SUB>welding rods and accessories</SUB>.  Equipment 
shall meet referenced standards contained in this section.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<TXT>Not Used</TXT><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   CONSTRUCTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Pressure Vessels</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1.1   New Construction</TTL><BRK/>
<BRK/>
<TXT>Contractor shall meet the fabrication, welding/brazing and inspection requirements of the [<RID>ASME BPVC SEC VIII D1</RID>
] [<RID>ASME BPVC SEC VIII D2</RID>].</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specifier should also reference any companion codes necessary to meet 
applicable national standards or specific project requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT><TTL>3.1.1.2   Repairs to Existing Pressure Vessels</TTL><BRK/>
<BRK/>
<TXT>Code Stamped Vessels:  Contractor shall meet the fabrication, welding/brazing and inspection requirements of <RID>
NBBPVI NB-23</RID>.</TXT><BRK/>
<BRK/>
<TXT>Non-Code Vessels:  Contractor shall meet the fabrication, welding/brazing and inspection requirements of <RID>NBBPVI NB-23</RID>
 with the following exception:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  It is not necessary that a National Board Code Inspector inspect the work.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  National Board ("R" Stamp) Code stamping is not required.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.2   Piping</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specifier may elect to use any or all of the following fabrication guidelines.  
Any companion code requirements may be added at the specifier's option.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.1.2.1   High Pressure (<MET>860 kilopascal </MET><ENG>125 Psig </ENG>or Above)</TTL><BRK/>
<BRK/>
<TXT>Steam Piping:  Piping systems shall be fabricated, assembled and welded/brazed in accordance with <RID>ASME B31.1</RID>, 
and Power Piping Codes, <RID>PFI ES 1</RID>, <RID>PFI ES 3</RID>, <RID>PFI ES 7</RID>, <RID>PFI ES 21</RID>, <RID>PFI ES 31</RID>, <RID>PFI ES 35</RID>, and <RID>PFI TB1</RID>, of the Piping 
Fabrication Institute's companion code requirements.</TXT><BRK/>
<BRK/>
<TXT>Other High Pressure Piping:  Other high pressure piping systems shall be fabricated, assembled and welded/brazed 
in accordance with <RID>ASME B31.3</RID>, and Power Piping Codes, <RID>PFI ES 1</RID>, <RID>PFI ES 3</RID>, <RID>PFI ES 7</RID>, <RID>PFI ES 21</RID>, <RID>PFI ES 31</RID>, <RID>PFI ES 35</RID>
, and <RID>PFI TB1</RID>, of the Piping Fabrication Institute's companion code requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.2   Low Pressure (Below<MET> 860 kilopascal</MET><ENG> 125 Psig</ENG>)</TTL><BRK/>
<BRK/>
<TXT>Refrigeration Piping:  Piping systems shall be fabricated, assembled and welded/brazed/soldered in accordance 
with the <RID>ASME B31.5</RID>.</TXT><BRK/>
<BRK/>
<TXT>Plumbing:  Plumbing systems shall be fabricated, assembled and welded/brazed/soldered in accordance with <RID>ICC IPC</RID>
.</TXT><BRK/>
<BRK/>
<TXT>Other Low Pressure Piping:  Other low pressure piping systems shall be fabricated, assembled and welded/brazed/soldered 
in accordance with the <RID>ASME B31.1</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.2   HEAT INPUT REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Preheat</TTL><BRK/>
<BRK/>
<TXT>Welding shall not be done at ambient temperature below<MET> 0 degrees C</MET><ENG> 32 degrees F</ENG>, or when the surfaces are wet 
or exposed to rain, snow, or high wind.  Temperature of the metals in the area where the welding is to be done 
shall be not less than<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG>.  When the ambient conditions are such that the normal temperature 
of the base metal is below<MET> 10 degrees C</MET><ENG> 50 degrees F</ENG>, the area surrounding the joint shall be preheated to provide 
a base metal temperature of<MET> 38 degrees C</MET><ENG> 100 degrees F</ENG> for a distance of at least<MET> 75 millimeter</MET><ENG> 3 inches</ENG> in all 
directions from the joint to be welded.  Preheat shall be in accordance with <RID>ASME BPVC SEC VIII D1</RID> [<RID>ASME BPVC SEC VIII D2</RID>
] and <RID>ASME BPVC SEC V</RID>.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Welding a steel which is at an initial temperature below<ENG> 100 degrees 
F</ENG><MET> 38 degrees C</MET> may require localized preheating to remove moisture from the 
surface of the steel.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT><TTL>3.2.2   Interpass</TTL><BRK/>
<BRK/>
<TXT>In a multipass weld, the interpass temperature is the temperature of the weld metal before the next pass is started.  
Interpass requirements shall be in accordance with [<RID>ASME BPVC SEC VIII D1</RID>] [<RID>ASME BPVC SEC V</RID>] [<RID>ASME BPVC SEC VIII D2</RID>
].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Postweld</TTL><BRK/>
<BRK/>
<TXT>Weldments shall not be given a postweld heat treatment unless noted in the applicable [NASA approved] code qualified/certified 
welding documentation, WPS, PQR and WPQ.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   INSPECTION/NONDESTRUCTIVE TESTING (NDT)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Inspection and acceptance requirements of these codes and standards are 
the minimum requirements.  Additional inspections and tighter acceptance requirements 
may be used, but the specifier must note the additional NDT requirements on 
the specifications/drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.3.1   General</TTL><BRK/>
<BRK/>
<TXT>Fabrication/Erection inspection shall be performed prior to assembly, during assembly, during welding and after 
welding to ensure that materials and workmanship meet the requirements of the contract documents.</TXT><BRK/>
<BRK/>
<TXT>Each specified radiograph shall, as a minimum, have the following additional information permanently included 
in the image:</TXT><BRK/>
<BRK/>
<LST>Agency Weld No. (including repair cycle no.)<BRK/>
<BRK/>
Agency drawing No.<BRK/>
<BRK/>
Agency View No.<BRK/>
<BRK/>
Agency Contract No.</LST><BRK/>
<BRK/>
<TXT>Final interpretation and acceptance of all <SUB>Radiographs</SUB> of welded joints, with the exception of code stamped pressure 
vessel welds, will be by the Contracting Officer.</TXT><BRK/>
<BRK/>
<TXT>Final acceptance of all welded/brazed joints shall be by the Contracting Officer.</TXT><BRK/>
<BRK/>
<TXT>Prior to the Contracting Officer's inspection, all slag and scale shall be removed from all welds.  Procedure 
employed shall not produce notches in either the weld metal or adjacent base metal.</TXT><BRK/>
<BRK/>
<TXT>Unacceptable welds shall be immediately repaired and made ready for Government reinspection at no additional 
cost to the Government.</TXT><BRK/>
<BRK/>
<TXT>After weld joints have been satisfactorily completed by the Contractor and accepted by the Contracting Officer, 
the joint area shall be cleaned to a bright, unpitted, and unscarred surface and then protected in accordance 
with the contract documents.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Pressure Vessels</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.2.1   Test Method</TTL><BRK/>
<BRK/>
<TXT>All nondestructive testing shall be performed in accordance with the requirements of <RID>ASME BPVC SEC V</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.2   Acceptance Requirements</TTL><BRK/>
<BRK/>
<TXT>Acceptance requirements shall be in accordance with [<RID>ASME BPVC SEC V</RID>] [<RID>ASME BPVC SEC VIII D2</RID>].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.3   Piping</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.3.1   Test Method</TTL><BRK/>
<BRK/>
<TXT>NDT (Nondestructive Testing) of all piping systems, except plumbing systems, shall be performed in accordance 
with the requirements of <RID>ASME BPVC SEC V</RID>.</TXT><BRK/>
<BRK/>
<TXT>[For high pressure (<MET>860 kilopascal </MET><ENG>125 psig </ENG>or above) systems.  Not less than 10 percent of all butt welds shall 
be examined fully by random radiography.  Welds to be examined shall be selected to ensure that the work product 
of each welder or welding operator doing the production welding is included.  These welds shall satisfy the acceptance 
standards of the specified code.  If any of the butt welds examined reveals an unacceptable indication, all butt 
welds welded by that welder(s) shall be examined/accepted by radiography.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3.2   Acceptance Requirements</TTL><BRK/>
<BRK/>
<TXT>High Pressure (<MET>860 kilopascal </MET><ENG>125 psig </ENG>or above):</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Steam piping systems shall meet the requirements of <RID>ASME B31.1</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Other high pressure piping systems shall meet the requirements of <RID>ASME B31.3</RID>.</ITM><BRK/>
<BRK/>
<TXT>Low Pressure (Below<MET> 860 kilopascal</MET><ENG> 125 psig</ENG>):</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Refrigeration piping systems shall meet the requirements of <RID>ASME B31.5</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Plumbing piping systems shall meet the requirements of <RID>ICC IPC</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Other low pressure piping systems shall meet the requirements of <RID>ASME B31.1</RID>.</ITM><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.4   PROTECTION OF ADJACENT MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Contractor shall sufficiently protect machinery, materials, floor, <NED/>furnishings, finishes and other items  adjacent 
to the welding/brazing operations to prevent any damage from these operations.</TXT><BRK/>
<BRK/></SPT>