USACE / NAVFAC / AFCESA / NASA      UFGS-01 20 00.00 20 (July 2006)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Superseding<BRK/>
                                    UFGS-01 20 00.00 20 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 01 20 00.00 20</SCN><BRK/>
<BRK/>
<STL>PRICE AND PAYMENT PROCEDURES</STL><BRK/>
<DTE>07/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>payment instruction 
paragraphs required for use in all projects</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
This guide specification includes tailoring options for EFD and EFA regional 
requirements.  Selection or deselection of a tailoring option will include or 
exclude that option in the section, but editing of the resulting section to 
fit the project is still required.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: When Section 01 31 17.00 20 is included in the project, the information 
required by this Section for the Schedule of Prices will be an intregal part 
of the cost-loaded Network Analysis Schedule and its Mathematical Analysis.  
Delete the requirement in this section for the submittal of the Schedule of 
Prices and edit the remainder of the section appropriately. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>EP-1110-1-8</RID><RTL>(2005) Construction Equipment Ownership and Operating Expense Schedule, Vol 1-12</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Schedule of prices</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   <SUB>SCHEDULE OF PRICES</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Data Required</TTL><BRK/>
<BRK/>
<TXT>[This contract requires the use of a cost-loaded Network Analysis Schedule.  The information required for the 
Schedule of Prices will be entered as an intregal part of the Network Analysis Schedule (NAS) and its Mathematical 
Analysis.] [Within [15] [_____] calendar days of notice of award, prepare and deliver to the Contracting Officer 
a schedule of prices (construction contract) on the forms furnished by the Government.]  Provide a detailed breakdown 
of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices 
therefor.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.3.2   Construction Categories</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include this paragraph for projects funded under the military construction 
(MCON) programming system and list construction category numbers and descriptions.  
This information will be provided by the Government.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The following construction categories apply to work covered by this specification:</TXT><BRK/>
<TBL><THD><BRK/>
         CATEGORY                      DESCRIPTION<BRK/></THD>
<BRK/>
         [_____]                         [_____]<BRK/></TBL>
<BRK/>
<TXT>Divide detailed breakdown into each construction category, stated in this contract.  Subcontractors who may be 
involved in work under more than one of these categories shall be advised of this requirement in order to furnish 
such data without delay.  Construction categories given above may be modified by the Contracting Officer as necessary 
during course of work.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>1.3.3   Schedule Instructions</TTL><BRK/>
<BRK/>
<TXT>Payments will not be made until the [Schedule of Prices][cost-loaded NAS] has been submitted to and accepted 
by the Contracting Officer.  Identify the cost for site work, and include incidental work to the<MET> 1.5 m</MET><ENG> 5 foot</ENG>
 line.  Identify costs for the building(s), and include work out to the<MET> 1.5 m</MET><ENG> 5 foot</ENG> line.  Work out to the<MET> 1.5 
m</MET><ENG> 5 foot</ENG> line shall include construction encompassed within a theoretical line<MET> 1.5 m</MET><ENG> 5 feet</ENG> from the face of 
exterior walls and shall include attendant construction, such as cooling towers, placed beyond the<MET> 1.5 m</MET><ENG> 5 foot</ENG>
 line.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.3.4   Schedule Requirements for HVAC TAB</TTL><BRK/>
<BRK/>
<TXT>The field work Section <SRF>23 05 93</SRF> TESTING, ADJUSTING AND BALANCING shall be broken down in the [Schedule of Prices 
and in the Construction Progress Documentation][cost-loaded NAS] by separate line items which reflect measurable 
deliverables.  Specific payment percentages for each line item shall be determined on a case by case basis for 
each contract.  The line items shall be as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Approval of Design Review Report:  The TABS Agency is required to conduct a review of the 
project plans and specifications to identify any feature, or the lack thereof, that would preclude 
successful testing and balancing of the project HVAC systems.  The resulting findings shall 
be submitted to the Government to allow correction of the design.  The progress payment shall 
be issued after review and approval of the report.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Approval of the pre-field engineering report:  The TABS Agency submits a report which outlines 
the scope of field work.  The report shall contain details of what systems will be tested, procedures 
to be used, sample report forms for reporting test results and a quality control checklist of 
work items that must be completed before TABS field work commences.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Season I field work:  Incremental payments are issued as the TABS field work progresses.  
The TABS Agency mobilizes to the project site and executes the field work as outlined in the 
pre-field engineering report.  The HVAC water and air systems are balanced and operational data 
shall be collected for one seasonal condition (either summer or winter depending on project 
timing).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Approval of Season I report:  On completion of the Season I field work, the data is compiled 
into a report and submitted to the Government.  The report is reviewed, and approved, after 
ensuring compliance with the pre-field engineering report scope of work.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Completion of Season I field QA check:  Contract QC and Government representatives meet 
the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report.  
The purpose of these tests are to validate the accuracy and completeness of the previously submitted 
Season I report.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Approval of Season II report:  The TABS Agency completes all Season II field work, which 
is normally comprised mainly of taking heat transfer temperature readings, in the season opposite 
of that under which Season I performance data was compiled.  This data shall be compiled into 
a report and submitted to the Government.  On completion of submittal review to ensure compliance 
with the pre-field engineering report scope, progress payment is issued.  Progress payment is 
less than that issued for the Season I report since most of the water and air balancing work 
effort is completed under Season I.</ITM><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.4   CONTRACT MODIFICATIONS</TTL><BRK/>
<BRK/>
<TXT>In conjunction with the Contract Clause "DFARS 252.236-7000, Modification Proposals-Price Breakdown," and where 
actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting 
records, equipment use rates shall be based upon the applicable provisions of the <RID>EP-1110-1-8</RID>.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="EFA MW,PACDIV,EFA CHES,EFA NW,EFA WEST,NORTHDIV,SOUTHDIV,SWDIV"><SPT><TTL>1.5   CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this article "Contractor's Invoice and Contract Performance Statement," 
for all projects, except those in LANTNAVFACENGCOM.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.5.1   Content of Invoice</TTL><BRK/>
<BRK/>
<TXT>Requests for payment will be processed in accordance with the Contract Clause "FAR 52.232-27, Prompt Payment 
Construction Contracts."</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  The Contractor's invoice certified by QC, on the form furnished by the Government for this 
purpose, showing in summary form, the basis for arriving at the amount of the invoice.  Submit 
original and five copies.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  The Contract Performance Statement on the form furnished by the Government for this purpose, 
showing in detail, the estimated cost, percentage of completion, and value of completed performance 
[for each of the construction categories stated in this contract].  Submit original and two 
copies.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Final invoice shall be accompanied by Final Release Form.  <TAI OPT="PACDIV">If the contractor is incorporated, 
the release shall contain the corporate seal.  An officer of the corporation shall sign the 
release and the corporate secretary shall certify the release</TAI></ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select appropriate bracketed text regarding construction schedule and 
network mathematical analysis.  Select construction schedules when Section 01 
32 16.00 20 is included in the project.  Select network mathematical analysis 
when Section 01 32 17.00 20 is included in the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">d.  [Updated construction and equipment delivery schedules (two copies).][Updated network mathematical 
analysis (three copies).]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Contractor Safety Self Evaluation Checklist (original)</ITM><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.5.2   Mailing of Invoices</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  All invoices shall be forwarded with specific marking on the envelope.  This marking shall 
be in the front lower left hand corner, in large letters, "INVOICES - ENCLOSED."</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Invoices not completed in accordance with contract requirements will be returned to the 
Contractor for correction of the deficiencies.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Final invoices not accompanied by Final Release Form will be considered incomplete and will 
be returned to the Contractor.</ITM><BRK/>
<BRK/>
]</SPT></SPT></TAI><TAI OPT="LANTDIV"><SPT>[<TTL>1.6   CONTRACTOR'S INVOICE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this article "Contractor's Invoice" for LANTNAVFACENGCOM projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For projects at Naval Station Guantanamo Bay, Cuba, include the last 
bracketed option, "Materials on Site."</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete requirement for affidavits on overseas projects, except Puerto 
Rico.  Also delete the listing for number of copies of affidavit when it is 
not required for overseas projects.  Select appropriate bracketed expressions 
regarding progress schedule and network mathematical analysis. Progress schedules 
are used except for projects utilizing network mathematical analysis.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.6.1   Content of Invoice</TTL><BRK/>
<BRK/>
<TXT>Requests for payment in accordance with the terms of the contract shall consist of the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Contractor's Invoice on NAVFAC Form 7300/30, which shall show, in summary form, the basis 
for arriving at the amount of the invoice.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Contractor's Monthly Estimate for Voucher (LANTNAVFACENGCOM Form 4-4330/110 (New 7/84)), 
with subcontractor and supplier payment certification.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[c.  Affidavit to accompany invoice (LANTDIV NORVA Form 4-4235/4 (Rev. 5/81)).]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Updated copy of submittal register.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[e.  Updated copy of progress schedule.  Furnish as specified in "FAR 52.236-15, Schedules for 
Construction Contracts."]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[f.  Network mathematical analysis.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[g.  Include Contractor's Final Release Form.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[h.  Materials on Site]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   Quantities of Monthly Invoices and Supporting Forms</TTL><BRK/>
<BRK/>
<TXT>Forms will be furnished by the Contracting Officer.  Requests for payment shall be processed in accordance with 
"FAR 52.232-5, Payments Under Fixed-Price Construction Contracts."  Monthly invoices and supporting forms for 
work performed through the anniversary award date of the contract shall be submitted to the Contracting Officer 
within 5 calendar days of the date of invoice (e.g., contract award date is the 7th of the month, the date of 
each monthly invoice shall be the 7th and the invoice shall be submitted by the 12th of the month) in the following 
quantities:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Contractor's invoice - Original and five copies</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Contractor's monthly estimate for voucher  - Original and two copies shall be required on 
jobs where there is a schedule of prices</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[c.  Affidavit - Original]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Updated submittal register - Two copies</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[e.  Progress schedule - Two copies]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[f.  Network mathematical analysis - Three copies]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Contractor Safety Self Evaluation Checklist (original)</ITM><BRK/>
<BRK/></SPT>
]</SPT></TAI><SPT><TTL>1.7   PAYMENTS TO THE CONTRACTOR</TTL><BRK/>
<BRK/>
<TXT>Payments will be made on submission of itemized requests by the Contractor which comply with the requirements 
of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous 
payments to the Contractor.</TXT><BRK/>
<TAI OPT="PACDIV"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following paragraph for PACNAVFACENGCOM projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">a.  Basis for Contracting Officer's consideration to allow progress payment for material delivered 
on the site (but not installed) and for completed preparatory work, as authorized under FAR 
52.232-5(b), shall be (1) major high cost items and (2) long lead special order items.  Materials 
that will not be paid for prior to installation include, but are not limited to, bulk quantities 
such as nails, fasteners, conduits, gypsum board, etc.  In the request for progress payment, 
such items shall be specifically identified in the Contractor's estimates of work submitted 
for the Contracting Officer's approval in accordance with paragraph entitled "Schedule of Prices" 
above.  At the time of invoicing, the amount billed shall be supported by documents establishing 
its value.</ITM></TAI><BRK/>
<BRK/>
<SPT><TTL>1.7.1   Obligation of Government Payments</TTL><BRK/>
<BRK/>
<TXT>The obligation of the Government to make payments required under the provisions of this contract will, at the 
discretion of the Contracting Officer, be subject to reductions and/or suspensions  permitted under the FAR and 
agency regulations including the following in accordance with "FAR 32.503-6:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Reasonable deductions due to defects in material or workmanship;</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Claims which the Government may have against the Contractor under or in connection with 
this contract;</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Unless otherwise adjusted, repayment to the Government upon demand for overpayments made 
to the Contractor; and</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Failure to provide up to date record drawings not current as stated in Contract Clause "FAC 
5252.236-9310, Record Drawings."</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.2   Payment for Materials Offsite</TTL><BRK/>
<TAI OPT="LANTDIV"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For LANTNAVFACENGCOM projects, this paragraph shall only be used as directed 
by the Contracting Officer.</NPR><BRK/>
<AST/><BRK/></NTE>
</TAI><BRK/>
<TXT>Payments may be made to the Contractor for materials stored off construction sites under the following conditions:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Conditions described in the paragraph entitled "Payments to the Contractor";</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Material within [a distance of<MET> [80] [_____] km</MET><ENG> [50] [_____] miles</ENG> by streets and roads to] 
[the county of] the construction site;</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Materials adequately insured and protected from theft and exposure;</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Materials not susceptible to deterioration or physical damage in storage or in transit to 
the job site are acceptable for progress payments. Items such as steel, machinery, pipe and 
fittings, precast/prestressed concrete piles, and electrical cable are acceptable; items such 
as gypsum wallboard, glass, insulation, and wall coverings are not;</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Materials in transit to the job site or storage site are not acceptable for payment; and</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Conditions specified in "FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts."</ITM><BRK/>
<BRK/></SPT>
<TAI OPT="LANTDIV"><SPT>[<TTL>1.7.3   Payment for Materials On Site</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include this paragraph for projects located at Guantanamo Naval Base.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment may be made for materials delivered to the site but not yet incorporated into the construction.  Materials 
on site shall be listed as a separate item on he Contract Performance Statement.  The value of the materials 
shall be supported by the Schedule of Prices and a separate list of all materials being invoiced shall be submitted 
with the invoice in the following format:</TXT><BRK/>
<TBL><BRK/>
    MATERIAL ON        MATERIAL            MATERIAL          MATERIAL<BRK/>
    SITE LAST          RECEIVED            CONSUMED          ON<BRK/>
    ITEM PERIOD   +    THIS PERIOD    -    THIS PERIOD   =   SITE<BRK/></TBL>
<BRK/>
]</SPT></TAI></SPT><TAI OPT="LANTDIV"><SPT><TTL>1.8   EQUITABLE ADJUSTMENTS:  WAIVER AND RELEASE OF CLAIMS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For LANTNAVFACENGCOM, include the following paragraph for projects in 
the Mediterranean.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">a. Whenever the Contractor submits a claim for equitable adjustment under any clause of this 
Contract which provides for equitable adjustment of the Contract, such claim shall include all 
types of adjustments in the total amounts to which the clause entitles the Contractor, including, 
but not limited to, adjustments arising out of delays or disruptions or both caused by such 
change.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b. Except as the parties may otherwise expressly agree, the Contractor shall be deemed to have 
waived (1) any adjustments to which it otherwise might be entitled under the clause where such 
claim fails to request such adjustments, and (2) any increase in the amount of equitable adjustments 
additional to those requested in its claim.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c. The Contractor agrees that, if required by the Contracting Officer, he will execute a release, 
in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement 
setting forth the aforesaid equitable adjustment.  The Contractor further agrees that such release 
shall discharge the Government, its officers, agents and employees, from any further claims, 
including but not limited to, further claims arising out of delays or disruptions or both caused 
by the aforesaid change.</ITM><BRK/>
<BRK/></SPT>
</TAI><TAI OPT="LANTDIV"><SPT><TTL>1.9   CHANGES ESTIMATES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For LANTNAVFACENGCOM, include the following paragraph for projects in 
the Mediterranean.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In making all equitable adjustments under the Changes Clause, compensation for additions will be based upon estimated 
costs at the time the work is performed and credit for deductions will be based upon estimated costs at the time 
the Contract was made.  In arriving at the amount of the change in price, if any, allowance may be made for profit 
overhead and general expenses, plant rental and other similar items.</TXT><BRK/>
<BRK/></SPT>
</TAI></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<TXT>Not Used</TXT><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<TXT>Not Used</TXT><BRK/>
<BRK/></PRT>
    <END/><BRK/></SEC>