<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA      UFGS-01 58 00 (August 2008)<BRK/>
                                    -------------------------------<BRK/>
Preparing Activity: <PRA>NAVFAC</PRA>          Superseding<BRK/>
                                    UFGS-01 58 00 (April 2008)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 01 58 00</SCN><BRK/>
<BRK/>
<STL>PROJECT IDENTIFICATION</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>temporary signs 
for project identification</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
This guide specification includes tailoring options for AIR FORCE, AVIANO (Aviano 
Air Base Italy) and NAVFAC Atlantic. Selection or deselection of a tailoring 
option will include or exclude that option in the section, but editing the resulting 
section to fit the project is still required.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the following on project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Location of project sign.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)</ORG><BRK/><BRK/><RID>AWPA C1</RID><RTL>(2003) All Timber Products - Preservative Treatment by Pressure Processes</RTL><BRK/><BRK/><RID>AWPA C2</RID><RTL>(2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes</RTL><BRK/><BRK/></REF></SPT><NTE><AST/><BRK/>
<NPR>NOTE: Include the following Submittal and Quality Assurance paragraphs in all 
design-build projects and on other applicable projects where the Contractor 
must provide the rendering. </NPR><BRK/>
<AST/><BRK/></NTE>
<SPT>[<TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Preliminary one line</SUB> drawings of project rendering[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>preliminary drawing indicating layout and text content</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Final rendering</SUB> sample[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Final framed rendering</SUB> and copies[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Facility Recognition Plaque</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>]<BRK/>
<BRK/>
]</SPT><SPT>[<TTL>1.3   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Rendering</TTL><BRK/>
<BRK/>
<TXT>Provide the project rendering in accordance with the following drawing stages as required in paragraph entitled 
"Submittals".  The following submittal data is required to properly identify the appropriate view and approve 
the final rendering of the facility.  The final painted rendering will be used to produce the image for the signboard 
and framed photographic copies provided to the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1.1   <SUB>Preliminary One Line</SUB> Drawings</TTL><BRK/>
<BRK/>
<TXT>Provide three different views of the facility in a preliminary single line drawing (black and white) format.  
These three views will represent the best angles at which to view the proposed facility showing the [_____][best 
design features] and the three dimensional character of the facility.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.2   <SUB>Final Rendering</SUB> Sample</TTL><BRK/>
<BRK/>
<TXT>Provide a photographic copy (<ENG>8 x 10 inches,</ENG> <MET>200 x 250 millimeters,</MET> minimum size) of final rendering for approval 
of color, landscaping, and foreground/background development prior to final submittal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.3   <SUB>Final Framed Rendering</SUB> and Copies</TTL><BRK/>
<BRK/>
<TXT>Provide final full color rendering of the proposed facility as specified. </TXT><BRK/>
<BRK/></SPT>
</SPT>]<TAI OPT="NAVY">[<SPT><TTL>1.3.2   <SUB>Facility Recognition Plaque</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include this paragraph for new people oriented/ people occupied MCON/MILCOM 
facilities such as: BEQ, Administration, Child Care Centers, Fitness Centers, 
and other appropriate landmark or unique facilities.  Confirm the decision to 
use this plaque with the Project Manager.  Provide design, details and specifications 
on the contract documents for this plaque.  Coordinate the names and organizations 
that will be identified on the plaque with the Project Manager.  Refer to UFC 
1-300-09N, Design Procedures for further plaque requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit full size drawing of Facility Recognition Plaque for approval.  Contractor shall confirm the content (message), 
location and mounting with Contracting Officer prior to fabrication.  The names on the plaque shall be determined 
at the end of the project duration to assure that current participants can be identified and recognized on the 
plaque.</TXT><BRK/>
<BRK/></SPT>
]</TAI></SPT><SPT>[<TTL>1.4   PROJECT SIGN</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  TO DOWNLOAD UFGS GRAPHICS Go to <URL HREF="http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf">http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf</URL>
.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide project signboard on all MILCON and other significant facility 
projects for CNIC and NAVFAC in accordance with Plates 1, 3, and 4 of attached 
sketches.  For USMC and NAVFAC projects, provide signboard in accordance with 
Plates 1MC, 3 and 4 of attached sketches.  Significant projects are those projects, 
greater than $1,000,000, that are located in an area visible to large numbers 
of people; will provide visual construction activities; will be of sufficient 
size and scope; or of high interest to the using activity.  Unless waived by 
government project management, provide project signboard with rendering for 
all MILCON and other significant projects. Signboard with rendering details 
for CNIC and NAVFAC are indicated in accordance with Plates 2, 3, 4 and 5 of 
attached sketches.  Signboard with rendering details for USMC and NAVFAC are 
indicated in accordance with Plates 2MC, 3, 4 and 5 of attached sketches.  Signs 
are generally not required for projects located in remote areas; projects involving 
all interior work; parking lot and utilities projects whether overhead or underground; 
etc.  Discuss the necessity of a sign with the using Activity.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The 1220 mm (4'-0") x 2440 mm (8'-0") size of the signboard depicted 
in Plates 1 and 2 is a minimum size requirement.  Adjust size to suit, massing, 
distance from most traveled roads, traffic and speed.  When a size larger than 
the minimum is warranted, provide adequate support and bracing based on soil 
and wind conditions and increase lettering size in proportion to the dimensions 
of the sign.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: For design-build projects eliminate the bracketed option stating that 
the Government will provide a temporary rendering and include the last bracketed 
option for Contractor to provide a color rendering.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prior to initiating any work on site, provide [one][_____] project identification sign at the location [indicated][designated].  
Construct the sign in accordance with project sign detail attached at the end of this section.  Maintain sign 
throughout the life of the project.  Upon completion of the project, remove the sign from the site.[  The Government 
will temporarily supply the Contractor a copy of the rendering to use in the production of the final signboard 
artwork.][  Provide color rendering of the project.  Reproduce the rendering on the signboard or enclose a copy 
of the rendering under a water-proof, transparent cover, and caulk for weather protection.]</TXT><BRK/>
<TAI OPT="LANTDIV"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: For NAVFAC Atlantic and NAVFAC Europe projects in Italy, add the following 
paragraph.  Obtain the current name of the Design Safety Coordinator from NAVFAC 
Atlantic or NAVFAC Europe project manager and insert below. Obtain the current 
name of the Resident Officer in Charge of Construction from NAVFAC Atlantic 
or NAVFAC Europe project manager and insert as the Construction Safety Officer. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[On the project sign, provide points of contact for the Design Safety Coordinator and the Construction Safety 
Officer in accordance with Italian Law as follows:  "Design Safety Coordinator-[_____], CEC, U.S. Navy, Commanding 
Officer, Engineering Field Activity Mediterranean" "Construction Safety Officer - [_____], CEC, U.S. Navy, Resident 
Officer in Charge of Construction".] </TXT></TAI><BRK/>
<BRK/>
<SPT>[<TTL>1.4.1   Project Identification Signboard (Navy)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following paragraph for all NAVY projects and include the appropriate 
project identification signboard plates at the end of this section.  Signboard 
Plates are grouped for CNIC and NAVFAC without rendering, USMC and NAVFAC without 
rendering, CNIC and NAVFAC with rendering, and USMC and NAVFAC with rendering. 
Delete this paragraph for Air Force projects and utilize the Air Force paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A project identification signboard shall be provided in accordance with attached Plates [1, 3, and 4][1MC, 3, 
and 4][2, 3, 4, and 5][2MC, 3, 4, and 5].  Provide <SUB>preliminary drawing indicating layout and text content</SUB>.The 
signboard shall be provided at a conspicuous location on the job site where directed by the Contracting Officer.  </TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  The field of the sign shall consist of a<MET> 1200 by 2400 mm</MET><ENG> 4 by 8 foot</ENG> sheet of grade B-B 
medium density overlaid exterior plywood.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Lumber shall be B or better Southern pine, pressure-preservative treated in accordance with <RID>
AWPA C1</RID> and <RID>AWPA C2</RID>.  Nails shall be aluminum or galvanized steel.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  The entire signboard and supports shall be given one coat of exterior alkyd primer and two 
coats of exterior alkyd enamel paint.  The lettering and sign work shall be performed by a skilled 
sign painter using paint known in the trade as bulletin colors.  The colors, lettering sizes, 
and lettering styles shall be as indicated.  Where preservative-treated lumber is required, 
utilize only cured pressure-treated wood which has had the chemicals leached from the surface 
of the wood prior to painting.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Use spray applied automotive quality high gloss acrylic white enamel paint as background 
for the NAVFAC logo.  NAVFAC logo shall be an applied 2 millimeter film sticker/decal with either 
transparent or white background or paint the logo by stencil onto the sign.  The weather resistant 
sticker/decal film shall be rated for a minimum of 2-year exterior vertical exposure.  The self-adhering 
sticker shall be mounted to the sign with pressure sensitive, permanent acrylic adhesive.  Shop 
cut sticker/decal to rectangular shape and provide pull-off backing sheet on adhesive side of 
design sticker for shipping.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Sign paint colors (manufacturer's numbers/types listed below for color identification only)</ITM><BRK/>
<BRK/>
<ITM>(1)  Blue = To match dark blue color in the NAVFAC logo.</ITM><BRK/>
<BRK/>
<ITM>(2)  White = To match Brilliant White color in the NAVFAC logo.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  NAVFAC logo must retain proportions and design integrity.  NAVFAC logos in electronic format 
may be obtained from the NAVFAC web portal via the follwoing link: https://portal.navfac.navy.mil/portal/page?_pageid=181,3465071&amp;_dad=portal&amp;_schema=portal.  
Use the following to choose color values for the paint to be used:</ITM><BRK/>
<BRK/>
<ITM>(1)  Dark Blue = equivalent to CMYK values 100, 72, 0, 8 .</ITM><BRK/>
<BRK/>
<ITM>(2)  Light Blue = equivalent to CMYK values 69, 34, 0, 0.</ITM><BRK/>
<BRK/>
<ITM>(3)  Cyan = equivalent to CMYK values 100, 9, 0, 6.</ITM><BRK/>
<BRK/>
<ITM>(4)  Yellow = equivalent to CMYK values 0.9,94, 0.</ITM><BRK/>
<BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE: Use the following paragraph when a rendering is required on the signboard. </NPR><BRK/>
<AST/><BRK/>
<BRK/></NTE>
<ITM INDENT="-0.33">[g.  Final signboard artwork (rendering) may be either mounted under plexiglass as indicated 
in attached Plates 2 and 5, or at the Contractor's option may be electrostatically printed on 
4 mil self-adhering, weather resistant, glossy vinyl film and mounted to signboard.  Provide 
film that is capable of full color reproduction of the building rendering and cover it with 
an ultra-violet protection film.  Laminate the 2 mil satin gloss clear protection film to the 
white 4 mil vinyl image film.  Utilize pressure sensitive "controltac" adhesive to attach rendering 
to signboard and smooth out surface with hand pressure tools in accordance with manufacturer's 
recommendations.  Shop cut sticker to size required and provide pull-off backing sheet on adhesive 
side of film for shipping.  Provide the rendering on film that is rated for a minimum of 2 years 
exterior vertical exposure.]</ITM><BRK/>
<BRK/>
<SPT>[<TTL>1.4.1.1   Project Rendering</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Use the following paragraph for projects that require the Contractor to 
provide the rendering.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a full color rendering of the proposed facility as specified below:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Provide rendering by a company that regularly does this work as a major component of their 
normal business.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Colors used on rendering shall match the exterior color scheme indicated in the contract 
document.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  The rendering shall be a full vignette/fully developed, on heavy illustration board.  Approximate 
finished size shall be <ENG>24 x 30 inches</ENG> <MET>610 x 760 mm</MET> with minimum inside mat dimension of <ENG>16 X 
20 inches</ENG> <MET>406 x 508 mm</MET>.  Draw the rendering at [human eye][roof][bird's eye][_____] level view, 
painted with Case-in Tempera.</ITM><BRK/>
<BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE: Use contract award date for fully designed projects and preliminary design 
approval for Design Build projects. </NPR><BRK/>
<AST/><BRK/>
<BRK/></NTE>
<ITM INDENT="-0.33">d.  Provide three preliminary single line black and white perspectives prior to proceeding with 
the color rendering.  Provide these preliminary perspectives within 30 days after [preliminary 
design approval][contract award] for evaluation by the Contracting Officer.  The view selected 
by the Contracting Officer shall be developed into the final rendering.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Provide the final rendering sample photograph within 30 days after approval of preliminary 
single line drawings.  Provide this sample photograph for evaluation by the Contracting Officer.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Provide final original color rendering, two (2) full size photographic reproductions of 
the original rendering, and the photographic negative.  Original and reproductions shall be 
mounted on acid free board, double-matted (acid free matting) with appropriate colored board 
and framed in contemporary metal frames, using non-glare glass.  Project name, location, Architect/Engineer 
firm's name shall be printed on the matting.  On the back of the renderings and reproductions, 
indicated the project name, the location, the contract number, and the date of reproduction.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Insert into the blank the address of the EFD/EFA Project Manager of the 
project design. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">g.  The rendering, the photographic copies, and the negative shall be shipped in resilient packaging 
to ensure damage-free delivery.<BRK/>
<BRK/>
Deliver to:     [__________]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Provide copy of rendering to be used for the signboard that has been protected from UV damage 
as per specifications.</ITM><BRK/>
<BRK/>
]</SPT>]</SPT><SPT><TAI OPT="AIR FORCE">[<TTL>1.4.2   Project Signboard (Air Force)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following paragraph for all Air Force projects.  The host Activity 
provides sign colors and details to the Government in the project book submittal.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Furnish the sign, maintain the sign during construction, and remove the sign from the job site upon completion 
of the project.  Details of sign graphics and construction are indicated in Plates 6 and 7 of sketches attached 
to this section.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Confirm with Contracting Officer for each project as to whether the Contractor 
or Government will provide the applied Air Force logo.  NAVFAC logos shall not 
be provided by the Government.  If the Government will provide Air Force stickers 
delete the following requirement.  </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[The<MET> 450  mm</MET><ENG> 18 inch</ENG> maxium width and height for Air Force and rectangular height for NAVFAC applied stickers 
shall be created in the design indicated, and printed on a 2 millimeter transparent film.  The weather resistant, 
self adhering film shall be rated for a minimum of 2 year exterior vertical exposure and be mounted to sign with 
pressure sensitive, permanent acrylic adhesive.  Shop cut sticker to square shape and provide pull-off backing 
sheet on adhesive side of sticker for shipping.]</TXT><BRK/>
<TAI OPT="AVIANO"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph for projects at Aviano Air Base, Aviano, Italy only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Move the "PLANNED COMPLETION DATE" to the sign left edge and add to the sign right side "EMERGENCY RESPONSE 
(ERP) COORDINATES:____".    These coordinates, which are used to locate base emergencies, will be provided by 
the ROICC.]</TXT><TAI OPT="AIR FORCE"><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For Air Force projects on Guam, add the paragraph below.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[On the project sign, list two points of contact by name and telephone number for a Navy representative and an 
Air Force representative, which will be provided by the Contracting Officer.]</TXT></TAI></TAI><BRK/>
<BRK/></TAI>
]</SPT>]</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<TXT>Not Used</TXT><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<TXT>Not Used</TXT><BRK/>
<BRK/></PRT>
    <END/><BRK/></SEC>