USACE / NAVFAC / AFCESA / NASA            UFGS-01 78 00 (January 2008)<BRK/>
                                          --------------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                Superseding<BRK/>
                                          UFGS-01 77 00.00 20 (April 2006)<BRK/>
                                          UFGS-01 78 00.00 40 (April 2006)<BRK/>
                                          UFGS-01 78 02.00 10 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 01 78 00</SCN><BRK/>
<BRK/>
<STL>CLOSEOUT SUBMITTALS</STL><BRK/>
<DTE>01/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>closeout submittals 
including:  revised project documents, warranty management, testing, adjusting 
and balancing, O &amp; M manuals, and final cleaning</SCP>.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
Use of electronic communication is encouraged.<BRK/>
<BRK/>
Brackets are used in the text to indicate designer choices or locations where 
text must be supplied by the designer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Issue (date) of references included in<BRK/>
project specifications need not be more current than<BRK/>
provided by the latest guide specification.  Use of<BRK/>
SpecsIntact automated reference checking is<BRK/>
recommended for projects based on older guide<BRK/>
specifications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM E 1971</RID><RTL>(2005) Stewardship for the Cleaning of Commercial and Institutional Buildings</RTL><BRK/><BRK/></REF><REF><ORG>GREEN SEAL (GS)</ORG><BRK/><BRK/><RID>GS-37</RID><RTL>(2000; R 2005) Industrial and Institutional Cleaners</RTL><BRK/><BRK/></REF></SPT><NTE><AST/><BRK/>
<NPR>NOTE:  Coordinate with the customer regarding special warranty requirements 
and options.</NPR><BRK/>
<AST/><BRK/></NTE>
<SPT><TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>As-Built Record of Equipment and Materials</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Two] [_____] copies of the record listing the as-built materials and equipment incorporated 
into the construction of the project.</ITM><BRK/>
<BRK/>
<ITM><SUB>Warranty Management Plan</SUB></ITM><BRK/>
<BRK/>
<ITM>  [One set] [[_____] sets] of the warranty management plan containing information relevant to 
the warranty of materials and equipment incorporated into the construction project, including 
the starting date of warranty of construction.  Furnish with each warranty the name, address, 
and telephone number of each of the guarantor's representatives nearest to the project location.</ITM><BRK/>
<BRK/>
<ITM><SUB>Warranty Tags</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Two] [_____] record copies of the warranty tags showing the layout and design.</ITM><BRK/>
<BRK/>
<ITM><SUB>Final Cleaning</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Two] [_____] copies of the listing of completed final clean-up items.</ITM><BRK/>
<BRK/>
<ITM><SUB>Spare Parts Data</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Two] [_____] copies of list that ndicates manufacturer's name, part number, nomenclature, 
and stock level recommended for maintenance and repair. List those items that may be standard 
to the normal maintenance of the system.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Preventative Maintenance</SUB> and <SUB>Condition Monitoring (Predictive Testing)</SUB> and <SUB>Inspection</SUB> schedules 
with instructions that state when systems should be retested.<BRK/>
<BRK/>
Define within the schedule the anticipated length of each test, test apparatus, number of personnel 
identified by responsibility, and a testing validation procedure permitting the record operation 
capability requirements.  On each test feature; e.g.,<MET> liter per second, rpm, kilopascal</MET><ENG> gpm, 
rpm, psi</ENG>, provide a signoff blank for the Contractor and Contracting Officer.  Within a remarks 
column of the testing validation procedure include references to operating limits of time, pressure, 
temperature, volume, voltage, current, acceleration, velocity, alignment, calibration, adjustments, 
cleaning, or special system notes.  Delineate procedures for preventative maintenance, condition 
monitoring (predictive testing) and inspection, adjustment, lubrication and cleaning necessary 
to prevent failure.</ITM><BRK/>
<BRK/>
<ITM>Posted <SUB>Instructions</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM>Submit <SUB>Operation and Maintenance Manuals</SUB> in accordance with paragraph entitled, "Operation and 
Maintenance," of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Record Drawings</SUB></ITM><BRK/>
<BRK/>
<ITM>  Drawings showing final as-built conditions of the project.  [The final CADD record drawings 
must consist of one set of electronic CADD drawing files in the specified format, one set of 
mylar drawings, 2 sets of blue-line prints of the mylars, and one set of the approved working 
Record drawings.] [The manually prepared drawings must consist of 1 set of completed final as-built 
original transparency drawings, 2 sets of blue-line prints of the transparencies, and the approved 
marked working as-built prints.]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Certification of EPA Designated Items</SUB>; <SUB>G</SUB></ITM>]<BRK/>
<TAI OPT="ARMY,NAVY"><BRK/>
<ITM><SUB>Form DD1354</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Checklist for Form DD1354</SUB>; <SUB>G</SUB></ITM></TAI><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   PROJECT RECORD DOCUMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   <SUB>Record Drawings</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The USACE policy on Record (As-Built) drawings is as follows:<BRK/>
<BRK/>
     a. Method of Preparation for DoD Projects.  The construction Contractor 
will prepare the final Record drawings, whether in manual or CADD format.<BRK/>
<BRK/>
     b.  Method of Preparation for Civil Works Projects.  The preferred method 
of preparing the final Record drawings is by the construction Contractor.  The 
management plan for the project must justify the preparation of the final Record 
drawings by any other method, such as by in-house personnel.  Two such exceptions 
are "emergency construction" and operations work performed with hired labor.  
Revise the following specification paragraphs if as-builts are not to be done 
by the Contractor.<BRK/>
<BRK/>
     c.  Customer Coordination.  The method of producing the record drawings 
and their format will be discussed with the customer at the beginning of a project, 
reflected in the Memorandum of  Understanding with the customer (if applicable) 
and the management plan for the project, and confirmed with the customer before 
issuing the construction solicitation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This paragraph covers record drawings complete, as a requirement of the contract.  The terms "drawings," "contract 
drawings," "drawing files," "working record drawings" and "final record drawings" refer to contract drawings 
which are revised to be used for final record drawings showning as-built conditions.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1.1   Government Furnished Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit this paragraph to specify manually prepared drawings or CADD files 
compatible with the customers CADD system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>One set of [mylar drawings revised to reflect all bid amendments will be provided by the Government at the preconstruction 
conference for projects requiring manually prepared record drawings] [electronic CADD files in the specified 
software and format revised to reflect all bid amendments will be provided by the Government at the preconstruction 
conference for projects requiring CADD file record drawings].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.2   Working Record and Final Record Drawings</TTL><BRK/>
<BRK/>
<TXT>Revise [2] [_____] sets of paper drawings by red-line process to show the as-built conditions during the prosecution 
of the project.  Kept these working as-built marked drawings current on a weekly basis and at least one set available 
on the jobsite at all times.  Changes from the contract plans which are made in the work or additional information 
which might be uncovered in the course of construction must be accurately and neatly recorded as they occur by 
means of details and notes.  Prepare final record (as-built) drawings after the completion of each definable 
feature of work as listed in the Contractor Quality Control Plan (Foundations, Utilities, Structural Steel, etc., 
as appropriate for the project).  The working as-built marked prints and final record (as-built) drawings will 
be jointly reviewed for accuracy and completeness by the Contracting Officer and the Contractor prior to submission 
of each monthly pay estimate.  If the Contractor fails to maintain the working and final record drawings as specified 
herein, the Contracting Officer will deduct from the monthly progress payment an amount representing the estimated 
cost of maintaining the record drawings.  This monthly deduction will continue until an agreement can be reached 
between the Contracting Officer and the Contractor regarding the accuracy and completeness of updated drawings.  
Show on the working and final record drawings , but not limited to, the following information:</TXT><BRK/>
<BRK/>
<TXT>     a.  The actual location, kinds and sizes of all sub-surface utility lines.  In order that the location of 
these lines and appurtenances may be determined in the event the surface openings or indicators become covered 
over or obscured, show by offset dimensions to two permanently fixed surface features the end of each run including 
each change in direction on the record drawings.  Locate valves, splice boxes and similar appurtenances by dimensioning 
along the utility run from a reference point.  Also record the average depth below the surface of each run.</TXT><BRK/>
<BRK/>
<TXT>     b.  The location and dimensions of any changes within the building structure.</TXT><BRK/>
<BRK/>
<TXT>     c.  Correct grade, elevations, cross section, or alignment of roads, earthwork, structures or utilities 
if any changes were made from contract plans.</TXT><BRK/>
<BRK/>
<TXT>     d.  Changes in details of design or additional information obtained from working drawings specified to be 
prepared and/or furnished by the Contractor; including but not limited to fabrication, erection, installation 
plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.</TXT><BRK/>
<BRK/>
<TXT>     e.  The topography, invert elevations and grades of drainage installed or affected as part of the project 
construction.</TXT><BRK/>
<BRK/>
<TXT>     f.  Changes or modifications which result from the final inspection.</TXT><BRK/>
<BRK/>
<TXT>     g.  Where contract drawings or specifications present options, show only the option selected for construction 
on the final as-built prints.</TXT><BRK/>
<BRK/>
<TXT>     h.  If borrow material for this project is from sources on Government property, or if Government property 
is used as a spoil area, furnish a contour map of the final borrow pit/spoil area elevations.</TXT><BRK/>
<BRK/>
<TXT>     i.  Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler, and 
irrigation systems.</TXT><BRK/>
<BRK/>
<TXT>     j.  Modifications (include within change order price the cost to change working and final record drawings 
to reflect modifications) and compliance with the following procedures.</TXT><BRK/>
<BRK/>
<ITM>(1)  Follow directions in the modification for posting descriptive changes.</ITM><BRK/>
<BRK/>
<ITM>(2)  Place a Modification [Circle][Delta] at the location of each deletion.</ITM><BRK/>
<BRK/>
<ITM>(3)  For new details or sections which are added to a drawing, place a Modification [Circle][Delta] 
by the detail or section title.</ITM><BRK/>
<BRK/>
<ITM>(4)  For minor changes, place a Modification [Circle][Delta] by the area changed on the drawing 
(each location).</ITM><BRK/>
<BRK/>
<ITM>(5)  For major changes to a drawing, place a Modification [Circle][Delta] by the title of the 
affected plan, section, or detail at each location.</ITM><BRK/>
<BRK/>
<ITM>(6)  For changes to schedules or drawings, place a Modification [Circle][Delta] either by the 
schedule heading or by the change in the schedule.</ITM><BRK/>
<BRK/>
<ITM>(7)  The Modification [Circle][Delta] size shall be<MET> 13 mm</MET><ENG> 1/2 inch</ENG> diameter unless the area 
where the circle is to be placed is crowded.  Smaller size circle shall be used for crowded 
areas.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.1.3   Drawing Preparation</TTL><BRK/>
<BRK/>
<TXT>Modify the record drawings as may be necessary to correctly show the features of the project as it has been constructed 
by bringing the contract set into agreement with approved working as-built prints, and adding such additional 
drawings as may be necessary.  These working as-built marked prints must be neat, legible and accurate.  These 
drawings are part of the permanent records of this project and must be returned to the Contracting Officer after 
approval by the Government.  Any drawings damaged or lost by the Contractor must be satisfactorily replaced by 
the Contractor at no expense to the Government.</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>1.3.1.4   Computer Aided Design and Drafting (CADD) Drawings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit this paragraph to specify CADD drawings compatible with the costumer's 
CADD system, providing the version where applicable.</NPR><BRK/>
<BRK/>
<NPR>Omit this paragraph if manually prepared drawings are required for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Only employ personnel proficient in the preparation of CADD drawings to modify the contract drawings or prepare 
additional new drawings.  Additions and corrections to the contract drawings must be equal in quality and detail 
to that of the originals.  Line colors, line weights, lettering, layering conventions, and symbols must be the 
same as the original line colors, line weights, lettering, layering conventions, and symbols.  If additional 
drawings are required, prepare them using the specified electronic file format applying the same graphic standards 
specified for original drawings.  The title block and drawing border to be used for any new final record drawings 
must be identical to that used on the contract drawings.  Accomplish additions and corrections to the contract 
drawings using CADD files.  The Contractor will be furnished "as-designed" drawings in [AutoCad Release [14] 
[2000i] [2004] [____]] [Microstation [J] [V8] [_____]] format compatible with a [ [Windows XP] [Windows NT] [_____]] 
operating system.  The electronic files will be supplied on compact disc, read-only memory (CD-ROM).  Provide 
all program files and hardware necessary to prepare final record drawings.  The Contracting Officer will review 
final record drawings for accuracy and return them to the Contractor for required corrections, changes, additions, 
and deletions.</TXT><BRK/>
<BRK/>
<TXT>     a.  Provide CADD "base" colors of red, green, and blue.  Color code for changes as follows:</TXT><BRK/>
<BRK/>
<ITM>(1)  Deletions (Red) - Over-strike deleted graphic items (lines), lettering in notes and leaders.</ITM><BRK/>
<BRK/>
<ITM>(2)  Additions (Green) - Added items, lettering in notes and leaders.</ITM><BRK/>
<BRK/>
<ITM>(3)  Special (Blue) - Items requiring special information, coordination, or special detailing 
or detailing notes.</ITM><BRK/>
<BRK/>
<TXT>     b.  Rename the Contract Drawing files in a manner related to the contract number (i.e., 98-C-10.DGN) as 
instructed in the Pre-Construction conference.  Use only those renamed files for the Marked-up changes.  All 
changes shall be made on the layer/level as the original item.</TXT><BRK/>
<BRK/>
<TXT>     c.  When final revisions have been completed, show the wording "RECORD DRAWINGS / AS-BUILT CONDITIONS" followed 
by the name of the Contractor in letters at least<MET> 5 mm</MET><ENG> 3/16 inch</ENG> high on the cover sheet drawing.  Mark all other 
contract drawings either "Record" drawing denoting no revisions on the sheet or "Revised Record" denoting one 
or more revisions.  Date original contract drawings in the revision block.</TXT><BRK/>
<BRK/>
<TXT>     d.  Within [[10] [_____] days for contracts less than $5 million] [20 days for contracts $5 million and 
above] after Government approval of all of the working record drawings for a phase of work, prepare the final 
CADD record drawings for that phase of work and submit two sets of blue-lined prints of these drawings for Government 
review and approval.  The Government will promptly return one set of prints annotated with any necessary corrections.  
Within [[7] [_____] days for contracts less than $5 million] [10 days for contracts $5 million and above] revise 
the CADD files accordingly at no additional cost and submit one set of final prints for the completed phase of 
work to the Government.  Within [[10] [_____] days for contracts less than $5 million] [20 days for contracts 
$5 million and above] of substantial completion of all phases of work, submit the final record drawing package 
for the entire project.  Submit one set of electronic files on compact disc, read-only memory (CD-ROM), one set 
of mylars, two sets of blue-line prints and one set of the approved working record drawings.  They must be complete 
in all details and identical in form and function to the contract drawing files supplied by the Government.  
Any transactions or adjustments necessary to accomplish this is the responsibility of the Contractor.  The Government 
reserves the right to reject any drawing files it deems incompatible with the customer's CADD system.  Paper 
prints, drawing files and storage media submitted will become the property of the Government upon final approval.  
Failure to submit final record drawing files and marked prints as specified will be cause for withholding any 
payment due the Contractor under this contract.  Approval and acceptance of final record drawings must be accomplished 
before final payment is made to the Contractor.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>1.3.1.5   Manually Prepared Drawings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit this paragraph to specify manually prepared drawings.</NPR><BRK/>
<BRK/>
<NPR>Omit this paragraph if CADD drawings are required for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Employ only personnel proficient in the preparation of manually prepared drawings to modify the original contract 
drawing or prepare additional new drawings.  Additions and corrections to the contract drawings must be neat, 
clean and legible, shall be done to the same level of detail, and match the adjacent existing line work, and 
lettering being annotated in type, density, size and style.  Drafting work must be done using the same medium 
(pencil, plastic lead or ink) that was employed on the original contract drawings and with graphite lead on paper 
base material.  The Contracting Officer will review record drawings for accuracy and conformance to the above 
specified drafting standards.  Corrections, changes, additions, and deletions required must meet these standards.  
The title block to be used for any new record drawings must be similar to that used on the original drawings.</TXT><BRK/>
<BRK/>
<TXT>     a.  When final revisions have been completed, Letter or stamp each drawing with the words "RECORD DRAWINGS 
/ AS-BUILT CONDITIONS" followed by the name of the Contractor in letters at least<MET> 5 mm</MET><ENG> 3/16 inch</ENG> high.  Mark 
original contract drawings either "Record" drawings denoting no revisions on the sheet or "Revised Record" denoting 
one or more revisions  Date all original contract drawings in the revision block.</TXT><BRK/>
<BRK/>
<TXT>     b.  Within[[10] [_____] days for contracts less than $5 million] [20 days for contracts $5 million and above] 
after Government approval of all of the working record drawings for a phase of work, prepare the final record 
drawings for that phase of work and submit two sets of blue-line prints of these drawings for Government review 
and approval.  The Government will promptly return one set of prints annotated with any necessary corrections.  
Within [[7] [_____] days for contracts less than $5 million] [10 days for contracts $5 million and above] revise 
the drawings accordingly at no additional cost and submit one set of final prints for the completed phase of 
work to the Government.  Within [[10] [_____] days for contracts less than $5 million] [20 days for contracts 
$5 million and above] of substantial completion of all phases of work, submit the final record drawing package 
for the entire project.  Submit two blue-line prints of these drawings and the return of the approved marked 
record prints, complete in all details.  Paper prints and reproducible drawings will become the property of the 
Government upon final approval.  Failure to submit final record drawings and marked prints, as required herein, 
will be cause for withholding any payment due the Contractor under this contract.  Approval and acceptance of 
final record drawings must be accomplished before final payment is made to the Contractor.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>1.3.1.6   Payment</TTL><BRK/>
<BRK/>
<TXT>No separate payment will be made for record drawings required under this contract, and all costs accrued in connection 
with such drawings are considered a subsidiary obligation of the Contractor.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.2   <SUB>As-Built Record of Equipment and Materials</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is intended to provide data on equipment and materials 
incorporated in the construction of the project that cannot readily be determined 
after completion of construction.  The data is expected to be of value for future 
maintenance, alteration, and repair work.  The designer should predetermine 
the items on which data is required and list them in the DESCRIPTION column 
of the following form.  A typical list of items would include such things as:  
roofing, insulation, and special wall coverings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Furnish [one copy] [[_____]copies] of preliminary record of equipment and materials used on the project [15] 
[_____] days prior to final inspection.  This preliminary submittal will be reviewed and returned [2] [_____] 
days after final inspection with Government comments.  Submit [Two] [_____] sets of final record of equipment 
and materials [10] [_____] days after final inspection.  Key the designations to the related area depicted on 
the contract drawings.  List the following data:</TXT><BRK/>
<TBL><THD><BRK/>
<HL4>RECORD OF DESIGNATED EQUIPMENT AND MATERIALS DATA</HL4><BRK/></THD>
<BRK/>
  Description      Specification     Manufacturer      Composition     Where<BRK/>
                   Section           and Catalog,      and Size        Used<BRK/>
                                     Model, and<BRK/>
                                     Serial Number <BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>1.3.3   Final Approved Shop Drawings</TTL><BRK/>
<BRK/>
<TXT>Furnish final approved project shop drawings [30] [_____] days after transfer of the completed facility.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   Construction Contract Specifications</TTL><BRK/>
<BRK/>
<TXT>Furnish final record (as-built) construction contract specifications, including modifications thereto, [30] [_____] 
days after transfer of the completed facility.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   Real Property Equipment</TTL><BRK/>
<BRK/>
<TXT>Furnish a list of installed equipment furnished under this contract.  Include all information usually listed 
on manufacturer's name plate.  In the "EQUIPMENT-IN-PLACE LIST" include, as applicable, the following for each 
piece of equipment installed:  description of item, location (by room number), model number, serial number, capacity, 
name and address of manufacturer, name and address of equipment supplier, condition, spare parts list, manufacturer's 
catalog, and warranty.  Furnish a draft list at time of transfer.  Furnish the final list [30] [_____] days after 
transfer of the completed facility.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   <SUB>SPARE PARTS DATA</SUB></TTL><BRK/>
<BRK/>
<TXT>Indicate manufacturer's name, part number, nomenclature, and stock level required for maintenance and repair. 
List those items that may be standard to the normal maintenance of the system.</TXT><BRK/>
<BRK/>
<TXT>Supply [_____] items of each part for spare parts inventory.  Provision of spare parts does not relieve the Contractor 
of responsibilities listed under the contract guarantee provisions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   PREVENTATIVE MAINTENANCE</TTL><BRK/>
<BRK/>
<TXT>Submit <SUB>Preventative Maintenance</SUB> and <SUB>Condition Monitoring (Predictive Testing)</SUB> and <SUB>Inspection</SUB> schedules with instructions 
that state when systems should be retested.</TXT><BRK/>
<BRK/>
<TXT>Define the anticipated length of each test, test apparatus, number of personnel identified by responsibility, 
and a testing validation procedure permitting the record operation capability requirements within the schedule.  
Provide a signoff blank for the Contractor and Contracting Officer for each test feature; e.g.,<MET> liter per second, 
rpm, kilopascal</MET><ENG> gpm, rpm, psi</ENG>.  Include a remarks column for the testing validation procedure referencing operating 
limits of time, pressure, temperature, volume, voltage, current, acceleration, velocity, alignment, calibration, 
adjustments, cleaning, or special system notes.  Delineate procedures for preventative maintenance, inspection, 
adjustment, lubrication and cleaning necessary to minimize corrective maintenance and repair.</TXT><BRK/>
<BRK/>
<TXT>Repair requirements must inform operators how to check out, troubleshoot, repair, and replace components of the 
system.  Include electrical and mechanical schematics and diagrams and diagnostic techniques necessary to enable 
operation and troubleshooting of the system after acceptance.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   CERTIFICATION OF EPA DESIGNATED ITEMS</TTL><BRK/>
<BRK/>
<TXT>Submit the <SUB>Certification of EPA Designated Items</SUB> as required by FAR 52.223-9, "Certification and Estimate of 
Percentage of Recovered Material Content for EPA Designated Items".  Include on the certification form the following 
information: project name, project number, Contractor name, license number, Contractor address, and certification.  
The certification will read as follows and be signed and dated by the Contractor.  ["I hereby certify the information 
provided herein is accurate and that the requisition/procurement of all materials listed on this form comply 
with current EPA standards for recycled/recovered materials content.  The following exemptions may apply to the 
non-procurement of recycled/recovered content materials: 1) The product does not meet appropriate performance 
standards; 2) The product is not available within a reasonable time frame; 3) The product is not available competitively 
(from two or more sources); 4) The product is only available at an unreasonable price (compared with a comparable 
non-recycled content product)."][_____]  Record each product used in the project that has a requirement or option 
of containing recycled [or biobased] content in accordance with Section <SRF>01 62 35</SRF> RECYCLED/RECOVERED MATERIALS, 
noting total price, total value of post-industrial recycled content, total value of post-consumer recycled content, 
[total value of biobased content,] exemptions (1, 2, 3, or 4, as indicated), and comments.  Recycled [and biobased] 
content values may be determined by weight or volume percent, but must be consistent throughout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   WARRANTY MANAGEMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  A warranty package based on a cost/benefit determination will be established 
with the customer at the beginning of a project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.7.1   <SUB>Warranty Management Plan</SUB></TTL><BRK/>
<BRK/>
<TXT>Develop a warranty management plan which contains information relevant to the clause Warranty of Construction 
in [_____].  At least 30 days before the planned pre-warranty conference, submit the warranty management plan 
for Government approval.  Include within the warranty management plan all required actions and documents to assure 
that the Government receives all warranties to which it is entitled.  The plan must be in narrative form and 
contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, 
or of engineering background, not necessarily familiar with this contract.  The term "status" as indicated below 
must include due date and whether item has been submitted or was accomplished.  Warranty information made available 
during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly 
pay estimate.  Assemble approved information in a binder and turn over to the Government upon acceptance of the 
work.  The construction warranty period will begin on the date of project acceptance and continue for the full 
product warranty period.  A joint 4 month and 9 month warranty inspection will be conducted, measured from time 
of acceptance, by the Contractor, Contracting Officer and the Customer Representative.  Include within the warranty 
management plan , but not limited to, the following:</TXT><BRK/>
<BRK/>
<TXT>     a.  Roles and responsibilities of all personnel associated with the warranty process, including points of 
contact and telephone numbers within the organizations of the Contractors, subContractors, manufacturers or suppliers 
involved.</TXT><BRK/>
<BRK/>
<TXT>     b.  Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include 
roofs, HVAC balancing, pumps, motors, transformers, and for all commissioned systems such as fire protection 
and alarm systems, sprinkler systems, lightning protection systems, etc.</TXT><BRK/>
<BRK/>
<TXT>     c.  A list for each warranted equipment, item, feature of construction or system indicating:</TXT><BRK/>
<BRK/>
<ITM>1.  Name of item.</ITM><BRK/>
<ITM>2.  Model and serial numbers.</ITM><BRK/>
<ITM>3.  Location where installed.</ITM><BRK/>
<ITM>4.  Name and phone numbers of manufacturers or suppliers.</ITM><BRK/>
<ITM>5.  Names, addresses and telephone numbers of sources of spare parts.</ITM><BRK/>
<ITM>6.  Warranties and terms of warranty.  Include one-year overall warranty of construction.  Items 
which have extended warranties must be indicated with separate warranty expiration dates.</ITM><BRK/>
<ITM>7.  Cross-reference to warranty certificates as applicable.</ITM><BRK/>
<ITM>8.  Starting point and duration of warranty period.</ITM><BRK/>
<ITM>9.  Summary of maintenance procedures required to continue the warranty in force.</ITM><BRK/>
<ITM>10. Cross-reference to specific pertinent Operation and Maintenance manuals.</ITM><BRK/>
<ITM>11. Organization, names and phone numbers of persons to call for warranty service.</ITM><BRK/>
<ITM>12. Typical response time and repair time expected for various warranted equipment.</ITM><BRK/>
<BRK/>
<TXT>     d.  The Contractor's plans for attendance at the 4 and 9 month post-construction warranty inspections conducted 
by the Government.</TXT><BRK/>
<BRK/>
<TXT>     e.  Procedure and status of tagging of all equipment covered by extended warranties.</TXT><BRK/>
<BRK/>
<TXT>     f.  Copies of <SUB>instructions</SUB> to be posted near selected pieces of equipment where operation is critical for 
warranty and/or safety reasons.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.2   Performance Bond</TTL><BRK/>
<BRK/>
<TXT>The Contractor's Performance Bond [must remain effective throughout the construction period] [_____].</TXT><BRK/>
<BRK/>
<TXT>     a.  In the event the Contractor fails to commence and diligently pursue any construction warranty work required, 
the Contracting Officer will have the work performed by others, and after completion of the work, will charge 
the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, 
but not limited to administrative expenses.</TXT><BRK/>
<BRK/>
<TXT>     b.  In the event sufficient funds are not available to cover the construction warranty work performed by 
the Government at the Contractor's expense, the Contracting Officer will have the right to recoup expenses from 
the bonding company.</TXT><BRK/>
<BRK/>
<TXT>     c.  Following oral or written notification of required construction warranty repair work, respond in a timely 
manner.  Written verification will follow oral instructions.  Failure of the Contractor to respond will be cause 
for the Contracting Officer to proceed against the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.3   Pre-Warranty Conference</TTL><BRK/>
<BRK/>
Prior to contract completion, and at a time designated by the Contracting Officer, meet with the Contracting Officer 
to develop a mutual understanding with respect to the requirements of this section.  Communication procedures for 
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable 
time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution 
of the construction warranty will be established/reviewed at this meeting.  In connection with these requirements 
and at the time of the Contractor's quality control completion inspection, furnish the name, telephone number and 
address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action 
on behalf of the Contractor.  This point of contact will be located within the local service area of the warranted 
construction, be continuously available, and sbe responsive to Government inquiry on warranty work action and status.  
This requirement does not relieve the Contractor of any of its responsibilities in connection with other portions 
of this provision.<BRK/>
<BRK/></SPT>
<TAI OPT="ARMY"><SPT><TTL>1.7.4   Contractor's Response to Construction Warranty Service Requirements</TTL><BRK/>
<BRK/>
<TXT>Following oral or written notification by the Contracting Officer, respond to construction warranty service requirements 
in accordance with the "Construction Warranty Service Priority List" and the three categories of priorities listed 
below.  Submit a report on any warranty item that has been repaired during the warranty period.  Include within 
the report the cause of the problem, date reported, corrective action taken, and when the repair was completed.  
If the Contractor does not perform the construction warranty within the timeframes specified, the Government 
will perform the work and backcharge the construction warranty payment item established.</TXT><BRK/>
<BRK/>
<TXT>     a.  First Priority Code 1.  Perform onsite inspection to evaluate situation, and determine course of action 
within 4 hours, initiate work within 6 hours and work continuously to completion or relief.</TXT><BRK/>
<BRK/>
<TXT>     b.  Second Priority Code 2.  Perform onsite inspection to evaluate situation, and determine course of action 
within 8 hours, initiate work within 24 hours and work continuously to completion or relief.</TXT><BRK/>
<BRK/>
<TXT>     c.  Third Priority Code 3.  All other work to be initiated within 3 work days and work continuously to completion 
or relief.</TXT><BRK/>
<BRK/>
<TXT>     d.  The "Construction Warranty Service Priority List" is as follows:</TXT><BRK/>
<BRK/>
<TXT>Code 1-Air Conditioning Systems</TXT><BRK/>
<ITM>(1)  Recreational support.</ITM><BRK/>
<ITM>(2)  Air conditioning leak in part of building, if causing damage.</ITM><BRK/>
<ITM>(3)  Air conditioning system not cooling properly.</ITM><BRK/>
<BRK/>
<TXT>Code 1-Doors</TXT><BRK/>
<ITM>(1)  Overhead doors not operational, causing a security, fire, or safety problem.</ITM><BRK/>
<ITM>(2)  Interior, exterior personnel doors or hardware, not functioning properly, causing a security, 
fire, or safety problem.</ITM><BRK/>
<BRK/>
<TXT>Code 3-Doors</TXT><BRK/>
<ITM>(1)  Overhead doors not operational.</ITM><BRK/>
<ITM>(2)  Interior/exterior personnel doors or hardware not functioning properly.</ITM><BRK/>
<BRK/>
<TXT>Code 1-Electrical</TXT><BRK/>
<ITM>(1)  Power failure (entire area or any building operational after 1600 hours).</ITM><BRK/>
<ITM>(2)  Security lights</ITM><BRK/>
<ITM>(3)  Smoke detectors</ITM><BRK/>
<BRK/>
<TXT>Code 2-Electrical</TXT><BRK/>
<ITM>(1)  Power failure (no power to a room or part of building).</ITM><BRK/>
<ITM>(2)  Receptacle and lights (in a room or part of building).</ITM><BRK/>
<BRK/>
<TXT>Code 3-Electrical</TXT><BRK/>
<ITM>Street lights.</ITM><BRK/>
<BRK/>
<TXT>Code 1-Gas</TXT><BRK/>
<ITM>(1)  Leaks and breaks.</ITM><BRK/>
<ITM>(2)  No gas to family housing unit or cantonment area.</ITM><BRK/>
<BRK/>
<TXT>Code 1-Heat</TXT><BRK/>
<ITM>(1).  Area power failure affecting heat.</ITM><BRK/>
<ITM>(2).  Heater in unit not working.</ITM><BRK/>
<BRK/>
<TXT>Code 2-Kitchen Equipment</TXT><BRK/>
<ITM>(1)  Dishwasher not operating properly.</ITM><BRK/>
<ITM>(2)  All other equipment hampering preparation of a meal.</ITM><BRK/>
<BRK/>
<TXT>Code 1-Plumbing</TXT><BRK/>
<ITM>(1)  Hot water heater failure.</ITM><BRK/>
<ITM>(2)  Leaking water supply pipes.</ITM><BRK/>
<BRK/>
<TXT>Code 2-Plumbing</TXT><BRK/>
<ITM>(1)  Flush valves not operating properly.</ITM><BRK/>
<ITM>(2)  Fixture drain, supply line to commode, or any water pipe leaking.</ITM><BRK/>
<ITM>(3)  Commode leaking at base.</ITM><BRK/>
<BRK/>
<TXT>Code 3  -Plumbing</TXT><BRK/>
<ITM>Leaky faucets.</ITM><BRK/>
<BRK/>
<TXT>Code 3-Interior</TXT><BRK/>
<ITM>(1)  Floors damaged.</ITM><BRK/>
<ITM>(2)  Paint chipping or peeling.</ITM><BRK/>
<ITM>(3)  Casework.</ITM><BRK/>
<BRK/>
<TXT>Code 1-Roof Leaks</TXT><BRK/>
<LST>Temporary repairs will be made where major damage to property is occurring.</LST><BRK/>
<BRK/>
<TXT>Code 2-Roof Leaks</TXT><BRK/>
<LST>Where major damage to property is not occurring, check for location of leak during rain and complete 
repairs on a Code 2 basis.</LST><BRK/>
<BRK/>
<TXT>Code 2-Water (Exterior)</TXT><BRK/>
<LST>No water to facility.</LST><BRK/>
<BRK/>
<TXT>Code 2-Water (Hot)</TXT><BRK/>
<LST>No hot water in portion of building listed.</LST><BRK/>
<BRK/>
<TXT>Code 3-All other work not listed above.</TXT><BRK/>
<BRK/></SPT>
</TAI><SPT><TTL>1.7.5   <SUB>Warranty Tags</SUB></TTL><BRK/>
<BRK/>
<TXT>At the time of installation, tag each warranted item with a durable, oil and water resistant tag approved by 
the Contracting Officer.  Attached each tag with a copper wire and spray with a silicone waterproof coating.  
The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy.  
Show the following information on the tag.</TXT><BRK/>
<TBL><BRK/>
     a.  Type of product/material_____________________________________.<BRK/>
<BRK/>
     b.  Model number_________________________________________________.<BRK/>
<BRK/>
     c.  Serial number________________________________________________.<BRK/>
<BRK/>
     d.  Contract number______________________________________________.<BRK/>
<BRK/>
     e.  Warranty period___________from___________to__________________.<BRK/>
<BRK/>
     f.  Inspector's signature________________________________________.<BRK/>
<BRK/>
     g.  Construction Contractor______________________________________.<BRK/>
<BRK/>
         Address______________________________________________________.<BRK/>
<BRK/>
         Telephone number_____________________________________________.<BRK/>
<BRK/>
     h.  Warranty contact_____________________________________________.<BRK/>
<BRK/>
         Address______________________________________________________.<BRK/>
<BRK/>
         Telephone number_____________________________________________.<BRK/>
<BRK/>
     i.  Warranty response time priority code_________________________.<BRK/>
<BRK/>
     j.  WARNING - PROJECT PERSONNEL TO PERFORM ONLY OPERATIONAL MAINTENANCE DURING THE WARRANTY PERIOD.<BRK/></TBL>
<BRK/></SPT>
</SPT><SPT>[<TTL>1.8   MECHANICAL TESTING AND BALANCING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:   Use for projects as directed by the Government.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All contract requirements of Section [<SRF>23 09 53.00 20</SRF> SPACE TEMPERATURE CONTROL SYSTEMS] [<SRF>23 09 23.13 20</SRF> BACnet 
DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC] must be fully completed, including all testing, prior to contract completion 
date.  In addition, all contract requirements of Section <SRF>23 05 93</SRF>TESTING, ADJUSTING AND BALANCING must be fully 
completed, including testing and inspection, prior to contract completion date, except as noted otherwise in 
Section <SRF>23 05 93</SRF>.  The time required to complete all work and testing as prescribed by Sections [
<SRF>23 09 53.00 20</SRF>] [<SRF>23 09 23.13 20</SRF>], <SRF>23 05 93</SRF>and [_____] is included in the allotted calendar days for completion.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>1.9   OPERATION AND MAINTENANCE MANUALS</TTL><BRK/>
<BRK/>
<TXT><SUB>Operation and Maintenance Manuals</SUB> must be consistent with the manufacturer's standard brochures, schematics, 
printed instructions, general operating procedures, and safety precautions.  Bind information in manual format 
and grouped by technical sections.  Test data must be legible and of good quality.  Light-sensitive reproduction 
techniques are acceptable provided finished pages are clear, legible, and not subject to fading.  Pages for vendor 
data and manuals must have<MET> 10 millimeter</MET><ENG> 0.3937-inch</ENG> holes and be bound in 3-ring, loose-leaf binders.  Organize 
data by separate index and tabbed sheets, in a loose-leaf binder.  Binder must lie flat with printed sheets that 
are easy to read.  Caution and warning indications must be clearly labeled.</TXT><BRK/>
<BRK/>
<TXT>Submit classroom and field instructions in the operation and maintenance of systems equipment where required 
by the technical provisions.  These services must be directed by the Contractor, using the manufacturer's factory-trained 
personnel or qualified representatives.  <NED/>Contracting Officer will be given 7 calendar days written notice of 
scheduled instructional services.  Instructional materials belonging to the <NED/>manufacturer or vendor, such as lists, 
static exhibits, and visual aids, must be made available to the Contracting Officer.</TXT><BRK/>
<BRK/>
<TXT>Submit [6] [_____] copies of the project operation and maintenance manuals 30 calendar days prior to testing 
the system involved.  Update and resubmit data for final approval no later than 30 calendar days prior to contract 
completion.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.10   CLEANUP</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Natural cleaning materials include:<BRK/>
a.  abrasive cleaners: substitute 1/2 lemon dipped in borax.<BRK/>
b.  ammonia: substitute vinegar, salt and water mixture, or baking soda and water.<BRK/>
c.  disinfectants: substitute 1/2 cup borax in gallon water.<BRK/>
d.  drain cleaners: substitute 1/4 cup baking soda and 1/4 cup vinegar in boiling water.<BRK/>
e.  upholstery cleaners: substitute dry cornstarch.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TAI OPT="NAVY">Provide <SUB>final cleaning</SUB> in accordance with <RID>ASTM E 1971</RID>.  </TAI>Leave premises "broom clean."<TAI OPT="NAVY">  Comply with <RID>GS-37</RID> for 
general purpose cleaning and bathroom cleaning.  Use only nonhazardous cleaning materials, including natural 
cleaning materials, in the final cleanup.</TAI>  Clean interior and exterior glass surfaces exposed to view; remove 
temporary labels, stains and foreign substances; polish transparent and glossy surfaces; vacuum carpeted and 
soft surfaces.  Clean equipment and fixtures to a sanitary condition. [Clean] [Replace] filters of operating 
equipment<TAI OPT="NAVY"> and comply with the Indoor Air Quality (IAQ) Management Plan</TAI>.  Clean debris from roofs, gutters, downspouts 
and drainage systems.  Sweep paved areas and rake clean landscaped areas.  Remove waste and surplus materials, 
rubbish and construction facilities from the site.<TAI OPT="NAVY">  Recycle, salvage, and return construction and demolition 
waste from project in accordance with the Waste Management Plan.  Promptly and legally transport and dispose 
of any trash.  Do not burn, bury, or otherwise dispose of trash on the project site.</TAI></TXT><BRK/>
<BRK/>
<SPT>[<TTL>1.10.1   Extraordinary Cleanup Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Do not add information related to facility regulations which are of a 
routine nature.  Include unusual cleanup requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The following cleanup requirements apply:  [_____].</TXT><BRK/>
<BRK/>
]</SPT></SPT><TAI OPT="ARMY,NAVY"><SPT><TTL>1.11   REAL PROPERTY RECORD</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  All DoD projects require Form DD1354 to be completed, made final, and 
submitted for entry into the applicable service database of real property.  
The Designer of Record must complete and attach a draft version of Form DD1354 
(with cost data deleted) to the end of this section for subsequent revision 
by the construction Contractor, or US Naval Construction Forces, whichever is 
appropriate.  Complete procedural instructions for design and construction government 
forces are provided at the checklist url below.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify paragraph below if Command requires the activity contracting office 
to complete the form instead of the Contractor.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Near the completion of Project, but a minimum of 60 days prior to final acceptance of the work, complete, update 
draft attached to this section, and submit an accounting of all installed property on <SUB>Form DD1354</SUB> "Transfer and 
Acceptance of Military Real Property."  Contact the Contracting Officer for any project specific information 
necessary to complete the DD Form 1354.  For information purposes, a blank DD Form 1354 (fill-able) in ADOBE 
(PDF) may be obtained at the following web site:<BRK/>
    http://www.dtic.mil/whs/directives/infomgt/forms/eforms/dd1354.pdf<BRK/>
<BRK/>
Submit the completed <SUB>Checklist for Form DD1354</SUB> of Government-Furnished and Contractor-Furnished/Contractor Installed 
items.  Attach this list to the updated DD Form 1354.  Instructions for completing the form and a blank checklist 
(fill-able) in ADOBE (PDF) may be obtained at the following web site:<BRK/>
    http://www.hnd.usace.army.mil/techinfo/UFC/UFC1-300-08/UFC1-300-08.pdf  See Appendix D of this pdf for the 
checklist.</TXT><BRK/>
<BRK/></SPT>
</TAI></PRT><PRT><TTL>PART 2   PRODUCTS (NOT USED)</TTL><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION (NOT USED)</TTL><BRK/>
<BRK/></PRT>
    <END/><BRK/></SEC>