USACE / NAVFAC / AFCESA / NASA            UFGS-02 82 16.00 20 (April 2006)<BRK/>
                                          --------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>               Replacing without change<BRK/>
                                          UFGS-13281N (August 2003)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 02 82 16.00 20</SCN><BRK/>
<BRK/>
<STL>ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>safety procedures 
and requirements for the demolition, removal, encapsulation, and disposal of 
asbestos containing materials (ACM)</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Federal regulations require EPA model accreditation plan training to 
edit this document.  Furthermore, asbestos abatement designers must be accredited 
and licensed to design asbestos work in the location of the construction.</NPR><BRK/>
<BRK/>
<NPR>Nonfriable asbestos containing materials do not always require special handling.  
However, during demolition and removal of this material dust and airborne asbestos 
fibers will sometimes be released.  If the project contains nonfriable asbestos 
which may release fibers when demolished and removed, the nonfriable asbestos 
shall be removed in the same way as friable asbestos.</NPR><BRK/>
<BRK/>
<NPR>OSHA regulations address worker protection,  NESHAPS (EPA) regulations address 
disposal requirements, and they have different definitions as to what constitutes 
ACM in wallboard/joint compound systems.  Therefore, where wallboard/joint compound 
are suspected to contain ACM, analyze both discrete samples (separate samples 
from wallboard and joint compound) to address worker protection and composite 
samples (wallboard system as a whole) to address disposal requirements.  It 
is not unusual for the wallboard itself and the wallboard system (taken as a 
whole) to contain less than 1 percent asbestos, but the discrete joint compound 
samples to contain greater than 1 per cent asbestos.  Problems can arise if 
these materials are not properly categorized in the design.  Also, if the material 
is applied as an “add on” or “skim coat”, NESHAPS considers the layers separate 
and composite sampling is not appropriate.</NPR><BRK/>
<BRK/>
<NPR>Asbestos operations do not always indicate negative pressure enclosure type 
asbestos control with all of its attendant requirements.  The location of the 
area, type of material, and initial as well as other exposure assessments for 
abatement workers and the environment must be reviewed and a judgment made by 
the designer as to the precise asbestos control techniques described herein 
that may be safely and legally used.</NPR><BRK/>
<BRK/>
<NPR>It is the policy of the Navy to eliminate the use of materials containing asbestos 
wherever possible.  Therefore, the designer shall not use asbestos containing 
materials wherever a substitute, suitable to the Navy, exists.</NPR><BRK/>
<BRK/>
<NPR>The limits and conditions of asbestos hazard abatement efforts must be indicated 
on the drawings or in the specification in sufficient detail for the Contractor 
to submit an accurate bid.  Portions of the building where asbestos work will 
take place must be unoccupied during the removal operation.  It is highly recommended 
that the entire building be unoccupied during asbestos hazard abatement operations.  
If portions of the building where asbestos hazard abatement is not taking place 
must remain occupied, additional requirements must be added for providing temporary 
heating/cooling and other utilities to the occupied portions of the building.  
The building heating/cooling system for example cannot be operated in the asbestos 
control area and due to wet removal procedures, electrical service to the asbestos 
control area may need to be shut off and resupplied through a ground fault circuit 
interrupter.  In addition, the rooms with openings into the room undergoing 
asbestos abatement must be empty with critical barriers installed to provide 
a buffer zone.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following information shall be shown on the project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  The project drawings shall clearly show location, extent, condition and 
form of asbestos materials to be controlled or in contact with other non-ACM 
removals or new work.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)</ORG><BRK/><BRK/><RID>ANSI Z88.2</RID><RTL>(1992) Respiratory Protection</RTL><BRK/><BRK/><RID>ANSI Z9.2</RID><RTL>(2001) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM C 732</RID><RTL>(2006) Aging Effects of Artificial Weathering on Latex Sealants</RTL><BRK/><BRK/><RID>ASTM D 1331</RID><RTL>(1989; R 2001) Surface and Interfacial Tension of Solutions of Surface-Active Agents</RTL><BRK/><BRK/><RID>ASTM D 2794</RID><RTL>(1993; R 2004) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)</RTL><BRK/><BRK/><RID>ASTM D 522</RID><RTL>(1993a; R 2008) Mandrel Bend Test of Attached Organic Coatings</RTL><BRK/><BRK/><RID>ASTM E 119</RID><RTL>(2008a) Standard Test Methods for Fire Tests of Building Construction and Materials</RTL><BRK/><BRK/><RID>ASTM E 1368</RID><RTL>(2005e1) Visual Inspection of Asbestos Abatement Projects</RTL><BRK/><BRK/><RID>ASTM E 1494</RID><RTL>(1992; R 2002) Encapsulants for Spray- or Trowel-Applied Friable Asbestos-Containing Building Materials</RTL><BRK/><BRK/><RID>ASTM E 736</RID><RTL>(2000; R 2006) Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members</RTL><BRK/><BRK/><RID>ASTM E 84</RID><RTL>(2008a) Standard Test Method for Surface Burning Characteristics of Building Materials</RTL><BRK/><BRK/><RID>ASTM E 96/E 96M</RID><RTL>(2005) Standard Test Methods for Water Vapor Transmission of Materials</RTL><BRK/><BRK/></REF><REF><ORG>STATE OF VIRGINIA ADMINISTRATIVE CODE (VAC)</ORG><BRK/><BRK/><RID>16 VAC 25-20-30</RID><RTL>Title 16, Agency 25, Chapter 20, Section 30: Notification and Permit Fee</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)</ORG><BRK/><BRK/><RID>EPA 560/5-85-024</RID><RTL>(1985) Guidance for Controlling Asbestos-Containing Materials in Buildings (Purple Book)</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>29 CFR 1926.103</RID><RTL>Respiratory Protection</RTL><BRK/><BRK/><RID>29 CFR 1926.1101</RID><RTL>Asbestos</RTL><BRK/><BRK/><RID>29 CFR 1926.200</RID><RTL>Accident Prevention Signs and Tags</RTL><BRK/><BRK/><RID>29 CFR 1926.51</RID><RTL>Sanitation</RTL><BRK/><BRK/><RID>29 CFR 1926.59</RID><RTL>Hazard Communication</RTL><BRK/><BRK/><RID>40 CFR 61-SUBPART A</RID><RTL>General Provisions</RTL><BRK/><BRK/><RID>40 CFR 61-SUBPART M</RID><RTL>National Emission Standard for Asbestos</RTL><BRK/><BRK/><RID>40 CFR 763</RID><RTL>Asbestos</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)</ORG><BRK/><BRK/><RID>ND OPNAVINST 5100.23</RID><RTL>(Rev G) Navy Occupational Safety and Health (NAVOSH) Program Manual</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 586</RID><RTL>(1996; Rev thru Aug 2008) Standard for High-Efficiency Particulate, Air Filter Units</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1   ACM</TTL><BRK/>
<BRK/>
<TXT>Asbestos Containing Materials.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   <SUB>Amended Water</SUB></TTL><BRK/>
<BRK/>
<TXT>Water containing a wetting agent or surfactant with a maximum surface tension of<MET> 2.9 Pa</MET><ENG> 29 dynes per centimeter</ENG>
 when tested in accordance with <RID>ASTM D 1331</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Area Sampling</TTL><BRK/>
<BRK/>
<TXT>Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical 
breathing zone but is not actually collected in the breathing zone of an employee.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Asbestos</TTL><BRK/>
<BRK/>
<TXT>The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and 
actinolite asbestos and any of these minerals that has been chemically treated or altered.  Materials are considered 
to contain asbestos if the asbestos content of the material is determined to be at least one percent.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.5   Asbestos Control Area</TTL><BRK/>
<BRK/>
<TXT>That area where asbestos removal operations are performed which is isolated by physical boundaries which assist 
in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.6   Asbestos Fibers</TTL><BRK/>
<BRK/>
<TXT>Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute 
for Occupational Safety and Health (NIOSH) Method 7400.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.7   Asbestos Permissible Exposure Limit</TTL><BRK/>
<BRK/>
<TXT>0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined 
by <RID>29 CFR 1926.1101</RID> or other Federal legislation having legal jurisdiction for the protection of workers health.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.8   Background</TTL><BRK/>
<BRK/>
<TXT>The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard 
abatement efforts.  Background concentrations for other (contaminated) areas are measured in similar but asbestos 
free locations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.9   Contractor</TTL><BRK/>
<BRK/>
<TXT>The Contractor is that individual, or entity under contract to the Navy to perform the herein listed work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.10   Competent Person</TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Check state requirements for licensing and edit appropriately.  For Virginia 
and North Carolina, a state asbestos abatement license is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<TXT>A person meeting the requirements for competent person as specified in <RID>29 CFR 1926.1101</RID> including a person capable 
of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for 
asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically 
trained in a training course which meet the criteria of EPA's Model Accreditation Plan (<RID>40 CFR 763</RID>) for project 
designer or supervisor, or its equivalent. [The competent person shall have a current [State of _____] [Commonwealth 
of Virginia] asbestos contractors or supervisors license.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.11   Encapsulation</TTL><BRK/>
<BRK/>
<TXT>The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.12   Encapsulants</TTL><BRK/>
<BRK/>
<TXT>Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations 
to prevent these fibers from becoming airborne.  There are four types of encapsulants as follows which must comply 
with performance requirements as specified herein.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Removal Encapsulant (can be used as a wetting agent)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing 
material)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating 
all asbestos fibers and preventing fiber release due to routine mechanical damage)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces 
from which asbestos containing material has been removed).</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.13   Friable Asbestos Material</TTL><BRK/>
<BRK/>
<TXT>One percent asbestos containing material that can be crumbled, pulverized, or reduced to powder by hand pressure 
when dry.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.14   Glovebag Technique</TTL><BRK/>
<BRK/>
<TXT>Those asbestos removal and control techniques put forth in <RID>29 CFR 1926.1101</RID> Appendix G.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.15   HEPA Filter Equipment</TTL><BRK/>
<BRK/>
<TXT>High efficiency particulate air (HEPA) filtered vacuum and/or exhaust ventilation equipment with a filter system 
capable of collecting and retaining asbestos fibers.  Filters shall retain 99.97 percent of particles 0.3 microns 
or larger as indicated in <RID>UL 586</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.16   Navy Consultant (NC)</TTL><BRK/>
<BRK/>
<TXT>That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other 
way advise the Contracting Officer.  The NC is normally a private consultant, but can be an employee of the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.17   Negative Pressure Enclosure (NPE)</TTL><BRK/>
<BRK/>
<TXT>That engineering control technique described as a negative pressure enclosure in <RID>29 CFR 1926.1101</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.18   Nonfriable Asbestos Material</TTL><BRK/>
<BRK/>
<TXT>Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, 
or other material so that the asbestos is well bound and will not normally release asbestos fibers during any 
appropriate use, handling, storage or transportation.  It is understood that asbestos fibers may be released 
under other conditions such as demolition, removal, or mishap.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.19   Personal Sampling</TTL><BRK/>
<BRK/>
<TXT>Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific 
employee, as performed in accordance with <RID>29 CFR 1926.1101</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.20   Private Qualified Person (PQP)</TTL><BRK/>
<BRK/>
<TXT>That qualified person hired by the Contractor to perform the herein listed tasks.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.21   Qualified Person (QP)</TTL><BRK/>
<BRK/>
<TXT>A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified 
person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation 
Plan as described in <RID>40 CFR 763</RID> as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos 
Project Designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 
582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent.  The QP must be qualified to perform 
visual inspections as indicated in <RID>ASTM E 1368</RID>.  [The QP shall be appropriately licensed in the State of [_____].]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.22   TEM</TTL><BRK/>
<BRK/>
<TXT>Refers to Transmission Electron Microscopy.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.23   Time Weighted Average (TWA)</TTL><BRK/>
<BRK/>
<TXT>The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.24   Wetting Agent</TTL><BRK/>
<BRK/>
<TXT>A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak 
into the material to which it is applied.  An equivalent wetting agent must have a surface tension of at most<MET>
 2.9 Pa</MET><ENG> 29 dynes per centimeter</ENG> when tested in accordance with <RID>ASTM D 1331</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Description of Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify the form, condition and approximate quantity<MET> square meters or 
linear meters</MET><ENG> square feet or linear feet</ENG> of asbestos material to be controlled 
in the first blank and the location of the material in the second blank.  Example:  
"The asbestos work includes the demolition and removal of<MET> 90 m of 200 mm</MET><ENG> 300 
feet of 8 inch</ENG> diameter asbestos insulation located on existing steam piping 
indicated to be removed in the boiler room."  or "The asbestos work includes 
the encapsulation of<MET>  270 square meters</MET><ENG> 3,000 square feet</ENG> of sprayed on asbestos 
containing fire proofing materials located above the ceiling throughout the 
structure."</NPR><BRK/>
<BRK/>
<NPR>The use of this section in the contract specification means that known asbestos 
material is involved.  Estimate the quantity and specify as unit price items 
in Section 00200, "Instructions to Bidders" or Section 01200, "Price and Payment 
Procedures" per standard practice of the activity preparing the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include reference to 40 CFR 763 when asbestos work occurs in a public 
or private school Grades K thru 12.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Nonfriable ACM may not require special handling.  However, during demolition 
and removal of this material dust and airborne asbestos fibers will sometimes 
be released.  If the project contains nonfriable asbestos which may release 
fibers when demolished and removed, the nonfriable asbestos shall be removed 
in the same way as friable asbestos.  Include "Under normal.... specified herein.", 
if material traditionally defined as non-friable asbestos materials are to be 
removed.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The appropriate engineering control technique must comply with the requirements 
outlined in 29 CFR 1926.1101 which is selected based on existing conditions, 
but must be that technique that provides the best control during abatement at 
most reasonable cost.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The work covered by this section includes the handling and control of asbestos containing materials and describes 
some of the resultant procedures and equipment required to protect workers, the environment and occupants of 
the building or area, or both, from contact with airborne asbestos fibers.  The work also includes the disposal 
of any asbestos containing materials generated by the work.  More specific operational procedures shall be outlined 
in the Asbestos Hazard Abatement Plan called for elsewhere in this specification.  The asbestos work includes 
the [demolition and removal] [encapsulation] of [_____] located [_____] [which is governed by <RID>40 CFR 763</RID>].  [Under 
normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; 
however, this material may release airborne asbestos fibers during demolition and removal and therefore must 
be handled in accordance with the removal and disposal procedures as specified herein.]  Provide [negative pressure 
enclosure] [_____] techniques as outlined in this specification.  The Navy will evacuate the [building] [work 
area] during the asbestos abatement work. All asbestos removal work shall be supervised by a competent person 
as specified herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1.1   Wallboard/Joint Compound</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: When both composite and discrete sampling and testing is done on wallboard/joint 
compound ,  include and edit the following to address the site specific situation:  </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Both composite samples of the wallboard and discrete samples of the components (wallboard and joint compound) 
have been tested and results are attached.]<BRK/>
<BRK/>
[Composite samples of the wallboard system were tested and found to contain [less than one percent asbestos] 
[__________]. Discrete samples of the wallboard were tested and found to contain [less than one percent asbestos.] 
[__________].  Discrete samples of the joint compound were tested and found to contain [greater than one percent 
asbestos.] [__________].]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.2   Medical Requirements</TTL><BRK/>
<BRK/>
<TXT>Provide medical requirements including but not limited to medical surveillance and medical record keeping as 
listed in <RID>29 CFR 1926.1101</RID>.  </TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.2.1   Medical Examinations</TTL><BRK/>
<BRK/>
<TXT>Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required 
by <RID>29 CFR 1926.1101</RID> or other pertinent State or local directives.  This requirement must have been satisfied 
within the 12 months prior to the start of work on this contract.  The same medical examination shall be given 
on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before 
or after the termination of employment in such occupation.  Specifically identify x-ray films of asbestos workers 
to the consulting radiologist and mark medical record jackets with the word "ASBESTOS."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2.2   Medical Records</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Medical records shall be retained at least 50 years.  Some States require 
longer retention periods.  Check with the State in which the project is located 
for the required retention time.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data 
for a period of [50 years] [indefinite time] after termination of employment and make records of the required 
medical examinations and exposure data available for inspection and copying to:  The Assistant Secretary of Labor 
for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician 
upon the request of the employee or former employee.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.3   <SUB>Employee Training</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include bracketed sentence where required by law, regulation or statute.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit certificates, prior to the start of work but after the main abatement submittal, signed by each employee 
indicating that the employee has received training in the proper handling of materials and wastes that contain 
asbestos in accordance with <RID>40 CFR 763</RID>; understands the health implications and risks involved, including the 
illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory 
equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related 
to health and respiratory equipment as indicated in <RID>29 CFR 1926.1101</RID> on an initial and annual basis.  Certificates 
shall be organized by individual worker, not grouped by type of certification.  [Post appropriate evidence of 
compliance with the training requirements of <RID>40 CFR 763</RID>.]  Train all personnel involved in the asbestos control 
work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response 
Act (AHERA) training criteria or State training criteria whichever is more stringent.  The Contractor shall document 
the training by providing:  dates of training, training entity, course outline, names of instructors, and qualifications 
of instructors upon request by the Contracting Officer.  Furnish each employee with respirator training and fit 
testing administered by the PQP as required by <RID>29 CFR 1926.1101</RID>.  Fully cover engineering and other hazard control 
techniques and procedures.  [All asbestos workers shall have a current [State of _____][Commonwealth of Virginia] 
asbestos worker's license.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   Permits [, Licenses,] and <SUB>Notifications</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The USEPA has delegated the responsibility of notification requirements 
to most States.  Verify with the State and local authorities where the project 
is located whether the city, county, State, and/or USEPA has jurisdiction and 
whether a license is required.<BRK/>
<BRK/>
For Virginia, use "Asbestos Control Clerk, Virginia Department of Labor" for 
the second sentence.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Obtain necessary <SUB>permits [and licenses]</SUB> in conjunction with asbestos removal, encapsulation, hauling, and disposition, 
and furnish notification of such actions required by Federal, State, regional, and local authorities prior to 
the start of work.  Notify the [Regional Office of the United States Environmental Protection Agency (USEPA)] 
[State's environmental protection agency] [local air pollution control district/agency] and the Contracting Officer 
in writing 20 working days prior to commencement of work in accordance with <RID>40 CFR 61-SUBPART M</RID>[ and <RID>16 VAC 25-20-30</RID>
].  Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior 
to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations.  
Submit copies of all <SUB>Notifications</SUB> to the Contracting Officer. [Notify the local fire department 3 days prior 
to removing fire-proofing material from the building including notice that the material contains asbestos.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   Environment, Safety and Health Compliance</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer shall research the State, regional and local laws, regulations, 
statutes, etc., and list by authority and document number in the blank spaces 
provided those which apply to the asbestos work to be performed by the Contractor.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, 
rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, 
and disposing of asbestos waste materials.  Comply with the applicable requirements of the current issue of <RID>29 CFR 1926.1101</RID>
, <RID>40 CFR 61-SUBPART A</RID>, <RID>40 CFR 61-SUBPART M</RID>, and <RID>ND OPNAVINST 5100.23</RID>.  Submit matters of interpretation of standards 
to the appropriate administrative agency for resolution before starting the work.  Where the requirements of 
this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, 
the most stringent requirement as defined by the Government shall apply.  The following laws, ordinances, criteria, 
rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials 
apply:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a. [_____]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b. [_____]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c. [_____].</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.6   <SUB>Respiratory Protection Program</SUB></TTL><BRK/>
<BRK/>
<TXT>Establish and implement a respirator program as required by <RID>ANSI Z88.2</RID>, <RID>29 CFR 1926.1101</RID>, and <RID>29 CFR 1926.103</RID>
.  Submit a written description of the program to the Contracting Officer.  Submit a written program manual or 
operating procedure including methods of compliance with regulatory statutes.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.6.1   <SUB>Respirator Program Records</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit records of the respirator program as required by <RID>ANSI Z88.2</RID>, <RID>29 CFR 1926.103</RID>, and <RID>29 CFR 1926.1101</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3.7   Asbestos Hazard Control Supervisor</TTL><BRK/>
<BRK/>
<TXT>The Contractor shall be represented on site by a supervisor, trained using the model Contractor accreditation 
plan as indicated in the Federal statutes for all portions of the herein listed work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.8   Hazard Communication</TTL><BRK/>
<BRK/>
<TXT>Adhere to all parts of <RID>29 CFR 1926.59</RID> and provide the Contracting Officer with a copy of the <SUB>Material Safety 
Data Sheets (MSDS) for all materials</SUB> brought to the site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.9   <SUB>Asbestos Hazard Abatement Plan</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined 
space entry procedures and equipment and work procedures to be used in the [encapsulation] [removal] [and demolition] 
of materials containing asbestos.  The plan, not to be combined with other hazard abatement plans, shall be prepared, 
signed, and sealed by the PQP.  Provide a Table of Contents for each abatement submittal, which shall follow 
the sequence of requirements  in the contract.  Such plan shall include but not be limited to the precise personal 
protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection 
[and if reusable coveralls are to be employed decontamination methods (operations and quality control plan)], 
the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, 
change rooms, [removal] [encapsulation] method, interface of trades involved in the construction, sequencing 
of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local 
exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed 
in order to control environmental pollution.  The plan shall also include (both fire and medical emergency) response 
plans.  The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work.  
The Contractor, Asbestos Hazard Control Supervisor, and PQP shall meet with the Contracting Officer prior to 
beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety 
precautions.  Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification.  
Any changes required in the specification as a result of the plan shall be identified specifically in the plan 
to allow for free discussion and approval by the Contracting Officer prior to starting work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.10   <SUB>Testing Laboratory</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit the name, address, and telephone number of each testing laboratory selected for the [sampling,] analysis, 
and reporting of airborne concentrations of asbestos fibers along with [evidence that each laboratory selected 
holds the appropriate State license and/or permits and] certification that each laboratory is American Industrial 
Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current 
inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the 
Proficiency Analytical Testing (PAT) Program.  Where analysis to determine asbestos content in bulk materials 
or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National 
Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) 
for asbestos analysis.  The testing laboratory firm shall be independent of the asbestos contractor and shall 
have no employee or employer relationship which could constitute a conflict of interest.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.11   <SUB>Landfill Approval</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The USEPA has delegated the responsibility of approving landfills for 
the disposal of asbestos to most States.  Verify with the State in which the 
project is located whether the State or USEPA has jurisdiction and what laws 
apply.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit written evidence that the landfill is for asbestos disposal by the U.S. Environmental Protection Agency, 
Region 3, Air Enforcement Section (38W12), and local regulatory agencies. Within 3 working days after delivery, 
submit detailed <SUB>delivery tickets</SUB>, prepared, signed, and dated by an agent of the landfill, certifying the amount 
of asbestos materials delivered to the landfill. Submit a copy of the <SUB>waste shipment records</SUB> within 1 day of 
the shipment leaving the project site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.12   <SUB>Medical Certification</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that 
the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in <RID>29 CFR 1926.1101</RID>
 and <RID>29 CFR 1926.103</RID> as prescribed by law.  Submit certificates prior to the start of work but after the main 
abatement submittal.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The submittals required for each project are very dependent upon the 
removal method to be used.  Edit the submittals paragraph accordingly.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Local exhaust equipment</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Vacuums</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Respirators</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Pressure differential automatic recording instrument</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Amended water</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Glovebags</SUB>; <SUB>G</SUB></ITM>]<BRK/>
<BRK/>
<ITM><SUB>Material Safety Data Sheets (MSDS) for all materials</SUB> proposed for transport to the project site; <SUB>
G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Encapsulants</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Air sampling results</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Pressure differential recordings for local exhaust system</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Asbestos disposal quantity report</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Encapsulation test patches</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Clearance sampling</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include contractor's and worker's licenses for Virginia projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<ITM><SUB>Asbestos hazard abatement plan</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Testing laboratory</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Private qualified person documentation</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Contractor's license</SUB>; <SUB>G</SUB></ITM>]<BRK/>
<BRK/>
<ITM><SUB>Competent person</SUB> documentation; <SUB>G</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Worker's license</SUB>; <SUB>G</SUB></ITM>]<BRK/>
<BRK/>
<ITM><SUB>Landfill approval</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Employee training</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Medical certification</SUB> requirements; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Waste shipment records</SUB> and if applicable exemption report; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Respiratory Protection Program</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Delivery tickets</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Vacuums</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Water filtration equipment</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Ventilation systems</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>Other <SUB>equipment used to contain airborne asbestos fibers</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>Chemical <SUB>encapsulants</SUB> sealers; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Notifications</SUB></ITM><BRK/>
<BRK/>
<ITM>  Show compliance with <RID>ANSI Z9.2</RID> by providing manufacturers' certifications.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Notifications</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Rental equipment</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Respirator program records</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Permits [and licenses]</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Protective clothing decontamination quality control records</SUB>; <SUB>G</SUB></ITM>]<BRK/>
<BRK/>
[<ITM><SUB>Protective clothing decontamination facility notification</SUB>; <SUB>G</SUB></ITM>]<BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Private Qualified Person Documentation</SUB></TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit requirement for private qualified person to have licensing.</NPR><BRK/>
<AST/><BRK/></NTE>
<TXT>Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the 
Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully 
completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor 
Abatement Worker, and Asbestos Project Designer as described by <RID>40 CFR 763</RID> and has successfully completed the 
National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos 
Dust" or equivalent.  [The PQP shall be appropriately licensed in the [State of _____][Commonwealth of Virginia 
as a Project Monitor]].  The PQP and the asbestos contractor shall not have an employee/employer relationship 
or financial relationship which could constitute a conflict of interest.  The PQP shall be a first tier subcontractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>Competent Person</SUB> Documentation</TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit requirement for licensing.</NPR><BRK/>
<AST/><BRK/></NTE>
<TXT>Submit training certification and a current [State of _____][Commonwealth of Virginia] Asbestos Contractor's 
and Supervisor's License.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   <SUB>Worker's License</SUB></TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit requirement for licensing.</NPR><BRK/>
<AST/><BRK/></NTE>
<TXT>Submit documentation that requires all workers have a current [State of _____][Commonwealth of Virginia] Asbestos 
Workers License.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4   <SUB>Contractor's License</SUB></TTL><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit requirement for licensing.</NPR><BRK/>
<AST/><BRK/></NTE>
<TXT>Contractor shall have current [Virginia][_____] asbestos contractor's license. Submit a copy of the asbestos 
contractor's license issued by the [State of _____][Commonwealth of Virginia].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.5   <SUB>Air Sampling Results</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normal practice is to have the Contractor hire one independent Private 
Qualified Person (the PQP) to perform all required functions.  However, some 
applicable laws forbid this approach and will dictate when the PQP, the NC or 
both will be required to perform the function involved.  However, the Contractor 
shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Complete fiber counting and provide results to the [PQP] [and] [NC] for review within 16 hours of the "time off" 
of the sample pump.  Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in 
excess of the acceptable limits.  Submit sampling results to the Contracting Officer and the affected Contractor 
employees where required by law within 3 working days, signed by the testing laboratory employee performing air 
sampling, the employee that analyzed the sample, and the [PQP] [and] [NC].  Notify the Contractor and the Contracting 
Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to 
have asbestos fiber concentrations in excess of 0.01 fibers per cubic centimeter or background whichever is higher.  
In no circumstance shall levels exceed 0.1 fibers per cubic centimeter.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.6   <SUB>Pressure Differential Recordings for Local Exhaust System</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When an negative pressure enclosure is not required, delete the requirements 
for the local exhaust system and pressure differential recording.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normal practice is to have the Contractor hire one independent Private 
Qualified Person (the PQP) to perform all required functions.  However, some 
applicable laws forbid this approach and will dictate when the PQP, the NC or 
both will be required to perform the function involved.  However, the Contractor 
shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a local exhaust system that creates a negative pressure of at least<MET> 0.51 mm</MET><ENG> 0.02 inches</ENG> of water relative 
to the pressure external to the enclosure and operate it continuously, 24 hours a day, until the temporary enclosure 
of the asbestos control area is removed.  Submit pressure differential recordings for each work day to the [PQP] 
[and] [NC] for review and to the Contracting Officer within 24 hours from the end of each work day.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.5.7   <SUB>Protective Clothing Decontamination Quality Control Records</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide all records that document quality control for the decontamination of reusable outer protective clothing.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>1.5.8   <SUB>Protective Clothing Decontamination Facility Notification</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit written evidence that persons who decontaminate, store, or transport asbestos contaminated clothing used 
in the performance of this contract were duly notified in accordance with <RID>29 CFR 1926.1101</RID>.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.6   EQUIPMENT</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   <SUB>Rental Equipment</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide a copy of the written notification to the rental company concerning the intended use of the equipment 
and the possibility of asbestos contamination of the equipment.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>ENCAPSULANTS</SUB></TTL><BRK/>
<BRK/>
<TXT>Shall conform to current USEPA requirements, shall contain no toxic or hazardous substances as defined in <RID>29 CFR 1926.59</RID>
, and shall conform to the following performance requirements.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Removal Encapsulants</TTL><BRK/>
<TBL><THD><BRK/>
  <HL1>Requirement</HL1>                                    <HL1>Test Standard</HL1><BRK/>
<BRK/></THD>
  Flame Spread - 25, Smoke Emission - 50         <RID>ASTM E 84</RID><BRK/>
<BRK/>
  Life Expectancy - 20 years                     <RID>ASTM C 732</RID> Accelerated<BRK/>
                                                 Aging Test<BRK/>
<BRK/>
  Permeability - Minimum 0.4 perms               <RID>ASTM E 96/E 96M</RID><BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>2.1.2   Bridging Encapsulant</TTL><BRK/>
<TBL><THD><BRK/>
  <HL1>Requirement</HL1>                                    <HL1>Test Standard</HL1><BRK/></THD>
<BRK/>
  Flame Spread - 25, Smoke Emission - 50         <RID>ASTM E 84</RID><BRK/>
<BRK/>
  Life Expectancy - 20 years                     <RID>ASTM C 732</RID> Accelerated<BRK/>
                                                 Aging Test<BRK/>
<BRK/>
  Permeability - Minimum 0.4 perms               <RID>ASTM E 96/E 96M</RID><BRK/>
<BRK/>
  Fire Resistance - Negligible affect on         <RID>ASTM E 119</RID><BRK/>
  fire resistance rating over 3 hour test<BRK/>
  (Classified by UL for use over fibrous<BRK/>
  and cementitious sprayed fireproofing)<BRK/>
<BRK/>
  Impact Resistance - Minimum                    <RID>ASTM D 2794</RID><BRK/>
 <MET> 245.5 mm/N</MET><ENG> 43 in/lb</ENG>                    Gardner Impact Test<BRK/>
<BRK/>
  Flexibility - no rupture or cracking           <RID>ASTM D 522</RID><BRK/>
                                                 Mandrel Bend Test<BRK/>
<BRK/></TBL>
</SPT><SPT><TTL>2.1.3   Penetrating Encapsulant</TTL><BRK/>
<TBL><THD><BRK/>
  <HL1>Requirement</HL1>                                    <HL1>Test Standard</HL1><BRK/></THD>
<BRK/>
  Flame Spread - 25, Smoke Emission - 50         <RID>ASTM E 84</RID><BRK/>
<BRK/>
  Life Expectancy - 20 years                     <RID>ASTM C 732</RID> Accelerated<BRK/>
                                                 Aging Test<BRK/>
<BRK/>
  Permeability - Minimum 0.4 perms               <RID>ASTM E 96/E 96M</RID><BRK/>
<BRK/>
  Cohesion/Adhesion Test -                       <RID>ASTM E 736</RID><BRK/>
 <MET> 729.5 N of force/meter</MET><ENG> 50 pounds of force/foot</ENG><BRK/>
<BRK/>
  Fire Resistance - Negligible affect on         <RID>ASTM E 119</RID><BRK/>
  fire resistance rating over 3 hour test<BRK/>
  (Classified by UL for use over fibrous<BRK/>
  and cementitious sprayed fireproofing)<BRK/>
<BRK/>
  Impact Resistance - Minimum                    <RID>ASTM D 2794</RID><BRK/>
 <MET> 245.5 mm/N</MET><ENG> 43 in/lb</ENG>                    Gardner Impact Test<BRK/>
<BRK/>
  Flexibility - no rupture or cracking           <RID>ASTM D 522</RID><BRK/>
                                                 Mandrel Bend Test<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>2.1.4   Lock-down Encapsulant</TTL><BRK/>
<TBL><THD><BRK/>
  <HL1>Requirement</HL1>                                    <HL1>Test Standard</HL1><BRK/></THD>
<BRK/>
  Flame Spread:  25, Smoke Emission - 50         <RID>ASTM E 84</RID><BRK/>
<BRK/>
  Life Expectancy:  20 years                     <RID>ASTM C 732</RID> Accelerated<BRK/>
                                                 Aging Test<BRK/>
<BRK/>
  Permeability:  Minimum 0.4 perms               <RID>ASTM E 96/E 96M</RID><BRK/>
<BRK/>
  Fire Resistance:  Negligible affect on         <RID>ASTM E 119</RID><BRK/>
  fire resistance rating over 3 hour test<BRK/>
  (Tested with fireproofing over encapsulant<BRK/>
  applied directly to steel member)<BRK/>
<BRK/>
  Bond Strength: <MET> 1459 N of force/meter</MET><ENG> 100 pounds of force/foot</ENG>      <RID>ASTM E 736</RID><BRK/>
  (Tests compatibility with cementitious and fibrous fireproofing)<BRK/></TBL>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   EQUIPMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify the number of sets of protective equipment as required, depending 
on the size of the asbestos removal project.  Larger projects may require more 
than two persons on an inspection team.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>At all times, provide the Contracting Officer or the Contracting Officer's Representative, with at least [two] 
[_____] complete sets of personal protective equipment [including decontaminating reusable coveralls] as required 
for entry to and inspection of the asbestos control area.  Provide equivalent training to the Contracting Officer 
or a designated representative as provided to Contractor employees in the use of the required personal protective 
equipment.  Provide manufacturer's certificate of compliance for all <SUB>equipment used to contain airborne asbestos 
fibers</SUB>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Respirators</TTL><BRK/>
<BRK/>
<TXT>Select respirators from those approved by the National Institute for Occupational Safety and Health (NIOSH), 
Department of Health and Human Services.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1.1   <SUB>Respirators</SUB> for Handling Asbestos</TTL><BRK/>
<BRK/>
<TXT>Provide personnel engaged in pre-cleaning, cleanup, handling, [encapsulation] [removal] [and] [or] [demolition] 
of asbestos materials with respiratory protection as indicated in <RID>29 CFR 1926.1101</RID> and <RID>29 CFR 1926.103</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.2   Exterior Whole Body Protection</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.2.1   Outer Protective Clothing</TTL><BRK/>
<BRK/>
<TXT>Provide personnel exposed to asbestos with disposable "non-breathable," [or reusable "non-breathable"] whole 
body outer protective clothing, head coverings, gloves, and foot coverings.  Provide disposable plastic or rubber 
gloves to protect hands.  Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but shall 
not be used alone.  Make sleeves secure at the wrists, make foot coverings secure at the ankles, and make clothing 
secure at the neck by the use of tape.  [Reusable whole body outer protective clothing shall be either disposed 
of as asbestos contaminated waste upon exiting from the asbestos regulated work area or be properly decontaminated.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.2   Work Clothing</TTL><BRK/>
<BRK/>
<TXT>Provide cloth work clothes for wear under the outer protective clothing and foot coverings and either dispose 
of or properly decontaminate them as recommended by the [NC] [PQP] after each use.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.3   Personal Decontamination Unit</TTL><BRK/>
<BRK/>
<TXT>Provide a temporary, negative pressure unit with a separate decontamination locker room and clean locker room 
with a shower that complies with <RID>29 CFR 1926.51</RID>(f)(4)(ii) through (V) in between for personnel required to wear 
whole body protective clothing.  Provide two separate lockers for each asbestos worker, one in each locker room.  
Keep street clothing and street shoes in the clean locker.  HEPA vacuum and remove asbestos contaminated disposable 
protective clothing while still wearing respirators at the boundary of the asbestos work area and seal in impermeable 
bags or containers for disposal.  [HEPA vacuum and remove asbestos contaminated reusable protective clothing 
while still wearing respirators at the boundary of the asbestos work area, seal in two impermeable bags, label 
outer bag as asbestos contaminated waste, and transport for decontamination.]  Do not wear work clothing between 
home and work.  Locate showers between the decontamination locker room and the clean locker room and require 
that all employees shower before changing into street clothes.  Collect used shower water and filter with approved <SUB>
water filtration equipment</SUB> to remove asbestos contamination.  Dispose of filters and residue as asbestos waste.  
Discharge clean water to the sanitary system.  Dispose of asbestos contaminated work clothing as asbestos contaminated 
waste [or properly decontaminate as specified in the Contractor's Asbestos Hazard Abatement Plan].  Decontamination 
units shall be physically attached to the asbestos control area.  Build both a personnel decontamination unit 
and an equipment decontamination unit onto and integral with each asbestos control area.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.4   [Decontamination of Reusable Outer Protective Clothing</TTL><BRK/>
<BRK/>
<TXT>When reusable outer protective clothing is used, transport the double bagged clothing to a previously notified 
commercial/industrial decontamination facility for decontamination.  Perform non-destructive testing to determine 
the effectiveness of asbestos decontamination.  If representative sampling is used, ensure the statistical validity 
of the sampling results.  If representative sampling is used, reject any entire batch in which any of the pieces 
exceed 40 fibers per square millimeter.  Inspect reusable protective clothing prior to use to ensure that it 
will provide adequate protection and is not or is not about to become ripped, torn, deteriorated, or damaged, 
and that it is not visibly contaminated.  Notify, in writing, all personnel involved in the decontamination of 
reusable outer protective clothing as indicated in 29 CFR 1926.1101.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.5   Eye Protection</TTL><BRK/>
<BRK/>
<TXT>Provide goggles to personnel engaged in asbestos abatement operations when the use of a full face respirator 
is not required.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.3   Warning Signs and Labels</TTL><BRK/>
<BRK/>
<TXT>Provide [bilingual] warning signs [printed in English and [_____]] at all approaches to asbestos control areas.  
Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required 
before entering the area.  Provide labels and affix to all asbestos materials, scrap, waste, debris, and other 
products contaminated with asbestos.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.3.1   Warning Sign</TTL><BRK/>
<BRK/>
<TXT>Provide vertical format conforming to <RID>29 CFR 1926.200</RID>, and <RID>29 CFR 1926.1101</RID> minimum<MET> 500 by 355 mm</MET><ENG> 20 by 14 inches</ENG>
 displaying the following legend in the lower panel:</TXT><BRK/>
<TBL><THD><BRK/>
  <HL1>Legend</HL1>                               <HL1>Notation</HL1><BRK/></THD>
<BRK/>
  Danger                              <MET> 25 mm</MET><ENG> one inch</ENG> Sans Serif<BRK/>
                                       Gothic or Block<BRK/>
<BRK/>
  Asbestos                            <MET> 25 mm</MET><ENG> one inch</ENG> Sans Serif<BRK/>
                                       Gothic or Block<BRK/>
<BRK/>
  Cancer and Lung Disease Hazard      <MET> 6 mm</MET><ENG> 1/4 inch</ENG> Sans Serif<BRK/>
                                       Gothic or Block<BRK/>
<BRK/>
  Authorized Personnel Only           <MET> 6 mm</MET><ENG> 1/4 inch</ENG> Gothic<BRK/>
<BRK/>
  Respirators and Protective          <MET> 6 mm</MET><ENG> 1/4 inch</ENG> Gothic<BRK/>
  Clothing are Required in<BRK/>
  this Area<BRK/></TBL>
<BRK/>
<TXT>Spacing between lines shall be at least equal to the height of the upper of any two lines.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3.2   Warning Labels</TTL><BRK/>
<BRK/>
<TXT>Provide labels conforming to <RID>29 CFR 1926.1101</RID> of sufficient size to be clearly legible, displaying the following 
legend:</TXT><BRK/>
<TBL><BRK/>
<HL4>DANGER</HL4><BRK/>
<BRK/>
<HL4>CONTAINS ASBESTOS FIBERS</HL4><BRK/>
<BRK/>
<HL4>AVOID CREATING DUST</HL4><BRK/>
<BRK/>
<HL4>CANCER AND LUNG DISEASE HAZARD</HL4><BRK/>
<BRK/>
<HL4>BREATHING ASBESTOS DUST MAY</HL4><BRK/>
<HL4>CAUSE SERIOUS BODILY HARM</HL4><BRK/>
<BRK/></TBL>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.4   Local Exhaust System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When a negative pressure enclosure is not required, delete the requirements 
for the local exhaust system and pressure differential recording.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a local exhaust system in the asbestos control area in accordance with <RID>ANSI Z9.2</RID> and <RID>29 CFR 1926.1101</RID>
 that will provide at least four air changes per hour inside of the negative pressure enclosure.  <SUB>Local exhaust 
equipment</SUB> shall be operated 24 hours per day, until the asbestos control area is removed and shall be leak proof 
to the filter and equipped with HEPA filters.  Maintain a minimum pressure differential in the control area of 
minus<MET> 0.51 mm</MET><ENG> 0.02 inch</ENG> of water column relative to adjacent, unsealed areas.  Provide continuous 24-hour per 
day monitoring of the pressure differential with a <SUB>pressure differential automatic recording instrument</SUB>.  In 
no case shall the building ventilation system be used as the local exhaust system for the asbestos control area.  
Filters on exhaust equipment shall conform to <RID>ANSI Z9.2</RID> and <RID>UL 586</RID>.  The local exhaust system shall terminate 
out of doors and remote from any public access or ventilation system intakes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Tools</TTL><BRK/>
<BRK/>
<TXT><SUB>Vacuums</SUB> shall be leak proof to the filter and equipped with HEPA filters.  Filters on vacuums shall conform to <RID>
ANSI Z9.2</RID> and <RID>UL 586</RID>.  Do not use power tools to remove asbestos containing materials unless the tool is equipped 
with effective, integral HEPA filtered exhaust <SUB>ventilation systems</SUB>.  Remove all residual asbestos from reusable 
tools prior to storage or reuse.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.6   Rental Equipment</TTL><BRK/>
<BRK/>
<TXT>If rental equipment is to be used, furnish written notification to the rental agency concerning the intended 
use of the equipment and the possibility of asbestos contamination of the equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>3.1.7   <SUB>Glovebags</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include this paragraph if glovebag technique is permitted to be used 
in the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit written manufacturers proof that glovebags will not break down under expected temperatures and conditions.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>3.2   WORK PROCEDURE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use wet removal procedures in almost all cases.  Wet removal is the preferred 
method and the least hazardous.  Dry removal as an option can be used to allow 
the Contractor to use dry removal where wet removal may damage equipment or 
present an extreme hazard.  Dry removal as the only method of removal should 
only be specified if freezing is likely to occur, safety hazards preclude the 
use of water, or severe water damage to equipment, etc., would occur during 
wet removal.  If dry removal alone is allowed, carefully edit the specification 
to remove all reference to amended water and wetting down procedures and to 
include a requirement for a written variance submitted by the Contractor along 
with the written approval of any regulatory authority having jurisdiction.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Negative pressure enclosure and glovebag techniques pertain to the two 
most general but yet essentially different asbestos control techniques used 
for asbestos removal.  Encapsulation work practice techniques are listed here, 
also.  The use of unlisted removal work practice techniques will be acceptable 
if they are proven at least as safe as the listed practices.  The appropriate 
technique depends on existing conditions, but must be that technique that provides 
the best control during abatement at most reasonable cost.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform asbestos related work in accordance with <RID>29 CFR 1926.1101</RID>, <RID>40 CFR 61-SUBPART M</RID>, and as specified herein.  
Use [[wet] [or] [if given prior EPA approval, dry] removal procedures] [appropriate encapsulation procedures 
as listed in the asbestos hazard abatement plan] and [negative pressure enclosure] [_____] techniques.  Personnel 
shall wear and utilize protective clothing and equipment as specified herein.  Eating, smoking, drinking, chewing 
gum, tobacco, or applying cosmetics shall not be permitted in the asbestos work or control areas.  Personnel 
of other trades not engaged in the [encapsulation] [removal and demolition] of asbestos containing material shall 
not be exposed at any time to airborne concentrations of asbestos unless all the personnel protection and training 
provisions of this specification are complied with by the trade personnel.  [Seal all roof top penetrations, 
except plumbing vents, prior to asbestos roofing work.]  Shut down the building heating, ventilating, and air 
conditioning system, cap the openings to the system, [and provide temporary [heating,] [and] [ventilation,] [and] 
[air conditioning]] prior to the commencement of asbestos work.  [Disconnect electrical service when [encapsulation] 
[wet removal] is performed and provide temporary electrical service with verifiable ground fault circuit interrupter 
(GFCI) protection prior to the use of any [water] [encapsulant].]  If an asbestos fiber release or spill occurs 
[outside of the asbestos control area], stop work immediately, correct the condition to the satisfaction of the 
Contracting Officer including clearance sampling, prior to resumption of work.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Protection of Existing Work to Remain</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normal practice is to have the Contractor hire one independent Private 
Qualified Person (the PQP) to perform all required functions.  However, some 
applicable laws forbid this approach and will dictate when the PQP, the NC or 
both will be required to perform the function involved.  However, the Contractor 
shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform work without damage or contamination of adjacent work.  Where such work is damaged or contaminated as 
verified by the Contracting Officer using visual inspection or sample analysis, it shall be restored to its original 
condition or decontaminated by the Contractor at no expense to the Government as deemed appropriate by the Contracting 
Officer.  This includes inadvertent spill of dirt, dust, or debris in which it is reasonable to conclude that 
asbestos may exist.  When these spills occur, stop work immediately.  Then clean up the spill.  When satisfactory 
visual inspection and air sampling results are obtained from the [PQP] [NC] work may proceed at the discretion 
of the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Furnishings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose one of the following options.  In most projects, the Government 
will remove furniture and equipment before the Contractor begins work.  In this 
case the first paragraph should be used.  The third paragraph should only be 
used when existing furnishings have been contaminated with asbestos fibers and 
the Contractor will be required to clean these items.  When the third paragraph 
is used, identify the furnishings and indicate the quantity of each.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer must decide if porous, non-solid surfaced items can be cleaned 
or must be disposed of as contaminated waste.  If cleaning is chosen, specify 
methods.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Furniture [,(_____)] and equipment will be removed from the area of work by the Government before asbestos work 
begins.]</TXT><BRK/>
<BRK/>
<TXT>[Furniture [,(_____)] and equipment will remain in the building.  Cover and seal furnishings with<MET> 0.15 mm</MET><ENG> 6-mil</ENG>
 plastic sheet or remove from the work area and store in a location on site approved by the Contracting Officer.]</TXT><BRK/>
<BRK/>
<TXT>[Furnishings listed below and located in the work area are considered to be contaminated with asbestos fibers.  
Transfer these items to an area on site approved by the Contracting Officer, decontaminate (wet methods where 
possible), and then store until the room from which they came is declared clean and safe for entry.  [Carpets, 
draperies, and other items with porous, non-solid surfaces can not be suitably cleaned and shall be properly 
disposed of as contaminated waste.]  At the conclusion of the asbestos removal work and cleanup operations, transfer 
all objects so removed and cleaned back to the area from which they came and re-install them.  Base bids on decontaminating:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.   [_____] Desks</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.   [_____] Filing cabinets</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.   [_____] Linear<MET> meters</MET><ENG> feet</ENG> of shelving</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.   [_____] Cubic<MET> meters</MET><ENG> feet</ENG> of books, papers, files, etc.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.   [_____]].</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Precleaning</TTL><BRK/>
<BRK/>
<TXT>Wet wipe and HEPA vacuum all surfaces potentially contaminated with asbestos prior to establishment of an enclosure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Asbestos Control Area Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When negative pressure enclosure is infeasible, use paragraph entitled 
"Glovebag" and delete paragraph entitled "Negative Pressure Enclosure."  If 
the project has both areas which can be enclosed and areas which cannot be enclosed, 
retain the appropriate paragraphs and identify the areas which must be enclosed 
and the areas which cannot be enclosed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.2.4.1   Negative Pressure Enclosure</TTL><BRK/>
<BRK/>
<TXT>Block and seal openings in areas where the release of airborne asbestos fibers can be expected.  Establish an 
asbestos negative pressure enclosure with the use of curtains, portable partitions, or other enclosures in order 
to prevent the escape of asbestos fibers from the contaminated asbestos work area.  Negative pressure enclosure 
development shall include protective covering of uncontaminated walls, and ceilings with a continuous membrane 
of two layers of minimum<MET> 0.15 mm</MET><ENG> 6-mil</ENG> plastic sheet sealed with tape to prevent water or other damage.  Provide 
two layers of <MET> 0.15 mm</MET><ENG> 6-mil</ENG> plastic sheet over floors and extend a minimum of <MET> 300 mm</MET><ENG> 12 inches</ENG> up walls.  Seal 
all joints with tape.  Provide local exhaust system in the asbestos control area.  Openings will be allowed in 
enclosures of asbestos control areas for personnel and equipment entry and exit, the supply and exhaust of air 
for the local exhaust system and the removal of properly containerized asbestos containing materials.  Replace 
local exhaust system filters as required to maintain the efficiency of the system.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>3.2.4.2   Glovebag</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify the asbestos material to be removed in the first blank and identify 
the location of the area which cannot be enclosed in the second blank.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The construction of a negative pressure enclosure is infeasible for the [removal] [encapsulation] of [_____] 
located [_____].  Use alternate techniques as indicated in <RID>29 CFR 1926.1101</RID>.  Establish designated limits for 
the asbestos regulated area with the use of rope or other continuous barriers, and maintain all other requirements 
for asbestos control areas.  The PQP shall conduct personal samples of each worker engaged in asbestos handling 
(removal, disposal, transport and other associated work) throughout the duration of the project.  If the quantity 
of airborne asbestos fibers monitored at the breathing zone of the workers at any time exceeds background or 
0.01 fibers per cubic centimeter whichever is greater, stop work, evacuate personnel in adjacent areas or provide 
personnel with approved protective equipment at the discretion of the Contracting Officer.  This sampling may 
be duplicated by the Government at the discretion of the Contracting Officer.  If the air sampling results obtained 
by the Government differ from those obtained by the Contractor, the Government will determine which results predominate.  
If adjacent areas are contaminated as determined by the Contracting Officer, clean the contaminated areas, monitor, 
and visually inspect the area as specified herein.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT>[<TTL>3.2.5   Removal Procedures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose "Removal Procedures" or "Encapsulation Procedures" as appropriate 
for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Wet asbestos material with a fine spray of [amended water] [a specific wetting agent such as light oil] during 
removal, cutting, or other handling so as to reduce the emission of airborne fibers.  Remove material and immediately 
place in<MET> 0.15 mm</MET><ENG> 6 mil</ENG> plastic disposal bags.  Remove asbestos containing material in a gradual manner, with 
continuous application of the amended water or wetting agent in such a manner that no asbestos material is disturbed 
prior to being adequately wetted.  Where unusual circumstances prohibit the use of<MET> 0.15 mm</MET><ENG> 6 mil</ENG> plastic bags, 
submit an alternate proposal for containment of asbestos fibers to the Contracting Officer for approval.  For 
example, in the case where both piping and insulation are to be removed, the Contractor may elect to wet the 
insulation, wrap the pipes and insulation in plastic and remove the pipe by sections.  Asbestos containing material 
shall be containerized while wet.  At no time shall asbestos material be allowed to accumulate or become dry.  
Lower and otherwise handle asbestos containing material as indicated in <RID>40 CFR 61-SUBPART M</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.5.1   Sealing Contaminated Items Designated for Disposal</TTL><BRK/>
<BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE:  Use this paragraph only when asbestos contaminated items are also designated 
for removal and disposal.</NPR><BRK/>
<AST/><BRK/>
<BRK/></NTE>
<TXT>Remove contaminated architectural, mechanical, and electrical appurtenances such as venetian blinds, full-height 
partitions, carpeting, duct work, pipes and fittings, radiators, light fixtures, conduit, panels, and other contaminated 
items designated for removal by completely coating the items with an asbestos lock-down encapsulant at the demolition 
site before removing the items from the asbestos control area.  These items need not be vacuumed.  The asbestos 
lock-down encapsulant shall be tinted a contrasting color.  It shall be spray-applied by airless method.  Thoroughness 
of sealing operation shall be visually gauged by the extent of colored coating on exposed surfaces.  Lock-down 
encapsulants shall comply with the performance requirements specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.5.2   Exposed Pipe Insulation Edges</TTL><BRK/>
<BRK/>
<TXT>Contain edges of asbestos insulation to remain that are exposed by a removal operation.  Wet and cut the rough 
ends true and square with sharp tools and then encapsulate the edges with a<MET> 6 mm</MET><ENG> 1/4 inch</ENG> thick layer of non-asbestos 
containing insulating cement troweled to a smooth hard finish.  When cement is dry, lag the end with a layer 
of non-asbestos lagging cloth, overlapping the existing ends by at least<MET> 100 mm</MET><ENG> 4 inches</ENG>.  When insulating cement 
and cloth is an impractical method of sealing a raw edge of asbestos, take appropriate steps to seal the raw 
edges as approved by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT>[<TTL>3.2.6   Encapsulation Procedures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose "Removal Procedures" or "Encapsulation Procedures" as appropriate 
for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.2.6.1   Preparation of Test Patches</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Prior to preparing plans and specifications for an encapsulation project, 
the designer will have to ascertain that encapsulation is feasible at all.  
The foremost design criteria is the soundness of the existing asbestos containing 
matrix, i.e. the bond of the matrix to the substrate and the shear strength 
of the matrix itself.  The designer should test the existing matrix in accordance 
with the ASTM E 1494, using the Field Testing Provisions for the Adhesion Test.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Exercise discretion on the number and location of Contractor applied 
test patches.  However, a minimum of three test patches should always be specified.  
Test locations, in areas of the matrix, that have a different appearance or 
raise doubts about their homogeneity.  Specify number of test patches in first 
bracket and location in second bracket.  Also show location on drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install [three] [_____] test patches of encapsulant in [_____], as indicated.  Use airless spray at the lowest 
pressure and as recommended by the encapsulant manufacturer.  Follow exactly the manufacturer's instructions 
for thinning recommendations, application procedures and rates.  Curing time shall be not less than five days 
or that recommended by the manufacturer, whichever is more.  A test patch shall be<MET> 0.8 square meter</MET><ENG> 9 square 
feet</ENG> in size.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.6.2   Field Testing</TTL><BRK/>
<BRK/>
<TXT><TST>Field test the <SUB>encapsulation test patches</SUB> in accordance with <RID>ASTM E 1494</RID>, paragraph "Required Field Test," in 
the presence of the Contracting Officer.</TST>  Keep a written record of the testing procedures and test results.  
Upon successful testing of the encapsulant, submit a signed statement to the Contracting Officer certifying that 
the encapsulant is suitable for installation on the particular asbestos containing material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.6.3   Large-Scale Application</TTL><BRK/>
<BRK/>
<TXT>Apply encapsulant using the same equipment and procedures as employed for the test patches.  Keep the encapsulant 
material stirred to prevent settling.  Keep a clean work area.  Change pre-filters in the ventilation equipment 
as soon as they appear clogged by encapsulant aerosol or pressure differential drops below 0.02 Hg.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>3.2.7   Air Sampling</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Air sampling regimen is very dependent on removal method and applicable 
laws, edit accordingly.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normal practice is to have the Contractor hire one independent Private 
Qualified Person (the PQP) to perform all required functions.  However, some 
applicable laws forbid this approach and will dictate when the PQP, the NC or 
both will be required to perform the function involved.  However, the Contractor 
shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Sampling of airborne concentrations of asbestos fibers shall be performed in accordance with <RID>29 CFR 1926.1101</RID>
 and as specified herein.  Sampling performed in accordance with <RID>29 CFR 1926.1101</RID> shall be performed by the PQP.  
[Sampling performed for environmental and quality control reasons shall be performed by the [PQP] [NC].]  Unless 
otherwise specified, use NIOSH Method 7400 for sampling and analysis.  Monitoring may be duplicated by the Government 
at the discretion of the Contracting Officer.  If the air sampling results obtained by the Government differ 
from those results obtained by the Contractor, the Government will determine which results predominate.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.7.1   Sampling Prior to Asbestos Work</TTL><BRK/>
<BRK/>
<TXT>Provide area air sampling and establish the baseline one day prior to the masking and sealing operations for 
each [demolition] [removal] [encapsulation] site.  Establish the background by performing area sampling in similar 
but uncontaminated sites in the building.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.7.2   Sampling During Asbestos Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose one of the following options.  Normal practice is to have the 
Contractor hire one independent Private Qualified Person (the PQP) to perform 
all required functions.  However, some applicable laws forbid this approach 
and will dictate when the PQP, the NC or both will be required to perform the 
function involved.  However, the Contractor shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When an "enclosed" asbestos control area is not required, retain the 
appropriate portion in brackets.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[The PQP shall provide personal and area sampling as indicated in <RID>29 CFR 1926.1101</RID> and governing environmental 
regulations.  In addition, provided the same type of work is being performed, provide area sampling at least 
once every work shift close to the work inside the enclosure, outside the clean room entrance to the enclosure, 
and at the exhaust opening of the local exhaust system.  If sampling outside the enclosure shows airborne levels 
have exceeded background or 0.01 fibers per cubic centimeter, whichever is greater, stop all work, correct the 
condition(s) causing the increase, and notify the Contracting Officer immediately.  [Where alternate methods 
are used, perform personal and area air sampling at locations and frequencies that will accurately characterize 
the evolving airborne asbestos levels.]]</TXT><BRK/>
<BRK/>
<TXT>[The PQP shall provide personal sampling as indicated in <RID>29 CFR 1926.1101</RID>.  At the same time the NC will provide 
area sampling close to the work inside the enclosure, outside the clean room entrance to the enclosure, and at 
the exhaust opening of the local exhaust system.  In addition, provided the same type of work is being performed, 
the NC will provide area sampling once every work shift close to the work inside the enclosure, outside the clean 
room entrance to the enclosure, and at the exhaust opening of the local exhaust system.  If sampling outside 
the enclosure shows airborne levels have exceeded background or 0.01 fibers per cubic centimeter, whichever is 
greater, stop all work, correct the condition(s) causing the increase, and notify the Contracting Officer immediately.  
[Where alternate methods are used, perform personal and area air sampling at locations and frequencies that will 
accurately characterize the evolving airborne asbestos levels.]]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.7.3   Sampling After Final Clean-Up (<SUB>Clearance Sampling</SUB>)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer shall research the State, regional and local laws, regulations, 
statutes, etc., to determine whether "aggressive" air sampling is required.  
However, always use aggressive air sampling techniques after encapsulation type 
abatement efforts.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normal practice is to have the Contractor hire one independent Private 
Qualified Person (the PQP) to perform all required functions.  However, some 
applicable laws forbid this approach and will dictate when the PQP, the NC or 
both will be required to perform the function involved.  However, the Contractor 
shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer shall research the State, regional and local laws, regulations, 
statutes, etc., to determine whether TEM analysis is required and the number 
of samples required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide area sampling of asbestos fibers [using aggressive air sampling techniques as defined in the <RID>EPA 560/5-85-024</RID>
] and establish an airborne asbestos concentration of less than 0.01 fibers per cubic centimeter after final 
clean-up but before removal of the enclosure or the asbestos work control area.  After final cleanup and the 
asbestos control area is dry but prior to clearance sampling, the [PQP] [and] [NC] shall perform a visual inspection 
in accordance with <RID>ASTM E 1368</RID> to ensure that the asbestos control and work area is free of any accumulations 
of dirt, dust, or debris.  [Prepare a written report signed and dated by the PQP documenting that the asbestos 
control area is free of dust, dirt, and debris and all waste has been removed.]  [Perform at least [_____] samples.]  
[Use transmission electron microscopy (TEM) to analyze clearance samples and report the results in accordance 
with current NIOSH criteria.] The asbestos fiber counts from these samples shall be less than 0.01 fibers per 
cubic centimeter or be not greater than the background, whichever is greater.  Should any of the final samples 
indicate a higher value, the Contractor shall take appropriate actions to re-clean the area and shall repeat 
the sampling and [TEM] analysis at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2.8   Lock-Down</TTL><BRK/>
<BRK/>
<TXT>Prior to removal of plastic barriers and after pre-clearance clean up of gross contamination, the [PQP] [NC] 
shall conduct a visual inspection of all areas affected by the [removal] [encapsulation] in accordance with <RID>ASTM E 1368</RID>
.  Inspect for any visible fibers [, and to ensure that encapsulants were applied evenly and appropriately].  
[A post removal (lock-down) encapsulant shall then be spray applied to ceiling, walls, floors and other areas 
exposed in the removal area.  The exposed area shall include but not be limited to plastic barriers, furnishings 
and articles to be discarded as well as dirty change room, air locks for bag removal and decontamination chambers.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.9   Site Inspection</TTL><BRK/>
<BRK/>
<TXT>While performing asbestos engineering control work, the Contractor shall be subject to on-site inspection by 
the Contracting Officer who may be assisted by or represented by safety or industrial hygiene personnel.  If 
the work is found to be in violation of this specification, the Contracting Officer or his representative will 
issue a stop work order to be in effect immediately and until the violation is resolved.  All related costs including 
standby time required to resolve the violation shall be at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   CLEAN-UP AND DISPOSAL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Housekeeping</TTL><BRK/>
<BRK/>
<TXT>Essential parts of asbestos dust control are housekeeping and clean-up procedures.  Maintain surfaces of the 
asbestos control area free of accumulations of asbestos fibers.  Give meticulous attention to restricting the 
spread of dust and debris; keep waste from being distributed over the general area.  Use HEPA filtered vacuum 
cleaners.  DO NOT BLOW DOWN THE SPACE WITH COMPRESSED AIR.  When asbestos removal is complete, all asbestos waste 
is removed from the work-site, and final clean-up is completed, the Contracting Officer will attest that the 
area is safe before the signs can be removed.  After final clean-up and acceptable airborne concentrations are 
attained but before the HEPA unit is turned off and the enclosure removed, remove all pre-filters on the building 
HVAC system and provide new pre-filters.  Dispose of filters as asbestos contaminated materials.  Reestablish 
HVAC mechanical, and electrical systems in proper working order.  The Contracting Officer will visually inspect 
all surfaces within the enclosure for residual material or accumulated dust or debris.  The Contractor shall 
re-clean all areas showing dust or residual materials.  If re-cleaning is required, air sample and establish 
an acceptable asbestos airborne concentration after re-cleaning.  The Contracting Officer must agree that the 
area is safe in writing before unrestricted entry will be permitted.  The Government shall have the option to 
perform monitoring to determine if the areas are safe before entry is permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Title to Materials</TTL><BRK/>
<BRK/>
<TXT>All waste materials, except as specified otherwise, shall become the property of the Contractor and shall be 
disposed of as specified in applicable local, State, and Federal regulations and herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Disposal of Asbestos</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Disposal procedures and sites for asbestos materials vary considerably 
with each location.  Contact local station Public Works and the NAVFAC Engineering 
Field Division Hazardous Waste Manager or Industrial Hygienist for local procedures.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.3.3.1   Procedure for Disposal</TTL><BRK/>
<BRK/>
<TXT>Collect asbestos waste, asbestos contaminated water, scrap, debris, bags, containers, equipment, and asbestos 
contaminated clothing which may produce airborne concentrations of asbestos fibers and place in sealed fiber-proof, 
waterproof, non-returnable containers (e.g. double plastic bags<MET> 0.15 mm</MET><ENG> 6 mils</ENG> thick, cartons, drums or cans).  
Wastes within the containers must be adequately wet in accordance with <RID>40 CFR 61-SUBPART M</RID>.  Affix a warning 
and Department of Transportation (DOT) label to each container including the bags or use at least<MET> 0.15 mm</MET><ENG> 6 mils</ENG>
 thick bags with the approved warnings and DOT labeling preprinted on the bag.  The name of the waste generator 
and the location at which the waste was generated shall be clearly indicated on the outside of each container.  
Prevent contamination of the transport vehicle (especially if the transport vehicle is a rented truck likely 
to be used in the future for non-asbestos purposes).  These precautions include lining the vehicle cargo area 
with plastic sheeting (similar to work area enclosure) and thorough cleaning of the cargo area after transport 
and unloading of asbestos debris is complete.  Dispose of waste asbestos material at an Environmental Protection 
Agency (EPA) or State-approved asbestos landfill off Government property.  For temporary storage, store sealed 
impermeable bags in asbestos waste drums or skids.  <TST>An area for interim storage of asbestos waste-containing 
drums or skids will be assigned by the Contracting Officer or his authorized representative.</TST>  Procedure for hauling 
and disposal shall comply with <RID>40 CFR 61-SUBPART M</RID>, State, regional, and local standards.  Sealed plastic bags 
may be dumped from drums into the burial site unless the bags have been broken or damaged.  Damaged bags shall 
remain in the drum and the entire contaminated drum shall be buried.  Uncontaminated drums may be recycled.  
Workers unloading the sealed drums shall wear appropriate respirators and personal protective equipment when 
handling asbestos materials at the disposal site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3.2   <SUB>Asbestos Disposal Quantity Report</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Normal practice is to have the Contractor hire one independent Private 
Qualified Person (the PQP) to perform all required functions.  However, some 
applicable laws forbid this approach and will dictate when the PQP, the NC or 
both will be required to perform the function involved.  However, the Contractor 
shall always hire a PQP.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Direct the PQP to record and report, to the Contracting Officer, the amount of asbestos containing material 
removed and released for disposal.  Deliver the report for the previous day at the beginning of each day shift 
with amounts of material removed during the previous day reported in<MET> linear meters or square meters</MET><ENG> linear feet 
or square feet</ENG> as described initially in this specification and in cubic<MET> meters</MET><ENG> feet</ENG> for the amount of asbestos 
containing material released for disposal.]</TXT><BRK/>
<BRK/>
<TXT>[Allow the NC to inspect, record and report the amount of asbestos containing material removed and released for 
disposal on a daily basis.]</TXT><BRK/>
<BRK/></SPT>