<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA                 UFGS-03 23 00 (April 2006)<BRK/>
                                               ---------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA> (CW)                Replacing without change<BRK/>
                                               UFGS-03230 (September 2001)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 03 23 00</SCN><BRK/>
<BRK/>
<STL>STEEL STRESSING TENDONS AND ACCESSORIES FOR PRESTRESSED CONCRETE</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>furnishing all equipment, 
materials, techniques and labor for providing and installing steel stressing 
tendons and accessories for the construction of prestressed concrete</SCP>.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ACI INTERNATIONAL (ACI)</ORG><BRK/><BRK/><RID>ACI 318</RID><RTL>(2008; Errata 2008) Building Code Requirements for Structural Concrete and Commentary</RTL><BRK/><BRK/><RID>ACI 318M</RID><RTL>(2008) Metric Building Code Requirements for Structural Concrete and Commentary</RTL><BRK/><BRK/><RID>ACI SP-66</RID><RTL>(2004) ACI Detailing Manual</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 416/A 416M</RID><RTL>(2006) Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete</RTL><BRK/><BRK/><RID>ASTM A 421/A 421M</RID><RTL>(2005) Standard Specification for Uncoated Stress-Relieved Wire for Prestressed Concrete</RTL><BRK/><BRK/><RID>ASTM A 722/A 722M</RID><RTL>(2007) Standard Specification for Uncoated High-Strength Steel Bar for Prestressing Concrete</RTL><BRK/><BRK/><RID>ASTM C 109/C 109M</RID><RTL>(2008) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 939</RID><RTL>(2002) Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method)</RTL><BRK/><BRK/><RID>ASTM C 940</RID><RTL>(1998a; R 2003) Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   LUMP SUM PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the 
project specifications, this paragraph title (LUMP SUM PRICES) should be deleted 
from this section and the remaining appropriately edited subparagraphs should 
be inserted into Section 01 22 00.00 10.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.2.1   Steel Stressing Tendons and Accessories for Prestressed Concrete</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment shall constitute full compensation for furnishing all plant, labor, materials and equipment and performing 
all operations necessary for steel stressing tendons and accessories for prestressed concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.1.2   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: lump sum.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Installation Drawings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Installation drawings for tendons and accessories shall be submitted and approved prior to 
commencing the work.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Prestressing Method and Equipment</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Descriptions of proposed prestressing method and equipment shall be submitted and approved 
prior to the start of prestressing operations.</ITM><BRK/>
<BRK/>
<ITM><SUB>Materials Disposition Records</SUB></ITM><BRK/>
<BRK/>
<ITM>  Records which identify the incorporation of approved materials into the work shall be submitted 
before completion of the contract.</ITM><BRK/>
<BRK/>
<ITM><SUB>Prestressing Operations Records</SUB></ITM><BRK/>
<BRK/>
<ITM>  Complete records of the prestressing operations shall be submitted before completion of the 
contract.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Stressing Tendons and Accessories</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certified materials test reports shall be submitted for all required materials tests, note 
the specific standards followed in the performance of tests, show that materials comply with 
the applicable specifications, be submitted for each material shipment and be identified with 
specific lots prior to use of materials in the work.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Certification of Prestressing Technicians</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certificates for prestressing technicians shall be submitted prior to start of prestressing 
operations.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   <SUB>CERTIFICATION OF PRESTRESSING TECHNICIANS</SUB></TTL><BRK/>
<BRK/>
<TXT>Submitted certificates for prestressing technicians who will use the proposed system in the work shall certify 
by name that these technicians are thoroughly trained and skilled in the use of the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   DELIVERY, STORAGE AND HANDLING OF MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Materials shall be suitably wrapped, packaged or covered at the factory to prevent being affected by dirt, water 
and rust.  Materials shall be protected against abrasion or damage during shipment and handling.  Materials stored 
at the site shall be placed above ground on elevated, covered platforms.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS</TTL><BRK/>
<BRK/>
<TXT><SUB>Stressing tendons and accessories</SUB> shall conform to the requirements of<MET> <RID>ACI 318M</RID></MET><ENG> <RID> ACI 318</RID></ENG> except as specified.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Stressing Tendons</TTL><BRK/>
<BRK/>
<TXT>Stressing tendons shall be clean and free of loose rust, scale and pitting.  Unbonded tendons shall be permanently 
protected from corrosion with an approved applied coating.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1.1   Seven-Wire Stress-Relieved Strand and Strand Assemblies</TTL><BRK/>
<BRK/>
<TXT>Seven-wire stress-relieved strand and strand assemblies shall conform to <RID>ASTM A 416/A 416M</RID>, Grade [250] [270], 
strand diameter as shown.  Strand assemblies may be either shop or field assembled with anchor fittings positively 
attached to strands.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.2   Stress-Relieved Wire and Wire Assemblies</TTL><BRK/>
<BRK/>
<TXT>Stress-relieved wire and wire assemblies shall conform to <RID>ASTM A 421/A 421M</RID>, Type BA or WA, wire diameter as 
shown.  Wire assemblies shall be shop assembled with anchor fittings positively attached to wires.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.3   High-Strength Steel Bars</TTL><BRK/>
<BRK/>
<TXT>High-strength steel bars shall conform to <RID>ASTM A 722/A 722M</RID>, Type I or II, meeting all supplementary requirements.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.2   Accessories</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.2.1   Ducts</TTL><BRK/>
<BRK/>
<TXT>Tendon ducts shall be of ferrous metal, capable of transmitting forces from grout to the surrounding concrete, 
flexible enough to conform to the tendon profile and strong enough to maintain their shape without deforming, 
sagging, or collapsing during concrete placement and vibration.  The inside diameter of the ducts shall be large 
enough to provide an internal area at least twice the gross area of multiple wire, bar or strand assemblies and 
shall be at least<MET> 6 mm</MET><ENG> 1/4-inch</ENG> larger than the diameter of a single wire, bar or strand placed in the ducts.  
Ducts shall be designed for watertight connections with all fittings.  Galvanized ducts will not be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.2   Anchorages and Couplers</TTL><BRK/>
<BRK/>
<TXT>Anchorages and couplers shall be metal of proven corrosion resistance and compatible with the stressing tendons, 
capable of fully developing the minimum guaranteed ultimate strength of tendons without excessive slip and approved.  
Anchorages shall be the button-head, wedge, nut and thread, grip nut, thread-bar, threaded plate or other approved 
type and shall be provided with bearing plates bars, rings, bells or other positive-attaching anchor fittings.  
Couplers shall be provided with housings long enough to permit the necessary movements and fittings which allow 
complete grouting of all components.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.3   Grout</TTL><BRK/>
<BRK/>
<TXT>Grout for grouting post-tensioned tendons shall consist of a mixture of Portland cement, shrinkage compensating 
admixture and potable water of which final proportions shall be based on test results of sample mixtures.  Cement 
shall conform to <RID>ASTM C 150</RID>, Type I or II.  The shrinkage compensating admixture shall produce a 2 percent minimum 
and a 10 percent maximum unconfined expansion when tested in accordance with <RID>ASTM C 940</RID>, shall not contain aluminum 
powder, chlorides, fluorides or nitrates, may be dispensed in solid or liquid form and must be approved by the 
Contracting Officer prior to its use.  The water content shall be the minimum necessary for proper placement 
but the water-cement ratio shall not exceed 0.50 by weight.  The pumpability of grout shall be determined in 
accordance with <RID>ASTM C 939</RID>.  The efflux time of a grout sample immediately after mixing shall not be less than 
11 seconds.  The minimum 7-day compressive strength of<MET> 50 mm</MET><ENG> 2-inch</ENG> grout cubes, molded, cured and tested in 
accordance with <RID>ASTM C 109/C 109M</RID> shall be<MET> 17.2 MPa</MET><ENG> 2500 psi</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.2   TESTS, INSPECTIONS, AND VERIFICATIONS</TTL><BRK/>
<BRK/>
<TXT>The Contractor shall have required material tests performed on stressing tendons and accessories by an approved 
laboratory to demonstrate that the materials are in conformance with the specifications.  These tests shall be 
at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Stressing tendons and accessories shall be installed or placed as specified and as shown on contract and approved 
installation drawings.  Installation details of stressing tendons and accessories not specified or shown shall 
be in accordance with <RID>ACI SP-66</RID> or<MET> <RID>ACI 318M</RID></MET><ENG> <RID>ACI 318</RID></ENG>.  Welding shall not be performed near or adjacent to stressing 
tendons.  Stressing tendons shall not be installed until all welding has been completed on supports or any part 
which might be in contact with the tendons.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   <SUB>Prestressing Method and Equipment</SUB></TTL><BRK/>
<BRK/>
<TXT>Descriptions of the proposed prestressing methods and equipment indicating the manufacturer of all prestressing 
equipment, including tensioning jacks, stress measurement gages, dynamometers and load cells or other devices 
for measuring stressing loads, shall be provided by the Contractor.  Descriptions shall include certified calibration 
records for each set of jacking equipment and testing curves for stress measurement gages which show that the 
gages have been calibrated for the jacks for which they are to be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   <SUB>Installation Drawings</SUB></TTL><BRK/>
<BRK/>
<TXT>Detailed installation drawings for stressing tendons and accessories showing the type and size of stressing tendons 
and anchorages, erection methods, sequence of stressing and stressing calculations shall be provided by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Anchorages</TTL><BRK/>
<BRK/>
<TXT>Anchorages must be set in a plane normal to the axis of the tendons such that uniform bearing on the concrete 
is assured.  Positive connecting anchorages rather than gripping types shall be used for anchoring embedded ends 
of tendons.  Anchorages and anchor fittings shall be permanently protected against corrosion.  Parallel wire 
anchorage wedges or cores shall be recessed within the members.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Stressing Tendons and Ducts</TTL><BRK/>
<BRK/>
<TXT>Protective coverings and wrappings shall be removed and each stressing tendon shall be closely inspected to see 
that nicks, scoring, pits or other damage does not exist and high strength steel bars shall be closely inspected 
to assure that they are not bent and that threaded ends are in satisfactory condition immediately prior to installation.  
Strand, wire and bar tendons shall be shop or field assembled as required and positively attached to anchorages.  
Type WA wire assemblies shall be anchored only with wedge type anchorages.  Stressing tendons and ducts shall 
be assembled to required shapes and dimensions and placed where indicated on drawings within specified tolerances 
and adequately supported.  Ducts shall be securely fastened at close intervals and grout openings and vents must 
be securely anchored to ducts and to either the forms or reinforcing steel to prevent displacement during concrete 
placing.  The ends of ducts shall be effectively protected to prevent entry of water, concrete, grout or debris.  
Wires of parallel-wire assemblies shall not be spliced.  Steel bar tendons may be joined by couplers where shown 
or approved, provided they are capable of developing the guaranteed minimum ultimate strength of the bars.  Strands 
to be spliced shall have the same lay or direction of twist and the ends shall be cut by shears or abrasive grinders.  
No more than one strand shall be spliced in any one member where single strand tensioning is employed.  Strand 
splices shall be capable of developing the full ultimate strength of the strand.  Slippage of the splice shall 
be checked and correction made for differential slippage.  Where multiple strand tensioning is used, not more 
than 10 percent of the strands in any member shall be spliced.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Tensioning Tendons</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Determination of the initial prestress force must consider prestress 
losses in accordance with <MET>ACI 318M</MET><ENG>ACI 318</ENG>, Section 18.6.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Tensioning of stressing tendons shall be as specified and shown.  The stress induced in the tendons by any method 
of tensioning shall be determined independently by both (1) measurement of tendon elongation and (2) direct measurement 
of force using a pressure gauge or load cell.  If the results of these two measurements do not check each other 
and the theoretical values within 5 percent, the operation shall be carefully checked and the source of error 
determined and corrected before proceeding further.  Concrete cylinder tests shall indicate a breaking strength 
of at least [_____]<MET> MPa</MET><ENG> psi</ENG> before transfer of stress to ensure that the concrete strength is adequate for the 
requirements of the anchorages or for transfer through bond as well as meet camber or deflection requirements.  
The final prestress load in each unit after seating shall be as shown.  Safety measures shall be taken by the 
Contractor to prevent accidental injury caused by failure of a stressing tendon or tendon component.  The exposed 
ends of stressing tendons and anchorages shall be protected from damage during stressing operations to prevent 
failure.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.5.1   Pretensioning</TTL><BRK/>
<BRK/>
<TXT>Strand tendons may be tensioned by jacking of groups of strands or may be tensioned individually by means of 
a single-strand jack.  Before final tensioning, all tendons shall be brought to a uniform initial tension of 
approximately<MET> 4.5 kN</MET><ENG> 1,000 pounds</ENG> per strand per<MET> 60 m</MET><ENG> 200 feet</ENG> of bed, with a minimum of<MET> 4.5 kN</MET><ENG> 1,000 pounds</ENG> 
and a maximum of<MET> 13.5 kN</MET><ENG> 3,000 pounds</ENG> per strand.  The force corresponding to the initial tension shall be measured 
by a dynamometer or other approved method to aid in determining the final elongation.  After this initial tensioning, 
the tendons shall be stressed to the total tension indicated on the drawings using hydraulic or mechanical equipment 
with gauges or dynamometers graduated and calibrated to accurately determine the load applied.  Draped pretensioned 
strands shall be tensioned partially by jacking at the end of the bed and partially by uplifting or depressing 
strands, or they shall be held in their draped positions by means of rollers, pins or other approved methods 
and tensioned entirely by jacking.  Approved low-friction devices shall be used at all points of change in slope 
of draped strands while tensioning draped strands, regardless of the tensioning method used.  Cable stress shall 
be maintained between anchorages until the concrete has reached the specified compressive strength.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5.2   Detensioning</TTL><BRK/>
<BRK/>
<TXT>Forces from pretensioned strands shall be transferred to the concrete by either the multiple-strand release or 
the single-strand release method.  The stress transfer shall not be performed until concrete strength, as indicated 
by test cylinders, has reached the specified transfer strength.  If concrete has been heat-cured, the detensioning 
shall be done immediately following the curing period while the concrete is still warm and moist.  During detensioning, 
the prestressing forces shall be kept nearly symmetrical about the vertical axis of the member and shall be applied 
in a manner that will minimize sudden loading.  Eccentricity about the vertical axis shall be limited to one 
strand.</TXT><BRK/>
<BRK/>
<LST>a.  Multiple-Strand Release:  In this method, all strands shall be detensioned simultaneously and the 
load transferred gradually to the concrete by hydraulic jacking.</LST><BRK/>
<BRK/>
<LST>b.  Single-Strand Release:  In this method, all strands shall be detensioned by slow heat-cutting the 
strands in accordance with a pattern and schedule as approved.  The strands shall be heated using a low-oxygen 
flame until the metal gradually loses its strength, causing release of the strands to occur gradually.  
The low-oxygen flame shall be played along the strand for a minimum of<MET> 125 mm</MET><ENG> five inches</ENG>.  Strands shall 
be so heated that the failure of the first wire in each strand shall occur after the torch has been applied 
for a minimum of five seconds.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5.3   Post-Tensioning</TTL><BRK/>
<BRK/>
<TXT>Tensioning shall not be performed until the concrete has reached the required strength at transfer of stress.  
Before final tensioning of tendons, all tendons shall be brought to a uniform initial tension of approximately 
10 percent of the full load.  The force corresponding to the initial tension shall be measured by a dynamometer 
or other approved method as a starting point in determining final elongation.  A temporary overstress above the 
final prestress force as approved by the Contracting Officer shall be used to overcome stress losses.  The units 
shall be tensioned until the proper elongations and jacking pressures are attained and reconciled within the 
limits stated above.  Straight tendons may be tensioned from one end.  Curved or draped tendons shall be stressed 
by simultaneous jacking from both ends using a common pump with identical hoses and jacks, unless otherwise shown.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.6   Grouting Post-Tensioned Tendons</TTL><BRK/>
<BRK/>
<TXT>Grouting between each tendon and its enclosing duct shall be performed within 5 days after completion of the 
tensioning operation.  Grouting shall not be performed if air temperature below<MET> 7.2 degrees C</MET><ENG> 45 degrees F</ENG> is 
anticipated within 48 hours after grouting unless an approved method of temperature control is used.  The grout 
shall be mixed in a mechanical mixer of a type that will produce uniformly and thoroughly mixed grout.  First 
water shall be placed in the mixer followed by cement and admixture.  Grout shall be continuously agitated until 
it is pumped.  Grout that has begun to set shall be discarded.  Just before grouting, the ducts shall be flushed 
with clean water and then blown clear by compressed air to removed excess water.  With the grout vent open at 
one end of duct, grout shall be applied continuously under moderate pressure at the other end until all entrapped 
air is forced out as indicated by a uniform flow of grout from the discharge vent.  The discharge vent shall 
then be closed and the pressure raised to<MET> 340 MPa</MET><ENG> 50 psi</ENG> minimum and held for at least 1 minute.  The injection 
point shall then be closed by an approved means to prevent any loss of grout.  For a period of at least 3 days 
after grouting the tendons, the prestressed members shall not have equipment or other loads placed on them.  
A longer period may be required, depending upon the method of curing and magnitude of imposed stresses.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.7   Accuracy of Stress and Elongation Measurement</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.7.1   Stress Measurement</TTL><BRK/>
<BRK/>
<TXT>Hydraulic gauges, dynamometers, load cells or other devices for measuring stressing load shall have an accuracy 
of reading within two percent for stress measurement.  Gauges are required to have been calibrated for the jacks 
for which they are used within a period not exceeding 12 months.  Recalibration shall be performed at any time 
that a gaging system shows indication of erratic results in the opinion of the Contracting Officer.  Gauges shall 
indicate loads directly in<MET> kN</MET><ENG> pounds</ENG> or be accompanied by a chart which converts dial readings into<MET> kN</MET><ENG> pounds</ENG>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.7.2   Elongation Measurement</TTL><BRK/>
<BRK/>
<TXT>After the initial force has been applied to a tendon, reference points for measuring elongation due to additional 
tensioning forces shall be established.  They shall be located according to the method of tensioning and type 
of equipment.  The system used shall be capable of measuring the true elongation plus or minus<MET> 2 mm</MET><ENG> 1/16-inch</ENG>
.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.8   <SUB>Prestressing Operations Records</SUB></TTL><BRK/>
<BRK/>
<TXT>The Contractor shall compile and submit complete prestressing operations records to the Contracting Officer.  
These records shall show the manufacturer, identification and description of materials and equipment including 
prestressing tendons and jacking and load measuring equipment; location of prestressing tendons; initial design 
tensioning loads, final design tensioning loads and actual tensioning loads for tendons; dates tensioning loads 
applied; and theoretical and actual elongations for tendons.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   INSPECTION</TTL><BRK/>
<BRK/>
<TXT>The Contractor's facilities shall be open for inspection by the Contracting Officer at any time.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   <SUB>MATERIALS DISPOSITION RECORDS</SUB></TTL><BRK/>
<BRK/>
<TXT>Accurate materials disposition records identifying all materials incorporated into the work and showing the disposition 
of specific lots of approved tested materials shall be compiled by the Contractor.</TXT><BRK/>
<BRK/></SPT>
</PRT>   <END/><BRK/></SEC>