USACE / NAVFAC / AFCESA / NASA      UFGS-07 61 15.00 20 (April 2006)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Replacing without change<BRK/>
                                    UFGS-07612N (September 1999)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 07 61 15.00 20</SCN><BRK/>
<BRK/>
<STL>ALUMINUM STANDING SEAM ROOFING</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>aluminum standing 
seam roofing</SCP>.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
Use of electronic communication is encouraged.<BRK/>
<BRK/>
Brackets are used in the text to indicate designer choices or locations where 
text must be supplied by the designer.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  On the drawings, show:</NPR><BRK/>
<BRK/>
<NPR>1.  Design loads.</NPR><BRK/>
<BRK/>
<NPR>2.  Roof slope (minimum<MET> one in 24</MET><ENG> 1/2 inch per foot</ENG>).</NPR><BRK/>
<BRK/>
<NPR>3.  Line(s) of fixity.</NPR><BRK/>
<BRK/>
<NPR>4.  Supporting structural framework.</NPR><BRK/>
<BRK/>
<NPR>5.  Track spacing and attachment details, when applicable.</NPR><BRK/>
<BRK/>
<NPR>6.  Attachment clip spacing (list capacity of each type in spec).</NPR><BRK/>
<BRK/>
<NPR>7.  Flashing support and fastening spacing.</NPR><BRK/>
<BRK/>
<NPR>8.  Roof venting.  (Pay particular attention to preventing infiltration of wind-driven 
rain).</NPR><BRK/>
<BRK/>
<NPR>9.  Sealant and closure locations.</NPR><BRK/>
<BRK/>
<NPR>10.  Locations for dissimilar metal protection.</NPR><BRK/>
<BRK/>
<NPR>11.  Details of accessories such as ladders, walkways, antenna mounts, guy wire 
fastening, ventilation equipment and lighting.</NPR><BRK/>
<BRK/>
<NPR>12.  Details of flashing at all roof penetrations.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When designing standing seam roofs, consider:</NPR><BRK/>
<BRK/>
<NPR>1.  Consult with manufacturers early in design stage to obtain current design 
manuals and structural information regarding roof attachments.  Early contact 
will reduce need for corrections and changes during review process and construction 
phase.</NPR><BRK/>
<BRK/>
<NPR>2.  Calculate wind uplift forces in accordance with Unified Facilities Criteria 
(UFC) 1-200-01 Design: General Buidling Requirements.</NPR><BRK/>
<BRK/>
<NPR>3.  NAVFAC minimum guidelines are<MET> one in 24</MET><ENG> 1/2 inch per foot</ENG> for roof slopes.  
Provide greater slope if possible.  In renovation of existing buildings, adequate 
slope must often be obtained by imaginative solutions.  Sleepers and stub walls 
have been successfully used, but attachment and structural stability of these 
must be assured.  In some existing structures it will be difficult to design 
strong connections to structural system, or modifications to existing structural 
shimming system will be necessary to resist wind forces adequately.</NPR><BRK/>
<BRK/>
<NPR>4.  It will be necessary to diagram a number of attachment clips for varying 
roof conditions.  Each type should be individually designated on the drawings 
with spacing shown.  Spacing will be a function of allowable panel span and 
holding capability assumed for the clip(s).  Minimum holding force for each 
type should be specified as subparagraphs under paragraph entitled "Attachment 
Clips."  Assure that fasteners used to attach clips to structure develop full 
capacity of clip.  Check existing structures to assure that the forces can be 
resisted by existing structural system.  Make provisions for thermal expansion 
of roof structure.</NPR><BRK/>
<BRK/>
<NPR>5.  Flashing presents a particular design problem in preventing wind and water 
infiltration.  High winds create stresses in flashing which must be resisted 
by careful detailing of attachment.</NPR><BRK/>
<BRK/>
<NPR>While standing seam roofing presents continuous, sealed surface to the elements, 
flashing transitions are often the cause of serious problems.  Overhangs, especially, 
are susceptible to high wind forces and attachment should be at much closer 
spacing than usual.  Copious use of sealants and closure pieces molded to conform 
to roof panels is imperative.</NPR><BRK/>
<BRK/>
<NPR>6.  Building may require equipment such as antennae, ladders, or lighting installed 
on roof.  Access to roof-mounted mechanical equipment is often required.  Provide 
walking surfaces and attachment accessories which do not compromise integrity 
of roof system.  These accessories should provide support without penetrating 
roofing panels.  Usually this is done with clamps attached to standing seam, 
or other specially designed clips.  Provide curbs for mechanical equipment.</NPR><BRK/>
<BRK/>
<NPR>7.  Specify insulation in appropriate Division 07 section.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ALUMINUM ASSOCIATION (AA)</ORG><BRK/><BRK/><RID>AA ADM1</RID><RTL>(2005; Errata 2005) Aluminum Design Manual</RTL><BRK/><BRK/><RID>AA ASM-35</RID><RTL>(2000) Specifications for Aluminum Sheet Metal Work in Building Construction, Section 5</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN FOREST &amp; PAPER ASSOCIATION (AF&amp;PA)</ORG><BRK/><BRK/><RID>AF&amp;PA T101</RID><RTL>(2001) National Design Specification (NDS)for Wood Construction</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN IRON AND STEEL INSTITUTE (AISI)</ORG><BRK/><BRK/><RID>AISI SG03-3</RID><RTL>(2002) Cold-Formed Steel Design Manual Set</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM B 117</RID><RTL>(2007a) Standing Practice for Operating Salt Spray (Fog) Apparatus</RTL><BRK/><BRK/><RID>ASTM B 209</RID><RTL>(2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate</RTL><BRK/><BRK/><RID>ASTM B 209M</RID><RTL>(2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)</RTL><BRK/><BRK/><RID>ASTM D 1654</RID><RTL>(2008) Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments</RTL><BRK/><BRK/><RID>ASTM D 2247</RID><RTL>(2002) Testing Water Resistance of Coatings in 100% Relative Humidity</RTL><BRK/><BRK/><RID>ASTM D 226</RID><RTL>(2006) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing</RTL><BRK/><BRK/><RID>ASTM D 2565</RID><RTL>(1999; R 2008) Xenon Arc Exposure of Plastics Intended for Outdoor Applications</RTL><BRK/><BRK/><RID>ASTM D 4214</RID><RTL>(2007) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films</RTL><BRK/><BRK/><RID>ASTM D 522</RID><RTL>(1993a; R 2008) Mandrel Bend Test of Attached Organic Coatings</RTL><BRK/><BRK/><RID>ASTM D 523</RID><RTL>(2008) Standard Test Method for Specular Gloss</RTL><BRK/><BRK/><RID>ASTM D 714</RID><RTL>(2002e1) Evaluating Degree of Blistering of Paints</RTL><BRK/><BRK/><RID>ASTM D 968</RID><RTL>(2005e1) Abrasion Resistance of Organic Coatings by Falling Abrasive</RTL><BRK/><BRK/><RID>ASTM E 1592</RID><RTL>(2005) Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference</RTL><BRK/><BRK/><RID>ASTM E 330</RID><RTL>(2002) Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference</RTL><BRK/><BRK/><RID>ASTM E 84</RID><RTL>(2008a) Standard Test Method for Surface Burning Characteristics of Building Materials</RTL><BRK/><BRK/><RID>ASTM G 23</RID><RTL>(1996) Operating Light-Exposure Apparatus (Carbon-Arc Type) With and Without Water for Exposure of Nonmetallic Materials</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)</ORG><BRK/><BRK/><RID>NRCA Details</RID><RTL>(2003) NRCA Roof Perimeter Flashing Systems Construction Details for Class 1 Roof Construction</RTL><BRK/><BRK/></REF><REF><ORG>SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)</ORG><BRK/><BRK/><RID>SMACNA 1793</RID><RTL>(2006) Architectural Sheet Metal Manual, Sixth Edition, Second Printing</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1   Field-Formed Seam</TTL><BRK/>
<BRK/>
<TXT>Seams of panels so configured that when adjacent sheets are installed the seam is sealed utilizing mechanical 
or hand seamers.  Crimped (45 degree bend), roll formed (180 degree bend), double roll formed (2 - 180 degree 
bend), and roll and lock systems are types of field-formed seam systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Snap Together Seam</TTL><BRK/>
<BRK/>
<TXT>Panels so configured that the male and female portions of the seam interlock through the application of foot 
pressure or tamping with a mallet.  Snap-on cap configurations are a type of snap together system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Pre-Formed</TTL><BRK/>
<BRK/>
<TXT>Formed to the final, less field-formed seam, profile and configuration in the factory.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Field-Formed</TTL><BRK/>
<BRK/>
<TXT>Formed to the final, less field-formed seam, profile and configuration at the site of work prior to installation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.5   Roofing System</TTL><BRK/>
<BRK/>
<TXT>The roofing system is defined as the assembly of roofing components, including roofing panels, flashing, fasteners, 
and accessories which, when assembled properly result in a watertight installation.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Design Requirements</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Provide continuous length panels with no joints or seams, except where indicated.  Individual 
panels shall be removable for replacement of damaged material.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  There shall be no exposed or penetrating fasteners except where shown on the approved shop 
drawings.  Fasteners into wood shall be stainless steel sheet metal screws with full length 
threads. Fasteners into steel shall be stainless steel or cadmium plated stainless steel screws 
inserted into predrilled holes.  Length and diameter of screws shall be sufficient to meet the 
design loads with a suitable factor of safety for the material to which the roofing components 
are attached.  Calculate fastener capacity in accordance with <RID>AISI SG03-3</RID>, <RID>AA ADM1</RID> or <RID>AF&amp;PA T101</RID>
 as applicable.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Roof panel standing seam shall include a capillary break and be mechanically locked closed 
by the manufacturer's locking tool.  The seam shall include a continuous sealant when required 
by the manufacturer to withstand the rainfall and wind specified in paragraph entitled "Manufacturer's 
Requirements."</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Roof panel anchor clips shall be concealed and designed to allow for thermal movement of 
the panels, except where specific fixed points are indicated.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  The system shall resist the positive and negative loads specified herein in accordance with 
"Sheet Building Sheathing Design Guide" of the <RID>AA ADM1</RID>.  Determine capacity in accordance with 
principles of <RID>ASTM E 330</RID> modified as follows:</ITM><BRK/>
<BRK/>
<ITM>(1)  Test panels shall be production material of the type proposed for use.  Use either full 
length or partial length panels with attachment representative of the main part of the roof.</ITM><BRK/>
<BRK/>
<ITM>(2)  Test specimens shall be five panels wide, span one or more supports, and shall have no 
end or edge attachment or seals that will restrict crosswise movement of the panels under load.  
Do not bridge longitudinal seams with tape or film that can restrict separation.</ITM><BRK/>
<BRK/>
<ITM>(3)  Panels shall be tested to failure.  Report load at failure.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Panels shall support walking loads without excessive distortion or telegraphing of the structural 
supports.  Panels shall support a<MET> 115 kilogram</MET><ENG> 250 pound</ENG> load concentrated on a<MET> 2500 square 
millimeter (mm)</MET><ENG> four square inch</ENG> area at the center of the panel without buckling or permanent 
distortion.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Performance Requirements</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.2.1   Wind Loads</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Determine the appropriate pressures, positive and negative, that apply 
to the various portions of the roof using current engineering technology that 
takes into account the height, shape, and location of the structure.  See NAVFAC 
Military Handbook MIL-HDBK-1002/2, "Structural Engineering-Loads," for structural 
design and wind load information.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Resistance to wind uplift generated by winds of<MET> [200] [_____] km/h</MET><ENG> [124] [_____] mph</ENG>.  The roof system and attachments 
shall resist the following wind loads (<MET>kPa</MET><ENG> psf</ENG>) with a factor of safety appropriate for the material holding 
the anchor:</TXT><BRK/>
<TBL><THD><BRK/>
                                       Positive       Negative<BRK/></THD>
<BRK/>
  At eaves                             [_____]        [_____]<BRK/>
<BRK/>
  At rakes                             [_____]        [_____]<BRK/>
<BRK/>
  At ridge                             [_____]        [_____]<BRK/>
<BRK/>
  At building corners                  [_____]        [_____]<BRK/>
<BRK/>
  At central areas                     [_____]        [_____]<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>1.3.2.2   Resistance to Water Infiltration</TTL><BRK/>
<BRK/>
<TXT>Roofing system shall show no infiltration at seams, edges, flashings, counterflashings and penetrations when 
subjected to a rainfall of<MET> [125] [_____] mm</MET><ENG> [5] [_____] inches</ENG> per hour with<MET> [200] [_____] km/h</MET><ENG> [124] [_____] 
mph</ENG> wind.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2.3   Thermal Movement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the temperature range appropriate for the finish and color specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The system shall be capable of withstanding thermal movement based on a temperature range of<MET> 5 degrees C</MET><ENG> 10 degrees 
F</ENG> below design low air temperature and [<MET>60 degrees C</MET><ENG>140 degrees F</ENG> for mill finish and light colors.] [<MET>82 degrees 
C</MET><ENG>180 degrees F</ENG> for dark colors.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2.4   Deflection</TTL><BRK/>
<BRK/>
<TXT>Panel deflection shall not exceed L/140.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2.5   <SUB>Structural Performance</SUB></TTL><BRK/>
<BRK/>
<TXT>The structural performance test methods and requirements shall be in accordance with <RID>ASTM E 1592</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Roofing panels</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit drawings as necessary to supplement the instructions and diagrams. Drawings shall include 
design and erection drawings containing an isometric view of the roof showing the design uplift 
pressures and dimensions of edge, ridge and corner zones.  Show typical and special conditions 
including flashings, accessory installation, materials and thicknesses, all dimensions, anchoring 
methods, sealant locations, sealant tape locations, fastener layout, sizes, spacing, provisions 
for thermal movement, terminations, penetrations, and attachments.  Details of installation 
shall be in accordance with the manufacturer's Standard Instructions and details or the <RID>SMACNA 1793</RID>
.  The manufacturer's technical engineering department shall approve the drawings before they 
are submitted.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Roofing panels</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Attachment clips</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Closures</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Accessories</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Underlayment</SUB></ITM><BRK/>
<BRK/>
<ITM>Sample <SUB>warranty</SUB> certificate; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit for all materials to be provided.  Submit data sufficient to indicate conformance to 
specified requirements.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Roofing panels</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit a<MET> 300 mm</MET><ENG> 12 inch</ENG> long section of typical panel [in color specified] [in color selected].</ITM><BRK/>
<BRK/>
<ITM>  When colors are not indicated, submit samples of not less than six different manufacturer's 
standard colors for selection.</ITM><BRK/>
<BRK/>
<ITM><SUB>Accessories</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit each type of accessory item used in the project including, but not limited to:  each 
type of anchor clip, closures, fasteners and leg clamps.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Load calculations</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Structural performance</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Panel finish</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit reports of the tests required by this section.</ITM><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's field inspection</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit manufacturer's technical representative's inspection reports as required in paragraph 
entitled "Manufacturer's Field Inspection."</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Technical representative</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Qualification of Installer</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit documentation proving the installer is factory-trained, has the specified experience 
and is authorized by the manufacturer to install the products specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Coil stock</SUB> compatibility; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Provide certification of coil compatibility with roll forming machinery to be used for forming 
panels without warping, waviness, and rippling not part of panel profile; to be done without 
damage, abrasion or marking of finish coating.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Sealant</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit manufacturer's sealant requirements for making the standing seam watertight when subjected 
to<MET> 125 mm</MET><ENG> 5 inches</ENG> of rainfall per hour simultaneous with<MET> [160] [200] [_____] km/h</MET><ENG> [100] [124] 
[_____] mph</ENG> winds.</ITM><BRK/>
<BRK/>
<ITM><SUB>Installation</SUB> manual; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit manufacturer's printed installation manual/instructions and standard details.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Information card</SUB></ITM><BRK/>
<BRK/>
<ITM>  For each roofing installation, submit a typewritten card or photoengraved aluminum card containing 
the information listed on Form 1 located at the end of this section.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   <SUB>LOAD CALCULATIONS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Ensure that appropriate design loads are specified in paragraph entitled 
"Wind Loads."</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use<MET> 200 km/h</MET><ENG> 124 mph</ENG> at Adak, Alaska.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit load calculations for the following by a structural engineer registered as a Professional Engineer in 
any jurisdiction verifying that the system supplied meets the design loads indicated.  Coordinate calculations 
with manufacturer's test results.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Wind load uplift design pressure at roof locations specified in paragraph entitled "Wind 
Loads."</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Clip spacing and allowable load per clip calculations.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  The fastening of clips to structure or intermediate support spacing.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Intermediate support spacing and fastening to structure when required.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Allowable panel span at anchorage spacing indicated.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Safety factor used in determining loading.</ITM><BRK/></SPT>
<BRK/>
<SPT><TTL>1.6   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Preroofing Conference</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Consult with the Contracting Officer responsible for construction of 
the project to determine who should conduct the conference.  For SOUTHNAVFACENGCOM 
administered projects, delete the option of Contractor conducting the conference 
and delete the last sentence.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After submittals are received and approved but before roofing [and insulation] work, including associated work, 
is preformed, the [Contracting Officer will] [Contractor shall] hold a preroofing conference to review the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  The drawings and specifications</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Procedure for on site inspection and acceptance of the roofing substrate and pertinent structural 
details relating to the roofing system</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Contractor's plan for coordination of the work of the various trades involved in providing 
the roofing system and other components secured to the roofing</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Safety requirements.</ITM><BRK/>
<BRK/>
<TXT>The preroofing conference shall be attended by the Contractor and personnel directly responsible for the roofing 
[and insulation] installation, [mechanical] [and] [electrical work], and the roofing manufacturer's technical 
representative.  Conflicts among those attending the preroofing conference shall be resolved and confirmed in 
writing before roofing work, including associated work, is begun.  [Prepare written minutes of the preroofing 
conference and submit to the Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   Manufacturer's <SUB>Technical Representative</SUB></TTL><BRK/>
<BRK/>
<TXT>The representative shall have authorization from manufacturer to approve field changes and be thoroughly familiar 
with the products and with installations in the geographical area where construction will take place.  The manufacturer's 
representative shall be an employee of the manufacturer with at least 5 years experience in installing the roof 
system.  The representative shall be available to perform field inspections and attend meetings as required herein, 
and as requested by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3   <SUB>Qualification of Installer</SUB></TTL><BRK/>
<BRK/>
<TXT>The roofing system installer shall be factory-trained, approved by the metal roofing system manufacturer to install 
the system, and shall have a minimum of three years experience as an approved applicator with that manufacturer.  
The applicator shall have applied five installations of similar size and scope to this project within the previous 
3 years.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.4   Single Source</TTL><BRK/>
<BRK/>
<TXT>Provide roofing panels, clips, closures and other accessories from a single manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5   Manufacturer</TTL><BRK/>
<BRK/>
<TXT>The SSMRS shall be the product of a metal roofing industry recognized SSMRS manufacturer who has been in the 
practice of manufacturing SSMRS for a period of not less than 5 years and who has been involved in at least 5 
projects similar in size and complexity to this project.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.7   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Deliver, store, and handle preformed panels, bulk roofing products and other manufactured items in a manner to 
prevent damage or deformation.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.7.1   Delivery</TTL><BRK/>
<BRK/>
<TXT>Provide adequate packaging to protect materials during shipment.  Do not uncrate materials until ready for use 
except for inspection.  Immediately upon arrival of materials at jobsite, inspect materials for damage, dampness, 
and staining.  Replace damaged or permanently stained materials that cannot be restored to like-new condition 
with new material.  If materials are wet, remove moisture, restack and protect panels until used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.2   Handling</TTL><BRK/>
<BRK/>
<TXT>Handle material carefully to avoid damage to surfaces, edges and ends.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.3   Storage</TTL><BRK/>
<BRK/>
<TXT>Stack materials stored on the site on platforms or pallets and cover with tarpaulins or other suitable weathertight 
coverings which prevent water trapping or condensation.  Store panels so that water which might have accumulated 
during transit or storage will drain off.  Do not store the panels in contact with materials that might cause 
staining, such as mud, lime, cement, fresh concrete or chemicals.  Protect stored panels from wind damage.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.8   <SUB>Warranty</SUB></TTL><BRK/>
<BRK/>
<TXT>Furnish manufacturer's no dollar limit materials and workmanship warranty for the roofing system.  The warranty 
period shall be not less than 20 years from the date of Government acceptance of the work.  The warranty shall 
be issued directly to the Government.  The warranty shall provide that if within the warranty period the metal 
roofing system becomes non-watertight or shows evidence of corrosion, perforation, peeling paint, rupture or 
excess weathering due to deterioration of the roofing system resulting from defective materials or workmanship 
the repair or replacement of the defective materials and correction of the defective workmanship shall be the 
responsibility of the roofing system manufacturer.  Repairs that become necessary because of defective materials 
and workmanship while roofing is under warranty shall be performed within 7 days after notification, unless additional 
time is approved by the Contracting Officer. Failure to perform repairs within the specified period of time will 
constitute grounds for having the repairs performed by others and the cost billed to the manufacturer.  Contractor 
shall also provide a 2 year contractor installation warranty.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>ROOFING PANELS</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Material</TTL><BRK/>
<BRK/>
<TXT>3004 aluminum,<MET> <RID>ASTM B 209M</RID></MET><ENG> <RID>ASTM B 209</RID></ENG>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1.1   Thickness</TTL><BRK/>
<BRK/>
<TXT><MET>1.0 mm</MET><ENG>0.040 inch</ENG> minimum.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.2   Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose the finish appropriate for the project.  In general, hangars, 
warehouses, and other utilitarian structures may use mill finish to reduce cost.  
Mill finish Alclad is more economical than fluorocarbon painted finish.  Some 
colors in the painted finish are substantially more costly than others, due 
to the scarcity of certain pigments.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Alclad mill finish, unpainted] [Alclad fluorocarbon baked enamel exterior and neutral washcoat interior].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.3   Texture</TTL><BRK/>
<BRK/>
<TXT>[Stucco embossed.][Smooth.][Smooth with raised intermediate ribs for added stiffness].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.4   Color</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Check with the facility regarding color selection.  Use only manufacturer's 
standard colors. Delete this paragraph if mill finish has been selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[As selected.] [Blue] [Red] [[_____], No. [_____]] exterior.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.5   Configuration</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The height of vertical legs should not be less than<MET> 50 mm</MET><ENG> 2 inches</ENG> on 
roofs having a slope less than 2 in 12.  The occurrence of ice dams or other 
water flow obstructions should be considered when determining the vertical leg 
height.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide panels of continuous lengths from ridge to eaves or from top to eaves on shed roof designs.  Panels shall 
be<MET> [300] [_____] mm</MET><ENG> [12] [_____] inches</ENG> wide with a minimum<MET> [50] [_____] mm</MET><ENG> [2.0] [_____] inch</ENG> high vertical 
legs and two [<MET>9.4 mm</MET><ENG>0.37 inch</ENG>] [_____] stiffening ribs at<MET> 100 mm</MET><ENG> 4 inches</ENG> on center between the legs to minimize 
oil-canning and telegraphing of structural members.  Leading vertical leg shall have a continuous groove in the 
rib top for anti-siphon protection when hook-rib top of next panel is locked over leading vertical leg to form 
the standing seam.  Panels from <SUB>coil stock</SUB> shall be formed without warping, waviness or ripples not a part of 
the panel profile, and shall be free of damage to the finish coating system.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.1.1.6   Prefinished Coating System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if mill finish has been selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fluorocarbon baked enamel, factory-applied, minimum total dry film nominal thickness of<MET> [0.0175] [0.050] [_____] 
mm</MET><ENG> [0.7] [2.0] [_____] mils</ENG>, and conforming to test requirements specified herein.  Provide prefinished coating 
system on [both faces.] [the exterior face.]  Interior face shall receive same coating system, or, at the manufacturer's 
option, receive a coat of acrylic wash coat applied to a minimum total dry film nominal thickness of<MET> 0.005 mm</MET><ENG>
 0.20 mil</ENG>.  Color shall be [as specified] [as selected from the manufacturer's standard colors].</TXT><BRK/>
<BRK/>
]</SPT></SPT></SPT><SPT><TTL>2.2   <SUB>ATTACHMENT CLIPS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Add the appropriate choice(s) for the attachment clip(s) used in the 
design.  Insert design value for minimum load capacity.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Series 300 non-magnetic stainless steel.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Type 1:  [_____] clip, minimum capacity [_____]<MET> kgs</MET><ENG> lbs</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Type 2:  [_____] clip, minimum capacity [_____]<MET> kgs</MET><ENG> lbs</ENG>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Type 3:  [_____] clip, minimum capacity [_____]<MET> kgs</MET><ENG> lbs</ENG>.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   <SUB>ACCESSORIES</SUB></TTL><BRK/>
<BRK/>
<TXT>Sheet metal flashings, trim, moldings, closure strips, caps, preformed crickets, equipment curbs, [gutters,] 
[down spouts,] and other similar sheet metal accessories provided in conjunction with preformed metal panels 
shall be of the same material and finish as panels, except that such items which will be concealed after installation 
may be provided without the finish if they are aluminum or stainless steel.  Provide ridge and rib closures, 
as specified.  Metal shall be of thickness not less than that of panels.  Molded closure strips shall be closed-cell 
synthetic rubber, neoprene, or polyvinyl chloride premolded to match configurations of preformed metal panels.  
Thermal spacer blocks and other thermal barriers at concealed fasteners shall be as recommended by the roofing 
panel manufacturer.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.3.1   <SUB>Closures</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.1.1   Ridge Closure</TTL><BRK/>
<BRK/>
<TXT>Metal-clad foam or metal closure with foam secondary closure matching panel configuration for installation on 
surface of roof panel between panel ribs at ridge and headwall roof panel flashing conditions and terminations.  
Foam material shall not absorb water.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.1.2   Rib Closure</TTL><BRK/>
<BRK/>
<TXT>Aluminum, closed-cell or solid-cell synthetic rubber, neoprene or polyvinyl chloride pre-molded to match configuration 
of rib opening.  Material for closures shall not absorb water.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3.2   Fasteners</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In the high winds, metal will vibrate and fatigue at fasteners on "normal" 
spacings.  For this reason, cleated (blind fastened) flashings are not acceptable, 
and attachment at<MET> 50 to 200 mm</MET><ENG> 6 to 8 inches</ENG> on center is customary.  Flashing 
should not extend a significant distance more than <MET> 25 mm</MET><ENG> one inch</ENG> beyond a 
support or fastener.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Series 300 stainless steel with composite metal and neoprene composition washers.  Fasteners for attachment to 
structural supports and fasteners for attachment of panels shall be as approved and in accordance with manufacturer's 
recommendation.  Unless specified otherwise herein, fasteners shall be either self-tapping screws, bolts and 
nuts, or self-locking bolts.  Design fastening system to withstand design loads indicated.  Fasteners shall not 
be over-torqued and shall develop full capacity of attachment clips.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.3.2.1   Screws</TTL><BRK/>
<BRK/>
<TXT>Provide not less than<MET> 0.242 mm</MET><ENG> No. 14</ENG> diameter for self-tapping type and not less than<MET> 0.216 mm</MET><ENG> No. 12</ENG> diameter 
for self-drilling and self-tapping.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2.2   Bolts</TTL><BRK/>
<BRK/>
<TXT>Provide not less than<MET> 6 mm</MET><ENG> 1/4 inch</ENG> diameter, shouldered or plain shank as required, with proper nuts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2.3   Automatic End-Welded Studs</TTL><BRK/>
<BRK/>
<TXT>Provide shouldered type with a shank diameter of not less than<MET> 5 mm</MET><ENG> 3/16 inch</ENG> and cap or nut for holding covering 
against the shoulder.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2.4   Explosive Driven Fasteners</TTL><BRK/>
<BRK/>
<TXT>Provide fasteners to be driven with explosive actuated tools and with a shank diameter of not less than<MET> 13 mm</MET><ENG>
 1/2 inch</ENG> for fastening to steel and not less than<MET> 25 mm</MET><ENG> one inch</ENG> for fastening to concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2.5   Rivets</TTL><BRK/>
<BRK/>
<TXT>Blind rivets shall be aluminum with<MET> 5 mm</MET><ENG> 3/16 inch</ENG> nominal diameter shank or stainless steel with<MET> 3 mm</MET><ENG> 1/8 inch</ENG>
 nominal diameter shank.  Rivets shall be threaded stem type if used for other than fastening trim.  Rivets with 
hollow stems shall have closed ends.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3.3   <SUB>Sealant</SUB></TTL><BRK/>
<BRK/>
<TXT>Elastomeric type containing no oil or asphalt.  Exposed sealant shall cure to a rubberlike consistency.  Concealed 
sealant shall be the non-hardening type.  Seam sealant shall be factory-applied, non-skinning, non-drying, and 
shall conform to the roofing manufacturer's recommendations.  Silicone-based sealants shall not be used in contact 
with finished metal panels and components unless approved otherwise by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.4   Sealant Tape</TTL><BRK/>
<BRK/>
<TXT>Polyvinyl chloride closed cell foam tape or composed of 99 percent solids in a base of butyl polyisobutylene 
rubber with the following properties and characteristics:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Webbing and Elongation:  100% minimum at<MET> 25 degrees C</MET><ENG> 77 degrees F</ENG></ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Adhesion:  Excellent to surfaces used</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  U-V light exposure:  No effect</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Ozone: No effect</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Weathering: 1000 hours in QUV Test Apparatus - Excellent, no cracking, bleeding, or significant 
changes.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Moisture Transmission:  0.05 to 0.15 grams per<MET> 62500 square mm</MET><ENG> 100 square inches</ENG> in 24 hours.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Service Temperature Tests:  Bending over<MET> 13 mm</MET><ENG> 1/2 inch</ENG>mandrel at<MET> -50 degrees C</MET><ENG> -60 degrees 
F</ENG> with no cracking.  Expose sealed typical metal lap joint to<MET> +176 degrees C</MET><ENG> +350 degrees F</ENG> 
for 24 hours with no significant loss of original properties.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Reaction to Metals:  Non-corrosive to metals</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   <SUB>UNDERLAYMENT</SUB> FOR WOOD SUBSTRATES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the following paragraph where standing seam metal roof is applied 
directly to a wood deck.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide underlayment <RID>ASTM D 226</RID>, Type I perforated, covered by water-resistant rosin sized building paper.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   LABORATORY TESTS FOR <SUB>PANEL FINISH</SUB></TTL><BRK/>
<BRK/>
<TXT>Previously manufactured panels of the same type and finish as proposed for the project shall have been tested 
by an approved testing laboratory to ensure conformance to specifications.  The term "appearance of base metal" 
refers to the aluminum base metal.  Panels shall meet the following test requirements.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.5.1   Salt Spray Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use 2000-hour test for products to be installed in marine environments 
such as at Adak, Alaska.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>Panels shall withstand a salt spray test for a minimum of [1000] [2000] hours in accordance with <RID>ASTM B 117</RID>, 
including the scribe requirement in the test.</TST>  Immediately upon removal of the panel from the test, coating shall 
receive a rating of 10, no blistering, as determined by <RID>ASTM D 714</RID>; and a rating of 7,<MET> 2 mm</MET><ENG> 1/16 inch</ENG> failure 
at scribe, as determined by <RID>ASTM D 1654</RID>, Rating Schedule No. 1.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   Formability Test</TTL><BRK/>
<BRK/>
<TXT><TST>For formability test, when subjected to a 180 degree bend over a<MET> 3 mm</MET><ENG> 1/8 inch</ENG> diameter mandrel in accordance 
with <RID>ASTM D 522</RID>, exterior coating film shall show only microchecking of the exterior film and there shall be 
no loss of adhesion.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.3   Accelerated Weathering Test</TTL><BRK/>
<BRK/>
<TXT><TST>Panels shall withstand an accelerated weathering test for a minimum of 2000 hours in accordance with <RID>ASTM G 23</RID>
 or <RID>ASTM D 2565</RID> without cracking, peeling, blistering, loss of adhesion of the protective coating, or corrosion 
of the base metal.</TST>  Protective coating that can be readily removed from the base metal with a penknife blade 
or similar instrument shall be considered to indicate loss of adhesion.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4   Chalking Resistance</TTL><BRK/>
<BRK/>
<TXT><TST>After the 2000-hour weatherometer test, exterior coating shall not chalk greater than No. 8 rating when measured 
in accordance with <RID>ASTM D 4214</RID> test procedures.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.5   Abrasion Resistance Test for Color Coating</TTL><BRK/>
<BRK/>
<TXT><TST>When subjected to the falling sand test in accordance with <RID>ASTM D 968</RID>, coating system shall withstand a minimum 
of 100 liters of sand per<MET> 0.025 mm</MET><ENG> mil</ENG> of coating thickness before appearance of base metal.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.6   Humidity Test</TTL><BRK/>
<BRK/>
<TXT><TST>When subjected to a humidity cabinet test in accordance with <RID>ASTM D 2247</RID> for 1000 hours, a scored panel shall 
show no signs of blistering, cracking, creepage, or corrosion.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.7   Fire Hazard</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if mill finish has been selected.  If roofing is 
exposed in exit areas, use a flame spread of 25; if exposed in non-exit areas, 
use flame spread of 75; otherwise delete the paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>The finish on factory-fabricated panels shall have a flame spread rating of not more than [25] [75] when tested 
in accordance with <RID>ASTM E 84</RID>.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.8   Gloss</TTL><BRK/>
<BRK/>
<TXT>The gloss of the finish shall be 30 plus or minus 5 at an angle of 60 degrees, when measured in accordance with <RID>
ASTM D 523</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.9   Glare Resistance</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The requirements for glare resistance should be included only when specifically 
required by the facility for critical glare areas such as control towers or 
other structures where glare can be an operational hazard.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Surfaces of panels that will be exposed to the exterior shall have a specular reflectance of not more than 10 
when measured in accordance with <RID>ASTM D 523</RID> at an angle of 85 degrees.  Requirements specified under "Formability 
Test" will be waived if necessary to conform to this requirement.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6   LINER PANELS</TTL><BRK/>
<BRK/>
<TXT>Fabricate liner panels of the same material as roof panels, and formed or patterned to prevent waviness and distortion.  
Liner panels shall have a factory applied,<MET> 0.025 mm</MET><ENG> one mil</ENG> thick minimum painted coating on the inside face, 
and a prime coat on the liner side.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   EXAMINATION</TTL><BRK/>
<BRK/>
<TXT>Examine surfaces to receive standing seam metal roofing and flashing. Provide plumb and true surfaces, clean, 
even, smooth and as dry as possible.  Ensure that surfaces are free from defects and projections which might 
affect the installation.  Report unsuitable conditions to Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   PROTECTION OF DISSIMILAR METALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Galvanized steel will deteriorate in humid conditions, coastal areas 
and should be considered a dissimilar metal unless it is known that the contact 
surface will remain dry and free from condensation. Wood which has been pressure 
treated will also react with aluminum.  Provide protection if aluminum could 
contact treated wood.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Where an aluminum component is in contact with, fastened to, or contacted by drainage from dissimilar metals 
other than stainless steel, give such dissimilar metals one of the following treatments:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  A heavy brush coat of primer followed by two coats of aluminum metal and masonry paint.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  A heavy coat of alkali-resistant bituminous paint.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Separate contact surfaces with non-absorptive tape or gasket.</ITM><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Contact with Masonry</TTL><BRK/>
<BRK/>
<TXT>Where aluminum is in contact with masonry, concrete, or plaster, apply a heavy coat of alkali-resistant bituminous 
paint.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Contact with Wood</TTL><BRK/>
<BRK/>
<TXT>Where aluminum is in contact with wood or other absorptive material subject to wetting, or with wood treated 
with a preservative not compatible with aluminum, seal joints with sealing compound and apply one heavy brushcoat 
of aluminum pigmented bituminous paint.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   <SUB>INSTALLATION</SUB></TTL><BRK/>
<BRK/>
<TXT>Install in accordance with approved manufacturer's erection instructions shop drawings, and diagrams, except 
as specified otherwise herein.  Provide panels in full and firm contact with clips.  Obtain approval prior to 
installation on prefinished panels cut in the field, and factory applied coverings or coatings that were repaired 
after being abraded or damaged during handling or installation.  Make repairs with material of same color as 
weather coating.  Completely seal openings through panels.  Correct defects or errors in materials in an approved 
manner.  Replace materials which cannot be corrected in an approved manner with new materials. Provide molded 
closure strips where indicated and where necessary for weathertight construction.  [Use shims as required to 
ensure clip line is true.]  Use a spacing gage at each row of panels to ensure that panel width is not stretched 
or shortened.  [Provide one layer of asphalt-saturated felt placed perpendicular to roof slope covered by one 
layer of rosin-sized building paper placed parallel to roof slope with side laps down slope and attached with 
roofing nails.  Overlap side end laps<MET> 75 mm</MET><ENG> 3 inches</ENG>, offset seams in building paper with seams in felt.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Roof Panels</TTL><BRK/>
<BRK/>
<TXT>Apply roofing panels with standing seams parallel to slope of roof.  Provide roofing panels in full lengths from 
ridge to eaves (top to eaves on shed roofs), with no transverse joints except at the junction of ventilators, 
curbs, skylights, chimneys, and similar openings.  Form interlocking rib type panel seams in the field with an 
automatic mechanical seamer approved by the manufacturer.  Attach panels to structure with concealed clips which 
are incorporated into the panel seams.  Clip attachment shall allow roof to move freely and independently of 
the structure, except at fixed points as indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Flashings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In the high winds metal will vibrate and fatigue at fasteners on "normal" 
spacings.  For this reason, cleated (blind fastened) flashings are not acceptable, 
and attachment at<MET> 100 to 150 mm</MET><ENG> 4 to 6 inches</ENG> on center is customary.  Flashing 
should not extend a significant distance more than <MET> 25 mm</MET><ENG> one inch</ENG> beyond a 
support or fastener.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide flashing and related closures and accessories in connection with preformed metal panels [as indicated] 
and as necessary to provide a weathertight installation.  Install flashing to ensure positive water drainage 
away from roof penetrations.  Flash and seal roof at ridge, eaves and rakes, at projections through roof, and 
elsewhere as necessary. Accomplish placement of closure strips, flashing, and sealing material in an approved 
manner that will ensure complete weathertightness.  Details of installation which are not indicated shall be 
in accordance with the <BRK/>
<RID>NRCA Details</RID>, <RID>SMACNA 1793</RID>, <RID>AA ASM-35</RID>, panel manufacturer's printed instructions and details of the approved shop 
drawings.  Installation shall allow for expansion and contraction of flashing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Flashing Fasteners</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In the high winds, metal will vibrate and fatigue at fasteners on "normal" 
spacings.  For this reason, cleated (blind fastened) flashings are not acceptable, 
and attachment at<MET> 100 to 150 mm</MET><ENG> 4 to 6 inches</ENG> on center is customary.  Flashing 
should not extend any significant distance more than <MET> 25 mm</MET><ENG> one inch</ENG> beyond 
a support or fastener.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fastener spacings shall be in accordance with the panel manufacturer's recommendations and as necessary to withstand 
the indicated design loads. Install fasteners in roof valleys as recommended by the manufacturer of the panels.  
Install fasteners in straight lines within a tolerance of<MET> 13 mm</MET><ENG> 1/2 inch</ENG> in the length of a bay.  Drive exposed 
penetrating type fasteners normal to the surface and to a uniform depth to seat gasketed washers properly and 
drive so as not to damage factory applied coating.  Exercise extreme care in drilling pilot holes for fastenings 
to keep drills perpendicular and centered.  Do not drill through sealant tapes.  After drilling, remove metal 
filings and burrs from holes prior to installing fasteners and washers.  Torque used in applying fasteners shall 
not exceed that recommended by the manufacturer.  Remove panels deformed or otherwise damaged by over-torqued 
fastenings, and provide new panels.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.4   Closure/Closure Strips</TTL><BRK/>
<BRK/>
<TXT>Set closure/closure strips in joint sealant material.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   CLEANING</TTL><BRK/>
<BRK/>
<TXT>Clean exposed sheet metal work at completion of installation.  Remove metal shavings, filings, nails, bolts, 
and wires from roofs on completion to prevent discoloration and harm to the panels and flashing.  Remove grease 
and oil films, excess sealants handling marks, contamination from steel wool, fittings and drilling debris and 
scrub the work clean.  Exposed metal surfaces shall be free of dents, creases, waves, scratch marks, and solder 
or weld marks.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   <SUB>MANUFACTURER'S FIELD INSPECTION</SUB></TTL><BRK/>
<BRK/>
<TXT>Manufacturer's technical representative shall visit the site as necessary during the installation process to 
assure panels, flashings, and other components are being installed in a satisfactory manner.  Manufacturer's 
technical representative shall perform a field inspection during the first [20] [_____] squares of roof panel 
installation and at substantial completion prior to issuance of warranty, as a minimum, and as otherwise requested 
by the Contracting Officer.  Additional inspections shall not exceed one for each [100] [_____] squares of total 
roof area with the exception that follow-up inspections of previously noted deficiencies or application errors 
shall be performed as requested by the Contracting Officer.  Each inspection visit shall include a review of 
the entire installation to date.  After each inspection, a report, signed by the manufacturer's technical representative, 
shall be submitted to the Contracting Officer noting the overall quality of work, deficiencies and any other 
concerns, and recommended corrective actions in detail.  Notify Contracting Officer a minimum of 2 working days 
prior to site visit by manufacturer's technical representative.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   COMPLETED WORK</TTL><BRK/>
<BRK/>
<TXT>Completed work shall be plumb and true without oil canning, dents, ripples, abrasion, rust, staining, or other 
damage detrimental to the performance or aesthetics of the completed roof assembly.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   <SUB>INFORMATION CARD</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include only the applicable EFD.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>For each roof, provide a typewritten card, laminated in plastic and framed for interior display or a photoengraved<MET>
 0.8 mm thick</MET><ENG> 0.032 inch</ENG> thick aluminum card for exterior display.  Card to be<MET> 220 by 280 mm</MET><ENG> 8 1/2 by 11 inches</ENG>
 minimum and contain the information listed on Form 1 at end of this section.  Install card near point of access 
to roof, or where indicated.  Send a photostatic paper copy to [LANTNAVFACENGCOM, Code 1613, 1510 Gilbert Street, 
Norfolk, VA 23511-2699] [NORTHNAVFACENGCOM, Code 103A, 10 Industrial Highway, Mail Stop #82, Lester, PA 19113-2090] 
[PACNAVFACENGCOM, Code 102, Pearl Harbor, HI 96860-7300] [SOUTHNAVFACENGCOM, Code 0535, P.O. Box 190010, North 
Charleston, SC 29419-9010] [SOUTHWESTNAVFACENGCOM, Code 133SB, 1220 Pacific Highway, San Diego, CA 92132-5190].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8   SCHEDULE</TTL><BRK/>
<BRK/>
<TXT>Some metric measurements in this section are based on mathematical conversion of English unit measurements, and 
not on metric measurement commonly agreed to by the manufacturers or other parties.  The English and metric units 
for the measurements shown are as follows:</TXT><BRK/>
<TBL><THD><BRK/>
      <HL1>PRODUCTS</HL1>               <HL1>ENGLISH UNITS</HL1>               <HL1>METRIC UNITS</HL1><BRK/></THD>
<BRK/>
  a.  Sheet Aluminum         0.040 inch                    1.0 mm<BRK/>
<BRK/>
  b.  Panels                 12 inches                     300 mm<BRK/>
       - vertical legs        2 inches                     50 mm<BRK/>
       - stiffening ribs      4 inches                     100 mm<BRK/>
<BRK/>
  c.  Screws                 No. 14                        0.242 mm<BRK/>
                             No. 12                        0.216 mm<BRK/>
<BRK/>
  d.  Bolts                  1/4 inch                      6 mm<BRK/>
<BRK/>
  e.  Studs                  3/16 inch                     5 mm<BRK/>
<BRK/>
  f.  Fasteners              1/2 inch                      13 mm<BRK/>
                             One inch                      25 mm<BRK/>
<BRK/>
  g.  Rivets                 1/16 inch                     5 mm<BRK/>
                             1/8 inch                      3 mm<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>3.9   FORM ONE</TTL><BRK/>
<PGE/><TXT>FORM 1  -  PREFORMED STEEL STANDING SEAM ROOFING SYSTEM COMPONENTS</TXT><BRK/>
<BRK/>
<TXT>1.  Contract Number:</TXT><BRK/>
<BRK/>
<TXT>2.  Building Number &amp; Location:</TXT><BRK/>
<BRK/>
<TXT>3.  NAVFAC Specification Number:</TXT><BRK/>
<BRK/>
<TXT>4.  Deck/Substrate Type:</TXT><BRK/>
<BRK/>
<TXT>5.  Slopes of Deck/Roof Structure:</TXT><BRK/>
<BRK/>
<TXT>6.  Insulation Type &amp; Thickness:</TXT><BRK/>
<BRK/>
<TXT>7.  Insulation Manufacturer:</TXT><BRK/>
<BRK/>
<TXT>8.  Vapor Retarder:    ( )Yes    ( )No</TXT><BRK/>
<BRK/>
<TXT>9.  Vapor Retarder Type:</TXT><BRK/>
<BRK/>
<TXT>10. Preformed Steel Standing Seam Roofing Description:</TXT><BRK/>
<BRK/>
<TXT>a.  Manufacturer (Name, Address, &amp; Phone No.):</TXT><BRK/>
<TXT>b.  Product Name:              c.  Width:            d.  Gage:</TXT><BRK/>
<TXT>e.  Base Metal:                f.  Method of Attachment:</TXT><BRK/>
<BRK/>
<TXT>11. Repair of Color Coating:</TXT><BRK/>
<BRK/>
<TXT>a.  Coating Manufacturer (Name, Address &amp; Phone No.):</TXT><BRK/>
<TXT>b.  Product Name:</TXT><BRK/>
<TXT>c.  Surface Preparation:</TXT><BRK/>
<TXT>d.  Recoating Formula:</TXT><BRK/>
<TXT>e.  Application Method:</TXT><BRK/>
<BRK/>
<TXT>12. Statement of Compliance or Exception:_________________________________</TXT><BRK/>
<TXT>__________________________________________________________________________</TXT><BRK/>
<TXT>__________________________________________________________________________</TXT><BRK/>
<BRK/>
<TXT>13. Date Roof Completed:</TXT><BRK/>
<BRK/>
<TXT>14. Warranty Period:  From_______________  To_______________</TXT><BRK/>
<BRK/>
<TXT>15. Roofing Contractor (Name &amp; Address):</TXT><BRK/>
<BRK/>
<TXT>16. Prime Contractor (Name &amp; Address):</TXT><BRK/>
<BRK/>
<BRK/>
<TXT>Contractor's Signature _________________________  Date:</TXT><BRK/>
<BRK/>
<BRK/>
<TXT>Inspector's Signature  _________________________  Date:</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>