<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA            UFGS-11 46 00 (January 2008)<BRK/>
                                          --------------------------------<BRK/>
Preparing Activity:  <PRA>USACE </PRA>               Superseding<BRK/>
                                          UFGS-11 40 00.00 20 (April 2006)<BRK/>
                                          UFGS 11 46 01.00 10 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 11 46 00</SCN><BRK/>
<BRK/>
<STL>FOOD DISPENSING EQUIPMENT</STL><BRK/>
<DTE>01/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>food dispensing 
equipment</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
This guide specification includes tailoring options for NAVFAC,and USACE.  Selection 
or deselection of a tailoring option will include or exclude that option in 
the section, but editing the resulting section to fit the project is still required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification includes, but is not limited to, bar equipment, 
coffee urns and warmers, salad bars, desert tables, food warmers, soup kettles, 
tureens and heat lamps; pre-packaged food dispensers, dish, tableware; ice, 
ice cream, beverage, juice and water dispensers.</NPR><BRK/>
<BRK/>
<NPR>On the drawings, show:</NPR><BRK/>
<BRK/>
<NPR>1.  A 1:50 (1/4 inch) scale floor plan with layout of all food service equipment<TAI OPT="NAVFAC">
 and Naval Equipment Symbols</TAI>.</NPR><BRK/>
<BRK/>
<NPR>2.  Food Service Equipment Schedule laid out in accordance with <TAI OPT="NAVFAC">NAVFSSO</TAI><TAI OPT="USACE">current 
US Army Quartermaster Center and School equipment schedule</TAI> specified design 
requirements, including Energy Star qualified model list.</NPR><BRK/>
<BRK/>
<NPR>3.  Floor, wall, and ceiling penetrations.</NPR><BRK/>
<BRK/>
<NPR>4.  Raised bases, retainer curbs, or depressions.</NPR><BRK/>
<BRK/>
<NPR>5.  Recessed, grated floor drains required for equipment.</NPR><BRK/>
<BRK/>
<NPR>6.  Disconnect switches.</NPR><BRK/>
<BRK/>
<NPR>7.  Electrical chases and raceways and plumbing chases.</NPR><BRK/>
<BRK/>
<NPR>8.  Utility connections to building water, sanitary, electrical, and other utility 
systems.  Convenience outlets at point of use for plug-in equipment.</NPR><BRK/>
<BRK/>
<NPR>9.  All Contractor built-to-order items, per Food Service Equipment Schedule, 
shown and coordinated with the specifications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   GENERAL RELATED SECTIONS AND STANDARDS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit the master "Food Service Equipment Schedule" in section 
<SRF>11 06 40.13</SRF> carefully; retain items of equipment used for the project.  The 
Equipment List is intended to be edited and included in the project Specification.  
List the information contained on the Equipment List on the Contract Drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Refer to section <SRF>11 05 40</SRF> COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT for general requirements.  
Provide detailed Food Service Equipment Schedule as specified in Section <SRF>11 06 40.13</SRF> FOOD SERVICE EQUIPMENT 
SCHEDULE.</LST><BRK/>
<BRK/>
<LST>b.  Food dispensing equipment shall conform to OSHA standards <RID>29 CFR 1910.144</RID>, <RID>29 CFR 1910.145</RID>, <RID>29 CFR 1910.306</RID>
, and related NSF and UL standards.</LST><BRK/>
<BRK/>
<LST>c.  Floor areas adjacent to food dispensing equipment point of operation, and working surfaces shall 
conform to <RID>29 CFR 1910-SUBPART D</RID></LST><BRK/>
<BRK/>
<LST>d.  Submit detailed Food Service Equipment List.  Include submittal of <SUB>NSF Certification</SUB> and <SUB>UL Certification</SUB>
 for individual food dispensing components.</LST><BRK/>
<BRK/>
<LST>e.  Construction and finish of fabricated equipment shall conform to the specifications as stated in 
section <SRF>11 05 40</SRF>.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME A112.19.3</RID><RTL>(2008) Stainless Steel Plumbing Fixtures (Designed for Residential Use)</RTL><BRK/><BRK/></REF><REF><ORG>NSF INTERNATIONAL (NSF)</ORG><BRK/><BRK/><RID>NSF 14</RID><RTL>(2008) Plastics Piping System Components and Related Materials</RTL><BRK/><BRK/><RID>NSF 169</RID><RTL>(2007) Standard Specification for Special Purpose Food Equipment and Devices</RTL><BRK/><BRK/><RID>NSF 18</RID><RTL>(2007) Standard for Manual Food and Beverage Dispensing Equipment</RTL><BRK/><BRK/><RID>NSF 2</RID><RTL>(2008) Food Equipment</RTL><BRK/><BRK/><RID>NSF 20</RID><RTL>(2007) Standard for Bulk Milk Dispensing Machines</RTL><BRK/><BRK/><RID>NSF 25</RID><RTL>(2007) Standard for Vending Machines for Food and Beverage</RTL><BRK/><BRK/><RID>NSF 36</RID><RTL>(2007) Standard for Dinnerware</RTL><BRK/><BRK/><RID>NSF 4</RID><RTL>(2007) Standard for Commercial Cooking, Rethermalization and Powered Hot Food Holding and Transport Equipment</RTL><BRK/><BRK/><RID>NSF 42</RID><RTL>(2007a; Addendum 2008) Standard Specification for Water Treatment Units - Aesthetic Effects</RTL><BRK/><BRK/><RID>NSF 51</RID><RTL>(2007) Food Equipment Materials</RTL><BRK/><BRK/><RID>NSF 53</RID><RTL>(2007a; Addenda 2008) Standard Specification for Drinking Water Treatment Units - Health Effects</RTL><BRK/><BRK/><RID>NSF 6</RID><RTL>(2007) Dispensing Freezers</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)</ORG><BRK/><BRK/><RID>Energy Star</RID><RTL>(1992; R 2006) Energy Star Energy Efficiency Labeling System</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>29 CFR 1910-SUBPART D</RID><RTL>Walking - Working Surfaces</RTL><BRK/><BRK/><RID>29 CFR 1910.144</RID><RTL>Safety Color Code for Marking Physical Hazards</RTL><BRK/><BRK/><RID>29 CFR 1910.145</RID><RTL>Accident Prevention Signs and Tags</RTL><BRK/><BRK/><RID>29 CFR 1910.306</RID><RTL>Specific Purpose Equipment and Installations</RTL><BRK/><BRK/></REF></SPT>
<SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate the configuration and layout for all food dispensing equipment, 
with elevations and equipment identified by number.  Show "Food Service Equipment 
Schedule" on the drawings using the same identification numbers<TAI OPT="USACE">[ as indicated 
on the current US Army Quartermaster Center and School equipment schedule]</TAI>.  
Ensure that all Contractor built-to-order items, per Food Service Equipment 
Schedule", are shown and coordinated with the specifications.</NPR><BRK/>
<BRK/>
<NPR>Designer must coordinate with other sections for final connection of equipment.</NPR><BRK/>
<BRK/>
<TAI OPT="NAVFAC"><NPR>NOTE:  Details of particular equipment and installations are provided on Naval 
Food Service Division drawings.  Use these NAVFSD drawings as a basis for the 
project details.  Contact NAVFSD at commercial telephone (717) 790-7580 or DSN 
430-7580.</NPR><BRK/>
<BRK/>
<NPR><HL1>Equipment Item</HL1>                  <HL1>NAVFSSO Dwg. File</HL1></NPR><BRK/>
<BRK/>
<NPR>1.  Clean Gear Dresser                 541</NPR><BRK/>
<NPR>2.  Clean Gear Table                   553</NPR><BRK/>
<NPR>3.  Service Stand                      851</NPR><BRK/>
<NPR>4.  Steam Kettles and Water Metering   983</NPR></TAI><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The work includes [furnishing and] [installing] [and modifying existing]  food service dispensing equipment and 
related work.  Verify all existing dimensions, contract drawings, product data and all related conditions prior 
to commencing rough-in work.  Include coordination of delivery through existing finished opening and vertical 
handling limitations within the building.  Advise the Contracting Officer of all discrepancies prior to ordering 
equipment.  Submit <SUB>Contractor's Field Verification Data</SUB> prior to the preconstruction meeting.</TXT><BRK/>
<BRK/>
<LST>a.  Provide rough-in and connect utilities to equipment in accordance with requirements specified in 
other sections of this specification and in accordance with the physical dimensions, capacities, manufacturer's 
instructions, and other requirements of the equipment furnished.</LST><BRK/>
<BRK/>
<LST>b.  Submit detail drawings for food dispensing and related food processing equipment.  Provide Drawings 
at <MET> 1:50</MET><ENG> 1/4 inch</ENG> scale minimum.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review Submittal Description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Contractor's Field Verification Data</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Detail Drawings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>Custom fabricated equipment</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>Installation Instructions and Diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Detail drawings, as specified,including insulation and utility requirements.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>food dispensing equipment</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's literature</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Test Data</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>Field Test Reports</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>NSF Certification</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>UL Certification</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>Energy Star Qualified</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Instructions</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Manufacturer' instructions for shipping, handling, storage, installation, and start-up.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<TXT>Provide equipment conformig to the applicable requirements of the following reference standards: <RID>NSF 14</RID>, <RID>NSF 169</RID>
, <RID>NSF 18</RID>, <RID>NSF 2</RID>, <RID>NSF 20</RID>, <RID>NSF 25</RID>, <RID>NSF 36</RID>, <RID>NSF 4</RID>, <RID>NSF 42</RID>, <RID>NSF 51</RID>, <RID>NSF 53</RID>, <RID>NSF 6</RID>, and <RID>Energy Star</RID> for powered equipment.</TXT><BRK/>
<BRK/>
<LST>a.  [Thirty] [_____] days prior to the commencement of work, notify the Contracting Officer that the 
following items are prepared and ready for review at the Pre-Installation Meetings listed here as shown 
in the Submittals paragraph.</LST><BRK/>
<BRK/>
<LST>b.  <SUB>Detail Drawings</SUB>, product data and installation instructions.  Submit <SUB>Custom fabricated equipment</SUB> 
drawings after approval of food service equipment drawings.  Submit <SUB>Installation Instructions and Diagrams</SUB>
 and <SUB>food dispensing equipment</SUB></LST><BRK/>
<BRK/>
<LST>c.  Submit Design Data consisting of <SUB>Manufacturer's literature</SUB>, <SUB>Manufacturer's Test Data</SUB>, and <SUB>Energy 
Star Qualified</SUB></LST><BRK/>
<BRK/>
<LST>d.  Submit <SUB>Manufacturer's Instructions</SUB> for shipping, handling, storage, installation, and start-up.</LST><BRK/>
<BRK/>
<LST>e.  <TST>Submit [_____] copies of all <SUB>Manufacturer's Test Data</SUB> and certifications, including <SUB>NSF Certification</SUB>
; <SUB>UL Certification</SUB>, and Energy Star Qualified data to the Contracting Officer prior to the commencement 
of any installation work.</TST></LST><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
[<SPT><TTL>2.1   WATER FILTER</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Water filters will be used only where water taste and quality are poor.  
Delete if adequate water treatment is provided for the entire facility.<BRK/>
<BRK/>
Designer will indicate the location of the water filters on the drawings.  Water 
filters will be located in an accessible location.  Water filters may be piped 
in parallel to obtain greater capacity.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a cartridge-type water filter on water supply lines to equipment as shown.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Cartridge Filter</TTL><BRK/>
<BRK/>
<TXT>The filter, conforming to <RID>NSF 42</RID>, <RID>NSF 51</RID>, and <RID>NSF 53</RID>, shall remove dirt and off-taste items, such as chlorine 
and other medicinal items, and also reduce lime-scale problems when required by water conditions.  Provide filter 
consisting of a stainless steel pressure vessel, which includes shell top, bracket check valve, fittings and 
accessories, and plastic disposable cartridge.  Provide precoat filtration type cartridge in which a coating 
of particles is applied on a suitable fabric support.  The filter shall contain not less than 90 percent activated 
carbon and 10 percent inert binders, and remove particles 2 microns and larger.  Install the filter with [an 
inlet valve] [a three-position valve header], activation faucet, and by-pass valve which will be normally closed.  
In addition, provide an indication gauge which indicates when cartridge requires replacement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Working Pressure and Flow Rate</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer will select filter size with flow rate to accommodate equipment 
being filtered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install the filter as recommended by the manufacturer.  Provide filter suitable for<MET> 860 kPa</MET><ENG> 125 psig</ENG> maximum 
working pressure at<MET> 38 degrees C</MET><ENG> 100 degrees F</ENG> water inlet temperature.  Each filter shall have a nominal flow 
rate of<MET> [11.34] [5.67] [3.78] L/minute</MET><ENG> [180] [90] [60] gph</ENG>.  Provide [1] [2] [_____] additional replacement cartridge[s] 
for each filter.</TXT><BRK/>
<BRK/></SPT>
</SPT>]<SPT><TTL>2.2   HAND SINKS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Handwashing sinks must be provided behind each serving line . Each handwashing 
sink must be provided with soap dispensers and either towel dispensers or electric 
hand dryers specified in Section <SRF>10 28 13</SRF> TOILET ACCESSORIES.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.2.1   Sink Body</TTL><BRK/>
<BRK/>
<TXT>Provide sizes and mountings as indicated; provide in accordance with requirements of <RID>NSF 2</RID>.  Provide in accordance 
with <RID>ASME A112.19.3</RID>.  Fabricate of<MET> 1.8 mm thick</MET><ENG> 14 gage</ENG> stainless steel.  Round vertical and horizontal corners 
with a radius of not less than<MET> 19 mm</MET><ENG> 0.75 inch</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Mounting</TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.2.1   Leg Mounting</TTL><BRK/>
<BRK/>
<TXT>Sink legs to be as specified for counters, except weld closed gussets to support channels.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.2   Wall Mounting</TTL><BRK/>
<BRK/>
<TXT>Provide stainless steel mounting brackets.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.3   Counter Mounting</TTL><BRK/>
<BRK/>
<TXT>Provide sink body [set in counter] [integral with counter].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2.3   Faucets and Drain</TTL><BRK/>
<BRK/>
<TXT>Provide [splashback] [counter top] [and] [ledge] mounted [as indicated].  Provide gooseneck faucet spout, aerator, 
with two valves.  Provide nozzle with anti-splash device without hose thread.  Provide cleanout at location indicated 
on drawings.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Refer to section <SRF>11 05 40</SRF> COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT for detailed installation procedures, 
operation and maintenance manual requirements, training and project closeout procedures.  <TST>Include all food service 
dispensing equipment in the <SUB>Field Test Reports</SUB>.</TST></TXT><BRK/>