USACE / NAVFAC / AFCESA / NASA           UFGS-21 21 00.00 40 (August 2008)<BRK/>
                                         ---------------------------------<BRK/>
Preparing Activity:  <PRA>NASA</PRA>                Superseding<BRK/>
                                         UFGS-21 21 00.00 40 (April 2008)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 21 21 00.00 40</SCN><BRK/>
<BRK/>
<STL>CARBON-DIOXIDE FIRE-EXTINGUISHING SYSTEMS</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This specification covers the requirements for <SCP>carbon dioxide fire-protection 
systems</SCP>.</NPR><BRK/>
<BRK/>
<NPR>Indicate protected spaces and affected equipment on the drawings.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.</NPR><BRK/>
<BRK/>
<NPR>Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.</NPR><BRK/>
<BRK/>
<NPR>Recommended changes to a UFGS should be submitted as a <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.</NPR><BRK/>
<BRK/>
<NPR>Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.</NPR><BRK/>
<BRK/>
<NPR>References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/>
<BRK/>
<RID>ASME B36.10M</RID><RTL>(2004) Standard for Welded and Seamless Wrought 
Steel Pipe</RTL><BRK/>
<BRK/></REF>
<REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/>
<BRK/>
<RID>ASTM A 106/A 106M</RID><RTL>(2008) Standard Specification for Seamless Carbon 
Steel Pipe for High-Temperature Service</RTL><BRK/>
<BRK/>
<RID>ASTM A 53/A 53M</RID><RTL>(2007) Standard Specification for Pipe, Steel, 
Black and Hot-Dipped, Zinc-Coated, Welded and 
Seamless</RTL><BRK/>
<BRK/>
<RID>ASTM B 88</RID><RTL>(2003) Standard Specification for Seamless Copper 
Water Tube</RTL><BRK/>
<BRK/>
<RID>ASTM B 88M</RID><RTL>(2005) Standard Specification for Seamless Copper 
Water Tube (Metric)</RTL><BRK/>
<BRK/></REF>
<REF><ORG>MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY (MSS)</ORG><BRK/>
<BRK/>
<RID>MSS SP-58</RID><RTL>(2002) Standard for Pipe Hangers and Supports 
- Materials, Design and Manufacture</RTL><BRK/>
<BRK/>
<RID>MSS SP-69</RID><RTL>(2003; R 2004) Standard for Pipe Hangers and 
Supports - Selection and Application</RTL><BRK/>
<BRK/></REF>
<REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/>
<BRK/>
<RID>NFPA 12</RID><RTL>(2007) Standard on Carbon Dioxide Extinguishing 
Systems</RTL><BRK/>
<BRK/>
<RID>NFPA 72</RID><RTL>(2006) National Fire Alarm Code</RTL><BRK/>
<BRK/></REF>
<REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/>
<BRK/>
<RID>UL 536</RID><RTL>(1997; Rev thru Jun 2003) Standard for Flexible 
Metallic Hose</RTL><BRK/>
<BRK/></REF>
</SPT><SPT><TTL>1.2   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section <SRF>23 00 00</SRF> AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST 
SYSTEMS is not included in the project specification, applicable requirements 
therefrom should be inserted and the following paragraph deleted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Section <SRF>23 00 00</SRF> AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS applies to work specified in this 
section.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.2.1   Design Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify the following paragraph to suit project requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Full consideration shall be given to built-in spaces, piping, electrical equipment, ductwork, and all other construction 
and equipment.  System shall be free from operating and maintenance difficulties.</TXT><BRK/>
<BRK/>
<TXT>Devices and equipment shall be a make and type listed by the Underwriters Laboratories, (UL), or FM Global (FM) 
approved.  In the UL and FM publications, the advisory provisions shall be considered to be mandatory. Reference 
to the "authority having jurisdiction" shall be interpreted to mean the Contracting Officer.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select system type.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>System shall be an approved high-pressure carbon dioxide [hand] [hose] [reel] total flooding type system conforming 
to <RID>NFPA 12</RID>.</TXT><BRK/>
<BRK/>
<TXT>Electrical work associated with the system shall meet the requirements of the appropriate sections of Division 
16, "Electrical," pertaining to fire detection.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Section <SRF>23 05 48</SRF> VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 
may be used as a guide for vibration isolation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT><TTL>1.2.2   Performance Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Discharge of carbon dioxide into an enclosed space creates a dangerous 
oxygen deficiency for personnel.  Dilution of oxygen in the air by the carbon 
dioxide concentrations necessary to extinguish the fire will create atmosphere 
that will not sustain life.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Carbon dioxide shall be supplied from<MET> 25-, 40-, 50-kilogram</MET><ENG> 50-, 75-, or 100-pound</ENG> high-pressure cylinders and 
shall be stored in rechargeable containers designed to hold pressurized carbon dioxide in liquid form at atmospheric 
temperatures corresponding to a normal pressure of<MET> 5860 kilopascal at 21 degrees C</MET><ENG> 850 pounds per square inch 
(psi) at 70 degrees F</ENG>.</TXT><BRK/>
<BRK/>
<TXT><SUB>High-pressure cylinders</SUB> shall be constructed, tested, and marked in accordance with U.S. Department of Transportation 
specifications for seamless steel cylinders.</TXT><BRK/>
<BRK/>
<TXT>Each cylinder shall be provided with a safety device to relieve excess pressure safely, in advance of the rated 
cylinder test pressure.  Devices shall be Interstate Commerce Commission approved frangible safety disks.</TXT><BRK/>
<BRK/>
<TXT>Carbon dioxide cylinders shall be supported by suitable racks attached to walls and floor.  Cylinder framing 
shall be fitted with a weighing bar bracket, weight bar, and direct-reading scale to weigh cylinders in place 
without deactivating the system.</TXT><BRK/>
<BRK/>
<TXT>System shall be arranged for fully automatic, manually operated, and remote-pushbutton electric control operation.  
Operating controls shall be the enclosed release type to prevent accidental operation.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review Submittal Description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.</NPR><BRK/>
<BRK/>
<NPR>A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.</NPR><BRK/>
<BRK/>
<NPR>For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.</NPR><BRK/>
<BRK/>
<NPR>Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  Submit the following 
in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM>Connection diagrams shall be submitted indicating the relations and connections of the following 
items.  Drawings shall indicate the general physical layout of all controls, and internal tubing 
and wiring details.</ITM><BRK/>
<BRK/>
<ITM><SUB>Carbon Dioxide Cylinders</SUB><BRK/>
<SUB>Piping Materials</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Installation Drawings</SUB> shall be submitted in accordance with paragraph entitled, "General," of 
this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Equipment Foundation Data</SUB> shall be submitted in accordance with paragraph entitled, "General," 
of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Design Analysis and Calculations</SUB> shall be submitted in accordance with paragraph entitled, "General," 
of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM>Test reports shall be submitted for the following tests in accordance with the paragraph entitled, 
"Field Testing," of this section.</ITM><BRK/>
<BRK/>
<ITM><SUB>Pressure Tests</SUB></ITM><BRK/>
<ITM><SUB>System Tests</SUB></ITM><BRK/>
<ITM><SUB>Impedance Test</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Request for Inspection and Test</SUB> shall be submitted in accordance with paragraph entitled, "Preliminary 
Tests," of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Listing of Product Installation</SUB> shall be submitted for carbon dioxide fire-protection systems 
in accordance with paragraph entitled, "Installation," of this section.</ITM><BRK/>
<BRK/>
<ITM>Certificates shall be submitted for the following items showing conformance with the referenced 
standards contained in this section.</ITM><BRK/>
<BRK/>
<ITM><SUB>Piping Materials</SUB></ITM><BRK/>
<ITM><SUB>High-Pressure Cylinders</SUB></ITM><BRK/>
<ITM><SUB>Escutcheons</SUB></ITM><BRK/>
<ITM><SUB>Supporting Elements</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Operating Instructions</SUB> shall be submitted in accordance with paragraph entitled, "Operating 
Instructions," of this section.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Operation and Maintenance Manuals</SUB> shall be submitted in accordance with paragraph entitled, 
"Operating Instructions," of this section.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   GENERAL</TTL><BRK/>
<BRK/>
<TXT><SUB>Equipment Foundation Data</SUB> shall be submitted for carbon dioxide fire-protection systems consisting of the following 
information:</TXT><BRK/>
<BRK/>
<LST>Equipment weight and operating loads.</LST><BRK/>
<BRK/>
<LST>Horizontal and vertical loads.</LST><BRK/>
<BRK/>
<LST>Size, location, and projection of anchor bolts.</LST><BRK/>
<BRK/>
<LST>Horizontal and vertical clearances for installation, operation and maintenance.</LST><BRK/>
<BRK/>
<LST>Plan dimensions of foundations and relative elevations.</LST><BRK/>
<BRK/>
<LST>Installation requirements such as noise abatement, vibration isolation, and utility service.</LST><BRK/>
<BRK/>
<TXT><SUB>Installation Drawings</SUB> shall be submitted for carbon dioxide fire-protection systems in accordance with the requirements 
of <RID>NFPA 12</RID>.  Drawings shall include details of equipment layout and design.</TXT><BRK/>
<BRK/>
<TXT><SUB>Design Analysis and Calculations</SUB> shall be submitted for carbon dioxide fire-protection systems including spray 
areas, hazard by class, and pressure calculations.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Only UL-listed or FM-approved equipment and devices shall be used in the systems.</TXT><BRK/>
<BRK/>
<TXT>System shall be designed and constructed to include a fixed supply of <SUB>carbon dioxide cylinders</SUB> connected to properly 
sized, fixed piping with fittings and nozzles to direct this agent into an enclosure surrounding the hazard.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   COMPONENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Piping</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Revise the following paragraph to suit project requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Manifolds and distribution <SUB>piping materials</SUB> shall be galvanized, ferrous piping, Schedule [40] [80], conforming 
to [<RID>ASTM A 53/A 53M</RID>] [<RID>ASTM A 106/A 106M</RID>] [<RID>ASME B36.10M</RID>].  Nonferrous drawn seamless copper tubing shall conform 
to<MET> <RID>ASTM B 88M</RID></MET><ENG> <RID>ASTM B 88</RID></ENG>.  Flexible metallic hose shall conform to <RID>UL 536</RID>.</TXT><BRK/>
<BRK/>
<TXT>Pipe sizes shall be reduced in the fitting.  Flush bushings shall not be used.  Brazed joints, when used, shall 
be fused with an alloy with a melting point above<MET> 538 degrees C</MET><ENG> 1,000 degrees F</ENG>.</TXT><BRK/>
<BRK/>
<TXT>Pipe and fittings shall have a minimum bursting pressure of<MET> 34.5 Megapascal</MET><ENG> 5,000 psi</ENG>.  For<MET> DN15 and DN20</MET><ENG> 1/2-inch 
and 3/4-inch</ENG> iron pipe size (ips), the pipe shall be Schedule 40.  For<MET> DN25</MET><ENG> 1 inch</ENG> or greater, the pipe shall 
be Schedule 80.  Standard malleable iron banded fittings or ductile iron fittings shall be used up through<MET> DN20</MET><ENG>
 3/4-inch</ENG> ips.  Extra heavy malleable iron or ductile iron fittings shall be used through<MET> DN50</MET><ENG> 2-inch</ENG> ips.  Forged 
steel fittings shall be used in all sizes over<MET> DN50</MET><ENG> 2 inches</ENG>.</TXT><BRK/>
<BRK/>
<TXT>A dirt trap (leg) consisting of a tee with a capped nipple, at least<MET> 50 millimeter</MET><ENG> 2 inches</ENG> long, shall be installed 
at the end of each pipe run.</TXT><BRK/>
<BRK/>
<TXT>Baffle-type nozzles shall be used for distribution in normal total flooding systems.  Strainers shall be installed 
ahead of small-orifice nozzles to prevent clogging.</TXT><BRK/>
<BRK/>
<TXT>Discharge nozzles shall be permanently marked to identify the nozzle and to show the equivalent single orifice 
diameter regardless of shape and number of orifices.</TXT><BRK/>
<BRK/>
<TXT>Piping shall be concealed to the maximum extent possible.  Piping shall be inspected, tested, and approved before 
being concealed.</TXT><BRK/>
<BRK/>
<TXT>Joint compound for pipe threads shall be pipe cement and oil or graphite and oil.</TXT><BRK/>
<BRK/>
<TXT>Pipe hangers and supports shall be <RID>MSS SP-58</RID> and <RID>MSS SP-69</RID>, adjustable type, zinc-coated.  Spacing shall be as 
follows:</TXT><BRK/>
<MET><TBL><THD><BRK/>
                 Nominal Pipe Size          Maximum Spacing<BRK/>
                       <HL1>(DN)</HL1>                  <HL1>(millimeter)</HL1><BRK/></THD>
<BRK/>
                   15 and under                  2130<BRK/>
<BRK/>
                   32                            2440<BRK/>
<BRK/>
                   40                            2740<BRK/>
<BRK/>
                   50                            3050<BRK/>
<BRK/>
                   65                            3350<BRK/>
<BRK/>
                   80                            3660<BRK/>
<BRK/>
                   90                            3960<BRK/>
<BRK/>
                  100                            4270<BRK/>
<BRK/>
                  125                            4570<BRK/>
<BRK/>
                  150                            4880<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
                 Nominal Pipe Size          Maximum Spacing<BRK/>
                    <HL1>(inches)</HL1>                    <HL1>(feet)</HL1><BRK/></THD>
<BRK/>
                   1 and under                     7<BRK/>
<BRK/>
                   1.25                            8<BRK/>
<BRK/>
                   1.5                             9<BRK/>
<BRK/>
                   2                               10<BRK/>
<BRK/>
                   2.5                             11<BRK/>
<BRK/>
                   3                               12<BRK/>
<BRK/>
                   3.5                             13<BRK/>
<BRK/>
                   4                               14<BRK/>
<BRK/>
                   5                               15<BRK/>
<BRK/>
                   6                               16<BRK/></TBL>
</ENG><BRK/></SPT>
<SPT><TTL>2.2.2   Pipe Sleeves</TTL><BRK/>
<BRK/>
<TXT>Pipe sleeves shall be provided where piping passes through masonry or concrete walls, floors, roofs, and partitions.  
Sleeves in outside walls below and above grade, in floor, or in roof slabs, shall be Schedule 40 zinc-coated 
steel pipe.  Sleeves in partitions shall be zinc-coated sheet steel having a nominal weight of not less than<MET> 
4.4 kilogram per square meter</MET><ENG> 0.90 pound per square foot</ENG>.  Space between piping and the sleeve shall be not less 
than<MET> 6 millimeter</MET><ENG> 0.25 inch</ENG>.  Sleeves shall be placed securely in proper position and location during construction.  
Sleeves shall be of sufficient length to pass through the entire thickness of walls, partitions, or slabs.  Sleeves 
shall extend<MET> 50 millimeter</MET><ENG> 2 inches</ENG> above finished floor slabs.  Space between the pipe and sleeve shall be packed 
with insulation and both ends of the sleeve shall be calked with plastic waterproof cement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   <SUB>Escutcheons</SUB></TTL><BRK/>
<BRK/>
<TXT>Approved-type escutcheons shall be provided for piping passing through floors, walls, and ceilings.  Escutcheons 
shall be one-piece or split-type and, where pipe passes through finished ceilings, shall be chrome-plated. Other 
escutcheons shall be of steel or cast iron, with aluminum paint finish.  Escutcheons shall be securely fastened 
in place with setscrews or other positive means.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Materials and equipment shall be installed in accordance with <RID>NFPA 12</RID>.</TXT><BRK/>
<BRK/>
<TXT>Each system shall be provided complete and ready for operation.</TXT><BRK/>
<BRK/>
<TXT>Each system shall be provided with an approved pressure-relief device designed to operate between<MET> 20 Megapascal</MET><ENG>
 2,400 and 3,000 psi</ENG> and located between the storage cylinder manifolds and any normally close valve.</TXT><BRK/>
<BRK/>
<TXT><SUB>Listing of Product Installation</SUB> shall be submitted for carbon dioxide fire-protection systems showing at least 
5 installed units, similar to those proposed, that have been in successful service for a minimum period of 5 
years.  List shall include purchaser, address of installation, service organization, and date of installation.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   System Control</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1.1   Controls</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select control type.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Actuating control system shall be [manual] [combination] [electric] [pneumatic] [mechanical pull cable].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.1.2   Control Stations for Underfloor Flooding Systems</TTL><BRK/>
<BRK/>
<TXT>Actuation stations for underfloor flooding systems shall be provided at the principal exits from the protected 
area.  A separate actuation shall be provided for the main supply and reserve supply of carbon dioxide at each 
location.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.1.3   Pressure-Operated Fire Alarm Switch</TTL><BRK/>
<BRK/>
<TXT>A pressure-operated switch shall be provided to actuate the building interior fire alarm system upon the discharge 
of gas into the carbon dioxide system piping for each separate system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.1.4   Pressure-Operated Equipment Switch</TTL><BRK/>
<BRK/>
<TXT>A pressure-operated switch shall be provided to automatically shut down the air handling equipment serving the 
protected space upon the discharge of gas into the carbon dioxide system piping for each separate system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.1.5   Control Panel</TTL><BRK/>
<BRK/>
<TXT>Means shall be provided for complete electrical supervision of actuating circuitry.  A modular type panel in 
a flush- or surface-mounted steel cabinet with hinged door and cylinder lock shall be installed.  Control panel 
shall be a neat, compact, factory-wired assembly containing the parts and equipment required to provide specified 
operating and supervisory functions of the system.  A ground fault condition that prevents the required operation 
of the system or a single break in any of the actuating circuits shall result in the activation of a system trouble 
bell.  Loss of ac power shall also result in the operation of the system trouble bell.  Trouble bell shall sound 
continuously until the system has been restored to normal at the control panel.  A silencing switch shall be 
provided to transfer the trouble signals to an indicating lamp in accordance with <RID>NFPA 72</RID>.</TXT><BRK/>
<BRK/>
<TXT>In addition to the normal system trouble bell, a remote<MET> 100 millimeter,</MET><ENG> 4-inch,</ENG> system trouble bell shall be 
provided together with a rigid plastic or metal identification sign that reads CARBON DIOXIDE SYSTEM TROUBLE.  
Lettering shall be a minimum of<MET> 25 millimeter</MET><ENG> 1 inch</ENG> high.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.2   System Power</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.2.1   Primary Supply</TTL><BRK/>
<BRK/>
<TXT>System power shall be 120-volt, 60-hertz service, transformed through a two-winding isolation-type transformer 
and rectified to 24 volts dc for operating trouble signal and actuating circuits.  A secondary dc power supply 
shall be provided for operation of the system if the ac power fails. Transfer from normal to emergency power 
or restoration from emergency to normal power shall be fully automatic.  Trouble lights shall be located on the 
door of the cabinet.  A<MET> 100 millimeter</MET><ENG> 4-inch</ENG> trouble bell shall be located above the top of the cabinet.  Cabinet 
shall be finished on the inside and outside in red enamel with prominent rigid plastic or metal identification 
plates attached.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.2   Secondary Supply</TTL><BRK/>
<BRK/>
<TXT>Secondary power supply shall include [nickel cadmium] [lead calcium] [sealed lead acid] batteries and charger.  
Dry cell batteries shall not be used.  Batteries shall be housed in a well-constructed steel cabinet with cylinder 
lock.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.3   Storage Batteries</TTL><BRK/>
<BRK/>
<TXT>Batteries shall be of the proper ampere-hour capacity to operate the system under supervisory conditions for 
up to 60 hours.  Calculations substantiating the battery capacity shall be provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.4   Battery Charger</TTL><BRK/>
<BRK/>
<TXT>Battery charger shall provide completely automatic high/low charging rate capable of recovery of the batteries 
from full discharge to full charge in 24 hours or less.  An ammeter showing rate of charge and a voltmeter to 
indicate state of battery charge shall be provided.  A red pilot light shall indicate when batteries are manually 
placed on a high rate of charge, if a high-rate switch is provided.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.3   Electrical Work</TTL><BRK/>
<BRK/>
<TXT>Electrical work is specified in Section <SRF>28 31 13.00 40</SRF> FIRE DETECTION AND ALARM CONTROL, GUI, AND LOGIC SYSTEMS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Operating Instructions</TTL><BRK/>
<BRK/>
<TXT>Operating instructions shall be provided at each remote control station.  Instructions shall clearly indicate 
necessary steps for the operation of the system.</TXT><BRK/>
<BRK/>
<TXT>Contractor shall submit [6] [_____] copies of the <SUB>Operation and Maintenance Manuals</SUB> 30 calendar days prior to 
testing the carbon dioxide fire-protection systems.  Data shall be updated and resubmitted for final approval 
no later than 30 calendar days prior to contract completion.</TXT><BRK/>
<BRK/>
<TXT><SUB>Operating Instructions</SUB> shall be submitted for carbon dioxide fire-protection systems consisting of raised or 
embossed white letters on red rigid plastic or enameled steel background and shall be of adequate size to permit 
them to be easily read.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Field Painting</TTL><BRK/>
<BRK/>
<TXT>Painting of the system shall be in accordance with Section <SRF>09 90 00.00 40</SRF> PAINTING AND COATING.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<TXT><TST>Testing to determine conformance with the requirements shall be conducted in the presence of the Contracting 
Officer.</TST></TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Preliminary Tests</TTL><BRK/>
<BRK/>
<TXT><SUB>Pressure tests</SUB> and <SUB>system tests</SUB> shall be performed and recorded.</TXT><BRK/>
<BRK/>
<TXT><TST>Each piping system shall be tested pneumatically at<MET> 1050 kilopascal</MET><ENG> 150 pounds per square inch gage</ENG> and shall 
show no leakage or reduction in gage pressure after 2 hours.  Upon completion and before final acceptance of 
the work, each piping system shall be tested by discharging a minimum of one<MET> 34 kilogram</MET><ENG> 75-pound</ENG> <SUB>high-pressure 
cylinders</SUB> of carbon dioxide to demonstrate the reliability and proper functioning of pressure-operated switches 
and the discharge of carbon dioxide gas from each system discharge nozzle.  Remote control stations, and all 
other components, <SUB>supporting elements</SUB> and accessories shall be tested individually to demonstrate proper functioning.</TST>
   Storage batteries shall be given an <SUB>impedance test</SUB> of each cell and the results recorded to be used as baselines.  
Test results shall be provided to the Contracting Officer.  Test results shall have a cover letter/sheet clearly 
marked with the System name, date, and the words "Final Test Reports - Forward to the Systems Engineer/Condition 
Monitoring Office/Predictive Testing Group for inclusion in the Maintenance Database." At the completion of tests 
and corrections, a signed and dated certificate shall be submitted to the Contracting Officer attesting to the 
satisfactory completion of all testing and that the system is in operating condition.</TXT><BRK/>
<BRK/>
<TXT>A written <SUB>Request for Inspection and Test</SUB> shall be submitted to the Contracting Officer for carbon dioxide fire-protection 
systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Formal Tests</TTL><BRK/>
<BRK/>
<TXT><TST>At a time to which the Government has agreed, the Government Fire Protection Engineer will witness formal tests 
and approve systems before they are accepted.  An experienced technician regularly employed by the system installer 
shall be present during the inspection.  At this inspection any or all of the required tests shall be repeated 
as directed by the Contracting Officer.  Carbon dioxide, instruments, personnel, appliances, and equipment for 
testing shall be furnished by the Contractor at his expense.</TST></TXT><BRK/>
<BRK/></SPT>
<NED/><SPT><TTL>3.2.3   Manufacturer's Representative</TTL><BRK/>
<BRK/>
<TXT><TST>An experienced manufacturer's field engineer shall be provided to supervise <NED/>installation and testing of the system.</TST></TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>