USACE / NAVFAC / AFCESA / NASA   UFGS-21 22 00.00 20 (April 2006)<BRK/>
                                 ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>      Replacing without change<BRK/>
                                 UFGS-13966N (September 2000)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 21 22 00.00 20</SCN><BRK/>
<BRK/>
<STL>HALON 1301 FIRE EXTINGUISHING</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>Halon 1301 fire 
extinguishing systems for protection of data processing equipment and similar 
electronics occupancies</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use of this guide specification requires a waiver in accordance with 
NAVFAC Ozone Depleting Substances (ODS) Procurement Policy and Procedures with 
the approval of a Senior Acquisition Officer (SAO).  With minor changes, this 
guide can be adapted to other occupancies or needs, such as the protection of 
electric generators and flight simulators.  The extent and location of the work 
to be accomplished, and the type of electric service, cables, wire, conduit, 
location of storage cylinders, actuating stations, control panels, storage batteries, 
battery chargers, and accessories indicated, specified, or necessary for the 
complete installation required shall be indicated on the project drawings.  
If there are questions concerning system design, the cognizant Engineering Field 
Division Fire Protection Engineer should be consulted.  Due to the toxicity 
of decomposed Halon, an engineered smoke and Halon removal system (not part 
of this specification) will be required for each protected space.  Such a system 
shall be manually key operated, for fire department use only.  See also NFPA 
12A section on relief venting.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following information should be shown on the drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  On the electrical power floor plans show locations of control panel, annunciator(s), 
audible and visual alarm devices, manual actuation stations, point of connection 
to the building fire evacuation alarm system, remote trouble device, and point 
of connection to the incoming power supply and fusible safety switch. Do not 
show conduit sizes or number of conductors for DC circuits.  Do not show locations 
of smoke detectors.</NPR><BRK/>
<BRK/>
<NPR>2.  Show single line riser diagram for all detection, activation, and alarm 
circuits. Connection of equipment shall be indicated by circuit runs and not 
conduit runs.  Do not indicate number and size of conductors for interconnection 
of fire alarm components.</NPR><BRK/>
<BRK/>
<NPR>3.  On the mechanical floor plans, show locations for Halon storage containers.  
Show areas of system coverage, with zone designations (if multiple zones).  
Do not show Halon piping layout and nozzle placement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B16.11</RID><RTL>(2005) Forged Fittings, Socket-Welding and Threaded</RTL><BRK/><BRK/><RID>ASME B16.3</RID><RTL>(2006) Malleable Iron Threaded Fittings, Classes 150 and 300</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 106/A 106M</RID><RTL>(2008) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service</RTL><BRK/><BRK/><RID>ASTM A 53/A 53M</RID><RTL>(2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless</RTL><BRK/><BRK/></REF><REF><ORG>FM GLOBAL (FM)</ORG><BRK/><BRK/><RID>FM P7825</RID><RTL>(2005) Approval Guide</RTL><BRK/><BRK/></REF><REF><ORG>MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY (MSS)</ORG><BRK/><BRK/><RID>MSS SP-58</RID><RTL>(2002) Standard for Pipe Hangers and Supports - Materials, Design and Manufacture</RTL><BRK/><BRK/><RID>MSS SP-69</RID><RTL>(2003; R 2004) Standard for Pipe Hangers and Supports - Selection and Application</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 12A</RID><RTL>(2008) Halon 1301 Fire Extinguishing Systems</RTL><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/><RID>NFPA 72</RID><RTL>(2006) National Fire Alarm Code</RTL><BRK/><BRK/><RID>NFPA 75</RID><RTL>(2008) Protection of Information Technology Equipment</RTL><BRK/><BRK/><RID>NFPA 90A</RID><RTL>(2008) Standard for the Installation of Air Conditioning and Ventilating Systems</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF DEFENSE (DOD)</ORG><BRK/><BRK/><RID>MIL-STD-101</RID><RTL>(Rev B) Color Code for Pipelines &amp; for Compressed Gas Cylinders</RTL><BRK/><BRK/></REF><REF><ORG>U.S. GENERAL SERVICES ADMINISTRATION (GSA)</ORG><BRK/><BRK/><RID>FS A-A-2962</RID><RTL>(Rev J) Enamel, Alkyd, Gloss, Low VOC Content</RTL><BRK/><BRK/><RID>FS A-A-58092</RID><RTL>(Basic) Tape, Antiseize, Polytetrafluoroethylene</RTL><BRK/><BRK/><RID>FS TT-P-645</RID><RTL>(Rev B) Primer, Paint, Zinc-Molybdate, Alkyd Type</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL Fire Prot Dir</RID><RTL>(2008) Fire Protection Equipment Directory</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITION</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Year 2000 compliant - means computer controlled facility components that accurately process 
date and time data (including, but not limited to, calculating, comparing, and sequencing) from, 
into, and between the twentieth and twenty-first centuries, and the years 1999 and 2000 and 
leap year calculations.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   GENERAL REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Section <SRF>23 03 00.00 20</SRF> BASIC MECHANICAL MATERIALS AND METHODS, applies to this section, with the additions and 
modifications specified herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Description of Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Identify the rooms, spaces or areas, as appropriate, which are to be 
protected by each type of system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The work includes the designing and providing of approved Halon 1301 underfloor [and room] flooding extinguishing 
system(s) for protection of [_____].  The design, equipment, materials, installation and workmanship shall be 
in strict accordance with the required and advisory provisions of <RID>NFPA 12A</RID>, except as modified herein.  Each 
system shall include all materials, accessories and equipment inside and outside the building necessary to provide 
each system complete and ready for use.  Design and install each system to give full consideration to built-in 
spaces, piping, electrical equipment, ductwork and all other construction and equipment and to be free from operating 
and maintenance difficulties, all in accordance with detailed drawings to be submitted to the Contracting Officer 
for approval.  Devices and equipment for fire protection service shall be of a make and type listed by the Underwriter's 
Laboratories, Inc., or approved by the Factory Mutual System.  In the publications referred to herein, the advisory 
provisions shall be considered to be mandatory, as though the word "shall" had been substituted for "should" 
wherever it appears; reference to the "authority having jurisdiction" shall be interpreted to mean the [_____] 
Division Fire Protection Engineer.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
[<TXT>The fire protection engineer, [_____] Division, Naval Facilities Engineering Command will review any approve 
all submittals in this section requiring Government approval.</TXT>]<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For projects administered by the Pacific Division, Naval Facilities Engineering 
Command, use the optional "SUBMITTALS" article immediately below and delete 
the general "SUBMITTALS" article above for Navy projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
[<TXT>The [_____] Division, Naval Facilities Engineering Command, Fire Protection Engineer delegates the authority 
to the Quality Control (QC) Representative's U.S. Registered Fire Protection Engineer for review and approval 
of submittals required by this section.  Submit to the [_____] Division, Naval Facilities Engineering Command, 
Fire Protection Engineer one set of all approved submittals and drawings immediately after approval but no more 
later than 15 working days prior to final inspection.</TXT>]<BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Halon system piping layout</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Field wiring diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Storage cylinders</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Discharge heads</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Manifolds</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Valves</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Discharge nozzles</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Pipe</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Pipe hangers and supports</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Control panel</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Manual actuation stations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Pressure switches</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Storage batteries</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Smoke detectors</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Audible alarms</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Visual alarms</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Annunciator panels</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Electromagnetic door holder release</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Battery charger</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Fittings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Halon discharge calculations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Battery capacity calculations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The qualifications clause in this guide specification has been approved 
by NAVFACENGCOMHQ in accordance with the requirements of NAVFAC P-68. The paragraph 
in this guide specification may be used without any other NAVFACHQ approval 
or request for waiver.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM><SUB>Record of Prior Installations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Halon fire extinguishing system</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Halon fire extinguishing system</SUB>, Data Package 3[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Remote control station operating instructions</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Record drawings</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The qualifications clause in this guide specification has been approved 
by NAVFACHQ in accordance with the requirements of NAVFAC P-68. The paragraph 
in this guide specification may be used without any other NAVFACHQ approval 
or request for waiver.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Record of Prior Installations</SUB></TTL><BRK/>
<BRK/>
<TXT>Prior to installation, submit data showing of Halon fire extinguishing systems of the same type and design as 
specified herein.  The data shall include the names and locations of at least two locations where the Contractor 
has installed such systems. The Contractor shall indicate the type and design of these systems and certify that 
these systems have performed satisfactorily in the manner intended for a period of not less than 18 months.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For projects administered by the Pacific Division, Naval Facilities Engineering 
Command, include the following optional paragraph requiring the minimum qualification 
of a NICET Level-III technician for preparation of all fire protection system 
drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Qualifications of System Technician:  Installation drawings, shop drawing and as-built drawings shall be prepared, 
by or under the supervision of, an individual who is experienced with the types of works specified herein, and 
is currently certified by the National Institute for Certification in Engineering Technologies (NICET) as an 
engineering technician with minimum Level-III certification in Special Hazard System program.  Contractor shall 
submit data for approval showing the name and certification of all involved individuals with such qualifications 
at or prior to submittal of drawings.]</TXT><BRK/>
<BRK/>
<TXT>Contractor shall have successfully installed Halon fire extinguishing systems of the same type and design as 
specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>Halon Fire Extinguishing System</SUB></TTL><BRK/>
<BRK/>
<TXT>When preliminary field tests have been completed and all necessary corrections made, submit to the Contracting 
Officer a signed and dated letter attesting to the satisfactory completion of testing and stating that the systems 
is in operating condition.  The letter shall include a written request for a formal inspection and test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   Manufacturer's Representative</TTL><BRK/>
<BRK/>
<TXT>Provide the services of a manufacturer's authorized representative or technician, experienced in the installation 
and operation of the type of system being provided to supervise the installation and testing, including final 
testing, adjustment of the system and to provide instruction to Government personnel.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   DESIGN OF HALON FIRE EXTINGUISHING SYSTEMS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete reference to NFPA 75 only if the protected space(s) contain no 
automatic data processing requirement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Design and installation of Halon fire extinguishing systems shall conform to <RID>NFPA 12A</RID>, <RID>NFPA 70</RID>, <RID>NFPA 72</RID>, [and <RID>
NFPA 75</RID>] and to the requirements as hereinafter specified.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Piping Layout and Wiring Diagrams</TTL><BRK/>
<BRK/>
<TXT>Annotate <SUB>halon system piping layout</SUB> with reference points for design.  In <SUB>field wiring diagrams</SUB>, show locations 
of devices and points of the system.  Prepare working drawings on sheets not smaller than<MET> A0 1189 x 841 mm</MET><ENG> 30 
by 42 inches</ENG>, in accordance with the requirements for "Plans" as specified in <RID>NFPA 12A</RID>.  Include data essential 
to the proper installation of each system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   Calculations</TTL><BRK/>
<BRK/>
<TXT>Submit <SUB>halon discharge calculations</SUB> verifying total storage requirements, flooding concentrations, discharge 
times, flow through the piping network, pipe sizes, and nozzle orifice sizes, in accordance with the manufacturer's 
listed design manual and <RID>NFPA 12A</RID>.  Submit substantiating <SUB>battery capacity calculations</SUB> showing capacity, supervisory 
and alarm power requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3   Flooding Concentration</TTL><BRK/>
<BRK/>
<TXT>The system shall totally flood the protected area(s) providing a volumetric concentration of Halon 1301 of not 
less than 5 percent nor more than 7 percent at<MET> 21 degrees C</MET><ENG> 70 degrees F</ENG>.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.3.1   Halon Concentration</TTL><BRK/>
<BRK/>
<TXT>The Halon concentration shall be based upon shutting down the heating, ventilation and air conditioning (HVAC) 
systems at the time of agent discharge.  The required Halon concentration shall be maintained in the protected 
area(s) for a minimum of ten minutes.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.4   Discharge Time</TTL><BRK/>
<BRK/>
<TXT>The maximum Halon liquid discharge time shall be 10 seconds.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.5   Reserve Supplies</TTL><BRK/>
<BRK/>
<TXT>Each system shall be provided with its own connected reserve supply of Halon 1301.  Each reserve supply shall 
contain an amount of Halon 1301 equal to the primary supply of the system to which it is connected.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.6   <SUB>Record Drawings</SUB></TTL><BRK/>
<BRK/>
<TXT>Upon completion, and before final acceptance of the work, submit a complete set of as-built (record) working 
drawings, [including complete as-built circuit diagrams,] of each Halon 1301 system for record purposes.  The 
as-built working drawings shall be not smaller than<MET> A0 1189 x 841 mm</MET><ENG> 30 by 42 inches</ENG> reproducible drawings on 
mylar film with title block (<MET>200 by 100 mm</MET><ENG>8 by 4 inches</ENG>) similar to full size contract drawings.  The as-built 
working drawings shall be furnished in addition to the record drawings required by Section <SRF>01 78 00</SRF> CLOSEOUT 
SUBMITTALS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.7   SYSTEM CONTROL</TTL><BRK/>
<BRK/>
<TXT>Provide all apparatus, accessories, components and associated materials specified or necessary to furnish each 
system complete and ready for operation.  All equipment shall be the current products of their manufacturers.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.7.1   Controls</TTL><BRK/>
<BRK/>
<TXT>Detection and actuating control system shall be complete, Class A electrically supervised combination automatic 
and manual.  Automatic actuation shall be accomplished by smoke detectors.  Manual actuation shall be accomplished 
by electrical manual actuation stations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.2   Sequence of Operation</TTL><BRK/>
<BRK/>
<TXT>Smoke detection system shall be cross-zoned, priority matrix, or have common circuit individual detector verification 
capability.  If a cross-zoned system is used, each protected area shall contain two smoke detection circuits 
(zones), with each circuit having an equal number of detectors connected thereto and no two adjacent detectors 
connected to the same zone.  Upon activation of any smoke detector, the system shall simultaneously activate 
pre-discharge alarms in the protected area(s), signal the building fire alarm control panel(s) to activate the 
building fire evacuation alarms, and send a signal to the base fire department via the base fire alarm system.  
Upon activation of a second detector (on the opposite zone of a cross-zoned system), the systems shall immediately 
shut down [computer] [_____] equipment and air conditioning power, close all fire dampers [release all doors 
to permit closing] activate the discharge alarms, and initiate an adjustable 0-60 second time delay.  At the 
end of the time delay, Halon shall discharge into the protected area [and post-discharge visual alarms shall 
activate].</TXT><BRK/>
<BRK/>
<SPT><TTL>1.7.2.1   Activation By Manual Station</TTL><BRK/>
<BRK/>
<TXT>Upon activation by a manual station, the system shall immediately perform all the above listed alarm functions 
and shut-down functions, and initiate the adjustable time delay.  At the end of the delay, Halon shall discharge 
into the protected area.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.7.2.2   Manual Activation of Inhibit Switch</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Inhibit switches are optional devices which decrease system reliability 
and shall not be used without approval of the Division Fire Protection Engineer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Upon manual activation of the inhibit switch, equipment shutdown and agent discharge shall be delayed.  All other 
functions shall continue unimpeded. Upon release of inhibit switch, shutdown and discharge functions shall resume.  
Time delay shall not reset and shall resume countdown to discharge after release of switch.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.7.3   Transfer to reserve supply</TTL><BRK/>
<BRK/>
<TXT>Transfer from system main supply to reserve supply shall be controlled by a "main-reserve" switch at the system 
control panel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.4   <SUB>Remote Control Station Operating Instructions</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit the proposed legend for remote control station operating instructions.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   PIPING</TTL><BRK/>
<BRK/>
<TXT>Conceal piping to the maximum extent possible.  <TST>Piping shall be inspected, tested and approved before being concealed.</TST>
  Provide fittings for changes in direction of piping and for all connections.  Make changes in piping sizes 
through standard reducing pipe fittings; the use of bushings is not permitted.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   <SUB>Pipe</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 53/A 53M</RID> or <RID>ASTM A 106/A 106M</RID>, black or zinc-coated, threaded, Schedule 40.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   <SUB>Fittings</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>ASME B16.11</RID> or <RID>ASME B16.3</RID>, Class 300, zinc-coated, threaded, except Class 150 or 300 for pipe<MET> 20 mm</MET><ENG> 3/4 inch</ENG> 
or smaller.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   <SUB>Pipe Hangers and Supports</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>MSS SP-58</RID> and <RID>MSS SP-69</RID>, adjustable type.  Rods, hangers and supports shall be zinc plated.  Provide pipe hangers 
and supports as follows:</TXT><BRK/>
<MET><TBL><THD><BRK/>
         Nominal Pipe                     Maximum<BRK/>
         <HL1>Size (mm)</HL1>                    <HL1>Spacing (meters)</HL1><BRK/></THD>
<BRK/>
            25 and under                     2.00<BRK/>
            32                               2.50<BRK/>
            40                               2.75<BRK/>
            50                               3.00<BRK/>
            65                               3.25<BRK/>
            80                               3.75<BRK/>
            90                               4.00<BRK/>
           100                               4.25<BRK/>
           125                               4.50<BRK/>
           150                               5.00<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
         Nominal Pipe                     Maximum<BRK/>
         <HL1>Size (inches)</HL1>                 <HL1>Spacing (feet)</HL1><BRK/></THD>
<BRK/>
         1 and under                          7<BRK/>
         1.25                                 8<BRK/>
         1.5                                  9<BRK/>
         2                                   10<BRK/>
         2.5                                 11<BRK/>
         3                                   12<BRK/>
         3.5                                 13<BRK/>
         4                                   14<BRK/>
         5                                   15<BRK/>
         6                                   16<BRK/></TBL>
</ENG><BRK/></SPT>
<SPT><TTL>2.1.4   Pipe Sleeves</TTL><BRK/>
<BRK/>
<TXT>Provide where piping passes through masonry or concrete walls, floors, roofs and partitions.  Sleeves in outside 
walls below and above grade, in floor, and in roof slabs, shall be standard weight zinc coated steel pipe. Sleeves 
in partitions shall be zinc coated sheet steel having a nominal weight of not less than<MET> 4.40 kg per sq meters</MET><ENG>
 0.90 pounds per square foot</ENG>.  Space between piping and the sleeve, shall be not less than<MET> 13 mm</MET><ENG> 0.5 inch</ENG>.  Sleeves 
shall be of sufficient length to pass through the entire thickness of walls, partitions and slabs.  Extend sleeves 
in floor slabs<MET> 50 mm</MET><ENG> 2 inches</ENG> above the finished floor.  Pack space between the pipe and sleeve with asbestos 
free insulation and calk at both ends of the sleeve with plastic waterproof cement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   Escutcheon Plates</TTL><BRK/>
<BRK/>
<TXT>Provide piping passing through floors, walls and ceilings with one piece or split type plates.  Plates where 
pipe passes through finished ceilings shall be chromium plated.  Other plates shall be of steel or cast iron, 
with aluminum paint finish.  Securely anchor plates in place.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6   <SUB>Discharge Nozzles</SUB></TTL><BRK/>
<BRK/>
<TXT>Fabricated of corrosion resistant materials.  All nozzles shall be designed so that the orifice piece is connected 
directly to the supply pipe.  The size of pipe and nozzles shall be determined from the calculated flow and terminal 
pressures in accordance with established, recognized test data contained in the manufacturer's listed design 
manual.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.7   <SUB>Storage Cylinders</SUB></TTL><BRK/>
<BRK/>
<TXT>Constructed of high strength alloy steel, conforming to all applicable specifications of the Department of Transportation.  
Container design shall permit on-site reconditioning and refilling when required.  Safety valves, <SUB>manifolds</SUB>, 
pressure gauges, and <SUB>pressure switches</SUB> shall be provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8   Jointing Compound</TTL><BRK/>
<BRK/>
<TXT>Tape conforming to <RID>FS A-A-58092</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   <SUB>CONTROL PANEL</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide complete electrical supervision of all circuits.  Install modular type panel in a [flush] [surface] mounted 
steel cabinet with hinged door and cylinder lock.  Switches and other controls shall not be accessible without 
the use of a key.  The control panel shall be a neat, compact, factory-wired assembly containing all parts and 
equipment required to provide specified operating and supervisory functions of the system.  Panel cabinet shall 
be finished on the inside and outside with factory-applied enamel finish.  [Provide separate alarm and trouble 
lamps located on the exterior of the cabinet door or visible through the cabinet door for each zone initiating 
circuit.]  Provide prominent rigid plastic or metal identification plates for all lamps and switches.  A single 
open or ground fault condition in any detection or actuation circuit shall not result in any loss of system function, 
but shall cause the actuation of system trouble signals.  A ground fault condition or single break in any other 
circuit shall result in the activation of the system trouble signals. [Supervision of wiring external to the 
control panel for mechanical equipment shutdown is not required, provided a break in such wiring will cause the 
associated mechanical equipment to shut down.]  Loss of AC power, a break in the standby battery power circuits, 
or abnormally low battery voltage shall also result in the operation of the system trouble signals. The abnormal 
position of any system switch in the control panel shall also result in the operation of the system trouble signals.  
Trouble signals shall operate continuously until the system has been restored to normal at the control panel.  
Provide a<MET> 100 mm</MET><ENG> 4 inch</ENG> remote system trouble bell, installed [in a constantly attended area] [where shown], 
arranged to operate in conjunction with the integral trouble signals of the panel.  Provide remote bell with 
a rigid plastic or metal identification sign which reads "Halon System Trouble."  Lettering on identification 
sign shall be a minimum of<MET> 25 mm</MET><ENG> one inch</ENG> high.  Panel shall be provided with the following switches:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Trouble silencing switch which transfers trouble signals to an indicating lamp.  Upon correction 
of the trouble condition, audible signals will again sound until the switch is returned to its 
normal position, or the trouble circuit shall be automatically restored to normal upon correction 
of the trouble condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Evacuation alarm silence switch which when activated will silence all alarm devices and 
cause operation of system trouble signals.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[3.  [Master box] Disconnect switch which when activated will disconnect the system from the 
base fire alarm system and cause operation of the Halon system trouble signals.]</ITM><BRK/>
<BRK/>
<TXT>System control panel shall be <RID>UL Fire Prot Dir</RID> listed or <RID>FM P7825</RID> approved for extinguishing system control (releasing 
device service).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   SECONDARY POWER SUPPLY</TTL><BRK/>
<BRK/>
<TXT>Supply shall include nickel cadmium, lead calcium or sealed lead acid batteries and charger.  Drycell batteries 
are not allowed.  House batteries in a well constructed steel cabinet with cylinder lock.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.3.1   <SUB>Storage Batteries</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide batteries of adequate ampere-hour rating to operate the system under supervisory conditions for 60 hours 
at the end of which time batteries shall be capable of operating the entire system in a full alarm condition 
for not less than 30 minutes.  Provide calculations substantiating the battery capacity.  Provide reliable separation 
between cells to prevent contact between terminals of adjacent cells and between battery terminals and other 
metal parts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   <SUB>Battery Charger</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide completely automatic high/low charging rate type charger capable of recovery of the batteries from full 
discharge to full charge in 24 hours or less.  Provide an ammeter for recording rate of charge and a voltmeter 
to indicate the state of battery charge.  Provide a red pilot light to indicate when batteries are manually placed 
on a high rate of charge as part of the unit assembly if a high-rate switch is provided.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   <SUB>MANUAL ACTUATION STATIONS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where there is no room flooding or no raised floor space, omit requirement 
for separate actuation stations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide actuation stations for systems at the exits from the protected areas.  Operation of a manual station 
shall cause the control panel to go into full alarm condition and discharge Halon into the protected area following 
the adjustable time delay.  [Provide separate, clearly labelled, manual stations for control of underfloor discharge 
and room flooding.] Stations shall be of a type not subject to operation by jarring or vibration.  Stations shall 
have a dual action release configuration to prevent accidental system discharge.  Break-glass-front stations 
are not permitted; however a pull lever break-glass-rod type is acceptable. Station color shall be red or orange.  
Warning signs shall be placed at each station indicating that operation of the station will cause immediate Halon 
discharge.  Where building fire alarm pull stations are also mounted at the exits from the protected areas, they 
shall be separated from Halon actuation stations by at least<MET> one meter</MET><ENG> 3 feet</ENG> horizontally, labels shall be provided 
to clearly distinguish building fire alarm stations from Halon stations and stations shall be of different colors.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   <SUB>SMOKE DETECTORS</SUB></TTL><BRK/>
<BRK/>
<TXT>Designed for detection of abnormal smoke densities by the [ionization] [photoelectric] principle.  Necessary 
control and/or power modules required for operation of the device shall be integral with the main control panel. 
Detectors shall be compatible with main control panel provided and shall be suitable for use in a supervised 
circuit.  Detectors shall not draw power from the initiating circuit.  Operating power shall be taken from a 
separate supervised power supply circuit.  Malfunction of the electrical circuitry to the detector or its control 
or power units shall result in the operation of the system trouble devices.  Detectors shall not be susceptible 
to operation by changes in relative humidity.  Each detector shall contain a visible indicator lamp that shall 
show when the unit is activated.  Each detector shall be the plug-in type in which the detector base contains 
screw terminals for making all wiring connections.  Remote indicator lamp shall be provided for each detector 
that is located above suspended ceilings, beneath raised floors or otherwise concealed from view.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.5.1   Ionization Detectors</TTL><BRK/>
<BRK/>
<TXT>Multiple chamber type which is responsive to both visible and invisible products of combustion.  The sensitivity 
of each detector shall be field adjustable to compensate for the conditions under which it is to operate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   Photoelectric Detectors</TTL><BRK/>
<BRK/>
<TXT>Operate on a multiple cell concept using a light-emitting diode (LED) light source.  Failure of the LED shall 
not cause an alarm condition but shall operate the detector trouble indicating lamp.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.3   Detector Spacing and Location</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Do not show detector locations on plans, however a detail for mounting 
smoke detectors to the raised flooring system in compliance with this paragraph 
should be shown.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In accordance with the requirements of <RID>NFPA 72</RID>, the manufacturer's recommendations and the requirements stated 
herein.  Spacing and location of detectors shall take into account the airflow into the room and supply diffusers.  
Detectors shall not be placed closer than<MET> 1 1/2 meters</MET><ENG> 5 feet</ENG> from any discharge grille.  Spacing of detectors 
on room ceilings shall not exceed<MET> 41.80 square meter</MET><ENG> 450 square feet</ENG> per detector.  Spacing of detectors under 
raised floors shall not exceed<MET> 23.25 square meter</MET><ENG> 250 square feet</ENG> per detector.  Detectors installed beneath 
raised floors shall be mounted with the detector base within<MET> 50 mm</MET><ENG> 2 inches</ENG> of the underside of the raised floor 
framing, with the detector facing downward.  Where the space under the raised floor is less than<MET> 305 mm</MET><ENG> 12 inches</ENG>
 in height, detectors shall be mounted with their bases either horizontal or vertical, with the detection chambers 
mounted in the upper half of the underfloor space.  Under no circumstances shall detectors be mounted facing 
upward.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT>[<TTL>2.6   DUCT SMOKE DETECTORS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Automatic dampers are required in all ducts passing through walls, floors, 
and ceilings, to prevent the leakage of Halon from the protected space, and 
to prevent the communication of fire and smoke.  Locations of dampers should 
be shown on HVAC plans.  Additional smoke dampers may be required in systems 
over<MET> 424,740 L/m</MET><ENG> 15,000 cfm</ENG> by NFPA 90A, <HL1>Air Conditioning and Ventilating Systems</HL1>
.  Coordinate with Section <SRF>23 09 53.00 20</SRF>, SPACE TEMPERATURE CONTROL SYSTEMS.  
Provide access door in duct at each damper location.  Connect duct detectors 
to Halon system control panel only if no building fire alarm system is provided.  
Otherwise delete paragraph entitled "Duct Smoke Detectors."</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In accordance with the requirements of <RID>NFPA 90A</RID>, the manufacturer's recommendations and the requirements stated 
herein.  Detectors required in ducts shall be ionization type and listed by <RID>UL Fire Prot Dir</RID> or <RID>FM P7825</RID>for duct 
installation.  Provide duct detectors with an approved duct housing, mounted exterior to the duct, with perforated 
sampling tubes extending across the width of the duct.  Activation of duct detectors shall cause shut down of 
the associated air-handling unit, annunciation at the control panel, tripping of the [master box] [transmitter], 
and sounding of building fire evacuation alarms.  Detector shall have a test port or switch.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.7   INHIBIT SWITCH</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Inhibit switches are optional devices which decrease system reliability 
and shall not be used without approval of the Division Fire Protection Engineer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide one switch where shown.  Activation of switch shall delay only equipment shutdown and agent discharge.  
Switch shall be guarded, spring-loaded type which operates only when pressure is manually applied to the switch.  
Upon release of manual pressure, switch shall de-activate allowing delayed functions to resume.  After start 
of agent discharge, switch shall have no effect.  Activation of switch during normal (non-alarm) conditions shall 
cause activation of system trouble signals.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.8   ALARM SIGNALLING DEVICES</TTL><BRK/>
<BRK/>
<TXT>Provide each protected area with audible and visual alarms located where shown.  All alarm circuits shall be 
electrically supervised.  Provide separate and distinct audible and visual pre-discharge and discharge signals.  
Where the building is equipped with a separate fire evacuation alarm system the discharge signals shall also 
be distinct from those used by the building fire evacuation system.  Each signal device shall be provided with 
a rigid plastic or metal identification sign with lettering a minimum of<MET> 40 mm</MET><ENG> 1.5 inches</ENG> high.  The pre-discharge 
alarm shall be labelled "FIRE" and the discharge alarm shall be labelled "HALON DISCHARGE." [Post-discharge visual 
alarms shall be located outside all entrances to the protected areas, and shall be provided with signs reading 
"HALON DISCHARGED WHEN FLASHING - DO NOT ENTER].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.8.1   <SUB>Audible Alarms</SUB></TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Alarm bells</ITM><BRK/>
<BRK/>
<TXT><MET> 250 mm</MET><ENG> 10 inch</ENG> [surface mounted] [recessed] with matching mounting back box.  Bells shall be of the vibrating 
type suitable for use in an electrically supervised circuit.  Bells shall be of the underdome type and produce 
a sound output rating of at least 90 decibels at<MET> 3 meters</MET><ENG> 10 feet</ENG>.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Alarm horns</ITM><BRK/>
<BRK/>
<TXT>[Recessed,] [Surface mounted,] vibrating type suitable for use in an electrically supervised circuit and shall 
have a sound output rating of at least 90 decibels at<MET> 3 meters</MET><ENG> 10 feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.2   <SUB>Visual Alarms</SUB></TTL><BRK/>
<BRK/>
<TXT>[Flush] [Surface mounted] lamp assembly suitable for use in an electrically supervised circuit.  Lamp shall be 
the flashing [stroboscopic] [incandescent] [rotary beacon] type and powered from the control panel alarm circuit.  
Lamps shall provide a minimum of 50 candle power.  Flash rate shall be between 60 and 120 flashes per minute.  
Lamps shall be protected by a thermo-plastic lens, red for pre-discharge alarms and blue for discharge [and post-discharge] 
alarms.  [Visual alarms may be part of an audio-visual alarm assembly.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9   MAIN ANNUNCIATOR</TTL><BRK/>
<BRK/>
<TXT>Annunciator shall be integral with the main control panel.  Provide separate alarm and trouble lamps for each 
zone alarm initiating circuit located on the exterior of the cabinet door or visible through the cabinet door.  
Supervision will not be required provided a fault in the annunciator circuits results only in loss of annunciation 
and will not affect the normal functional operation of the remainder of the system.  Each lamp shall provide 
specific identification of the [zone] [area] [device] by means of a permanent label.  In no case shall zone identification 
consist of the words "Zone 1," "Zone 2," etc., but shall consist of the description of the [zone] [area] [device].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.9.1   Annunciation Zones</TTL><BRK/>
<BRK/>
<TXT>Shall be arranged as follows:</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.2   <SUB>Annunciator Panels</SUB></TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Remote annunicator panels</ITM><BRK/>
<BRK/>
<TXT>Locate as shown.  Panel shall duplicate all requirements specified for the main control panel annunciator, except 
that in lieu of individual zone trouble lamps a single common system trouble lamp may be provided.  Panel shall 
have a lamp test switch.  Zone identification shall be by means of [permanently attached rigid plastic or metal 
plate(s).]  [Silk-screened labels attached to the reverse face of backlighted viewing windows(s).] Panel shall 
be of the [interior] [weatherproof] type, [flush] [surface] [pedestal-mounted].</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Graphic Annunciator Panel</ITM><BRK/>
<BRK/>
<TXT>Locate as shown.  Panel shall be of the [interior] [weatherproof] type, [flush] [surface] [pedestal]-mounted.  
Panel shall be provided with the [building] [room] floor plan, drawn to scale, with remote alarm lamps mounted 
to represent the location of [each concealed detector] [each alarm in initiating device].  [Principal rooms and 
areas shown shall be labelled with their room numbers or titles.]  The panel location shall be shown on the floor 
plan.  Detectors mounted above ceilings, [on ceilings,] and beneath raised floors [and different types of initiating 
devices] shall have different symbols or lamps of different colors for identification. Lamps shall illuminate 
upon actuation of their corresponding device and shall remain illuminated until the system is reset.  Panel shall 
have a lamp test switch.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.10   AUTOMATIC FIRE DAMPERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Automatic dampers are required in all ducts passing through walls, floors, 
and ceilings, to prevent the leakage of Halon from the protected space, and 
to prevent the communication of fire and smoke.  Locations of dampers should 
be shown on HVAC plans.  Additional smoke dampers may be required in systems 
over<MET> 424,740 L/m</MET><ENG> 15,000 cfm</ENG> by NFPA 90A, <HL1>Air Conditioning and Ventilating Systems</HL1>
.  Coordinate with Section <SRF>23 09 53.00 20</SRF>, SPACE TEMPERATURE CONTROL SYSTEMS.  
Provide access door in duct at each damper location.  Connect duct detectors 
to Halon system control panel only if no building fire alarm system is provided.  
Otherwise delete paragraph entitled "Duct Smoke Detectors."</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide automatic control of fire dampers in air conditioning supply duct work as specified in Section 
<SRF>23 09 53.00 20</SRF> SPACE TEMPERATURE CONTROL SYSTEMS.  Activation of fire dampers shall occur upon second zone detection, 
or upon activation of Halon discharge by manual pull station.  Fire dampers are specified in Section 
<SRF>23 00 00</SRF> AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS.  Provide heaters for fusible links.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.11   <SUB>ELECTROMAGNETIC DOOR HOLDER RELEASE</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide where shown.  The armature portion shall be mounted on the door and shall have an adjusting screw for 
setting the angle of the contact plate. The electro-magnetic release shall be wall mounted, with a total horizontal 
projection not exceeding<MET> 100 mm</MET><ENG> 4 inches</ENG>.  All doors shall release to close upon first stage (pre-discharge) 
alarm.  Electrical supervision of wiring external of control panel for magnetic door holding circuits is not 
required.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.12   ELECTRICAL WORK</TTL><BRK/>
<BRK/>
<TXT>[Electrical work is specified in Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM, except for control and fire alarm 
wiring.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.12.1   Wiring</TTL><BRK/>
<BRK/>
<TXT>Control and fire alarm wiring, including connections to fire alarm systems, shall be provided under this section 
and shall conform to <RID>NFPA 70</RID>. Wiring for 120 volt circuits shall be No. 12 AWG minimum.  Wiring for low voltage 
DC circuits shall be No. [14] [16] AWG minimum.  All wiring shall be color coded.  Use rigid metal conduit or 
intermediate metal conduit, except electrical metallic tubing may be used in dry locations not enclosed in concrete 
and where not subject to mechanical damage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12.2   Operating Power</TTL><BRK/>
<BRK/>
<TXT>Power shall be 120 volts AC service, transformed through a two winding isolation type transformer and rectified 
to 24 volts DC for operation of all signal initiating, signal sounding, trouble signal and [master box] [transmitter] 
tripping circuits.  Provide secondary DC power supply for operation of system in the event of failure of the 
AC supply.  Transfer from normal to emergency power or restoration from emergency to normal power shall be fully 
automatic and shall not cause transmission of a false alarm.  Obtain AC operating power to control panel and 
battery charger from the line side of the incoming building power source ahead of all building services.  Provide 
independent properly fused safety switch, with provisions for locking the cover and operating handle in the "POWER 
ON" position for these connections and locate adjacent to the main distribution panel.  Paint switch box red 
and suitably identify by a lettered designation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12.3   Conductor Identification</TTL><BRK/>
<BRK/>
<TXT>All circuit conductors shall be identified within each enclosure where a tap, splice or termination is made.  
Conductor identification shall be by plastic coated self sticking printed markers or by heat-shrink type sleeves.  
Attach the markers in a manner that will not permit accidental detachment.  Properly identify control circuit 
terminations.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   PIPE INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Cut screw-jointed pipe accurately and work into place without springing or forcing.  Ream pipe ends and free 
pipe and fittings from burrs.  Clean with solvent to remove all varnish and cutting oil prior to assembly.  Make 
screw joints with tetrafluoroethylene tape applied to male thread only.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   FIELD PAINTING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate Section 09 90 00, PAINTS AND COATINGS with this paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Clean, pretreat, prime, and finish paint new Halon 1301 fire extinguishing systems, including piping, conduit, 
hangers and miscellaneous metalwork. Apply coatings only to clean, dry, surfaces using clean brushes.  Clean 
surfaces to remove all dust, dirt, rust and loose mill scale.  Immediately after cleaning, the metal surfaces 
shall receive one coat of primer conforming to <RID>FS TT-P-645</RID> applied to a minimum dry film thickness of <MET> 0.025 
mm</MET><ENG> one mil</ENG>.  Exercise due care to avoid the painting of operating devices.  Materials which are used to protect 
devices, while painting is in process, shall be removed upon the completion of painting.  Remove all devices 
which are painted and provide new clean devices of the proper type in lieu thereof.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Systems in Unfinished Areas</TTL><BRK/>
<BRK/>
<TXT>Unfinished areas are defined as attic spaces, spaces above suspended ceilings, spaces under raised floors, crawl 
spaces, pipe chases, and spaces where walls or ceiling are not painted or not constructed of a prefinished material.  
Primed surfaces shall receive one coat of red enamel conforming to <RID>FS A-A-2962</RID> applied to a minimum dry film 
thickness of<MET> 0.025 mm</MET><ENG> one mil</ENG> and color coded in accordance with <RID>MIL-STD-101</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Systems in All Other Areas</TTL><BRK/>
<BRK/>
<TXT>Primed surfaces shall receive two coats of paint to match adjacent surfaces, except stop valves and accessories 
shall receive one coat of red enamel conforming to <RID>FS A-A-2962</RID> applied to a minimum dry film thickness of<MET> 0.025 
mm</MET><ENG> one mil</ENG>.  Provide piping with<MET> 50 mm</MET><ENG> 2 inch</ENG> wide red bands spaced at maximum of<MET> 6 meters</MET><ENG> 20 feet</ENG> intervals 
throughout the piping systems, except in finished areas such as offices, the red bands may be deleted.  Red bands 
shall be red enamel or self adhering red plastic tape and color coded in accordance with <RID>MIL-STD-101</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   FIELD TESTING</TTL><BRK/>
<BRK/>
<TXT><TST>Perform tests in the presence of the Contracting Officer to determine conformance with the specified requirements.</TST></TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Preliminary Tests</TTL><BRK/>
<BRK/>
<TXT><TST>Each piping system shall be pneumatically tested at<MET> 1034 kPa (gage)</MET><ENG> 150 psig</ENG> and shall show no leakage or reduction 
in gage pressure after 30 minutes.  The contractor shall conduct complete preliminary tests, which shall encompass 
all aspects of system operation.  Individually test all detectors, manual actuation stations, alarms, control 
panels, and all other components and accessories to demonstrate proper functioning.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Formal Inspection and Tests</TTL><BRK/>
<BRK/>
<TXT>The [_____] Division, Naval Facilities Engineering Command, Fire Protection Engineer, will witness formal tests 
and approve all systems before they are accepted.  <TST>The system shall be considered ready for such testing only 
after all necessary preliminary tests have been made and all deficiencies found have been corrected to the satisfaction 
of the equipment manufacturer's technical representative and the Contracting Officer.</TST>Submit the request for formal 
inspection at least 15 days prior to the date the inspection is to take place.  The control panel(s) and detection 
system(s) shall be in service for a "break-in" period of at least 15 consecutive days prior to the formal inspection.  
Experienced technicians regularly employed by the contractor in the installation of both the mechanical and electrical 
portions of such systems shall be present during the inspection and shall conduct the testing.  All Halon 1301, 
instruments, personnel, appliances and equipment for testing shall be furnished by the contractor.  <TST>All necessary 
tests encompassing all aspects of system operation shall be made including the following</TST>, and any deficiency 
found shall be corrected and the system retested at no cost to the Government.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.2.1   System Function Tests Without Halon Discharge</TTL><BRK/>
<BRK/>
<TST><TXT>The entire detection/alarm/actuation system shall be operated.  As a minimum, operation and supervision of the 
following functions and devices shall be demonstrated.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  All operational and supervisory functions of the control and annunciator panels, including 
the cross-zoning, pre-discharge alarm, discharge alarm [, post-discharge alarm] and time delay 
features.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Each manual actuation station and associated circuit(s).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  All smoke detectors and associated circuits.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  All pre-discharge [,] [and] discharge [and post-discharge] alarms and associated circuits.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  All actuator circuits and <SUB>discharge heads</SUB> (without Halon discharge).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Air handing [and computer] equipment shutdown.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Automatic fire dampers.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Activation of the building fire evacuation alarm system.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Activation of the Base fire alarm system (receipt of fire alarm at alarm office).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  All of the above tests shall be repeated with the system on battery power only.</ITM></TST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.2   Halon Discharge Tests</TTL><BRK/>
<BRK/>
<TXT>When all of the detection/alarm/actuation, and supervisory functions of the system operate to the satisfaction 
of manufacturer's technical representative, the Division Fire Protection Engineer, and the Contracting Officer, <TST>
a complete discharge test of Halon system shall be performed to demonstrate satisfactory performance, Halon concentration, 
uniformity of Halon concentration, system discharge time, mechanical operation and operation of <SUB>valves</SUB>, release 
devices, alarms, and interlocks which control the protected area.  Halon 1301 shall be used for this test; substitution 
of agents is not permitted.  This test shall be conducted by experienced personnel according to the equipment 
and Halon manufacturer's recommendations.  All personal required to be in the protected area during or immediately 
after the test shall wear self-contained, positive pressure breathing apparatus.  Contractor shall provide all 
breathing apparatus, except apparatus for Government personnel shall be provided by the Government.  Halon concentration 
shall be monitored at a minimum of 3 sampling points in each protected area.  Provide a calibrated strip chart 
recorder for continuous recording of concentrations at each monitoring point.</TST>  Table 1 at end of this section 
shall be completed using observations taken during this test.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.4   OPERATING INSTRUCTIONS</TTL><BRK/>
<BRK/>
<TXT>Provide operating instructions at each remote control station. Instructions shall clearly indicate all necessary 
steps for the operation of the system.  Instructions shall be in raised or embossed white letters on red rigid 
plastic or red enameled steel backgrounds and shall be of adequate size to permit them to be easily read.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   TRAINING REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Prior to final acceptance, the Contractor shall provide operation and maintenance training to the Base Fire Department 
and [Public Works] [Civil Engineering] [and] [Computer] personnel.  Each training session shall include [computer] 
emergency procedures, and unique maintenance and safety requirements.  Training areas will be provided by the 
Government in the same building as the protected areas.  The training conducted shall use operation and maintenance 
manuals called for in paragraph entitled "Operation and Maintenance Instructions, Parts and Testing."  Dates 
and times of the training period shall be coordinated through the Contracting Officer not less then two weeks 
prior to the session.  Government shall be provided with a simplified training manual providing a description 
of operation and controls, possible hazards to personnel, and restart procedures for [computers and] air handling 
units.</TXT><BRK/>
<PGE/><MET><TBL><THD><BRK/>
<HL4>TABLE I</HL4><BRK/>
<BRK/>
<HL4>HALON 1301 DATA (EACH ROOM &amp; UNDER FLOOR)</HL4><BRK/></THD>
<BRK/>
                                                           Date:____________<BRK/>
<BRK/>
  Room Description ___________________________________________________________<BRK/>
  Dimensions (m) Length _______________ Height ______________ Width __________<BRK/>
  Area ______________ Sq Meters        Volume ________________________________<BRK/>
  Ventilation Rate into Room ____________ Cubic Meter per Second<BRK/>
  Specific Volume At Design Temp. ____________________________________________<BRK/>
  Design Temp. ______________ Deg C    Max. Temp Expected ______________ Deg C<BRK/>
  Percent Design Concentration _________ kg      1301 Required ______________<BRK/>
  Number of Nozzles ______________          Sq Meter/Nozzle___________________<BRK/>
  Kg 1301 to be Supplied/Nozzle ____________(Based on no air flow)<BRK/>
  Discharge Time _________________________<BRK/>
  Concentration at Design Temperature ______________________ percent<BRK/>
  Concentration at Max Temperature ___________________________ percent<BRK/>
<BRK/>
  Concentration                           Point A     Point B     Point C<BRK/>
    0 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
    5 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   10 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   15 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   20 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   25 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   30 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   40 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   50 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   60 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
  120 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
  Agent Tanks to be Supplied for test use ________________________kg Each<BRK/>
  Free Venting Requirements      ___________ kg/sq meter allowable strength<BRK/>
  this requires                  ___________ sq mm free venting area<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>TABLE I</HL4><BRK/>
<BRK/>
<HL4>HALON 1301 DATA (EACH ROOM &amp; UNDER FLOOR)</HL4><BRK/></THD>
<BRK/>
                                                           Date:____________<BRK/>
<BRK/>
  Room Description ___________________________________________________________<BRK/>
  Dimensions (Ft) Length ______________ Height ______________ Width __________<BRK/>
  Area ______________ Sq Ft            Volume ________________________________<BRK/>
  Ventilation Rate into Room ____________ Cubic Feet per Minute<BRK/>
  Specific Volume At Design Temp. ____________________________________________<BRK/>
  Design Temp. ______________ Deg F    Max. Temp Expected ______________ Deg F<BRK/>
  Percent Design Concentration _________ lbs     1301 Required ______________<BRK/>
  Number of Nozzles ______________          Sq Ft/Nozzle _____________________<BRK/>
  Lbs 1301 to be Supplied/Nozzle ____________(Based on no air flow)<BRK/>
  Discharge Time _________________________<BRK/>
  Concentration at Design Temperature ______________________ percent<BRK/>
  Concentration at Max Temperature ___________________________ percent<BRK/>
<BRK/>
  Concentration                           Point A     Point B     Point C<BRK/>
    0 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
    5 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   10 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   15 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   20 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   25 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   30 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   40 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   50 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
   60 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
  120 Seconds after end of Discharge percent C  __________  __________  __________<BRK/>
  Agent Tanks to be Supplied for test use ________________________Lb Each<BRK/>
  Free Venting Requirements       __________ lbs/SF allowable strength<BRK/>
  this requires                  ___________ sq. in. free venting area<BRK/></TBL>
</ENG><BRK/></SPT>
</PRT>    <END/><BRK/></SEC>