<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA               UFGS-23 25 00 (November 2008)<BRK/>
                                             -----------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                   Superseding<BRK/>
                                             UFGS-23 25 00 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 23 25 00</SCN><BRK/>
<BRK/>
<STL>CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS</STL><BRK/>
<DTE>11/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>chemical treatment 
of water for mechanical systems</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B40.100</RID><RTL>(2005) Pressure Gauges and Gauge Attachments</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM D 1384</RID><RTL>(2005e1) Corrosion Test for Engine Coolants in Glassware</RTL><BRK/><BRK/><RID>ASTM D 2688</RID><RTL>(2005) Corrosivity of Water in the Absence of Heat Transfer (Weight Loss Methods)</RTL><BRK/><BRK/><RID>ASTM D 596</RID><RTL>(2001; R 2006) Reporting Results of Analysis of Water</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA 250</RID><RTL>(2003) Enclosures for Electrical Equipment (1000 Volts Maximum)</RTL><BRK/><BRK/><RID>NEMA MG 1</RID><RTL>(2007; Errata 2008) Standard for Motors and Generators</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>PWTB 420-49-5</RID><RTL>(1998) Industrial Water Treatment Procedures</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF DEFENSE (DOD)</ORG><BRK/><BRK/><RID>UFC 3-230-08A</RID><RTL>(2004) Water Supply: Water Treatment</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<TXT>This section covers the provisions and installation procedures necessary for a complete and totally functional 
water system(s) chemical treatment.  Provide and install the system with all necessary System Components, Accessories, 
Piping Components, and Supplemental Components/Services.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Water Treatment System</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>Water Analysis</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] complete copies, at least 5 weeks prior to the purchase of the water treatment 
system, of the proposed water treatment plan including a layout; control scheme; a list of existing 
make-up water chemistry, including the items listed in paragraph Water Analysis; a list of treatment 
chemicals to be added; the proportion of chemicals to be added; the final treated water control 
levels; and a description of health, safety and environmental concerns for handling the chemicals 
plus any special ventilation requirements.</ITM><BRK/>
<BRK/>
<ITM><SUB>Spare Parts</SUB></ITM><BRK/>
<BRK/>
<ITM>  Spare parts data for each different item of material and equipment specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Field Instructions</SUB></ITM><BRK/>
<BRK/>
<ITM>  Instructions, at least 2 weeks prior to construction completion, including equipment layout, 
wiring and control diagrams, piping, valves and control sequences, and typed condensed operation 
instructions.  The condensed operation instructions shall include preventative maintenance procedures, 
methods of checking the system for normal and safe operation, and procedures for safely starting 
and stopping the system.  The posted instructions shall be framed under glass or laminated plastic 
and posted where indicated by the Contracting Officer.</ITM><BRK/>
<BRK/>
<ITM><SUB>Tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Test schedules, at least 2 weeks prior to the start of related testing, for the condenser/chilled/boiler/condensate/feedwater 
water quality tests.  The schedules shall identify the date, time, frequency and collection 
location for each test.</ITM><BRK/>
<BRK/>
<ITM><SUB>Demonstrations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A schedule, at least 2 weeks prior to the date of the proposed training course, which identifies 
the date, time, and location for the training.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Condenser Water Quality Assurance Tests</SUB></ITM><BRK/>
<BRK/>
<ITM>  Test reports in bound<MET> 216 by 279 mm</MET><ENG> 8-1/2 by 11 inch</ENG> booklets.  The reports shall identify 
the chemical composition of the condenser water.  The reports shall also include a comparison 
of the manufacturer's or chemical vendor's recommended operating conditions for the cooling 
tower and condenser in relation to the actual condition of the condenser water.  Any required 
corrective action shall be documented within the report.</ITM><BRK/>
<BRK/>
<ITM><SUB>Steam Boiler Water Quality Assurance Tests</SUB></ITM><BRK/>
<BRK/>
<ITM>  The water quality test report identifying the chemical composition of the boiler, feedwater 
and condensate water.  The report shall include a comparison of the condition of the boiler 
water with the manufacturer's or chemical vendor's recommended conditions.  Any required corrective 
action shall be documented within the report.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Water Treatment System</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] complete copies of operating and maintenance manuals for the step-by-step water 
treatment procedures.  The manuals shall include testing procedures used in determining water 
quality.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Safety</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Catwalk, ladder and guardrail may be required.  If so, select the applicable 
item and delete the others and indicate on drawings the selected item.  If not 
applicable, delete the entire sentence within the brackets.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, 
and parts that may be a hazard to operating personnel shall be insulated, fully enclosed, guarded, or fitted 
with other types of safety devices.  Install safety devices so that proper operation of equipment is not impaired.  
Provide [catwalk,] [ladder,] [and guardrail] where indicated and in accordance with Section [<SRF>05 50 13</SRF> MISCELLANEOUS 
METAL FABRICATIONS] [<SRF>05 51 33</SRF> METAL LADDERS].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   Drawings</TTL><BRK/>
<BRK/>
<TXT>Because of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories 
that may be required.  Carefully investigate the plumbing, fire protection, electrical, structural and finish 
conditions that would affect the work to be performed and arrange such work accordingly, furnishing required 
offsets, fittings, and accessories to meet such conditions.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Protect all equipment delivered and placed in storage from the weather, humidity and temperature variations, 
dirt and dust, or other contaminants.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   MAINTENANCE</TTL><BRK/>
<BRK/>
<TXT>Submit <SUB>spare parts</SUB> data for each different item of material and equipment specified, after approval of the detail 
drawings, not later than [_____] months prior to the date of beneficial occupancy.  The data shall include a 
complete list of parts and supplies, with source of supply</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL> <BRK/>
<BRK/>
<SPT><TTL>2.1   STANDARD PRODUCTS</TTL><BRK/>
<BRK/>
<LST>a.  Provide materials and equipment which are standard products of a manufacturer regularly engaged in 
the manufacturing of such products, that are of a similar material, design and workmanship and that have 
been in satisfactory commercial or industrial use for two years prior to bid opening.</LST><BRK/>
<BRK/>
<LST>b.  The two-year use shall include applications of equipment and materials under similar circumstances 
and of similar size.  The two years experience shall have been satisfactorily completed by a product 
which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's 
catalogs, or brochures.  Products having less than a two-year field service record will be acceptable 
if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the 
manufacturer's factory tests, can be shown.</LST><BRK/>
<BRK/>
<LST>c.  All products shall be supported by a service organization.  Submit a certified list of qualified 
permanent service organizations for support of the equipment, including their addresses and ualifications.  
These service organizations shall be reasonably convenient to the equipment installation and shall be 
able to render satisfactory service to the equipment on a regular and emergency basis during the warranty 
period of the contract.</LST><BRK/>
<BRK/>
<LST>d.  The selected service organization shall provide the chemicals required, the concentrations required, 
and the water treatment equipment sizes and flow rates required.  The company shall provide all chemicals 
required for the [condenser] [condenser and chilled] water systems and fill the systems with chemicals 
to the levels specified.  The chemical shall meet the requirements of this specification as well as the 
recommendations from the manufacturers of the condenser and cooling tower.  Acid treatment chemicals 
shall not be used.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   NAMEPLATES</TTL><BRK/>
<BRK/>
<TXT>Each major component of equipment shall have the manufacturer's name, address, type or style, and catalog or 
serial number on a plate securely attached to the item of equipment.  Nameplates shall be provided for:</TXT><BRK/>
<BRK/>
<ITM>a.  Pump(s)</ITM><BRK/>
<BRK/>
<ITM>b.  Pump Motor(s)</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   ELECTRICAL WORK</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where motor starters for mechanical equipment are provided in motor-control 
centers, the references to motor starters will be deleted.  Mechanical designer 
must ensure that the electrical designer is provided with electrical requirements 
for chemical feed pumps.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Electrical equipment, motors, motor efficiencies, and wiring shall be in accordance with Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM.  Provide electrical motor driven equipment specified complete with motors, motor starters, 
and controls.  Electrical characteristics and enclosure type shall be as shown, and unless otherwise indicated, 
all motors of<MET> 745 W</MET><ENG> 1 horsepower</ENG> and above with open, dripproof, or totally enclosed fan cooled enclosures, shall 
be high efficiency type.  Field wiring shall be in accordance with manufacturer's instructions.  Each motor shall 
conform to <RID>NEMA MG 1</RID> and be of sufficient size to drive the equipment at the specified capacity without exceeding 
the nameplate rating of the motor.  All motors shall be continuous duty with the enclosure specified.  Provide 
motor starters complete with thermal overload protection and other appurtenances necessary for the motor control 
indicated.  Furnish motors with a magnetic across-the-line or reduced voltage type starter as required by the 
manufacturer.  Motor starter shall be provided with [NEMA 1] [NEMA 3R] [NEMA [_____]] enclosures.  Manual or 
automatic control and protective or signal devices required for the operation specified and any control wiring 
required for controls and devices specified, but not shown, shall be provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   GAUGES</TTL><BRK/>
<BRK/>
<TXT>Gauges shall conform to <RID>ASME B40.100</RID>, Class 1, 2, or 3, Style X, Type I or III as required, <MET>115 mm</MET><ENG> 4-1/2 inches</ENG>
 in diameter with phenolic or metal case.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   <SUB>WATER ANALYSIS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  A water analysis may be available from the user.  If an analysis is not 
available, an analysis will be performed during the design, and appropriate 
data will be entered.</NPR><BRK/>
<BRK/>
<NPR>Cooling towers with a capacity greater than 176 kW (50 tons) will be provided 
with automatic chemical feed and blow down systems.  Smaller towers will be 
provided with continuously activated systems.  Indicate the location of the 
entire water treatment system.  Delete all the information under this paragraph 
if a cooling tower is not used in the system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conditions of make-up water to be supplied to the boilers, cooling towers and chilled water systems reported 
in accordance with <RID>ASTM D 596</RID> are as follows:</TXT><BRK/>
<BRK/>
<LST>Date of Sample                            [_____]</LST><BRK/>
<LST>Temperature                               [_____] degrees C.</LST><BRK/>
<LST>Silica (SiO 2)                            [_____] ppm (mg/L)</LST><BRK/>
<LST>Insoluble                                 [_____] ppm (mg/L)</LST><BRK/>
<LST>Iron, total (Fe)                          [_____] ppm (mg/L)</LST><BRK/>
<LST>Aluminum (Al)                             [_____] ppm (mg/L)</LST><BRK/>
<LST>Calcium (Ca)                              [_____] ppm (mg/L)</LST><BRK/>
<LST>Magnesium (Mg)                            [_____] ppm (mg/L)</LST><BRK/>
<LST>Carbonate (HCO 3)                         [_____] ppm (mg/L)</LST><BRK/>
<LST>Sulfate (SO 4)                            [_____] ppm (mg/L)</LST><BRK/>
<LST>Chloride (Cl)                             [_____] ppm (mg/L)</LST><BRK/>
<LST>Nitrate (NO 3)                            [_____] ppm (mg/L)</LST><BRK/>
<LST>Turbidity                                 [_____] ntu</LST><BRK/>
<LST>pH                                        [_____]</LST><BRK/>
<LST>Residual Chlorine                         [_____] ppm (mg/L)</LST><BRK/>
<LST>Total Alkalinity                          [_____] ppm (mg/L)</LST><BRK/>
<LST>Non-Carbonate Hardness                    [_____] ppm (mg/L)</LST><BRK/>
<LST>Total Hardness                            [_____] ppm (mg/L)</LST><BRK/>
<LST>Dissolved Solids                          [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                              [_____] micromho/cm</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   CONDENSER WATER TREATMENT SYSTEMS</TTL><BRK/>
<BRK/>
<TXT>The use of chemical-treatment products containing hexavalent chromium (Cr) is prohibited.  Treat rhe water to 
be used in the condenser water systems to maintain the conditions recommended by this specification as well as 
the recommendations from the manufacturers of the condenser and evaporator coils.  Chemicals shall meet all required 
federal, state, and local environmental regulations for the treatment of condenser-side heat exchangers, cooling 
towers and direct discharge to the sanitary sewer.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.6.1   Condenser Water Limits</TTL><BRK/>
<BRK/>
<TXT>The condenser water limits shall be as follows, unless dictated differently by the cooling tower or chiller manufacturer's 
recommendations:</TXT><BRK/>
<BRK/>
<ITM>Treatment type                    Phosphonate/Polymer</ITM><BRK/>
<ITM>Puckorius Index                   4 minimum</ITM><BRK/>
<ITM>Langelier Index                   4 maximum</ITM><BRK/>
<ITM>Total Dissolved Solids            5000 ppm maximum</ITM><BRK/>
<ITM>Calcium Hardness                  1200 ppm maximum</ITM><BRK/>
<ITM>Silica                            150 ppm maximum</ITM><BRK/>
<ITM>PH                                7.5 - 8.5</ITM><BRK/>
<BRK/>
<TXT>For treated condenser/cooling tower water, blowdown must be minimized until the first of one of the top 5 limits 
is reached.  Specific requirements for treatment chemicals and levels are listed below in paragraphs dealing 
with small and large systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.2   Glycol Solution</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If freeze protection for condenser water is not required, this paragraph 
should be deleted.  When a glycol system is used, the size of the HVAC systems 
should be corrected due to changes in specific heat and viscosity.  ASHRAE's 
"HVAC systems and Equipment Handbook" should be consulted for the appropriate 
calculation procedures.  Ethylene glycol should be used for HVAC systems.  However, 
if the heat transfer media has the possibility of mixing with a potable water 
system, propylene glycol should be used.  The required concentration should 
be entered based upon the anticipated ambient or operating temperature.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide for the system a [_____] percent concentration by volume of industrial grade [ethylene] [propylene] glycol, 
and corrosion inhibitors.  Test the glycol in accordance with <RID>ASTM D 1384</RID> with less than<MET> 0.013 mm</MET><ENG> 0.5 mils</ENG> penetration 
per year for all system metals.  The glycol shall contain corrosion inhibitors.  Silicate based inhibitors are 
not acceptable.  The solution shall be compatible with pump seals, other elements of the system, and water treatment 
chemicals used within the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3   Chemical Treatment for Small Systems</TTL><BRK/>
<BRK/>
<TXT>For cooling systems with a capacity of<MET> 175.8 kW</MET><ENG> 50 tons</ENG> or less, provide the following chemical treatment.  For 
corrosion control provide<MET> 6.8 to 9.1 kg</MET><ENG> 15 to 20 pounds</ENG> polyphosphate in nylon mesh bag in cooling tower sump.  
If biocide is needed, use either 1-bromo-3-chloro-5.5-dimethylhydantoin or gluteraldehyde as recommended by manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4   Chemical Treatment for Large Systems</TTL><BRK/>
<BRK/>
<TXT>For cooling systems with capacities greater than<MET> 175.8 kW</MET><ENG> 50 tons</ENG> provide one of the three following chemical 
treatments with the limits indicated.  The zinc and molybdate in the last two treatments help to meet the maximum 
corrosion requirements in waters that tend to be more corrosive.  Biocides must be maintained to control bacteria 
below 10,000 colony forming units per milliliter.</TXT><BRK/>
<BRK/>
<LST>a.  Phosphonate Type Treatment</LST><BRK/>
<BRK/>
<ITM>Phosphonate      (3-5 ppm)</ITM><BRK/>
<ITM>Polymer          (3-4 ppm)</ITM><BRK/>
<ITM>TT               (1-2 ppm)</ITM><BRK/>
<ITM>Biocides         as required</ITM><BRK/>
<BRK/>
<LST>b.  Zinc-Phosphonate Type Treatment</LST><BRK/>
<BRK/>
<ITM>Phosphonate      (3-5 ppm)</ITM><BRK/>
<ITM>Polymer          (3-4 ppm)</ITM><BRK/>
<ITM>Zinc             (1-2 ppm)</ITM><BRK/>
<ITM>TT               (1-2 ppm)</ITM><BRK/>
<ITM>Biocides         as required</ITM><BRK/>
<BRK/>
<LST>c.  Zinc-Molybdate Type Treatment</LST><BRK/>
<BRK/>
<ITM>Phosphonate      (3-5 ppm)</ITM><BRK/>
<ITM>Polymer          (3-4 ppm)</ITM><BRK/>
<ITM>Molybdate        (10-15 ppm)</ITM><BRK/>
<ITM>Zinc             (2-3 ppm)</ITM><BRK/>
<ITM>TT               (1-2 ppm)</ITM><BRK/>
<ITM>Biocides         as required</ITM><BRK/>
<BRK/>
<SPT><TTL>2.6.4.1   General Requirements</TTL><BRK/>
<BRK/>
<TXT>Provide a <SUB>water treatment system</SUB> capable of automatically feeding chemicals and bleeding the system to prevent 
corrosion, scale, and biological formations.  Automatic chemical feed systems shall automatically feed chemicals 
into the condenser water based on makeup water rate.  Electrical signals from a water meter on the makeup water 
line shall be used to control the output of chemical feed pumps.  The system shall be initially set manually 
based on the water analysis of the make-up water.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.2   Chemical Feed Pumps and Tanks</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The required maximum pump flow rate will be shown on the drawings.  The 
flow rate will depend upon the makeup water flow rate, the chemical composition 
of the makeup water and the concentration of the chemical supplied.  A water 
treatment company should be consulted for determining the proper maximum pump 
flow rate.</NPR><BRK/>
<BRK/>
<NPR>A water treatment company will be consulted to determine the number of tanks 
required and shall be shown on plans.  The number will depend on the size of 
the boiler, makeup water flow rate, and makeup water composition.  A potable 
water line will be provided near the tanks for the mixing of chemicals.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Furnish chemical feed pumps and tanks as a package with the pumps mounted on and piping connected 
to the tank.  The chemical feed pumps shall be positive displacement diaphragm type.  The pump's cylinders, 
plungers, ball check valves, and check valve bodies shall be of corrosion resistant materials suitable 
for the chemicals being pumped.  Cylinders shall be replaceable for increased or reduced pressure or 
capacity ranges.</LST><BRK/>
<BRK/>
<LST>b.  The flow rate of the pumps shall be adjustable from 0 to 100 percent while in operation.  Volumetric 
accuracy of the pumps shall be within one percent over the range indicated.  Pump capacities shall be 
adjustable by positioning crank pin with micrometer setscrews.  Stroke length scale shall be divided 
in percentage graduations engraved on scale.  The discharge pressure of pumps shall not be less than 
1.5 times the line pressure at the point of connection.  The pumps shall be provided with a pressure 
relief valve and a check valve mounted in the pump discharge.  The pumps shall be controlled by an external 
controller/timer receiving signals from the makeup water meter.</LST><BRK/>
<BRK/>
<LST>c.  Drive motors shall be 110 volt, single phase and shall have drip-proof enclosures.  Provide two chemical 
tanks.  The tanks shall be constructed of [materials compatible with the chemicals to be stored in the 
tank] [high density polyethylene] [stainless steel] [fiber reinforced plastic] with a hinged cover and 
mounted on legs.  Tanks shall have filling and drain connections and gauge glass.  Each tank shall be 
furnished with one pump, mounted and piped with black iron pipe and fittings, with suction strainer and 
stainless steel screen, and with<MET> 13 mm</MET><ENG> 1/2 inch</ENG> relief valve with steel body and stainless steel trim.  
Tank bottom shall be dished concave to a radius equal to the diameter of the tank.  Motor-driven agitator 
shall be provided.  The tanks shall have sufficient capacity to require recharging only once per [7] 
[14] [21] [_____] days during normal operation.</LST> <BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.3   Chemical Injection Assembly</TTL><BRK/>
<BRK/>
<TXT>Provide an injection assembly at each chemical feed point.  Locate the injection assembly downstream of recirculating 
pumps and upstream of the condenser.  The injection assemblies shall be constructed of stainless steel.  The 
discharge of the assemblies shall extend to the centerline of the condenser water piping.  Each assembly shall 
include a shutoff valve and check valve at the point of entrance into the condenser water line.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.4   Water Meter</TTL><BRK/>
<BRK/>
<TXT>Provide water meters with an electric contacting register and remote accumulative counter.  Install the meter 
within the make-up water line, as indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.5   Timers</TTL><BRK/>
<BRK/>
<TXT>Timers shall be of the automatic reset, adjustable type, and electrically operated.  The timers shall be designed 
to work with the contacting head water meters.  The timer should include the water meter cable.  The timers will 
control operation of the chemical feed pumps.  The timers shall be suitable for a 120 volt current.  The timers 
shall be located within the water treatment control panel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.6   Bleed (Blowdown) Line</TTL><BRK/>
<BRK/>
<TXT>Control the flow through the bleed line by a conductivity meter and probe installed to measure the conductivity 
of the condenser water.  The conductivity meter shall have a high and low set point above which the conductivity 
meter shall open a solenoid valve on the bleed line.  The bleed line attachment to the condenser water piping 
shall be located downstream of the recirculating pumps and upstream of the chemical injection point.  The bleed 
line shall be extended to the nearest drain for continuous discharge.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.7   Control Panel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The MAN-OFF-AUTO switch should be deleted for continuously fed systems.  
In areas where a panel could come in contact with the water treatment chemical, 
choose the stainless steel construction.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The control panel shall be a NEMA 12 enclosure suitable for surface mounting.  The panel shall be constructed 
of [stainless steel] [coated steel] with a hinged door and lock.  The panel shall contain a laminated plastic 
nameplate identifying each of the following functions:</TXT><BRK/>
<BRK/>
<ITM>(1)  Main power switch and indicating light</ITM><BRK/>
<ITM>(2)  MAN-OFF-AUTO selector switch</ITM><BRK/>
<ITM>(3)  Indicating lamp for bleed-off valve</ITM><BRK/>
<ITM>(4)  Indicating lamp for each chemical feed pump</ITM><BRK/>
<ITM>(5)  Set point reading for each timer</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.8   Chemical Piping</TTL><BRK/>
<BRK/>
<TXT>The piping and fittings shall be constructed of [schedule 80 PVC] [stainless steel] suitable for the water treatment 
chemicals.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.9   Sequence of Operation</TTL><BRK/>
<BRK/>
<TXT>The chemicals shall be added based upon sensing the make-up water flow rate and activating appropriate timers.  
A separate timer shall be provided for each chemical.  The blow down shall be controlled based upon the conductivity 
of the condenser water.  The injection of the chemical required for biological control shall be controlled by 
a timer that can be manually set for proper chemical feed.  All timer set points, blow down rates, and chemical 
pump flow rates shall be determined and set by the water treatment company.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.10   Test Kits</TTL><BRK/>
<BRK/>
<TXT>One test kit of each type required to determine the water quality as outlined within the operation and maintenance 
manuals shall be provided.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.7   CHILLED WATER SYSTEM</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The services of a company regularly engaged in water treatment for mechanical 
systems to treat a chilled water system should only be required if the makeup 
water available is of very poor quality.</NPR><BRK/>
<BRK/>
<NPR>For dual temperature systems (chilled and heated water), coordinate the compatibility 
of the separate water treatment systems.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A<MET> [7.57] [18.92] [_____] L</MET><ENG> [2] [5] [_____] gallon</ENG> shot feeder shall be provided on the chilled water piping as 
indicated.  The feeder shall be furnished with an air vent, gauge glass, funnel, valves, fittings, and piping.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.7.1   Requirements for Glycol Solution</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If freeze protection for chilled water is not required, this paragraph 
should be deleted.  When a glycol system is used, the size of the HVAC systems 
should be corrected due to changes in specific heat and viscosity.  ASHRAE's 
"HVAC systems and Equipment Handbook" should be consulted for the appropriate 
calculation procedures.  Ethylene glycol should be used for HVAC systems.  However, 
if the heat transfer media has the possibility of mixing with a potable water 
system, propylene glycol should be used.  The required concentration should 
be entered based upon the anticipated ambient or operating temperature.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a [_____] percent concentration by volume of industrial grade [ethylene] [propylene] glycol, and corrosion 
inhibitors, for the system.  Test the glycol in accordance with <RID>ASTM D 1384</RID> with less than<MET> 0.013 mm</MET><ENG> 0.5 mils</ENG> 
penetration per year for all system metals.  The glycol shall contain corrosion inhibitors.  Silicate based inhibitors 
shall not be used.  The solution shall be compatible with pump seals, other elements of the system, and water 
treatment chemicals used within the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.2   Chilled Water Treatment</TTL><BRK/>
<BRK/>
<TXT>Treat chilled water with either a borax/nitrite type treatment or a molybdate type treatment.  Both types of 
treatment can be used with  glycol.  Borax/nitrite treatment shall be maintained at the limits of 600 to 1000 
ppm nitrite, 40 - 50 ppm copper corrosion inhibitor (TT or MBT), and pH of 8.5 to 9.5.  Molybdate treatment shall 
be maintained at the limits of 100 to 125 ppm molybdate, 40 - 50 ppm copper corrosion inhibitor (TT or MBT), 
and pH of 8.0 to 9.0.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.3   Dual Temperature Systems</TTL><BRK/>
<BRK/>
<TXT>Dual hot/chilled water systems treated with borax/nitrite shall also be treated with a biocide.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.4   Chilled Water Test Kits</TTL><BRK/>
<BRK/>
<TXT>One test kit of each type required to determine the water quality as outlined within the operation and maintenance 
manuals shall be provided (e.g. pH and nitrite or molybdate).</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.8   LOW AND MEDIUM TEMPERATURE HOT WATER BOILERS AND HEAT EXCHANGERS</TTL><BRK/>
<BRK/>
<TXT>Low and medium temperature hot water boilers are defined as those operating below<MET> 177 degrees C</MET><ENG> 350 degrees F</ENG>
, (<MET>122 degrees C</MET><ENG> 250 degrees F</ENG> for Low Temperarure).</TXT><BRK/>
<BRK/>
<SPT><TTL>2.8.1   Chemical Feeder</TTL><BRK/>
<BRK/>
<TXT>A<MET> [7.57] [18.92] [_____] L</MET><ENG> [2] [5] [_____] gallon</ENG> shot feeder shall be provided on the hot water piping as indicated.  
Size and capacity of feeder shall be based on local requirements and water analysis.  The feeder shall be furnished 
with an air vent, gauge glass, funnel, valves, fittings, and piping.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.2   Water Softening System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The makeup water analysis and the boiler manufacturer's recommended feed 
water conditions will be used to determine the need for a water softener.  UFC 
3-230-08A contains general guidance for the selection.  Softening of makeup 
water for hot water boilers is required if the makeup water hardness is above 
200 ppm or the makeup rate is above 1%.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The water softening system shall be as specified in Section <SRF>22 31 00</SRF> WATER SOFTENERS, CATION-EXCHANGE (SODIUM 
CYCLE).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.3   Low and Medium Temperature Hot Water Treatment</TTL><BRK/>
<BRK/>
<TXT>Hot water shall be treated with either a borax/nitrite type treatment or a molybdate type treatment.  Both types 
of treatment can be used with glycol.  Borax/nitrite treatment shall be maintained at the limits of 600 to 1000 
ppm nitrite, 40 - 50 ppm copper corrosion inhibitor (TT or MBT) and pH of 8.5 to 9.5.  Molybdate treatment shall 
be maintained at the limits of 100 to 125 ppm molybdate, 40 - 50 ppm copper corrosion inhibitor (TT or MBT) and 
pH of 8.0 to 9.0.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.4   Dual Temperature Systems</TTL><BRK/>
<BRK/>
<TXT>Dual hot/chilled water systems treated with borax/nitrite shall also be treated with a biocide.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.5   Test Kit Requirements</TTL><BRK/>
<BRK/>
<TXT>One test kit of each type required to determine the water quality as outlined within the operation and maintenance 
manuals shall be provided (e.g. pH and nitrite or molybdate).</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9   HIGH TEMPERATURE HOT WATER BOILERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>High Temperature Hot Water Boilers are defined as those operating above 177 
degrees C (350 deg F).  The chemical treatment requires more attention (daily), 
the makeup water requires softening and the chemicals and limits differ from 
the low and medium temperature hot water boilers.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.9.1   Chemical Feeder Unit </TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The required maximum pump flow rate will be shown on the drawings.  The 
flow rate will depend upon the makeup water flow rate, the chemical composition 
of the makeup water and the concentration of the chemical supplied.  A water 
treatment company should be consulted for determining the proper maximum pump 
flow rate.</NPR><BRK/>
<BRK/>
<NPR>A company regularly engaged in water treatment for mechanical systems will be 
consulted to determine the number of tanks required to be shown on the drawings.  
The number will depend on the size of the boiler, makeup water flow rate, and 
makeup water composition.  A potable water line will be provided near the tanks 
for the mixing of chemicals.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A feeder unit shall be provided for each boiler.  Chemical feeder shall be automatic proportioning, shot type, 
or pump type.  All appurtenances necessary for satisfactory operation shall be provided.  Size and capacity of 
feeder shall be based upon local requirements and water analysis.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.2   Pumps and Tanks</TTL><BRK/>
<BRK/>
<LST>a.  Furnish chemical feed pumps and tanks as a package with the pumps mounted on and piping connected 
to the tank.  The chemical feed pumps shall be positive displacement diaphragm type.  The pump cylinders, 
plungers, ball check valves, and check valve bodies shall be of corrosion resistant materials suitable 
for the chemicals being pumped.  Cylinders shall be replaceable for increased or reduced pressure or 
capacity ranges.</LST><BRK/>
<BRK/>
<LST>b.  The flow rate of the pumps shall be adjustable from 0 to 100 percent while in operation.  Volumetric 
accuracy of the pumps shall be within one percent over the range indicated.  Pump capacities shall be 
adjustable by positioning crank pin with micrometer setscrews.  Stroke length scale shall be divided 
in percentage graduations engraved on scale.  The discharge pressure of pumps shall not be less than 
1.5 times the line pressure at the point of connection.  The pump shall be designed to feed the chemical 
solutions into the HTW return line to the system circulating pumps and shall have capacity to feed a 
maximum of<MET> [5.3] [_____] mL/second</MET><ENG> [5] [_____] gph</ENG>.  The pumps shall be provided with a pressure relief 
valve and a check valve mounted in the pump discharge.  The pumps shall be controlled by an external 
controller/timer receiving signals from the makeup water meter.</LST><BRK/>
<BRK/>
<LST>c.  Drive motors shall be 110 volt, single phase and shall have drip-proof enclosures.  The tanks shall 
be constructed of [materials compatible with the chemicals to be stored in the tank] [high density polyethylene] 
[stainless steel] [fiber reinforced plastic] with a hinged cover and mounted on legs.  Tanks shall have 
filling and drain connections and gauge glass.  Each tank shall be furnished with one pump, mounted and 
piped with black iron pipe and fittings, with suction strainer and stainless steel screen, and with<MET> 13 
mm</MET><ENG> 1/2 inch</ENG> relief valve with steel body and stainless steel trim. Tank bottom shall be dished concave 
to a radius equal to the diameter of the tank.  Units shall be for phosphate, caustic feed and sulfite 
feeding.  Sulfite tank shall have a floating cover to completely cover the surface of the solution.  
Motor-driven agitator shall be provided.  The tanks shall have sufficient capacity to require recharging 
only once per [7] [14] [21] [_____] days during normal operation.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.3   Water Softening System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The makeup water analysis and the boiler manufacturer's recommended feed 
water conditions will be used to determine the need for a water softener.  UFC 
3-230-08A contains general guidance for the selection.  Hardness must be maintained 
below 2 ppm.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The water softening system shall be as specified in Section <SRF>22 31 00</SRF> WATER SOFTENERS, CATION-EXCHANGE (SODIUM 
CYCLE).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.4   Treated Water Limits </TTL><BRK/>
<BRK/>
<TXT>The boiler manufacturer shall be consulted for the determination of the boiler water chemical composition limits.  
The recirculating hot water chemical limits shall be as follows unless dictated differently by the boiler manufacturer's 
recommendations:</TXT><BRK/>
<BRK/>
<ITM>PH                 9.3-9.9</ITM><BRK/>
<ITM>Sulfite            30-60 ppm</ITM><BRK/>
<ITM>Hardness           Less than 2.0 ppm</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.10   Test Kit</TTL><BRK/>
<BRK/>
<TXT>One test kit of each type required to determine the water quality as outlined within the operation and maintenance 
manuals shall be provided (e.g. pH, hardness and sulfite).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11   STEAM BOILER WATER TREATMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The chemical piping will be indicated on the drawing.  Piping for feeding 
sulfite will be connected to the storage section of the deaerator or feedwater 
heater or to the feedwater line.  Piping for other treatment chemicals will 
be connected to the boiler drum.  The chemical shot feeder will not be required 
for larger steam boilers.</NPR><BRK/>
<BRK/>
<NPR>If steam is used for cooking or humidification, a separate heat exchanger will 
be required due to environmental constraints with the use of amines (AR 420-49, 
6-5b).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a water treatment system capable of feeding chemicals and blowdown of the system to prevent corrosion 
and scale within the boiler and piping distribution system.  Treat the water to maintain the conditions recommended 
by the boiler manufacturer or <RID>UFC 3-230-08A</RID> (Central Boiler Plants) and <RID>PWTB 420-49-5</RID> (Industrial Water Treatment 
Procedures).  Chemicals shall meet required federal, state, and local environmental regulations for the treatment 
of boilers and discharge to the sanitary sewer.  The services of a company regularly engaged in the treatment 
of boilers shall be used to determine the correct concentrations required for water treatment.  The company shall 
maintain the chemical treatment and provide all chemicals required for a period of 1 year from the date of occupancy.  
Filming amines, hydrazine and chelants shall not be used.  The water treatment chemicals shall remain stable 
throughout the operating temperature range of the system and shall be compatible with pump seals and other elements 
of the system.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.11.1   Boiler Water Limits</TTL><BRK/>
<BRK/>
<TXT>The boiler water limits shall be as follows unless dictated differently by the boiler manufacturer's recommendations:</TXT><BRK/>
<BRK/>
<LST>Causticity (OH)                         20-200 ppm</LST><BRK/>
<LST>Total Alkalinity (CaCO3)                200-800 ppm</LST><BRK/>
<LST>Phosphate (PO4)                         30-60 ppm</LST><BRK/>
<LST>Polymer (dispersant) or Tannin          5-10 ppm or medium color,<BRK/>
                                             respectively</LST><BRK/>
<LST>Dissolved Solids (water tube boilers)   3000-3500 ppm</LST><BRK/>
<LST>Dissolved Solids (fire tube boilers)    3500-5000 ppm</LST><BRK/>
<LST>Suspended Solids                        15 ppm Maximum</LST><BRK/>
<LST>Sodium Sulfite                          20-40 ppm </LST><BRK/>
<LST>Silica                                  Less than 200 ppm</LST><BRK/>
<LST>Dissolved Oxygen                        Less than 7 ppb</LST><BRK/>
<LST>Iron                                    Less than 10 ppm</LST><BRK/>
<LST>pH (Condensate)                         7.5 - 8</LST><BRK/>
<LST>Conductivity (Condensate)               Less than 35 micromhos</LST><BRK/>
<LST>Hardness (Condensate and makeup)        Less than 2 ppm</LST><BRK/>
<BRK/>
<TXT>The above limits apply to boilers operating above<MET> 100 kPa</MET><ENG> 15 psi</ENG> up<MET> 2070 kPa</MET><ENG> 300 psi</ENG>.  Above<MET> 2070 kPa</MET><ENG> 300 psi</ENG>
 these limits decrease.  Use ABMA or chemical vendor recommended limits above<MET> 2070 kPa</MET><ENG> 300 psi</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.2   Water Softening System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The makeup water analysis and the boiler manufacturer's recommended feed 
water conditions will be used to determine the need for a water softener.  UFC 
3-230-08A contains general guidance for the selection.  Generally, all boilers 
operating above 100 kPa (15 psi) require softened water.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The water softening system shall be as specified in Section <SRF>22 31 00</SRF> WATER SOFTENERS, CATION-EXCHANGE (SODIUM 
CYCLE).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.3   Boiler Water Treatment System</TTL><BRK/>
<BRK/>
<TXT>The water treatment system shall be capable of automatically feeding chemicals to prevent corrosion and scale 
within the boiler and condensate system.  Automatic chemical feed systems shall feed chemicals into the boiler 
based on makeup water rate.  Electrical signals from a water meter on the makeup water line shall be used to 
control the output of chemical feed pumps.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.4   Steam Boiler Chemical Feed Pumps and Tanks</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The required maximum pump flow rate will be shown on the drawings.  The 
flow rate will depend upon the makeup water flow rate, the chemical composition 
of the makeup water and the concentration of the chemical supplied.  A water 
treatment company should be consulted for determining the proper maximum pump 
flow rate.</NPR><BRK/>
<BRK/>
<NPR>A company regularly engaged in water treatment for mechanical systems will be 
consulted to determine the number of tanks required to be shown on the drawings.  
The number will depend on the size of the boiler, makeup water flow rate, and 
makeup water composition.  A potable water line will be provided near the tanks 
for the mixing of chemicals.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Furnish chemical feed pumps and tanks as a package with the pumps mounted on and piping connected 
to the tank.  The chemical feed pumps shall be positive displacement diaphragm type.  The pump cylinders, 
plungers, ball check valves, and check valve bodies shall be of corrosion resistant materials suitable 
for the chemicals being pumped.  Cylinders shall be replaceable for increased or reduced pressure or 
capacity ranges.  The flow rate of the pumps shall be adjustable from 0 to 100 percent while in operation.  
Volumetric accuracy of the pumps shall be within one percent over the range indicated.  Pump capacities 
shall be adjustable by positioning crank pin with micrometer setscrews.  Stroke length scale shall be 
divided in percentage graduations engraved on scale.</LST><BRK/>
<BRK/>
<LST>b.  The discharge pressure of pumps shall not be less than 1.5 times the line pressure at the point of 
connection.  The pumps shall be provided with a pressure relief valve and a check valve mounted in the 
pump discharge.  The pumps shall be controlled by an external controller/timer receiving signals from 
the makeup water meter.</LST><BRK/>
<BRK/>
<LST>c.  Drive motors shall be 110 volt, single phase and shall have drip-proof enclosures.  The tanks shall 
be constructed of [materials compatible with the chemicals to be stored in the tank] [high density polyethylene] 
[stainless steel] [fiber reinforced plastic] with a hinged cover and mounted on legs.  Tanks shall have 
filling and drain connections and gauge glass.  Each tank shall be furnished with one pump, mounted and 
piped with black iron pipe and fittings, with suction strainer and stainless steel screen, and with<MET> 13 
mm</MET><ENG> 1/2 inch</ENG> relief valve with steel body and stainless steel trim.  Tank bottom shall be dished concave 
to a radius equal to the diameter of the tank.  The tank for sodium sulfite will have a floating cover 
to minimize contact with air.  Motor-driven agitator shall be provided.  The tanks shall have sufficient 
capacity to require recharging only once per [7] [14] [21] [_____] days during normal operation.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.5   Steam Boiler Chemical Injection Assemblies</TTL><BRK/>
<BRK/>
<TXT>Provide an injection assembly at each chemical injection point located along the boiler piping as indicated.  
The injection assemblies shall be constructed of stainless steel.  The discharge of the assemblies shall extend 
to the centerline of the piping.  Each assembly shall include a shutoff valve and check valve at the point of 
entrance into the water line.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.6   Steam Boiler Water Meter</TTL><BRK/>
<BRK/>
<TXT>Provide the water meter with an electric contacting register and remote accumulative counter.  Install the meter 
within the makeup water line, as indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.7   Steam Boiler Timers</TTL><BRK/>
<BRK/>
<TXT>Timers shall be of the automatic reset, adjustable type, and electrically operated.  The timers shall be designed 
to work with the contacting head water meters.  The timer should include the water meter cable.  The timers will 
control operation of the chemical feed pumps.  The timers shall be suitable for a 120 volt current.  The timers 
shall be used to control the electrical signals from the water meters to the chemical feed pumps.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.8   Steam Boiler Control Panel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The MAN-OFF-AUTO switch should be deleted for continuously fed systems.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The control panel shall be a NEMA 12, single door, wall-mounted box conforming with <RID>NEMA 250</RID>.  The panel shall 
be constructed of [coated steel] [stainless steel] with a hinged door and lock.  The panel shall contain, as 
a minimum, the following functions identified with a laminated plastic nameplate:</TXT><BRK/>
<BRK/>
<ITM>a.  Main power switch and indicating light</ITM><BRK/>
<ITM>b.  MAN-OFF-AUTO selector switch</ITM><BRK/>
<ITM>c.  Indicating lamp for each chemical feed pump</ITM><BRK/>
<ITM>d.  Indicating lamp for the water softener</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.9   Boiler Blowdown</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Typically, automatic blowdown will be economical for boilers with capacities 
greater than 2.9 MW (10,000,000 Btuh).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide the boiler with [continuous blowdown] [automatic blowdown based upon conductivity or boiler load].  Bottom 
blowdown connection and valve shall also be present to allow removal of solids and water from the bottom of the 
boiler.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.10   Boiler Chemical Piping</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If steel piping is selected, an interior coating may be required depending 
upon the chemicals used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The piping and fittings shall be constructed of [steel] [stainless steel].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.11   Boiler Test Kits</TTL><BRK/>
<BRK/>
<TXT>One test kit of each type required to determine the water quality as outlined in paragraph Boiler Water Limits 
above and within the operation and maintenance manuals.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.12   SUPPLEMENTAL COMPONENTS/SERVICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  All drain and makeup water piping should be indicated on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drain and makeup water piping shall comply with the requirements of Section <SRF>22 00 00</SRF> PLUMBING, GENERAL PURPOSE.  
Drains which connect to sanitary sewer systems shall be connected by means of an indirect waste.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   EXAMINATION</TTL><BRK/>
<BRK/>
<TXT>After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting 
Officer of any discrepancy, before performing any work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Provide all chemicals, equipment and labor necessary to bring all system waters in conformance with the specified 
requirements.  Perform all work in accordance with the manufacturer's published diagrams, recommendations, and 
equipment warranty requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   PIPING</TTL><BRK/>
<BRK/>
<TXT>Connections between dissimilar metals shall be made with a dielectric union.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   TRAINING COURSE</TTL><BRK/>
<BRK/>
<TXT>Conduct a training course for the operating staff as designated by the Contracting Officer.  The training period 
shall consist of a total [_____] hours of normal working time and start after the system is functionally completed 
but prior to final acceptance tests.  The <SUB>field instructions</SUB> shall cover all of the items contained in the Operation 
and Maintenance Manuals as well as <SUB>demonstrations</SUB> of routine maintenance operations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   <SUB>TESTS</SUB></TTL><BRK/>
<BRK/>
<TXT>If the waters of the mechanical systems are not in conformance with the specified requirements or in accordance 
with manufacturer's recommendations, the water treatment company shall take corrective action to enable compliance.  
Daily operational tests shall be performed in the directed frequencies to maintain required control to prevent 
corrosion, scaling and damage to equipment during operation</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Condenser Water Quality Tests</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.1.1   Small Systems (weekly)</TTL><BRK/>
<BRK/>
<TXT>Once a week, for cooling systems with a capacity of<MET> 175.8 kW</MET><ENG> 50 tons</ENG> or less, the following items shall be recorded.</TXT><BRK/>
<BRK/>
<LST>PH                                  [_____] </LST><BRK/>
<LST>Total Alkalinity (as CaCO3)         [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                        [_____] micromho/cm</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.2   Tests for Large Systems (daily)</TTL><BRK/>
<BRK/>
<TXT>Daily, for cooling systems with a capacity larger than<MET> 175.8 kW</MET><ENG> 50 tons</ENG>, the following items shall be recorded.</TXT><BRK/>
<BRK/>
<LST>PH                                   [_____]</LST><BRK/>
<LST>Total Alkalinity (as CaCO3)          [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                         [_____] micromho/cm</LST><BRK/>
<LST>Phosphonate                          [_____] ppm (mg/L)</LST><BRK/>
<LST>Zinc, if used (Zn)                   [_____] ppm (mg/L)</LST><BRK/>
<LST>Molybdate, if used (Mo)              [_____] ppm (mg/L)</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.2   Chilled Water Testing (monthly)</TTL><BRK/>
<BRK/>
<TXT>Once a month, the following tests will be performed on chilled water.</TXT><BRK/>
<BRK/>
<LST>PH                                   [_____] </LST><BRK/>
<LST>Nitrite or Molybdate                 [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                         [_____] micromho/cm</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3   Hot Water Boiler Water Quality Testing</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.3.1   Low and Medium Temperature Systems (monthly)</TTL><BRK/>
<BRK/>
<TXT>Monthly testing shall be completed and recorded for the following parameters.</TXT><BRK/>
<BRK/>
<LST>PH                                   [_____] </LST><BRK/>
<LST>Nitrite or Molybdate                 [_____] ppm (mg/L)</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3.2   High Temperature Hot Water Systems (daily)</TTL><BRK/>
<BRK/>
<TXT>Daily testing shall be completed and recorded for the following parameters.</TXT><BRK/>
<BRK/>
<LST>PH                                   [_____] </LST><BRK/>
<LST>Sulfite (Na2SO3)                     [_____] ppm (mg/L)</LST><BRK/>
<LST>Hardness                             [_____] ppm (mg/L)</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.4   Steam Boiler Water Testing</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.4.1   Small Steam Systems</TTL><BRK/>
<BRK/>
<TXT>The type of treatment required for small steam systems (below<MET> 0.25 MW</MET><ENG> 25 hp</ENG>) varies greatly depending on local 
water and system conditions.  The type of treatment and frequency of testing shall be determined by the water 
treatment chemical vendor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4.2   Medium Steam Systems (twice weekly)</TTL><BRK/>
<BRK/>
<TXT>Twice a week for steam boiler systems operating between<MET> 0.25 MW</MET><ENG> 25 hp</ENG> and<MET> 1 MW</MET><ENG> 100 hp</ENG> the following items will 
be recorded and utilized for operation purposes.</TXT><BRK/>
<BRK/>
<LST>PH                                    [_____] </LST><BRK/>
<LST>P Alkalinity (as CaCO3)               [_____] ppm (mg/L)</LST><BRK/>
<LST>Total Dissolved Solids                [_____] ppm (mg/L)</LST><BRK/>
<LST>Phosphate (PO4)                       [_____] ppm (mg/L)</LST><BRK/>
<LST>Sulfite (NaSO3)                       [_____] ppm (mg/L)</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4.3   Large Steam Systems (daily)</TTL><BRK/>
<BRK/>
<TXT>Daily, for steam boiler systems operating above<MET> 100 kPa</MET><ENG> 15 psi</ENG> and<MET> 1 MW</MET><ENG> 100 hp</ENG>, the following items will be recorded 
and utilized for operational purposes.</TXT><BRK/>
<BRK/>
<LST>Sulfite (NaSO3)                       [_____] ppm (mg/L)</LST><BRK/>
<LST>P Alkalinity (as CaCO3)               [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                          [_____] micromho/cm</LST><BRK/>
<LST>Neutralized Conductivity              [_____] micromho/cm</LST><BRK/>
<LST>Total Dissolved Solids                [_____] ppm (mg/L)</LST><BRK/>
<LST>Phosphate   (PO4)                     [_____] ppm (mg/L)</LST><BRK/>
<LST>Condensate pH                         [_____] </LST><BRK/>
<LST>Condensate Conductivity               [_____] micromho/cm</LST><BRK/>
<LST>Condensate Hardness (as CaCO3)        [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup Water Hardness (as CaCO3)      [_____] ppm (mg/L)</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.5   Quality Assurance Testing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:   It is important to require Quality Assurance (QA) testing performed 
by an independent industrial water treatment laboratory/consultant to sustain 
good water chemistry control.  Systems without good chemistry control will experience 
higher equipment replacement costs, energy and operating costs, higher water 
usage, more plant shutdowns, higher and decreased safety.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conduct quality assurance testing periodically by an independent water treatment lab/consultant to verify to 
managers that the mechanical and water treatment systems are being maintained properly.  Provide the Quality 
Assurance evaluation reports to the government COR.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.5.1   <SUB>Condenser Water Quality Assurance Tests</SUB></TTL><BRK/>
<BRK/>
<LST>a.  For cooling systems with a capacity of<MET> 175.8 kW</MET><ENG> 50 ton</ENG> or less, the following tests shall be performed</LST><BRK/>
<BRK/>
<ITM>Presence of scale/corrosion         [_____]</ITM><BRK/>
<ITM>Polyphosphate                       [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Biocide                             [_____] ppm (mg/L)</ITM><BRK/>
<ITM>PH                                  [_____] </ITM><BRK/>
<ITM>Total Alkalinity (as CaCO3)         [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Calcium Hardness (as CaCO3)         [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Conductivity                        [_____] micromho/cm</ITM><BRK/>
<ITM>Written evaluation summary</ITM><BRK/>
<BRK/>
<LST>b.  For cooling systems with capacities greater than<MET> 175.8 kW</MET><ENG> 50 ton</ENG>), the condenser water shall be analyzed 
a minimum of once a month for a period of one year by the water treatment company.  The analysis shall 
include the following information recorded in accordance with <RID>ASTM D 596</RID>.</LST><BRK/>
<BRK/>
<LST>Date of Sample                             [_____]</LST><BRK/>
<LST>Temperatures (before &amp; after condenser)    [_____] [_____] degrees C.</LST><BRK/>
<LST>pH                                         [_____]</LST><BRK/>
<LST>Silica (SiO2)                              [_____] ppm (mg/L)</LST><BRK/>
<LST>Iron (total, as Fe(2)O(3))                 [_____] ppm (mg/L)</LST><BRK/>
<LST>Copper (Cu)                                [_____] ppm (mg/L)</LST><BRK/>
<LST>Calcium Hardness(CaCO3)                    [_____] ppm (mg/L)</LST><BRK/>
<LST>Total Hardness (as CaCO3)                  [_____] ppm (mg/L)</LST><BRK/>
<LST>Chloride (Cl)                              [_____] ppm (mg/L)</LST><BRK/>
<LST>Total Alkalinity (as CaCO3)                [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                               [_____] micromho/cm</LST><BRK/>
<LST>Total Dissolved Solids                     [_____] ppm (mg/L)</LST><BRK/>
<LST>Phosphonate (as PO4)                       [_____] ppm (mg/L)</LST><BRK/>
<LST>Zinc (if used) (Zn)                        [_____] ppm (mg/L)</LST><BRK/>
<LST>Molybdate (if used) (Mo)                   [_____] ppm (mg/L)</LST><BRK/>
<LST>Tolyltriazole (TT)                         [_____] ppm (mg/L)</LST><BRK/>
<LST>Biocide                                    [_____] ppm (mg/L)</LST><BRK/>
<LST>Bacteria colony count                      [_____] colonies/mL</LST><BRK/>
<LST>Makeup water pH                            [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Iron                          [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Silica                        [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Calcium Hardness              [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Total Hardness                [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Total Alkalinity              [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Chloride (Cl)                 [_____] ppm (mg/L)</LST><BRK/>
<LST>Makeup water Conductivity                  [_____] micromho/cm</LST><BRK/>
<LST>Written evaluation summary</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5.2   Chilled Water Quality Assurance Testing (quarterly)</TTL><BRK/>
<BRK/>
<TXT>Quarterly, the following tests shall be performed on chilled water.</TXT><BRK/>
<BRK/>
<LST>PH                                         [_____] </LST><BRK/>
<LST>Nitrite or Molybdate                       [_____] ppm (mg/L)</LST><BRK/>
<LST>Conductivity                               [_____] micromho/cm</LST><BRK/>
<LST>Iron (total, as Fe(2)O(3))                 [_____] ppm (mg/L)</LST><BRK/>
<LST>Written evaluation summary</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5.3   Hot Water Boiler Water Quality Assurance Testing</TTL><BRK/>
<BRK/>
<LST>a.  Quarterly testing of Low and Medium Temperature Systems shall be completed and recorded for the following 
parameters.</LST><BRK/>
<BRK/>
<ITM>PH                                          [_____]</ITM><BRK/>
<ITM>Nitrite or Molybdate                        [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Iron (total, as Fe(2)O(3))                  [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Written evaluation summary</ITM><BRK/>
<BRK/>
<LST>b.  The hot water boiler water shall be analyzed once a month for a period of 1 year by an independent 
consultant.  The analysis shall include the following information recorded in accordance with <RID>ASTM D 596</RID>
.</LST><BRK/>
<BRK/>
<ITM>PH                                          [_____] </ITM><BRK/>
<ITM>Sulfite (Na2SO3)                            [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Hardness(as CaCO3)                          [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Iron (total, as Fe(2)O(3))                  [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Written evaluation summary</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5.4   <SUB>Steam Boiler Water Quality Assurance Tests</SUB></TTL><BRK/>
<BRK/>
<LST>a.  Small and Medium Steam Boiler Systems (quarterly)are systems operating between<MET> 0.25 MW</MET><ENG> 25 hp</ENG> and<MET> 
1 MW </MET><ENG> 100 hp</ENG>.  The following tests shall be performed quarterly.</LST><BRK/>
<BRK/>
<ITM>pH                                            [_____]</ITM><BRK/>
<ITM>Sulfite, if used, (NaSO3)                     [_____] ppm (mg/L)</ITM><BRK/>
<ITM>P Alkalinity (as CaCO3)                       [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Total Dissolved Solids                        [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Phosphate, if used, (PO4)                     [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Polymer, if used                              [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Iron (total, as Fe(2)O(3))                    [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Condensate pH                                 [_____] </ITM><BRK/>
<ITM>Condensate Conductivity                       [_____] micromho/cm</ITM><BRK/>
<ITM>Condensate Hardness (as CaCO3)                [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Condensate Iron (total, as Fe(2)O(3))         [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Makeup Water Hardness (as CaCO3)              [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Written evaluation summary</ITM><BRK/>
<BRK/>
<LST>b.  Large steam boilers are those operating above<MET> 100 kPa</MET><ENG> 15 psi</ENG> and<MET> 1 MW</MET><ENG> 100 hp</ENG>.  The boiler water shall 
be analyzed a minimum of once a month for a period of 1 year by an independent consultant.  The analysis 
shall include the following information recorded in accordance with <RID>ASTM D 596</RID>.</LST><BRK/>
<BRK/>
<ITM>Date of Sample                                [_____]</ITM><BRK/>
<ITM>pH                                            [_____]</ITM><BRK/>
<ITM>Sulfite (NaSO3)                               [_____] ppm (mg/L)</ITM><BRK/>
<ITM>P Alkalinity (as CaCO3)                       [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Conductivity                                  [_____] micromho/cm</ITM><BRK/>
<ITM>Neutralized Conductivity                      [_____] micromho/cm</ITM><BRK/>
<ITM>Total Dissolved Solids                        [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Phosphate   (PO4)                             [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Polymer                                       [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Silica (SiO2)                                 [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Iron (total, as Fe(2)O(3))                    [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Condensate pH                                 [_____] </ITM><BRK/>
<ITM>Condensate Conductivity                       [_____] micromho/cm</ITM><BRK/>
<ITM>Condensate Hardness (as CaCO3)                [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Condensate Iron (total, as Fe(2)O(3))         [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Makeup Water Hardness (as CaCO3)              [_____] ppm (mg/L)</ITM><BRK/>
<ITM>Written evaluation summary</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.6   Corrosion Testers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose from the systems below to be monitored with corrosion testers. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install corrosion coupon and rack systems to verify corrosion control in the systems.  Testers or coupons are 
installed in flowing system water through a sidestream or rack system.  Both mild steel and copper metal samples 
are to be tested in the corrosion testers in accordance with <RID>ASTM D 2688</RID>.  Samples are to be replaced and analyzed 
every 3 months.  Rates of corrosion less than 3 mpy for steel and 0.2 mpy for copper are acceptable.  Corrosion 
testers shall be installed on the piping systems of the following systems.</TXT><BRK/>
<BRK/>
<ITM>Condenser loop</ITM><BRK/>
<ITM>Chilled water system</ITM><BRK/>
<ITM>Hot water loop</ITM><BRK/>
<ITM>Condensate</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   INSPECTIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.6.1   Inspection General Requirements</TTL><BRK/>
<BRK/>
<TXT>Thirty days after project completion, inspect the cooling tower and condenser for problems due to corrosion, 
scale, and biological growth.  If the cooling tower and condenser are found not to conform to the manufacturer's 
recommended conditions, and the water treatment company recommendations have been followed; the water treatment 
company shall provide all chemicals and labor for cleaning or repairing the equipment as required by the manufacturer's 
recommendations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.2   Boiler/Piping Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If a steam boiler is not used, delete the reference to condensate piping.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Thirty day after project completion, inspect the boiler and condensate piping for problems due to corrosion and 
scale.  If the boiler is found not to conform to the manufacturer's recommendations, and the water treatment 
company recommendations have been followed, the water treatment company shall provide all chemicals and labor 
for cleaning or repairing the equipment as required by the manufacturer's recommendations.  If corrosion is found 
within the condensate piping, proper repairs shall be made by the water treatment company.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>