<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA          UFGS-23 64 10 (August 2008)<BRK/>
                                        --------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>             Superseding<BRK/>
                                        UFGS-23 64 00.00 10 (January 2008)<BRK/>
                                        UFGS-23 66 00.00 20 (July 2006) <BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 23 64 10</SCN><BRK/>
<BRK/>
<STL>WATER CHILLERS, VAPOR COMPRESSION TYPE</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>water chilling equipment</SCP>.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
Use of electronic communication is encouraged.<BRK/>
<BRK/>
Brackets are used in the text to indicate designer choices or locations where 
text must be supplied by the designer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)</ORG><BRK/><BRK/><RID>AHRI 450</RID><RTL>(2007) Standard for Water-Cooled Refrigerant Condensers, Remote Type</RTL><BRK/><BRK/><RID>AHRI 460</RID><RTL>(2005) Performance Rating of Remote Mechanical-Draft Air-Cooled Refrigerant Condensers</RTL><BRK/><BRK/><RID>AHRI 480</RID><RTL>(2007) Standard for Refrigerant-Cooled Liquid Coolers, Remote Type</RTL><BRK/><BRK/><RID>AHRI 495</RID><RTL>(2005) Performance Rating of Refrigerant Liquid Receivers</RTL><BRK/><BRK/><RID>AHRI 550/590</RID><RTL>(2003) Standard for Water-Chilling Packages Using the Vapor Compression Cycle</RTL><BRK/><BRK/><RID>AHRI 575</RID><RTL>(1994) Method of Measuring Machinery Sound Within an Equipment Space</RTL><BRK/><BRK/><RID>AHRI 740</RID><RTL>(1998) Refrigerant Recovery/Recycling Equipment</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)</ORG><BRK/><BRK/><RID>ABMA 11</RID><RTL>(1990; R 1999) Load Ratings and Fatigue Life for Roller Bearings</RTL><BRK/><BRK/><RID>ABMA 9</RID><RTL>(1990; R 2000) Load Ratings and Fatigue Life for Ball Bearings</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)</ORG><BRK/><BRK/><RID>ASHRAE 15 &amp; 34</RID><RTL>WARNING: Text in  tags exceeds the maximum length of 300 characters</RTL><BRK/><BRK/><RID>ASHRAE 64</RID><RTL>(2005) Methods of Testing Remote Mechanical-Draft Evaporative Refrigerant Condensers</RTL><BRK/><BRK/><RID>ASHRAE 90.1 - SI</RID><RTL>(2004; Addendas a through p, r through v, x,ak 2006; Supp to Addendas 2006; Errata 2007; Interpretations 8 - 15:2007; Errata 2008; INT 16-21 2008; Errata 2008; INT 22-26 2008) Energy Standard for Buildings Except Low-Rise Residential Buildings, SI Edition</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN WELDING SOCIETY (AWS)</ORG><BRK/><BRK/><RID>AWS Z49.1</RID><RTL>(2005) Safety in Welding, Cutting and Allied Processes</RTL><BRK/><BRK/></REF><REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME BPVC SEC VIII D1</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VIII, Pressure Vessels Division 1 - Basic Coverage</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 307</RID><RTL>(2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength</RTL><BRK/><BRK/><RID>ASTM A 53/A 53M</RID><RTL>(2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless</RTL><BRK/><BRK/><RID>ASTM B 117</RID><RTL>(2007a) Standing Practice for Operating Salt Spray (Fog) Apparatus</RTL><BRK/><BRK/><RID>ASTM D 520</RID><RTL>(2000; R 2005) Zinc Dust Pigment</RTL><BRK/><BRK/><RID>ASTM E 84</RID><RTL>(2008a) Standard Test Method for Surface Burning Characteristics of Building Materials</RTL><BRK/><BRK/><RID>ASTM F 104</RID><RTL>(2003) Standard Classification System for Nonmetallic Gasket Materials</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA MG 11</RID><RTL>(1977; R 2007) Energy Management Guide for Selection and Use of Single Phase Motors</RTL><BRK/><BRK/><RID>NEMA SM 23</RID><RTL>(1991; R 2002) Steam Turbines for Mechanical Drive Service</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 37</RID><RTL>(2006) Installation and Use of Stationary Combustion Engines and Gas Turbines</RTL><BRK/><BRK/><RID>NFPA 54</RID><RTL>(2008) National Fuel Gas Code</RTL><BRK/><BRK/></REF><REF><ORG>SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)</ORG><BRK/><BRK/><RID>SAE J537</RID><RTL>(2000) Storage Batteries</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 1236</RID><RTL>(2006) Standard for Safety Battery Chargers for Charging Engine-Starter Batteries</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Water Chiller</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Manufacturer's standard catalog data, at least highlighted to show material, size, options, 
performance charts and curves, etc. in adequate detail to demonstrate compliance with contract 
requirements.  Data shall include manufacturer's recommended installation instructions and procedures.  
Data shall be adequate to demonstrate compliance with contract requirements as specified within 
the paragraphs:</ITM><BRK/>
<BRK/>
<ITM>a.  Water Chiller</ITM><BRK/>
<BRK/>
<ITM>b.  Chiller Components</ITM><BRK/>
<BRK/>
<ITM>c.  Accessories</ITM><BRK/>
<BRK/>
<ITM>If vibration isolation is specified for a unit, vibration isolator literature shall be included 
containing catalog cuts and certification that the isolation characteristics of the isolators 
provided meet the manufacturer's recommendations.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Posted instructions to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<ITM><BRK/>
[<SUB>Posted Instructions</SUB></ITM><BRK/>
<BRK/>
<ITM>  Posted instructions, including equipment layout, wiring and control diagrams, piping, valves 
and control sequences, and typed condensed operation instructions.  The condensed operation 
instructions shall include preventative maintenance procedures, methods of checking the system 
for normal and safe operation, and procedures for safely starting and stopping the system.  
The posted instructions shall be framed under glass or laminated plastic and be posted where 
indicated by the Contracting Officer.]</ITM><BRK/>
<BRK/>
<ITM><SUB>Verification of Dimensions</SUB></ITM><BRK/>
<BRK/>
<ITM>  A letter including the date the site was visited, conformation of existing conditions, and 
any discrepancies found.</ITM><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Multi-Year Compressor Warranty</SUB></ITM><BRK/>
<BRK/>
<ITM>  Manufacturer's multi-year warranty for compressor(s) in air-cooled water chillers as specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Factory Tests</SUB></ITM><BRK/>
<BRK/>
<ITM>  Schedules which identify the date, time, and location for each test.  Schedules shall be submitted 
for both the Chiller Performance Test and the Chiller Sound Test.  [The Chiller Performance 
Test schedule shall also allow the witnessing of the test by a Government Representative.]</ITM><BRK/>
<BRK/>
<ITM><SUB>System Performance Tests</SUB></ITM><BRK/>
<BRK/>
<ITM>  A schedule, at least [2] [_____] weeks prior to the start of related testing, for the system 
performance tests.  The schedules shall identify the proposed date, time, and location for each 
test.</ITM><BRK/>
<BRK/>
<ITM><SUB>Demonstrations</SUB></ITM><BRK/>
<BRK/>
<ITM>  A schedule, at least [2] [_____] weeks prior to the date of the proposed training course, 
which identifies the date, time, and location for the training.</ITM><BRK/>
<BRK/>
<ITM><SUB>Water Chiller</SUB> - field acceptance test plan</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Field Acceptance Testing</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Water Chiller</SUB> - field acceptance test report</ITM><BRK/>
<BRK/>
<ITM><SUB>Factory Tests</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] copies of the report shall be provided in bound <MET>216 x 279 mm (8 1/2 x 11 inch) </MET><ENG>
8 1/2 x 11 inch</ENG> booklets.  Reports shall certify the compliance with performance requirements 
and follow the format of the required testing standard for both the Chiller Performance Tests 
and the Chiller Sound Tests.  Test report shall include certified calibration report of all 
test instrumentation.  Calibration report shall include certification that all test instrumentation 
has been calibrated within 6 months prior to the test date, identification of all instrumentation, 
and certification that all instrumentation complies with requirements of the test standard.  
Test report shall be submitted [1] [_____] week after completion of the factory test.</ITM><BRK/>
<BRK/>
<ITM><SUB>System Performance Tests</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] copies of the report shall be provided in bound <MET>216 x 279 (8 1/2 x 11 inch) </MET><ENG>
8 1/2 x 11 inch</ENG> booklets.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Refrigeration System</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Where the system, components, or equipment are specified to comply with requirements of AGA, 
NFPA, ARI, ASHRAE, ASME, or UL, [1] [_____] copy of proof of such compliance shall be provided.  
The label or listing of the specified agency shall be acceptable evidence.  In lieu of the label 
or listing, a written certificate from an approved, nationally recognized testing organization 
equipped to perform such services, stating that the items have been tested and conform to the 
requirements and testing methods of the specified agency may be submitted.  When performance 
requirements of this project's drawings and specifications vary from standard ARI rating conditions, 
computer printouts, catalog, or other application data certified by ARI or a nationally recognized 
laboratory as described above shall be included.  If ARI does not have a current certification 
program that encompasses such application data, the manufacturer may self certify that his application 
data complies with project performance requirements in accordance with the specified test standards.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Water Chiller</SUB> - Installation Instruction[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Operation and Maintenance Manuals</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] complete copies of an operation manual in bound <MET>216 x 279 (81/2 x 11 inch) </MET><ENG>8 
1/2 x 11 inch</ENG> booklets listing step-by-step procedures required for system startup, operation, 
abnormal shutdown, emergency shutdown, and normal shutdown at least [4] [_____] weeks prior 
to the first training course.  The booklets shall include the manufacturer's name, model number, 
and parts list.  The manuals shall include the manufacturer's name, model number, service manual, 
and a brief description of all equipment and their basic operating features.  [Six] [_____] 
complete copies of maintenance manual in bound <MET>216 x 279 (81/2 x 11 inch) </MET><ENG>8 1/2 x 11 inch</ENG> booklets 
listing routine maintenance procedures, possible breakdowns and repairs, and a trouble shooting 
guide.  The manuals shall include piping and equipment layouts and simplified wiring and control 
diagrams of the system as installed.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SAFETY REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, 
and parts that may be a hazard to operating personnel shall be insulated, fully enclosed, guarded, or fitted 
with other types of safety devices.  Safety devices shall be installed so that proper operation of equipment 
is not impaired.  Welding and cutting safety requirements shall be in accordance with <RID>AWS Z49.1</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Stored items shall be protected from the weather, humidity and temperature variations, dirt and dust, or other 
contaminants.  Proper protection and care of all material both before and during installation shall be the Contractor's 
responsibility.  Any materials found to be damaged shall be replaced at the Contractor's expense.  During installation, 
piping and similar openings shall be capped to keep out dirt and other foreign matter.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   PROJECT REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Verification of Dimensions</SUB></TTL><BRK/>
<BRK/>
<TXT>The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and advise 
the Contracting Officer of any discrepancy before performing any work.</TXT><BRK/>
<BRK/></SPT>
</SPT><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Warranties on Navy construction:  Warranties for equipment, materials, 
or design furnished, or workmanship performed by the Contractor or any subcontractor 
or supplier, has a duration of one year from the date of final acceptance of 
the work.  An exception is in normal commercial practice longer warranty period 
for particular construction are given.<BRK/>
<BRK/>
An example of a typically longer duration period is the warranty for the chiller 
refrigeration compressor, is typically good for five years.  The Contractor 
submits to the Contracting Officer all applicable warranties signed and official 
prior to project closeout.<BRK/>
<BRK/>
If a longer than one year warranty duration is desired, it is recommended that 
the specifier/designer survey the chiller market to determine if the chiller 
industry normally provides a longer warranty for all of the subject chiller 
or for any major components.<BRK/>
<BRK/>
A warranty duration of longer than a year, and not covered normally by the industry, 
requires a Level III Contracting Officer's written determination documenting 
that the extra warranty protection is needed.</NPR><BRK/>
<AST/><BRK/></NTE>
<SPT><TTL>1.6   Warranty</TTL><BRK/>
<BRK/>
<TXT>In addition to the warranty requirements specification in Division 00, Contract Requirements, the following major 
components of the chiller shall be covered by a warranty of a duration period of five years:  compressor, and 
[______].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   <SUB>MANUFACTURER'S MULTI-YEAR COMPRESSOR WARRANTY</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is to be used only in conjunction with an air-cooled water 
chiller.  If an air-cooled water chiller is not specified, then delete this paragraph.<BRK/>
<BRK/>
The designer will be responsible for selecting the length of the warranty, the 
type (i.e., parts only, or parts and labor), and a response time.  Coordinate 
the selections made with the installation and consider the needs and repair/response 
capabilities of the user, the criticality of the site, the location of the site 
in relation to the availability of manufacturer qualified technicians, and cost.<BRK/>
<BRK/>
Response time is site/manufacturer dependent although for most sites a 6-hour 
response time is reasonable.  Response time may differ from the response time 
indicated for items covered under the standard construction warranty.  Designers 
must be aware that specifying a response time less than 24 hours for warranty 
service on chillers at remote sites may limit competition.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor shall provide a [5] [10] year [parts only (excludes refrigerant)][parts and labor (includes refrigerant)] 
manufacturer's warranty on the chiller compressor(s).  This warranty shall be directly from the chiller manufacturer 
to the Government and shall be in addition to the standard one-year warranty of construction.  The manufacturer's 
warranty shall provide for the repair or replacement of the chiller compressor(s) that become inoperative as 
a result of defects in material or workmanship within [5] [10] years after the date of final acceptance.  When 
the manufacturer determines that a compressor requires replacement, the manufacturer shall furnish new compressor(s) 
at no additional cost to the Government.  Upon notification that a chiller compressor has failed under the terms 
of the warranty, the manufacturer shall respond in no more than [6] [24] [_____] hours.  Response shall mean 
having a manufacturer-qualified technician onsite to evaluate the extent of the needed repairs.  The warranty 
period shall begin on the same date as final acceptance and shall continue for the full product warranty period.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.7.1   Indexed Notebook</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where multiple air-cooled water chillers are to be covered by a manufacturer's 
multi-year warranty, include the following paragraph.  This paragraph requires 
a bound and indexed notebook.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor shall furnish to the Contracting Officer a bound and indexed notebook containing a complete listing 
of all water chillers covered by a manufacturer's multi-year warranty.  The chiller list shall state the duration 
of the warranty thereof, start date of the warranty, ending date of the warranty, location of the warranted equipment, 
and the point of contact for fulfillment of the warranty.  This information shall be provided for each chiller 
and the recorded chiller serial numbers shall identify each chiller.  Point of contact shall include the name 
of the service representative along with the day, night, weekend, and holiday phone numbers for a service call.  
The completed bound and indexed notebook shall be delivered to the Contracting Office prior to final acceptance 
of the facility.</TXT><TXT>The Contractor shall furnish with each manufacturer's multi-year warranty the name, address, 
and telephone number (day, night, weekend, and holiday) of the service representative nearest to the location 
where the equipment is installed.  Upon a request for service under the multi-year warranty, the service representative 
shall honor the warranty during the warranty period, and shall provide the services prescribed by the terms of 
the warranty.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7.2   Equipment Warranty Tags</TTL><BRK/>
<BRK/>
<TXT>At the time of installation, each item of manufacturer's multi-year warranted equipment shall be tagged with 
a durable, oil- and water-resistant tag, suitable for interior and exterior locations, resistant to solvents, 
abrasion, and fading due to sunlight.  The tag shall be attached with copper wire or a permanent, pressure-sensitive, 
adhesive backing.  The tag shall be installed in an easily noticed location attached to the warranted equipment.  
The tag for this equipment shall be similar to the following in format, and shall contain all of the listed information:<BRK/>
<BRK/>
MANUFACTURER'S MULTI-YEAR WARRANTY EQUIPMENT TAG<BRK/>
Equipment/Product Covered:  ____________________<BRK/>
Manufacturer:_______Model No.:_____Serial No.:__<BRK/>
Warranty Period:  From _________to _____________<BRK/>
Contract No.:  _________________________________<BRK/>
Warranty Contact:  _____________________________<BRK/>
Name:  _________________________________________<BRK/>
Address:  ______________________________________<BRK/>
Telephone:  ____________________________________<BRK/>
     STATION PERSONNEL SHALL PERFORM PREVENTIVE<BRK/>
     MAINTENANCE AND OPERATIONAL MAINTENANCE</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Job specifications will be written to avoid restrictions on specific 
types of refrigerant (excluding CFC refrigerants) in order to encourage competitive 
bidding of available product offerings.</NPR><BRK/>
<BRK/>
<NPR>Minimum chiller efficiencies will either be presented in this specification 
or on the design drawings.  Delete chiller efficiencies in the specification 
if efficiencies are shown on the drawings.  If the efficiencies are shown on 
the drawings, reference the applicable ARI standard.</NPR><BRK/>
<BRK/>
<NPR>The following is a list of terms which are commonly used in regard to efficiency 
ratings of equipment defined within this specification.</NPR><BRK/>
<BRK/>
<NPR>COP  - Coefficient of Performance (dimensionless)</NPR><BRK/>
<NPR>EER  - Energy Efficiency Ratio (Btuh/Watt)</NPR><BRK/>
<NPR>IPLV - Integrated Part Load Value</NPR><BRK/>
<NPR>(dimensionless or kW/ton)</NPR><BRK/>
<NPR>NPLV - Non-Standard Part Load Value</NPR><BRK/>
<NPR>(dimensionless or kW/ton)</NPR><BRK/>
<BRK/>
<NPR>Note that the IPLV ratings presented by manufacturers are based upon standard 
rating conditions established by ARI.  NPLV ratings on the other hand are based 
upon site specific rating conditions.  NPLV ratings should be specified in most 
applications.  NPLV ratings will be coordinated with ARI and with the chiller 
manufacturers.</NPR><BRK/>
<BRK/>
<NPR>The following is a list of minimum full load and part load efficiency ratings 
to be used to specify electrically driven, air-cooled and water-cooled water 
chillers.  Minimum efficiency ratings for water chillers are defined under paragraph 
WATER WATER CHILLER.</NPR><BRK/>
<TBL><THD><BRK/>
<HL4>Minimum Efficiencies for Air-Cooled Chillers</HL4><BRK/>
<BRK/>
                                             Full Load         IPLV<BRK/>
                                             COP  (EER)     COP  (kW/ton)<BRK/></THD>
<BRK/>
      Air-Cooled (with Condenser):<BRK/>
        527 kW (150 tons) or less =           2.8  (9.5)     3.1  (1.12)<BRK/>
        greater than 527 kW (150 tons) =      2.7  (9.2)     2.9  (1.22)<BRK/>
<BRK/>
      Air-Cooled (Condenserless):<BRK/>
        All Capacities =                      3.1  (10.6)    3.2  (1.10)<BRK/></TBL>
<TBL><THD><BRK/>
<BRK/>
<HL4>Minimum Efficiencies for Water-Cooled Chillers</HL4><BRK/>
<BRK/>
                                             Full Load         IPLV<BRK/>
             Capacity                       COP  (EER)     COP  (kW/ton)<BRK/></THD>
<BRK/>
        281 kW (80 tons) or less =          3.9  (13.3)     4.7  (0.75)<BRK/>
<BRK/>
        greater than 281 kw (80 tons)<BRK/>
        or less than or equal to<BRK/>
        351 kw (100 tons) =                 3.9  (13.3)     5.1  (0.70)<BRK/>
<BRK/>
        greater than 351 kw (100 tons)<BRK/>
        or less than or equal to<BRK/>
        702 kw (200 tons) =                 4.7  (16.0)     5.4  (0.65)<BRK/>
<BRK/>
        greater than 702 kw (200 tons)<BRK/>
        or less than or equal to<BRK/>
        1757 kw (500 tons) =                5.7  (19.4)     6.1  (0.58)<BRK/>
<BRK/>
        greater than 1757 kw (500 tons) =   5.9  (20.0)     6.3  (0.56)<BRK/>
<BRK/></TBL>
<BRK/>
<NPR>Because of typical manufacturing practices, air-cooled and small water-cooled 
chillers (typically less than 527 kW (150 tons)) are not available in multiple 
efficiencies for each available capacity.  Only one model, and therefore, only 
one efficiency is available from a manufacturer for a given capacity.  The minimum 
efficiencies stated above for air-cooled and small water-cooled chillers are 
low enough to allow all of the major chiller manufacturers to competitively 
bid.  Specifying a higher efficiency for air-cooled and small water-cooled chillers 
will limit competition and may require a sole source justification.</NPR><BRK/>
<BRK/>
<NPR>Larger water-cooled chillers (greater than 527 kW (150 tons)) are available 
in multiple efficiencies for each available capacity.  The minimum efficiencies 
stated above are only guidelines in specifying efficiencies.  The designer will 
be responsible for developing a life cycle cost comparison between available 
efficiencies to determine the optimum alternative.  The decision to specify 
a more efficiency water chiller than the minimums defined above will typically 
be driven by the kW-hour costs, the electrical demand costs, and the chiller's 
annual energy usage.  A designer should develop a sole source justification 
(if applicable) to procure the most life cycle cost effective chiller applicable.  
Coordinate chiller efficiencies with chiller manufacturers prior finalizing 
the specification.</NPR><BRK/>
<BRK/>
<NPR>The driving force in the procurement of higher efficient equipment is Executive 
Order 12902.  Executive Order 12902 specifies that energy consuming products 
be selected which are in the top 25 percent of their class for energy efficiency 
or, at a minimum, at least 10 percent better than current federal minimum standards, 
to the extent practical and cost effective.</NPR><BRK/>
<BRK/>
<NPR>Full and part load efficiencies for gas-engine driven water chillers will have 
a COP of between 1.0 and 2.0 based upon operating conditions (i.e., with heat 
recovery, without heat recovery, etc.).  A designer will coordinate with chiller 
manufacturers prior to specifying a minimum full or part load efficiency for 
a gas-engine driven chiller.  Gas-engine driven chiller can be provided with 
compressors of the centrifugal type (typically larger than 2460 kW (700 tons)), 
the rotary screw type (intermediate sizes), the reciprocating type (typically 
up to 703 kW (200 tons)), and the scroll type (small system).</NPR><BRK/>
<BRK/>
<NPR>Projects which include vapor-compression type water chillers (this excludes 
water chillers) will comply with the safety standards defined in ASHRAE 15.  
Designers will be responsible for thoroughly researching and implementing the 
ASHRAE 15 safety requirements.  For refrigerant-containing parts (excluding 
piping) located within an indoor space, a designer can use the following 6-step 
synopsis as a guide in determining "System Application Requirements" from ASHRAE 
15.</NPR><BRK/>
<BRK/>
<NPR>     Step 1.  Identify the safety group classification of the refrigerant anticipated 
to be used in the new water chilling equipment.  Refrigerants R-22 and R-134a 
are considered Group A1 refrigerants.  Refrigerant R-123 is considered a Group 
B1 refrigerant.<BRK/>
<BRK/>
     Step 2.  Identify the occupancy classification of the facility which will 
house the new water chilling equipment.  Occupancies include institutional, 
public assembly, residential, commercial, large mercantile, industrial, and 
mixed types.<BRK/>
<BRK/>
     Step 3.  Determine the system probability (high or low) of the new water 
chilling equipment.  Water chillers are typically considered low-probability 
systems according to ASHRAE 15.<BRK/>
<BRK/>
     Step 4.  Estimate the quantity of refrigerant (grams or pounds) in the 
largest single water chiller or largest refrigerant circuit of the new equipment.  
The designer will research catalog data from a minimum of 2 different water 
chiller manufacturers in order to get an approximation.<BRK/>
<BRK/>
     Step 5.  Determine the volume (cubic meters or cubic feet) of the indoor 
space which is planned to house the new water chilling equipment.<BRK/>
<BRK/>
     Step 6.  Identify the "System Application Requirements" from the applicable 
table in ASHRAE 15 based upon the information identified in the previous steps 
(e.g., safety group, occupancy, system probability, refrigerant quantity, and 
indoor space volume).  The "System Application Requirements" will dictate applicable 
refrigerant limitations as well as occupied space or mechanical room requirements.  
Typically, indoor spaces housing water chilling equipment must meet the mechanical 
room requirements defined in ASHRAE 15.</NPR><BRK/>
<BRK/>
<NPR>ASHRAE 15 refers to a mechanical room as a machinery room, however, the terms 
are synonymous.  On mechanical room design, ASHRAE 15 touches on criteria concerning 
chiller placement, ventilation design, door and passageway restrictions, refrigerant 
monitoring, open-flame devices, pressure-relief and purge piping.  In addition 
to  mechanical room design, ASHRAE 15 also touches on criteria concerning refrigerant 
piping, signs, self-contained breathing apparatus (SCBA), and miscellaneous 
installation restrictions.  (SCBAs cannot be considered MCA funded items and 
are therefore not included in this specification.)</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.1   STANDARD COMMERCIAL PRODUCTS</TTL><BRK/>
<BRK/>
<TXT>Materials and equipment shall be standard Commercial cataloged products of a manufacturer regularly engaged in 
the manufacturing of such products, which are of a similar material, design and workmanship.</TXT><BRK/>
<BRK/>
<TXT>These products shall have a two year record of satisfactory field service prior to bid opening.  the two year 
record of service shall include applications of equipment and materials under similar circumstances and of similar 
size.</TXT><BRK/>
<BRK/>
<TXT>Products having less than a two year record of satisfactory field service shall be acceptable if a certified 
record of satisfactory field service for not less than 6000 hours can be shown.  The 6000 hour service record 
shall not include any manufacturer's prototype or factory testing.</TXT><BRK/>
<BRK/>
<TXT>Satisfactory field service shall have been completed by a product that has been, and presently is being sold 
or offered for sale on the commercial market through the following copyrighted means:  advertisements, manufacturer's 
catalogs, or brochures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   MANUFACTURER'S STANDARD NAMEPLATES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In a salt water environment, substitute acceptable non-corroding metal 
such as but not limited to nickel-copper, 304 stainless steel, or monel.  Aluminum 
is unacceptable.  Nomenclature (or system identification) should be established 
by the designer.</NPR><BRK/>
<BRK/>
<NPR>Choose first bracketed paragraph for Army projects.  Second bracketed paragraph 
for Navy projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Major equipment including chillers, compressors, compressor drivers, condensers, water coolers, receivers, refrigerant 
leak detectors, heat exchanges, fans, and motors shall have the manufacturer's name, address, type or style, 
model or serial number, and catalog number on a plate secured to the item of equipment.  Plates shall be durable 
and legible throughout equipment life.  Plates shall be fixed in prominent locations with nonferrous screws or 
bolts.]</TXT><BRK/>
<BRK/>
<TXT>[Nameplates are required on major components if the manufacturer needs to provide specific engineering and manufacturing 
information pertaining to the particular component.  Should replacement of this component be required, nameplate 
information will insure correct operation of the unit after replacement of this component.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   ELECTRICAL WORK</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where motor starters for mechanical equipment are provided in motor-control 
centers, the references to motor starters will be deleted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE:  Show the electrical characteristics, motor starter type(s), enclosure 
type, and maximum rpm on the drawings in the equipment schedule.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><AST/><NPR>Where reduced-voltage motor starters are recommended by the manufacturer or 
required otherwise, specify and coordinate the type(s) required in Section 
<SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM.  Reduced-voltage starting is required 
when full voltage starting will interfere with other electrical equipment and 
circuits and when recommended by the manufacturer.  Where adjustable speed drives 
(SD) are specified, reference Section <SRF>26 29 23</SRF> VARIABLE FREQUENCY DRIVE SYSTEMS 
UNDER 600 VOLTS.  The methods for calculating the economy of using an adjustable 
speed drive is described in UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS</NPR><BRK/>
<AST/><BRK/></NTE>
<LST>a.  Provide motors, controllers, integral disconnects, contactors, and controls with their respective 
pieces of equipment, except controllers indicated as part of motor control centers.  Provide electrical 
equipment, including motors and wiring, as specified in Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM.  
Manual or automatic control and protective or signal devices required for controls and devices specified, 
but not shown, shall be provided.  For packaged equipment, the manufacturer shall provide controllers 
including the required monitors and timed restart.</LST><BRK/>
<BRK/>
<LST>b.  For single-phase motors, provide high-efficiency type, fractional-horsepower alternating-current 
motors, including motors that are part of a system, in accordance with <RID>NEMA MG 11</RID>.</LST><BRK/>
<BRK/>
<LST>c.  For polyphase motors, provide squirrel-cage medium induction motors, including motors that are part 
of a system, and that meet the efficiency ratings for premium efficiency motors in accordance with <RID>NEMA MG 11</RID>
.</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Bracketed sentence "Motor bearings..." to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>d.  Provide motors in accordance with <RID>NEMA MG 11</RID> and of sufficient size to drive the load at the specified 
capacity without exceeding the nameplate rating of the motor.  Motors shall be rated for continuous duty 
with the enclosure specified.  Motor duty requirements shall allow for maximum frequency start-stop operation 
and minimum encountered interval between start and stop.  Motor torque shall be capable of accelerating 
the connected load within 20 seconds with 80 percent of the rated voltage maintained at motor terminals 
during one starting period.  Provide motor starters complete with thermal overload protection and other 
necessary appurtenances.  [Motor bearings shall be fitted with grease supply fittings and grease relief 
to outside of the enclosure.]</LST><BRK/>
<BRK/>
<LST>e.  Provide inverter duty premium efficiency motors for use with variable frequency drives.</LST><BRK/>
<BRK/>
<LST>f.  [Where two-speed or variable-speed motors are indicated, solid-state variable-speed controllers may 
be provided to accomplish the same function.  Use solid-state variable-speed controllers for motors rated <MET>
7.45 kW</MET><ENG>10 hp</ENG> or less and variable frequency drives for larger motors.]  [Provide variable frequency drives 
for motors as specified in Section <SRF>26 29 23</SRF> VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS]</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   SELF-CONTAINED WATER CHILLERS, VAPOR COMPRESSION TYPE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Typically, units 500 tons or smaller are fully assembled and run-tested 
at the factory.  Units larger than 500 tons are typically shipped and then assembled, 
charged, and run-tested in the field.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Unless necessary for delivery purposes, units shall be assembled, leak-tested, charged (refrigerant and oil), 
and adjusted at the factory.  In lieu of delivery constraints, a chiller may be assembled, leak-tested, charged 
(refrigerant and oil), and adjusted at the job site by a factory representative.  Unit components delivered separately 
shall be sealed and charged with a nitrogen holding charge.  Parts weighing <MET>23 kg </MET><ENG>50 pounds</ENG> or more which must 
be removed for inspection, cleaning, or repair, such as motors, gear boxes, cylinder heads, casing tops, condenser, 
and cooler heads, shall have lifting eyes or lugs.  Chiller shall be provided with a single point wiring connection 
for incoming power supply.  Chiller's condenser and water cooler shall be provided with [standard] [marine] water 
boxes with [grooved mechanical] [flanged] [welded] connections.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.4.1   Scroll, Reciprocating, or Rotary Screw Type</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  These type units are typically available in capacities of 1406 kW (400 
tons) or less.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chiller shall be rated in accordance with <RID>AHRI 550/590</RID>.  Chiller shall conform to <RID>ASHRAE 15 &amp; 34</RID>.  As a minimum, 
chiller shall include the following components as defined in paragraph CHILLER COMPONENTS.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Refrigerant and oil</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Structural base</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Chiller refrigerant circuit</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Controls package</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Scroll, reciprocating, or rotary screw compressor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Compressor driver, [electric motor] [gas-engine]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Compressor driver connection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Water cooler (evaporator)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  [Air][Water]-cooled condenser coil</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  [Heat recovery condenser]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">k.  [Receiver]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tools to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">l.  [Tools]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Centrifugal or Rotary Screw Type</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: These type units are typically available in capacities of 703 kW (150 
tons) or more.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chiller shall be constructed and rated in accordance with <RID>AHRI 550/590</RID>.  Chiller shall conform to <RID>ASHRAE 15 &amp; 34</RID>
.  As a minimum, chiller shall include the following components as defined in paragraph CHILLER COMPONENTS.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Refrigerant and oil</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Structural base</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Chiller refrigerant circuit</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Controls package</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Centrifugal or rotary screw compressor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Compressor driver, [electric motor] [gas-engine] [steam turbine]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Compressor driver connection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Water cooler (evaporator)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  [Air][Water]-cooled condenser coil</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  [Heat recovery condenser coil]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">k.  [Receiver]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">l.  Purge system for chillers which operate below atmospheric pressure</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">m.  [Tools]</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5   SPLIT-SYSTEM <SUB>WATER CHILLER</SUB>, VAPOR COMPRESSION TYPE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Typically, units 500 tons or smaller are fully assembled and run-tested 
at the factory.  Units larger than 500 tons are typically shipped and then assembled, 
charged, and run-tested in the field.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Total chiller system shall be constructed and rated in accordance with ARI 550/590.  Individual chiller components 
shall be constructed and rated in accordance with the applicable ARI standards.  Chiller system shall be conform 
to <RID>ASHRAE 15 &amp; 34</RID>.  [The chiller shall be <RID>ASHRAE 90.1 - SI</RID> complaint and 10 CFR Part 433, 434 and 435 efficiency 
performance standards for federal construction.  The manufacturer shall provide certification of compliance].  
Chiller shall be assembled, leak-tested, charged (refrigerant and oil), and adjusted at the job site in strict 
accordance with manufacturer's recommendations.  Unit components delivered separately shall be sealed and charged 
with a nitrogen holding charge.  Unit assembly shall be completed in strict accordance with manufacturer's recommendations.  
Chiller shall operate within capacity range and speed recommended by the manufacturer.  Parts weighing 50 pounds 
or more which must be removed for inspection, cleaning, or repair, shall have lifting eyes or lugs.  Chiller 
shall include all customary auxiliaries deemed necessary by the manufacturer for safe, controlled, automatic 
operation of the equipment.  Chiller's condenser and water cooler shall be provided with [standard] [marine] 
water boxes with [grooved mechanical] [flanged] [welded] connections.  Chillers shall operate at partial load 
conditions without increased vibration over normal vibration at full load, and shall be capable of continuous 
operation down to minimum capacity.  As a minimum, chiller shall include the following components as defined 
in paragraph CHILLER COMPONENTS.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Refrigerant and oil</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Structural base</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Chiller refrigerant circuit</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Controls package</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  [Receiver]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tools to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">f.  [Tools]</ITM><BRK/>
<BRK/>
<SPT><TTL>2.5.1   Compressor-Chiller Unit</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  These type units are typically available in capacities of 1406 kW (400 
tons) or less.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>As a minimum, the compressor-chiller unit shall include the following components as defined in paragraph CHILLER 
COMPONENTS.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Scroll, reciprocating, or rotary screw compressor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Compressor driver, electric motor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Compressor driver connection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Water cooler (evaporator)</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   Condensing Unit</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: These type units are typically available in capacities of 703 kW (150 
tons) or more.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>As a minimum, the condensing unit shall include the following components as defined in paragraph CHILLER COMPONENTS.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Scroll, reciprocating, or rotary screw compressor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Compressor driver, electric motor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Compressor driver connection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Air or water cooled condenser</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.3   Remote Water Cooler (Evaporator)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coil bundles to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.5.3.1   Shell and Tube Type</TTL><BRK/>
<BRK/>
<TXT>Cooler shall be constructed and rated in accordance with <RID>AHRI 480</RID>.  Cooler shall be of the shell-and-coil or 
shell-and-tube type design.  Cooler's refrigerant side shall be designed and factory pressure tested to comply 
with <RID>ASHRAE 15 &amp; 34</RID>.  Cooler's water side shall be designed and factory pressure tested for not less than 
[150] [250] psi.  Cooler shell shall be constructed of seamless or welded steel.  [Coil bundles shall be totally 
removable and arranged to drain completely.]  Tubes shall be seamless copper, plain, integrally finned with smooth 
bore or integrally finned with enhanced bore.  Each tube shall be individually replaceable.  Tubes shall be installed 
into carbon mild steel tube sheets by rolling.  Tube baffles shall be properly spaced to provide adequate tube 
support and cross flow.  Cooler shall be skid-mounted.  Refrigerant circuit shall be complete with liquid solenoid 
valve and expansion device capable of modulating to the minimum step of capacity unloading.  For the water side 
of water cooler, performance shall be based on a water velocity not less than 3 fps and not more than 12 fps 
and a fouling factor of 0.00025.  [Evaporator shall be provided with electric freeze protection type.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.3.2   Brazed Plate Type</TTL><BRK/>
<BRK/>
<TXT>Cooler shall be constructed and rated in accordance with <RID>AHRI 480</RID>.  Cooler shall be of the brazed plate design.  
Cooler's refrigerant side shall be designed and factory pressure tested to comply with <RID>ASHRAE 15 &amp; 34</RID>.  Cooler's 
water side shall be designed and factory pressure tested for not less than [150] [250] psi.  Cooler shell shall 
be constructed of stainless steel plates brazed together with copper.  Refrigerant circuit shall be complete 
with liquid solenoid valve and expansion device capable of modulating to the minimum step of capacity unloading.  
For the water side of water cooler, performance shall be based on a water velocity not less than 3 fps and not 
more than 12 fps and a fouling factor of 0.00025.  [Evaporator shall be provided with electric freeze protection 
type.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5.4   Remote Air-Cooled Condenser</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Louvered panels to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Condenser shall be a factory-fabricated and assembled unit, consisting of coils, fans, and condenser fan motors.  
Condenser shall be constructed and rated in accordance with <RID>AHRI 460</RID>.  [Unless the condenser coil is completely 
protected through inherent design, louvered panel coil guards shall be provided by the manufacturer to prevent 
physical damage to the coil.]  Manufacturer shall certify that the condenser and associated equipment are designed 
for the submitted condensing temperature.  For design conditions, if matched combination catalog ratings matching 
remote condensers to compressors are not available, the Contractor shall furnish a crossplotting of the gross 
heat rejection of the condenser against the gross heat rejection of the compressor, for the design conditions 
to show the compatibility of the equipment furnished.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.5.4.1   Condenser Casing</TTL><BRK/>
<BRK/>
<TXT>Condenser casing shall be aluminum not less than [0.040] [0.080] inch or hot-dip galvanized steel not lighter 
than 18 gauge.  Condensers having horizontal air discharge shall be provided with discharge baffle to direct 
air upward, constructed of the same material and thickness as the casing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4.2   Coil</TTL><BRK/>
<BRK/>
<TXT>Condenser coil shall be of the extended-surface fin-and-tube type and shall be constructed of seamless [copper] 
[or] [aluminum] tubes with compatible [copper] [or] [aluminum] fins.  Fins shall be soldered or mechanically 
bonded to the tubes and installed in a metal casing.  Coils shall be circuited and sized for a minimum of 5 degrees 
F subcooling and full pumpdown capacity.  Coil shall be factory leak and pressure tested after assembly in accordance 
with <RID>ASHRAE 15 &amp; 34</RID>.  [Coil shall be entirely coated with the manufacturer's standard epoxy or vinyl coating.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4.3   Fans</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Belt drives to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fans shall be centrifugal or propeller type as best suited for the application.  Fans shall be direct or V-belt 
driven.  [Belt drives shall be completely enclosed within the unit casing or equipped with a guard.]  [When belt 
drive is provided, an adjustable sheave to furnish not less than 20 percent fan-speed adjustment shall be provided.  
Sheaves shall be selected to provide the capacity indicated at the approximate midpoint of the adjustment.]  
Fans shall be statically and dynamically balanced.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4.4   Condenser Sizing</TTL><BRK/>
<BRK/>
<TXT>Size condensers for full capacity at <ENG>30 degrees F</ENG> temperature difference between entering outside air and condensing 
refrigerant.  Subcooling shall not be considered in determining compressor and condenser capacities.    For design 
conditions, submit a cross-plot of net refrigeration effect of compressor to establish net refrigeration effect 
and compatibility of equipment furnished.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4.5   Low Ambient Control</TTL><BRK/>
<BRK/>
<TXT>Provide factory mounted head pressure control for operation during low ambient conditions.  Head pressure shall 
be controlled by [fan cycling,] [fan speed control,] [condenser refrigerant flooding].  Low ambient control shall 
permit compressor operation below [<ENG>40 degrees F</ENG><MET>4.4 degrees C</MET>] [<ENG>0 degrees F</ENG><MET>-17.7 degrees C</MET>] [<ENG>______ degrees F</ENG><MET>_____ 
degrees C</MET>].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.4.6   High Ambient Unloading</TTL><BRK/>
<BRK/>
<TXT>Provide unloading capability to allow operation in high ambient conditions [<ENG>______ degrees F</ENG><MET>_____ degrees C</MET>] 
above design conditions.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5.5   Remote Water-Cooled Condenser</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coil bundles to be used in Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Condenser shall be a factory-fabricated and assembled unit constructed and rated in accordance with <RID>AHRI 450</RID>.  
Condenser shall be of the shell-and-coil or shell-and-tube type design.  Condenser's refrigerant side shall be 
designed and factory pressure tested to comply with <RID>ASHRAE 15 &amp; 34</RID>.  Condenser's water side shall be designed 
and factory pressure tested for not less than [150] [250] psi.  Condensers shall be complete with pressure relief 
valve or rupture disk, water drain connections, refrigerant charging valve, refrigerant valves, liquid-level 
indicating devices, and stand or saddle.  Low pressure refrigerant condenser shall be provided with a purge valve 
located at the highest point in the condenser to purge non-condensibles trapped in the condenser.  Condenser 
shell shall be constructed of seamless or welded steel.  [Coil bundles shall be totally removable and arranged 
to drain completely.]  Tubes shall be seamless copper, plain, integrally finned with smooth bore or integrally 
finned with enhanced bore.  Each tube shall be individually replaceable, except for the coaxial tubes.  Tubes 
shall be installed into carbon mild steel tube sheets by rolling.  Tube baffles shall be properly spaced to provide 
adequate tube support and cross flow.  Condenser performance shall be based on water velocities not less than 
3 fps nor more than 12 fps and a fouling factor of [0.00025] [0.0005].  Water-cooled condensers may be used for 
refrigerant storage in lieu of a separate liquid receiver, if the condenser storage capacity is 20 percent in 
excess of the fully charged system for remote water cooled condensers.  As a minimum, the condenser shall include 
the following components as defined in paragraph "Chiller Components".</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Liquid-level indicating devices.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Companion flanges, bolts, and gaskets for flanged water connections.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.6   Remote Evaporatively-Cooled Condenser</TTL><BRK/>
<BRK/>
<TXT>Condenser shall be rated and tested in accordance with the requirements of <RID>ASHRAE 64</RID>.  Condenser shall include 
fans, water pump with suction strainer, electric motor and drive equipment, water eliminators if required, condensing 
coil, liquid receiver if required, water pan or sump, spray nozzles or water-distribution pan, water strainer, 
water make-up assembly, bleeder with flow valve of the needle valve type sized for the flow required or a fixed 
orifice, enclosure with suitable access doors, and air-inlet and outlet openings.  No water shall carry over 
into the unit discharge outlet.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.5.6.1   Condenser Casing</TTL><BRK/>
<BRK/>
<TXT>Enclosure shall be constructed of not lighter than [18 gauge hot-dip galvanized steel] [0.080 inch aluminum], 
reinforced and braced.  Access doors or panels suitably sized and located shall be provided for access to water 
nozzles or distribution pan, coils, and valves for cleaning, repair, or removal of the item.  Access doors or 
panels shall be gasketed with synthetic rubber, or equivalent gasket material, and locked in place with thumb 
screws or catches.  One-half inch mesh hot-dip galvanized steel or copper air-inlet screens shall be provided 
on each air inlet.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.6.2   Refrigerant Section</TTL><BRK/>
<BRK/>
<TXT>Condenser coil shall be constructed of unfinned copper or steel tubes hot-dip galvanized after fabrication.  
The receiver shall be welded steel and shall be fitted and tested in accordance with <RID>AHRI 495</RID>.  A refrigerant 
charging valve shall be installed in the liquid line between the receiver cut-off valve and the expansion device.  
Refrigerant section shall be tested in accordance with ASHRAE 15 for the refrigerant employed in the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.6.3   Fans</TTL><BRK/>
<BRK/>
<TXT>Fans shall be centrifugal or propeller type as best suited for the application.  Fans shall be direct or V-belt 
driven.  Belt drives shall be completely enclosed within the unit casing or equipped with a guard.  When belt 
drive is provided, an adjustable sheave to furnish not less than 20 percent fan-speed adjustment shall be provided.  
Sheaves shall be selected to provide the capacity indicated at the approximate midpoint of the adjustment.  Fans 
shall be statically and dynamically balanced.  Fan motor shall be totally enclosed type or open dripproof and 
located within an enclosure to be fully protected from the weather.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.6.4   Water Section</TTL><BRK/>
<BRK/>
<TXT>Water eliminators shall be constructed of nonferrous metal, of an approved nonmetallic material, or of not lighter 
than 24 gauge steel, hot-dip galvanized after fabrication.  Spray nozzles shall be brass nonclogging type designed 
to permit easy disassembly, and shall be arranged for easy access.  Water pump shall be bronze-fitted centrifugal 
or turbine type, and may be mounted as an integral part of the evaporative condenser or remotely on a separate 
mounting pad.  Pump suction shall be fully submerged and provided with screened inlet.  Water pan or sump shall 
be constructed of not lighter than 14 gauge steel, hot-dip galvanized after fabrication, or molded acid-resistant 
glass-fiber-reinforced polyester.  Water distribution pan shall be constructed of not lighter than 16 gauge steel, 
hot-dip galvanized after fabrication.  Joints shall be watertight.  Water pan or sump shall be provided with 
drain, overflow, and make-up water connection with stop valve and float valve.  A bleed line with a flow valve 
of the needle type sized for the flow required or fixed orifice shall be provided in the pump discharge line 
and shall be extended to the nearest drain for continuous discharge.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.6   CHILLER COMPONENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate the type of chiller components required with the type of chiller 
specified in the previous paragraphs.  Components define under this paragraph 
do not apply to water type chillers.  Delete this paragraph if only water type 
chillers are specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.6.1   Refrigerant and Oil</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Non-water type chillers shall operate on a refrigerant with an ozone 
depletion potential (ODP) less than or equal to 0.055.  R-22, R-123, R-134a, 
R-407C, and R-410A all meet this requirement.  The Ozone Depletion Potential 
(ODP) of 0.055 is the limiting potential for refrigerants until the year 2010.  
After January 1, 2010 equipment using refrigerants with an ODP greater than 
0 will no longer be produced or approved for installation in DoD facilities.  
the exception is equipment using R-123 which will continue to be produced until 
January 1, 2020 and will remain acceptable for installation in DoD facilities 
until then.</NPR><BRK/>
<BRK/>
<NPR>Choose the first bracketed option for new projects prior to the year 2010.  
choose the second bracketed option for new projects after January 1, 2010.  
On January 1, 2020, R-123 will no longer be allowed.</NPR><BRK/>
<BRK/>
<NPR>Choose the third bracketed option for Navy projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Refrigerants shall be one of the fluorocarbon gases.  Refrigerants shall have number designations and safety 
classifications in accordance with <RID>ASHRAE 15 &amp; 34</RID>.  [Refrigerants shall have an Ozone Depletion Potential 
(ODP) of 0.055 or less.]  [Refrigerants classified by the EPA as Class 2 shall not be allowed with the exception 
of R-123.]  [The ODP shall be in accordance with the "Montreal Protocol On Substances That Deplete The Ozone 
Layer," September 1987, as amended through 2000, sponsored by the United Nations Environment Programme.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.2   Structural Base</TTL><BRK/>
<BRK/>
<TXT>Chiller and individual chiller components shall be provided with a factory-mounted structural steel base (welded 
or bolted) or support legs.   Chiller and individual chiller components shall be isolated from the building structure 
by means of [molded neoprene isolation pads.] [vibration isolators with published load ratings.  Vibration isolators 
shall have isolation characteristics as recommended by the manufacturer for the unit supplied and the service 
intended.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3   Chiller Refrigerant Circuit</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Filter dryers are not needed on chillers which make use of a purge system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chiller refrigerant circuit shall be completely piped and factory leak tested.  For multicompressor units, not 
less than 2 independent refrigerant circuits shall be provided.  Circuit shall include as a minimum a [combination 
filter and drier,] combination sight glass and moisture indicator, liquid-line solenoid valve for reciprocating, 
an electronic or thermostatic expansion valve with external equalizer, charging ports, compressor service valves 
for field-serviceable compressors, and superheat adjustment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4   Controls Package</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For large water-cooled chillers (centrifugal or rotary screw), motor 
starters and disconnects switches which are to be remotely-mounted are not typically 
supplied by the chiller manufacturer.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chiller shall be provided with a complete [factory-mounted] [remote-mounted where indicated], prewired electric 
or microprocessor based operating and safety control system.  Controls package shall contain as a minimum a digital 
display or acceptable gauges, an on-auto-off switch, [motor starters,] [disconnect switches,] power wiring, and 
control wiring.  Controls package shall provide operating controls, monitoring capabilities, programmable setpoints, 
safety controls, and EMCS interfaces as defined below.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.6.4.1   Operating Controls</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For proper startup and head pressure controls, enter the winter design 
temperature to which the equipment will be subjected.  Coordinate this temperature 
with manufacturers to assure available equipment.</NPR><BRK/>
<BRK/>
<NPR>A cooling tower bypass line and modulating control valve should be evaluated 
and incorporated into a design which requires chiller operation in ambient temperatures 
less than 13 degrees C (55 degree F).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chiller shall be provided with the following adjustable operating controls as a minimum.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Leaving chilled water temperature control</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Adjustable timer or automated controls to prevent a compressor from short cycling</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Automatic lead/lag controls (adjustable) for multi-compressor units</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Load limiting</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  System capacity control to adjust the unit capacity in accordance with the system load and 
the programmable setpoints.  Controls shall automatically re-cycle the chiller on power interruption.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Startup and head pressure controls to allow system operation at all ambient temperatures 
down to [_____] degrees <MET>C </MET><ENG>F</ENG></ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  [Fan sequencing for air-cooled condenser]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.2   Monitoring Capabilities</TTL><BRK/>
<BRK/>
<TXT>During normal operations, the control system shall be capable of monitoring and displaying the following operating 
parameters.  Access and operation of display shall not require opening or removing any panels or doors.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Entering and leaving chilled water temperatures</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Self diagnostic</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Operation status</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Operating hours</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Number of starts</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Compressor status (on or off)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Refrigerant discharge and suction pressures</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Oil pressure</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  [Condenser water entering and leaving temperatures]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  [Number of purge cycles over the last 7 days]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.3   Programmable Setpoints</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Small sized chillers may not have security setting capabilities.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The control system shall be capable of being reprogrammed directly at the unit.  [No parameters shall be capable 
of being changed without first entering a security access code.]  The programmable setpoints shall include the 
following as a minimum.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Leaving Chilled Water Temperature</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  [Leaving Condenser Water Temperature]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  [Time Clock/Calendar Date]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.4   Safety Controls with Manual Reset</TTL><BRK/>
<BRK/>
<TXT>Chiller shall be provided with the following safety controls which automatically shutdown the chiller and which 
require manual reset.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Low chilled water temperature protection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  High condenser refrigerant discharge pressure protection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Low evaporator pressure protection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Chilled water flow detection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  High motor winding temperature protection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Low oil flow protection if applicable</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  [Motor current overload and phase loss protection]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.5   Safety Controls with Automatic Reset</TTL><BRK/>
<BRK/>
<TXT>Chiller shall be provided with the following safety controls which automatically shutdown the chiller and which 
provide automatic reset.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Over/under voltage protection</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Chilled water flow interlock</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  [Phase reversal protection]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.6   Remote Alarm</TTL><BRK/>
<BRK/>
<TXT>During the initiation of a safety shutdown, a chiller's control system shall be capable of activating a remote 
alarm bell.  In coordination with the chiller, the Contractor shall provide an alarm circuit (including transformer 
if applicable) and a minimum <MET>100 mm </MET><ENG>4 inch</ENG> diameter alarm bell.  Alarm circuit shall activate bell in the event 
of machine shutdown due to the chiller's monitoring of safety controls.  The alarm bell shall not sound for a 
chiller that uses low-pressure cutout as an operating control.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4.7   Energy Management Control System (EMCS) Interface</TTL><BRK/>
<BRK/>
<TXT>The control system shall be capable of communicating all data to a remote integrated DDC processor through a 
single shielded cable.  The data shall include as a minimum all system operating conditions, capacity controls, 
and safety shutdown conditions.  The control system shall also be capable of receiving at a minimum the following 
operating commands.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Remote Unit Start/Stop</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  [Remote Chilled Water Reset]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  [Remote Condenser Water Reset]</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6.5   Compressor(s)</TTL><BRK/>
<BRK/>
<SPT><TTL>2.6.5.1   Reciprocating Compressor(s)</TTL><BRK/>
<BRK/>
<TXT>Rotating parts shall be statically and dynamically balanced at the factory to minimize vibration.  Compressors 
shall be capable of operating at partial-load conditions without increased vibration over the normal vibration 
at full load operation and shall be capable of continuous operation down to the lowest step of unloading as specified.  
Compressors of size <MET>7.45 kW </MET><ENG>10 horsepower</ENG> and above shall have an oil lubrication system of the reversible, forced-feed 
type with oil strainer.  Shaft seal in open-type units shall be mechanical type.  Piston speed for open-type 
compressors shall not exceed the manufacturer's recommendation or <MET>6 m/s </MET><ENG>1200 fpm</ENG>, whichever is less.  Compressors 
shall include:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Vertical, V, W, or radial cylinder design</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Oil lubrication</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Integrally cast block of close-grained iron or cast aluminum block with hardened steel cylinder 
sleeves</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Oil-level bull's eye</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Cast cylinder heads</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Cast-aluminum or forged-steel connecting rods</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Cast iron or forged-steel crankshaft</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  Main bearings of the sleeve-insert type</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  Crankcase oil heaters controlled as recommended by the manufacturer</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  Suction and discharge refrigerant service valves that are flange connected, wrench operated, 
with cap</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">k.  A strainer on the suction side of the compressor</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">l.  [A hot-gas muffler to reduce vibration and noise from pulsations]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.5.2   Scroll Compressor(s)</TTL><BRK/>
<BRK/>
<TXT>Compressors shall be of the hermetically sealed design.  Compressors shall be mounted on vibration isolators 
to minimize vibration and noise.  Rotating parts shall be statically and dynamically balanced at the factory 
to minimize vibration.  Lubrication system shall be centrifugal pump type equipped with a means for determining 
oil level and an oil charging valve.  Crankcase oil heater shall be provided if standard or if available as an 
option.  If provided, the crankcase oil heater shall be controlled as recommended by the manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.5.3   Rotary Screw Compressor(s)</TTL><BRK/>
<BRK/>
<TXT>Compressors shall operate stably for indefinite time periods at any stage of capacity reduction without hot-gas 
bypass.  Provision shall be made to insure proper lubrication of bearings and shaft seals on shutdown with or 
without electric power supply.  Rotary screw compressors shall include:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  An open or hermetic, positive displacement, oil-injected design directly driven by the compressor 
driver.  Compressor shall allow access to internal compressor components for repairs, inspection, 
and replacement of parts.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.Rotors shall be solid steel, possessing sufficient rigidity for proper operation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  A maximum rotor operating speed no greater than 3600 RPM.  provide cast iron rotor housing</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Casings of cast iron, precision machined for minimal clearance about periphery of rotors 
with minimal clearance at rotor tops and rotor ends.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  A lubrication system of the forced-feed type that provides oil at the proper pressure to 
all parts requiring lubrication.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Bearing housing shall be conservatively loaded and rated for an L(10) life of not less than 
200,000 hours.  Shaft main bearings of the sleeve type with heavy duty bushings or rolling element 
type in accordance with <RID>ABMA 9</RID> or <RID>ABMA 11</RID>.  </ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  A differential oil pressure or flow cutout to allow the compressor to operate only when 
the required oil pressure or flow is provided to the bearings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">h.  A temperature- or pressure-initiated, hydraulically actuated, single-slide-valve, capacity-control 
system to provide minimum automatic capacity modulation from 100 percent to 15 percent.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">i.  An oil separator and oil return system to remove oil entrained in the refrigerant gas and 
automatically return the oil to the compressor.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">j.  Crankcase oil heaters controlled as recommended by the manufacturer.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.5.4   Centrifugal Compressor(s)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When centrifugal chillers are used for heat recovery duty, the entering 
heat recovery condenser water temperature is usually controlled to between 35 
and 40 degrees C (95 and 105 degrees F) so that the water temperature leaving 
the heat recovery condenser is high enough to be used as a heat source.  Under 
these conditions, the chiller will be operating at a higher head pressure than 
normally encountered.  At these high head conditions, the centrifugal compressor 
may surge at part-load conditions of as high as 30 percent to 40 percent depending 
upon the conditions to which the chiller is subjected.  In these cases, the 
designer should survey the manufacturers to determine at what load the available 
chillers will surge, at the conditions and loads to be encountered at the site.  
The bracketed sentences will be removed from the centrifugal chiller paragraph 
and replaced with the appropriate capacity control requirements.  The designer 
should also consider multiple chillers to satisfy the load and to partition 
the loading to the chillers such that the heat recovery chiller load is sufficiently 
high to avoid surge.  When examining heat recovery, full consideration should 
be given to the effect of 35-40 degrees C (95-105 degree F) water and the resulting 
power requirements of the chiller on the economic benefit of heat recovery.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Centrifugal compressors shall be single or multistage, having dynamically balanced impellers, either direct or 
gear driven by the compressor driver.  Impellers shall be over-speed tested at 1.2 times the impeller-shaft speed.  
Impeller shaft shall be heat-treated alloy steel with sufficient rigidity for proper operation at any required 
operating speed.  Centrifugal compressors shall include:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Shaft main bearings that are the rolling element type in accordance with <RID>ABMA 9</RID> or <RID>ABMA 11</RID>
, journal type with bronze or babbitt liners, or of the aluminum-alloy one-piece insert type.  
Bearings shall be rated for an L(10) life of not less than 200,000 hours.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Casing of cast iron, aluminum, or steel plate with split sections gasketed and bolted or 
clamped together.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Lubrication system of the forced-feed type that provides oil at the proper pressure to all 
parts requiring lubrication.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Provisions to ensure proper lubrication of bearings and shaft seals prior to starting and 
upon stopping with or without electric power supply.  On units providing forced-feed lubrication 
prior to starting, a differential oil pressure cutout interlocked with the compressor starting 
equipment shall allow the compressor to operate only when the required oil pressure is provided 
to the bearings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Oil sump heaters controlled as recommended by the manufacturer.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Temperature-or pressure-actuated prerotation vane or suction damper to provide automatic 
capacity modulation from 100 percent capacity to 10 percent capacity.  If operation to 10 percent 
capacity cannot be achieved without providing hot-gas bypass, then the Contractor shall indicate 
in the equipment submittal the load percent at which hot gas bypass is required.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6.6   Compressor Driver, Electric Motor</TTL><BRK/>
<BRK/>
<TXT>Motors, starters, [variable speed drives], wiring, etc. shall be in accordance with paragraph ELECTRICAL WORK.  
Motor starter shall be [unit mounted] [remote mounted] as indicated with starter type, wiring, and accessories 
coordinated with the chiller manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7   Compressor Driver, Gas-Engine</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Natural gas-engine drives are used in conjunction with either reciprocating, 
rotary, or centrifugal type compressors.</NPR><BRK/>
<BRK/>
<NPR>The decision to use a heavy duty industrial type engine as compared to a standard 
automotive type engine will be based strictly on an economic comparison.  The 
standard automotive type engines have a much lower initial cost, but they must 
be replaced and/or overhauled much more often.  Also note that typically, standard 
automotive type engines are only available for chillers with a capacity of 500 
tons or less.</NPR><BRK/>
<BRK/>
<NPR>Guidance to Project Designers:  When specifying natural gas-engine drive chillers, 
close coordination with the DPW (customer) must be exercised.  The designer 
should inform the DPW that preventive maintenance and periodical overhaul of 
the gas-engine drives is essential to ensure continued operation, and that energy 
demand savings are realized.  While the initial cost of gas-engine drives is 
much lower than other types, gas-engine drives require more frequent maintenance 
and overhaul.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Gas-engine compressor driver shall operate on natural gas and be in accordance with <RID>NFPA 37</RID> and <RID>NFPA 54</RID>.  Engine 
shall be designed for stationary applications and include all ancillaries necessary for operation.  Engine shall 
be a manufacturer's standard production model and be specifically designed for chiller operation.  Engine shall 
include as a minimum a [heavy duty industrial] [standard automotive] grade block, starting system, lubrication 
system, coolant system, engine heat exchanger, [engine cooling radiator,] fuel supply system, electronic ignition, 
and controls package.  Engine shall be [naturally aspirated], [supercharged,] or [turbocharged] and include appropriate 
air filters.  Engine shall be 2- or 4-stroke-cycle and compression-ignition type.  Engine shall be vertical in-line, 
V- or opposed-piston type, with a solid cast block or individually cast cylinders.  Engine shall have a minimum 
of 2 cylinders.  Opposed-piston type engines shall have not less than 4 cylinders.  Engine block shall have a 
coolant drain port.</TXT><BRK/>
<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For pneumatic start systems size air receiver tank and compressor per 
manufacturer's recommendations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.6.7.1   Starting System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify either an electric or pneumatic type starting system.  Electric 
type system will be used for most applications.  For installations where a compressed 
air system exists or is to be installed, a pneumatic starting system should 
be considered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Engine starting system shall be the [electric] [pneumatic] type and be of sufficient capacity, at the maximum 
temperature specified, to crank the engine without damage or overheating.  [Electric starting system shall operate 
on a [24] [_____]-volt DC system utilizing a negative circuit ground.  A starting battery system shall be provided 
and shall include the battery, corrosion resistant battery rack, intercell connectors, spacers, automatic battery 
charger with overcurrent protection, metering and relaying.  Battery shall be in accordance with <RID>SAE J537</RID>.  Battery 
charger shall conforming to <RID>UL 1236</RID> and be the current-limiting type with overcurrent protection.] [Pneumatic 
starting system shall be as specified in Section <SRF>22 00 00</SRF> PLUMBING, GENERAL PURPOSE, for a working pressure of <MET>
1.03 MPa </MET><ENG>150 psi</ENG>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7.2   Lubrication System</TTL><BRK/>
<BRK/>
<TXT>Engine shall be provided with a pressurized oil lubrication system.  System shall include a lubrication oil pump 
that is engine driven.  One full-flow filter shall be provided for each pump.  Filters shall be readily accessible 
and capable of being changed without disconnecting the piping or disturbing other components.  System pressure 
shall be regulated as recommended by the engine manufacturer.  A pressure relief valve shall be provided on the 
crankcase.  Crankcase breathers shall be piped to the outside.  System shall be readily accessible for servicing 
such as draining, refilling, and overhauling.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7.3   Coolant System</TTL><BRK/>
<BRK/>
<TXT>Engine shall include an automatic engine jacket water cooling system.  Water shall be circulated through the 
system with an engine-driven circulating pump.  [System coolant shall use a combination water and ethylene-glycol 
sufficient for freeze protection at the minimum temperature specified.]</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If engine heat exchanger is used the cooling tower must be sized to include 
heat rejected from both engine and chiller.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
[<SPT><TTL>2.6.7.4   Engine Heat Exchanger</TTL><BRK/>
<BRK/>
<TXT>Engine heat exchanger shall be of the shell-and-tube type construction and be in accordance with <RID>ASME BPVC SEC VIII D1</RID>
.  Shell material shall be carbon steel.  Tubes shall be seamless copper or copper-nickel.  Tubes shall be individually 
replaceable.  Unit's waterside working pressure shall be rated for not less than <MET>1,000 kPa </MET><ENG>150 psig</ENG> and factory 
tested at 150 percent of design working pressure.  Water connections larger than <MET>75 mm </MET><ENG>3 inches</ENG> shall be ASME 
Class 1500 flanged.  Unit shall be provided with gasketed removable covers, drains, and vents.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.6.7.5   Engine Cooling Radiator</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  An engine cooling radiator will be needed to satisfy an engine's cooling 
requirements if cooling tower water or heat recovery is not used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Heat exchanger may be factory coated with corrosive resistant film, provided that correction measures are taken 
to restore the heat rejection capability of the radiator to the initial design requirement via over sizing, or 
other compensating methods.  Internal surfaces shall be compatible with liquid fluid coolant used.  Materials 
and coolant are subject to approval by the Contracting Officer.  Heat exchangers shall be the pressure type incorporating 
a pressure valve, vacuum valve and a cap.  Caps shall be designed for pressure relief prior to removal.  Each 
heat exchanger and the entire cooling system shall be capable of withstanding a minimum pressure of <MET>48 kPa </MET><ENG>7 
psi</ENG> and shall be protected with a strong grille or screen guard.  Each heat exchanger shall have at least 2 tapped 
holes; one shall be equipped with a drain cock, the rest shall be plugged.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>2.6.7.6   Fuel Supply System</TTL><BRK/>
<BRK/>
<TXT>Engine fuel supply system shall be factory mounted.  System shall include as a minimum a solenoid shut-off valve, 
a gas pressure regulator, and carburetors (including a throttle body assembly) or fuel injectors.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7.7   Controls Package</TTL><BRK/>
<BRK/>
<TXT>The controls for the gas-engine shall be incorporated into the overall controls package for the water chiller.  
The engine controls shall be capable of monitoring, displaying, and controlling, as applicable, the following 
conditions.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Coolant-fluid inlet and outlet temperatures</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Lubricating-oil inlet and outlet temperatures and pressures</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Engine run-time hours</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Engine current status mode (on/off)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Engine speed</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Percent engine load</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Engine jacket temperature</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7.8   Exhaust Piping</TTL><BRK/>
<BRK/>
<TXT>Exhaust piping shall be <RID>ASTM A 53/A 53M</RID> Schedule 40 seamless black iron, exhaust piping installation shall be 
per the engine manufacturer's recommendations, except as modified herein.  Horizontal sections of exhaust piping 
shall be sloped downward away from the engine to a drip leg for collection of condensate with drain valve and 
cap.  Changes in direction shall be long radius.  Exhaust piping and mufflers shall be insulated in accordance 
with Section <SRF>23 07 00</SRF> THERMAL INSULATION FOR MECHANICAL SYSTEMS.  Vertical exhaust piping shall be provided with 
a hinged, gravity-operated, self-closing, rain cover.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7.9   Exhaust Muffler</TTL><BRK/>
<BRK/>
<TXT>Engine shall be provided with a chamber type exhaust muffler.  The muffler shall be of welded steel and designed 
for [outside] [inside] [vertical] [horizontal] mounting.  Eyebolts, lugs, flanges, or other items shall be provided 
as necessary for support in the location and position indicated.  Pressure drop through the muffler shall not 
exceed the recommendations of the engine manufacturer.  Outside mufflers shall be zinc coated or painted with 
high temperature [_____] degrees resisting paint.  The muffler and exhaust piping together shall reduce the noise 
level to less than [_____] dBa at a distance of <MET>22.9 m </MET><ENG>75 feet</ENG> from the end of the exhaust piping with the chiller 
operating at 100 percent of rated output capacity.  The muffler shall have a drain valve, nipple, and cap at 
the low-point of the muffler.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.7.10   Exhaust System Connections</TTL><BRK/>
<BRK/>
<TXT>Flexible connectors shall be provided at the exhaust piping connection to the engine.  An expansion joint shall 
be provided in the exhaust piping at the muffler connection.  Flexible connectors and expansion joints shall 
have flanged connections.  Flexible sections shall be made of convoluted seamless tube without joints or packing.  
Expansion joints shall be the bellows type.  Expansion and flexible elements shall be stainless steel suitable 
for engine exhaust gas at <MET>649 degrees C </MET><ENG>1200 degrees F</ENG>.  Flexible connectors and expansion joints shall be capable 
of absorbing vibration from the engine and compensation for thermal expansion and contraction.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6.8   Compressor Driver, Steam Turbine</TTL><BRK/>
<BRK/>
<TXT>Steam turbine shall conform to <RID>NEMA SM 23</RID> and be suitable for direct connection to the compressor.  Turbine shall 
have a capacity 10 percent greater than the compressor brake horsepower requirement at full-load condition.  
Steam strainer shall be either internally mounted or installed in connecting piping.  Turbine shall include sentinel 
warning valve, forced-feed lubrication, oil cooler, oil reservoir, oil relief valve, oil piping, oil-pressure 
gauge, tachometer, and gland-seal piping if a condensing turbine is used.  If a non-condensing turbine is used, 
provision shall be made for drain piping.  The turbine shall be suitable for automatic control.  An overspeed 
trip governor shall be provided to shut off the steam supply at 115 percent of design speed.  Provision shall 
be made to stop the turbine upon operation of the compressor safety devices and upon power failure by the use 
of a solenoid trip on the emergency overspeed governor.  Turbine shall be governed by a pneumatically controlled 
hydraulic governor during automatic operation and with a manual control effective during failure of the air supply.  
Pneumatic valve shall be actuated by a temperature controller with its sensing element in contact with the chilled 
water.  Turbine shall be designed to operate at the steam pressure and exhaust conditions indicated.  If the 
turbine is a condensing type, a surface-type steam condenser complete with single-stage air ejector, inter- and 
after-condenser, electric-driven dual condensate pumps, atmospheric relief valve, and expansion joint shall be 
furnished.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.9   Compressor Driver Connections</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the first set of brackets if a large water-chilling package is 
specified.  Delete the second set of brackets if a condensing and compressing 
unit or a small water-chilling package is used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Each compressor shall be driven by a V-belt drive or direct connected through a flexible coupling, except that 
flexible coupling is not required on hermetic units.  V-belt drives shall be designed for not less than 150 percent 
of the driving motor capacity.  Flexible couplings shall be of the type that does not require lubrication.]  
[Each machine driven through speed-increasing gears shall be so designed as to assure self-alignment, interchangeable 
parts, proper lubrication system, and minimum unbalanced forces.  Bearings shall be of the sleeve or roller type.  
Gear cases shall be oil tight.  Shaft extensions shall be provided with seals to retain oil and exclude all dust.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.10   Water Cooler (Evaporator)</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The standard performance fouling factor per ARI is 0.0001 h(ft2)(degrees 
F)/Btu.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cooler shall be of the shell-and-coil or shell-and-tube type design.  Condenser's refrigerant side shall be designed 
and factory pressure tested to comply with <RID>ASHRAE 15 &amp; 34</RID>.  Condenser's water side shall be designed and 
factory pressure tested for not less than <MET>[1,000] [1,700] kPa </MET><ENG>[150] [250] psi</ENG>.  Cooler shell shall be constructed 
of seamless or welded steel.  Coil bundles shall be totally removable and arranged to drain completely.  Tubes 
shall be seamless copper, plain, integrally finned with smooth bore or integrally finned with enhanced bore.  
Each tube shall be individually replaceable.  Tubes shall be installed into carbon mild steel tube sheets by 
rolling.  Tube baffles shall be properly spaced to provide adequate tube support and cross flow.  Performance 
shall be based on a water velocity not less than <MET>0.91 m/s </MET>  Performance shall be based on a water velocity not 
less than <MET>0.91 m/s </MET><ENG>3 fps</ENG> nor more than <MET>3.7 m/s </MET><ENG>12 fps</ENG> and a fouling factor of <MET>[0.000018 m2(degrees C)/W (0.0001 
h(ft2)(degrees F)/Btu)] [0.000044 m2(degrees C)/W (0.00025 h(ft2)(degrees F)/Btu)] [0.000088 m2(degrees C)/W 
(0.0005 h(ft2)degrees F/Btu)] </MET><ENG>[0.0001 h(ft2)(degrees F)/Btu] [0.00025 h(ft2)(degrees F)/Btu] [0.0005 h(ft2)(degrees 
F)/Btu]</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.11   Air-Cooled Condenser Coil</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Standard coil construction is copper tubes with aluminum fins.  For excessively 
corrosive atmospheres, either copper tubes with copper fins or aluminum tubes 
with aluminum fins should be considered.  For additional corrosion protection, 
specify the manufacturer's standard epoxy or vinyl coating.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Condenser coil shall be of the extended-surface fin-and-tube type and shall be constructed of seamless [copper] 
[or] [aluminum] tubes with compatible [copper] [or] [aluminum] fins.  Fins shall be soldered or mechanically 
bonded to the tubes and installed in a metal casing.  Coils shall be circuited and sized for a minimum of <MET>3 degrees 
C </MET><ENG>5 degrees F</ENG> subcooling and full pumpdown capacity.  Coil shall be factory leak and pressure tested after assembly 
in accordance with <RID>ASHRAE 15 &amp; 34</RID>.  [Coil shall be entirely coated with the manufacturer's standard epoxy 
or vinyl coating.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.12   Water-Cooled Condenser Coil</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The standard performance fouling factor per ARI is 0.00025 h(ft2)(degrees 
F)/Btu for condenser.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Condenser shall be of the shell-and-coil or shell-and-tube type design.  Condenser's refrigerant side shall be 
designed and factory pressure tested to comply with <RID>ASHRAE 15 &amp; 34</RID>.  Condenser's water side shall be designed 
and factory pressure tested for not less than <MET>[1,000] [1,700] kPa </MET><ENG>[150] [250] psi</ENG>.  Condensers shall be complete 
with refrigerant relief valve/rupture disc assembly, water drain connections, and refrigerant charging valve.  
Low pressure refrigerant condenser shall be provided with a purge valve located at the highest point in the condenser 
to purge non-condensibles trapped in the condenser.  Condenser shell shall be constructed of seamless or welded 
steel.  Coil bundles shall be totally removable and arranged to drain completely.  Tubes shall be seamless copper, 
plain, integrally finned with smooth bore or integrally finned with enhanced bore.  Each tube shall be individually 
replaceable, except for the coaxial tubes.  Tube baffles shall be properly spaced to provide adequate tube support 
and cross flow.  Performance shall be based on water velocities not less than <MET>0.91 m/s </MET><ENG>3 fps</ENG> nor more than <MET>3.7 
m/s </MET><ENG>12 fps</ENG> and a fouling factor of <MET>[0.000044 m2(degrees C)/W (0.00025 h(ft2)(degrees F)/Btu)] [0.000088 m2(degrees 
C)/W (0.0005 h(ft2)(degrees F)/Btu)] </MET><ENG>[0.00025 h(ft2)(degrees F)/Btu)] [0.0005 h(ft2)(degrees F)/Btu]</ENG>.  Water-cooled 
condensers may be used for refrigerant storage in lieu of a separate liquid receiver, if the condenser storage 
capacity is 5 percent in excess of the fully charged system for single packaged systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.13   Heat Recovery Condenser Coil</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will conduct feasibility studies to determine if a heat 
recovery condenser is an economical addition to the system.  Heat recovery condensers 
generally come in two sizes.  The smaller of the two is generally sized to reject 
the superheat to the domestic water.  The larger is sized to reject the same 
amount of heat as the standard condenser.  The drawings will indicate the heat 
rejection capacity of the heat recovery condenser and the temperatures of the 
water to which it must reject the heat.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Condenser shall be of the shell-and-coil or shell-and-tube type design and shall not be a part of the standard 
condenser.  Condenser shall be provided and installed by the chiller manufacturer.  Condenser's refrigerant side 
shall be designed and factory pressure tested to comply with <RID>ASHRAE 15 &amp; 34</RID>.  Condenser's water side shall 
be designed and factory pressure tested for not less than <MET>[1,000] [1,700] kPa </MET><ENG>[150] [250] psi</ENG>.  Condenser shall 
have performance characteristics as indicated on the drawings.  Condenser shell shall be constructed of seamless 
or welded steel.  Coil bundles shall be totally removable and arranged to drain completely.  Tubes shall be seamless 
copper, plain, integrally finned with smooth bore or integrally finned with enhanced bore.  Each tube shall be 
individually replaceable, except for the coaxial tubes.  Tube baffles shall be properly spaced to provide adequate 
tube support and cross flow.  Performance shall be based on water velocities not less than <MET>0.91 m/s </MET><ENG>3 fps</ENG> nor 
more than <MET>3.7 m/s </MET><ENG>12 fps</ENG> and a fouling factor of[0.00025] [0.0005].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.14   Receivers</TTL><BRK/>
<BRK/>
<TXT>Receiver shall bear a stamp certifying compliance with <RID>ASME BPVC SEC VIII D1</RID> and shall meet the requirements 
of <RID>ASHRAE 15 &amp; 34</RID>.  Inner surfaces shall be thoroughly cleaned by sandblasting or other approved means.  
Each receiver shall have a storage capacity not less than 20 percent in excess of that required for the fully-charged 
system.  Each receiver shall be equipped with inlet, outlet drop pipe, drain plug, purging valve, relief valves 
of capacity and setting required by <RID>ASHRAE 15 &amp; 34</RID>, and two bull's eye liquid-level sight glasses.  Sight 
glasses shall be in the same vertical plane, 90 degrees apart, perpendicular to the axis of the receiver, and 
not over <MET>75 mm </MET><ENG>3 inches</ENG> horizontally from the drop pipe measured along the axis of the receiver.  In lieu of 
bull's eye sight glass, external gauge glass with metal glass guard and automatic closing stop valves may be 
provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.15   Chiller Purge System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Refrigeration systems which operate below atmospheric pressure (i.e., 
R-123 machines) will require a refrigerant purge piping system.  Indicate the 
routing of the piping on the drawings.  Require the Contractor to delete the 
piping if a purge system is not required for the type of chiller that is to 
be provided.  Indicate that it will be the Contractor's responsible to size 
the piping based upon the chiller manufacturer's recommendations.  Purge discharge 
piping may be connected to the pressure-relief piping on the chiller side of 
the piping's vibration isolators.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chillers which operate at pressures below atmospheric pressure shall be provided with a purge system.  Purge 
system shall automatically remove air, water vapor, and non-condensible gases from the chiller's refrigerant.  
Purge system shall condense, separate, and return all refrigerant back to the chiller.  An oil separator shall 
be provided with the purge system if required by the manufacturer.  Purge system shall not discharge to occupied 
areas, or create a potential hazard to personnel.  Purge system shall include a purge pressure gauge, number 
of starts counter, and an elapsed time meter.  Purge system shall include lights or an alarm which indicate excessive 
purge or an abnormal air leakage into chiller.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tools to be used for Army projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT>[<TTL>2.6.16   Tools</TTL><BRK/>
<BRK/>
<TXT>One complete set of special tools, as recommended by the manufacturer for field maintenance of the system, shall 
be provided.  Tools shall be mounted on a tool board in the equipment room or contained in a toolbox as directed 
by the Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.7   ACCESSORIES</TTL><BRK/>
<BRK/>
<SPT><TTL>2.7.1   Refrigerant Leak Detector</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Refrigerant leak detectors will be provided as required by the "System 
Application  Requirements" in ASHRAE 15.<BRK/>
<BRK/>
When a detector is required, the location will be indicated on the drawings.  
Detectors are best located between the refrigeration system and the room exhaust.  
Sampling points from a detector will be located a maximum of 18 inches above 
the finished floor since all commonly-used refrigerants are heavier than air.<BRK/>
<BRK/>
As a rule of thumb, the distance between any refrigeration system and a refrigerant 
sampling point shouldn't exceed 50 feet.  In order to meet the recommended 50 
foot distance, a mechanical room can be provided with either multiple detectors 
each with single sampling points or with one detector that has the capability 
of monitoring at multiple sampling points.  If multiple sampling points are 
required, enter the number in the appropriate blank below.<BRK/>
<BRK/>
Per ASHRAE 15, when a detector senses refrigerant it must activate an alarm 
and initiate the room ventilation system.  In regards to alarms, as a minimum, 
indicate that the detector will energize a light on or near the detector as 
well as a second light installed on the outside wall next to the mechanical 
room entrance.  The exterior light will be provided with a sign that warns personnel 
entering the mechanical room of a refrigerant release and that a SCBA is required 
to enter.  If applicable to the installation, include an audible alarm on the 
exterior of the mechanical room.  Include the electrical design for the alarm 
system on the drawings.<BRK/>
<BRK/>
As an additional item, ASHRAE 15 states that open-flame devices (i.e., boilers, 
etc.) cannot be installed in the same area as a refrigeration system, unless 
either combustion air for the open-flame device is ducted straight from outside 
to the device; or the alarm relay from the detector is used to automatically 
shutdown the combustion process in the event of refrigerant leakage.  Indicate 
all applicable alarm controls on the drawings.<BRK/>
<BRK/>
Delete the information in the last bracketed sentences if an EMCS is not applicable 
to the design.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Detector shall be the continuously-operating, halogen-specific type.  Detector shall be appropriate for the refrigerant 
in use.  Detector shall be specifically designed for area monitoring and shall include [a single sampling point] 
[[_____] sampling points] installed where indicated.  Detector design and construction shall be compatible with 
the temperature, humidity, barometric pressure and voltage fluctuations of the operating area.  Detector shall 
have an adjustable sensitivity such that it can detect refrigerant at or above 3 parts per million (ppm).  Detector 
shall be supplied factory-calibrated for the appropriate refrigerant(s).  Detector shall be provided with an 
alarm relay output which energizes when the detector detects a refrigerant level at or above the TLV-TWA (or 
toxicity measurement consistent therewith) for the refrigerant(s) in use.  The detector's relay shall be capable 
of initiating corresponding alarms and ventilation systems as indicated on the drawings.  Detector shall be provided 
with a failure relay output that energizes when the monitor detects a fault in its operation.  [Detector shall 
be capable with the facility's energy management and control system (EMSS).  The EMCS shall be capable of generating 
an electronic log of the refrigerant level in the operating area, monitoring for detector malfunctions, and monitoring 
for any refrigerant alarm conditions.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.2   Refrigerant Relief Valve/Rupture Disc Assembly</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  ASHRAE 15 requires refrigeration systems to be protected with a pressure-relief 
device that will safely relieve pressure due to fire or other abnormal conditions.  
A relief valve/rupture disc assembly is the optimum solution.  The rupture disc 
will provide visual indication of a release while also providing immediate shutoff 
once a safe pressure is achieved.<BRK/>
<BRK/>
Designer will indicate on the drawings the location of each new relief valve/rupture 
disc assembly as well as the routing and size of corresponding pressure-relief 
piping.  The routing and size of new pressure-relief piping will be per ASHRAE 
15.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The assembly shall be a combination pressure relief valve and rupture disc designed for refrigerant usage.  The 
assembly shall be in accordance with <RID>ASME BPVC SEC VIII D1</RID> and <RID>ASHRAE 15 &amp; 34</RID>.  The assembly shall be provided 
with a pressure gauge assembly which will provide local indication if a rupture disc is broken.  Rupture disc 
shall be the non-fragmenting type.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.3   Refrigerant Signs</TTL><BRK/>
<BRK/>
<TXT>Refrigerant signs shall be a medium-weight aluminum type with a baked enamel finish.  Signs shall be suitable 
for indoor or outdoor service.  Signs shall have a white background with red letters not less than <MET>13 mm </MET><ENG>0.5 
inches</ENG> in height.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.7.3.1   Installation Identification</TTL><BRK/>
<BRK/>
<TXT>Each new refrigerating system shall be provided with a refrigerant sign which indicates the following as a minimum:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Contractor's name.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Refrigerant number and amount of refrigerant.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  The lubricant identity and amount.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Field test pressure applied.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.3.2   Controls and Piping Identification</TTL><BRK/>
<BRK/>
<TXT>Refrigerant systems containing more than <MET>50 kg </MET><ENG>110 lb </ENG>of refrigerant shall be provided with refrigerant signs 
which designate the following as a minimum:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Valves or switches for controlling the refrigerant flow [, the ventilation system,] and 
the refrigerant compressor(s).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Pressure limiting device(s).</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.7.4   Refrigerant Recovery/Recycle System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  A refrigerant recovery/recycle system will not be specified if the designer 
determines that on site staff will not be responsible for chiller teardown or 
major service.  If the designer determines the on site staff will be responsible 
for chiller teardown or major service, the designer shall investigate whether 
another recovery/recycle system is available to maintenance personnel before 
specifying a new system.  The recovery/recycle system is an expensive item and 
all alternatives to providing a new system should be investigated.</NPR><BRK/>
<BRK/>
<NPR>If a refrigerant recovery/recycle system is specified, the recovery/recycle 
system shall be tested and listed to conform to the requirements of ARI 740 
for refrigerant recovery/recycle systems by a recognized national testing laboratory.  
The system shall include separate storage vessel(s) capable of storing the entire 
refrigerant charge of the largest chiller.</NPR><BRK/>
<BRK/>
<NPR>The recovery/recycle unit shall be portable.  Chiller mounting or floor mounting 
of the system is expensive and therefore is discouraged.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A manually initiated refrigerant recovery/recycle system shall be provided, consisting of a motor-driven, air- 
or water-cooled, reciprocating condensing unit and a receiver of sufficient capacity to store the entire refrigerant 
charge of the largest water-chilling system.  For refrigerants with atmospheric pressure boiling temperature 
below <MET>20 degrees C </MET><ENG>68 degrees F</ENG> the receiver shall be sized so that it is no more than 80 percent full at <MET>32 
degrees C </MET><ENG>90 degrees F</ENG>.  For refrigerants with atmospheric pressure boiling temperature above <MET>20 degrees C </MET><ENG> 68 
degrees F</ENG>, the receiver shall be sized so that it is no more than 90 percent full at <MET>32 degrees C </MET><ENG>90 degrees 
F</ENG>.  The recovery/recycle system condensing unit shall be assembled as a complete unit and meet the requirements 
of <RID>ASHRAE 15 &amp; 34</RID>.  The system components shall be portable and shall include all valves, connections, and 
controls required for operation.  Receiver and relief devices shall conform to the requirements of <RID>ASME BPVC SEC VIII D1</RID>
.  The recovery/recycle system shall be tested and listed to conform to <RID>AHRI 740</RID> for refrigerant recovery/recycle 
systems by a recognized national testing laboratory.  For refrigerants with atmospheric pressure boiling temperature 
below <MET>20 degrees C </MET><ENG>68 degrees F</ENG>, the recovery/recycle unit shall have an <RID>AHRI 740</RID> vapor refrigerant recovery 
rate of no less than <MET>8.5 kg/minute </MET><ENG>17.0 lb/minute</ENG>.  For refrigerants with atmospheric pressure boiling temperature 
above <MET>20 degrees C </MET><ENG>68 degrees F</ENG>, the recovery/recycle unit shall have an <RID>AHRI 740</RID> vapor refrigerant recovery 
rate of no less than <MET>1.0 kg/minute </MET><ENG>2.2 lb/minute</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.5   Automatic Tube Brush Cleaning System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph unless specifically required by the onsite staff.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.7.5.1   Brush and Basket Sets</TTL><BRK/>
<BRK/>
<TXT>One brush and basket set (one brush and two baskets) shall be furnished for each condenser tube.  Brushes shall 
be made of nylon bristles, with titanium wire.  Baskets shall be polypropylene.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.5.2   Flow-Diverter Valve</TTL><BRK/>
<BRK/>
<TXT>Each system shall be equipped with one flow-diverter valve specifically designed for the automatic tube brush 
cleaning system and have parallel flow connections.  The flow-diverter valve shall be designed for a working 
pressure of <MET>[1,000] [1,700] kPa </MET><ENG>[150] [250] psig</ENG>.  End connections shall be flanged.  Each valve shall be provided 
with an electrically operated air solenoid valve and position indicator.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.5.3   Control Panel</TTL><BRK/>
<BRK/>
<TXT>The control panel shall provide signals to the diverter valve at a preset time interval to reverse water flow 
to drive the tube brushes down the tubes and then signal the valve to reverse the water flow to drive the brushes 
back down the tubes to their original position.  The controller shall have the following features as a minimum:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Timer to initiate the on-load cleaning cycle.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Manual override of preset cleaning cycle.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Power-on indicator.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Diverter-position indicator.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Cleaning-cycle-time adjustment</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Flow-switch bypass.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.7.6   Gaskets</TTL><BRK/>
<BRK/>
<TXT>Gaskets shall conform to <RID>ASTM F 104</RID> - classification for compressed sheet with nitrile binder and acrylic fibers 
for maximum <MET>371 degrees C </MET><ENG>700 degrees F</ENG> service.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.7   Bolts and Nuts</TTL><BRK/>
<BRK/>
<TXT>Bolts and nuts, except as required for piping applications, shall be in accordance with <RID>ASTM A 307</RID>.  The bolt 
head shall be marked to identify the manufacturer and the standard with which the bolt complies in accordance 
with <RID>ASTM A 307</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.8   FABRICATION</TTL><BRK/>
<BRK/>
<SPT><TTL>2.8.1   Factory Coating</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For equipment to be installed outdoors, adequate protection will be specified.  
Manufacturers must submit evidence that unit specimen have passed the specified 
salt spray fog test.  A 125 hour test will be specified in a noncorrosive environment 
and a 500 hour test will be specified in a corrosive environment.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Unless otherwise specified, equipment and component items, when fabricated from ferrous metal, shall be factory 
finished with the manufacturer's standard finish, except that items located outside of buildings shall have weather 
resistant finishes that will withstand [125] [500] hours exposure to the salt spray test specified in <RID>ASTM B 117</RID>
 using a 5 percent sodium chloride solution.  Immediately after completion of the test, the specimen shall show 
no signs of blistering, wrinkling, cracking, or loss of adhesion and no sign of rust creepage beyond <MET>3 mm </MET><ENG>1/8 
inch</ENG> on either side of the scratch mark.  Cut edges of galvanized surfaces where hot-dip galvanized sheet steel 
is used shall be coated with a zinc-rich coating conforming to <RID>ASTM D 520</RID>, Type I.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.2   Factory Applied Insulation</TTL><BRK/>
<BRK/>
<TXT>Chiller shall be provided with factory installed insulation on surfaces subject to sweating including the water 
cooler, suction line piping, economizer, and cooling lines.  Insulation on heads of coolers may be field applied, 
however it shall be installed to provide easy removal and replacement of heads without damage to the insulation.  
Where motors are the gas-cooled type, factory installed insulation shall be provided on the cold-gas inlet connection 
to the motor per manufacturer's standard practice.  Factory insulated items installed outdoors are not required 
to be fire-rated.  As a minimum, factory insulated items installed indoors shall have a flame spread index no 
higher than 75 and a smoke developed index no higher than 150.  Factory insulated items (no jacket) installed 
indoors and which are located in air plenums, in ceiling spaces, and in attic spaces shall have a flame spread 
index no higher than 25 and a smoke developed index no higher than 50.  Flame spread and smoke developed indexes 
shall be determined by <RID>ASTM E 84</RID>.  Insulation shall be tested in the same density and installed thickness as 
the material to be used in the actual construction.  Material supplied by a manufacturer with a jacket shall 
be tested as a composite material.  Jackets, facings, and adhesives shall have a flame spread index no higher 
than 25 and a smoke developed index no higher than 50 when tested in accordance with <RID>ASTM E 84</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9   <SUB>FACTORY TESTS</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.9.1   Chiller Performance Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Currently, most chiller manufacturers do not have the ability to factory 
performance test anything other than water-cooled chillers (centrifugal or rotary 
screw) which have flooded evaporators.  In addition, most testing facilities 
are only setup to test chillers 300 tons or larger in capacity.  The ability 
to performance test small DX systems (water- or air-cooled) is almost non-existent.</NPR><BRK/>
<BRK/>
<NPR>Chiller performance testing is a very expensive requirement and should be carefully 
evaluated before including it into a job specification.  The ARI certification 
program has gone a long way in recent years of assuring chiller performance 
as specified.  The need for a performance test will be evaluated against the 
customer's requirements and the criticality of the installation.  When a chiller 
performance test is not required, ensure that paragraph "SUBMITTALS" is edited 
to remove the requirements for factory tests in SD-03 and SD-06.</NPR><BRK/>
<BRK/>
<NPR>If a performance test is deemed necessary to assure that the capacity and efficiencies 
specified will be met, then include this paragraph.  Testing should only be 
specified on water-cooled chillers between 1054 and 5622 kW (300 and 1600 tons).  
Tests may be specified for smaller chillers in critical applications where the 
tests are felt justified, however, the designer must determine in the design 
stage if such tests are available.  In no case should a test be required on 
more than one unit of multiple, identical capacities.</NPR><BRK/>
<BRK/>
<NPR>The ARI testing of chillers allows a deviation to chiller capacity of up to 
5% at full load.  Load calculations should consider this tolerance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Contractor and proposed chiller manufacturer shall be responsible for performing the chiller factory test 
to validate the specified full load capacity, full load EER, and [IPLV] [NPLV] in accordance with <RID>AHRI 550/590</RID>
 except as indicated.  [The chiller factory test shall be performed in the presence of a Government representative.]  
The Contractor and chiller manufacturer shall provide to the Government a certified chiller factory test report 
in accordance with <RID>AHRI 550/590</RID> to confirm that the chiller performs as specified.  Tests shall be conducted 
in an ARI certified test facility in conformance with <RID>AHRI 550/590</RID> procedures and tolerances, except as indicated.  
At a minimum, chiller capacity shall be validated to meet the scheduled requirements indicated on the drawings.  
Tolerance or deviation shall be in strict accordance with <RID>AHRI 550/590</RID>.  Stable operation at minimum load of 
10 percent of total capacity shall be demonstrated during the factory test.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.9.1.1   Temperature Adjustments</TTL><BRK/>
<BRK/>
<TXT>Temperature adjustments shall adhere to <RID>AHRI 550/590</RID> to adjust from the design fouling factor to the clean tube 
condition.  Test temperature adjustments shall be verified prior to testing by the manufacturer.  There shall 
be no exceptions to conducting the test with clean tubes with the temperature adjustments per <RID>AHRI 550/590</RID>.  
The manufacturer shall clean the tubes, if necessary, prior to testing to obtain a test fouling factor of 0.0000.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.1.2   Test Instrumentation</TTL><BRK/>
<BRK/>
<TXT>The factory test instrumentation shall be per <RID>AHRI 550/590</RID> and the calibration shall be traceable to the National 
Institute of Standards and Technology.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.1.3   Test Report</TTL><BRK/>
<BRK/>
<TXT>A certified test report of all data shall be forwarded to the Government for approval prior to project acceptance.  
Calibration curves and information sheets for all instrumentation shall be provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.1.4   Equipment Adjustments</TTL><BRK/>
<BRK/>
<TXT>If the equipment fails to perform within allowable tolerances, the manufacturer shall be allowed to make necessary 
revisions to his equipment and retest as required.  [The manufacturer shall assume all expenses incurred by the 
Government to witness the retest.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9.2   Chiller Sound Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Require factory sound tests for chiller applications where sound levels 
are a critical issue.  Typically, factory sound tests are only performed on 
large centrifugal and rotary screw machines.  As a minimum if a factory sound 
test is not deemed necessary, indicated the maximum allowable sound level requirements 
for all applicable chiller components on the drawings.</NPR><BRK/>
<BRK/>
<NPR>In the paragraph below, select 85 decibels if military personnel (90 decibels 
for civilian personnel) will operate the equipment without hearing protection.  
Other decibel requirements may be specified if hearing protection is provided.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chillers shall be sound tested at the factory prior to shipment to confirm the sound pressure level specified 
herein.  Tests and data shall be conducted and measured in strict accordance with <RID>AHRI 575</RID> at the full load system 
operating conditions.  The chiller sound pressure level, in decibels (dB), with a reference pressure of 20 micropascals, 
shall not exceed [85] [90] [_____] dB, A weighted.  Ratings shall be in accordance with <RID>AHRI 575</RID>.  No reduction 
of entering condenser water temperature or raising of leaving chilled water temperature shall be allowed.  A 
minimum of 75 percent of the sound data points shall be taken along the length of the machine, and established 
as the minimum percentage of total possible points used to determine sound levels.  In the event that the chiller 
does not meet the dBA sound pressure level, the manufacturer shall, at his expense, provide sufficient attenuation 
to the machine to meet the specified value.  This attenuation shall be applied in such a manner that it does 
not hinder the operation or routine maintenance procedures of the chiller.  The attenuation material, adhesives, 
coatings, and other accessories shall have surface burning characteristics as determined by <RID>ASTM E 84</RID>. </TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.10   SUPPLEMENTAL COMPONENTS/SERVICES</TTL><BRK/>
<BRK/>
<SPT><TTL>2.10.1   Chilled and Condenser Water Piping and Accessories</TTL><BRK/>
<BRK/>
<TXT>Chilled and condenser water piping and accessories shall be provided and installed in accordance with Section 
<SRF>23 64 26</SRF> CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10.2   Refrigerant Piping</TTL><BRK/>
<BRK/>
<TXT>Refrigerant piping for split-system water chillers shall be provided and installed in accordance with Section 
<SRF>23 23 00</SRF> REFRIGERANT PIPING.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10.3   Cooling Tower</TTL><BRK/>
<BRK/>
<TXT>Cooling towers shall be provided and installed in accordance with Section <SRF>23 65 00</SRF> COOLING TOWER.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10.4   Temperature Controls</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify this paragraph as required to coordinate the central equipment 
controls with the air-side system controls.  In projects where this section 
of the specifications is intended to produce control equipment for existing 
air-side systems, this paragraph will be rewritten to secure controls to match 
existing controls and to properly integrate the specified controls into the 
existing temperature control system.</NPR><BRK/>
<BRK/>
<NPR>A sequence of control, a schematic of controls, and a ladder diagram should 
be included on the drawings for each cooling tower fan, chilled water pump, 
condenser water pump, etc. in order to define the overall system operation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Chiller control packages shall be fully coordinated with and integrated [into the temperature control system 
specified in Section <SRF>23 00 00</SRF> AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM and <SRF>23 09 23</SRF> DIRECT DIGITAL 
CONTROL FOR HVAC AND OTHER LOCAL BUILDING SYSTEMS <SRF>23 09 23.13 20</SRF> BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC] 
[into the existing air-conditioning system].</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Installation of water chiller systems including materials, installation, workmanship, fabrication, assembly, 
erection, examination, inspection, and testing shall be in accordance with the manufacturer's written installation 
instructions, including the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">[1.  <SUB>Water chiller</SUB> - installation instructions]</ITM><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Connections to Existing Systems</TTL><BRK/>
<BRK/>
<TXT>Notify the Contracting Officer in writing at least 15 calendar days prior to the date the connections are required.  
Obtain approval before interrupting service.  Furnish materials required to make connections into existing systems 
and perform excavating, backfilling, compacting, and other incidental labor as required.  Furnish labor and tools 
for making actual connections to existing systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   <SUB>Refrigeration System</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.2.1   Equipment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Determine in the initial stages of design the approximate distances required 
for maintenance clearances of all new equipment.  The maintenance clearances 
will be used in determining the final layout of the equipment.</NPR><BRK/>
<BRK/>
<NPR>For installations where noise and vibration transmission to the building must 
be reduced, the maximum tolerable transmissibility, in percent, should be determined 
and the blank filled in with the appropriate value.  When it is not necessary 
to specify the percent of transmissibility, the item in the brackets will be 
deleted and brackets removed.  Recommended transmissibility in percentages are:  
10 percent for equipment mounted in very critical areas; 10 to 20 percent for 
critical areas; and 20 to 40 percent for noncritical areas.  The drawings should 
be checked to ensure that all structural and equipment connection factors and 
the conditions surrounding the equipment to be provided with the vibration isolation 
units favorably influence the effectiveness of the isolators.  Where many items 
of equipment require different transmission values, based on the equipment location, 
the specification may be revised to indicate the appropriate values on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Refrigeration equipment and the installation thereof shall conform to <RID>ASHRAE 15 &amp; 34</RID>.  Necessary supports 
shall be provided for all equipment, appurtenances, and pipe as required, including frames or supports for compressors, 
pumps, cooling towers, condensers, water coolers, and similar items.  Compressors shall be isolated from the 
building structure.  If mechanical vibration isolators are not provided, vibration absorbing foundations shall 
be provided.  Each foundation shall include isolation units consisting of machine and floor or foundation fastenings, 
together with intermediate isolation material.  Other floor-mounted equipment shall be set on not less than a <MET>
150 mm </MET><ENG>6 inch</ENG> concrete pad doweled in place.  Concrete foundations for floor mounted pumps shall have a mass 
equivalent to three times the weight of the components, pump, base plate, and motor to be supported.  In lieu 
of concrete pad foundation, concrete pedestal block with isolators placed between the pedestal block and the 
floor may be provided.  Concrete pedestal block shall be of mass not less than three times the combined pump, 
motor, and base weights.  Isolators shall be selected and sized based on load-bearing requirements and the lowest 
frequency of vibration to be isolated.  Isolators shall limit vibration to [_____] percent at lowest equipment 
rpm.  Lines connected to pumps mounted on pedestal blocks shall be provided with flexible connectors.  Foundation 
drawings, bolt-setting information, and foundation bolts shall be furnished prior to concrete foundation construction 
for all equipment indicated or required to have concrete foundations.  Concrete for foundations shall be as specified 
in Section <SRF>03 30 00</SRF> CAST-IN-PLACE CONCRETE.  Equipment shall be properly leveled, aligned, and secured in place 
in accordance with manufacturer's instructions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.2   Field Refrigerant Charging</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Initial Charge:  Upon completion of all the refrigerant pipe tests, the vacuum on the system 
shall be broken by adding the required charge of dry refrigerant for which the system is designed, 
in accordance with the manufacturer's recommendations.  Contractor shall provide the complete 
charge of refrigerant in accordance with manufacturer's recommendations.  Upon satisfactory 
completion of the system performance tests, any refrigerant that has been lost from the system 
shall be replaced.  After the system is fully operational, service valve seal caps and blanks 
over gauge points shall be installed and tightened.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Refrigerant Leakage:  If a refrigerant leak is discovered after the system has been charged, 
the leaking portion of the system shall immediately be isolated from the remainder of the system 
and the refrigerant shall be pumped into the system receiver or other suitable container.  The 
refrigerant shall not be discharged into the atmosphere.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Contractor's Responsibility:  The Contractor shall, at all times during the installation 
and testing of the refrigeration system, take steps to prevent the release of refrigerants into 
the atmosphere.  The steps shall include, but not be limited to, procedures which will minimize 
the release of refrigerants to the atmosphere and the use of refrigerant recovery devices to 
remove refrigerant from the system and store the refrigerant for reuse or reclaim.  At no time 
shall more than <MET>85 g </MET><ENG>3 ounces</ENG> of refrigerant be released to the atmosphere in any one occurrence.  
Any system leaks within the first year shall be repaired in accordance with the specified requirements 
including material, labor, and refrigerant if the leak is the result of defective equipment, 
material, or installation.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.3   Oil Charging</TTL><BRK/>
<BRK/>
<TXT>Except for factory sealed units, two complete charges of lubricating oil for each compressor crankcase shall 
be furnished.  One charge shall be used during the performance testing period, and upon the satisfactory completion 
of the tests, the oil shall be drained and replaced with the second charge.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.3   Mechanical Room Ventilation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>For mechanical rooms which are intended to house refrigeration equipment, designers 
will use ASHRAE 15 to determine applicable design criteria.  Delete this paragraph 
if a mechanical room is not applicable to the design.</NPR><BRK/>
<BRK/>
<NPR>In summary, ASHRAE 15 allows the use of either natural or mechanical ventilation 
systems, however natural ventilation is allowed only in certain limited applications.  
Natural ventilation is allowed only when "a refrigerant system is located outdoors 
more than 6.1 m (20 feet) from building openings and is enclosed by a penthouse, 
lean-to or other open structure", otherwise mechanical ventilation is required.</NPR><BRK/>
<BRK/>
<NPR>The amount of ventilation air required for a mechanical room will be determined 
based upon the ventilation equations in ASHRAE 15.  In order to use these equations, 
a designer must approximate the mass of refrigerant (kgs or lbs) expected in 
the largest system located in the mechanical room.  <BRK/>
Refrigerant quantities will be determined based upon a minimum of 2 different 
system manufacturers.</NPR><BRK/>
<BRK/>
<NPR>     a.  For a natural ventilation system, ASHRAE 15 provides an equation for 
sizing the amount of free opening area required.</NPR><BRK/>
<BRK/>
<NPR>     b.  For a mechanical ventilation system, ASHRAE 15 requires both normal 
and alarm ventilation.  Normal ventilation will be sized to cover personnel 
ventilation requirements 2.5 1/s/m2 or (0.5 cfm/ft2) and heat buildup requirements 
if applicable.  Alarm ventilation will be sized based upon the equations in 
ASHRAE 15.  Both the normal and alarm ventilation rates can be achieved using 
the same ventilation system (e.g., multi-speed exhaust fans), however, individual 
systems are preferred.  For the alarm ventilation, exhaust intakes will be located 
near the equipment and close to the finished floor.  Most commonly used refrigerants 
are heavier-than-air and subsequently sink to the floor.  Also per ASHRAE 15, 
air supply and exhaust ducts to the mechanical room will serve no other area 
within a facility.  Discharge air from a mechanical ventilation system will 
be to the outdoors.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Mechanical ventilation systems shall be in accordance with Section <SRF>23 00 00</SRF> AIR SUPPLY, DISTRIBUTION, VENTILATION, 
AND EXHAUST SYSTEM.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Field Applied Insulation</TTL><BRK/>
<BRK/>
<TXT>Field installed insulation shall be as specified in Section <SRF>23 07 00</SRF> THERMAL INSULATION FOR MECHANICAL SYSTEMS, 
except as defined differently herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Field Painting</TTL><BRK/>
<BRK/>
<TXT>Painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory 
are specified in Section <SRF>09 90 00</SRF> PAINTS AND COATINGS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   MANUFACTURER'S FIELD SERVICE</TTL><BRK/>
<BRK/>
<TXT>The services of a factory-trained representative shall be provided for [_____] days.  The representative shall 
advise on the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Hermetic machines:</ITM><BRK/>
<BRK/>
<ITM>(1)  Testing hermetic water-chilling unit under pressure for refrigerant leaks; evacuation and 
dehydration of machine to an absolute pressure of not over 300 microns.</ITM><BRK/>
<BRK/>
<ITM>(2)  Charging the machine with refrigerant.</ITM><BRK/>
<BRK/>
<ITM>(3)  Starting the machine.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Open Machines:</ITM><BRK/>
<BRK/>
<ITM>(1)  Erection, alignment, testing, and dehydrating.</ITM><BRK/>
<BRK/>
<ITM>(2)  Charging the machine with refrigerant.</ITM><BRK/>
<BRK/>
<ITM>(3)  Starting the machine.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   CLEANING AND ADJUSTING</TTL><BRK/>
<BRK/>
<TXT>Equipment shall be wiped clean, with all traces of oil, dust, dirt, or paint spots removed.  Temporary filters 
shall be provided for all fans that are operated during construction, and new filters shall be installed after 
all construction dirt has been removed from the building.  System shall be maintained in this clean condition 
until final acceptance.  Bearings shall be properly lubricated with oil or grease as recommended by the manufacturer.  
Belts shall be tightened to proper tension.  Control valves and other miscellaneous equipment requiring adjustment 
shall be adjusted to setting indicated or directed.  Fans shall be adjusted to the speed indicated by the manufacturer 
to meet specified conditions.  At least one week before the official equipment warranty start date, all condenser 
coils on air-cooled water chillers and split-system water chillers shall be cleaned in accordance with the chiller 
manufacturer's instructions.  This work covers two coil cleanings.  The condenser coils shall be cleaned with 
an approved coil cleaner by a service technician, factory trained by the chiller manufacturer.  The condenser 
coil cleaner shall not have any detrimental affect on the materials or protective coatings on the condenser coils.  
Testing, adjusting, and balancing shall be as specified in Section <SRF>23 05 93</SRF> TESTING, ADJUSTING, AND BALANCING.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   <SUB>FIELD ACCEPTANCE TESTING</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Test Plans</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Manufacturer's Test Plans:  Within [120][___] calendar days after contract award, submit 
the following plans:</ITM><BRK/>
<BRK/>
<ITM>[(1)  <SUB>Water chiller</SUB> - field acceptance test plan</ITM>]<BRK/>
<BRK/>
<ITM>Field acceptance test plans shall be developed by the absorption chiller manufacturer detailing 
recommended field test procedures for that particular type and size of equipment.  Field acceptance 
test plans developed by the installing Contractor, or the equipment sales agency furnishing 
the equipment, will not be acceptable.</ITM><BRK/>
<BRK/>
<ITM>The Contracting Officer will review and approve the field acceptance test plan for each of the 
listed equipment prior to commencement of field testing of the equipment.  The approved field 
acceptance tests of the absorption chiller and subsequent test reporting.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Coordinated testing:  Indicate in each field acceptance test plan when work required by 
this section requires coordination with test work required by other specification sections.  
Furnish test procedures for the simultaneous or integrated testing of tower system controls 
which interlock and interface with controls factory prewired or external controls for the equipment 
provided under [Section <SRF>23 09 23</SRF> DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING SYSTEMS][Section 
<SRF>23 09 53.00 20</SRF>, SPACE TEMPERATURE CONTROL SYSTEMS] [Section <SRF>23 09 23.13 20</SRF>, BACNET DIRECT DIGITAL 
CONTROL SYSTEMS FOR HVAC].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Prerequisite testing:  Absorption chillers for which performance testing is dependent upon 
the completion of the work covered by Section <SRF>23 05 93</SRF> TESTING, ADJUSTING, AND BALANCING must 
have that work completed as a prerequisite to testing work under this section.  Indicate in 
each field acceptance test plan when such prerequisite work is required.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Test procedure:  Indicate in each field acceptance test plan each equipment manufacturers 
published installation, start-up, and field acceptance test procedures.  Include in each test 
plan a detailed step-by-step procedure for testing automatic controls provided by the manufacturer.</ITM><BRK/>
<BRK/>
<ITM>Each test plan shall include the required test reporting forms to be completed by the Contractor's 
testing representatives.  Procedures shall be structured to test the controls through all modes 
of control to confirm that the controls are performing with the intended sequence of control.</ITM><BRK/>
<BRK/>
<ITM>Controller shall be verified to be properly calibrated and have the proper set point to provide 
stable control of their respective equipment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Performance variables:  Each test plan shall list performance variables that are required 
to be measured or tested as part of the field test.</ITM><BRK/>
<BRK/>
<ITM>Include in the listed variables performance requirements indicated on the equipment schedules 
on the design drawings.  Chiller manufacturer shall furnish with each test procedure a description 
of acceptable results that have been verified.</ITM><BRK/>
<BRK/>
<ITM>Chiller manufacturer shall identify the acceptable limits or tolerance within which each tested 
performance variable shall acceptably operate.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Job specific:  Each test plan shall be job specific and shall address the particular cooling 
towers and particular conditions which exist in this contract.  Generic or general preprinted 
test procedures are not acceptable.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">g.  Specialized components:  Each test plan shall include procedures for field testing and field 
adjusting specialized components, such as hot gas bypass control valves, or pressure valves.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Testing</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Each water chiller system shall be field acceptance tested in compliance with its approved 
field acceptance test plan and the resulting following field acceptance test report submitted 
for approval:</ITM><BRK/>
<BRK/>
<ITM>[1.  <SUB>Water chiller</SUB> - field acceptance test report]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Manufacturer's recommended testing:  Conduct the manufacturer's recommended field testing 
in compliance with the approved test plan.  Furnish a factory trained field representative authorized 
by and to represent the equipment manufacturer at the complete execution of the field acceptance 
testing.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Operational test:  Conduct a continuous 24 hour operational test for each item of equipment.  
Equipment shutdown before the test period is completed shall result in the test period being 
started again and run for the required duration.  For the duration of the test period, compile 
an operational log of each item of equipment.  Log required entries every two hours.  Use the 
test report forms for logging the operational variables.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Notice of tests:  Conduct the manufacturer's recommended tests and the operational tests; 
record the required data using the approved reporting forms.  Notify the Contracting Officer 
in writing at least 15 calendar days prior to the testing.  Within 30 calendar days after acceptable 
completion of testing, submit each test report for review and approval.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Report forms:  Type data entries and writing on the test report forms.  Completed test report 
forms for each item of equipment shall be reviewed, approved, and signed by the Contractor's 
test director.  The manufacturer's field test representative shall review, approve, and sign 
the report of the manufacturer's recommended test.  Signatures shall be accompanied by the person's 
name typed.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">f.  Deficiency resolution:  The test requirements acceptably met; deficiencies identified during 
the tests shall be corrected in compliance with the  manufacturer's recommendations and corrections 
retested in order to verify compliance.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   <SUB>SYSTEM PERFORMANCE TESTS</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.1   General Requirements</TTL><BRK/>
<BRK/>
<TXT>Before each refrigeration system is accepted, tests to demonstrate the general operating characteristics of all 
equipment shall be conducted by a registered professional engineer or an approved manufacturer's start-up representative 
experienced in system start-up and testing, at such times as directed.  Tests shall cover a period of not less 
than [48] [_____] hours for each system and shall demonstrate that the entire system is functioning in accordance 
with the drawings and specifications.  Corrections and adjustments shall be made as necessary and tests shall 
be re-conducted to demonstrate that the entire system is functioning as specified.  Prior to acceptance, service 
valve seal caps and blanks over gauge points shall be installed and tightened.  Any refrigerant lost during the 
system startup shall be replaced.  If tests do not demonstrate satisfactory system performance, deficiencies 
shall be corrected and the system shall be retested.  Tests shall be conducted in the presence of the Contracting 
Officer.  Water and electricity required for the tests will be furnished by the Government.  Any material, equipment, 
instruments, and personnel required for the test shall be provided by the Contractor.  Field tests shall be coordinated 
with Section <SRF>23 05 93</SRF> TESTING, ADJUSTING, AND BALANCING.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   Test Report</TTL><BRK/>
<BRK/>
<TXT>The report shall document compliance with the specified performance criteria upon completion and testing of the 
system.  The report shall indicate the number of days covered by the tests and any conclusions as to the adequacy 
of the system.  The report shall also include the following information and shall be taken at least three different 
times at outside dry-bulb temperatures that are at least <MET>3 degrees C </MET><ENG>5 degrees F</ENG> apart:</TXT><BRK/>
<BRK/>
<ITM>a.  Date and outside weather conditions.</ITM><BRK/>
<BRK/>
<ITM>b.  The load on the system based on the following:</ITM><BRK/>
<BRK/>
<ITM>  (1)  The refrigerant used in the system.</ITM><BRK/>
<ITM>  (2)  Condensing temperature and pressure.</ITM><BRK/>
<ITM>  (3)  Suction temperature and pressure.</ITM><BRK/>
<ITM>  (4)  Running current, voltage and proper phase sequence for each phase of all motors.</ITM><BRK/>
<ITM>  (5)  The actual on-site setting of all operating and safety controls.</ITM><BRK/>
<ITM>  (6)  Chilled water pressure, flow  and temperature in and out of the chiller.</ITM><BRK/>
<ITM>  (7)  The position of the [capacity-reduction gear] [gas supply control valve] [fuel oil supply 
valve] at machine off, one-third loaded, one-half loaded, two-thirds loaded, and fully loaded.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   <SUB>DEMONSTRATIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Contractor shall conduct a training course for the operating staff as designated by the Contracting Officer.  
The training period shall consist of a total [_____] hours of normal working time and start after the system 
is functionally completed but prior to final acceptance tests.  The field <SUB>posted instructions</SUB> shall cover all 
of the items contained in the approved <SUB>operation and maintenance manuals</SUB> as well as demonstrations of routine 
maintenance operations.</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>