USACE / NAVFAC / AFCESA / NASA   UFGS-26 08 00 (August 2008)<BRK/>
                                 -------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>      Superseding <BRK/>
                                 UFGS-26 08 00 (April 2006))<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 26 08 00</SCN><BRK/>
<BRK/>
<STL>APPARATUS INSPECTION AND TESTING</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>electrical inspection 
and testing</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this specification on project specifications where NETA testing is 
required.</NPR><BRK/>
<BRK/>
<NPR>The following sections reference NETA for power distribution services and equipment.</NPR><BRK/>
<BRK/>
<NPR>--Section <SRF>26 32 13.00 20</SRF> SINGLE OPERATION GENERATOR SETS</NPR><BRK/>
<NPR>--Section <SRF>26 12 19.20</SRF> THREE-PHASE PAD-MOUNTED TRANSFORMERS</NPR><BRK/>
<NPR>--Section <SRF>26 12 19.20</SRF> SINGLE-PHASE PAD-MOUNTED TRANSFORMERS</NPR><BRK/>
<NPR>--Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION</NPR><BRK/>
<NPR>--Section <SRF>33 71 02.00 20</SRF> UNDERGROUND ELECTRICAL DISTRIBUTION</NPR><BRK/>
<BRK/>
<NPR>--Section <SRF>26 13 00.00 20</SRF> PAD-MOUNTED SF6 INSULATED INTERRUPTER</NPR><BRK/>
<NPR>--Section <SRF>26 11 16</SRF> SECONDARY UNIT SUBSTATIONS</NPR><BRK/>
<NPR>--Section <SRF>26 11 13.00 20</SRF> PRIMARY UNIT SUBSTATIONS</NPR><BRK/>
<NPR>--Section <SRF>26 36 23.00 20</SRF> AUTOMATIC TRANSFER SWITCHES</NPR><BRK/>
<NPR>--Section <SRF>26 23 00</SRF> SWITCHBOARDS AND SWITCHGEAR</NPR><BRK/>
<BRK/>
<NPR>This section shall also be used for specification sections containing low-voltage 
or medium voltage generator control switchboards or switchgear,  pad-mounted 
air switches, and medium voltage circuit breakers.  Provide the section numbers 
and titles in this section, and add NETA testing requirements to the applicable 
section.</NPR><BRK/>
<BRK/>
<NPR>Coordinate the sections in your contract documents with this list and with paragraph 
entitled "Acceptance Tests and Inspection" in PART 3 of this specification.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)</ORG><BRK/><BRK/><RID>NETA ATS</RID><RTL>(2003) Acceptance Testing Specifications</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   RELATED REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Section <SRF>26 00 00.00 20</SRF> BASIC ELECTRICAL MATERIALS AND METHODS applies to this section with additions and modifications 
specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Acceptance tests and inspections</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Qualifications</SUB> of organization, and lead engineering technician[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Acceptance test and inspections procedure</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1   <SUB>Qualifications</SUB></TTL><BRK/>
<BRK/>
<TXT>Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, 
and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance 
Tests and Inspections" herein.  Organization shall be independent of the supplier, manufacturer, and installer 
of the equipment.   The organization shall be a first tier subcontractor.  No work required by this section of 
the specification shall be performed by a second tier subcontractor.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Submit name and qualifications of organization.  Organization shall have been regularly 
engaged in the testing of electrical materials, devices, installations, and systems for a minimum 
of 5 years.  The organization shall have a calibration program, and test instruments used shall 
be calibrated in accordance with <RID>NETA ATS</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Submit name and qualifications of the lead engineering technician performing the required 
testing services.  Include a list of three comparable jobs performed by the technician with 
specific names and telephone numbers for reference.  Testing, inspection, calibration, and adjustments 
shall be performed by an engineering technician, certified by NETA or the National Institute 
for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience 
inspecting, testing, and calibrating electrical distribution and generation equipment, systems, 
and devices.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   Acceptance Tests and Inspections Reports</TTL><BRK/>
<BRK/>
<TXT>Submit certified copies of inspection reports and test reports.  Reports shall include certification of compliance 
with specified requirements, identify deficiencies, and recommend corrective action when appropriate.  Type and 
neatly bind test reports to form a part of the final record.  Submit test reports documenting the results of 
each test not more than 10 days after test is completed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.3   <SUB>Acceptance Test and Inspections Procedure</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned 
testing date.  Do not perform testing until after test procedure has been approved.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<TXT>Not used.</TXT><BRK/>
<BRK/></PRT>
<PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   <SUB>ACCEPTANCE TESTS AND INSPECTIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Testing organization shall perform acceptance tests and inspections.  Test methods, procedures, and test values 
shall be performed and evaluated in accordance with <RID>NETA ATS</RID>, the manufacturer's recommendations, and paragraph 
entitled "Field Quality Control" of each applicable specification section.  Tests identified as optional in <RID>NETA ATS</RID>
 are not required unless otherwise specified.  Equipment shall be placed in service only after completion of 
required tests and evaluation of the test results have been completed.  Contractor shall supply to the testing 
organization complete sets of shop drawings, settings of adjustable devices, and other information necessary 
for an accurate test and inspection of the system prior to the performance of any final testing.  Contracting 
Officer shall be notified at least 14 days in advance of when tests will be conducted by the testing organization.  
Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select applicable sections for each project.   Ensure each equipment 
section includes the following information.  These changes should be found in 
the Atlantic Division Interim Specification Revision.</NPR><BRK/>
<BRK/>
<NPR>1. NETA ATS listed in the references.</NPR><BRK/>
<BRK/>
<NPR>2. The words "and Section 16081N, "Apparatus Inspection and Testing" apply" 
added to paragraph entitled "Related Requirements."</NPR><BRK/>
<BRK/>
<NPR>3.  SD-06 submittals with "Acceptance checks and tests" added in PART 1.</NPR><BRK/>
<BRK/>
<NPR>4.  Appropriate paragraphs from the NETA manual added under "Field Quality Control" 
in PART 3.</NPR><BRK/>
<BRK/>
<NPR>5.  Add any job section numbers and titles containing low-voltage or medium 
voltage generator control switchgear or switchboards, pad-mounted air switches, 
or medium voltage circuit breakers.  Provide the NETA tests required in the 
applicable section.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[a.  Section <SRF>26 32 13.00 20</SRF> SINGLE-OPERATION GENERATOR SETS.  Functional engine shutdown tests, 
vibration base-line test, and load bank test shall not be performed by the testing organization.  
These tests shall be performed by the start-up engineer.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[b.  Section <SRF>26 12 19.10</SRF> THREE-PHASE PAD-MOUNTED TRANSFORMERS]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[c.  Section <SRF>26 12 19.20</SRF> SINGLE-PHASE PAD-MOUNTED TRANSFORMERS]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[d.  Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[e.  Section <SRF>33 71 02.00 20</SRF> UNDERGROUND ELECTRICAL DISTRIBUTION] </ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[f.  Section <SRF>26 13 00.00 20</SRF> PAD-MOUNTED SF6 INSULATED INTERRUPTER SWITCHES]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[g.  Section <SRF>26 11 16</SRF> SECONDARY UNIT SUBSTATIONS]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[h.  Section <SRF>26 11 13.00 20</SRF> PRIMARY UNIT SUBSTATIONS]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[i.  Section <SRF>26 36 23.00 20</SRF> AUTOMATIC TRANSFER SWITCHES]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[j.  Section <SRF>26 23 00</SRF> SWITCHBOARDS AND SWITCHGEAR]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   SYSTEM ACCEPTANCE</TTL><BRK/>
<BRK/>
<TXT>Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3   PLACING EQUIPMENT IN SERVICE</TTL><BRK/>
<BRK/>
<TXT>A representative of the approved testing organization shall be present when equipment tested by the organization 
is initially energized and placed in service.</TXT><BRK/>