USACE / NAVFAC / AFCESA / NASA   UFGS-26 23 00 (July 2006)<BRK/>
                                 -------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>      Superseding<BRK/>
                                 UFGS-26 23 00 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 26 23 00</SCN><BRK/>
<BRK/>
<STL>SWITCHBOARDS AND SWITCHGEAR</STL><BRK/>
<DTE>07/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>free standing deadfront 
switchboard assemblies rated 6000 amperes or less, 600 volts or less, and metal-enclosed 
low-voltage power circuit-breaker switchgear assemblies in either interior or 
exterior locations</SCP>.  Rename the section appropriately if this section is used 
to specify only switchboards or only switchgear.  Use Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM, for power and distribution panelboards rated 1200 amperes 
or less and consisting of only group mounted stationary molded case circuit 
breakers and fusible or nonfusible switches designed to be placed in a cabinet 
or cutout box.<BRK/>
<BRK/>
When the proposed switchboard or switchgear is connected to a secondary unit 
substation, coordinate with Section <SRF>26 11 16</SRF> SECONDARY UNIT SUBSTATIONS.<BRK/>
<BRK/>
This specification is not intended to be used for generator control switchboards 
without extensive modification and coordination with applicable diesel engine-generator 
guide specifications.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestion on this specification are welcome and should be directed 
to the technical proponent of the specification.  A listing of the <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: The following information should be indicated on the project drawings 
or specified in the project specifications:<BRK/>
<BRK/>
1.  Single-line diagram showing buses and interrupting devices with interrupting 
capacities; current transformers with ratings; instruments and meters required; 
and description of instruments and meters.<BRK/>
<BRK/>
2.  Location, space available, arrangement, and elevations of switchboards or switchgear.<BRK/>
<BRK/>
3.  Grounding plan.<BRK/>
<BRK/>
4.  Type and number of cables, size of conductors for each power circuit, and 
point of entry (top or bottom).<BRK/>
<BRK/>
5.  Special conditions, such as altitude, temperature and humidity, exposure 
to fumes, vapors, dust, and gases; and seismic requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to in the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)</ORG><BRK/><BRK/><RID>ANSI C12.15</RID><RTL>(1990) Solid-State Demand Registers for Electromechanical Watthour Meters</RTL><BRK/><BRK/><RID>ANSI C39.1</RID><RTL>(1981; R 1992) Requirements for Electrical Analog Indicating Instruments</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 123/A 123M</RID><RTL>(2008) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products</RTL><BRK/><BRK/><RID>ASTM A 153/A 153M</RID><RTL>(2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware</RTL><BRK/><BRK/><RID>ASTM A 167</RID><RTL>(1999; R 2004) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip</RTL><BRK/><BRK/><RID>ASTM A 653/A 653M</RID><RTL>(2008) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process</RTL><BRK/><BRK/><RID>ASTM A 780</RID><RTL>(2001; R 2006) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings</RTL><BRK/><BRK/><RID>ASTM D 149</RID><RTL>(1997a; R 2004) Dielectric Breakdown Voltage and Dielectric Strength of Solid Electrical Insulating Materials at Commercial Power Frequencies</RTL><BRK/><BRK/><RID>ASTM D 1535</RID><RTL>(2008) Specifying Color by the Munsell System</RTL><BRK/><BRK/><RID>ASTM D 709</RID><RTL>(2001; R 2007) Laminated Thermosetting Materials</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE C12.16</RID><RTL>(1991) Solid-State Electricity Meters</RTL><BRK/><BRK/><RID>IEEE C2</RID><RTL>(2007; Errata 2007; INT 2008) National Electrical Safety Code</RTL><BRK/><BRK/><RID>IEEE C37.13</RID><RTL>(1990; R 1995) Standard for Low-Voltage AC Power Circuit Breakers Used in Enclosures</RTL><BRK/><BRK/><RID>IEEE C37.20.1</RID><RTL>(2002; Addenda A 2005; Addenda B 2006; R 2007) Standard for Metal-Enclosed Low-Voltage Power Circuit-Breaker Switchgear</RTL><BRK/><BRK/><RID>IEEE C37.90.1</RID><RTL>(2002; Errata 2003; Errata 2004) Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus</RTL><BRK/><BRK/><RID>IEEE C57.12.28</RID><RTL>(2005) Standard for Pad-Mounted Equipment - Enclosure Integrity</RTL><BRK/><BRK/><RID>IEEE C57.12.29</RID><RTL>(2005) Pad-Mounted Equipment - Enclosure Integrity for Coastal Environments</RTL><BRK/><BRK/><RID>IEEE C57.13</RID><RTL>(2008) Standard Requirements for Instrument Transformers</RTL><BRK/><BRK/><RID>IEEE Std 100</RID><RTL>(2000) The Authoritative Dictionary of IEEE Standards Terms</RTL><BRK/><BRK/><RID>IEEE Std 81</RID><RTL>(1983) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System (Part 1)Normal Measurements</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)</ORG><BRK/><BRK/><RID>NETA ATS</RID><RTL>(2003) Acceptance Testing Specifications</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA C12.1</RID><RTL>(2008) Electric Meters; Code for Electricity Metering</RTL><BRK/><BRK/><RID>NEMA C12.10</RID><RTL>(2004) Physical Aspects of Watthour Meters</RTL><BRK/><BRK/><RID>NEMA C12.4</RID><RTL>(1984; R 2002) Mechanical Demand Registers</RTL><BRK/><BRK/><RID>NEMA ICS 6</RID><RTL>(1993; R 2006) Standard for Industrial Controls and Systems Enclosures</RTL><BRK/><BRK/><RID>NEMA LI 1</RID><RTL>(1998) Industrial Laminated Thermosetting Products</RTL><BRK/><BRK/><RID>NEMA PB 2</RID><RTL>(2006) Deadfront Distribution Switchboards</RTL><BRK/><BRK/><RID>NEMA PB 2.1</RID><RTL>(2007) General Instructions for Proper Handling, Installation, Operation and Maintenance of Deadfront Distribution Switchboards Rated 600 Volts or Less</RTL><BRK/><BRK/><RID>NEMA ST 20</RID><RTL>(1992; R 1997) Standard for Dry-Type Transformers for General Applications</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 1558</RID><RTL>(1999; Rev thru Mar 2006) Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear</RTL><BRK/><BRK/><RID>UL 198M</RID><RTL>(2003; Rev thru Oct 2007) Mine-Duty Fuses</RTL><BRK/><BRK/><RID>UL 467</RID><RTL>(2007) Standard for Grounding and Bonding Equipment</RTL><BRK/><BRK/><RID>UL 489</RID><RTL>(2002; Rev thru Jun 2006) Standard for Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures</RTL><BRK/><BRK/><RID>UL 512</RID><RTL>(1993; Rev thru Jan 2008) Fuseholders</RTL><BRK/><BRK/><RID>UL 891</RID><RTL>(2005) Dead-Front Switchboards</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   RELATED REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Section <SRF>26 08 00</SRF> APPARATUS INSPECTION AND TESTING applies to this section, with the additions and modifications 
specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   DEFINITIONS</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, 
and on the drawings, shall be as defined in <RID>IEEE Std 100</RID>.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Choose between switchboards and switchgear in brackets throughout this 
specification.  Modify appropriately if both are used in a job. </NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  Submit the following 
in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>[Switchboard][Switchgear] Drawings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>Include wiring diagrams and installation details of equipment indicating proposed location, 
layout and arrangement, control panels, accessories, piping, ductwork, and other items that 
must be shown to ensure a coordinated installation.  Wiring diagrams shall identify circuit 
terminals and indicate the internal wiring for each item of equipment and the interconnection 
between each item of equipment.  Drawings shall indicate adequate clearance for operation, maintenance, 
and replacement of operating equipment devices.  Submittals shall include the nameplate data, 
size, and capacity.  Submittals shall also include applicable federal, military, industry, and 
technical society publication references.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>[Switchboard][Switchgear]</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>[Switchboard][Switchgear] design tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>[Switchboard][Switchgear] production tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Acceptance checks and tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>[Switchboard][Switchgear] Operation and Maintenance</SUB>, Data Package 5[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Assembled Operation and Maintenance Manuals</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Equipment Test Schedule</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Request for Settings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   [Switchboard][Switchgear] Product Data</TTL><BRK/>
<BRK/>
<TXT>Each submittal shall include manufacturer's information for each component, device and accessory provided with 
the [switchboard][switchgear] including:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Circuit breaker type, interrupting rating, and trip devices, including available settings</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Manufacturer's instruction manuals and published time-current curves (on full size logarithmic paper) 
of the main secondary breaker and largest secondary feeder device.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>[Switchboard][Switchgear] Drawings</SUB></TTL><BRK/>
<BRK/>
<TXT>Drawings shall include, but are not limited to the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  One-line diagram including breakers[, fuses][, current transformers, and meters]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Outline drawings including front elevation, section views, footprint, and overall dimensions</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Bus configuration including dimensions and ampere ratings of bus bars</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Markings and NEMA nameplate data[, including fuse information (manufacturer's name, catalog number, 
and ratings)]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Circuit breaker type, interrupting rating, and trip devices, including available settings</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Three-line diagrams and elementary diagrams and wiring diagrams with terminals identified, and indicating 
prewired interconnections between items of equipment and the interconnection between the items.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">g.  Manufacturer's instruction manuals and published time-current curves (on full size logarithmic paper) 
of the main secondary breaker and largest secondary feeder device.  These shall be used by the designer 
of record to provide breaker settings that will ensure  protection and coordination are achieved.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[h.  Provisions for future extension.]</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   Regulatory Requirements</TTL><BRK/>
<BRK/>
<TXT>In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the 
word, "shall" had been substituted for "should" wherever it appears.  Interpret references in these publications 
to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.  Equipment, 
materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of <RID>
NFPA 70</RID> unless more stringent requirements are specified or indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4   Standard Products</TTL><BRK/>
<BRK/>
<TXT>Provide materials and equipment that are products of manufacturers regularly engaged in the production of such 
products which are of equal material, design and workmanship.  Products shall have been in satisfactory commercial 
or industrial use for 2 years prior to bid opening.  The 2-year period shall include applications of equipment 
and materials under similar circumstances and of similar size.  The product shall have been on sale on the commercial 
market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.  Where two or 
more items of the same class of equipment are required, these items shall be products of a single manufacturer; 
however, the component parts of the item need not be the products of the same manufacturer unless stated in this 
section.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.5.4.1   Alternative Qualifications</TTL><BRK/>
<BRK/>
<TXT>Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory 
field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is 
furnished.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4.2   Material and Equipment Manufacturing Date</TTL><BRK/>
<BRK/>
<TXT>Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified 
otherwise.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.6   MAINTENANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   <SUB>[Switchboard][Switchgear] Operation and Maintenance</SUB> Data</TTL><BRK/>
<BRK/>
<TXT>Submit Operation and Maintenance Manuals in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   <SUB>Assembled Operation and Maintenance Manuals</SUB></TTL><BRK/>
<BRK/>
<TXT>Manuals shall be assembled and bound securely in durable, hard covered, water resistant binders.  The manuals 
shall be assembled and indexed in the following order with a table of contents.  The contents of the assembled 
operation and maintenance manuals shall be as follows:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Manufacturer's O&amp;M information required by the paragraph entitled "SD-10, Operation and Maintenance 
Data".</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Catalog data required by the paragraph entitled, "SD-03, Product Data".</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Drawings required by the paragraph entitled, "SD-02, Shop Drawings".</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Prices for spare parts and supply list.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[e.  Information on metering]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Design test reports</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">g.  Production test reports</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.6.3   Spare Parts</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Spare parts are specified in Section 01 78 23 OPERATION AND MAINTENANCE 
DATA for Navy projects.  Do not use this paragraph for Navy projects.<BRK/>
<BRK/>
Edit as required if additional spare parts are required for a specific project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Spare parts shall be furnished as specified below.  All spare parts shall be of the same material and workmanship, 
shall meet the same requirements, and shall be interchangeable with the corresponding original parts furnished.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  2 - Fuses of each type and size.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[b.  [________________________________]]</LST><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.7   WARRANTY</TTL><BRK/>
<BRK/>
<TXT>The equipment items shall be supported by service organizations which are reasonably convenient to the equipment 
installation in order to render satisfactory service to the equipment on a regular and emergency basis during 
the warranty period of the contract.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   PRODUCT COORDINATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  <BRK/>
For Army projects, refer to Section 33 70 02.00 10 UNDERGROUND TRANSMISSION 
AND DISTRIBUTION SYSTEM, UNDERGROUND; typical throughout this specification.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When project is designated to be designed to Antiterrorism Construction 
Standards, the electrical design must address limiting critical infrastructure 
damage.  If project scope does not address special (Switchboard) (Switchgear) 
requirements, designer should check with Project Manager to see if, as a minimum, 
Seismic Zone 1 criteria should be incorporated.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Products and materials not considered to be[ switchboards][ or][ switchgear] and related accessories are specified 
in[ Section <SRF>33 71 02.00 20</SRF> UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION,][ Section <SRF>33 70 02.00 10</SRF> UNDERGROUND 
TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND,] and Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   <SUB>[SWITCHBOARD][SWITCHGEAR]</SUB></TTL><BRK/>
<BRK/>
<TXT>[<RID>NEMA PB 2</RID> and <RID>UL 891</RID>][<RID>IEEE C37.20.1</RID> and <RID>UL 1558</RID>].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Ratings</TTL><BRK/>
<BRK/>
<TXT>The voltage rating of the [switchboard][switchgear] shall be [480Y/277][208Y/120][125][_____] volts [AC][DC], 
[2][3][4]-wire [[single][3] phase][as indicated].  The continuous current rating of the main bus shall be [_____ 
amperes][as indicated].  The short-circuit current rating shall be [_____ rms symmetrical amperes][as indicated].  
The [switchboard][switchgear] shall be UL listed and labeled[ for its intended use][ as service entrance equipment].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Construction</TTL><BRK/>
<BRK/>
<TXT>[Switchboard][Switchgear] shall consist of vertical sections bolted together to form a rigid assembly and shall 
be [rear][front and rear] aligned[ as indicated].  All circuit breakers shall be front accessible.[  Rear aligned 
switchboards shall have front accessible load connections.][  Front and rear aligned switchboards shall have 
rear accessible load connections.][  Compartmentalized [switchboards][switchgear] shall have vertical insulating 
barriers between the front device section, the main bus section, and the cable compartment[ with full front to 
rear vertical insulating barriers between adjacent sections].]  Where indicated, "space for future" or "space" 
shall mean to include bus, device supports, and connections.  Provide insulating barriers in accordance with <RID>
NEMA LI 1</RID>, Type GPO-3,<MET> 6.35 mm (0.25 inch)</MET><ENG> 0.25 inch</ENG> minimum thickness.  Apply moisture resistant coating to 
all rough-cut edges of barriers.  Switchboard shall be completely factory engineered and assembled, including 
protective devices and equipment indicated with necessary interconnections, instrumentation, and control wiring.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.2.1   Enclosure</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose the level of corrosion protection required for the specific project 
location.  Use galvanized steel in most indoor applications.  Use stainless 
steel bases for most outdoor applications.  In less corrosive environments, 
galvanized steel can be included as an alternative to stainless steel.  Manufacturer's 
standard construction material is acceptable only in noncoastal and noncorrosive environments.<BRK/>
<BRK/>
In last sentence use IEEE C57.12.28 for galvanized enclosures.  Use IEEE C57.12.29 
for stainless steel enclosures.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The [switchboard][switchgear] enclosure shall be a[ outdoor] <RID>NEMA ICS 6</RID> Type [3R][1][__][as indicated][ fabricated 
entirely of 12 gauge <RID>ASTM A 167</RID> type 304 or 304L stainless steel].  Enclosure shall be bolted together with removable 
bolt-on side and[ hinged] rear covers[, and sloping roof downward toward rear].[  Front[ and rear] doors shall 
be provided with[ stainless steel] padlockable vault handles with a three point catch.]  Bases, frames and channels 
of enclosure shall be corrosion resistant and shall be fabricated of[ <RID>ASTM A 167</RID> type 304 or 304L stainless steel][ 
or][ galvanized steel].  Base shall include any part of enclosure that is within<MET> 75 mm</MET><ENG> 3 inches</ENG> of concrete pad.[  
Galvanized steel shall be <RID>ASTM A 123/A 123M</RID>, <RID>ASTM A 653/A 653M</RID> G90 coating, and <RID>ASTM A 153/A 153M</RID>, as applicable.  
Galvanize after fabrication where practicable.]  Paint enclosure, including bases, <RID>ASTM D 1535</RID> light gray No. 
61 or No. 49.  Paint coating system shall comply with[ <RID>IEEE C57.12.28</RID> for galvanized steel][ and][ <RID>IEEE C57.12.29</RID>
 for stainless steel].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.2   Bus Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Use copper with silver-plated contact surfaces in exterior or damp locations 
or for heavy motor loads.<BRK/>
<BRK/>
Only choose the bracketed option requiring epoxy coating on the bus bars for 
outdoor locations with a high concentration of airborne contaminants.  Choose 
this option primarily for outdoor waterfront or dirty industrial applications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Bus bars shall be[ copper with silver-plated contact surfaces][ or][ aluminum with tin-plated contact surfaces].  
Plating shall be a minimum of<MET> 0.005 mm (0.0002 inch)</MET><ENG> 0.0002 inch</ENG> thick.  Make bus connections and joints with 
hardened steel bolts.  The through-bus shall be rated at the full ampacity of the main throughout the switchboard.  
Provide minimum<MET> 6.35 mm by 50.8 mm (one-quarter by 2 inch)</MET><ENG> one-quarter by 2 inch</ENG> copper ground bus secured to 
each vertical section along the entire length of the [switchboard][switchgear].  The neutral bus shall be rated 
[100][_____] percent of the main bus continuous current rating[ as indicated].[  Phase bus bars shall be insulated 
with an epoxy finish coating powder providing a minimum breakdown voltage of 16,000 volts per <RID>ASTM D 149</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.3   Main Section</TTL><BRK/>
<BRK/>
<TXT>The main section shall consist of[ main lugs only][ an individually mounted[ drawout][ air power circuit breaker[ 
with current-limiting fuses]][ insulated-case circuit breaker][ molded-case circuit breaker][ bolted pressure 
switch][ fusible switch]][ and utility transformer compartment]. </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.4   Distribution Sections</TTL><BRK/>
<BRK/>
<TXT>The distribution section[s] shall consist of[ [individually mounted,][drawout,]][ air power circuit breakers[ 
with current-limiting fuses]][ insulated-case circuit breakers][ molded-case circuit breakers][ bolted pressure 
switches][ fusible switches][ and utility transformer compartments] as indicated. </TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.2.5   Combination Sections</TTL><BRK/>
<BRK/>
<TXT>Combination sections shall consist of[ molded-case circuit breakers][ fusible switches] for the[ main and] branch 
devices as indicated.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.2.6   Auxiliary Sections</TTL><BRK/>
<BRK/>
<TXT>Auxiliary sections shall consist of indicated[ instruments,][ metering equipment,][ control equipment,][ transformer,][ 
and][ current transformer compartments] as indicated.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.2.7   Handles</TTL><BRK/>
<BRK/>
<TXT>Handles for individually mounted devices shall be of the same design and method of external operation.  Label 
handles prominently to indicate device ampere rating, color coded for device type.  Identify ON-OFF indication 
by handle position and by prominent marking.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.2.3   Protective Device</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Switchboard should be placed where the ambient temperature is less than 
40 deg. C.  However, should the ambient temperature be expected to exceed 40 
Deg. C, the designer shall call for special calibration for the circuit breakers.<BRK/>
<BRK/>
  Provide ground fault protection of equipment for solidly grounded wye electrical 
services of more than 150 volts to ground for each service disconnect rated 
1000 amperes or more in accordance with NFPA 70.<BRK/>
<BRK/>
 If 48 Vdc or 125 Vdc electrically operated circuit breakers are required, the 
appropriate DC control power supply information must be added to the specification.  
Reference information can be obtained fS.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide[ main and] branch protective devices as indicated.</TXT><BRK/>
<BRK/>
<SPT>[<TTL>2.2.3.1   Power Circuit Breaker</TTL><BRK/>
<BRK/>
<TXT><RID>IEEE C37.13</RID>. [120 Vac][ electrically][ manually] operated [stationary][drawout], [unfused][fused],[ steel frame,] 
low-voltage power circuit breaker with a short-circuit current rating[ of [_____] rms amperes symmetrical][ as 
indicated] at [_____] volts.  Breaker frame size shall be[ as indicated][ [_____] amperes].[  Equip electrically 
operated breakers with motor-charged, stored-energy closing mechanism to permit rapid and safe closing of the 
breaker against fault currents within the short time rating of the breaker, independent of the operator's strength 
or effort in closing the handle.]</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.3.2   Insulated-Case Breaker</TTL><BRK/>
<BRK/>
<TXT>UL listed, 100 percent rated,[ stationary][ drawout],[ 120 Vac],[ electrically] [manually] operated, low voltage, 
insulated-case circuit breaker, with a short-circuit current rating[ of [_____] rms symmetrical amperes][ as 
indicated] at [_____] volts.  Breaker frame size shall be[ [_____] amperes][ as indicated].[  Equip electrically 
operated breaker with motor-charged, stored-energy closing mechanism to permit rapid and safe closing of the 
breaker against fault currents within the short time rating of the breaker, independent of the operator's strength 
or effort in closing the handle.]</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.3.3   Molded-Case Circuit Breaker</TTL><BRK/>
<BRK/>
<TXT><RID>UL 489</RID>.  UL listed and labeled, 100 percent rated,[ stationary][ drawout],[ 120 Vac],[ electrically][ manually] 
operated, low voltage  molded-case circuit breaker, with a short-circuit current rating of[ [_____] rms symmetrical 
amperes][ as indicated] at [_____] volts.  Breaker frame size shall be[ [_____] amperes][ as indicated].  Series 
rated circuit breakers are unacceptable.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.3.4   Fusible Switches</TTL><BRK/>
<BRK/>
<TXT>Fusible Switches:  Quick-make, quick-break, hinged-door type.[  Switches serving as motor disconnects shall be 
horsepower rated.]  Fuses shall be current-limiting cartridge type conforming to[ <RID>UL 198M</RID>, Class J for 0 to 600 
amperes and Class L for 601 to 6000 amperes][ <RID>UL 198M</RID>, Class [RK1][RK5] for 0 to 600 amperes].<BRK/>
<BRK/>
Fuseholders:  <RID>UL 512</RID>.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.3.5   Integral Combination Breaker and Current-Limiting Fuses</TTL><BRK/>
<BRK/>
<TXT><RID>UL 489</RID>.  Provide integral combination molded-case circuit breaker and current-limiting fuses[ as indicated][ 
rated [_____] amperes] with a minimum short-circuit-current rating equal to the short-circuit-current rating 
of the [switchboard][switchgear] in which the circuit breaker will be mounted.  Series rated circuit breakers 
are unacceptable.  Coordination of overcurrent devices of the circuit breaker and current-limiting fuses shall 
be such that on overloads or fault currents of relatively low value, the overcurrent device of the breaker will 
be operated to clear the fault.  For high magnitude short circuits above a predetermined value[ crossover point], 
the current-limiting fuses shall operate to clear the fault.  Housing for the current-limiting fuses shall be 
an individual molding readily removable from the front and located at the load side of the circuit breaker.  
If the fuse housing is removed, a blown fuse shall be readily evident by means of a visible indicator.  Removal 
of fuse housing shall cause the breaker contacts to open, and it shall not be possible to close the breaker contacts 
with the fuse housing removed.  It shall not be possible to insert the fuse housing with a blown fuse or with 
one fuse missing.  The blowing of any of the fuses shall cause the circuit breaker contacts to open.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT>[<TTL>2.2.4   Drawout Breakers</TTL><BRK/>
<BRK/>
<TXT>Equip drawout breakers with disconnecting contacts, wheels, and interlocks for drawout application.  The main, 
auxiliary, and control disconnecting contacts shall be silver-plated, multifinger, positive pressure, self-aligning 
type.  Each drawout breaker shall be provided with four-position operation.  Each position shall be clearly identified 
by an indicator on the circuit breaker front panel.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Connected Position:  Primary and secondary contacts are fully engaged.  Breaker must be tripped before 
racking into or out of position.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Test Position:  Primary contacts are disconnected but secondary contacts remain fully engaged.  Position 
shall allow complete test and operation of the breaker without energizing the primary circuit.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Disconnected Position:  Primary and secondary contacts are disconnected.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Withdrawn (Removed) Position:  Places breaker completely out of compartment, ready for removal.  
Removal of the breaker shall actuate assembly that isolates the primary stabs.</LST><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.5   Electronic Trip Units</TTL><BRK/>
<BRK/>
<TXT>Equip[ main and][ distribution] breakers[ as indicated] with a solid-state tripping system consisting of three 
current sensors and a microprocessor-based trip unit that will provide true rms sensing adjustable time-current 
circuit protection.  The ampere rating of the current sensors shall be[ as indicated][ [_____] amperes][ the 
same as the breaker frame rating].  The trip unit ampere rating shall be[ as indicated][ [_____] amperes].[  
Ground fault protection shall be[ as indicated][ zero sequence sensing][ residual type sensing].][  The electronic 
trip units shall have the following features[ as indicated].]</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In the items below, choose the bracketed item "main" when the item only 
applies to the main breaker.<BRK/>
<BRK/>
Provide ground fault protection of equipment for solidly grounded wye electrical 
services of more than 150 volts to ground for each service disconnect rated 
1000 amperes or more in accordance with NFPA 70.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">[a.  [Indicated ]Breakers shall have long delay pick-up and time settings, and LED indication of cause 
of circuit breaker trip.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[b.  Main breakers shall have[ short delay pick-up and time settings][ and][, instantaneous settings][ 
and][ ground fault settings][ as indicated].]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[c.  Distribution breakers shall have[ short delay pick-up and time settings][, instantaneous settings][, 
and ground fault settings][ as indicated].]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[d.  [Main ]Breakers shall have a digital display for phase and ground current.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[e.  [Main ]Breakers shall have a digital display for watts, vars, VA, kWh, kvarh, and kVAh.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[f.  [Main ]Breakers shall have a digital display for phase voltage, and percent THD voltage and current.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[g.  [Main ]Breakers shall have provisions for communication via a network twisted pair cable for remote 
monitoring and control.]</LST><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.6   Electronic Trip Unit Central Monitor</TTL><BRK/>
<BRK/>
<TXT>Provide a microprocessor-based device designed to monitor and display parameters of the circuit breaker electronic 
trip units.  The central monitor shall have the following features:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Alphanumeric display.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Indication of circuit breaker status; tripped, open, closed.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Cause of circuit breaker trip.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Phase, neutral, and ground current for each breaker.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Energy parameters for each breaker.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Provisions for communicating directly to a remote computer.</LST><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.7   Instruments</TTL><BRK/>
<BRK/>
<TXT><RID>ANSI C39.1</RID> for electrical indicating switchboard instruments, with 2 percent accuracy.  The ac ammeters and voltmeters 
shall be a minimum of<MET> 50.8 mm square (2 inches square)</MET><ENG> 2 inches square</ENG>, with<MET> 4.36 rad (250-degree)</MET><ENG> 250-degree</ENG>
 scale.  Provide single phase indicating instruments with flush-mounted transfer switches for reading three phases.</TXT><BRK/>
<BRK/>
<SPT>[<TTL>2.2.7.1   Ac Ammeters</TTL><BRK/>
<BRK/>
<TXT>[Self-contained, ][Transformer rated, 5-ampere input, for use with a [_____] to 5-ampere current transformer 
ratio, ]0 to [_____]-ampere scale range, 60 hertz.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.7.2   Ac Voltmeters</TTL><BRK/>
<BRK/>
<TXT>Self-contained.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.7.3   Instrument Control Switches</TTL><BRK/>
<BRK/>
<TXT>Provide rotary cam-operated type with positive means of indicating contact positions.  Switches shall have silver-to-silver 
contacts enclosed in a protective cover which can be removed to inspect the contacts.</TXT><BRK/>
<BRK/>
]</SPT>]</SPT><SPT>[<TTL>2.2.8   Watthour and Digital Meters</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When Section 23 09 54.00 20 DIRECT DIGITAL CONTROL SYSTEMS or Section 
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING SYSTEMS is 
used, coordinate meter requirements.  Form 9S, in text below, is for three-phase, 
four-wire wye systems, for other system configurations, designer shall determine 
the appropriate form designation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT>[<TTL>2.2.8.1   Digital Meters</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Digital metering incorporates the latest technology and provides additional 
information, often without additional cost.  A control power transformer (115 
V or 130 V) is normally required with this type of metering.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>IEEE C37.90.1</RID> for surge withstand.  Provide true rms, plus/minus one percent accuracy, programmable, microprocessor-based 
meter enclosed in sealed cases with a simultaneous three line, twelve value LED display.  Meters shall have<MET> 16 
mm (0.56 inch)</MET><ENG> 0.56 inch</ENG>, minimum, LEDs.[  Watthour meter shall have<MET> 16 mm (0.56 inch)</MET><ENG> 0.56 inch</ENG>, minimum, LEDs.]  
The meters shall accept[ input from standard 5A secondary instrument transformers][ and][ direct voltage monitoring 
range to [300][600] volts, phase to phase].  Programming shall be via a front panel display and a communication 
interface with a computer.  Password secured programming shall be stored in non-volatile EEPROM memory.  Digital 
communications shall be Modbus [ASCII][RTU] protocol via a [RS232C][RS485] serial port[ and an independently 
addressable [RS232C][RS485] serial port].  The meter shall calculate and store average max/min demand values 
for all readings based on a user selectable sliding window averaging period.  The meter shall have programmable 
hi/low set limits with two Form C dry contact relays when exceeding alarm conditions.[  Meter shall provide Total 
Harmonic Distortion (THD) measurement to the thirty-first order.][  Historical trend logging capability shall 
include ability to store up to 100,000 data points with intervals of 1 second to 180 minutes.  The unit shall 
also store and time stamp up to 100 programmable triggered conditions.][  Event waveform recording shall be triggered 
by the rms of 2 cycles of voltage or current exceeding programmable set points.  Waveforms shall be stored for 
all 6 channels of voltage and current for a minimum of 10 cycles prior to the event and 50 cycles past the event.]</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">[a.  Multi-Function Meter: Meter shall simultaneously display a selected phase to neutral voltage, phase 
to phase voltage, percent phase to neutral voltage THD, percent phase to phase voltage THD; a selected 
phase current, neutral current, percent phase current THD, percent neutral current; selected total PF, 
kW, KVA, kVAR, FREQ, kVAh, kWh.  Detected alarm conditions include over/under current, over/under voltage, 
over/under KVA, over/under frequency, over/under selected PF/kVAR, voltage phase reversal, voltage imbalance, 
reverse power, over percent THD. The meter shall have a Form C KYZ pulse output relay.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[b.  Power Meter: Meter shall simultaneously display Watts, VARs, and selected KVA/PF. Detected alarm 
conditions include over/under KVA, over/under PF, over/under VARs, over/under reverse power.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[c.  Volt Meter: Meter shall be selectable between simultaneous display of the three phases of phase 
to neutral voltages and simultaneous display of the three phases of the phase to phase voltages.  Detected 
alarm conditions include over/under voltage, over/under voltage imbalance, over percent THD.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[d.  Ammeter: Meter shall simultaneously display phase A, B, and C currents.  Detected alarm conditions 
include over/under current, over percent THD.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[e.  Digital Watthour Meter:  Meter shall have a single selectable display for watts, total kilowatt 
hours (kWh) and watt demand (Wd).  The meter shall have a Form C KYZ pulse output relay.]</LST><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.8.2   Electronic Watthour Meter</TTL><BRK/>
<BRK/>
<TXT>Provide a switchboard style electronic programmable watthour meter, semi-drawout, semi-flush mounted, as indicated.  
Meter shall either be programmed at the factory or shall be programmed in the field.  When field programming 
is performed, turn field programming device over to the Contracting Officer at completion of project.  Meter 
shall be coordinated to system requirements and conform to <RID>IEEE C12.16</RID>.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Design:  Provide meter designed for use on a 3-phase, 4-wire, [208Y/120][480Y/277] volt system with 
3 current transformers.  Include necessary KYZ pulse initiation hardware for Energy Monitoring and Control 
System (EMCS)[ as specified in[ Section <SRF>23 09 23</SRF> DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING 
SYSTEMS]].</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Coordination:  Provide meter coordinated with ratios of current transformers and transformer secondary 
voltage.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Class: 20.  Form: [9S][___].  Accuracy: +/- 1.0 percent. Finish: Class II.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Kilowatt-hour Register: 5 digit electronic programmable type.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Demand Register:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Provide solid state <RID>ANSI C12.15</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Meter reading multiplier:  Indicate multiplier on the meter face.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Demand interval length: shall be programmed for [15][30][60] minutes with rolling demand 
up to six subintervals per interval.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Meter fusing: Provide a fuse block mounted in the metering compartment containing one fuse per phase 
to protect the voltage input to the watthour meter.  Size fuses as recommended by the meter manufacturer.</LST><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.8.3   Electro-Mechanical Watthour Meters</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  On standard projects, use of the electronic meter versus the optional 
electromechanical meter is recommended due to decreasing availability of electromechanical 
meters.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>NEMA C12.10</RID>.  Kilowatt-hour meters shall be[ two][ three][ four]-stator, transformer rated, polyphase, 60 hertz,[ 
surface][ semiflush] mounted,[ drawout][ semidrawout] switchboard meters[ 120 volt for use on a four-wire wye, 
three phase, 208Y/120 volt system][ 240 volt for use on a four-wire wye, three-phase 480Y/277 volt system].  
Meter shall have a five-dial pointer type register.[  The kilowatt-hour meter shall have a[ sweep-hand][ cumulative] 
type kilowatt demand register with [15][30][60]-minute interval conforming to <RID>NEMA C12.4</RID>.]  Provide correct multiplier 
on face of meter.</TXT><BRK/>
<BRK/>
]</SPT>]</SPT><SPT><TTL>2.2.9   Current Transformers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the appropriate current transformer (CT) ratio, continuous-thermal-current 
rating factor (RF) at 30 degrees C and ANSI Metering Accuracy Class values based 
on the CT Ratio which is just below the rating of the main protective device.<BRK/>
<BRK/>
Select an ANSI Metering Accuracy Class in accordance with the following table:<BRK/>
<BRK/>
<HL1>     CT Ratio   RF        Accuracy Class</HL1><BRK/>
<BRK/>
      200/5     4.0       0.3 thru B-0.1<BRK/>
      300/5     3.0       0.3 thru B-0.2<BRK/>
      400/5     4.0       0.3 thru B-0.2<BRK/>
      600/5     3.0       0.3 thru B-0.5<BRK/>
      800/5     2.0       0.3 thru B-0.5<BRK/>
     1200/5     1.5       0.3 thru B-0.5<BRK/>
     1500/5     1.5       0.3 thru B-0.9<BRK/>
     2000/5     1.5       0.3 thru B-1.8<BRK/></NPR>
<BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>IEEE C57.13</RID>.  Transformers shall be single ratio, 60 hertz, [_____] to 5-ampere ratio, [_____] rating factor, 
with a metering accuracy class of 0.3 through [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.10   Transformer</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Coordinate with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM, when transformer 
section is provided.  Use UL 891 for switchboards and UL 1558 for switchgear.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide transformer section in [switchboard][switchgear] in accordance with [<RID>UL 891</RID>][<RID>UL 1558</RID>] and as indicated.  
The transformer and section shall be suitable for the installation.[  Transformers greater than 10 kVA shall 
be tested in accordance with <RID>UL 891</RID>.]  Transformer shall conform to the requirements of Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.11   Meter Fusing</TTL><BRK/>
<BRK/>
<TXT>Provide a fuse block mounted in the metering compartment containing one fuse per phase to protect the voltage 
input to voltage sensing meters.  Size fuses as recommended by the meter manufacturer.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.2.12   Heaters</TTL><BRK/>
<BRK/>
<TXT>Provide 120-volt heaters in each [switchboard][switchgear] section.  Heaters shall be of sufficient capacity 
to control moisture condensation in the section, shall be 250 watts minimum, and shall be controlled by a thermostat[ 
and humidistat] located in the section.  Thermostat shall be industrial type, high limit, to maintain sections 
within the range of<MET> 15 to 32 degrees C (60 to 90 degrees F)</MET><ENG> 60 to 90 degrees F</ENG>.[  Humidistat shall have a range 
of 30 to 60 percent relative humidity.]  Supply voltage for the heaters shall be obtained from a control power 
transformer within the [switchboard][switchgear].  If heater voltage is different than switchboard voltage, provide 
transformer rated to carry 125 percent of heater full load rating.  Transformer shall have 220 degrees C insulation 
system with a temperature rise not exceeding 115 degrees C and shall conform to <RID>NEMA ST 20</RID>.[  Energize electric 
heaters in switchboard assemblies while the equipment is in storage or in place prior to being placed in service.  
Provide method for easy connection of heater to external power source.  Provide temporary, reliable external 
power source if commercial power at rated voltage is not available on site.]</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.2.13   Terminal Boards</TTL><BRK/>
<BRK/>
<TXT>Provide with engraved plastic terminal strips and screw type terminals for external wiring between components 
and for internal wiring between removable assemblies.  Terminal boards associated with current transformers shall 
be short-circuiting type.  Terminate conductors for current transformers with ring-tongue lugs.  Terminal board 
identification shall be identical in similar units.  External wiring shall be color coded consistently for similar 
terminal boards.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.14   Wire Marking</TTL><BRK/>
<BRK/>
<TXT>Mark control and metering conductors at each end.  Provide factory-installed, white, plastic tubing, heat stamped 
with black block type letters on factory-installed wiring.  On field-installed wiring, provide white, preprinted, 
polyvinyl chloride (PVC) sleeves, heat stamped with black block type letters.  Each sleeve shall contain a single 
letter or number, shall be elliptically shaped to securely grip the wire, and shall be keyed in such a manner 
to ensure alignment with adjacent sleeves.  Provide specific wire markings using the appropriate combination 
of individual sleeves.  Each wire marker shall indicate the device or equipment, including specific terminal 
number to which the remote end of the wire is attached.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   MANUFACTURER'S NAMEPLATE</TTL><BRK/>
<BRK/>
<TXT>Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial 
number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.  
This nameplate and method of attachment may be the manufacturer's standard if it contains the required information.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   FIELD FABRICATED NAMEPLATES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the bracketed sentence to specify labels for switchboards or switchgear 
where emergency breakers are located within the switchboards or switchgear.  
Provide note on the drawings to indicate where red labels are required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ASTM D 709</RID>.  Provide laminated plastic nameplates for each[ switchboard,][ switchgear,] equipment enclosure, 
relay, switch, and device; as specified in this section or as indicated on the drawings.  Each nameplate inscription 
shall identify the function and, when applicable, the position.  Nameplates shall be melamine plastic,<MET> 3 mm</MET><ENG> 0.125 
inch</ENG> thick, white with [black][_____] center core.[  Provide red laminated plastic label with white center core 
where indicated.]  Surface shall be matte finish.  Corners shall be square.  Accurately align lettering and engrave 
into the core.  Minimum size of nameplates shall be<MET> 25 by 65 mm</MET><ENG> one by 2.5 inches</ENG>.  Lettering shall be a minimum 
of<MET> 6.35 mm</MET><ENG> 0.25 inch</ENG> high normal block style.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   SOURCE QUALITY CONTROL</TTL><BRK/>
<BRK/>
<SPT><TTL>2.5.1   <SUB>Equipment Test Schedule</SUB></TTL><BRK/>
<BRK/>
<TXT>The Government reserves the right to witness tests.  Provide equipment test schedules for tests to be performed 
at the manufacturer's test facility.  Submit required test schedule and location, and notify the Contracting 
Officer 30 calendar days before scheduled test date.  Notify Contracting Officer 15 calendar days in advance 
of changes to scheduled date.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Test Instrument Calibration</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  The manufacturer shall have a calibration program which assures that all applicable test 
instruments are maintained within rated accuracy.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  The accuracy shall be directly traceable to the National Institute of Standards and Technology.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Instrument calibration frequency schedule shall not exceed 12 months for both test floor 
instruments and leased specialty equipment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Dated calibration labels shall be visible on all test equipment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Calibrating standard shall be of higher accuracy than that of the instrument tested.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Keep up-to-date records that indicate dates and test results of instruments calibrated or 
tested.  For instruments calibrated by the manufacturer on a routine basis, in lieu of third 
party calibration, include the following:</ITM><BRK/>
<BRK/>
<ITM>(a)  Maintain up-to-date instrument calibration instructions and procedures for each test instrument.</ITM><BRK/>
<BRK/>
<ITM>(b)  Identify the third party/laboratory calibrated instrument to verify that calibrating standard 
is met.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   <SUB>[Switchboard][Switchgear] Design Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Use the first bracketed option for switchboards and the second bracketed 
option for switchgear. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[<RID>NEMA PB 2</RID> and <RID>UL 891</RID>][<RID>IEEE C37.20.1</RID> and <RID>UL 1558</RID>].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.5.2.1   Design Tests</TTL><BRK/>
<BRK/>
<TXT>Furnish documentation showing the results of design tests on a product of the same series and rating as that 
provided by this specification.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Short-circuit current test</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Enclosure tests</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Dielectric test</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.5.2.2   Additional design tests</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include additional design tests when the switchboard or switchgear main 
bus is rated greater than 4000 amperes.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In addition to normal design tests, perform the following tests on the actual equipment.  Furnish reports which 
include results of design tests performed on the actual equipment.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Temperature rise tests</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Continuous current</LST><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.5.3   <SUB>[Switchboard][Switchgear] Production Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Use the first bracketed option for switchboards and the second bracketed 
option for switchgear.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[<RID>NEMA PB 2</RID> and <RID>UL 891</RID>][<RID>IEEE C37.20.1</RID> and <RID>UL 1558</RID>].  Furnish reports which include results of production tests 
performed on the actual equipment for this project.  These tests include:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  60-hertz dielectric tests</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Mechanical operation tests</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Electrical operation and control wiring tests</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Ground fault sensing equipment test</LST><BRK/>
<BRK/></SPT>
</SPT><SPT>[<TTL>2.6   COORDINATED POWER SYSTEM PROTECTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this paragraph only for Army projects.<BRK/>
<BRK/>
The requirement for studies in this section depends on the complexity and extent 
of the power system.  Delete this requirement for projects of limited scope, 
projects having protective devices which are not adjustable or for which coordination 
is not possible (standard molded case circuit breakers); projects involving 
simple extension of 600 volt level service to a building or facility from an 
existing transformer (750 kVA or less); or projects involving simple extension 
of 600 volt level service to a building or facility from a new transformer (750 
kVA or less).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a power system study as specified in Section <SRF>26 28 01.00 10</SRF> COORDINATED POWER SYSTEM PROTECTION.</TXT><BRK/>
<BRK/>
]</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Electrical installations shall conform to <RID>IEEE C2</RID>, <RID>NFPA 70</RID>, and to the requirements specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   GROUNDING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where rock or other soil conditions prevent obtaining a specified ground 
value, specify other methods of grounding.  Where it is impractical to obtain 
the indicated ground resistance values, make every effort to obtain ground resistance 
values as near as possible to the indicated values.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>NFPA 70</RID> and <RID>IEEE C2</RID>, except that grounds and grounding systems shall have a resistance to solid earth ground 
not exceeding 5 ohms.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Grounding Electrodes</TTL><BRK/>
<BRK/>
<TXT>Provide driven ground rods as specified in[ Section <SRF>33 71 02.00 20</SRF> UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION][ 
Section <SRF>33 70 02.00 10</SRF> UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND].  Connect ground conductors 
to the upper end of the ground rods by exothermic weld or compression connector.  Provide compression connectors 
at equipment end of ground conductors.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Equipment Grounding</TTL><BRK/>
<BRK/>
<TXT>Provide bare copper cable not smaller than No. 4/0 AWG not less than<MET> 610 mm</MET><ENG> 24 inches</ENG> below grade connecting 
to the indicated ground rods.  When work in addition to that indicated or specified is directed to obtain the 
specified ground resistance, the provision of the contract covering "Changes" shall apply.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Connections</TTL><BRK/>
<BRK/>
<TXT>Make joints in grounding conductors and loops by exothermic weld or compression connector.  Exothermic welds 
and compression connectors shall be installed as specified in[ Section <SRF>33 71 02.00 20</SRF> UNDERGROUND UNDERGROUND 
TRANSMISSION AND DISTRIBUTION, paragraph entitled "Grounding Connections."][ Section <SRF>33 70 02.00 10</SRF> UNDERGROUND 
TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND.]  </TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Grounding and Bonding Equipment</TTL><BRK/>
<BRK/>
<TXT><RID>UL 467</RID>, except as indicated or specified otherwise.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   INSTALLATION OF EQUIPMENT AND ASSEMBLIES</TTL><BRK/>
<BRK/>
<TXT>Install and connect equipment furnished under this section as indicated on project drawings, the approved shop 
drawings, and as specified herein.</TXT><BRK/>
<BRK/>
<SPT>[<TTL>3.3.1   Switchboard</TTL><BRK/>
<BRK/>
<TXT><RID>NEMA PB 2.1</RID>.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.3.2   Switchgear</TTL><BRK/>
<BRK/>
<TXT><RID>IEEE C37.20.1</RID>.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.3.3   Meters and Instrument Transformers</TTL><BRK/>
<BRK/>
<TXT><RID>NEMA C12.1</RID>.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>3.3.4   Field Applied Painting</TTL><BRK/>
<BRK/>
<TXT>Where field painting of enclosures is required to correct damage to the manufacturer's factory applied coatings, 
provide manufacturer's recommended coatings and apply in accordance with manufacturer's instructions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.5   Galvanizing Repair</TTL><BRK/>
<BRK/>
<TXT>Repair damage to galvanized coatings using <RID>ASTM A 780</RID>, zinc rich paint, for galvanizing damaged by handling, 
transporting, cutting, welding, or bolting.  Do not heat surfaces that repair paint has been applied to.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6   Field Fabricated Nameplate Mounting</TTL><BRK/>
<BRK/>
<TXT>Provide number, location, and letter designation of nameplates as indicated.  Fasten nameplates to the device 
with a minimum of two sheet-metal screws or two rivets.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   FOUNDATION FOR EQUIPMENT AND ASSEMBLIES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Mounting slab connections may have to be given in detail depending on 
the requirements for the seismic zone in which the equipment is located.  Include 
construction requirements for concrete slab only if slab is not detailed in 
drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.4.1   Exterior Location</TTL><BRK/>
<BRK/>
<TXT>Mount [switchboard][switchgear] on concrete slab.  Unless otherwise indicated, the slab shall be at least<MET> 200 
mm</MET><ENG> 8 inches</ENG> thick, reinforced with a<MET> 150 by 150 mm (6 by 6 inch)</MET><ENG> 6 by 6 inch</ENG> No. 6 mesh placed uniformly<MET> 100 
mm</MET><ENG> 4 inches</ENG> from the top of the slab.  Slab shall be placed on a<MET> 150 mm</MET><ENG> 6 inch</ENG> thick, well-compacted gravel base.  
The top of the concrete slab shall be approximately<MET> 100 mm</MET><ENG> 4 inches</ENG> above the finished grade.  Edges above grade 
shall have<MET> 15 mm</MET><ENG> 1/2 inch</ENG> chamfer.  The slab shall be of adequate size to project at least<MET> 200 mm</MET><ENG> 8 inches</ENG> beyond 
the equipment.  Provide conduit turnups and cable entrance space required by the equipment to be mounted.  Seal 
voids around conduit openings in slab with water- and oil-resistant caulking or sealant.  Cut off and bush conduits<MET>
 75 mm</MET><ENG> 3 inches</ENG> above slab surface.  Concrete work shall be as specified in[ Section <SRF>03 30 00</SRF> CAST-IN-PLACE CONCRETE][ 
Section <SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Interior Location</TTL><BRK/>
<BRK/>
<TXT>Mount [switchboard][switchgear] on concrete slab.  Unless otherwise indicated, the slab shall be at least<MET> 100 
mm</MET><ENG> 4 inches</ENG> thick.  The top of the concrete slab shall be approximately<MET> 100 mm</MET><ENG> 4 inches</ENG> above finished floor.  
Edges above floor shall have<MET> 15 mm</MET><ENG> 1/2 inch</ENG> chamfer.  The slab shall be of adequate size to project at least<MET> 
100 mm</MET><ENG> 8 inches</ENG> beyond the equipment.  Provide conduit turnups and cable entrance space required by the equipment 
to be mounted.  Seal voids around conduit openings in slab with water- and oil-resistant caulking or sealant.  
Cut off and bush conduits<MET> 75 mm</MET><ENG> 3 inches</ENG> above slab surface.  Concrete work shall be as specified in[ Section 
<SRF>03 30 00</SRF> CAST-IN-PLACE CONCRETE][ Section <SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<TXT>Contractor shall submit <SUB>request for settings</SUB> of breakers to the Contracting Officer after approval of [switchboard][switchgear] 
and at least 30 days in advance of their requirement.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Performance of <SUB>Acceptance Checks and Tests</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Perform in accordance with the manufacturer's recommendations</TST> and include the following visual and mechanical 
inspections and electrical tests, performed in accordance with <RID>NETA ATS</RID>.</TXT><BRK/>
<BRK/>
<SPT>[<TTL>3.5.1.1   Switchboard Assemblies</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical, electrical, and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Confirm correct application of manufacturer's recommended lubricants.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Verify appropriate anchorage, required area clearances, and correct alignment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Inspect all doors, panels, and sections for paint, dents, scratches, fit, and missing hardware.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Verify that[ fuse and] circuit breaker sizes and types correspond to approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[7.  Verify that current transformer ratios correspond to approved shop drawings.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">8.  Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, 
verifying  tightness of accessible bolted electrical connections by calibrated torque-wrench 
method, or performing thermographic survey.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">9.  Confirm correct operation and sequencing of electrical and mechanical interlock systems.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">10. Clean switchboard.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">11. Inspect insulators for evidence of physical damage or contaminated surfaces.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">12. Verify correct barrier[ and shutter] installation[ and operation].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">13. Exercise all active components.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">14. Inspect all mechanical indicating devices for correct operation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">15. Verify that vents are clear.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">16. Test operation, alignment, and penetration of instrument transformer withdrawal disconnects.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">17. Inspect control power transformers.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform insulation-resistance tests on each bus section.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform overpotential tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Perform insulation-resistance test on control wiring; Do not perform this test on wiring 
connected to solid-state components.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Perform control wiring performance test.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Perform primary current injection tests on the entire current circuit in each section of 
assembly.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[6.  Perform phasing check on double-ended switchboard to ensure correct bus phasing from each 
source.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[7.  Verify operation of switchboard heaters.]</ITM><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.5.1.2   Switchgear</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical, electrical, and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Confirm correct application of manufacturer's recommended lubricants.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Verify appropriate anchorage, required area clearances, and correct alignment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Inspect all doors, panels, and sections for paint, dents, scratches, fit, and missing hardware.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Verify that[ fuse and] circuit breaker sizes and types correspond to approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[7.  Verify that current transformer ratios correspond to approved shop drawings.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">8.  Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, 
verifying  tightness of accessible bolted electrical connections by calibrated torque-wrench 
method, or performing thermographic survey.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">9.  Confirm correct operation and sequencing of electrical and mechanical interlock systems.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">10. Clean switchgear.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">11. Inspect insulators for evidence of physical damage or contaminated surfaces.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">12. Verify correct barrier[ and shutter] installation[ and operation].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">13. Exercise all active components.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">14. Inspect all mechanical indicating devices for correct operation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">15. Verify that vents are clear.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">16. Test operation, alignment, and penetration of instrument transformer withdrawal disconnects.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">17. Inspect control power transformers.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform insulation-resistance tests on each bus section.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform overpotential tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Perform insulation-resistance test on control wiring; Do not perform this test on wiring 
connected to solid-state components.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Perform control wiring performance test.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Perform primary current injection tests on the entire current circuit in each section of 
assembly.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[6.  Perform phasing check on double-ended switchgear to ensure correct bus phasing from each 
source.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[7.  Verify operation of switchgear heaters.]</ITM><BRK/>
<BRK/>
]</SPT><SPT><TTL>3.5.1.3   Circuit Breakers - Low Voltage - Power</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Confirm correct application of manufacturer's recommended lubricants.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Inspect anchorage, alignment, and grounding.  Inspect arc chutes.  Inspect moving and stationary 
contacts for condition, wear, and alignment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Verify that all maintenance devices are available for servicing and operating the breaker.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Verify that primary and secondary contact wipe and other dimensions vital to satisfactory 
operation of the breaker are correct.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">7.  Perform all mechanical operator and contact alignment tests on both the breaker and its 
operating mechanism.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">8.  Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, 
verifying  tightness of accessible bolted electrical connections by calibrated torque-wrench 
method, or performing thermographic survey.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">9.  Verify cell fit and element alignment.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">10. Verify racking mechanism.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform contact-resistance tests on each breaker.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform insulation-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Adjust Breaker(s) for final settings in accordance with Government provided settings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Determine long-time minimum pickup current by primary current injection.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Determine long-time delay by primary current injection.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate each option with each breaker type.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[6.  Determine short-time pickup and delay by primary current injection.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[7.  Determine ground-fault pickup and delay by primary current injection.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[8.  Determine instantaneous pickup value by primary current injection.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[9.  Activate auxiliary protective devices, such as ground-fault or undervoltage relays, to 
ensure operation of shunt trip devices; Check the operation of electrically-operated breakers 
in their cubicle.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">10. Verify correct operation of any auxiliary features such as trip and pickup indicators, zone 
interlocking, electrical close and trip operation, trip-free, and antipump function.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">11. Verify operation of charging mechanism.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.4   Circuit Breakers</TTL><BRK/>
<BRK/>
<TXT>[Low Voltage - Insulated-Case][ and ][Low Voltage Molded Case with Solid State Trips]</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect circuit breaker for correct mounting.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Operate circuit breaker to ensure smooth operation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Inspect case for cracks or other defects.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Inspect all bolted electrical connections for high resistance using low resistance ohmmeter, 
verifying tightness of accessible bolted connections and/or cable connections by calibrated 
torque-wrench method, or performing thermographic survey.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Inspect mechanism contacts and arc chutes in unsealed units.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform contact-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform insulation-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Perform Breaker adjustments for final settings in accordance with Government provided settings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Perform long-time delay time-current characteristic tests</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate each option with each breaker type.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[5.  Determine short-time pickup and delay by primary current injection.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[6.  Determine ground-fault pickup and time delay by primary current injection.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[7.  Determine instantaneous pickup current by primary injection.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[8.  Verify correct operation of any auxiliary features such as trip and pickup indicators, 
zone interlocking, electrical close and trip operation, trip-free, and anti-pump function.]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.5   Current Transformers</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify correct connection.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Verify that adequate clearances exist between primary and secondary circuit.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, 
verifying  tightness of accessible bolted electrical connections by calibrated torque-wrench 
method, or performing thermographic survey.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Verify that all required grounding and shorting connections provide good contact.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform resistance measurements through all bolted connections with low-resistance ohmmeter, 
if applicable.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform insulation-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Perform polarity tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Perform ratio-verification tests.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.6   Metering and Instrumentation</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.  </ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify tightness of electrical connections.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Determine accuracy of meters at 25, 50, 75, and 100 percent of full scale.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Calibrate watthour meters according to manufacturer's published data.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify all instrument multipliers.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Electrically confirm that current transformer and voltage transformer secondary circuits 
are intact.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.7   Grounding System</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Inspect ground system for compliance with contract plans and specifications.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  <RID>IEEE Std 81</RID>.  Perform ground-impedance measurements utilizing the fall-of-potential method.  
On systems consisting of interconnected ground rods, perform tests after interconnections are 
complete.  On systems consisting of a single ground rod perform tests before any wire is connected.  
Take measurements in normally dry weather, not less than 48 hours after rainfall.  Use a portable 
ground testing megger in accordance with manufacturer's instructions to test each ground or 
group of grounds.  The instrument shall be equipped with a meter reading directly in ohms or 
fractions thereof to indicate the ground value of the ground rod or grounding systems under 
test.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Submit the measured ground resistance of each ground rod and grounding system, indicating 
the location of the rod and grounding system.  Include the test method and test setup (i.e., 
pin location) used to determine ground resistance and soil conditions at the time the measurements 
were made.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.2   Follow-Up Verification</TTL><BRK/>
<BRK/>
<TXT><TST>Upon completion of acceptance checks, settings, and tests, the Contractor shall show by demonstration in service 
that circuits and devices are in good operating condition and properly performing the intended function.</TST> Circuit 
breakers shall be tripped by operation of each protective device.  <TST>Test shall require each item to perform its 
function not less than three times.</TST>  As an exception to requirements stated elsewhere in the contract, the Contracting 
Officer shall be given 5 working days advance notice of the dates and times for checks, settings, and tests.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>