USACE / NAVFAC / AFCESA / NASA      UFGS-26 32 13.00 20 (April 2007)<BRK/>
                                    -------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Superseding <BRK/>
                                    UFGS-26 32 13.00 20 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 26 32 13.00 20</SCN><BRK/>
<BRK/>
<STL>SINGLE OPERATION GENERATOR SETS</STL><BRK/>
<DTE>04/07</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>1800 rpm diesel 
engine-generator sets with ratings up to 2000 kW at 0.8 power factor intended 
for use in low voltage, non paralleling, emergency electrical power systems 
meeting requirements of NFPA 70, NFPA 99, and MIL-HDBK-1191</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification will require modification for applications where 
automatic transfer switches are not used.  When generators are to be operated 
in parallel with utility or with other generators, and for medium voltage (greater 
than 600 volt) systems, contact the responsible Facilities Engineering Command 
(FEC) for determination as to which specification or sample specification is 
to be used.  If Echelon III Reach-back Support form NAVFAC Atlantic or NAVFAC 
Pacific is required for shop drawing review or field acceptance testing, the 
FEC technical representative (electrical engineer) editing this document for 
a specific project must contact the appropriate Capital Improvements Electrical 
Engineering Office for consultation during the design stage of the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  On drawings, show:</NPR><BRK/>
<BRK/>
<NPR>1.  Engine-generator set foundation design and details.</NPR><BRK/>
<BRK/>
<NPR>2.  Piping for ventilation of engine crankcase to atmosphere where required.</NPR><BRK/>
<BRK/>
<NPR>3.  Details of exhaust, cooling water, and fuel piping, including penetrations 
through walls and roofs showing piping sleeves and exterior flashing where applicable.</NPR><BRK/>
<BRK/>
<NPR>4.  Diesel fuel day tank capacity where applicable.</NPR><BRK/>
<BRK/>
<NPR>5.  Location of remote alarm annunciator where applicable.</NPR><BRK/>
<BRK/>
<NPR>6.  Circuiting for the jacket coolant heating system, electric motor driven 
radiator fan where applicable, diesel fuel day tank system, starting battery 
charger, remote alarm annunciator storage battery charger where applicable, 
and generator space heater.</NPR><BRK/>
<BRK/>
<NPR>7.  Grounding plan.  For applications using transfer switches, the transfer 
switch shall be four pole and the generator shall be grounded as a separately 
derived system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B16.1</RID><RTL>(2005) Standard for Gray Iron Threaded Fittings; Classes 125 and 250</RTL><BRK/><BRK/><RID>ASME B16.21</RID><RTL>(2005) Nonmetallic Flat Gaskets for Pipe Flanges</RTL><BRK/><BRK/><RID>ASME B16.3</RID><RTL>(2006) Malleable Iron Threaded Fittings, Classes 150 and 300</RTL><BRK/><BRK/><RID>ASME B16.5</RID><RTL>(2003) Standard for Pipe Flanges and Flanged Fittings:  NPS 1/2 Through NPS 24</RTL><BRK/><BRK/><RID>ASME B16.9</RID><RTL>(2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 126</RID><RTL>(2004) Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings</RTL><BRK/><BRK/><RID>ASTM A 181/A 181M</RID><RTL>(2006) Standard Specification for Carbon Steel Forgings, for General-Purpose Piping</RTL><BRK/><BRK/><RID>ASTM A 193/A 193M</RID><RTL>(2008b) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service</RTL><BRK/><BRK/><RID>ASTM A 194/A 194M</RID><RTL>(2008b) Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both</RTL><BRK/><BRK/><RID>ASTM A 234/A 234M</RID><RTL>(2007) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service</RTL><BRK/><BRK/><RID>ASTM A 53/A 53M</RID><RTL>(2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless</RTL><BRK/><BRK/><RID>ASTM D 975</RID><RTL>(2008ae1) Standard Specification for Diesel Fuel Oils</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE C2</RID><RTL>(2007; Errata 2007; INT 2008) National Electrical Safety Code</RTL><BRK/><BRK/><RID>IEEE C50.12</RID><RTL>(2005) Requirements for Salient Pole Synchronous Generators</RTL><BRK/><BRK/><RID>IEEE Std 115</RID><RTL>(1995; R 2002) Test Procedures for Synchronous Machines:  Part I: Acceptance and Performance Testing; Part II: Test Procedures and Parameter Determination for Dynamic Analysis</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS (ICBO)</ORG><BRK/><BRK/><RID>ICBO UBC</RID><RTL>(2000) Uniform Building Code (3 Vol.)</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)</ORG><BRK/><BRK/><RID>NETA ATS</RID><RTL>(2003) Acceptance Testing Specifications</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)</ORG><BRK/><BRK/><RID>IEC 60034-2</RID><RTL>(1972; Amendment 1995; Amendment 1996) Rotating Electrical Machines Part 2:  Methods for Determining Losses and Efficiency of Rotating Electrical Machinery from Tests (Excluding Machines for Traction Vehicles)</RTL><BRK/><BRK/></REF><REF><ORG>INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)</ORG><BRK/><BRK/><RID>ISO 3046</RID><RTL>(1986; Am. 1) Reciprocating Internal Combustion Engines - Performance</RTL><BRK/><BRK/><RID>ISO 8528</RID><RTL>(1993) Reciprocating Internal Combustion Engine Driven Alternating Current Generator Sets</RTL><BRK/><BRK/></REF><REF><ORG>MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY (MSS)</ORG><BRK/><BRK/><RID>MSS SP-58</RID><RTL>(2002) Standard for Pipe Hangers and Supports - Materials, Design and Manufacture</RTL><BRK/><BRK/><RID>MSS SP-69</RID><RTL>(2003; R 2004) Standard for Pipe Hangers and Supports - Selection and Application</RTL><BRK/><BRK/><RID>MSS SP-70</RID><RTL>(2006) Standard for Cast Iron Gate Valves, Flanged and Threaded Ends</RTL><BRK/><BRK/><RID>MSS SP-71</RID><RTL>(2005) Standard for Gray Iron Swing Check Valves, Flanged and Threaded Ends</RTL><BRK/><BRK/><RID>MSS SP-80</RID><RTL>(2008) Bronze Gate, Globe, Angle and Check Valves</RTL><BRK/><BRK/><RID>MSS SP-85</RID><RTL>(2002) Standard for Cast Iron Globe &amp; Angle Valves, Flanged and Threaded Ends</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA C50.10</RID><RTL>(1990) Rotating Electrical Machinery - Synchronous Machines</RTL><BRK/><BRK/><RID>NEMA ICS 6</RID><RTL>(1993; R 2006) Standard for Industrial Controls and Systems Enclosures</RTL><BRK/><BRK/><RID>NEMA MG 1</RID><RTL>(2007; Errata 2008) Standard for Motors and Generators</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 30</RID><RTL>(2007; Errata 2008) Flammable and Combustible Liquids Code</RTL><BRK/><BRK/><RID>NFPA 37</RID><RTL>(2006) Installation and Use of Stationary Combustion Engines and Gas Turbines</RTL><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF DEFENSE (DOD)</ORG><BRK/><BRK/><RID>MIL-DTL-16884</RID><RTL>(Rev L) Fuel, Naval Distillate</RTL><BRK/><BRK/><RID>MIL-DTL-5624</RID><RTL>(Rev U; Notice 1) Turbine Fuel, Aviation, Grades JP-4 and JP-5</RTL><BRK/><BRK/><RID>MIL-STD-461</RID><RTL>(Rev F) Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment</RTL><BRK/><BRK/></REF><REF><ORG>U.S. GENERAL SERVICES ADMINISTRATION (GSA)</ORG><BRK/><BRK/><RID>FS A-A-52557</RID><RTL>(Rev A)) Fuel Oil, Diesel; for Posts, Camps and Stations</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>40 CFR 60</RID><RTL>Standards of Performance for New Stationary Sources</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 1236</RID><RTL>(2006) Standard for Safety Battery Chargers for Charging Engine-Starter Batteries</RTL><BRK/><BRK/><RID>UL 142</RID><RTL>(2006; Rev thru Dec 2007) Steel Aboveground Tanks for Flammable and Combustible Liquids</RTL><BRK/><BRK/><RID>UL 429</RID><RTL>(1999; Rev thru Dec 2008) Electrically Operated Valves</RTL><BRK/><BRK/><RID>UL 467</RID><RTL>(2007) Standard for Grounding and Bonding Equipment</RTL><BRK/><BRK/><RID>UL 489</RID><RTL>(2002; Rev thru Jun 2006) Standard for Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   RELATED REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Section <SRF>26 00 00.00 20</SRF> BASIC ELECTRICAL MATERIALS AND METHODS, and Section <SRF>26 08 00</SRF> APPARATUS INSPECTION AND 
TESTING apply to this section except as modified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   <SUB>Engine-Generator Set Data</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit data pertaining to the diesel engine-generator set and to the auxiliary equipment including but not limited 
to the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Make of engine.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Type or model of engine.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Gross bhp rating of engine shall be the total rated power output before deducting power requirements 
of electric motor-driven equipment or engine driven radiator fan.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Net brake power rating of engine shall include deductions for the total power requirements of electric 
motor-driven or engine-driven accessories as defined in <RID>ISO 3046</RID>.  Net ratings shall include a deduction 
in power output for cooling media system power requirements including radiator fans and any other power 
consuming devices required to provide cooling as specified.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Strokes per cycle.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Number of cylinders.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">g.  Bore and stroke,<MET> mm</MET><ENG> inches</ENG>.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">h.  Engine speed, rpm.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">i.  Piston speed,<MET> m/s</MET><ENG> fpm</ENG>.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">j.  kW power rating of engine-generator set as defined in the paragraph entitled "Engine-Generator Set 
Ratings and Performance."</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">k.  Induction method (naturally aspirated, turbocharged).</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">l.  Intercooler type (air-to-air or jacket water).</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">m.  Governor type, make, and model.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">n.  Make and model of turbochargers.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   <SUB>Engine-Generator Set Efficiencies</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the bracketed option below for projects located outside the continental 
United States (OCONUS) </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit data pertaining to the diesel engine-generator set including but not limited to the following:  Loads 
shall be calculated on basis of rated engine-generator set power.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Fuel consumption at 0.80 power factor,<MET> liters per hr</MET><ENG> gallons per hr</ENG>.</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  1/2 load</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  3/4 load</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Full load</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Generator efficiency at 0.80 power factor (percent)[ in accordance with <RID>IEC 60034-2</RID>].</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  1/2 load</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  3/4 load</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Full load</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Radiator capacity at design conditions.</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Coolant shall be antifreeze mixture as specified under paragraph entitled "Cooling System."</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2. <MET> L/s</MET><ENG> gpm</ENG> of coolant</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3. <MET> L/s</MET><ENG> cfm</ENG> of air through radiator</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4. <MET> kW</MET><ENG> Btu per hr</ENG> of heat exchange based on optimum coolant temperature to and from engine.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   <SUB>Diesel Engine Data</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit data certified by the engine manufacturer including but not limited to the following:  Loads shall be 
calculated on basis of rated engine-generator set power.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Approximate exhaust temperature degrees<MET> C</MET><ENG> F</ENG> at full load</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Weight of exhaust gas at full load<MET> kg per hr</MET><ENG> lb per hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Weight of intake air at full load<MET> kg per hr</MET><ENG> lb per hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Total heat rejected at full load<MET> kW</MET><ENG> Btu per hr</ENG></LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  To jacket coolant system</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  To fuel oil cooling system</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Emissions (Lbs/hr)(kg/hr) at full load</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Total Suspended Particulate</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Particulate matter with an average aerodynamic diameter of 10 microns (PM-10)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Sulfur dioxides</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Nitrogen Oxides (as N02)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Carbon Monoxide</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Volatile Organic Compounds</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Visible Emissions (percent opacity) at full load</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   <SUB>Generator and Exciter Data</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit data certified by the generator manufacturer including but not limited to the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Make and model number of generator</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  kW rating of generator</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Generator reactances</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Synchronous reactance, Xd</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Transient reactance,  X'd</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Subtransient reactance, X"d</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Negative sequence reactance, X2</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Zero sequence reactance, Xo</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   <SUB>Capacity Calculations for Engine-Generator Set</SUB></TTL><BRK/>
<BRK/>
<TXT>Calculations shall verify that the engine-generator set power rating is adequate for the load described in the 
paragraph entitled "Load Profile."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.6   <SUB>Calculations for Brake Mean Effective Pressure</SUB> (BMEP)</TTL><BRK/>
<BRK/>
<TXT>Calculation shall verify that the diesel engine meets the specified maximum BMEP as follows:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  kW:  Minimum power rating of engine-generator set as defined in the paragraph entitled "Engine-Generator 
Set Ratings and Performance."</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  rpm:  Engine revolutions per minute.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c. <MET> liters</MET><ENG> cu. in.</ENG>:  Total engine piston displacement in<MET> liters</MET><ENG> cubic inches</ENG>.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  GEN.EFF.:  Generator efficiency.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  x:  Multiplication sign.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f. <MET> bkW'</MET><ENG> bhp'</ENG>:  Brake<MET> kW</MET><ENG> horsepower</ENG> required from diesel engine by generator loaded to full power rating.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">g. <MET> bkW'</MET><ENG> bhp'</ENG>: <MET> kW/GEN.EFF.</MET><ENG> kW/(GEN.EFF. x 0.746)</ENG>.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">h. <MET> bkW"</MET><ENG> bhp"</ENG>:  Brake<MET> kW</MET><ENG> horsepower</ENG> required by diesel engine driven fan for cooling radiator or motor 
driven fan for cooling radiator.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">i. <MET> bkW</MET><ENG> bhp</ENG>: <MET> bkW' + bkW"</MET><ENG> bhp' + bhp"</ENG>.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">j.  BMEP<MET> kPa</MET><ENG> psi</ENG>: <MET> (120,000 x bkW)</MET><ENG> (792,000 x bhp)</ENG><BRK/>
/(rpm x<MET> liters</MET><ENG> cu. in.</ENG>).</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.7   <SUB>Torsional Vibration Stress Analysis Computations</SUB></TTL><BRK/>
<BRK/>
<TXT>Torsional vibrational stresses in the crankshaft and generator shaft of assembled diesel engine and driven generator 
shall not exceed<MET> 34,450 kPa</MET><ENG> 5000 psi</ENG> when engine is driving generator at rated speed while assembled unit is 
loaded to rated engine-generator set power.  Computations shall be based on a mathematical model of the assembled 
generator set provided or based on calculations using measured values from tests on a unit identical to the one 
provided.  Calculations based on models of, or measured data from, the unassembled engine and generator will 
not be acceptable.  Calculations shall include:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  A description of the system relating information pertinent to analysis such as operating speed range 
and identification plate data.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  A mass elastic assembly drawing, showing the arrangement of the units in the generator set and dimensions 
of shafting, including minimum diameters (or section moduli) of shafting in the system.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  A labeled line diagram of the mass elastic system indicating values of masses, stiffness, equivalent 
lengths, and equivalent diameters including basic assumptions and definition of terms.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Sample computations showing procedures used to obtain resulting stress values.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Computations indicating assembled engine-generator speed of 1800 rpm with assembly loaded to rated 
generator power and the resulting computed critical torsional stress values in the assembled engine crankshaft 
and generator shaft.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.8   <SUB>Capacity Calculations for Batteries</SUB></TTL><BRK/>
<BRK/>
<TXT>Calculation shall verify that the engine starting battery capacity exceeds dc power requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.3.9   <SUB>Turbocharger Load Calculations</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the engine-generator set installation includes field installed exhaust 
system (i.e., the engine-generator set is installed internal to a building in 
lieu of in a self contained outdoor enclosure), include the following paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>When the proposed exhaust system layout is different from that shown on the contract drawings, submit calculations 
showing that the external loads from the exhaust system such as weight and thermal expansion do not exceed the 
engine manufacturer's maximum allowed forces and moments on the turbocharger.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Engine-Generator set and auxiliary equipment</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Auxiliary systems</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>]<BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Engine-generator set data</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Engine-generator set efficiencies</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Diesel engine data</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Generator and exciter data</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Diesel engine-generator set</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Auxiliary systems and equipment</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Remote alarm annunciator</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Capacity calculations for engine-generator set</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Calculations for brake mean effective pressure</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Torsional vibration stress analysis computations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Capacity calculations for batteries</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
[<ITM><SUB>Turbocharger load calculations</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM>]<BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Acceptance checks and tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Functional acceptance tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Functional acceptance test procedure</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Vibration isolation system</SUB> certification[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Fuel system</SUB> certification[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Start-up engineer</SUB> qualification resume[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Instructor's</SUB> qualification resume[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-09 Manufacturer's Field Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Engine tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Generator tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Assembled engine-generator set tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Diesel engine-generator set</SUB>, Data Package 4[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Auxiliary systems and equipment</SUB>, Data Package 4[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Preliminary assembled operation and maintenance manuals</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Submit in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA and the paragraph 
entitled "Assembled Operation and Maintenance Manuals."</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Posted operating instructions</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Training plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   Drawing Requirements</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1.1   <SUB>Engine-Generator Set and Auxiliary Equipment</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit drawings pertaining to the engine-generator set and auxiliary equipment, including but not limited to 
the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Certified outline, general arrangement (setting plan), and anchor bolt details.  Show total weight 
and center of gravity of assembled equipment on the steel subbase.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Detailed elementary, schematic wiring, and interconnection diagrams of the engine starting system, 
jacket coolant heating system, engine protective devices, engine alarm devices, engine speed governor 
system, generator and excitation system, and other integral devices.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Detailed elementary, schematic wiring; and interconnection diagrams of the diesel fuel system, starting 
battery system, engine-generator control panel, generator circuit breaker[, and remote alarm annunciator].</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Dimensional drawings or catalog cuts of exhaust silencers, radiator, diesel fuel day tanks, fuel 
oil cooler, valves and pumps, intake filters, vibration isolators, and other auxiliary equipment not 
integral with the engine-generator set.</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.5.1.2   <SUB>Auxiliary Systems</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When the engine-generator set installation includes field installed exhaust, 
air intake, fuel oil cooler, or jacket coolant water systems (i.e., the engine-generator 
set is installed internal to a building in lieu of in a self contained outdoor 
enclosure), include the following paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit drawings showing floor plan arrangement of[ exhaust,][ air intake,][ fuel oil cooler,][ and][ jacket coolant 
water] systems including arrangement of piping and pipe sizes.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.5.2   <SUB>Vibration Isolation System</SUB> Certification</TTL><BRK/>
<BRK/>
<TXT>Submit certification from the manufacturer that the vibration isolation system will reduce the vibration to the 
limits specified in the paragraph entitled "Vibration Isolation System."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   <SUB>Fuel System</SUB> Certification</TTL><BRK/>
<BRK/>
<TXT>When the diesel fuel system requires a fuel oil cooler as described in the paragraph entitled "Fuel Oil Cooler," 
submit certification from the engine manufacturer that the fuel system design is satisfactory.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Deliver equipment on pallets or blocking wrapped in heavy-duty plastic, sealed to protect parts and assemblies 
from moisture and dirt.  Plug piping, conduit, exhaust, and air intake openings.  Protect and prepare batteries 
for shipment as recommended by the battery manufacturer.  Store auxiliary equipment at the site in covered enclosures, 
protected from atmospheric moisture, dirt, and ground water.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   SITE CONDITIONS</TTL><BRK/>
<BRK/>
<TXT>Protect the components of the engine-generator set, including cooling system components, pumps, fans, and similar 
auxiliaries when not operating and provide components capable of the specified outputs in the following environment:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Site Location:  [_____]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Site Elevation:  <MET>[_____] meters</MET><ENG>[_____] feet</ENG> above mean sea level</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Ambient Temperatures:</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Ambient temperatures, design wind velocity, and prevailing wind direction 
shall be as defined by NAVFAC P-89, "Engineering Weather Data," dated 1 July 
1978.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">1.  Maximum <MET>[_____] degrees C</MET><ENG>[_____] degrees F</ENG> dry bulb, <MET>[_____] degrees C</MET><ENG>[_____] degrees F</ENG> 
wet bulb.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Minimum <MET>[_____] degrees C</MET><ENG>[_____] degrees F</ENG> dry bulb.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">[d.  Design Wind Velocity:  <MET>[_____] km/h</MET><ENG>[_____] mph</ENG>.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[e.  Prevailing Wind Direction:  [_____].]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Seismic Zone:  Zone [_____] as defined by <RID>ICBO UBC</RID>.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8   MAINTENANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.1   Extra Materials</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.1.1   Paint</TTL><BRK/>
<BRK/>
<TXT>Furnish<MET> 4 liters</MET><ENG> one gallon</ENG> of identical paint used on engine-generator set in manufacturer's sealed container 
with each engine-generator set.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8.1.2   Filters</TTL><BRK/>
<BRK/>
<TXT>Furnish four spare replacement elements in their original containers for each filter with each unit.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.8.2   <SUB>Posted Operating Instructions</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide proposed operating instructions for the engine-generator set and auxiliary equipment laminated between 
matte-surface thermoplastic sheets and suitable for placement adjacent to corresponding equipment.  After approval, 
install operating instructions where directed.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>DIESEL ENGINE-GENERATOR SET</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide diesel engine-generator sets consisting of a water cooled diesel engine direct connected to an ac generator 
with a brushless excitation system and accessories.  Equipment and materials shall be the manufacturer's standard 
products offered in catalogs for commercial or industrial use.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Engine-Generator Set Ratings and Performance</TTL><BRK/>
<BRK/>
<TXT><RID>ISO 8528</RID>.  Each engine-generator set shall have a power rating of not less than [_____] kW at 0.8 power factor 
and supply[ 208Y/120][ 480Y/277][ _____] -volt, three-phase,[ 60][ 50]-Hz ac output.  Coordinate the engine-generator 
set to ensure an installed rating in the environment described in paragraph entitled "Site Conditions."  The 
power of the engine-generator set is defined as the power output available at the generator terminals excluding 
the electrical power absorbed by the essential independent auxiliaries.  Essential independent auxiliaries are 
items of equipment which are essential for the continued or repeated operation of the engine which uses power 
supplied from a source other than the engine.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1.1   Diesel Engine Capacity</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the appropriate engine-generator set from three manufacturers 
that suit the intended application based on power rating (kW) and kind of power 
(i.e., number of operating hours per year and average power output).  Using 
the specified kW and the total engine piston displacement per the selected engine-generator 
sets catalog data, calculate the BMEP to be specified in accordance with the 
paragraph entitled "Calculations for BMEP." A value of 0.9 may be used for generator 
efficiency.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The diesel engine shall meet the specified maximum BMEP requirements at rated speed as calculated in accordance 
with the paragraph entitled "Calculations for BMEP."  The engine capacity shall be based on the following:</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Contact the activity to find out fuel type to be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">a.  Engine burning diesel fuel conforming to[ <RID>FS A-A-52557</RID>, Grade DF-2,][ <RID>MIL-DTL-16884</RID>,][ <RID>ASTM D 975</RID>
, Grade 2-D,] or [<RID>MIL-DTL-5624</RID>, Grade JP-5] at an ambient temperature of<MET> 29 degrees C</MET><ENG> 85 degrees F</ENG>.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Engine cooled by a radiator fan mechanically driven by the diesel engine or remote with a motor driven 
fan.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Engine cooled by coolant mixture of water and ethylene glycol, 50 percent by volume of each.</LST><BRK/>
<BRK/>
<TXT>Maximum BMEP,<MET> kPa</MET><ENG> psi</ENG></TXT><BRK/>
<BRK/>
<TBL><THD>                       Naturally                     Turbocharged<BRK/>
                       Aspirated     Turbocharged    and Intercooled<BRK/>
<BRK/></THD>
  Four-cycle engines     [____]         [____]           [____]<BRK/>
<BRK/>
  Engine speed, rpm:  [1800] [1500]</TBL><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.1.1.2   Diesel Engine Emission Limits</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Include the following paragraph when an air pollution permit is required 
by local, state, or federal law to install and operate the diesel engine generator 
set.  Contact the engine-generator set manufacturer for achievable limits.  
Contact the activities  environmental department representative to determine 
permit requirements. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Emissions from the operation of the engine-generator set shall not exceed the following limits at full rated 
load.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Total Suspended Particulate      [_____] <ENG>Lbs/Hr kg/Hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Particulate Matter with an       [_____] <ENG>Lbs/Hr kg/Hr</ENG> average aerodynamic diameter of 10 microns 
(PM-10)</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Sulfur Dioxide                   [_____] <ENG>Lbs/Hr kg/Hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Nitrogen Oxides (as NO2)         [_____] <ENG>Lbs/Hr kg/Hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Carbon Monoxide                  [_____] <ENG>Lbs/Hr kg/Hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Volatile Organic Compounds       [_____] <ENG>Lbs/Hr kg/Hr</ENG></LST><BRK/>
<BRK/>
<LST INDENT="-0.33">g.  Visible Emissions                [_____] percent opacity</LST><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.1.1.3   Performance Class</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  See the following guidelines and table for selecting the appropriate 
performance class:</NPR><BRK/>
<BRK/>
<NPR>1.  Select Class G1 where the connected loads are such that only basic parameters 
of voltage and frequency are needed, e.g., general purpose lighting and other 
simple electrical loads.</NPR><BRK/>
<BRK/>
<NPR>2.  Select Class G2 where the demands on voltage characteristics are very much 
the same as for the commercial power system, e.g., lighting systems, pumps, 
fans, hoists.</NPR><BRK/>
<BRK/>
<NPR>3.  Select Class G3 where the connected equipment may make severe demands on 
frequency, voltage, and waveform characteristics, e.g., telecommunications as 
thyristor-controlled loads.</NPR><BRK/>
<BRK/>
<NPR>4.  Select Class G4 where the demands on the frequency, voltage, and waveform 
characteristics are exceptionally severe, e.g., data processing equipment or 
computer systems.  Performance values for Class G4 shall be determined by the 
designer and an appropriate table similar to the following table must be inserted 
into the Specification.</NPR><BRK/>
<BRK/>
<NPR>Parameter                        Performance Class</NPR><BRK/>
<BRK/>
<NPR>                                 G1     G2      G3</NPR><BRK/>
<BRK/>
<NPR>100 Percent Load Increase Frequency</NPR><BRK/>
<NPR>Deviation (Percent)             &lt;-15   &lt;-10    &lt;-7</NPR><BRK/>
<BRK/>
<NPR>100 Percent Load Decrease Frequency</NPR><BRK/>
<NPR>Deviation (Percent)             &lt;+18  &lt;+12     &lt;+10</NPR><BRK/>
<BRK/>
<NPR>100 Percent Load Change Frequency</NPR><BRK/>
<NPR>Recovery Time (Seconds)         &lt;10   &lt;5       &lt;3</NPR><BRK/>
<BRK/>
<NPR>100 Percent Load Increase Voltage</NPR><BRK/>
<NPR>Deviation (Percent)             &lt;-25  &lt;-20     &lt;-15</NPR><BRK/>
<BRK/>
<NPR>100 Percent Load Decrease Voltage</NPR><BRK/>
<NPR>Deviation (Percent)             &lt;+35  &lt;+25     &lt;+20</NPR><BRK/>
<BRK/>
<NPR>100 Percent Load Change Voltage</NPR><BRK/>
<NPR>Recovery Time (Seconds)         &lt;10   &lt;6       &lt;4</NPR><BRK/>
<BRK/>
<NPR>Frequency Droop</NPR><BRK/>
<NPR>(Percent)                       &lt;-8   &lt;-5      &lt;-3</NPR><BRK/>
<BRK/>
<NPR>Steady-State Frequency</NPR><BRK/>
<NPR>Band (Percent) (+ or -)         &lt;2.5  &lt;1.5    &lt;0.5</NPR><BRK/>
<BRK/>
<NPR>Steady-State Voltage</NPR><BRK/>
<NPR>Regulation (Percent) (+ or -)   &lt;5    &lt;2.5    &lt;1.0</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The voltage and frequency behavior of the generator set shall be in accordance with <RID>ISO 8528</RID> operating limit 
values for performance Class[ G1][ G2][ G3][ G4 as follows].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.1.4   Load Profile</TTL><BRK/>
<BRK/>
<TXT>The diesel engine-generator set shall be of adequate capacity necessary for the following load profile:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">[a.  Lighting [_____] kW]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[b.  Computer [_____] kW]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[c.  Uninterruptible power supplies (UPS) [_____] kVA,[ 3][ 6][ 12][ 24] pulse]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[d.  Variable frequency drives (VFD) [_____] kVA,[ 3][ 6][ 12][ 24] pulse]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[e.  Motor starting sequence</LST><BRK/>
<BRK/>
<TBL><THD>Starting Size     Locked Rotor   Starting               Maximum<BRK/>
Order     (hp)     NEMA Code      Method                 Voltage Dip<BRK/>
<BRK/></THD>
[_____]   [_____]  [F] [_____]  [Full Voltage] [_____]  [25] [_____] Percent<BRK/>
<BRK/>
[_____]   [_____]  [F] [_____]  [Full Voltage] [_____]  [25] [_____] Percent<BRK/>
<BRK/>
[_____]   [_____]  [F] [_____]  [Full Voltage] [_____]  [25] [_____] Percent]</TBL><BRK/>
<BRK/>
<LST INDENT="-0.33">[f.  Other load:  [_____] kW at 0.8 p.f.]</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.2   Diesel Engines and Accessories</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: As of 8/98 major manufacturers are building only four-cycle engines in 
order to meet Federal emissions requirements. Two-cycle engines shall not be 
specified. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ISO 3046</RID>.  Diesel engines shall be four-cycle naturally aspirated, or turbocharged, or turbocharged and intercooled; 
vertical in-line or vertical Vee type; designed for stationary service.  Engines shall be capable of immediate 
acceleration from rest to normal speed without intermediate idle/warm up period or prelubrication to provide 
essential electrical power.  Two-cycle engines are not acceptable.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.2.1   Subbase Mounting</TTL><BRK/>
<BRK/>
<TXT>Mount each engine-generator set on a structural steel subbase sized to support the engine, generator, and necessary 
accessories, auxiliaries and control equipment to produce a complete self-contained unit as standard with the 
manufacturer.  Design the structural subbase to properly support the equipment and maintain proper alignment 
of the engine-generator set in the specified seismic zone.  In addition, provide subbase with both lifting rings 
and jacking pads properly located to facilitate shipping and installation of the unit.  Factory align engine 
and generator on the subbase and securely bolt into place in accordance with the manufacturer's standard practice.  
Crankshaft shall have rigid coupling for connection to the generator.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.2   Assembly</TTL><BRK/>
<BRK/>
<TXT>Completely shop assemble each engine-generator set on its structural steel subbase.  Paint entire unit with manufacturer's 
standard paints and colors.   After factory tests and before shipping, thoroughly clean and retouch painting 
as necessary to provide complete protection.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.3   Turbocharger</TTL><BRK/>
<BRK/>
<TXT>If required by the manufacturer to meet the engine-generator set rating, provide turbine type driven by exhaust 
gas from engine cylinders, and direct connected to the blower supplying air to the engine intake manifold.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.4   Intercooler</TTL><BRK/>
<BRK/>
<TXT>Provide manufacturer's standard intercooler for engine size specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.5   Crankcase Protection</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include details on the drawings for the crankcase ventilation piping 
and associated penetrations through walls and roofs showing the piping sleeve 
and exterior flashing when the radiator is remote and the engine-generator set 
is to be installed inside a building.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide manufacturer's standard method of preventing crankcase explosions and standard method of crankcase ventilation.  
[Provide ventilation of crankcase via piping to the atmosphere as indicated on the drawings.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.6   Engine Lubricating Oil System</TTL><BRK/>
<BRK/>
<TXT>Provide each engine with the manufacturer's standard full pressure lubricating oil system arranged to cool the 
pistons and to distribute oil to moving parts of the engine.  Provide oil type and oil filters as recommended 
by the engine manufacturer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.7   Engine Cooling System</TTL><BRK/>
<BRK/>
<TXT>Provide each engine with the manufacturer's standard jacket water pump.  Provide a thermostatic control valve 
in the jacket coolant system for each engine-generator set to maintain a constant jacket coolant temperature 
to the engine.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.8   Engine Fuel System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the options for duplex filters when changing of the filter will 
be required while the engine-generator set is operating.  Do not provide duplex 
filters when the engine-generator set is to be installed in an enclosure or 
provided with an engine-driven radiator.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide each engine with the manufacturer's standard fuel system integral with the engine, complete with necessary 
piping, fittings, and valves for connecting items of equipment which are a part of the system.  Provide engine 
manufacturer's standard hand priming pump.  Provide manufacturer's standard[ simplex][ duplex] filter for each 
engine, of the throwaway filter element type, consisting of shell filter elements, drains, and necessary connections 
and fittings.  [Arrange duplex filter such that flow may be diverted from one chamber to the other without interruption 
at any point of the changeover.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.9   Engine Intake Filter</TTL><BRK/>
<BRK/>
<TXT>Provide intake filter assemblies for each engine of the oil bath or dry type, as standard with the manufacturer.  
Filters shall be capable of removing a minimum of 92 percent of dirt and abrasive 3 microns and larger from intake 
air.  Size filters to suit engine requirements at 100 percent of rated full load.  Design unit for field access 
for maintenance purposes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.10   Engine Starting System</TTL><BRK/>
<BRK/>
<TXT>Starting shall be accomplished using an adequately sized dc starter system with a positive shift solenoid to 
engage the starter motor and to crank the engine continuously for 60 seconds without overheating.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.11   Jacket Coolant Heating System</TTL><BRK/>
<BRK/>
<TXT>Provide a factory-installed,[ 120][ _____] volts ac, jacket coolant heating system to ensure rapid starting.  
Thermostatically control heater at the temperature recommended by engine manufacturer.  Include necessary equipment, 
piping, controls, wiring, and accessories.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.12   Engine Protective (Shutdown) Devices</TTL><BRK/>
<BRK/>
<TXT>Equip each engine with devices to shut down the engine by shutting off the fuel supply to the engine via a fuel 
shutoff solenoid.  Auxiliary contacts shall be suitable for activating a remote alarm system.  Shutdown shall 
open the associated generator circuit breaker.  Provide the following shutdown devices:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Overspeed device which operates when engine speed exceeds normal synchronous speed by 18 percent 
or as recommended by manufacturer.   Device shall require manual reset.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Pressure switch which operates when lubricating oil pressure to engine drops below a preset value.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Temperature switch which operates when jacket coolant temperature exceeds a preset value.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Device which operates when the coolant level in the radiator drops below a preset level.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Other shutdown devices as recommended by the engine manufacturer.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.13   Engine Alarm Devices</TTL><BRK/>
<BRK/>
<TXT>Equip each engine with alarm devices.  Auxiliary contacts shall be suitable for activating a remote alarm system.  
Alarm devices shall have factory-fixed set points.  Provide the following alarm contact devices:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Pressure switch which operates when lubricating oil pressure drops below a preset value.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Temperature switch which operates when jacket coolant temperature exceeds a preset value.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Temperature switch which operates when jacket coolant temperature is too low.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Other alarm devices as recommended by the engine manufacturer.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.14   Miscellaneous Engine Accessories</TTL><BRK/>
<BRK/>
<TXT>Provide the following engine accessories where the manufacturer's standard design permits:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Piping on engine to inlet and outlet connections, including nonstandard companion flanges.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Structural steel subbase and vibration isolators, foundation bolts, nuts, and pipe sleeves.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Level jack screws or shims, as required.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Rails, chocks, and shims for installation of subbase on the foundation.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Removable guard, around fan.  Support guard, on engine subbase, to suit manufacturer's standard.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.15   Engine Speed Governor System</TTL><BRK/>
<BRK/>
<TXT>Provide a forward acting type engine speed governor system.  Steady-state frequency band and frequency regulation 
(droop) shall be in accordance with the operating limit values of the performance class specified in the paragraph 
entitled "Performance Class."</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.3   Generator and Excitation System</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.3.1   Generator</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following guidelines for specifying generators:</NPR><BRK/>
<BRK/>
<NPR>1.  Select dripproof guarded option for generators without weatherproof enclosures.</NPR><BRK/>
<BRK/>
<NPR>2.  Select NEMA MG 1, Part 16, standby duty, and temperature rise of 130 degrees 
C for engine-generator sets which are expected to operate for less than 300 
hours per year.  Select NEMA MG 1, Part 22, continuous duty, and temperature 
rise of 105 degrees C for engine-generator sets expected to operate 300 hours 
or greater per year or rated 300 kW and above.</NPR><BRK/>
<BRK/>
<NPR>3.  Select 2/3 pitch design option for engine-generator sets rated 300 kW and 
above.</NPR><BRK/>
<BRK/>
<NPR>4.  Select 10-12 lead reconnectable for engine-generator sets rated 300 kW to 
800 kW.</NPR><BRK/>
<BRK/>
<NPR>5.  For applications requiring high SCR loading or in harsh environments laden 
with salts and chemicals, select vacuum pressure impregnation (VPI) insulated 
coils.  When engine-generator sets are rated 800 kW and larger, also select 
form wound coils.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide salient-pole type, ac, brushless-excited, revolving field, air-cooled, self-ventilated,[ dripproof guarded,] 
coupled type, synchronous generator conforming to <RID>NEMA MG 1</RID>, Part[ 16][ 22], <RID>NEMA C50.10</RID>, and <RID>IEEE C50.12</RID>.  Generator 
shall be rated for[ standby][ continuous] duty at 100 percent of the power rating of the engine-generator set 
as specified in paragraph entitled "Engine-Generator Set Ratings and Performance." Temperature rise of each of 
the various parts of the generator shall not exceed[ 130][ 105] degrees C as measured by resistance, based on 
a maximum ambient temperature of 40 degrees C.  Winding insulation shall be Class H.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Stator:  Stator windings shall be[ 2/3 pitch design][,][ 10-12 lead reconnectable][ with VPI insulated[ 
and form wound] coils].</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Rotor:  The rotor shall have connected amortisser windings.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Generator Space Heater:  Provide[ 120][ _____] volt ac heaters. Heater capacity shall be as recommended 
by the generator manufacturer to aid in keeping the generator insulation dry.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Grounding:  Provide non-corrosive steel grounding pads located at two opposite mounting legs.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Filters:  Provide manufacturer's standard generator cooling air filter assembly.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3.2   Excitation System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select all options for engine-generator sets rated 300 kW and above.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a brushless excitation system consisting of an exciter and rotating rectifier assembly[, and permanent 
magnet generator] integral with the generator and a voltage regulator.  Insulation class for parts integral with 
the generator shall be as specified in paragraph entitled "Generator." System shall provide a minimum short circuit 
of 300 percent rated engine-generator set current for at least 10 seconds.  Steady state voltage regulation shall 
be in accordance with the operating limit values of the performance class specified in the paragraph entitled 
"Performance Class."</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Exciter and Rotating Rectifier Assembly:  Rectifiers shall be provided with surge voltage protection.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[b.  Permanent Magnet Generator:  Provide a voltage spike suppression device for permanent magnet generator 
(PMG) excitation systems.]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Voltage Regulator:  Voltage regulator shall be solid state or digital, automatic, three-phase sensing, 
volts per hertz type regulator.[  Regulator shall receive its input power from a PMG.]  Voltage variation 
for any 40 degree C change over the operating temperature range shall be less than plus or minus 1.0 
percent.  Operating temperature shall be minus 40 degree C to plus 70 degree C.  Voltage adjust range 
shall be plus to minus 5.0 percent of nominal.  Inherent regulator features shall include overexcitation 
shutdown.</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.1.3.3   Electromagnetic Interference (EMI) Suppression</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include electromagnetic interference (EMI) suppression for engine-generator 
set installations in the proximity of sensitive electronic equipment.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide as an integral part of the generator and excitation system, EMI suppression complying with <RID>MIL-STD-461</RID>
.</TXT><BRK/>
<BRK/>
]</SPT></SPT></SPT><SPT><TTL>2.2   ENGINE-GENERATOR SET <SUB>AUXILIARY SYSTEMS AND EQUIPMENT</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide auxiliary systems and equipment designed for continuous duty at 100 percent of the power rating of the 
engine-generator set as specified in the paragraph entitled "Engine-Generator Set Ratings and Performance."</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Vibration Isolation System</TTL><BRK/>
<BRK/>
<TXT>Install the subbase on vibration isolators that are secured to a suitable concrete foundation.  Provide isolators 
as recommended by the engine-generator set and isolator manufacturers and provide integral or external lateral 
support to limit lateral movement and overturning moments. The isolation system shall reduce the vibration transmitted 
to the adjacent floor slab to a maximum of<MET> 0.038 mm</MET><ENG> 0.0015 inch</ENG> total amplitude throughout the frequency range 
down to 65 Hz.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Exhaust System</TTL><BRK/>
<BRK/>
<TXT>Provide exhaust systems for each engine.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.2.1   Exhaust Silencers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The normal values given in the table for exhaust sound reduction are 
for installations in residential applications.  If the installation is in a 
critical environment (such as a hospital), more stringent criteria must be applied, 
including engine noise dampening, and the attenuation values in the table for 
critical class should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A[ residential class][ critical class] silencer shall be provided for each engine which will reduce the exhaust 
sound spectrum by the following listed values at a<MET> 23 m</MET><ENG> 75 foot</ENG> radius from the outlet, with generator set loaded 
to rated capacity and clear weather.  Inlet and outlet connections shall be flanged.</TXT><BRK/>
<BRK/>
<TBL><THD><HL4>Octave Band Center Frequency (Hertz)</HL4><BRK/>
<BRK/></THD>
Minimum              63      125      250   500   1000   2000   4000   8000<BRK/>
Silencer<BRK/>
Attenuation<BRK/>
Decibels<BRK/>
<BRK/>
[Residential<BRK/>
Class                10      25       32     30      25    25     24     23]<BRK/>
<BRK/>
[Critical <BRK/>
Class                15      32       37     36      30    36     37     37]</TBL><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.2.2   Field Installed Exhaust Piping System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the following paragraph when the engine-generator set is installed 
internal to a building in lieu of in a self contained outdoor enclosure.  The 
designer is responsible for ensuring that:<BRK/>
<BRK/>
1.  External loads from the exhaust system, such as weight and thermal expansion 
do not exceed the engine manufacturer's maximum allowed forces and moments on 
the turbocharger, and;<BRK/>
<BRK/>
2.  The exhaust piping system pressure loss is coordinated with the visible 
emission limits of the engine-generator set when air pollution permitting is 
required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Field installed exhaust piping shall conform to the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Exhaust Piping:  Provide flanges for connections to diesel engines, exhaust mufflers, and flexible 
connections.  Provide steel pipe conforming to <RID>ASTM A 53/A 53M</RID> for each engine complete with necessary 
fittings, flanges, gaskets, bolts, and nuts.  Exhaust piping shall be Schedule 40 pipe for<MET> 300 mm</MET><ENG> 12 
inches</ENG> and smaller, standard weight for sizes<MET> 350 mm</MET><ENG> 14 inches</ENG> through<MET> 600 mm</MET><ENG> 24 inches</ENG>, and<MET> 6 mm</MET><ENG> 0.25 
inch</ENG> wall thickness for sizes larger than<MET> 600 mm</MET><ENG> 24 inches</ENG>.  Flanges shall be Class 150 slip-on forged 
steel welding flanges in accordance with <RID>ASME B16.5</RID>, with material in accordance with <RID>ASTM A 181/A 181M</RID>
, Grade I.  Fittings shall be buttwelding conforming to <RID>ASTM A 234/A 234M</RID>, with wall thickness same as 
adjoining piping.  Fittings shall be of same material and wall thickness as pipe.  Built-up miter welded 
fittings may be used.  Miter angles of each individual section shall not exceed 22.5 degrees total and 
not more than 11.25 degrees relative to the axis of the pipe at any one cut.  Gaskets for exhaust piping 
shall be of high temperature asbestos-free material suitable for the service and shall be <RID>ASME B16.21</RID>
, composition ring,<MET> 1.6 mm</MET><ENG> 0.0625 inch</ENG> thick.  Bolting material for exhaust flanges shall be alloy-steel 
bolt-studs conforming to <RID>ASTM A 193/A 193M</RID>, Grade B7 bolts and alloy-steel nuts conforming to <RID>ASTM A 194/A 194M</RID>
, Grade 7.  Bolts shall be of sufficient length to obtain full bearing on the nuts and shall project 
not more than two full threads beyond the nut.  Provide stainless steel counterbalance type rain caps 
at termination of each exhaust pipe.</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select option for liners in expansion joints when required to reduce 
exhaust pressure drop.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">b.  Expansion (Flexible) Joints:  Provide sections of multiple corrugated stainless steel expansion joints[ 
with liners] in the engine exhaust piping for each engine to absorb expansion strains and vibration transmitted 
to the piping.  Flexible joints shall be suitable for operation at<MET> 93 degrees C</MET><ENG> 200 degrees F</ENG> above normal 
exhaust gas temperature at 100 percent load, 10,000 cycles, minimum.  Joints shall be flanged and located 
between engine exhaust manifold and exhaust piping, shall be the same size as exhaust piping size, and 
shall be designed and constructed for diesel engine exhaust service.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Hangers and Supports:  <RID>MSS SP-58</RID> and <RID>MSS SP-69</RID>.</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include on the drawings a detail of the exhaust piping penetrations through 
walls and roofs showing the piping sleeve and exterior flashing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">d.  Piping Sleeves:  Provide where piping passes through masonry or concrete walls, floors, roofs, and 
partitions.  Sleeves shall be placed during construction.  Unless indicated otherwise, pipe sleeves shall 
comply with following requirements:  sleeves in outside walls below and above grade, in floor, or in 
roof slabs, shall be standard weight zinc coated steel pipe.  Sleeves in partitions shall be zinc coated 
sheet steel having a nominal weight of not less than<MET> 4.4 kg per square meter</MET><ENG> 0.90 pound per square foot</ENG>
.  Space between piping insulation and the sleeve shall not be less than<MET> 6 mm</MET><ENG> 0.25 inch</ENG>. Sleeves shall 
be held securely in proper position and location during construction.  Sleeves shall be sufficient length 
to pass through entire thickness of walls, partitions, or slabs.  Sleeves in floor slabs shall extend<MET>
 50 mm</MET><ENG> 2 inches</ENG> above the finished floor.  Space between the pipe and the sleeve shall be firmly packed 
with insulation and calked at both ends of the sleeve with plastic waterproof cement.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Piping Insulation:  Provide exhaust piping insulation in accordance with Section <SRF>23 07 00</SRF> THERMAL 
INSULATION FOR MECHANICAL SYSTEMS.</LST><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.2.3   Cooling System</TTL><BRK/>
<BRK/>
<TXT>Provide the specified cooling water system.  Properly size equipment to handle the flow rate and pressure losses 
of the coolant mixture specified in the paragraph entitled "Diesel Engine Capacity," and at the site elevation 
specified in the paragraph entitled "Site Conditions."</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.3.1   Radiators</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Generally utilize the engine subbase radiator as the less expensive option.  
In cases where insufficient cooling air or space or additional reliability is 
necessary (requiring cross-connecting of radiators), provide remote radiators.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  At the text below, use the maximum dry-bulb temperature of the site plus<MET>
 8 degrees C</MET><ENG> 15 degrees F</ENG> for the first temperature, but not less than<MET> 43 degrees 
C</MET><ENG> 110 degrees F</ENG>.  Use minus<MET> 18 degrees C</MET><ENG> 0 degrees F</ENG>, except where minimum dry-bulb 
temperature permits use of a higher temperature.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide for each engine-generator set, as standard with the manufacturer.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Design Conditions:  Each radiator unit shall have ample capacity to remove not less than the total<MET>
 kW</MET><ENG> Btu per hour</ENG> of heat rejected by its respective engine at 100 percent full-rated load to the jacket 
water, fuel oil, and lubricating oil system, and intercooler.  Radiator capacity shall be rated at optimum 
temperature of coolant leaving the engine and intercooler as recommended by the engine manufacturer with 
an ambient dry bulb air temperature outside the enclosure of<MET> [_____] degrees C</MET><ENG> [_____] degrees F</ENG> maximum, 
and<MET> [_____] degrees C</MET><ENG> [_____] degrees F</ENG> minimum at the site elevation specified in the paragraph entitled 
"Site Conditions," and with the coolant mixture specified in the paragraph entitled "Diesel Engine Capacity."  
Pressure drop through the radiator shall not exceed<MET> 41.34 kPa</MET><ENG> 6 psi</ENG> when circulating the maximum required 
coolant flow.  Radiator air velocity shall be a maximum of<MET> 7.6 meters per second</MET><ENG> 1500 feet per minute</ENG>
.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">[b.  Engine Mounted Radiator Construction:  Radiator fan shall direct airflow from the engine outward 
through the radiator.  Fan shall be V-belt driven directly from the engine crankshaft.  Radiator fan 
shall have sufficient capacity to meet design conditions against a static restriction of<MET> [_____] Pa</MET><ENG> [_____] 
inch of water</ENG>.  Fan static capacity shall be adjusted to suit the ductwork furnished.  Cooling section 
shall have a tube and fin-type core consisting of copper or copper base alloy tubes with nonferrous fins.  
Select engine-driven fans for quiet vibration-free operation.  Make provision for coolant expansion either 
by self-contained expansion tanks or separately mounted expansion tanks, as standard with the manufacturer.  
Provide suitable guards for each fan and drive.]</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Radiator fan cycling controls should be considered for engines to be 
operated above 500 hours per year.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">[c.  Remote Radiator Construction:  Provide radiators as described above, except radiators shall be remotely 
piped and provided with electric motor driven fan.  Drive shall be multiple V-belt or reduction gears.  
Expansion tanks shall be separately mounted.  Air flow shall be vertical or horizontal as indicated.  
Interlock fan with engine operation such that fan shall operate when engine operates when recommended 
by engine manufacturer.[  Provide controls and control devices complete which shall cycle fan on and 
off based upon coolant temperature.]  Provide motors, controllers, contactors, and disconnects in accordance 
with paragraph entitled "Electrical Support Equipment."]</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Coolant solution shall be a mixture of clean water and ethylene glycol, 50 percent by volume each.  
Provide an anti-freeze solution tester suitable for the mixture.</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.3.2   Jacket Coolant Water Piping Systems</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the following paragraph when providing cooling system with a 
remote radiator.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Field installed jacket coolant water piping shall conform to the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Piping:  Provide seamless steel pipe, Schedule 40, conforming to <RID>ASTM A 53/A 53M</RID>, Grade A.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Fittings and Flanges:  Fittings,<MET> 40 mm</MET><ENG> 1 1/2 inches</ENG> or smaller, shall be malleable iron conforming 
to <RID>ASME B16.3</RID> for Class 300 threaded type.  Fittings,<MET> 50 mm</MET><ENG> 2 inches</ENG> and larger, shall be steel buttwelding 
conforming to <RID>ASME B16.9</RID>.  Utilize either <RID>ASME B16.1</RID> or Class A of <RID>ASTM A 126</RID> for Class 125 cast-iron 
flanged fittings.  Flanges shall be Class 150 slip-on forged steel welding flanges in accordance with <RID>
ASME B16.5</RID>, with material in accordance with <RID>ASTM A 181/A 181M</RID>, Grade I.  Provide flat face flanges for 
connecting to Class 125 standard cast-iron valves, fittings, and equipment connections.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Valves</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Gate Valves:  For valves,<MET> 40 mm</MET><ENG> 1 1/2 inches</ENG> and smaller, provide double disk, rising stem, 
inside screw, union bonnet type, Class 125 bronze material conforming to <RID>MSS SP-80</RID>.  For valves,<MET>
 50 mm</MET><ENG> 2 inches</ENG> and larger, provide double-disk, parallel seat type, hydraulic-rated, Class 
125, outside screw and yoke type with flanged ends and bronze trim conforming to <RID>MSS SP-70</RID>.  
Provide stem packing of material compatible with the system coolant.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Globe Valves:  For valves,<MET> 40 mm</MET><ENG> 1 1/2 inches</ENG> and smaller, provide rising stem, inside screw, 
union bonnet type, Class 125 bronze valves conforming to <RID>MSS SP-80</RID>.  For valves,<MET> 50 mm</MET><ENG> 2 inches</ENG>
 and larger, provide Class 125 cast iron, flanged ends, bronze trim globe valves conforming 
to <RID>MSS SP-85</RID>.  Valves shall have renewable composition or cast iron discs compatible with the 
system coolant.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Check Valves:  <RID>MSS SP-71</RID> or <RID>MSS SP-80</RID>, swing check type.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Hangers and Supports:  <RID>MSS SP-58</RID> and <RID>MSS SP-69</RID>.</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include on the drawings a detail of the cooling piping penetrations through 
walls and roofs showing the piping sleeve and exterior flashing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">e.  Piping Sleeves:  Provide where piping passes through masonry or concrete walls, floors, roofs, and 
partitions.  Place sleeves during construction.  Unless indicated otherwise, pipe sleeves shall comply 
with following requirements:  Sleeves in outside walls below and above grade, in floor, or in roof slabs, 
shall be standard weight zinc coated steel pipe.  Sleeves in partitions shall be zinc coated sheet steel 
having a nominal weight of not less than<MET> 4.4 kg per square meter</MET><ENG> 0.90 pound per square foot</ENG>.  Space between 
piping insulation and the sleeve shall be not less than<MET> 6 mm</MET><ENG> 0.25 inch</ENG>.  Sleeves shall be held securely 
in proper position and location during construction.  Sleeves shall be of sufficient length to pass through 
entire thickness of walls, partitions, or slabs.  Sleeves in floor slabs shall extend<MET> 50 mm</MET><ENG> 2 inches</ENG> 
above the finished floor.  Space between the pipe and the sleeve shall be firmly packed with insulation 
and calked at both ends of the sleeve with plastic waterproof cement.</LST><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.2.4   Diesel Fuel System</TTL><BRK/>
<BRK/>
<TXT><RID>NFPA 30</RID> and <RID>NFPA 37</RID> and the requirements herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.4.1   Diesel Fuel Piping System</TTL><BRK/>
<BRK/>
<TXT>Factory installed piping shall conform to the engine manufacturer's standard.  Provide flange connections in 
accordance with <RID>ASME B16.1</RID> Class 125 flanges.[  Piping between the engine and the diesel fuel day tank shall 
comply with Section <SRF>33 52 10</SRF> SERVICE PIPING, FUEL SYSTEMS.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4.2   Diesel Fuel Day Tank System</TTL><BRK/>
<BRK/>
<TXT>Provide[ 120][ _____] volt ac diesel fuel day tank system.  Include necessary equipment, piping, controls, wiring, 
and accessories.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following guidelines for specifying diesel fuel day tanks:</NPR><BRK/>
<BRK/>
<NPR>1.  Select integral day tank in skid where applicable and available.  Day tank 
capacity available varies from 100 gallons to 5,000 gallons.</NPR><BRK/>
<BRK/>
<NPR>2.  See NFPA 37 for allowable day tank sizes and restrictions.</NPR><BRK/>
<BRK/>
<NPR>3.  Provide an overflow or return line between the diesel fuel day tank and 
storage tank in accordance with NFPA 37 where applicable.</NPR><BRK/>
<BRK/>
<NPR>4.  Day tank capacity shall be in accordance with the following table for facilities 
complying with MIL-HDBK-1191, "DOD Medical and Dental Treatment Facilities Design 
and Construction Guide."</NPR><BRK/>
<BRK/>
<NPR>50 KW - 100 KW GEN SET   :  25 MIN - 50 MAX GAL</NPR><BRK/>
<NPR>101 KW - 200 KW GEN SET  :  50 MIN - 75 MAX GAL</NPR><BRK/>
<NPR>201 KW - 300 KW GEN SET  :  75 MIN - 100 MAX GAL</NPR><BRK/>
<NPR>OVER 300 KW GEN SET     :  100 MIN - 250 MAX GAL</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST INDENT="-0.33">a.  Day Tanks:  <RID>UL 142</RID>.  Provide[ integral in skid][ free standing] double wall (110 percent containment) 
diesel fuel day tanks with a[ minimum capacity of [_____] hours of engine-generator set operation at 
full-rated load][ capacity as indicated].  Epoxy coat day tanks inside and prime and paint outside.  
Construct tanks of not less than<MET> 4.76 mm</MET><ENG> 3/16 inch</ENG> steel plate with welded joints and necessary stiffeners 
on exterior of tank.  Provide a braced structural steel framework support.  Weld tank top tight and provide 
an access opening with dustproof, removable<MET> 600 mm</MET><ENG> 24 inch</ENG> cover.  Provide<MET> 114 mm</MET><ENG> 4 1/2 inch</ENG> square inspection 
port.  Provide proper venting of both inner and outer containment.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Float Switches:  Provide tank-top mounted or external float cage, single-pole, single-throw type 
designed for use on fuel oil tanks. Arrange high level float switches to close on rise of liquid level, 
and low level float switches to close on fall of liquid level.  Mount float cage units with isolating 
and drain valves.  Contacts shall be suitable for the station battery voltage.</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Critical low level float switch which shall activate at 5 percent of normal liquid level 
shall shut engine off.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Low-low level float switch which shall activate alarm at 30 percent of normal liquid level.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Low level float switch which shall open the fuel oil solenoid valve and start the[ remote] 
fuel transfer pump at 75 percent of normal liquid level.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  High level float switch which shall close the fuel oil solenoid valve and stop the[ remote] 
fuel transfer pump at 90 percent of normal liquid level.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Critical high level float switch which shall activate alarm at 95 percent of normal liquid 
level.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Leak Detector Switch:  Actuates when fuel is detected in containment basin, stops fuel transfer pump, 
and closes the fuel oil solenoid valve.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Control Panel:  Provide <RID>NEMA ICS 6</RID>, Type[ 1][ _____], enclosed control panel for each day tank.  
Control panel shall include the following accessories.</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Power available LED (green).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Critical low fuel alarm contacts for shut down of engine.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Low-low level fuel alarm LED.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Low-low level fuel alarm contacts for remote annunciator.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Critical high level fuel alarm LED.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Leak detecting alarm LED.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">7.  Alarm horn.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Tank Gages:  Provide buoyant force type gages for diesel fuel day tanks with dial indicator not less 
than<MET> 100 mm</MET><ENG> 4 inches</ENG> in size and arranged for top mounting.  Calibrate each reading dial or scale for 
its specific tank to read from empty to full, with intermediate points of 1/4, 1/2, and 3/4.</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.4.3   Fuel Transfer Pump[s]</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph when remote fuel transfer pump(s) are provided.  
Select duplex pumps for facilities complying with UFC 4-510-01, "Medical Military 
Facilities."</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fuel transfer pumps may be day tank or base mounted.  Pump[s] shall be[ duplex,] horizontal, positive displacement.  
Direct-connect pump to motor through a flexible coupling.  Equip each pump with a bypass relief valve, if not 
provided with an internal relief valve.  Provide motor and controller in accordance with paragraph entitled "Electrical 
Support Equipment."</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.2.4.4   Fuel Oil Solenoid Valve</TTL><BRK/>
<BRK/>
<TXT><RID>UL 429</RID>.  Provide electric solenoid type control valve for each day tank.  Solenoid shall be rated for starting 
battery voltage.  Valve body shall have a minimum working pressure rating of<MET> 1033 kPa</MET><ENG> 150psig</ENG> at<MET> 93 degrees C</MET><ENG>
 200 degrees F</ENG>.  Valve shall be capable of passing<MET> 0 to 0.63 L/s</MET><ENG> 0 to 10 gpm</ENG> of fuel oil.  Valves shall be two-way, 
direct acting, normally closed (open when energized, closed when de-energized), with brass body and resilient 
seat material.  Solenoid enclosures shall be <RID>NEMA ICS 6</RID>, Type 1.  Body connections shall be same size as connecting 
piping.  Valve shall be in line before the fuel pump.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4.5   Strainer</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the options for duplex filters when changing of the filter will 
be required while the engine-generator set is operating.  Do not provide duplex 
filters when the engine-generator set is to be installed in an enclosure or 
provided with an engine-driven radiator.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Simplex][Duplex] strainers shall comply with Section <SRF>33 52 10</SRF> SERVICE PIPING, FUEL SYSTEMS.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.4.6   Fuel Oil Meters</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide fuel oil meters when required by the using activity.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fuel oil meter shall comply with Section <SRF>33 52 10</SRF> SERVICE PIPING, FUEL SYSTEMS.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.2.4.7   Fuel Oil Cooler</TTL><BRK/>
<BRK/>
<TXT>Provide an air cooled fuel oil cooler if the temperature of the fuel returned to the tank from the engine will 
cause overheating of the tank fuel above the maximum fuel temperature allowed by the engine manufacturer when 
operating at maximum rated generator power output and low fuel level in the tank.  The fuel oil cooler shall 
be furnished by the engine manufacturer for the application and the installation shall be complete including 
piping and power requirements.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2.5   Starting Battery System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Starting battery system shall be 24-volt dc for engine-generator sets 
greater than 100 kW and 12-volt dc for engine-generator sets rated 100 kW and 
less.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a[ 24][ 12]-volt dc starting battery installation for starting of each engine-generator set utilizing 
an electric cranking system.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.5.1   Engine Starting Battery</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The ambient temperature selected shall be the lowest temperature at which 
the engine might be cranked.  Battery configuration shall be two parallel sets 
of two 12-volt batteries for engine-generator sets rated 750 kW and above.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide maintenance free, sealed, lead-acid, SAE Type D diesel engine starting batteries.[  Battery configuration 
shall be two parallel sets of two 12-volt batteries.]  Batteries shall have sufficient capacity to provide 60 
seconds of continuous cranking of the engine in an ambient temperature of<MET> [_____] degrees C</MET><ENG> [_____] degrees F</ENG>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.5.2   Starting Battery Charger</TTL><BRK/>
<BRK/>
<TXT><RID>UL 1236</RID>.  Provide[ 120][ ____] volt ac, enclosed, automatic equalizing, dual-rate, solid-state, constant voltage 
type battery charger with automatic ac line compensation.  Dc output shall be voltage regulated and current limited.  
Charger shall have two ranges, float and equalize, and shall provide continuous taper charging.  The charger 
shall have a continuous output rating of not less than 10 amperes and shall be sized to recharge the engine starting 
batteries in a minimum of 8 hours while providing the control power needs of the engine-generator set.  Enclosure 
shall be <RID>NEMA ICS 6</RID>, Type[ 1][ _____].  The following accessories shall be included:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Dc ammeter</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Dc voltmeter</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Equalize light</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Ac on light</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Low voltage light</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  High voltage light</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">g.  Equalize test button/switch</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">h.  Ac circuit breaker</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">i.  Low dc voltage alarm relay</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">j.  High dc voltage alarm relay</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">k.  Current failure relay</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">l.  Ac power failure relay</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2.6   Engine-Generator Control Panel</TTL><BRK/>
<BRK/>
<TXT>Provide <RID>NEMA ICS 6</RID>, Type[ 1][ _____], enclosed control panel mounted on the engine-generator set with vibration 
isolators.  Provide the following control panel mounted devices and control features.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.6.1   Control Panel Mounted Devices</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Engine Control Switch (ECS):  Provide a three position control switch with "MANUAL START" - "OFF/RESET" 
- "AUTO START" positions.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Emergency Stop Push Button (ESPB):  Provide a red, mushroom head, twist-to-reset, maintained contact 
type push button.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Generator Metering:  Provide ac metering package that displays ac voltage, current, and frequency 
of one phase of the generator output simultaneously.  Metering package shall include a voltmeter/ammeter 
phase selector switch to allow viewing of each phase.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Generator Voltage Adjust Potentiometer (VAP):  Provide a potentiometer, locking screwdriver type, 
to adjust generator voltage.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Engine Instrumentation:  Provide instrumentation package that displays the following engine information:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Engine oil pressure</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Engine coolant temperature</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Engine speed (rpm)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Engine running hours</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  Indicating Lamps:  Provide LED type indicating lamps and a lamp test switch.  Lamps shall indicate 
the following alarm and shutdown conditions:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Low engine lubricating oil pressure alarm</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Low engine lubricating oil pressure shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  High engine coolant temperature alarm</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  High engine coolant temperature shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Engine overcrank shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Engine overspeed shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">7.  Emergency stop shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">8.  Starting battery system trouble alarm</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">9.  Day tank low fuel shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">10. Low engine coolant temperature alarm</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">11. Low coolant level shutdown</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">g.  Alarm Horn:  Provide an alarm horn and a horn silence switch.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">h.  Panel Lamp:  Provide a panel lamp and lamp "ON-OFF" switch.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.6.2   Crank Cycle/Terminate Relay</TTL><BRK/>
<BRK/>
<TXT>Provide crank cycle/terminate relay with adjustable crank/rest periods of 1 to 60 seconds (initially set for 
15 seconds) and adjustable total crank time of 30 seconds to 10 minutes (initially set for 75 seconds).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.6.3   Engine Cooldown Relay</TTL><BRK/>
<BRK/>
<TXT>Provide cooldown relay with adjustable cool down time of 0 to 30 minutes (initially set at engine manufacturer's 
recommended time).</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT>[<TTL>2.2.7   <SUB>Remote Alarm Annunciator</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include option for remote alarm panel located in a location readily observed 
by operating personnel when the engine-generator set is not in a readily observed 
location.  For most applications the remote alarm annunciator should be powered 
from the engine starting battery system.  When a separate battery power source 
is necessary, select the option for "Storage Battery."</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide <RID>NEMA ICS 6</RID>, Type[ 1][ _____], enclosed remote alarm annunciator[ powered by the engine starting battery 
system].  The annunciator shall have a lamp test switch and LED type indicating lamps.  The annunciator shall 
give visual and audible warnings for the following operating and alarm conditions:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Provide lamps for the following operating conditions:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Operating power source, normal or emergency</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Starting battery system trouble</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Provide lamps and an audible signal for the following alarm conditions:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Low engine lubricating oil pressure</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Low engine coolant temperature</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  High engine coolant temperature</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Low fuel</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Engine overcrank shutdown</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Engine overspeed shutdown</ITM><BRK/>
<BRK/>
]<SPT>[<TTL>2.2.7.1   Storage Battery</TTL><BRK/>
<BRK/>
<TXT>Provide storage batteries of suitable rating and capacity to supply and maintain power for the remote alarm annunciator 
for a period of 90 minutes minimum without the voltage applied falling below 87.5 percent of normal.   Provide 
a[ 120][ _____] volt ac automatic battery charger.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.2.8   Generator Circuit Breaker</TTL><BRK/>
<BRK/>
<TXT><RID>UL 489</RID>, molded case, adjustable thermal magnetic trip type circuit breaker. The circuit breaker continuous current 
rating shall be adequate for the power rating of the engine-generator set and the circuit breaker shall be rated 
to withstand the short circuit current provided by the generator set. Provide circuit breaker in a <RID>NEMA ICS 6</RID>
, Type[ 1][ _____] enclosure mounted on the engine-generator set.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.9   Electrical Support Equipment</TTL><BRK/>
<BRK/>
<TXT>Furnish with respective pieces of equipment.  Motors, controllers, contactors, and disconnects shall conform 
to Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM.  Provide electrical connections under Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM.  Provide controllers and contactors with maximum of 120-volt control circuits, and auxiliary 
contacts for use with controls furnished.  When motors and equipment furnished are larger than size indicated, 
the cost of providing additional electrical service and related work shall be included under this section.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.2.10   Weatherproof Enclosure</TTL><BRK/>
<BRK/>
<TXT>Provide for each engine-generator set and fabricate from zinc coated or phosphatized and shop primed 16 gage 
minimum sheet steel in accordance with the manufacturer's standard design.  Provide a complete, weatherproof 
enclosure for the engine, generator, and auxiliary systems and equipment.  Support exhaust piping and silencer 
so that the turbocharger is not subjected to exhaust system weight or lateral forces generated in connecting 
piping that exceed the engine manufacturer's maximum allowed forces and moments.  The housing shall have sufficient 
louvered openings to allow entrance of outside air for engine and generator cooling at full load.  Design louvered 
openings to exclude driving rain and snow.  Provide properly arranged and sized, hinged panels in the enclosure 
to allow convenient access to the engine, generator, and control equipment for maintenance and operational procedures.  
Provide hinged panels with spring type latches which shall hold the panels closed securely and will not allow 
them to vibrate.  Brace the housing internally to prevent excessive vibration when the set is in operation.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.3   SPECIAL WRENCHES AND TOOLS</TTL><BRK/>
<BRK/>
<TXT>Wrenches and tools specifically designed and required to work on the new equipment, which are not commercially 
available as standard mechanic's tools, shall be furnished to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   IDENTIFICATION OF EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Provide plates and tags sized so that inscription is readily legible to operating or maintenance personnel and 
securely mounted to or attached in proximity of their identified controls or equipment.  Lettering shall be normal 
block lettering, a minimum of<MET> 6.4 mm</MET><ENG> 0.25 inch</ENG> high.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.4.1   Materials</TTL><BRK/>
<BRK/>
<TXT>Construct ID plates and tags of 16 gage minimum thickness bronze or stainless steel sheet metal engraved or stamped 
with inscription.  Construct plates and tags not exposed to the weather or high operational temperature of the 
diesel engine of laminated plastic,<MET> 3.2 mm</MET><ENG> 0.125 inch</ENG> thick, matte white finish with black center core, with 
lettering accurately aligned and engraved into the core.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Control Devices and Operation Indicators</TTL><BRK/>
<BRK/>
<TXT>Provide ID plates or tags for control devices and operation indicators, including valves, off-on switches, visual 
alarm annunciators, gages and thermometers, that are required for operation and maintenance of provided mechanical 
systems.  Plates or tags shall be minimum of<MET> 13 mm</MET><ENG> 0.5 inch</ENG> high and<MET> 50 mm</MET><ENG> 2 inches</ENG> long and shall indicate component 
system and component function.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.3   Equipment</TTL><BRK/>
<BRK/>
<TXT>Provide ID plates of a minimum size of<MET> 75 mm</MET><ENG> 3 inches</ENG> high and<MET> 130 mm</MET><ENG> 5 inches</ENG> long on provided equipment indicating 
the following information:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Manufacturer's name, address, type and model number, and serial number;</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Contract number and accepted date;</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Capacity or size;</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  System in which installed; and</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  System which it controls.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5   ASSEMBLED OPERATION AND MAINTENANCE MANUALS</TTL><BRK/>
<BRK/>
<TXT>The contents of the assembled operation and maintenance manuals shall include the manufacturer's O&amp;M information 
required by the paragraph entitled "SD-10, Operation and Maintenance Data" and the manufacturer's O&amp;M information 
specified in Section <SRF>26 36 23.00 20</SRF> AUTOMATIC TRANSFER SWITCHES.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Manuals shall be in separate books or volumes, assembled and bound securely in durable, hard covered, 
water resistant binder, and indexed by major assembly and components in sequential order.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  A table of contents (index) shall be made part of the assembled O&amp;M.  The manual shall be assembled 
in the order noted in table of contents.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  The cover sheet or binder on each volume of the manuals shall be identified and marked with the words, 
"Operation and Maintenance Manual."</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   SOURCE QUALITY CONTROL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the bracketed option below for projects located outside the continental 
United States (OCONUS) </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform and report on factory tests and inspections prior to shipment. Provide certified copies of manufacturer's 
test data and results.  Test procedures shall conform to ASME, IEEE,[ IEC,] and ANSI standards, and to ISO requirements 
on testing, as appropriate and applicable.  The manufacturer performing the tests shall provide equipment, labor, 
and consumables necessary for tests and measuring and indicating devices shall be certified to be within calibration.  
Tests shall indicate satisfactory operation and attainment of specified performance.  If satisfactory, equipment 
tested will be given a tentative approval.  Equipment shall not be shipped before approval of the factory test 
reports for the following tests.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.6.1   <SUB>Engine Tests</SUB></TTL><BRK/>
<BRK/>
<TXT>Perform customary commercial factory tests in accordance with <RID>ISO 3046</RID> on each engine and associated engine protective 
device, including, but not limited to the following:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Perform dynamometer test at rated power.  Record horsepower at rated speed and nominal characteristics 
such as lubricating oil pressure, jacket water temperature, and ambient temperature.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Test and record the values that the low oil pressure alarm and protective shutdown devices actuate 
prior to assembly on the engine.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Test and record values that the high jacket water temperature alarm and protective shutdown devices 
actuate prior to assembly on the engine.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.2   <SUB>Generator Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the bracketed option below for projects located outside the continental 
United States (OCONUS) </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Tests shall be performed on the complete factory assembled generator prior to shipment.  Conduct tests in accordance 
with <RID>IEEE Std 115</RID>, <RID>NEMA C50.10</RID>[, <RID>IEC 60034-2</RID>], and <RID>NEMA MG 1</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.6.2.1   Routine Tests</TTL><BRK/>
<BRK/>
<TXT>Perform the following routine tests on the generators and their exciters:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Resistance of armature and field windings</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Mechanical balance</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Phases sequence</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Open circuit saturation curve and phase (voltage) balance test</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Insulation resistance of armature and field windings</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">f.  High potential test</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.2.2   Design Tests</TTL><BRK/>
<BRK/>
<TXT>Submit the following design tests made on prototype machines that are physically and electrically identical to 
the generators specified.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Temperature rise test</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Short circuit saturation curve and current balance test</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6.3   <SUB>Assembled Engine-Generator Set Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the first option for engine-generator sets rated up to 250 kW.  
Select the second option for engine-generator sets rated greater than 250 kW.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Submit the following tests made on prototype machines that are physically and electrically identical to the 
engine-generator set specified.][Perform the following tests on the assembled engine-generator set.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.6.3.1   Initial Stabilization Readings</TTL><BRK/>
<BRK/>
<TXT>Operate the engine-generator set and allow the set to stabilize at rated kW at rated power factor, rated voltage, 
and rated frequency.  During this period record instrument readings for output power (kW), terminal voltage, 
line current, power factor, frequency (rpm) generator (exciter) field voltage and current, lubricating oil pressure, 
jacket water temperature, and ambient temperature at minimum intervals of 15 minutes.  Adjust the load, voltage, 
and frequency to maintain rated load at rated voltage and frequency.  Adjustments to load, voltage, or frequency 
controls shall be recorded on the data sheet at the time of adjustment.  Stabilization shall be considered to 
have occurred when four consecutive voltage and current recorded readings of the generator (or exciter) field 
either remain unchanged or have only minor variations about an equilibrium condition with no evident continued 
increase or decrease in value after the last adjustment to the load, voltage, or frequency has been made.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3.2   Regulator Range Test</TTL><BRK/>
<BRK/>
<TXT>Remove load and record instrument readings (after transients have subsided).  Adjust voltage to the maximum attainable 
value or to a value just prior to actuation of the overvoltage protection device.  Apply rated load and adjust 
voltage to the minimum attainable value or a value just prior to activation of the undervoltage protection device.  
The data sheets shall indicate the voltage regulation as a percent of rated voltage and the maximum and minimum 
voltages attainable.  Voltage regulation shall be defined as follows:</TXT><BRK/>
<BRK/>
<TXT>Percent Regulation = <HL1>((No-Load Voltage) - (Rated-Load Voltage)) x 100</HL1></TXT><BRK/>
<TXT>                                     (Rated-Load Voltage)</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3.3   Frequency Range Test</TTL><BRK/>
<BRK/>
<TXT>Adjust the engine-generator set frequency for the maximum attainable frequency at rated load.  Record instrument 
readings.  Adjust the engine-generator set frequency for the specified minimum attainable frequency at rated 
load.  Record instrument readings.  Reduce the load to zero and adjust the engine-generator set frequency for 
the maximum attainable frequency.  Record instrument readings.  Adjust the engine-generator set frequency for 
the minimum attainable frequency.  Record instrument readings.  The data sheet shall show the maximum and minimum 
frequencies attained at rated load, and at no load.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3.4   Transient Response Test</TTL><BRK/>
<BRK/>
<TXT>Drop the load to no load and re-apply rated load three times to ensure that the no load and rated load voltage 
and frequency values are repeatable and that the frequency and voltage regulation is within the limits specified.   
Record generator terminal voltage and frequency using a high speed strip chart recorder.  The data sheet shall 
show the following results:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Frequency</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Stability bandwidth or deviation in percent of rated frequency.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Recovery time.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Overshoot and undershoot.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Voltage</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Stability bandwidth or deviation in percent of rated voltage.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Recovery time.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Overshoot and undershoot.</ITM><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Installation shall conform to the applicable requirements of <RID>IEEE C2</RID> <RID>NFPA 30</RID>, <RID>NFPA 37</RID>, and <RID>NFPA 70</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   GROUNDING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where rock or other soil conditions prevent obtaining a specified ground 
value, other methods of grounding should be specified.  Where it is impractical 
to obtain the indicated ground resistance values, make every effort within reason 
to obtain ground resistance values as near as possible to the indicated values.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>NFPA 70</RID> and <RID>IEEE C2</RID>, except that grounding systems shall have a resistance to solid earth ground not exceeding 
5 ohms.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Grounding Electrodes</TTL><BRK/>
<BRK/>
<TXT>Provide driven ground rods as specified in[ Section <SRF>33 71 02.00 20</SRF> UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION][ 
and][ Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION].  Connect ground conductors to the upper end of 
ground rods by exothermic weld or compression connector.  Provide compression connectors at equipment end of 
ground conductors.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Engine-Generator Set Grounding</TTL><BRK/>
<BRK/>
<TXT>Provide separate copper grounding conductors and connect them to the ground system as indicated.  When work in 
addition to that indicated or specified is required to obtain the specified ground resistance, the provision 
of the contract covering "Changes" shall apply.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Connections</TTL><BRK/>
<BRK/>
<TXT>Make joints in grounding conductors by exothermic weld or compression connector.  Exothermic welds and compression 
connectors shall be installed as specified in Section <SRF>33 71 02.00 20</SRF> UNDERGROUND UNDERGROUND TRANSMISSION AND 
DISTRIBUTION paragraph entitled "Grounding."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Grounding and Bonding Equipment</TTL><BRK/>
<BRK/>
<TXT><RID>UL 467</RID>, except as indicated or specified otherwise.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   <SUB>START-UP ENGINEER</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide the services of a qualified factory trained start-up engineer, regularly employed by the engine-generator 
set manufacturer.  The start-up services shall include conducting preliminary operations and functional acceptance 
tests.  The start-up engineer shall be present at the engine generator set installation site, full-time, while 
preliminary operations and functional acceptance tests are being conducted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   PREREQUISITES FOR FUNCTIONAL ACCEPTANCE TESTING</TTL><BRK/>
<BRK/>
<TXT>Completion of the following requirements is mandatory prior to scheduling functional acceptance tests for the 
engine-generator set and auxiliary equipment.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Piping Tests</TTL><BRK/>
<BRK/>
<TXT>Complete as specified in Section <SRF>33 52 10</SRF> SERVICE PIPING, FUEL SYSTEMS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Performance of Acceptance Checks and Tests</TTL><BRK/>
<BRK/>
<TXT>The acceptance checks and tests shall be accomplished by the testing organization as described in Section 
<SRF>26 08 00</SRF> APPARATUS INSPECTION AND TESTING.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.2.1   Generator Sets</TTL><BRK/>
<BRK/>
<TXT>Complete as specified in the paragraph entitled "Acceptance Checks and Tests."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2.2   Automatic Transfer Switches</TTL><BRK/>
<BRK/>
<TXT>Complete acceptance checks and tests as specified in Section <SRF>26 36 23.00 20</SRF> AUTOMATIC TRANSFER SWITCHES.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4.3   Preliminary Operations</TTL><BRK/>
<BRK/>
<TXT>The start-up engineer shall conduct manufacturer recommended start-up procedures and tests to verify that the 
engine-generator set and auxiliary equipment are ready for functional acceptance tests.  Give the Contracting 
Officer 15 days' advance notice that preliminary operations will be conducted.  After preliminary operation has 
been successfully conducted, the start-up engineer will notify the Contracting Officer in writing stating the 
engine-generator set and auxiliary equipment are ready for functional acceptance tests.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.4   <SUB>Preliminary Assembled Operation and Maintenance Manuals</SUB></TTL><BRK/>
<BRK/>
<TXT>Preliminary assembled operation and maintenance manuals shall have been submitted to and approved by the Contracting 
Officer.  Manuals shall be prepared as specified in the paragraph entitled "Assembled Operation and Maintenance 
Manuals."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.5   <SUB>Functional Acceptance Test Procedure</SUB></TTL><BRK/>
<BRK/>
<TXT>Test procedure shall be prepared by the start-up engineer specifically for the engine-generator set and auxiliary 
equipment.  The test agenda shall cover the requirements specified in the paragraph entitled "Functional Acceptance 
Tests."  The test procedure shall indicate in detail how tests are to be conducted.  A statement of the tests 
that are to be performed without indicating how the tests are to be performed is not acceptable.  Indicate what 
work is planned on each workday and identify the calendar dates of the planned workdays.  Specify what additional 
technical support personnel is needed such as factory representatives for major equipment.  Specify on which 
testing workday each technical support personnel is needed.  Data recording forms to be used to document test 
results are to be submitted with the proposed test procedure.  A list of test equipment and instruments shall 
also be included in the test procedure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.6   Test Equipment</TTL><BRK/>
<BRK/>
<TXT>Test equipment and instruments shall be on hand prior to scheduling field tests or, subject to Contracting Officer 
approval, evidence shall be provided to show that arrangements have been made to have the necessary equipment 
and instruments on site prior to field testing.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   FIELD QUALITY CONTROL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the bracketed option below for NAVFAC projects.  coordinate Echelon 
III REach-back Support with NAVFAC Atlantic CIEE Office or NAVFAC PAcific CI44 
Office during the design stage of the specific project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Give Contracting Officer[ NAVFAC [_____], Code [_____]] 30 days notice of dates and times scheduled for tests 
which require the presence of the Contracting Officer.  The Contracting Officer will coordinate with the using 
activity and schedule a time that will eliminate or minimize interruptions and interference with the activity 
operations.  The Contractor shall be responsible for costs associated with conducting tests outside of normal 
working hours and with incorporating special arrangements and procedures, including temporary power conditions.  
The Contractor shall provide labor, equipment, diesel fuel, test load, and consumables required for the specified 
tests.  The test load shall be a cataloged product.  Calibration of measuring devices and indicating devices 
shall be certified.  Refer to Section <SRF>26 00 00.00 20</SRF> BASIC ELECTRICAL MATERIALS AND METHODS, for requirements 
for a cataloged product.  Perform the following field tests.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   <SUB>Acceptance Checks and Tests</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Perform in accordance with the manufacturer's recommendations,</TST> and include the following visual and mechanical 
inspections and electrical tests, performed in accordance with <RID>NETA ATS</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1.1   Circuit Breakers - Low Voltage Insulated Case/Molded Case</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and mechanical inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect circuit breaker for correct mounting.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Operate circuit breaker to ensure smooth operation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Inspect case for cracks or other defects.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Verify tightness of accessible bolted connections and cable connections by calibrated torque-wrench 
method.  Thermographic survey is not required.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Inspect mechanism contacts and arc chutes in unsealed units.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform contact-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform insulation-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Adjust Breaker(s) for final settings in accordance with engine-generator set manufacturer's 
requirements.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.2   Current Transformers</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify correct connection.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Verify that adequate clearances exist between primary and secondary circuit.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Verify tightness of accessible bolted electrical connections by calibrated torque-wrench 
method.  Thermographic survey is not required.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Verify that all required grounding and shorting connections provide good contact.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform insulation-resistance tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform polarity tests.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Perform ratio-verification tests.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.3   Metering and Instrumentation</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and Mechanical Inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify tightness of electrical connections.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical Tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Determine accuracy of meters at 25, 50, 75, and 100 percent of full scale.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Calibrate watthour meters according to manufacturer's published data.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify all instrument multipliers.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Electrically confirm that current transformer secondary circuits are intact.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.4   Battery Systems</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and mechanical inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Verify tightness of accessible bolted electrical connections by calibrated torque-wrench 
method.  Thermographic survey is not required.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Measure electrolyte specific gravity and temperature and visually check fill level.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Verify adequacy of battery support racks, mounting, anchorage, and clearances.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Set charger float and equalizing voltage levels.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Verify all charger functions and alarms.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Measure each cell voltage and total battery voltage with charger energized and in float 
mode of operation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Perform a capacity load test.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.5   Engine-Generator Set</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and mechanical inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Compare equipment nameplate data with specifications and approved shop drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Inspect physical and mechanical condition.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Inspect for correct anchorage and grounding.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical and mechanical tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Perform an insulation-resistance test on generator winding with respect to ground.  Calculate 
polarization index.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Perform phase rotation test to determine compatibility with load requirements.</ITM><BRK/>
<BRK/></SPT>
<TTL>3.5.1.6   Grounding System</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Visual and mechanical inspection</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Inspect ground system for compliance with contract plans and specifications.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical tests</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1. Perform ground-impedance measurements utilizing the fall-of-potential method.  On systems 
consisting of interconnected ground rods, perform tests after interconnections are complete.  
On systems consisting of a single ground rod perform tests before any wire is connected.  Take 
measurements in normally dry weather, not less than 48 hours after rainfall.  Use a portable 
ground testing megger in accordance with manufacturer's  instructions to test each ground or 
group of grounds.  The instrument shall be equipped with a meter reading directly in ohms or 
fractions thereof to indicate the ground value of the ground rod or grounding systems under 
test.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   <SUB>Functional Acceptance Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include the bracketed option below for NAVFAC projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The tests shall be performed by the start-up engineer.  Upon successful test completion, the start-up engineer 
shall provide the Contracting Officer with a written test report within 15 calendar days showing the tests performed 
and the results of each test.  The report shall include the completed approved test data forms and certification 
from the start-up engineer that the test results fall within the manufacturer's recommended limits and meet the 
specified requirements performance.  The report shall be dated and signed by the start-up engineer, and submitted 
for approval by the Contracting Officer.  The Contracting Officer[ and NAVFAC [____], Code [_____]] will witness 
final acceptance tests.  Testing shall include but not be limited to:</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Verify proper functioning of each engine protective shutdown device and pre-shutdown alarm device.  
Testing of the devices shall be accomplished by simulating device actuation and observing proper alarm 
and engine shutdown operation.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Verify proper functioning of the engine overspeed trip device.   Testing of the overspeed trip device 
shall be accomplished by raising the speed of the engine-generator set until an overspeed trip is experienced.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">c.  Verify proper functioning of the crank cycle/terminate relay.   Testing of the relay shall be accomplished 
by engaging the starter motor with the engine being prevented from running.  Observe the complete crank/rest 
cycle as described in the paragraph entitled "Crank Cycle/Terminate Relay."</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">d.  Verify proper functioning of the following automatic and manual operations.  Testing shall include 
but not be limited to:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  Loss of Utility:  Initiate a normal power failure with connected test load of rated kW at 
1.0 power factor.  Record time delay on start, cranking time until engine starts and runs, time 
to come up to operating speed, voltage and frequency overshoot, and time to achieve steady state 
conditions with all switches transferred to emergency position.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Return of Utility:  Return normal power and record time delay on retransfer for each automatic 
transfer switch, and time delay on engine cooldown and shutdown.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Manual starting</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Emergency stop</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">e.  Operate the engine-generator set at rated current (amperes) until the jacket water temperature stabilizes.  
Stabilization will be considered to have occurred when three consecutive temperature readings remain 
unchanged.  Continue to operate the generator set for an additional 2 hours.  Record instrument readings 
for terminal voltage, line current, frequency (Hz), engine speed rpm, lubricating oil pressure, jacket 
water temperature, and ambient temperature at 5 minute intervals for first 15 minutes and at 15 minute 
intervals thereafter.</LST><BRK/>
<BRK/></SPT>
<SPT>[<TTL>3.5.3   Emissions Tests</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Include the following paragraph when verification of diesel engine emission 
limits are required by air pollution permit. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide on site testing by a certified testing organization of each engine-generator set.  Testing shall be in 
accordance with an EPA approved method, <RID>40 CFR 60</RID>, (Appendix, Method 7, 7A, 7B, 7C, 7D or 7E).  Emissions at 
rated full load shall be within the limits specified in the paragraph entitled "Diesel Engine Emissions Limits."</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>3.6   DEMONSTRATION</TTL><BRK/>
<BRK/>
<TXT>Upon completion of the work and at a time approved by the Contracting Officer, the Contractor shall provide instructions 
by a qualified instructor to the Government personnel in the proper operation and maintenance of the equipment.  
[_____] Government personnel shall receive training comparable to the equipment manufacturer's factory training.  
The duration of instruction shall be for not less than one 8 hour working day for instruction of operating personnel 
and not less than one 8 hour working day for instruction of maintenance personnel.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.6.1   <SUB>Instructor's</SUB> Qualification Resume</TTL><BRK/>
<BRK/>
<TXT>Instructors shall be regular employees of the engine-generator set manufacturer.  The instruction personnel provided 
to satisfy the requirements above shall be factory certified by the related equipment manufacturer to provide 
instruction services.  Submit the name and qualification resume of instructor to the Contracting Officer for 
approval.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.2   <SUB>Training Plan</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit training plan 30 calendar days prior to training sessions.  Training plan shall include scheduling, content, 
outline, and training material (handouts).  Content shall include but not limited to the following:</TXT><BRK/>
<BRK/>
<SPT><TTL>3.6.2.1   Operating Personnel Training</TTL><BRK/>
<BRK/>
<TXT>This instruction includes operating the engine-generator set, auxiliary equipment including automatic transfer 
switches in all modes, and the use of all functions and features specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.2.2   Maintenance Personnel Training</TTL><BRK/>
<BRK/>
<TXT>Shall include mechanical, hydraulic, electrical, and electronic instructions for the engine-generator set and 
auxiliary equipment including automatic transfer switches.</TXT><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Mechanical Training:  Shall include at least the following:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  A review of mechanical diagrams and drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Component location and functions.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Troubleshooting procedures and techniques.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Repair procedures.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Assembly/disassembly procedures.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Adjustments (how, when, and where).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">7.  Preventive maintenance procedures.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">8.  Review of flow diagram.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">9.  Valve locations and function.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">10. Valve and hydraulic equipment adjustment and maintenance procedures.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">11. Hydraulic system maintenance and servicing.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">12. Lubrication points, type, and recommended procedures and frequency.</ITM><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Electrical and Electronic Maintenance Training:  Shall include at least the following:</LST><BRK/>
<BRK/>
<ITM INDENT="-0.33">1.  A review of electrical and electronic systems including wiring diagrams and drawings.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">2.  Troubleshooting procedures for the machine and control systems.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">3.  Electrical and electronic equipment servicing and care.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">4.  Use of diagnostics to locate the causes of malfunction.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">5.  Procedures for adjustments (locating components, adjustments to be made, values to be measured, 
and equipment required for making adjustments).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">6.  Maintenance and troubleshooting procedures for microprocessor or minicomputer where applicable.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">7.  Circuit board repair procedures where applicable (with schematics provided).</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">8.  Use of diagnostic tapes.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">9.  Recommended maintenance servicing and repair for motors, switches, relays, solenoids, and 
other auxiliary equipment and devices.</ITM><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT>    <END/><BRK/></SEC>