USACE / NAVFAC / AFCESA / NASA      UFGS-26 41 00.00 20 (April 2006)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Replacing without change<BRK/>
                                    UFGS-13100N (February 2003)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 26 41 00.00 20</SCN><BRK/>
<BRK/>
<STL>LIGHTNING PROTECTION SYSTEM</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>lightning protection 
systems for nonordnance naval facilities</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show the following information on the project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Location of air terminals.</NPR><BRK/>
<BRK/>
<NPR>2.  Location of down conductors.</NPR><BRK/>
<BRK/>
<NPR>3.  Location of ground rods or grounding plates.</NPR><BRK/>
<BRK/>
<NPR>4.  Location of ground loops (if any).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)</ORG><BRK/><BRK/><RID>ANSI C135.30</RID><RTL>(1988) Zinc-Coated Ferrous Ground Rods for Overhead or Underground Line Construction</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE Std 81</RID><RTL>(1983) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System (Part 1)Normal Measurements</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/><RID>NFPA 780</RID><RTL>(2007) Standard for the Installation of Lightning Protection Systems</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 467</RID><RTL>(2007) Standard for Grounding and Bonding Equipment</RTL><BRK/><BRK/><RID>UL 96</RID><RTL>(2005) Standard for Lightning Protection Components</RTL><BRK/><BRK/><RID>UL 96A</RID><RTL>(2007) Standard for Installation Requirements for Lightning Protection Systems</RTL><BRK/><BRK/><RID>UL Electrical Constructn</RID><RTL>(2008) Electrical Construction Equipment Directory</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   RELATED REQUIREMENTS</TTL><BRK/>
<BRK/>
<TXT>Section <SRF>26 00 00.00 20</SRF> BASIC ELECTRICAL MATERIALS AND METHODS applies to this section with additions and modifications 
specified herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.2.1   Verification of Dimensions</TTL><BRK/>
<BRK/>
<TXT>Contractor shall become familiar with all details of work, verify all dimensions in field, and shall advise Contracting 
Officer of any discrepancy before performing work.  No departures shall be made without prior approval of Contracting 
Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   System Requirements</TTL><BRK/>
<BRK/>
<TXT>Materials shall consist of standard products of a manufacturer regularly engaged in production of lightning protection 
systems and shall be manufacturer's latest UL approved design.  Lightning protection system shall conform to <RID>
NFPA 70</RID>, <RID>NFPA 780</RID>, <RID>UL 96</RID> and <RID>UL 96A</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Modify submittals paragraphs to ensure that an appropriate submittal 
is required for each item in the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Overall lightning protection system</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Each major component</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Grounding system test</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Lightning protection system inspection</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>UL listing or label</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<TXT>In each standard referred to herein, consider the advisory provisions to be mandatory, as though the word "shall" 
has been substituted for "should" wherever it appears.  Interpret references in these standards to "authority 
having jurisdiction," or words of similar meaning, to mean Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Installation Drawings</TTL><BRK/>
<BRK/>
<LST INDENT="-0.33">a.  Submit installation shop drawing for the <SUB>overall lightning protection system</SUB>.  Drawings shall include 
physical layout of the equipment, mounting details, relationship to other parts of the work, and wiring 
diagram.</LST><BRK/>
<BRK/>
<LST INDENT="-0.33">b.  Submit detail drawings for <SUB>each major component</SUB> to include manufacturer's descriptive and technical 
literature, catalog cuts, and installation instructions.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   <SUB>UL Listing or Label</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit proof of compliance.  Label of or listing in <RID>UL Electrical Constructn</RID> is acceptable evidence.  In lieu 
of label or listing, submit written certificate from an approved, nationally recognized testing organization 
equipped to perform such services, stating that items have been tested and conform to requirements and testing 
methods of Underwriters Laboratories.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5   SITE CONDITIONS</TTL><BRK/>
<BRK/>
<TXT>Contractor will become familiar with details of the work, verify dimensions in the field, and advise Contracting 
Officer of discrepancies before performing work.  Deviations from contract drawings will not be made without 
prior approval of Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Do not use a combination of materials that forms an electrolytic couple of such nature that corrosion is accelerated 
in presence of moisture unless moisture is permanently excluded from the junction of such metals.  Where unusual 
conditions exist which would cause corrosion of conductors, provide conductors with protective coatings or oversize 
conductors.  Where mechanical hazard is involved, increase conductor size to compensate for hazard or protect 
conductors by covering them with molding or tubing made of wood or nonmagnetic material.  When metallic conduit 
or tubing is provided, electrically bond conductor to conduit or tubing at the upper and lower ends by clamp 
type connectors or welds (including exothermic).</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Main and Bonding Conductors</TTL><BRK/>
<BRK/>
<TXT><RID>NFPA 780</RID> and <RID>UL 96</RID> Class I, Class II, or Class II modified materials as applicable.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Copper</TTL><BRK/>
<BRK/>
<TXT>Provide copper conductors on nonmetallic stacks that do not weigh less than<MET> 144.83 kg per 305 meters</MET><ENG> 319 pounds 
per thousand feet</ENG>, and provide cable such that the size of any strand in the cable is not less than No. 15 AWG.  
Provide thickness of web or ribbon on stacks that is not less than No. 12 AWG.  Provide loop conductors that 
are comprised of copper conductors not smaller than No. 1/0 AWG.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   Aluminum</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is to be deleted when used for Atlantic Division, Naval 
Facilities Engineering Command.  Exception, Aluminum conductors are allowable 
in Atlantic Division when specifically required by the NFPA 780 (e.g. aluminum 
structures, etc.)</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Do not allow aluminum to contact the earth and do not use in any other manner that will contribute to rapid deterioration 
of the metal. Observe appropriate precautions at connections with dissimilar metals in accordance with <RID>NFPA 70</RID>
 Article 110-14.  Provide aluminum cable conductors for bonding and interconnecting metallic bodies to main cable 
that are at least equivalent to strength cross-sectional area of a No. 4 AWG aluminum wire.  When perforated 
strips are provided, use strips that are much wider than solid strips.  Use a strip width that is at least twice 
that of the diameter of the perforations.  Use an aluminum strip which has a thickness of not less than the diameter 
of No. 12 AWG and at least<MET> 40 mm</MET><ENG> 1 1/2 inches</ENG> wide for connecting exposed water pipes.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   COMPONENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Air Terminals</TTL><BRK/>
<BRK/>
<TXT>Provide terminals in accordance with <RID>UL 96</RID>, except provide Class II for Class I and Class II applications.  Support 
air terminals more than<MET> 610 mm</MET><ENG> 24 inches</ENG> in length by suitable brace, with guides, not less than one-half the 
height of the terminal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Ground Rods</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will determine the type and number of ground rods to be 
used based on local conditions and earth resistivity data. Copper clad steel 
rods will be specified for normal conditions.  Galvanized coated steel or stainless 
steel rods will be used where low soil resistivities are encountered and galvanic 
corrosion may occur between adjacent underground metallic masses and the copper-clad 
rods.  Stainless steel rods have a longer life than zinc coated steel, but use 
of these must be justified based on the higher cost.  In high resistivity soils,<MET>
 3050 mm</MET><ENG> 10 foot</ENG> sectional rods may be used to obtain the required resistance 
to ground; however, where rock is encountered, additional rods, a ground loop, 
or ground grid may be necessary. Coordinate and standardize rod selection for 
individual facilities with other specification sections.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide [ground rods made of [copper-clad steel] [stainless steel] [solid copper] conforming to conform to <RID>UL 467</RID>
.] [galvanized ferrous rods conforming to <RID>ANSI C135.30</RID>.]  Provide ground rods that are not less than<MET> 20 mm</MET><ENG> 3/4 
inch</ENG> in diameter and<MET> 3050 mm</MET><ENG> 10 feet</ENG> in length.  Do not mix ground rods of copper-clad steel, stainless steel, 
galvanized ferrous, or solid copper on the job.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   Grounding Plates</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The use of grounding plates is discouraged in Military Handbook MIL-HDBK-1004/6, 
paragraph 3.3.4; however, the use of grounding plates is an acceptable alternative 
to ground rods in areas where excessive rock and surface ledge is encountered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide grounding plates made of [copper-clad steel][iron][stainless steel] [solid copper] conforming to <RID>UL 96</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4   Connections and Terminations</TTL><BRK/>
<BRK/>
<TXT>Provide connectors for splicing conductors that conform to <RID>UL 96</RID>, class as applicable.  Conductor connections 
can be made by clamps or welds (including exothermic).  Provide style and size connectors required for the installation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.5   Connector Fittings</TTL><BRK/>
<BRK/>
<TXT>Provide connector fittings for "end-to-end", "Tee", or "Y" splices that conform to <RID>NFPA 780</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.6   Lightning Protection Components</TTL><BRK/>
<BRK/>
<TXT>Provide bonding plates, air terminal supports, chimney bands, clips, and fasteners that conform to <RID>UL 96</RID> classes 
as applicable.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INTEGRAL SYSTEM</TTL><BRK/>
<BRK/>
<TXT>Lightning protection system consists of air terminals, roof conductors, down conductors, ground connections, 
grounding electrodes and ground loop conductor.  Electrically interconnect lightning protection system to form 
the shortest distance to ground.  Do not use nonconducting parts of the structure as part of the building's lightning 
protection system.  Expose conductors on the structures except where conductors are required to be in protective 
sleeves.  Interconnect secondary conductors with grounded metallic parts within the building.  Make interconnections 
within side-flash distances at or above the level of the grounded metallic parts.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Air Terminals</TTL><BRK/>
<BRK/>
<TXT>Air terminal design and support conforming to <RID>NFPA 780</RID>.  Rigidly connect terminals to, and make electrically  
continuous with, roof conductors by means of pressure connectors or crimped joints of T-shaped malleable metal.  
Provide pressure connector or crimped joint with a dowel or threaded fitting to connect ground rod conductor 
with air terminal.  Set air terminals at ends of structures not more than<MET> 610 mm</MET><ENG> 2 feet</ENG>from ends of ridges and 
corners of roofs.  Do not exceed<MET> 7620 mm</MET><ENG> 25 feet</ENG> in spacing of<MET> 610 mm</MET><ENG> 2 foot</ENG> high air terminals on ridges, parapets, 
and around perimeter of building with flat roofs.  When necessary to exceed this spacing, increase specified 
height of air terminals not less than<MET> 50 mm</MET><ENG> 2 inches</ENG> for each<MET> 305 mm</MET><ENG> one foot</ENG> of increase over<MET> 7620 mm</MET><ENG> 25 feet</ENG>
.  On large flat, or gently sloping roofs, as defined in <RID>NFPA 780</RID>, place air terminals at points of the intersection 
of imaginary lines dividing the surface into rectangles having sides not exceeding<MET> 15 m</MET><ENG> 50 feet</ENG> in length.  Secure 
air terminals against overturning either by attachment to the object to be protected or by means of a substantial 
tripod or other braces which are permanently and rigidly attached to the building or structure.  Metal projections 
and metal parts of buildings such as smokestacks and other metal objects that are at least<ENG> 3/16 inch</ENG><MET> 4.763 mm</MET>
 thick and that do not contain hazardous materials, need not be provided with air terminals.  However, bond these 
metal objects to a lightning conductor through a metal conductor of the same unit weight per length as the main 
conductor.  [Where metal ventilators are installed, mount air terminals thereon, where practical.  Bond air terminals, 
erected by necessity adjacent to a metal ventilator, to the ventilator near the top and bottom.] Where nonmetallic 
spires, steeples, or ventilators are present, mount air terminals to the side.  In addition, where spires or 
steeples project more than<MET> 3050 mm</MET><ENG> 10 feet</ENG> above the building, continue conductor from air terminal to nearest 
down conductor securely connect thereto.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Roof Conductors</TTL><BRK/>
<BRK/>
<TXT>Connect roof conductors directly to the roof or ridge roll.  Avoid sharp bends or turns in conductors.  Do not 
make turns of less than<MET> 205 mm</MET><ENG> 8 inches</ENG>.  Preserve horizontal or downward course on conductors.  Rigidly fasten 
conductors every<MET> 915 mm</MET><ENG> 3 feet</ENG> along the roof and down the building to the ground.  Rigidly connect metal ventilators 
to the roof conductor at three places.  Make connections electrically continuous.  Course roof conductors along 
contours of flat roofs, ridges, parapets, and edges; and where necessary, over flat surfaces, in such a way as 
to join each air terminal to all the rest.  Connect roof conductors surrounding tank tops, decks, flat surfaces, 
and flat roofs to form a closed loop.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Down Conductors</TTL><BRK/>
<BRK/>
<TXT>Make down conductors electrically continuous from air terminals and roof conductors to grounding electrodes.  
Course down conductors over outer extreme portions of the building, such as corners, with consideration given 
to location of ground connections and air terminals.  Provide each building or structure not less than two down 
conductors located as widely separated as practicable, such as at diagonally opposite corners.  [Rectangular 
structures having gable, hip, or gambrel roofs more than<MET> 33 m</MET><ENG> 110 feet</ENG> long, provide at least one additional 
down conductor for each additional<MET> 15 m</MET><ENG> 50 feet</ENG> of length or fraction thereof.] [Rectangular structures having 
French, flat, or sawtooth roofs exceeding<MET> 76 m</MET><ENG> 250 feet</ENG> in perimeter, provide at least one additional down conductor 
for each<MET> 30 m</MET><ENG> 100 feet</ENG> of perimeter or fraction thereof.]  [L- or T-shaped structure, provide at least one additional 
down conductor.]  [H-shaped structure, at least two additional down conductors.]  [Wing built structure, at least 
one additional down conductor for each wing.]  [Irregularly shaped structures, provide enough conductors so that 
the average distance between them along the perimeter is not greater than<MET> 30 m</MET><ENG> 100 feet</ENG>.]  [Structures exceeding<MET>
 15 m</MET><ENG> 50 feet</ENG> in height, provide at least one additional down conductor for each additional<MET> 18 m</MET><ENG> 60 feet</ENG> of height 
or fraction thereof, except that this application will not cause down conductors to be placed about the perimeter 
of the structure at intervals of less than<MET> 15 m</MET><ENG> 50 feet</ENG>.]  Install additional down conductors when necessary 
to avoid "dead ends" or branch conductors exceeding<MET> 5 m</MET><ENG> 16 feet</ENG> in length, ending at air terminals.  Equally 
and symmetrically spaced down conductors about the perimeter of the structure.  Protect conductors where necessary, 
to prevent physical damage or displacement to the conductor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Interconnection of Metallic Parts</TTL><BRK/>
<BRK/>
<TXT>Connect metal doors, windows, and gutters directly to ground or down conductors using not smaller than No. 6 
copper conductor, or equivalent.  Where there is probability of unusual wear, mechanical injury, or corrosion, 
provide conductors with greater electrical capacity than normal or protect the conductor.  Provide mechanical 
ties or pressure connectors between grounds and metal doors and windows.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Ground Connections</TTL><BRK/>
<BRK/>
<TXT>Securely connect conductor forming continuations of down conductors from structure to grounding electrode in 
a manner to ensure electrical continuity between the two.  Provide clamp type connections or welds (including 
exothermic) for continuation.  Provide a ground connection for each down conductor.  Attach down conductors to 
ground [rods] [plates] by welding (including exothermic), brazing, or clamping.  Provide clamps suitable for 
direct burial.  Protect ground connection from mechanical injury.  Bond metal water pipes and other large underground 
metallic objects together with all grounding mediums.  In making ground connections, take advantage of all permanently 
moist places where practicable, although avoid such places when area is wet with waste water that contains chemical 
substances, especially those corrosive to metal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.6   Grounding Electrodes</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where soil conditions indicate definitely that a ground loop will not 
be required, all references to a ground loop should be deleted from the specifications.</NPR><BRK/>
<BRK/>
<NPR>In accordance with MIL-HDBK-1004/6, the maximum ground resistance for any lighting 
protection system should not exceed 10 ohms.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide grounding electrode for each down conductor.  Extend driven ground rods into the existing undisturbed 
earth for a distance of not less<MET> 3050 mm</MET><ENG> 10 feet</ENG>.  Set ground rods not less than<MET> 610 mm</MET><ENG> 2 feet</ENG> nor more than<MET> 
3050 mm</MET><ENG> 10 feet</ENG>, from the structure.  After the completed installation, measure the total resistance to ground 
using the fall-of-potential method described in <RID>IEEE Std 81</RID>.  Maximum resistance of a driven ground rod shall 
be [10] [_____] ohms, under normally dry conditions [when a ground loop is not used].  Use a ground loop when 
two of any three ground rods, driven not less than<MET> 3050 mm</MET><ENG> 10 feet</ENG> into the ground, a minimum of<MET> 3050 mm</MET><ENG> 10 feet</ENG>
 apart, and equally spaced around the perimeter, give a combined value exceeding 50 ohms immediately after having 
driven.  For ground loop, provide continuous No. 1/0 bare stranded copper cable or equivalent material having 
suitable resistance to corrosion.  Lay ground loop around the perimeter of the structure in a trench not less 
than <MET> 765 mm</MET><ENG> 30 inches</ENG> below grade, at a distance not less than<MET> 610 mm</MET><ENG> 2 feet</ENG> nor more than<MET> 3050 mm</MET><ENG> 10 feet</ENG> from 
the nearest point of the structure.  Install a ground loop in earth undisturbed by excavation, not earth fill, 
and do not locate beneath roof overhang, or wholly under paved areas or roadways where rainfall cannot penetrate 
to keep soil moist in the vicinity of the cable.  Make connections between ground conductors and grounds or ground 
loop, and between ground loop and grounds electrically continuous.  [Where so indicated, provide an alternate 
method for grounding electrodes in shallow soil by digging trenches radially from the building.  Provide 1/0 
bare copper cable arranged in a star pattern with the structure at the center for radial systems.  Bury the radials 
at least<MET> 765 mm</MET><ENG> 30 inches</ENG> inches below grade external to the structure.  Lower ends of down conductors [or their 
equivalent in the form of metal strips or wires] are buried in trenches].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.7   Grounding Plates</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The use of grounding plates is discouraged in Military Handbook MIL-HDBK-1004/6, 
paragraph 3.3.4; however, the use of grounding plates is an acceptable alternative 
to ground rods in areas where excessive rock and surface ledge is encountered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a grounding plate for down conductor.  Set grounding plates not less than<MET> 610 mm</MET><ENG> 2 feet</ENG> nor more than<MET>
 3050 mm</MET><ENG> 10 feet</ENG>, from the structure.  Grounding plate is to be buried as deeply in the existing dirt as local 
conditions allow, without exceeding<MET> 3050 mm</MET><ENG> 10 feet</ENG>in depth.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   APPLICATIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Nonmetallic Exterior Walls with Metallic Roof</TTL><BRK/>
<BRK/>
<TXT>Bond metal roof sections together which are insulated from each other so that they are electrically continuous.  
Connect air terminals so that they are electrically continuous with the metal roof as well as the roof conductors 
and down conductors.  Bond ridge cables and roof conductors to the roof at upper and lower edges of roof and 
at intervals not to exceed<MET> 30 m</MET><ENG> 100 feet</ENG>.  Bond down conductors to roof conductors and to lower edge of metal 
roof.  Where metal of roof is in small sections, make connections between air terminals and down conductors to 
at least four sections of the metal roof.  Make connections electrically continuous and have a surface contact 
of at least<MET> 1935 square mm</MET><ENG> 3 square inches</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Metal Roofs with Metal Walls</TTL><BRK/>
<BRK/>
<TXT>Bond metal roof and metal walls so that they are electrically continuous and considered as one unit.  Connect 
air terminals to and make them electrically continuous with the metal roof as well as the roof down conductors.  
Bond all roof conductors and down conductors to metal roof or metal walls at upper and lower edges at intervals 
not to exceed<MET> 30 m</MET><ENG> 100 feet</ENG>.  Make all connections electrically continuous and have surface contact of at least<MET>
 1935 square mm</MET><ENG> 3 square inches</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Steel Frame Building</TTL><BRK/>
<BRK/>
<TXT>Make the steel framework of the building electrically continuous.  Electrical continuity may be provided by bolting, 
riveting, or welding unless another specific method is indicated.  Connect air terminals to the structural steel 
framework at the ridge.  Provide short runs of conductors to join air terminals to the metal framework so that 
proper placing of air terminals is maintained.  Separate down conductors from air terminals to ground connections 
are not required. Where water system enters the building, securely connect structural steel framework and water 
system at point of entrance by a ground connector.  Make connections to pipes by means of ground clamps with 
lugs.  Make connections to structural framework by means of nut and bolt or welding.  Make connections between 
columns and ground connections at bottom of steel columns.  Make ground connections to grounds or ground loop 
runs from not less than one-half of the columns distributed equally around perimeter of structure.  When no water 
system enter the structure, run ground connections from steel columns distributed equally around the perimeter 
of the structure.  Bond metal doors, windows, gutters, and similar metal installation to steel work of the building.  
Provide a grounding electrode for each ground connection.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Ramps and Covered Passageways</TTL><BRK/>
<BRK/>
<TXT>Ramps and covered passageways which are in the zone of protection of a lightning protection system, as defined 
by <RID>NFPA 780</RID>, need no additional lightning protection.  However, ramps and covered passageways which are outside 
the zone of protection of a lightning protection system shall be provided with a lightning protection conforming 
to the requirements for lightning protection systems for buildings of similar construction.  Place a down conductor 
and a driven ground at one of the corners where the ramp connects to each building or structure.  Connect down 
conductor and driven ground to the ground loop or nearest ground connection of the building or structure.  Where 
buildings or structures and connecting ramps are clad with metal, connect metal of the buildings or structures 
and metal of the ramp in a manner to ensure electrical continuity, in order to avoid the possibility of a flash-over 
or spark due to a difference in potential.  Make connections electrically continuous and have a surface contact 
area of at least<MET> 1935 square mm</MET><ENG> 3 square inches</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.5   Tanks and Towers</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.5.1   Wooden Tanks and Towers</TTL><BRK/>
<BRK/>
<TXT>Electrically interconnect lightning protection system components (such as: air terminals, ridge cables, down 
conductors, ground connections, and grounds) to form the shortest distance to ground without passing through 
any nonconducting parts of the structure.  Where the roof of the structure ends in a peak, a single air terminal 
not less than<MET> 610 mm</MET><ENG> 2 feet</ENG>high will be regarded as sufficient.  When structure does not end in a peak, provide 
air terminals not less than<MET> 610 mm</MET><ENG> 2 feet</ENG> high at intervals not exceeding<MET> 7620 m</MET><ENG> 25 feet</ENG> along the perimeter 
of the structure.  When the tank or tower is an adjunct of a building, near or touching the perimeter, extend 
one of the down conductors directly to a ground connection and connect the other to lightning protection of the 
building.  When tank or tower is set well within the perimeter of the building, connect both down conductors 
to lightning protection system of the building.  When height of the structure exceeds<MET> 30 m</MET><ENG> 100 feet</ENG>, cross-connect 
down conductors midway between the top and bottom.  Where buried metal pipes enter tank or tower, connect one 
down conductor to pipes, approximately<MET> 305 mm</MET><ENG> 1 foot</ENG> below grade.  Ground metal guy wires or cables set in concrete 
or attached to buildings or nonconducting supports to a ground rod driven full length into the ground.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.5.2   Metal or Reinforced-Concrete Tanks and Towers</TTL><BRK/>
<BRK/>
<TXT>Make metal or reinforcing steel electrically continuous.  Electrical continuity may be provided by bolting, riveting, 
or welding metal and tying or clipping reinforcing bars, unless a specific method is noted on the drawings.  
Air terminals and down conductors are required except on bolted, riveted, or welded<MET> 4.75 mm</MET><ENG> 3/16 inch</ENG> minimum 
steel plate tanks. Ground connections and grounding electrodes are not required on metal tanks that are electrically 
continuous with a metallic underground pipe system. On other structures, provide two ground connections approximately<MET>
 3.14 rad</MET><ENG> 180 degrees</ENG> apart at the base of the structure.  Connect each buried metal pipe entering the tank or 
tower to one ground connection approximately<MET> 305 mm</MET><ENG> one foot</ENG> below finished grade.  Ground metal guy wires on 
tanks and towers.  Metal guy wires or cables attached to steel anchor rods set in earth will be considered as 
grounded.  Ground metal guy wires or cables set in concrete or attached to buildings or nonconducting supports 
to a ground rod driven full length into the ground.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2.6   Stacks</TTL><BRK/>
<BRK/>
<TXT>Ground metal guy wires for stacks.  Metal guy wires or cables attached to steel anchor rods set in earth will 
be considered as sufficiently well grounded.  However, ground metal guy wires or cables attached to anchor rods 
set in concrete or attached to buildings or nonconducting supports to a ground rod driven full length into the 
ground.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.6.1   Metal Stacks</TTL><BRK/>
<BRK/>
<TXT>Make metal smokestacks electrically continuous and to ground.  Heavy-duty metal stacks having a metal thickness 
of<MET> 4.75 mm</MET><ENG> 3/16 inches</ENG> or greater do not require air terminals or down conductors.  Otherwise, provide two [ground 
rods][grounding plates] driven full length into the earth.  Locate [ground rods][grounds plates] approximately<MET>
 3.14 rad</MET><ENG> 180 degrees</ENG> apart and set [ground rods] [grounding plates] not less than<MET> 915 mm</MET><ENG> 3 feet</ENG> nor more than<MET>
 2440 mm</MET><ENG> 8 feet</ENG> from the nearest point of the stack foundation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.6.2   Nonmetallic Stacks</TTL><BRK/>
<BRK/>
<TXT>On nonmetallic smokestacks constructed of brick, hollow tile, or concrete, make the air terminals solid copper, 
copper alloy, stainless steel or Monel metal.  Distribute uniformly about the rim of the stack at intervals not 
exceeding<MET> 2440 mm</MET><ENG> 8 feet</ENG> and extending at least<MET> 765 mm</MET><ENG> 30 inches</ENG> above the rim of stack.  Electrically connect 
air terminal together by means of a metal band or ring to form a closed loop about<ENG> 2 feet</ENG><MET> 610 mm</MET> below the top 
of the stack.  Where the stack has a metal crown, connect air terminals to the metal crown.  Where stacks have 
metal lining extending part way up, connect lining to air terminal at its upper end and ground at the bottom.  
Provide at least two down conductors on opposite sides of the stack leading from the ring or crown at the top 
to the ground.  When the stack is an adjunct of building near or touching the building perimeter, extend one 
of the conductors directly to a ground connection while the other may be connected to lightning protection system 
on the building.  On stacks exceeding<MET> 48 m</MET><ENG> 160 feet</ENG> in height, cross-connect down conductors approximately midway 
between the top and bottom.  Reduce joints in conductors to a minimum and make joints to have the same tension 
strength as the conductors that are joining.  Space fasteners of copper or copper-bronze alloy not over<MET> 915 mm</MET><ENG>
 3 feet</ENG>apart for vertical conductors and not over<MET> 610 mm</MET><ENG> 2 feet</ENG> apart for horizontal conductors.  To prevent 
gases from corroding copper air terminals, provide conductors and fasteners within<MET> 7620 mm</MET><ENG> 25 feet</ENG>of the top 
of stack with continuous coating of hot dipped lead or an equivalent coating.  Provide conductors conforming 
to the requirements for nonmetallic stacks for stacks partly or wholly of reinforced concrete.  For nonmetallic 
stacks, electrically connect reinforcing steel to down conductors at top and bottom of concrete.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.3   INTERFACE WITH OTHER STRUCTURES</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Interconnection of Metal Bodies</TTL><BRK/>
<BRK/>
<TXT>Protect metal bodies when not within the zone of protection of air terminal.  Bond metal bodies having an area 
of<MET> 0.258 square m</MET><ENG> 400 square inches</ENG> or greater or a volume of<MET> 0.016387 cubic m</MET><ENG> 1000 cubic inches</ENG> or greater to 
lightning protection system using main size conductors and a bonding plate having a surface contact area of not 
less than<MET> 1935 square mm</MET><ENG> 3 square inches</ENG>.  Make provisions to guard against the corrosive effect of bonding dissimilar 
metals.  Bond metal bodies at their closest point to the lightning protection system using bonding conductors 
and fittings.  Independently ground any metal body that exceeds<MET> 1525 mm</MET><ENG> 5 feet</ENG> in any dimension, that is situated 
wholly within a building, and that does not at any point come within<MET> 1830 mm</MET><ENG> 6 feet</ENG> of a lightning conductor 
or metal connected to a lightning protection system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Fences</TTL><BRK/>
<BRK/>
<TXT>Except as specified below, metal fences that are electrically continuous with metal posts extending at least<MET> 
610 mm</MET><ENG> 2 feet</ENG> into the ground require no additional grounding.  Ground other fences on each side of every gate 
at gate posts, at corner posts, and at end posts.  Bond gate to adjacent fence post utilizing flexible copper 
grounding braid with sufficient slack to permit<MET> 3.14 rad</MET><ENG> 180 degree</ENG> opening of the gate.  Provide flexible copper 
ground braid which has an ampacity equivalent to that of the fence ground wire specified herein.  Provide [ground 
rods][grounding plates] every<MET> 305 to 457 m</MET><ENG> 1000 to 1500 feet</ENG> for grounding fences when fences are located in 
isolated places, and every<MET> 152 to 228 m</MET><ENG> 500 to 750 feet</ENG> when in proximity (<MET>30 m </MET><ENG>100 feet </ENG>or less) to public roads, 
highways, and buildings.  Provide connection to ground from the post where it is metal and is electrically continuous 
with the fencing using removable ground clamps on the fence posts and split-bolt connectors suitable for dissimilar 
metals on the fence fabric and barbed wire.  [Where the fence consists of wooden posts and horizontal metal strands 
only, run down conductors consisting of No. 8 copper wire or equivalent from the ground rod the full height of 
the fences and fastened to each wire, so as to be electrically continuous.] Make connections to ground from the 
horizontal metal strand using split-bolt connectors suitable for dissimilar metals on the fence fabric and barbed 
wire.  Ground metal fences at or near points<MET> 45 m</MET><ENG> 150 feet</ENG> on each side of medium and high voltage, (meaning 
in excess of 600 volts,) overhead line crossings.  Ground metal fences at<MET> 45 m</MET><ENG> 150 foot</ENG> intervals where high 
and medium voltage lines are directly overhead and run parallel to the fence.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Exterior Overhead Pipe Lines</TTL><BRK/>
<BRK/>
<TXT>Properly ground overhead pipes, conduits, and cable trays on the exterior of the building that enter a building, 
preferably to building grounds at points where pipes enter the building.  Where a separate ground is provided, 
bond the pipes to the building ground at points where the pipes are closest to the ground connections.  In addition, 
bond pipes to any metallic masses that are within<MET> 1830 mm</MET><ENG> 6 feet</ENG> of the pipe.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   RESTORATION</TTL><BRK/>
<BRK/>
<TXT>Where sod has been removed, place sod as soon as possible after completing the backfilling.  Restore to original 
condition the areas disturbed by trenching, storing of dirt, cable laying, and other work.  Include necessary 
topsoiling, fertilizing, liming, seeding, sodding, sprigging or mulching in any restoration.  Maintain disturbed 
surfaces and replacements until final acceptance.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.1   <SUB>Grounding System Test</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Test the grounding system to ensure continuity and that resistance to ground is not in excess of [10] [_____] 
ohms.</TST>  Test the ground rod for resistance to ground before making connections to the rod.  Tie the grounding 
system together and test for resistance to ground.  Make resistance measurements in dry weather, not earlier 
than 48 hours after rainfall.  Include in the written report:  locations of ground rods, resistance, and soil 
conditions at the time that measurements were made.  Submit results of each test to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   <SUB>Lightning Protection System Inspection</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Make visual inspections to verify that there are no loose connections which may result in high resistance joints, 
and that conductors and system components are securely fastened to their mounting surfaces and are protected 
against accidental mechanical displacement.</TST></TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>