<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR> <AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA            UFGS-27 21 10.00 10 (July 2006)<BRK/>
                                          --------------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                Superseding<BRK/>
                                          UFGS-40 95 33.00 10 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 27 21 10.00 10</SCN><BRK/>
<BRK/>
<STL>FIBER OPTIC DATA TRANSMISSION SYSTEM</STL><BRK/>
<DTE>07/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>fiber optics data 
transmission systems</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  There are two ways the designer can require the submission of data concerning 
fiber optic equipment.  The most common way is through the use of submittals.  
However, the Federal Acquisition Regulations apply special constraints on some 
types of technical data that fall under the Data Requirements Clause.  Generally, 
the technical data associated with fiber optic data transmission systems do 
not fall under the special Data Requirements Clause.  However, if other systems 
such as EMCS, UMCS, IDS, ESS, and CCTV, interconnected by FO systems do fall 
within the special category, the associated FO technical data should be acquired 
in the same manner.  Therefore, if some systems used with this specification 
fall under the special Data Requirements Clause, use sub-paragraph a. below 
for guidance.<BRK/>
<BRK/>
a.  The acquisition of all technical data, data bases and computer software 
items that are identified herein will be accomplished strictly in accordance 
with the Federal Acquisition Regulation (FAR) and the Department of Defense 
Federal Acquisition Regulation Supplement (DOD FARS).  Those regulations, as 
well as the Army and Corps of Engineers implementations thereof, should also 
be consulted to ensure that a delivery of critical items of technical data is 
not inadvertently lost.  Specifically, the Rights in Technical Data Non-commercial, 
DOD FARS 52.227-7013, and DOD FARS 52.227-7031 [Reserved], as well as any requisite 
software licensing agreements will be made a part of the CONTRACT CLAUSES or 
SPECIAL CONTRACT REQUIREMENTS of the contract.  In addition, the appropriate 
DD Form 1423, Contract Data Requirements List, will be filled out for each distinct 
deliverable item and made a part of the contract.  Where necessary, a DD Form 
1664, Data Item Description, shall be used to explain and more fully identify 
the data items listed on the DD Form 1423.  It is to be noted that all of these 
clauses and forms are required to assure the delivery of the data in question 
and that such data is obtained with the requisite rights to use by the Government.  
Include with the request for proposals a completed DD Form 1423, Contract Data 
Requirements List.  This form is essential to obtain delivery of all documentation.  
Each deliverable will be clearly specified, both description and quantity being 
required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>CONSUMER ELECTRONICS ASSOCIATION (CEA)</ORG><BRK/><BRK/><RID>CEA 170</RID><RTL>(1957) Electrical Performance Standards - Monochrome Television Studio Facilities</RTL><BRK/><BRK/><RID>CEA-310-E</RID><RTL>(2005) Racks, Panels, and Associated Equipment</RTL><BRK/><BRK/></REF><REF><ORG>ELECTRONIC INDUSTRIES ALLIANCE (EIA)</ORG><BRK/><BRK/><RID>EIA/TIA-455-170</RID><RTL>(1989) FOTP-170 Cable Cutoff Wavelength of Single-Mode Fiber by Transmitted Power</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE C2</RID><RTL>(2007; Errata 2007; INT 2008) National Electrical Safety Code</RTL><BRK/><BRK/><RID>IEEE C62.41.1</RID><RTL>(2002) IEEE Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits</RTL><BRK/><BRK/><RID>IEEE C62.41.2</RID><RTL>(2002) IEEE Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA 250</RID><RTL>(2003) Enclosures for Electrical Equipment (1000 Volts Maximum)</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)</ORG><BRK/><BRK/><RID>TIA TIA/EIA-455-204</RID><RTL>(2000) Standard for Measurement of Bandwidth on Multimode Fiber</RTL><BRK/><BRK/><RID>TIA-232-F</RID><RTL>(1997; R 2002) Interface Between Data Terminal Equipment and Data Circuit-Terminating Equipment Employing Serial Binary Data Interchange</RTL><BRK/><BRK/><RID>TIA-455-104-A</RID><RTL>(1993; R 2005) Standard for FOTP-104 Fiber Optic Cable Cyclic Flexing Test</RTL><BRK/><BRK/><RID>TIA-455-13-A</RID><RTL>(1996; R 2002) FOTP-13 Visual and Mechanical Inspection of Fiber Optic Components, Devices, and Assemblies</RTL><BRK/><BRK/><RID>TIA-455-177-B</RID><RTL>(2003) FOTP-177 IEC-60793-1-43 Optical Fibres - Part 1-43: Measurement Methods and Test Procedures - Numerical Aperture</RTL><BRK/><BRK/><RID>TIA-455-46A</RID><RTL>(1990) FOTP-46 Spectral Attenuation Measurement for Long-Length, Graded-Index Optical Fibers</RTL><BRK/><BRK/><RID>TIA-455-47B</RID><RTL>(1992) FOTP-47 Output Far Field Radiation Pattern Measurement</RTL><BRK/><BRK/><RID>TIA-455-58-B</RID><RTL>(2001) FOTP-58 Core Diameter Measurement of Graded-Index Optical Fibers</RTL><BRK/><BRK/><RID>TIA-455-78</RID><RTL>(2002B) FOTP-78 Optical Fibres - Part 1-40:  Measurement Methods and Test Procedures - Attenuation</RTL><BRK/><BRK/><RID>TIA-455-82B</RID><RTL>(1992) FOTP-82 Fluid Penetration Test for Fluid-Blocked Fiber Optic Cable</RTL><BRK/><BRK/><RID>TIA-455-91</RID><RTL>(1986; R 1996) FOTP-91 Fiber Optic Cable Twist-Bend Test</RTL><BRK/><BRK/><RID>TIA-485-A</RID><RTL>(1998; R 2003) Electrical Characteristics of Generators and Receivers for Use in Balanced Digital Multipoint System</RTL><BRK/><BRK/><RID>TIA/EIA-455-171-A</RID><RTL>(2001) FOTP-171 Attenuation by Substitution Measurement for Short-Length Multimode Graded-Index and Single-Mode Optical Fiber Cable Assemblies</RTL><BRK/><BRK/><RID>TIA/EIA-455-25C</RID><RTL>(2002) FOTP-25 Impact Testing of Optical Fiber Cables</RTL><BRK/><BRK/><RID>TIA/EIA-455-41A</RID><RTL>(1993; R 2001) FOTP-41 Compressive Loading Resistance of Fiber Optic Cables</RTL><BRK/><BRK/><RID>TIA/EIA-455-81B</RID><RTL>(2000) FOTP-81 Compound Flow (Drip) Test for Filled Fiber Optic Cable</RTL><BRK/><BRK/><RID>TIA/EIA-455-88</RID><RTL>(2001) FOTP-88 Fiber Optic Cable Bend Test</RTL><BRK/><BRK/><RID>TIA/EIA-606-A</RID><RTL>(2002) Administration Standard for the Telecommunications Infrastructure</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>47 CFR 15</RID><RTL>Radio Frequency Devices</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 1666</RID><RTL>(2007) Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1   General</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show on drawings the data transmission media required between each sub-assembly 
of the system or systems to be interconnected. Give consideration to compliance 
with NEC for supports, raceways, etc.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A fiber optics (FO) data transmission system (DTS) shall be provided.  The data transmission system shall consist 
of fiber optic transmission media, transmitter and receiver modules, modems, transceiver modules, repeaters, 
cable and power line surge protection, terminal devices (such as connectors, patch panels and breakout boxes) 
and power supplies for operating active components.  The data transmission system shall interconnect system components 
as shown.  Computing devices, as defined in <RID>47 CFR 15</RID>, shall be certified to comply with the requirements for 
Class A computing devices and labeled as set forth in <RID>47 CFR 15</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Hazardous Environment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer will show hazardous (classified) environment area(s), type of 
hazard(s), and hazard classification (Class I, II, or III, or combinations; 
Divisions 1 or 2; Groups A, B, C, D, E, F, or G or combinations; and operating 
temperatures) on the drawings.  Whenever possible, avoid placement of the FO 
DTS equipment and cables within the hazardous location to reduce installation 
costs, and to simplify maintenance.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>System components and wiring located in areas where fire or explosion hazards may exist because of flammable 
gases or vapors, flammable liquids, combustible dust, or ignitable fibers or flyings shall be rated for Classes, 
Divisions, Groups and suitable for the operating temperatures and shall be installed according to Chapter 5 of <RID>
NFPA 70</RID> and as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Electrical Requirements</TTL><BRK/>
<BRK/>
<TXT>The equipment shall operate from a voltage source as shown, plus or minus 10 percent, and 60 Hz, plus or minus 
2 percent.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Input Line Surge Protection</TTL><BRK/>
<BRK/>
<TXT>Inputs and outputs shall be protected against surges induced on wiring and cables including wiring and cables 
installed outdoors.  Surge protection devices shall be selected based on voltages and current ratings of components 
to be protected.  Communications equipment shall be protected against surges induced on any communications circuit.  
Cables and conductors (except non-conductive fiber optic cables which serve as communications circuits from consoles 
to field equipment and between field equipment), shall have surge protection circuits installed at each end.  
Protection shall be furnished at equipment, and additional triple electrode gas surge protectors rated for the 
application on each conductive wire line and coaxial circuit shall be installed within <MET>1 meter </MET><ENG>3 feet</ENG> of the 
building cable entrance.  Surge protection devices shall be selected based on voltages and current ratings of 
components to be protected.  Fuses shall not be used for surge protection.  The inputs and outputs shall be tested 
in both normal mode and common mode using the following two waveforms:</TXT><BRK/>
<BRK/>
<LST>a. A 10 microsecond rise time by 1000 microsecond pulse width waveform with a peak voltage of 1500 volts 
and a peak current of 60 amperes.</LST><BRK/>
<BRK/>
<LST>b. An 8 microsecond rise time by 20 microsecond pulse width waveform with a peak voltage of 1000 volts 
and a peak current of 500 amperes.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.5   Power Line Surge Protection</TTL><BRK/>
<BRK/>
<TXT>Equipment connected to AC circuits shall be protected from power line surges.  Surge protection devices shall 
be selected based on voltages and current ratings of components to be protected. Equipment shall meet the requirements 
of <RID>IEEE C62.41.1</RID> and <RID>IEEE C62.41.2</RID>.  Fuses shall not be used for surge protection.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Fiber Optic System</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<ITM><SUB>Installation</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Detail drawings including a complete list of equipment and material, including manufacturer's 
descriptive and technical literature, performance charts and curves, catalog cuts, and installation 
instructions.  Detail drawings shall contain complete cabling, wiring and schematic diagrams 
and any other details required to demonstrate that the system has been coordinated and will 
properly function with its associated subsystems as well as other systems.  Drawings shall show 
proposed layout and anchorage of equipment and appurtenances, and equipment relationship to 
other parts of the work including clearance for maintenance and operations.  System drawings 
shall show proposed configuration, including location, type and termination of both interior 
and exterior fiber optics and showing the location, duct and innerduct arrangement, and fiber 
assignment.  The ac power consumption and heat dissipation shall be shown under both normal 
and maximum operating conditions.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Fiber Optic System</SUB></ITM><BRK/>
<BRK/>
<ITM>  Equipment calculations for flux budgets and gain margins.</ITM><BRK/>
<BRK/>
<ITM><SUB>Spare Parts</SUB></ITM><BRK/>
<BRK/>
<ITM>  Data lists of spare parts, tools, and test equipment, as specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Instructions</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Where installation procedures, or any part thereof, are required to be in accordance with 
the recommendations of the manufacturer of the material being installed, printed copies of these 
recommendations shall be submitted prior to installation.  Installation of the item will not 
be allowed to proceed until the recommendations are received and approved.</ITM><BRK/>
<BRK/>
<ITM><SUB>Test Procedures and Reports</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Test plans shall define test procedures and tests required to ensure that the system meets 
technical, operational, and performance specifications.  The test plans shall define milestones 
for the tests, equipment, personnel, facilities, and supplies required.  The test plans shall 
identify the capabilities and functions to be tested.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Test Procedures and Reports</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Test reports, in booklet form showing field test procedures and field tests performed to adjust 
each component and field tests performed to prove compliance with the specified performance 
criteria, upon completion and testing of the installed system.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Fiber Optic System</SUB></ITM><BRK/>
<BRK/>
<ITM>  Manufacturer's certificate indicating compliance with transmission and reliability requirements.  
Where equipment or materials are specified to conform to the standards or publications and requirements 
of CFR, ANSI,IEEE, NEMA, NFPA, EIA, or UL, certificates attesting that the items furnished under 
this section of the specification conform to the specified requirements.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>System Maintenance Course</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] copies of operating instructions outlining the step-by-step procedures required 
for system operation including description of each subsystem in its operating mode.  Instructions 
shall include the manufacturer's name, service manual, parts list, and a brief description of 
equipment, components, and their basic operating features.  [Six] [_____] copies of the maintenance 
instructions listing regular maintenance procedures, possible system failures, a troubleshooting 
guide for repairs, and simplified diagrams for the system as installed.  A video describing 
operating and maintenance instructions may be included.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   DELIVERY OF TECHNICAL DATA</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert the Section title of the appropriate additional specifications: 
Section <SRF>28 23 23.00 10</SRF> CLOSED CIRCUIT TELEVISION SYSTEMS; Section 
<SRF>28 16 00.00 20</SRF> BASIC INTRUSION DETECTION SYSTEMS (IDS); Section 
<SRF>28 20 00.00 20</SRF> COMMERCIAL INTRUSION DETECTION SYSTEMS (IDS); Section 
<SRF>28 20 01.00 10</SRF> ELECTRONIC SECURITY SYSTEM; Section <SRF>28 16 01.00 10</SRF> SMALL INTRUSION 
DETECTION SYSTEM; Section <SRF>25 10 10</SRF> UTILITY MONITORING AND CONTROL SYSTEMS (UMCS).<BRK/>
<BRK/>
For UMCS, IDS, ESS and similar systems requiring head-end computers and software, 
designer shall use the paragraph DELIVERY OF TECHNICAL DATA and delete paragraph 
SUBMITTALS.  In no case will both paragraphs be retained.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Computer software and technical data (including technical data which relates to computer software), which are 
specifically identified in this specification shall be delivered strictly in accordance with the CONTRACT CLAUSES, 
SPECIAL CONTRACT REQUIREMENTS, and in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, 
which is attached to and thereby made a part of this contract.  All data delivered shall be identified by reference 
to the particular specification paragraph against which it is furnished.  If the DTS is being installed in conjunction 
with another system such as an intrusion detection system, electronic SECURITY system, closed circuit television 
system, or utility monitoring and control system, the Technical Data Packages shall be submitted as part of the 
Technical Data Package for Section [_____]; [_____] hard copies and [_____] electronic copies (DC-ROM or DVD-R) 
of the Technical Data Package(s) shall be submitted.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Group I Technical Data Package</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1.1   System Drawings</TTL><BRK/>
<BRK/>
<TXT>The package shall include the following:</TXT><BRK/>
<BRK/>
<LST>a. Communications system block diagram.</LST><BRK/>
<BRK/>
<LST>b. FO receivers, transmitters, transceivers, multiplexers, and FO modem installation, block diagrams, 
and wiring and cabling diagrams.</LST><BRK/>
<BRK/>
<LST>c. FO receivers, transmitters, transceivers, multiplexers, and FO modem physical layout and schematics.</LST><BRK/>
<BRK/>
<LST>d. Details of interfaces with other systems.</LST><BRK/>
<BRK/>
<LST>e. Details of connections to power sources, including grounding.</LST><BRK/>
<BRK/>
<LST>f. Details of surge protection device installations.</LST><BRK/>
<BRK/>
<LST>g. Details of cable splicing and connector installations.</LST><BRK/>
<BRK/>
<LST>h. Details of aerial cable and messenger installation on poles, cable entrance to buildings, and termination 
inside enclosures.</LST><BRK/>
<BRK/>
<LST>i. Details of underground cable and duct installation, cable entrance into buildings, and terminations 
inside enclosures.</LST><BRK/>
<BRK/>
<TXT>Drawings shall show proposed layout and anchorage of equipment and appurtenances, and equipment relationship 
to other parts of the work including clearance for maintenance and operations.  System drawings shall show proposed 
configuration, including location, type and termination of both interior and exterior fiber optics and showing 
the location, duct and innerduct arrangement, and fiber assignment.  The ac power consumption and heat dissipation 
shall be shown under both normal and maximum operating conditions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.1.2   Equipment Data</TTL><BRK/>
<BRK/>
<TXT>A complete data package shall be delivered for all material, including field and system equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.1.3   Data Transmission System Description and Analyses</TTL><BRK/>
<BRK/>
<TXT>The data package shall include complete system description, and analyses and calculations used in sizing equipment 
required by these specifications. Descriptions and calculations shall show how the equipment will operate as 
a system to meet the specified performance.  The data package shall include the following:</TXT><BRK/>
<BRK/>
<LST>a. FO receivers, transmitters, transceivers, multiplexers, FO modem transmit and receive levels, and 
losses in decibels (dB) on each communication link.</LST><BRK/>
<BRK/>
<LST>b. Digital transmitter and receiver communication speed and protocol description.</LST><BRK/>
<BRK/>
<LST>c. Analog signal transmission method and bandwidth of the transmitter and receiver.</LST><BRK/>
<BRK/>
<LST>d. Data transmission system expansion capability and method of implementation.</LST><BRK/>
<BRK/>
<LST>e. FO system signal-to-noise ratio calculation for each communication link.</LST><BRK/>
<BRK/>
<LST>f. Flux-budget and gain margin calculation for each communication link.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.1.4   System Overall Reliability Calculations</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer must insert the section that describes the system configuration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The data package shall include manufacturers' reliability data and calculations required to show compliance with 
the specified reliability.  The calculations shall be based on the configuration specified in Section [_____] 
and as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.1.5   Certifications</TTL><BRK/>
<BRK/>
<TXT>Specified manufacturers' certifications shall be included with the data package.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.1.6   Key Control Plan</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will specify the Section in which a key control plan is 
found, when this specification is used with IDS, ESS, or CCTV: Section 
<SRF>28 16 00.00 20</SRF> BASIC INTRUSION DETECTION SYSTEMS (IDS); Section 
<SRF>28 20 00.00 20</SRF> COMMERCIAL INTRUSION DETECTION SYSTEMS (IDS); Section 
<SRF>28 20 01.00 10</SRF> ELECTRONIC SECURITY SYSTEM; Section <SRF>28 16 01.00 10</SRF> SMALL INTRUSION 
DETECTION SYSTEM; Section <SRF>25 10 10</SRF> UTILITY MONITORING AND CONTROL SYSTEMS (UMCS); 
Section <SRF>28 23 23.00 10</SRF> CLOSED CIRCUIT TELEVISION SYSTEMS.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
</SPT><SPT><TTL>1.4.2   Group II Technical Data Package</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the designer has specified site condition investigation in other sections, 
the first bracketed sentence, with the proper section number inserted, may be 
substituted in lieu of the second set of bracketed sentences.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[The Group II technical data package is specified in Section [_____].] [Verify that site conditions are in agreement 
with the design package.  Submit a report to the Government documenting changes to the site, or differing conditions 
that affect performance of the system to be installed.  For those changes or conditions which affect system installation 
or performance, specification sheets shall be provided (with the report), or written functional requirements 
to support the findings, and a cost estimate to correct the deficiency shall be provided with the report.  Do 
not correct any deficiency without written permission from the Government.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.3   Group III Technical Data Package</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert section number and title for the UMCS, IDS, ESS or CCTV specifications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare <SUB>test procedures and reports</SUB> for the factory test.  A test plan and test procedures shall be prepared 
in accordance with Section [_____] and this specification.  The test procedures shall describe the applicable 
tests to be performed, and other pertinent information such as specialized test equipment required, length of 
test, and location of the test.  The procedures shall explain in detail, step-by-step actions and expected results 
to demonstrate compliance with the requirements of this specification, and the methods for simulating the necessary 
conditions of operation to demonstrate performance of the system.  The test report shall describe the results 
of testing to include the date, time, location and system component designations of material and equipment tested.  
Testing action shall be recorded whether successful or not.  Reasons for termination of testing shall be described.  
Testing work sheets, printouts, strip charts, oscilloscope or optical time domain reflectometer (OTDR) printouts/photographs, 
raw and analyzed data, and testing conclusions shall be included in the report.  Deliver the factory test procedures 
to the Government for approval.  After receipt by the Contractor of written approval of the test procedures, 
the Contractor may schedule the factory test.  Provide written notice of the test to the Government at least 
2 weeks prior to the scheduled start.  The final test report shall be delivered within 15 days after completion 
of the test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.4   Group IV Technical Data Package</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.4.1   Performance Verification and Endurance Testing Data</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert section number and title for the UMCS, IDS, ESS or CCTV specification.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare procedures and reports for the performance verification test and endurance test.  Test procedures shall 
be prepared in accordance with Section [_____] and this specification.  Testing shall be performed on an installed 
system as approved by the Government.  Where required and approved by the Government, simulate conditions of 
operation to demonstrate the performance of the system.  The test plan shall describe the applicable tests to 
be performed, other pertinent information such as specialized test equipment required, length of performance 
verification test and endurance test, and location of the performance verification test and endurance test.  
The procedures shall explain in detail, step-by-step actions and expected results to demonstrate compliance with 
the requirements of this specification, and the methods for simulating the necessary conditions of operation 
to demonstrate performance of the system.  The test report shall describe the results of testing to include the 
date, time, location and system component designations of material and equipment tested.  Testing action shall 
be recorded whether successful or not.  Reasons for termination of testing for any reason shall be recorded in 
the report.  Testing work sheets, printouts, strip charts, oscilloscope or OTDR printouts/photographs, raw data, 
analyzed data and testing conclusions shall be included in the report.  Deliver the performance verification 
test and endurance test procedures to the Government for review and approval.  After receipt of written approval 
of test procedures, the Contractor may schedule the performance verification and endurance tests.  Provide written 
notice of the performance verification test and the endurance test to the Government at least 2 weeks prior to 
the scheduled start of the test.  The final performance verification test and endurance test report shall be 
delivered 30 days after completion of testing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.4.2   Operation and Maintenance Data</TTL><BRK/>
<BRK/>
<TXT>A draft copy of the operation and maintenance data, in manual format, as specified for the Group V technical 
data package, shall be delivered to the Government prior to beginning the performance verification test for use 
during site testing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.4.3   Training Data</TTL><BRK/>
<BRK/>
<TXT>Lesson plans and training manuals, including type of training to be provided, with a list of reference material 
shall be delivered for approval by the Government prior to starting any training.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4.5   Group V Technical Data Package</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify the correct number of manuals on DD Form 1423.  Adjust the quantities 
below to fill special local requirements.  Coordinate O&amp;M manual requirements 
with those of the performing district.<BRK/>
<BRK/>
Generally, FO systems do not include controls or functions under the control 
of system operators.  Therefore, an operator's manual is not needed.  Include 
an operator's manual if such controls are provided.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The Group V package consists of the operation and maintenance data, in manual format.  Final copies of the manuals 
bound in hardback, loose-leaf binders, shall be delivered to the Government within 30 days after completing the 
endurance test.  The draft copy used during site testing shall be updated with any changes required prior to 
final delivery of the manuals.  Each manual's contents shall be identified on the cover.  The manuals shall include 
the names, addresses, and telephone numbers of each subcontractor installing equipment and systems, and of the 
nearest service representative for each item of equipment and each system.  The manuals shall have a table of 
contents and tab sheets.  Tab sheets shall be placed at the beginning of each chapter or section and at the beginning 
of each appendix.  The final copies delivered after completion of the endurance test shall include all modifications 
made during installation, checkout, and acceptance.  Manuals delivered shall include:</TXT><BRK/>
<BRK/>
<LST>a. Functional Design Manual:  [two]  [_____] copies [_____] hard copies [1] [_____] CD-ROM(s).</LST><BRK/>
<BRK/>
<LST>b. Hardware Manual:  [two]  [_____] copies [_____] hard copies [1] [_____] CD-ROM(s).</LST><BRK/>
<BRK/>
<LST>c. Maintenance Manuals:  [two]  [_____] copies. [_____] hard copies [1] [_____] CD-ROM(s).</LST><BRK/>
<BRK/>
<LST>d. Operator's Manual:  [six]  [_____] copies [_____] hard copies [1] [_____] CD-ROM(s).</LST><BRK/>
<BRK/>
<SPT><TTL>1.4.5.1   Functional Design Manual</TTL><BRK/>
<BRK/>
<TXT>The functional design manual shall identify the operational requirements for the data transmission system and 
explain the theory of operation, design philosophy, and specific functions.  A description of hardware functions, 
interfaces, and requirements shall be included for all system operating modes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.5.2   Hardware Manual</TTL><BRK/>
<BRK/>
<TXT>A manual describing all equipment and devices specified and under Part 2 PRODUCTS shall be furnished.  The following 
information shall be included:</TXT><BRK/>
<BRK/>
<LST>a. General description and specifications.</LST><BRK/>
<BRK/>
<LST>b. Installation and checkout procedures.</LST><BRK/>
<BRK/>
<LST>c. Equipment electrical schematics and layout drawings.</LST><BRK/>
<BRK/>
<LST>d. Data transmission systems schematics.</LST><BRK/>
<BRK/>
<LST>e. Alignment and calibration procedures.</LST><BRK/>
<BRK/>
<LST>f. Manufacturer's repair parts list indicating sources of supply.</LST><BRK/>
<BRK/>
<LST>g. Interface definition.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.5.3   Maintenance Manual</TTL><BRK/>
<BRK/>
<TXT>The maintenance manual shall include descriptions of maintenance for all equipment including inspection, periodic 
preventative maintenance, fault diagnosis, and repair or replacement of defective components.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.5.4   Operator's Manual</TTL><BRK/>
<BRK/>
<TXT>The operator's manual shall fully explain procedures and instructions for operation of the system. This shall 
include an operator's manual for any fiber optic systems in which system operators control any function of the 
system.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4.6   Group VI Technical Data Package</TTL><BRK/>
<BRK/>
<TXT>The Group VI Technical Data Package shall consist of the as-built drawings revised to include system revisions 
and modifications.  Copies of the updated as-built drawings shall be delivered to the Government following approval 
of the PVT and endurance test.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5   ENVIRONMENTAL REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select equipment and cable temperature rating within ambient temperature 
conditions at project location.  State additional requirements when ambient 
conditions are more extreme than manufacturers' equipment ratings (e.g., conformal 
coating for 100% relative humidity or condensing atmospheres, enclosure heaters 
or enclosure coolers.)</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Equipment and cable to be utilized indoors shall be rated for continuous operation under ambient environmental 
conditions of <MET>0 to 50 degrees C </MET><ENG>32 to 122 degrees F</ENG> dry bulb and 10 to 95 percent relative humidity, non-condensing.  
Equipment and cables to be used outdoors shall be rated for continuous operation under ambient environmental 
conditions of <MET>[minus 40] [minus [_____]] to plus [75] [_____] degrees C </MET><ENG>[minus 40] [minus [_____]] to plus [166] 
[_____]</ENG> and humidity of up to 100 percent condensing or as normally encountered for the installed location.  
All equipment and cable shall be rated for continuous operation under the ambient environmental temperature, 
pressure, humidity, and vibration conditions specified or normally encountered for the installed location.  Cables 
installed in ducts, plenums, and other air-handling spaces shall be installed in accordance with <RID>NFPA 70</RID>.  Cables 
installed in plenums shall be plenum-rated cables listed for the use.  Cables installed in risers shall be riser-rated 
cables listed for the use, unless the installed cable is identified as a permitted substitution for the required 
riser-rated cable type.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   EXTRA MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Submit <SUB>spare parts</SUB> data for each different item of material and equipment specified and furnished, after approval 
of detail drawings not later than [_____] months prior to the date of beneficial occupancy.  The data shall include 
a list of parts and supplies, with current unit prices and source of supply, and a list of the parts recommended 
by the manufacturer to be replaced after [1 year] [3 years] of service.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  All of the products listed in this section may not be required for every 
project.  Keep the products required and delete the others.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.1   FO MODEMS</TTL><BRK/>
<BRK/>
<TXT>FO modems shall be selected to meet FO system requirements.  The modems shall allow full duplex, asynchronous, 
point-to-point digital communication for the system being installed.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   FO Modem Operating Wavelength</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the required operating wavelength: Typically 850 and 1300 wavelengths 
are used with multimode fibers and 1300 and 1550 wavelengths are used with single-mode 
fibers.  Generally, longer wavelengths should be used for cable lengths over 
3 km (1.75 miles) because longer wavelengths exhibit less attenuation than shorter 
wavelengths.  Dense Wave Division Multiplexing (DWDM) and Coarse Wave Division 
Multiplexing (CWDM) transmitters use multiple wavelengths; the flux budget should 
be based on the wavelength with the greatest attenuation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The operating wavelength shall be centered on [850] [1300] [1550] nanometers (nm).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   FO Modem Inputs and Outputs</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Match the input and output configurations to the equipment to be interconnected.  
The data rate of the FO modem must exceed the data rate of the devices served.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>FO modems shall accept inputs and provide outputs compatible with [<RID>TIA-232-F</RID>] [<RID>TIA-485-A</RID>] [20 mA current loop] 
[T1] [10 Base-F].  Digital data rates through each link shall be [9.6 KBPS] [19.2 KBPS] [38.4 KBPS] [1.54 MBPS] 
[10 MBPS].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   FO TRANSMITTER AND RECEIVER MODULES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  There are several ways fiber optic transmitters and receivers can be 
implemented such as:<BRK/>
<BRK/>
a.  The transmitter and receiver can be mounted on a logic board.  The transmitter 
and receiver are then an integral part of the system at the logic level.<BRK/>
<BRK/>
b.  The transmitter and receiver can be individual modules which are mounted 
external to the logic boards.  They can be powered by their own power supplies 
and can communicate with the serial data ports of the logic boards at logic levels.<BRK/>
<BRK/>
c.  The fiber optics transmitter and receiver can be combined with interface 
and control logic to form a fiber optic modem.  The system field equipment can 
thus communicate with the modem over a EIA 232-F serial data port.<BRK/>
<BRK/>
The designer must determine where FO communication devices will be located.  
In many systems, FO transmitters and receivers or modems are located in the 
field equipment enclosures of the systems being supported by the FO system.  
Often, these FO devices are physically mounted on circuit cards or modules.  
In other cases, FO devices will have to be installed in separate enclosures 
provided with the FO system.  This is often the case for FO repeaters and active 
star units.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>FO transmitter/receiver pairs shall have signal-to-noise power ratio of 40 dB or better after photo detection 
at the receiver.  Transmitter power output and receiver sensitivity shall not drift more than plus or minus 2 
dB over their operational life.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Analog FO Transmitter and Receiver Modules</TTL><BRK/>
<BRK/>
<TXT>FO transmitter/receiver pairs used to pass analog video signals shall accept inputs and provide outputs that 
comply with <RID>CEA 170</RID> and shall have a bandwidth of 6 MHz or greater.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Digital FO Transmitter and Receiver Modules</TTL><BRK/>
<BRK/>
<TXT>FO transmitter/receiver pairs used to pass digital signals shall accept inputs and provide outputs compatible 
with [<RID>TIA-232-F</RID>] [<RID>TIA-485-A</RID>] [20 mA current loop] [T1] [10 Base-F].  Digital data rates through each link shall 
be [9.6 KBPS] [19.2 KBPS] [38.4 KBPS] [1.54 MBPS] [10 MBPS].  FO transmitter and receiver modules shall be housed 
[in field equipment enclosures where possible] [in new enclosures] [as shown].  FO transmitter and receiver modules 
shall be compatible with each other, the FO cable, and connectors.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   FO Transmitter Module</TTL><BRK/>
<BRK/>
<TXT>The FO transmitter module shall accept electronic signals and shall modulate a light source.  The light source 
shall be coupled into an FO cable.  The operating wavelength shall be centered on [850][1300][1550][850 and 1300][1300 
and 1550] nanometers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.4   FO Receiver Module</TTL><BRK/>
<BRK/>
<TXT>The FO receiver module shall receive light from the FO cable and shall convert this light into an electronic 
signal identical to the electronic signal applied to the FO transmitter module.  The operating wavelength shall 
be the same as the transmitter.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   FO DIGITAL REPEATERS</TTL><BRK/>
<BRK/>
<TXT>FO digital repeaters shall be used to extend the range of the FO data transmission system when necessary to meet 
the requirements of paragraph SYSTEM REQUIREMENTS.  For simplex circuits, the repeater shall consist of an FO 
receiver connected to an FO transmitter.  For Duplex circuits, the repeater shall consist of a pair of FO receivers 
that are connected to a pair of FO transmitters.  The FO receivers shall receive the optical signal and drive 
the transmitters.  The transmitters shall regenerate the optical signal at the transmission rate specified.  
The FO repeater shall be mechanically and optically compatible with the remainder of the FO system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   FO ANALOG REPEATERS</TTL><BRK/>
<BRK/>
<TXT>FO analog repeaters shall be used to extend the range of the FO data transmission system when necessary to meet 
the requirements of the paragraph SYSTEM REQUIREMENTS.  For simplex circuits, the repeater shall consist of an 
FO receiver connected to an FO transmitter.  For duplex circuits, the repeater shall consist of a pair of FO 
receivers that are connected to a pair of FO transmitters.  The FO receivers shall receive the optical signal 
and drive the transmitters.  The transmitters shall regenerate the optical signal in compliance with <RID>CEA 170</RID>.  
The FO repeater shall be mechanically and optically compatible with the remainder of the FO system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   TRANSCEIVERS FOR VIDEO APPLICATIONS</TTL><BRK/>
<BRK/>
<TXT>FO Transceivers shall allow bi-directional signal transmission on a single fiber.  The operating wavelength in 
one direction shall be 1300/850 nonometers, while in the opposite direction it shall be 850/1300 nanometers.  
Crosstalk attenuation between channels shall be 40 dB or greater.  FO transceivers shall be selected to match 
or exceed the highest data rate of attached input devices.  The FO transceiver shall be mechanically and optically 
compatible with the remainder of the FO system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   TRANSCEIVERS FOR LAN APPLICATIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer will use the transceivers for ESS or UMCS systems which use 
a LAN topology for communication.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Transceivers for FO LAN applications shall be active units, compatible with the LAN cards, modems and repeaters 
used in the system.  Indicators provided shall be for power, collision detection, receive, transmit, and status.  
Power for transceivers shall be derived from the Attachment Unit Interface (AUI) port of LAN equipment or from 
a dedicated power supply.  Transceiver loss characteristics shall be less than 1.0 db.  Connectors shall be low 
loss and compatible with LAN equipment.  Circuitry shall be included so when a device is disconnected, other 
devices on the LAN continue to operate without any disruption.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7   FO SWITCHES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer will show FO switches and designate latching or nonlatching 
on contract drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>FO switches shall be single pole, double throw.  Switching speed shall be less than 15 milliseconds.  Insertion 
loss shall be less than 1.5 dB.  Crosstalk attenuation between FO outputs shall be 40 dB or greater.  FO switches 
shall be latching or nonlatching as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8   FO SPLITTER/COMBINER</TTL><BRK/>
<BRK/>
<TXT>FO splitter/combiner units shall provide full-duplex communications in a multi-point configuration.  Each unit 
shall have one input port module and up to four output port modules.  FO splitter/combiner units shall be mechanically 
and optically compatible with the remainder of the FO system.  The splitter/combiner shall allow a mixed configuration 
of port module operating wavelengths and single-mode or multimode FO cables.  Each port module shall have a separate 
FO cable input and output.  Port modules shall be connected using an electronic data bus.  Port module FO transmitters 
shall regenerate the optical signal at the transmission rate specified.  Port modules shall be rack-mounted in 
a <MET>483 mm </MET><ENG>19 inch</ENG> rack complying with <RID>CEA-310-E</RID>.  The total propagation delay through the splitter/combiner shall 
be less than 100 nanoseconds.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9   FIBER OPTIC DIGITAL REPEATERS (FODR)</TTL><BRK/>
<BRK/>
<TXT>FODRs shall combine the features specified for Fiber Optic Digital Repeaters and Local Area Network (LAN) transceivers.  
FODRs shall regenerate the optical signal at the transmission rate specified.  The FODRs shall be mechanically 
and optically compatible with the remainder of the <SUB>Fiber Optic System</SUB>.  FODRs shall restore the optical signals 
amplitude, timing and waveform.  The FODR shall provide an electrical interface to the transmission media.  The 
electrical interface shall be identical to all other network interfaces as specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10   DATA TRANSMISSION CONVERTER</TTL><BRK/>
<BRK/>
<TXT>Data transmission converters shall be used to connect equipment using <RID>TIA-485-A</RID> data transmission when necessary 
and as shown.  Converters shall operate full duplex and support two wire circuits at speeds up to 2 megabytes 
per second and have a built in 120 Ohm terminating resistor.  Converters shall be mechanically, electrically, 
and optically compatible with the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11   ENCLOSURES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If all FO devices will be located in enclosures of other systems, then 
paragraph ENCLOSURES can be deleted.  Otherwise, paragraph ENCLOSURES must remain 
and enclosure locations must be shown on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Enclosures shall conform to the requirements of <RID>NEMA 250</RID> for the types specified.  Finish color shall be the 
manufacturer's standard, unless otherwise indicated.  Damaged surfaces shall be repaired and refinished using 
original type finish.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.11.1   Interior</TTL><BRK/>
<BRK/>
<TXT>Enclosures installed indoors shall meet the requirements of <RID>NEMA 250</RID> Type 12 or as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.2   Exterior</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For exterior applications where corrosive environments exist, Type 4X 
will be specified.  Type 4X metallic enclosures should be used for security 
applications where physical hardening is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Enclosures installed outdoors shall meet the requirements of <RID>NEMA 250</RID> Type 4 unless otherwise specified or shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.3   Corrosive Environment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show corrosive locations on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Enclosures in a corrosive environment shall meet the requirements of <RID>NEMA 250</RID>, Type 4X.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.4   Hazardous Environment</TTL><BRK/>
<BRK/>
<TXT>Enclosures in a hazardous environment shall be installed and shall meet the requirements as specified in paragraph 
ENVIRONMENTAL REQUIREMENTS.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.12   TAMPER AND PHYSICAL PROTECTION PROVISIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tamper and physical protection provisions are only required for FO system 
applications involving security systems such as IDS, ESS or CCTV.  This requirement 
should be deleted for all other applications.  Generally, security screws are 
preferred over tack welding or brazing because the enclosure surface protection 
is not damaged.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Enclosures and fittings of every description having hinged doors or removable covers that contain the FO circuits, 
connections, splices, or power supplies, shall be provided with cover-operated, corrosion-resistant tamper switches, 
arranged to initiate an alarm signal when the door or cover is moved.  Tamper switches shall be mechanically 
mounted to maximize the defeat time when enclosure covers are opened or removed.  The enclosure and the tamper 
switch shall function together to not allow direct line of sight to any internal components and tampering with 
the switch or the circuits before the switch activates.  Tamper switches shall be inaccessible until the switch 
is activated; have mounting hardware concealed so that the location of the switch cannot be observed from the 
exterior of the enclosure; be connected to circuits which are under electrical supervision at all times, irrespective 
of the protection mode in which the circuit is operating; shall be spring-loaded and held in the closed position 
by the door cover; and shall be wired so that they break the circuit when the door or cover is disturbed.  Tamper 
switches located in enclosures which must be opened to make routine maintenance adjustments to the system and 
to service the power supplies shall be push/pull-set, automatic reset type.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.12.1   Enclosure Covers</TTL><BRK/>
<BRK/>
<TXT>Covers of pull and junction boxes provided to facilitate installation of the system need not be provided with 
tamper switches if they contain no splices, connections or power supplies, but shall be protected by [security 
screws] [tack welding or brazing] to hold the covers in place.  Zinc labels shall be affixed to such boxes indicating 
they contain no connections.  These labels shall not indicate that the box is part of a security system.  Any 
damage to the enclosure or its cover's surface protection shall be cleaned and repaired using the same type of 
surface protection as the original enclosure.  Conduit enclosures constructed of fiberglass shall be secured 
with tamper proof security servers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12.2   Conduit-Enclosure Connections</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tamper and physical protection provisions are only required for FO system 
applications involving security systems such as IDS, ESS, or CCTV. Delete this 
requirement for all other applications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conduit-enclosure connections shall be protected by tack welding or brazing the conduit to the enclosure.  Tack 
welding or brazing shall be done in addition to standard conduit-enclosure connection methods as described in <RID>
NFPA 70</RID>.  Any damage to the enclosure or its cover's surface protection shall be cleaned and repaired using the 
same type of surface protection as the original enclosure.  Conduit enclosures constructed of fiberglass shall 
be secured with tamper proof security screws.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12.3   Locks and Key-Lock-Operated Switches</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Either round key or conventional key type locks as defined in this specification 
are acceptable.  Selection should be based on hardware availability at the time 
of design and the requirement for matching locks currently in use at the site.  
If the locks do not have to be matched to locks in use at the site, and the 
designer has no preference as to lock type, all brackets may be removed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.12.3.1   Locks</TTL><BRK/>
<BRK/>
<TXT>Locks required to be installed on system enclosures for maintenance purposes shall be UL listed, [round key type, 
with three dual, one mushroom, and three plain pin tumblers] [or] [conventional key type lock having a combination 
of five cylinder pin and five-point three position side bar]. Keys shall be stamped U.S. GOVT. DO NOT DUP.  The 
locks shall be so arranged that the key can only be withdrawn when in the locked position.  All maintenance locks 
shall be keyed alike and only two keys shall be furnished for all of these locks.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12.3.2   Key-Lock-Operated Switches</TTL><BRK/>
<BRK/>
<TXT>Key-lock-operated switches required to be installed on system components shall be UL listed, [with three dual, 
one mushroom, and three plain pin tumblers,] [or] [conventional key type lock having a combination of five cylinder 
pin and five-point three position side bar].  Keys shall be stamped U.S. GOVT. DO NOT DUP.  Key-lock-operated 
switches shall be two position, with the key removable in either position.  All key-lock-operated switches shall 
be keyed differently and only two keys shall be furnished for each key-lock-operated switch.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.13   SYSTEM REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.13.1   Signal Transmission Format Code</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Different FO systems may use different modulation methods and codes.  
For example, the digital signal may turn the light source on or off, it may 
use frequency shift keying, or it may cause the intensity to shift between two 
preset levels.  Likewise, the code can be the simple NRZ (non-return to zero), 
or it can be the more complex and efficient RZ (return to zero) code, such as 
the Manchester code.  The modulation method can be important to bandwidth limited 
systems since some methods required twice the bandwidth of other methods for 
transmitting the same data.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>FO equipment shall use the same transmission code format from the beginning of a circuit to the end of that circuit.  
Different transmission code formats may be used for different circuits as required to interconnect supported 
equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13.2   Flux Budget/Gain Margin</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The flux budget calculations for each FO link are used to determine if 
the gain margin designed into the link is large enough to allow for splicing 
of broken fibers and aging effects.  The flux budget is the power difference 
between the transmitter output power and the receiver input power for a given 
bit error rate.<BRK/>
<BRK/>
This power is usually measured in dBm (i.e. referenced to 1 milliwatt) and is 
an absolute measurement.  LED transmitter output power is typically between 
-10 and -18 dBm.  Positive Intrinsic Negative (PIN) receivers with pre-amplifiers 
have a power input typically between -24 and -37 dBm.  Using the flux budget, 
the link designer can determine the total losses the system links can have and 
still work properly.<BRK/>
<BRK/>
The flux budget is divided into components.  The components are the real losses 
in the system and the gain margin.  The real losses consist of all the system 
losses such as cable attenuation, coupling and splicing losses.  The gain margin 
is a reserve for future losses, such as aging and future splices.  System losses 
and the gain margin are usually measured in dB and are a relative measurement.<BRK/>
<BRK/>
The receiver dynamic range is the range of input power that can be successfully 
detected by the receiver (also referred to as the maximum and minimum optical 
input power).  The variables that can influence the flux budget include changing 
the transmitter power output, the receiver sensitivity, the imposed signal wavelength 
and system losses.  Allow 3 dB for aging and 3 dB for each cable repair for 
a total margin of not less than 6 dB. Different wavelengths exhibit different 
cable attenuation; thus for links that use DWDM or DWDM, the flux budget should 
be determined using the cable attenuation and connector losses for the wavelength 
with greater loss (which is usually the shorter wavelength).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>FO links shall have a minimum gain margin of 6 dB.  The flux budget is the difference between the transmitter 
output power and the receiver input power required for signal discrimination when both are expressed in dBm.  
The flux budget shall be equal to the sum of losses (such as insertion losses, connector and splice losses, and 
transmission losses) plus the gain margin.  When a repeater or other signal regenerating device is inserted to 
extend the length of an FO circuit, both the circuit between the transmitter and the repeater-receiver, and the 
circuit between the repeater-transmitter and the receiver are considered independent FO links for gain margin 
calculations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13.3   Receiver Dynamic Range</TTL><BRK/>
<BRK/>
<TXT>The dynamic range of receivers shall be large enough to accommodate both the worst-case, minimum receiver flux 
density and the maximum possible, receiver flux density.  The receiver dynamic range shall be at least 15 dB.  
Where required, optical attenuators shall be used to force the FO link power to fall within the receiver dynamic 
range.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.14   OPTICAL FIBERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  FO systems use one or two fibers for each full duplex FO link.  In the 
two-fiber links data flows only in one direction in each fiber.  DWM and CWM 
systems often use one fiber for each full duplex FO link in which differing 
wavelenghts travel in opposite directions on one fiber.  In some cases, such 
as sending sync and receiving video from long distances, bi-directional transmission 
on one fiber is desired.  Shorter wavelenghts generally have greater attenuation; 
loss budgets should be based on the wavelength with the greater attenuation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.14.1   General</TTL><BRK/>
<BRK/>
<TXT>Optical fibers shall be coated with a suitable material to preserve the intrinsic strength of the glass.  The 
outside diameter of the glass-cladded fiber shall be nominally 125 microns, and shall be concentric with the 
fiber core.  Optical fibers shall meet <RID>TIA-455-46A</RID>, and <RID>TIA-455-177-B</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14.2   50 Micron Multimode Fibers</TTL><BRK/>
<BRK/>
<TXT>Conductors shall be multimode, graded index, solid glass waveguides with a nominal core diameter of 50 microns.  
The fiber shall have transmission windows centered at 850 and 1300 nanometer wavelengths.  The numerical aperture 
for each fiber shall be a minimum of 0.20.  The attenuation at 850 nanometers shall be 3.5 dB/Km or less.  The 
attenuation at 1300 nanometers shall be 1.5 dB/Km or less.  The minimum bandwidth shall be 500 MHz-Km at both 
transmission windows.  The fibers shall be certified to meet <RID>TIA TIA/EIA-455-204</RID> and <RID>TIA-455-58-B</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14.3   62.5 Micron Multimode Fibers</TTL><BRK/>
<BRK/>
<TXT>Conductors shall be multimode, graded index, solid glass waveguides with a nominal core diameter of 62.5 microns.  
The fiber shall have transmission windows centered at 850 and 1300 nanometer wavelengths.  The numerical aperture 
for each fiber shall be a minimum of 0.275.  The attenuation at 850 nanometers shall be 3.5 dB/Km or less.  The 
attenuation at 1300 nanometers shall be 1.5 dB/Km or less.  The minimum bandwidth shall be 160 MHz-Km at 850 
nanometers and 500 MHz-Km at 1300 nanometers.  FO cable shall be certified to meet <RID>TIA TIA/EIA-455-204</RID> and <RID>TIA-455-58-B</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14.4   8.3 Micron Single-Mode Fibers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Single-mode FO DTS offer larger bandwidth, and lesser attenuation, usually 
at greater system cost than multimode FO DTS.  Single-mode FO DTS will only 
be used when the designer determines that large bandwidth or low attenuation 
links warrant the single-mode FO DTS.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conductors shall be single-mode, solid glass waveguides with a nominal core diameter of 8.3 microns.  The fiber 
shall have a transmission windows centered at 1310 and 1550 nanometer wavelengths.  The numerical aperture for 
each optical fiber shall be a minimum of 0.10.  The attenuation for inside cable at 1310 and 1550 nanometers 
shall be 1.0 dB/Km or less.  The attenuation for outside cable at 1310 and 1550 nanometers shall be 0.5 dB/Km 
or less.  The fibers shall be certified to meet <RID>EIA/TIA-455-170</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.15   CROSS-CONNECTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.15.1   Patch Panels</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show cross-connect or interconnect configuration on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Patch panels shall be a complete system of components by a single manufacturer, and shall provide termination, 
splice storage, routing, radius limiting, cable fastening, storage, and cross-connection.  Patch panel connectors 
and couplers shall be the same type and configuration as used elsewhere in the system.  Patch panels shall be 
[a <MET>480 mm </MET><ENG>19 inch</ENG> rack mount type] [wall mounted] [as shown].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.15.2   Patch Cords</TTL><BRK/>
<BRK/>
<TXT>Patch cords shall be cable assemblies consisting of factory connector-terminated flexible optical fiber cable 
with connectors of the same type as used elsewhere in the system.  Optical fiber shall be the same type as used 
elsewhere in the system.  Patch cords shall be complete assemblies from manufacturer's standard products.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.16   CABLE ASSEMBLY</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Either tight-buffer or loose-tube cable construction can be used.  The 
loose tube construction is more appropriate where the cable is subject to thermal 
expansion.  This would include outdoor aerial and long distance runs over 1 
Km (0.62 mile).  In multistory buildings or locations where the cable is installed 
vertically and will not experience significant temperature variations, use tight-buffer 
cables.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.16.1   General</TTL><BRK/>
<BRK/>
<TXT>The cable shall contain a minimum of two fiber optic fibers for each link circuit.  The number of fibers in each 
cable shall be [_____] [as shown].  Each fiber shall be protected by a protective tube.  Cables shall have a 
jacketed strength member, and an exterior jacket.  Cable and fiber protective covering shall be free from holes, 
splits, blisters, and other imperfections.  All interior cables' insulation and jacketing material shall not 
contain any poly vinyl chloride (PVC) compounds.  The covering shall be flame retardant, moisture resistant, 
non-nutrient to fungus, ultraviolet light resistant as specified and nontoxic.  Mechanical stress present in 
cable shall not be transmitted to the optical fibers.  Strength members shall be non-metallic and shall be an 
integral part of the cable construction.  The combined strength of all the strength members shall be sufficient 
to support the stress of installation and to protect the cable in service.  The exterior cables shall have a 
minimum storage temperature range of <MET>minus 40 to plus 75 degrees C </MET><ENG>minus 104 to plus 167 degrees F</ENG>.  Interior 
cables shall have a minimum storage temperature of <MET>minus 10 to plus 75 degrees C </MET><ENG>plus 14 to plus 167 degrees 
F</ENG>.  All optical fiber cables and all optical fiber raceways furnished shall meet the requirement of <RID>NFPA 70</RID>.  
Fire resistant characteristics of optical fiber cables and optical fiber raceways shall conform to Article 770, 
Sections 49, 50, and 51.  A flooding compound shall be applied into the interior of the fiber tubes, into the 
interstitial spaces between the tubes, to the core covering, and between the core covering and jacket of all 
cable to be installed aerially, underground, and in locations susceptible to moisture.  Flooded cables shall 
comply with <RID>TIA/EIA-455-81B</RID> and <RID>TIA-455-82B</RID>.  Cables shall be from the same manufacturer, of the same cable type, 
of the same size, and of the same optical characteristics.  Each fiber and protective coverings shall be continuous 
with no factory splices.  Fiber optic cable assemblies, including jacketing and fibers, shall be certified by 
the manufacturer to have a minimum life of 30 years.  Cables shall meet <RID>UL 1666</RID>.  FO cable shall be certified 
to meet the following:  <RID>TIA-455-13-A</RID>, <RID>TIA/EIA-455-25C</RID>, <RID>TIA/EIA-455-41A</RID>, <RID>TIA-455-47B</RID>, <RID>TIA-455-78</RID>, <RID>TIA/EIA-455-88</RID>
, <RID>TIA-455-91</RID>, <RID>TIA-455-104-A</RID>, and <RID>TIA/EIA-455-171-A</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.2   Exterior Cable</TTL><BRK/>
<BRK/>
<SPT><TTL>2.16.2.1   Aerial Cable</TTL><BRK/>
<BRK/>
<TXT>The optical fibers shall be surrounded by a tube buffer, shall be contained in a channel or otherwise loosely 
packaged to provide clearance between the fibers and inside of the container, and shall be extruded from a material 
having a coefficient of friction sufficiently low to allow the fiber free movement.</TXT><BRK/>
<BRK/>
<LST>a. The cable outer jacket shall be medium density polyethylene material containing at least 2.6 percent 
carbon black with only black pigment added for additional coloring.</LST><BRK/>
<BRK/>
<LST>b. Tensile strength:  Cables shall withstand an installation tensile load of not less than <MET>2700 Newtons </MET><ENG>
608 pounds</ENG> and not less than <MET>600 Newtons </MET><ENG>135 pounds</ENG> continuous tensile load.</LST><BRK/>
<BRK/>
<LST>c. Impact and Crush resistance:  The cables shall withstand an impact of <MET>3 Newton-meters </MET><ENG>1.7 lbs/in</ENG> as 
a minimum, and shall have a crush resistance of <MET>220 Newtons per square centimeter </MET><ENG>317 psi</ENG> as a minimum.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.2.2   Duct Cable</TTL><BRK/>
<BRK/>
<TXT>The optical fibers shall be surrounded by a tube buffer, shall be contained in a channel or otherwise loosely 
packaged to provide clearance between the fibers and inside of the container, and shall be extruded from a material 
having a coefficient of friction sufficiently low to allow the fiber free movement.</TXT><BRK/>
<BRK/>
<LST>a. The cable outer jacket shall be medium density polyethylene material with orange pigment added for 
ease of identification.</LST><BRK/>
<BRK/>
<LST>b. Tensile strength:  Cables shall withstand an installation tensile load of not less than <MET>2700 Newtons </MET><ENG>
608 pounds</ENG> and not less than <MET>600 Newtons </MET><ENG>135 pounds</ENG> continuous tensile load.</LST><BRK/>
<BRK/>
<LST>c. Impact and Crush resistance:  The cables shall withstand an impact of <MET>3 Newton-meters </MET><ENG>1.7 lbs/in</ENG> as 
a minimum, and shall have a crush resistance of <MET>220 Newtons per square centimeter </MET><ENG>317 psi</ENG> as a minimum.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.2.3   Direct Burial Cable</TTL><BRK/>
<BRK/>
<TXT>The optical fibers shall be surrounded by a tube buffer, shall be contained in a channel or otherwise loosely 
packaged to provide clearance between the fibers and inside of the container, and shall be extruded from a material 
having a coefficient of friction sufficiently low to allow the fiber free movement.</TXT><BRK/>
<BRK/>
<LST>a. The cable outer jacket shall be medium density polyethylene material containing at least 2.6 percent 
carbon black with only black pigment added for additional coloring.</LST><BRK/>
<BRK/>
<LST>b. Tensile strength:  Cables shall withstand an installation tensile load of not less than <MET>2700 Newtons </MET><ENG>
608 pounds</ENG> and not less than <MET>600 Newtons </MET><ENG>135 pounds</ENG> continuous tensile load.</LST><BRK/>
<BRK/>
<LST>c. Impact and Crush resistance:  The cables shall withstand an impact of <MET>3 Newton-meters </MET><ENG>1.7 lbs/in</ENG> as 
a minimum, and shall have a crush resistance of <MET>220 Newtons per square centimeter </MET><ENG>317 psi</ENG> as a minimum.</LST><BRK/>
<BRK/>
<LST>d. Direct burial cable shall be protected with plastic coated steel armor.  The plastic coated steel 
armor shall be applied longitudinally directly over an inner jacket and have an overlap of <MET>5 mm </MET><ENG>0.20 
inch</ENG> minimum. Armoring materials shall provide corrosion protection from local environmental/soil conditions 
over the projected life of the cable.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.16.3   Interior Cable</TTL><BRK/>
<BRK/>
<LST>a. Loose buffer tube cable construction shall be such that the optical fibers shall be surrounded by 
a tube buffer, and shall be contained in a channel or otherwise loosely packaged to provide clearance 
between the fibers and the inside of the container to allow for thermal expansions without constraining 
the fiber.  The protective container shall be extruded from a material having a coefficient of friction 
sufficiently low to allow the fiber free movement.  The cable outer jacket shall be fluorocopolymer (FCP), 
which complies with <RID>NFPA 70</RID> for optical fiber nonconductive plenum (OFNP) applications.  Manufacturers' 
recommended values for tensile strength, impact resistance, and crush resistance shall not be exceeded.  
Interior cables' insulation and jacketing material shall not contain any poly vinyl chloride (PVC) compounds.</LST><BRK/>
<BRK/>
<LST>b. Tight buffer tube cable construction shall be extrusion of plastic over each cladded fiber, with an 
outer jacket of FCP, which complies with <RID>NFPA 70</RID> for optical fiber nonconductive riser (OFNR) requirements 
for riser cables and vertical shaft installations.  Optical fibers shall be covered in near contact with 
an extrusion tube and shall have an intermediate soft buffer to allow for the thermal expansions and 
minor pressures.  Manufacturers' recommended values for tensile strength, impact resistance, and crush 
resistance shall not be exceeded. Interior cables' insulation and jacketing material shall not contain 
any poly vinyl chloride (PVC) compounds.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.4   Pigtail Cables</TTL><BRK/>
<BRK/>
<TXT>Cable used for connections to equipment shall be flexible fiber pigtail cables having the same physical and operational 
characteristics as the parent cable.  The cable jacket shall be FCP, which complies with <RID>NFPA 70</RID> for OFNP applications.  
Maximum dB loss for pigtail cable shall be 3.5 dB/km at 850 nanometers, and 1.0 dB/km at 1300 nanometers, and 
[_____] dB/Km at 1550 nanometers.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.17   FO CONNECTORS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Available FO connector types include, but are not limited to, FC, SC, 
Duplex SE (568SC), ST, Duplex ST, LC, Duplex LC, ESCON, FDDI, and MT-RJ.  Equipment 
manufacturers may offer both a manufacturer's standard termination connector 
type and also an optional termination connector type or types as available on 
a specific equipment component, whereas some equipment may only be available 
with one termination connector type (as an example, one manufacturer offers 
a choice of either ST, SC, or FC connectors on a specific FO transceiver).<BRK/>
<BRK/>
For equipment additions to existing installation, the installed base of legacy 
systems may suggest use of a certain type of connector be continued and to be 
used for new equipment.  Alternatively, use of hybrid adapters or hybrid cables, 
will allow the use of cables with different connector types on opposite cable 
ends to permit the cable connectors to be compatible with the equipment termination 
connectors.  Connectors with a pull-proof feature are preferable, especially 
for patch cords.<BRK/>
<BRK/>
Nominal and maximum connector pair losses vary by connector type, by manufacturer, 
and by cable type (e.g., multimode or single mode).  Nominal connector pair 
loss of 0.3 dB, and maximum connector pair loss of 0.5 dB are common for older 
types of FO connectors.  Small form factor types and newer connector types may 
offer lesser nominal and lesser maximum loss value.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>FO connectors shall be field installable, self-aligning and centering.  FO connectors shall match the fiber core 
and cladding diameters.  Provide FO cable connectors at field equipment [of the type to match the field equipment 
connectors] [of type [_____]] [as shown].  Provide FO connectors at terminal head end equipment [of the type 
to match terminal head equipment connectors] [of type [_____]] [as shown].  Connector insertion loss shall be 
nominally 0.3 dB and maximum loss shall be less than 0.7 dB.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18   MECHANICAL SPLICES</TTL><BRK/>
<BRK/>
<TXT>Mechanical splices shall be suitable for installation in the field.  External power sources shall not be required 
to complete a mechanical splice.  Mechanical splices shall be self-aligning for optimum signal coupling.  Mechanical 
splices shall not be used for exterior applications where they may be buried underground or laced to aerial messenger 
cables.  Mechanical splices may be used for interior locations and within enclosures.  Splice closures shall 
protect the spliced fibers from moisture and shall prevent physical damage.  The splice closure shall provide 
strain relief for the cable and the fibers at the splice points.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19   FUSION SPLICES</TTL><BRK/>
<BRK/>
<TXT>The fusion splicer shall be portable, fully automatic, and compact.  It shall be suitable for fusion splicing 
all types of telecommunication grade optical fibers and individual fibers as well as cables containing multiple 
optical fibers.  The fusion splicer shall be capable of operation under various environmental conditions (e.g., 
temperature, humidity, altitude, etc.) for all types of optical cable deployments.  The fusion splicer shall 
be craft friendly and operation shall require only minimal training.  Automatic splicing software shall be available 
to remove operator and environmental dependence from the splicing process.  The controls of the fusion splicer 
shall be designed in accordance with ergonomic considerations.  The automatic splicing process shall be started 
by pressing one button and can be interrupted at any time.  Alternatively, semi-automatic (step-by-step) or manual 
splicing shall be available by menu selection.  Communication with the fusion splicer shall be conducted through 
a language unspecific keyboard with universal symbols and the dialogue with the splicer shall be displayed on 
the device screen.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20   CONDUIT, FITTINGS AND ENCLOSURES</TTL><BRK/>
<BRK/>
<TXT>Conduit, fittings, and enclosures shall be as specified in Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM, and 
as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.21   FAN-OUT KITS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Fan-out kits (also referred to as providing buffer tube fan-out kits, 
or furcating harnesses, or furcation kits, or installing furcating tubes) will 
be provided for terminating all loose-tube optical fibers (i.e., optical fibers 
with 250 micron outside diameter) and will additionally incorporate strain relief 
if the connectorization is not contained within a patch panel.  Fan-out kits 
with furcating tubes are typically not used for tight-buffered (e.g., 900 micron 
outside diameter) optical fibers which have the connectorization contained within 
a patch panel.  Fan-out kits with strain relief furcating tubes are appropriate 
for field connectorization of tight-buffered optical fibers when the termination 
is not contained within a patch panel.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>For all loose-tube optical fibers, furnish and install fan-out kits using furcating tubes for connectorization.  
Loose-tube optical fiber furcating tubes shall incorporate strain relief if the connectorization is not contained 
within a protective enclosure such as a patch panel.  For tight-buffered optical fibers, furnish and install 
fan-out kits using furcating tubes and which incorporate strain relief, if the connectorization is not contained 
within a protective enclosure such as a patch panel.  Furcating tubes required to incorporate strain relief shall 
provide increased pullout protection and shall be comprised of an inner tube, surrounded by a layer of nonconductive 
strength members, then surrounded by an enclosing outer jacket layer.  [Fan-out kits shall be color coded to 
match the industry fiber color scheme.] Length of furcating tube shall be <MET>[610] [915] mm </MET><ENG>[24] [36] inches</ENG> minimum 
when installation is complete.  Fan-out kits shall be rated for the ambient conditions of the location in which 
installed as specified in paragraph Environmental Requirements.  Provide terminations for each fiber, regardless 
whether fiber is active or spare.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   <SUB>INSTALLATION</SUB></TTL><BRK/>
<BRK/>
<TXT>System components and appurtenances shall be installed in accordance with the <SUB>manufacturer's instructions</SUB> and 
as shown.  Interconnections, services, and adjustments required for a complete and operable data transmission 
system shall be provided.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Interior Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  DTS cable should not be used for, or routed through, Sensitive Compartmented 
Information Facilities (SCIFs).  The designer will not show any DTS cable routed 
through a SCIF.  The designer should check DCID 1/21 for further direction.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conduits, tubing and cable trays for interior FO cable shall be installed as specified in Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM and as shown.  Cable installation and applications shall meet the requirements of <RID>NFPA 70</RID>
, Article 770, Sections 52 and 53.  Cables not installed in conduits or wireways shall be properly supported, 
secured, and neat in appearance, and if installed in plenums or other spaces used for environmental air, shall 
comply with <RID>NFPA 70</RID> requirements for this type of installation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Exterior Work, Aerial</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Aerial cable should be installed on existing poles where height, clearance, 
and structure loading allow addition of cables.  Where this is not possible, 
requirements for new poles must be shown on drawings.  Installations will comply 
with IEEE C2 for Grade B construction and NFPA 70.  Designer must coordinate 
with facility personnel for ground clearance and establish clearances to be 
shown on the drawings.<BRK/>
<BRK/>
The designer will verify local electrical installation requirements to determine 
if new grounding conductors and electrodes are required at each messenger cable 
ground connection and will select the first, or second, or both bracketed entries 
as determined to be necessary.<BRK/>
<BRK/>
Common lashing machines provide 1 turn per 380 linear mm (1 turn per 15 linear 
inches) in a single pass, which is acceptable for locations where loading due 
to weather conditions is moderate.  Other locations may require multiple passes 
with the lashing machine.<BRK/>
<BRK/>
Percent values stated below for messenger rated breaking strength are based 
upon overload factors that apply to Grade B construction.  If the aerial electrical 
distribution system construction is a lesser grade (e.g., Grade C, Grade N, 
or not graded) differing values will be provided by the designer in accordance 
with NESC and actual requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified, poles and associated aerial hardware for an overhead FO cable system shall be 
installed as specified in Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION, as specified herein, and as 
shown.</TXT><BRK/>
<BRK/>
<LST>a. A messenger system meeting the requirements of <RID>IEEE C2</RID> to support aerial cables shall be furnished 
and installed.  The messenger system shall include all messenger support and attachment hardware and 
appurtenances needed to install the messenger.  Messenger tension due to combined ice and wind loading 
on the messenger with supported cables shall not exceed 60 percent of the messenger rated breaking strength.  
Messenger tension due to extreme wind loading on the messenger with supported cables shall not exceed 
80 percent of the messenger rated breaking strength.  Messenger support and attachment hardware shall 
have rated strength not less than the messenger rated breaking strength.  All messenger support and attachment 
hardware and appurtenances shall be sized to exceed the rated breaking strength of the messenger cable.  
Messenger cables shall be galvanized zinc coated steel or aluminum clad steel.</LST><BRK/>
<BRK/>
<LST>b. The messenger cables shall be grounded at all corners, dead ends, at the entrance to each facility, 
and at intervals not exceeding <MET>305 meters </MET><ENG>1000 feet</ENG>.  [New grounding conductors and electrodes shall 
be provided at each ground connection.]  [Where grounding connections are made in the vicinity of existing 
grounding conductors and electrodes, the grounding connection may be made by a bolted or welded connection 
to the existing grounding conductor.]</LST><BRK/>
<BRK/>
<LST>c. Aerial FO cables shall meet the horizontal, vertical and climbing space clearances prescribed in <RID>IEEE C2</RID>
 and those of the installation.</LST><BRK/>
<BRK/>
<LST>d. Transitions from aerial cable to underground cable shall be as specified in paragraph  CONNECTIONS 
BETWEEN AERIAL AND UNDERGROUND SYSTEMS in Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION and 
as shown.</LST><BRK/>
<BRK/>
<LST>e. Splices in aerial cable shall be within <MET>1 meter </MET><ENG>3 feet</ENG> of a pole and placed inside a watertight enclosure.  
Drip loops shall be formed at the cable entrance to the enclosure.  Lashing clamps shall be placed within <MET>
300 mm </MET><ENG>12 inches</ENG> of the enclosure.</LST><BRK/>
<BRK/>
<LST>f. Loops shall be formed in the aerial cables at points of connection and at poles to prevent damage 
from thermal stress and wind loading.  The communications cable shall be protected from chafing and physical 
damage with the use of spiral cut tubing and PVC tape, or plastic sleeves.  The ground clearance of installed 
cabling shall be as shown.</LST><BRK/>
<BRK/>
<LST>g. Cable shall be run vertically and when possible shall use gravity to assist in cable pulling.  Cable 
shall be pulled from top of run to bottom of run.  Cable shall be hand pull if possible.  If machine 
assistance is required, tension shall be monitored using dynamometers or load-cell instruments and shall 
not exceed specified cable tension limits.  After installation, the vertical tension on the cable shall 
be relieved at maximum intervals of <MET>30 meters </MET><ENG>100 feet</ENG> using a split support grip.</LST><BRK/>
<BRK/>
<LST>h. Lashing wire shall be wound tightly around both the communication cable and the messenger cable by 
machine methods.  The lashing wire shall have a minimum of <MET>1 turn per 380 linear mm</MET><ENG>1 turn per 15 linear 
inches</ENG> and not less than the number of turns per unit length that is recommended by the cable manufacturer 
for the distance between cable support points and the combined ice and wind loading and extreme wind 
loading specified or normally encountered loading for the installed location.  Lashing clamps shall be 
placed at all poles and splices.</LST><BRK/>
<BRK/>
<LST>i. Ground conductors shall be soft drawn copper, having a current capacity of at least 20 percent of 
that of the messenger to which it is connected.  Ground conductors shall not be smaller than No. 6 AWG.  
The ground conductor shall be connected to a copper or copper clad steel ground rod not less than <MET>19.1 
mm </MET><ENG>3/4 inch</ENG> in diameter, and length shall be as needed to achieve the specified ground resistance.  After 
installation is completed, the top of the ground rod shall be approximately <MET>300 mm </MET><ENG>1 foot</ENG>) below finished 
grade.  The ground conductor shall be protected by half-round wood, plastic, or fiber molding from the 
ground to a point at least <MET>2.4 m </MET><ENG>8 feet</ENG> above the ground.  Ground resistance shall be measured in normally 
dry conditions, not less than 48 hours after a rainfall, and the total ground resistance shall not exceed 
[25] [_____] ohms.</LST><BRK/>
<BRK/>
<LST>j. Design Parameters</LST><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will include the data listing the loading conditions, including 
radial thickness of ice, horizontal wind pressure, and temperature, for both 
combined ice and wind loading and extreme wind loading encountered at the project 
site.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>The ice and wind loading conditions to be encountered at this installation are as follows:</LST><BRK/>
<BRK/>
<ITM>aa.  Combined ice and wind loading:</ITM><BRK/>
<BRK/>
<ITM>  (1) Radical thickness of ice [_____] <MET>mm </MET><ENG>in</ENG></ITM><BRK/>
<ITM>  (2) Horizontal wind pressure [_____] <MET>Pa </MET><ENG>psf</ENG></ITM><BRK/>
<ITM>  (3) Temperature [_____] <MET>degrees C </MET><ENG>degrees F</ENG></ITM><BRK/>
<ITM>  (4) Constant to be added to the resultant [_____] <MET>N/m </MET><ENG>lb/ft</ENG></ITM><BRK/>
<BRK/>
<ITM>bb.  Extreme wind loading:</ITM><BRK/>
<BRK/>
<ITM>  (1) Velocity pressure exposure coefficient, wire [_____]</ITM><BRK/>
<ITM>  (2) Basic wind speed [_____] <MET>m/s </MET><ENG>mi/h</ENG></ITM><BRK/>
<ITM>  (3) Temperature <MET>15 degrees C </MET><ENG>60 degrees F</ENG></ITM><BRK/>
<ITM>  (4) Gust response factor, wire [1.0] [_____]</ITM><BRK/>
<ITM>  (5) Importance factor [1.0] [_____]</ITM><BRK/>
<ITM>  (6) Shape factor [1.0] [_____]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Exterior Work Underground</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For UMCS ESS or IDS projects, the designer will provide transition details 
in the drawings based on the details shown in UMCS/EMCS or IDS Typical Drawings 
and/or Standards installation Details.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except as otherwise specified, conduits, ducts, and manholes for underground FO cable systems shall be installed 
as specified in Section <SRF>33 70 02.00 10</SRF> ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND and as shown.</TXT><BRK/>
<BRK/>
<LST>a. Minimum burial depth for cable shall be <MET>760 mm </MET><ENG>30 inches</ENG>, but not less than the depth of the frost 
line.  Burial depth specified shall take precedence over any requirements specified elsewhere.</LST><BRK/>
<BRK/>
<LST>b. Where direct burial cable will pass under sidewalks, roads, or other paved areas, the cable shall 
be placed in a <MET>25 mm </MET><ENG>1 inch</ENG> zinc-coated rigid coated conduit or larger as required to limit conduit fill 
to 80 percent or less.  Conduit may be installed by jacking or trenching, as approved.</LST><BRK/>
<BRK/>
<LST>c. Buried cables shall be placed below a plastic warning tape buried in the same trench or slot.  The 
warning tape shall be <MET>300 mm </MET><ENG>12 inches</ENG> above the cable.  The warning tape shall be continuously imprinted 
with the words "WARNING - COMMUNICATIONS CABLE BELOW" at not more than <MET>1.2 m </MET><ENG>48 inch</ENG> intervals.  The 
warning tape shall be acid and alkali resistant polyethylene film, <MET>76.2 mm </MET><ENG>3 inches</ENG> wide with a minimum 
thickness of <MET>0.1 mm </MET><ENG>0.004 inch</ENG>.  Warning tape shall have a minimum strength of <MET>12066 kPa </MET><ENG>1750 psi</ENG> lengthwise 
and <MET>10342 kPa </MET><ENG>1500 psi</ENG> crosswise.</LST><BRK/>
<BRK/>
<LST>d. Transitions from underground cable to aerial cable shall be as specified in paragraph CONNECTIONS 
BETWEEN AERIAL AND UNDERGROUND SYSTEMS in Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION and 
as shown.</LST><BRK/>
<BRK/>
<LST>e. For cables installed in ducts and conduit, a cable lubricant compatible with the cable sheathing material 
shall be used on all cables pulled.  Pulling fixtures shall be attached to the cable strength members.  
If indirect attachments are used, the grip diameter and length shall be matched to the cable diameter 
and characteristics.  If an indirect attachment is used on cables having only central strength members, 
the pulling forces shall be reduced to ensure that the fibers are not damaged from forces being transmitted 
to the strength member.  During pulling the cable pull line tension shall be continuously monitored using 
dynamometers or load-cell instruments, and shall not exceed the maximum tension specified by the cable 
manufacturer.  The mechanical stress placed upon the cable during installation shall be such that the 
cable is not twisted or stretched.  A cable feeder guide shall be used between the cable reel and the 
face of the duct or conduit to protect the cable and guide it into the duct or conduit as it is unspooled 
from the reel.  As the cable is unspooled from the reel, it shall be inspected for jacket defects or 
damage.  The cable shall not be kinked or crushed and the minimum bend radius of the cable shall not 
be exceeded during installation.  Cable shall be hand fed and guided through each manhole and additional 
lubricant shall be applied at all intermediate manholes.  When practicable, the center pulling technique 
shall be used to lower pulling tension.  That is, the cable shall be pulled from the center point of 
the cable run towards the end termination points.  The method may require the cable to be pulled in successive 
pulls.  If the cable is pulled out of a junction box or manhole the cable shall be protected from dirt 
and moisture by laying the cable on a ground covering.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Service Loops</TTL><BRK/>
<BRK/>
<TXT>Each fiber optic cable shall have service loops of not less than <MET>3 meters </MET><ENG>9.8 feet</ENG> in length at each end.  The 
service loops shall be housed in a service loop enclosure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Metallic Sheath Grounding</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Direct burial cables with metallic sheath will not be installed when 
transmission of electromagnetic interference (EMI) or radio frequency interference 
(RFI) through the metallic sheath is a consideration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fiber optic cable with metallic sheath that enter buildings shall be grounded at a point as close as practical 
to the building point of entrance.  Fiber optic cable with metallic sheath routed in the trench with a power 
cable shall have the metallic sheath grounded at the cable termination points.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.6   Splices</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Maximum splice loss values per ANSI/TIA/EIA-568B are 0.3 dB for fusion 
splices, and 0.3 dB for mechanical splices.  These maximum loss values are considered 
larger loss values than can be provided by many manufacturers and installers.  
The designer will specify lesser loss values when the design and link loss budget 
require lesser values.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.1.6.1   General</TTL><BRK/>
<BRK/>
<TXT>No splices will be permitted unless the length of cable being installed exceeds the maximum standard cable length 
available from a manufacturer or unless fiber optic pigtails are used to connect transmitters, receivers, or 
other system components for terminations to the fiber.  Splices shall be made using the method recommended by 
the cable manufacturer.  Splices shall be housed in a splice enclosure and shall be encapsulated with an epoxy, 
ultraviolet light cured splice encapsulant or otherwise protected against infiltration of moisture or contaminants.  
FO splices shall be field tested at the time of splicing.  Fusion splices shall have nominal splice loss of [0.15] 
[_____] dB for multimode and for single mode cable fusion splices and shall have maximum fusion splice loss not 
more than 0.3 dB loss.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.6.2   Mechanical Splices</TTL><BRK/>
<BRK/>
<TXT>Mechanical splices shall have nominal splice loss of [0.15] [_____] for multimode fiber mechanical splices and 
[0.2] [_____] dB for single mode fiber mechanical splices and shall have maximum mechanical splice loss not more 
than [0.3] [_____] dB loss for multimode and for single mode fiber mechanical splices.  There shall be no more 
than 1 splice per <MET>km </MET><ENG>0.62 mile</ENG> in any of the FO cables excluding terminations.  Field splices shall be located 
in cable boxes.  Sufficient cable shall be provided in each splicing location to properly rack and splice the 
cables, and to provide extra cable for additional splices.  Cable ends shall be protected with end caps except 
during actual splicing.  During the splicing operations, means shall be provided to protect the unspliced portions 
of the cable and its fibers from the intrusion of moisture and other foreign matter.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.7   Connectors</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Maximum connector pair losses per ANSI/TIA/EIA-568B are provided in the 
first bracketed entry and are considered larger than connector pair losses that 
can be achieved by many manufacturers and installers.  The designer will specify 
lesser loss values when the design and link loss budget requires lesser values.  
The designer will confirm with two manufacturers minimum, that the lesser connector 
pair loss value can be achieved for the connector type and fiber (i.e., multimode 
or single mode) type.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prior to and during installation of connectors, appropriate cleaning should be performed to ensure that any contaminant 
particulates larger than 0.06 micron in size are removed.  Connectors shall be as specified in paragraph FO CONNECTORS.  
Connectors or splices which leave residue on the connector ferrule or optical connector "lens", are not permitted.  
Fibers at each end of the cable shall have jumpers or pigtails installed of not less than <MET>1 meter </MET><ENG>3 feet</ENG> in length.  
Fibers at both ends of the cable shall have connectors installed on the jumpers.  The mated connector pair loss 
shall not exceed [0.75] [_____] dB.  The pull strength between the connector and the attached fiber shall not 
be less than <MET>22.7 kg </MET><ENG>50 pounds</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.8   Identification and Labeling</TTL><BRK/>
<BRK/>
<TXT>Identification tags or labels shall be provided for each cable.  Markers, tags and labels shall use indelible 
ink or etching which will not fade in sunlight, or in buried or underground applications.  Markers, tags, and 
labels shall not become brittle or deteriorate for a period of 20 years due to moisture, sunlight, soil minerals, 
chemicals or other environmental elements.  Label all termination blocks and panels with cable number or pair 
identifier for cables in accordance with <RID>TIA/EIA-606-A</RID> and as specified.  The labeling format shall be identified 
and a complete record shall be provided to the Government with the final documentation.  Each cable shall be 
identified with type of signal being carried and termination points.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.9   Enclosure Sizing and Cable</TTL><BRK/>
<BRK/>
<TXT>Termination enclosures shall be sized to accommodate the FO equipment to be installed.  Sizing shall include 
sufficient space for service loops to be provided and to accommodate a neat, workmanlike layout of equipment 
and the bend radii of fibers and cables terminated inside the enclosure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.10   Enclosure Penetrations</TTL><BRK/>
<BRK/>
<TXT>Enclosure penetrations shall be from the bottom and shall be sealed with rubber silicone sealant to preclude 
the entry of water.  Conduits rising from underground shall be internally sealed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   TRAINING</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   General</TTL><BRK/>
<BRK/>
<TXT>Conduct a training course for designated personnel in the maintenance of the FO system.  The training shall be 
oriented to the specific system being installed under this specification.  Furnish training materials and supplies.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   <SUB>System Maintenance Course</SUB></TTL><BRK/>
<BRK/>
<TXT>The system maintenance course shall be taught at the project site after completion of the endurance test for 
a period of 1 training day.  A maximum of five personnel designated by the Government will attend the course.  
A training day shall be 8 hours of classroom or lab instruction, including two 15 minute breaks and excluding 
lunchtime during the daytime shift in effect at the facility.  Training shall include:</TXT><BRK/>
<BRK/>
<LST>a. Physical layout of the system and each piece of hardware.</LST><BRK/>
<BRK/>
<LST>b. Troubleshooting and diagnostics procedures.</LST><BRK/>
<BRK/>
<LST>c. Repair instructions.</LST><BRK/>
<BRK/>
<LST>d. Preventative maintenance procedures and schedules.</LST><BRK/>
<BRK/>
<LST>e. Calibration procedures.  Upon completion of this course, the students shall be fully proficient in 
the maintenance of the system.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   TESTING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insert the title of the appropriate system specification (such as UMCS, 
IDS, ESS or CCTV).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.3.1   General</TTL><BRK/>
<BRK/>
<TXT>Provide personnel, equipment, instrumentation, and supplies necessary to perform testing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Contractor's Field Test</TTL><BRK/>
<BRK/>
<TXT>Verify the complete operation of the data transmission system in conjunction with field testing associated with 
systems supported by the fiber optic data transmission system as specified in Section [_____] prior to formal 
acceptance testing.  Field tests shall include a flux density test.  These tests shall be performed on each link 
and repeated from the opposite end of each link.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.2.1   Optical Time Domain Reflectometer Tests</TTL><BRK/>
<BRK/>
<TXT>Optical time domain reflectometer tests shall be performed using the FO test procedures of <RID>TIA-455-78</RID>.  An optical 
time domain reflectometer test shall be performed on all fibers of the FO cable on the reel prior to installation.  
The optical time domain reflectometer shall be calibrated to show anomalies of 0.2 dB as a minimum.  Photographs 
of the traces shall be furnished to the Government.  An optical time domain reflectometer test shall be performed 
on all fibers of the FO cable after it is installed.  The optical time domain reflectometer shall be calibrated 
to show anomalies of 0.2 dB as a minimum.  If the optical time domain reflectometer test results show anomalies 
greater than 1 dB, the FO cable segment is unacceptable to the Government.  The unsatisfactory segments of cable 
shall be replaced with a new segment of cable.  The new segment of cable shall then be tested to demonstrate 
acceptability.  Photographs of the traces shall be furnished to the Government for each link.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.2   Power Attenuation Test</TTL><BRK/>
<BRK/>
<TXT>Power attenuation test shall be performed at each light wavelength of the transmitter to be used on the circuit 
being tested.  The flux shall be measured at the FO receiver end and shall be compared to the flux injected at 
the transmitter end.  There shall be a jumper added at each end of the circuit under test so that end connector 
loss shall be validated.  Rotational optimization of the connectors will not be permitted.  If the circuit loss 
exceeds the calculated circuit loss by more than 2 dB, the circuit is unsatisfactory and shall be examined to 
determine the problem.  The Government shall be notified of the problem and what procedures the Contractor proposes 
to eliminate the problem.  Prepare and submit a report documenting the results of the test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.3   Gain Margin Test</TTL><BRK/>
<BRK/>
<TXT>Test and verify that each circuit has a gain margin which exceeds the circuit loss by at least the minimum gain 
margin specified in paragraph FLUX BUDGET/GAIN MARGIN.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.4   Analog Video Signal Test</TTL><BRK/>
<BRK/>
<TXT>Analog video circuits shall be tested using a signal conforming to <RID>CEA 170</RID>.  The monitor or automated test set 
shall be stable, and shall be as described in <RID>CEA 170</RID>.  If the result is unsatisfactory, the circuit shall be 
examined to determine the problem.  The Government shall be notified of the problem and of the procedures the 
Contractor proposes to eliminate the problem.  Prepare and submit a report documenting the results of the test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.5   Digital Video Signal Test</TTL><BRK/>
<BRK/>
<TXT>Digital video circuits shall be tested using a signal conforming to <RID>CEA 170</RID>.  The monitor or automated test set 
shall be stable, and shall be as described in <RID>CEA 170</RID>.  If the result is unsatisfactory, the circuit shall be 
examined to determine the problem.  The Government shall be notified of the problem and of the procedures the 
Contractor proposes to eliminate the problem.  Prepare and submit a report documenting the results of the test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2.6   Performance Verification Test and Endurance Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This requirement pertains only to UMCS, IDS, ESS and CCTV projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The FO data transmission system shall be tested as a part of the completed [UMCS] [IDS] [ESS] [CCTV] [_____] 
during the Performance Verification Test and Endurance Test as specified in Section [_____].</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT>   <END/><BRK/></SEC>