USACE / NAVFAC / AFCESA / NASA   UFGS-28 40 01 (April 2006)<BRK/>
                                 ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>      Replacing without change<BRK/>
                                 UFGS-13799 (February 2003)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 28 40 01</SCN><BRK/>
<BRK/>
<STL>WATCHTOUR SYSTEM [FOR BRIG FACILITIES]</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>watchtour system</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This system is designed/used to report the guard's presence at designated 
locations at particular times of the tour.  Each activation of the system is 
recorded in the Central System printer for record.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following information shall be shown on the project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Watchtour station location and mounting</NPR><BRK/>
<BRK/>
<NPR>2.  Watchtour panel location and mounting</NPR><BRK/>
<BRK/>
<NPR>3.  Watchtour station construction</NPR><BRK/>
<BRK/>
<NPR>4.  Watchtour panel construction</NPR><BRK/>
<BRK/>
<NPR>5.  Conduit routing from station to panel to printer</NPR><BRK/>
<BRK/>
<NPR>6.  Printer location.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 50</RID><RTL>(2007) Standard for Enclosures for Electrical Equipment</RTL><BRK/><BRK/><RID>UL 6</RID><RTL>(2007) Standard for Electrical Rigid Metal Conduit-Steel</RTL><BRK/><BRK/><RID>UL 797</RID><RTL>(2007) Standard for Electrical Metallic Tubing -- Steel</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   PERFORMANCE REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.2.1   Integration and Services</TTL><BRK/>
<BRK/>
<TXT>Provide in the prisoner housing units a watchtour system with the capabilities of printing on its systems printer 
a log of watchtours conducted.  Provide two sets of auxiliary relay contacts for the interfacing of the interior 
fire alarm system to the watchtour system printer for log of fire alarm system alarms.  The watchtour system 
shall consist of a series of watchtour stations auxiliary relays, a watchtour panel and printer directly wired 
to each other.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Sequence of Operation</TTL><BRK/>
<BRK/>
<TXT>Where watchtour stations are indicated to be installed in a housing area, the combination of stations shall operate 
in the following manner as a system.  On the watchtour control panel located in the guard control station, the 
touring officer shall select one of the three "watchtour start" key switches labeled "MEDICAL OFFICER," "COMMANDING 
OFFICER," or "CONTROL OFFICER."  Turning the "watchtour start" momentary action key switch on the watchtour panel 
shall cause the amber light emitting diode (LED) and all green station LED to illuminate and a signal to be sent 
to the system printer which shall print the tour start, location, time, and date.  Activation of a watchtour 
station shall cause a corresponding green LED on the watchtour panel to extinguish.  Reset shall occur when the 
last green LED is extinguished.  Once all stations in the area have been activated, regardless of order but within 
the time frame, a "tour complete" green LED on the watchtour panel shall illuminate and a signal shall be sent 
to the system printer to print "tour complete," location, time and date.  Pressing the "reset" momentary action 
switch shall cause all LEDs associated with the watchtour system to turn off.  Activation of a watchtour station 
after a "reset" action but before a "start" action, shall have no effect.  Alarm shall be generated on fifteen 
minute interval at watchtour control panel to alert guard to begin watchtour.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Watchtour system</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit for the overall system to include the watchtour station, watchtour panel, and start 
station, auxiliary relay, control power transformer, wire and conduit.  Indicate how each item 
of equipment will function in the system and include an overall system schematic indicating 
relationships of watchtour system devices on one line diagram.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Watchtour system</SUB> components</ITM><BRK/>
<BRK/>
<ITM>  Submit for materials and equipment to be incorporated in work.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Watchtour system</SUB> components</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Watchtour system</SUB>, Data Package 2</ITM><BRK/>
<BRK/>
<ITM>  Submit in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<TXT>The watchtour system shall be an integrated design of a single supplier.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.4.1   <SUB>Watchtour system</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit, attesting that materials meet specified requirements.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>WATCHTOUR SYSTEM</SUB> EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Equipment and components of watchtour systems shall conform to applicable requirements of Article 810, <RID>NFPA 70</RID>
.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Watchtour Station</TTL><BRK/>
<BRK/>
<TXT>The watchtour station shall be recessed mounted with face plate mounted flush on wall<MET> 1830 mm</MET><ENG> 6 feet</ENG> above the 
area finished floor.  Round key operators shall be spring return keyswitch with key removable only in off position, 
momentary contact, normally open-rated at 10 amperes, 120 V ac.  Device plate shall be brown nylon attached to 
outlet box with nonremovable fasteners.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Watchtour Panels</TTL><BRK/>
<BRK/>
<TXT>Provide panel for the watchtour system controls.  Watchtour panel shall be custom built for the specific area.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.2.1   Fabrication</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Insure maximum dimensions required are shown on the drawing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Watchtour panel shall be constructed of 14 gage sheet steel, with<MET> 38 mm</MET><ENG> 1 1/2 inch</ENG> flange on all sides, and cover 
for mounting devices hinged to frame at top.  Hinge shall be continuous piano-type hinge.  Overall general dimensions 
indicated are maximum dimensions.  Coordinate mounting dimensions and support requirements with masonry work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2.2   Finish</TTL><BRK/>
<BRK/>
<TXT>Surfaces of the panel, except that containing the front, shall be prime finished with rust inhibiting paint and 
two coats of hammertone finish gray enamel.  A reverse silkscreen polyester plastic film or lexan panel with 
nomenclature shall be attached to the front portion.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.3   Start Station</TTL><BRK/>
<BRK/>
<TXT>The watchtour "start" station shall be unembossed, nontactile, momentary contact membrane type switches.  Operating 
force of membrane type switches shall be<MET> 2.22 N</MET><ENG> 8 ounces</ENG>.  Membrane switches shall be supplied with silver contacts 
and proper circuitry to perform functions specified.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.4   Visual Indicators</TTL><BRK/>
<BRK/>
<TXT>Visual indicators shall be T 1 3/4 light emitting diodes (LED), with resistors and protective diodes as required 
for operation of 24 V ac.  The indicators shall be rated for not less than 50,000 hours of operation at 20 milliamps 
ac, and produce a minimum of 147 and 570 lumens/watt for green and yellow devices respectively.  Resistors shall 
be sized according to the manufacturer's instructions and adjusted to produce uniform brightness among LEDs.  
Resistors and protective diodes shall be mounted on stand-off terminal blocks mounted adjacent to the LED served, 
on the underside of the panel.  Mounting hardware shall not be visible from the face of the panel. Resistors 
and protective diodes may be an integral part of the LED. Include a red LED in the panels for each electrically 
controlled and monitored door.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   Pushbutton</TTL><BRK/>
<BRK/>
<TXT>The watchtour panel shall contain a "press to test" pushbutton which shall test Visual and Audible indicators.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6   Auxiliary Relays</TTL><BRK/>
<BRK/>
<TXT>Auxiliary relays shall be general purpose, glass enclosed socket type with 24 V ac control coil, and with industry 
standard pin arrangement.  Relays shall be rated for continuous duty.  Operating voltage range shall be within 
plus or minus 10 percent of nominal voltage.  Contact arrangement shall be two pole double throw rated at not 
less than five amperes at 24 V ac.  Sockets with screw type terminals rated at five amperes shall be provided 
for each relay.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.7   Control Power Transformer</TTL><BRK/>
<BRK/>
<TXT>Control power transformer shall be provided to furnish 24 V ac power to the watchtour system.  Transformer volt-ampere 
rating shall be not less than one and one half times the sum of the volt-ampere rating of all the relays on the 
watchtour system.  Transformer primary voltage shall be 120 volts. Provide transformer secondary with glass cartridge 
fuse rated at 125 percent of transformer full load current.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8   System Printer</TTL><BRK/>
<BRK/>
<TXT>The system printer shall consist of main control unit, printer section, alarm monitor section, and auxiliary 
unit with power supply and auxiliary components.  The total unit shall contain electronic circuitry and connections 
and input circuit devices to receive and log by time and date starting and completion of the watchtour system.  
The total unit shall be desk mounted in a rack type desk enclosure.  Unit shall be for operation on 120 V ac.  
Provide auxiliary contact for additional printing out of fire detection system alarms.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.8.1   Printer Speed and Output</TTL><BRK/>
<BRK/>
<TXT>Printer shall be medium speed, three lines per second, roll type with take up device for<MET> 216 mm</MET><ENG> 8 1/2 inch</ENG> roll 
paper.  Unit shall contain controls for manual and automatic printout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8.2   Printer Clock</TTL><BRK/>
<BRK/>
<TXT>Clock shall provide time log data for month, day, hour, and minute.  Clock shall also alarm at designated time 
to remind control of tour start.  If tour start has been activated, alarm shall not sound.  Devices for setting 
and adjusting time controls shall be behind a locked panel.  Time shall be adjustable from 0 to 60 minutes.  
Unit shall contain display for time and date.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8.3   Printer Input</TTL><BRK/>
<BRK/>
<TXT>Input devices shall provide alpha-numeric print-out for each watchtour system from relay contact closure indicated 
on system wiring diagram. Auxiliary devices shall be provided to interconnect into individual watchtour wiring 
systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8.4   Printer Control Panel</TTL><BRK/>
<BRK/>
<TXT>Front control panel shall contain power on switch and pilot lamp and manual print-out switch.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.2   WIRE AND CONDUIT</TTL><BRK/>
<BRK/>
<TXT>Wire and conduit shall conform to <RID>UL 6</RID> and <RID>UL 797</RID>.  Cabinets and boxes shall conform to <RID>UL 50</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Power Wiring</TTL><BRK/>
<BRK/>
<TXT>Provide power wiring, conduit, and outlet boxes for the watchtour system as specified in Section <SRF>26 20 00</SRF> INTERIOR 
DISTRIBUTION SYSTEM.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   Control Circuit Wiring</TTL><BRK/>
<BRK/>
<TXT>Provide control circuits in accordance with Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM.  Wire and number of 
conductors as recommended by the watchtour system manufacturer.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Backboxes</TTL><BRK/>
<BRK/>
<TXT>Provide backboxes having characteristics suitable for watchtour stations mounted in them.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Equipment Cabinet</TTL><BRK/>
<BRK/>
<TXT>Provide surface mounted cabinet for control power transformer and auxiliary relays.  Provide cabinet with hinged 
cover and latch.  At the contractor's option the control power transformer and auxiliary relays may be installed 
in the locking control auxiliary relay/terminal cabinet.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Wire Grouping</TTL><BRK/>
<BRK/>
<TXT>Group wiring on underside of display and lace with nylon tie straps, supported at intervals not exceeding eight 
inches and terminated on identified terminal blocks at top of panel adjacent to hinged side.  Wiring spanning 
hinge shall be stranded conductors.  All such conductors shall be terminated with crimp type lugs of both sets 
of terminal blocks.  Leave <MET> 155 mm</MET><ENG> six inches</ENG> of slack in conductors.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<TXT><TST>Conduct testing specified herein in the presence of the Contracting Officer.</TST></TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Watchtour System Test</TTL><BRK/>
<BRK/>
<TXT><TST>Perform an operational system test to verify conformance of the Watchtour System to this specification.  Notify 
Contracting Officer two weeks prior to when tests are to be performed so that test may be witnessed by Contracting 
Officer.  These tests shall include activation of the system alarming to the Central Control printer, and completion 
of each system.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Equipment</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.2.1   Unit</TTL><BRK/>
<BRK/>
<TXT>Unit shall function to log each watchtour system with not less than the following data:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Watchtour zone:  location, (example:  watchtour zone Housing Unit 1-1)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Watchtour start:  date, time, (example:  10-3-75 11:25 p.m.)</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Watchtour completion:  date, time, (example:  10-3-75 11:40 p.m.)</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2.2   System</TTL><BRK/>
<BRK/>
<TXT>System shall receive watchtour signals as initiated by individual zones, store signals received simultaneously, 
and print out data as specified herein.  The system shall have automatic reset, so that acknowledge function 
shall not be required at central unit for signal input.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2.3   Retesting</TTL><BRK/>
<BRK/>
<TXT>Rectify deficiencies indicated by test and completely retest work affected by such deficiencies.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Fasteners</TTL><BRK/>
<BRK/>
<TXT>Nonremovable fasteners shall be installed after the system has been thoroughly tested.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.5   Inspection</TTL><BRK/>
<BRK/>
<TXT><TST>Verify that units and controls are properly labeled, and interconnecting wires and terminals identified.  Contracting 
Officer will observe system features specified.</TST></TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   INSTRUCTING GOVERNMENT PERSONNEL</TTL><BRK/>
<BRK/>
<TXT><TST>Upon completion of the work and at a time designated by the Contracting Officer, furnish a competent technician 
regularly employed or authorized by the manufacturer of the duress system to instruct Government personnel in 
the proper operation, maintenance, safety, and emergency procedures of the watchtour system.</TST>  The period of instruction 
shall be four eight-hour working days.  Conduct training at the job site.</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>