USACE / NAVFAC / AFCESA / NASA      UFGS-31 23 00.00 20 (April 2006)<BRK/>
                                    -------------------------------<BRK/>
Preparing Activity: <PRA>NAVFAC</PRA>          Replacing without change<BRK/>
                                    UFGS-02315N (June 2004)             <BRK/>
                     <BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 31 23 00.00 20</SCN><BRK/>
<BRK/>
<STL>EXCAVATION AND FILL</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>earthwork requirements 
for buildings, roads, and utilities</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Consult with a soils engineer while editing this section to determine 
specific requirements for each job.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following information shall be indicated on the project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Surface elevations, existing and new;</NPR><BRK/>
<BRK/>
<NPR>2.  Location of underground obstructions and existing utilities;</NPR><BRK/>
<BRK/>
<NPR>3.  Location and record of soil borings and test pits.  Include ground water 
observations and topsoil thickness encountered in boring, soil classifications, 
and properties such as moisture content and Atterberg limit determinations;</NPR><BRK/>
<BRK/>
<NPR>4.  Soil classification(s) and properties;</NPR><BRK/>
<BRK/>
<NPR>5.  Location of borrow and disposal area if located on Government property;</NPR><BRK/>
<BRK/>
<NPR>6.  Clearing stripping and grubbing limits, if different from clearing limits;</NPR><BRK/>
<BRK/>
<NPR>7.  Areas to be seeded;</NPR><BRK/>
<BRK/>
<NPR>8.  Hydrological data where available;</NPR><BRK/>
<BRK/>
<NPR>9.  Shoring and sheeting required (trench protection is specified in Corps of 
Engineers Manual EM 385-1-1);</NPR><BRK/>
<BRK/>
<NPR>10.  Pipe trench excavation details;</NPR><BRK/>
<BRK/>
<NPR>11.  Location and limits of hard material (rocks);</NPR><BRK/>
<BRK/>
<NPR>12.  Details of special construction such as under railroad and highways right-of-way 
requirements for jacking and boring;</NPR><BRK/>
<BRK/>
<NPR>13.  Details of sewage absorption trenches, absorption pits, and subsurface 
drains.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification does not include provisions for separate measurement 
and payment for any work specified herein.  Measurement and payment paragraphs 
may be provided in the contract specifications when unit-price payment is more 
equitable for rock excavation, borrow excavation, and the removal and replacement 
of unsatisfactory material below grades indicated.  This section includes requirements 
for clearing, grubbing, stripping, grading, and topsoiling.  If the contract 
specifications contain separate sections on clearing, grubbing, grading and 
turf establishment, revise this section accordingly.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to in the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN WATER WORKS ASSOCIATION (AWWA)</ORG><BRK/><BRK/><RID>AWWA C600</RID><RTL>(2005) Installation of Ductile-Iron Water Mains and Their Appurtenances</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN WELDING SOCIETY (AWS)</ORG><BRK/><BRK/><RID>AWS D1.1/D1.1M</RID><RTL>(2008) Structural Welding Code - Steel</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)</ORG><BRK/><BRK/><RID>AWPA C2</RID><RTL>(2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes</RTL><BRK/><BRK/><RID>AWPA P5</RID><RTL>(2005) Standard for Waterborne Preservatives</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 139/A 139M</RID><RTL>(2004) Standard Specification for Electric-Fusion (ARC)-Welded Steel Pipe (NPS 4 and over)</RTL><BRK/><BRK/><RID>ASTM A 252</RID><RTL>(1998; R 2007) Standard Specification for Welded and Seamless Steel Pipe Piles</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 33</RID><RTL>(2007) Standard Specification for Concrete Aggregates</RTL><BRK/><BRK/><RID>ASTM D 1140</RID><RTL>(2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve</RTL><BRK/><BRK/><RID>ASTM D 1556</RID><RTL>(2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method</RTL><BRK/><BRK/><RID>ASTM D 1557</RID><RTL>(2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)</RTL><BRK/><BRK/><RID>ASTM D 1883</RID><RTL>(2007) CBR (California Bearing Ratio) of Laboratory-Compacted Soils</RTL><BRK/><BRK/><RID>ASTM D 2216</RID><RTL>(2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass</RTL><BRK/><BRK/><RID>ASTM D 2321</RID><RTL>(2005) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications</RTL><BRK/><BRK/><RID>ASTM D 2434</RID><RTL>(1968; R 2006) Permeability of Granular Soils (Constant Head)</RTL><BRK/><BRK/><RID>ASTM D 2487</RID><RTL>(2006e1) Soils for Engineering Purposes (Unified Soil Classification System)</RTL><BRK/><BRK/><RID>ASTM D 2922</RID><RTL>(2005) Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)</RTL><BRK/><BRK/><RID>ASTM D 3017</RID><RTL>(2005) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)</RTL><BRK/><BRK/><RID>ASTM D 3786</RID><RTL>(2008a) Hydraulic Bursting Strength of Textile Fabrics-Diaphragm Bursting Strength Tester Method</RTL><BRK/><BRK/><RID>ASTM D 422</RID><RTL>(1963; R 2007) Particle-Size Analysis of Soils</RTL><BRK/><BRK/><RID>ASTM D 4318</RID><RTL>(2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils</RTL><BRK/><BRK/><RID>ASTM D 4355</RID><RTL>(2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus</RTL><BRK/><BRK/><RID>ASTM D 4491</RID><RTL>(1999a; R 2004e1) Water Permeability of Geotextiles by Permittivity</RTL><BRK/><BRK/><RID>ASTM D 4533</RID><RTL>(2004) Trapezoid Tearing Strength of Geotextiles</RTL><BRK/><BRK/><RID>ASTM D 4632</RID><RTL>(2008) Grab Breaking Load and Elongation of Geotextiles</RTL><BRK/><BRK/><RID>ASTM D 4751</RID><RTL>(2004) Determining Apparent Opening Size of a Geotextile</RTL><BRK/><BRK/><RID>ASTM D 4759</RID><RTL>(2002; R 2007) Determining the Specification Conformance of Geosynthetics</RTL><BRK/><BRK/><RID>ASTM D 4833</RID><RTL>(2007) Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products</RTL><BRK/><BRK/><RID>ASTM D 698</RID><RTL>(2007e1) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>EM 385-1-1</RID><RTL>(2008) Safety and Health Requirements Manual</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)</ORG><BRK/><BRK/><RID>EPA 530/F-93/004</RID><RTL>(1993; Rev O; Updates I, II, IIA, IIB, and III) Test Methods for Evaluating Solid Waste (Vol IA, IB, IC, and II) (SW-846)</RTL><BRK/><BRK/><RID>EPA 600/4-79/020</RID><RTL>(1983) Methods for Chemical Analysis of Water and Wastes</RTL><BRK/><BRK/></REF><REF><ORG>U.S. GENERAL SERVICES ADMINISTRATION (GSA)</ORG><BRK/><BRK/><RID>CID A-A-1909</RID><RTL>(Basic Notice 1; Canc. Notice 2) Fertilizer</RTL><BRK/><BRK/><RID>FS A-A-203</RID><RTL>(Rev C; Notice 2) Paper, Kraft, Untreated</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   DEFINITIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete definitions that will not be used in the specification text for 
a specific project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.2.1   Capillary Water Barrier</TTL><BRK/>
<BRK/>
<TXT>A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity which is 
placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to 
the area immediately below a slab.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.2   Degree of Compaction</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate test procedures with that specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented 
in [<RID>ASTM D 698</RID>][<RID>ASTM D 1557</RID>], for general soil types, abbreviated as percent laboratory maximum density.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.3   Hard Materials</TTL><BRK/>
<BRK/>
<TXT>Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition 
of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for 
removal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.4   Rock</TTL><BRK/>
<BRK/>
<TXT>Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate 
deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion 
jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, 
buried masonry, or concrete other than pavement exceeding<MET> [0.375] [0.75] [_____] cubic meter</MET><ENG> [1/2] [1] [_____] 
cubic yard</ENG> in volume.  Removal of hard material will not be considered rock excavation because of intermittent 
drilling and blasting that is performed merely to increase production.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.2.5   Pile Supported Structure</TTL><BRK/>
<BRK/>
<TXT>As used herein, a structure where both the foundation and floor slab are pile supported.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-01 Preconstruction Submittals</SUB></LST><BRK/>
<BRK/>
<ITM>[<SUB>Shoring and Sheeting Plan</SUB>]</ITM><BRK/>
<BRK/>
<ITM>[<SUB>Dewatering work plan</SUB> ]</ITM><BRK/>
<BRK/>
<ITM>[<SUB>Blasting</SUB> work plan]</ITM><BRK/>
<BRK/>
<TXT>Submit 15 days prior to starting work.</TXT><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Borrow Site Testing</SUB>; <SUB>G</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Fill and backfill</SUB> test</ITM><BRK/>
<BRK/>
<ITM><SUB>Select material</SUB> test</ITM><BRK/>
<BRK/>
<ITM><SUB>Porous fill</SUB> test for capillary water barrier</ITM><BRK/>
<BRK/>
<ITM><SUB>Density tests</SUB></ITM><BRK/>
<BRK/>
<ITM>[<SUB>Moisture Content Tests</SUB>]</ITM><BRK/>
<BRK/>
<TXT>Copies of all laboratory and field test reports within 24 hours of the completion of the test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Perform in a manner to prevent contamination or segregation of materials.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   CRITERIA FOR BIDDING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For most projects, the scope of earthwork can accurately be determined.  
However, if earthwork is approximately known, a unit price for earth work should 
be provided in the Bid Schedule.  Unit-price items are multiplied by the approximated 
and stated quantity giving a sum that is then added to the price for the rest 
of the work.  The result is a lump sum bid with automatic provision for payment 
or credit due to variations in earthwork within 15 percent of that shown and 
bid upon.  Variations exceeding 15 percent of that shown and bid upon will become 
the subject of negotiations in accordance with FAR 52.212.11, "VARIATION IN 
ESTIMATED QUANTITY."</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Base bids on the following criteria:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Surface elevations are as indicated.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Pipes or other artificial obstructions, except those indicated, will not be encountered.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[c.  Ground water elevations indicated by the boring log were those existing at the time subsurface 
investigations were made and do not necessarily represent ground water elevation at the time 
of construction.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[d.  Ground water elevation is [_____]<MET> meter</MET><ENG> feet</ENG> below existing surface elevation.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[e.  Material character is indicated by the boring logs.]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose the following option if no boring information is available, or 
if the boring information is insufficient to permit a bidder to develop an accurate 
estimate of hard material or rock to be encountered.  If hard material or rock 
is to be encountered, the following option should be modified to include a percent 
figure or an approximate depth at which hard material or rock will be encountered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
[<ITM INDENT="-0.33">f.  Hard materials [and rock] [will not] [will] be encountered [in [_____] percent of the excavations] 
[at [_____]<MET> meter</MET><ENG> feet</ENG> below existing surface elevations].</ITM>]<BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use statements in brackets to describe proposed source of borrow and 
other bedding or backfill materials if required by the project. Coordinate with 
submittals.  The drawings should indicate the location(s) within the project 
site or within the boundaries of the Government property where suitable borrow 
may be obtained.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose the types of materials to be provided as borrow.  Delete the bracketed 
sentence that is not applicable regarding location of source. Coordinate requirements 
with paragraph entitled "Borrow".</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[g.  [Borrow material] [Suitable backfill] [and] [bedding material] in the quantities required 
[is] [is not] available [at the project site] [on Government property] [at the location[s]]]</ITM> <BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose one between the two following bracketed options.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[h.  Blasting will not be permitted.  Remove material in an approved manner.]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[i.  <SUB>Blasting</SUB> will be permitted.  Blasting shall be conducted in accordance with <RID>EM 385-1-1</RID>, 
and Federal, State, and local safety regulations.  Submit for approval a blasting plan, including 
calculations for overpressure and debris hazard, prepared and sealed by a registered professional 
engineer.  Blasting mats shall be provided, and non-electric blasting caps shall be used.  Notify 
the Contracting Officer 24 hours prior to blasting.]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   REQUIREMENTS FOR OFF SITE SOIL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Check with regional and local authorities as well as the activity to determine 
actual requirements of bracketed items.  (Values shown come from the Commonwealth 
of Virginia).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Soils brought in from off site for use as backfill shall be tested for TPH, BTEX and full TCLP including ignitability, 
corrosivity and reactivity.  Backfill shall contain less than [100] [   ] parts per million (ppm) of total petroleum 
hydrocarbons (TPH) and less than [10] [  ] ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) 
and shall not fail the TCPL test.  TPH concentrations shall be determined by using <RID>EPA 600/4-79/020</RID> Method 418.1.  
BTEX concentrations shall be determined by using <RID>EPA 530/F-93/004</RID> Method 5030/8020.  TCLP shall be performed 
in accordance with <RID>EPA 530/F-93/004</RID> Method 1311.  Provide <SUB>Borrow Site Testing</SUB> for TPH, BTEX and TCLP from a composite 
sample of material from the borrow site, with at least one test from each borrow site.  Material shall not be 
brought on site until tests have been approved by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
[<SPT><TTL>1.7.1   <SUB>Shoring and Sheeting Plan</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Include the following paragraph when scope of work requires excavations 
which are greater than <MET>1.5 m</MET><ENG>5 feet</ENG> or when excavation complexity warrants extensive 
shoring and sheeting.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit drawings and calculations, certified by a registered professional engineer, describing the methods for 
shoring and sheeting of excavations.  Drawings shall include material sizes and types, arrangement of members, 
and the sequence and method of installation and removal.  Calculations shall include data and references used.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Where site conditions require extensive monitoring of excavations and 
water levels include the following requirement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
[<TXT>The Contractor is required to hire a Professional Geotechnical Engineer to provide inspection of excavations 
and soil/groundwater conditions throughout construction.  The Geotechnical Engineer shall be responsible for 
performing pre-construction and periodic site visits throughout construction to assess site conditions.  The 
Geotechnical Engineer shall update the excavation, sheeting and dewatering plans as construction progresses to 
reflect changing conditions and shall submit an updated plan if necessary.  A written report shall be submitted, 
at least monthly, informing the Contractor and Contracting Officer of the status of the plan and an accounting 
of the Contractor's adherence to the plan addressing any present or potential problems.  The Geotechnical Engineer 
shall be available to meet with the Contracting Officer at any time throughout the contract duration.</TXT><BRK/>
<BRK/>
]</SPT>][<SPT><TTL>1.7.2   <SUB>Dewatering Work Plan</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Where water levels will impact excavation operations include the following 
paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Submit procedures for accomplishing dewatering work.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>1.7.3   Utilities</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph in its entirety if no known utilities or subsurface 
construction is located below or adjacent to work covered in this specification.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Movement of construction machinery and equipment over pipes and utilities during construction shall be at the 
Contractor's risk.  [Perform work adjacent to non-Government utilities as indicated in accordance with procedures 
outlined by utility company.]  [Excavation made with power-driven equipment is not permitted within<MET> [600] [_____] 
mm</MET><ENG> [two] [_____] feet</ENG> of known Government-owned utility or subsurface construction.  For work immediately adjacent 
to or for excavations exposing a utility or other buried obstruction, excavate by hand.  Start hand excavation 
on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance 
for the new grade is assured.  Support uncovered lines or other existing work affected by the contract excavation 
until approval for backfill is granted by the Contracting Officer.]  Report damage to utility lines or subsurface 
construction immediately to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   SOIL MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use paragraphs titled "Expansive Soils" and "Nonfrost Susceptible Material" 
for Army projects.  Use paragraphs titled "Backfill and Fill Material" and "Select 
Material" for Navy projects.  Use all other paragraphs for both branches.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
[<SPT><TTL>2.1.1   Satisfactory Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Satisfactory material will be defined in accordance with locally available 
materials, climatic and water conditions prevailing onsite, economic limitations 
of the project, design slopes, etc., and suitable classes, based on the geotechnical 
report, will be listed in the project specification in accordance with the Unified 
Soil Classification System, ASTM D 2487.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Any materials classified by <RID>ASTM D 2487</RID> as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, [SM,] [SW-SM,] 
[SC,] [SW-SC,] [SP-SM,] [SP-SC,] [CL,] [ML,] [CL-ML,] [CH,] [MH] free of debris, roots, wood, scrap material, 
vegetation, refuse, soft unsound particles, and [frozen,] deleterious, or objectionable materials. Unless specified 
otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.1.2   Unsatisfactory Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Unsatisfactory material will be defined in accordance with locally available 
materials, design slopes, etc., and unsuitable classes will be listed in the 
project specifications in accordance with ASTM D 2487.  Normally, stones larger 
than 75 mm (3 inches) are considered unsatisfactory.  This paragraph should 
be edited to delete inapplicable materials.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Materials which do not comply with the requirements for satisfactory materials.  Unsatisfactory materials also 
include man-made fills, trash, refuse, or backfills from previous construction.  Unsatisfactory material also 
includes material classified as satisfactory which contains root and other organic matter, frozen material, and 
stones larger than [_____] <MET>mm</MET> <ENG>inches</ENG>.  The Contracting Officer shall be notified of any contaminated materials.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.1.3   Cohesionless and Cohesive Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When classification will be necessary during construction, determination 
of grain size for classification will be specified to be made in conformance 
with ASTM C 117, ASTM C 136, and ASTM D 422. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cohesionless materials include materials classified in <RID>ASTM D 2487</RID> as GW, GP, SW, and SP.  Cohesive materials 
include materials classified as GC, SC, ML, CL, MH, and CH.  Materials classified as GM, GP-GM, GW-GM, SW-SM, 
SP-SM, and SM shall be identified as cohesionless only when the fines are nonplastic (plasticity index equals 
zero).  Materials classified as GM and SM will be identified as cohesive only when the fines have a plasticity 
index greater than zero.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.1.4   Expansive Soils</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Additional laboratory testing and analysis might be needed to better 
define site specific expansive soils.  If expansive soils are anticipated at 
the construction site, this specification should be edited to ensure proper 
construction techniques are undertaken per Army TM 5-818-7.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Soils that have a plasticity index equal to or greater than [_____] when tested in accordance with <RID>ASTM D 4318</RID>
.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.1.5   Nonfrost Susceptible (NFS) Material</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Contract specifications for nonfrost-susceptible fill and backfill will 
follow the gradation requirements recommended in Army TM 5-822-5.  For fill 
under critical structures, materials with ML, MH, and CH classification will 
be specified as unsatisfactory (if at all feasible from an economic or material-availability 
standpoint).  If such materials must be used, the specification will point out 
the critical nature of the materials and the control difficulties to be anticipated.  
Organic materials and topsoil having OL, OH, and Pt classification will not 
be used in fill or backfill.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A uniformly graded washed sand with a maximum particle size of [_____] <MET>mm</MET> <ENG>inch</ENG> and less than 5 percent passing 
the <MET>0.075 mm</MET> <ENG>No. 200</ENG> size sieve, and with not more than 3 percent by weight finer than 0.02 mm grain size.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>2.1.6   Common Fill</TTL><BRK/>
<BRK/>
<TXT>Approved, unclassified soil material with the characteristics required to compact to the soil density specified 
for the intended location.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.7   Backfill and Fill Material</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Consult with a geotechnical engineer to determine the type of material, 
the classification of the material, and the particle size of the material. Never 
use site-excavated material without a thorough investigation.  Excavated material 
should be of a quality that will compact, will not settle or shrink, and will 
not become unstable when wet.  The borings or soils report will indicate properties 
of the native soils.  Stones in backfill should generally not exceed<MET> 75 mm</MET><ENG> 3 
inches</ENG> in diameter.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ASTM D 2487</RID>, classification GW, GP, GM, [GC,] SW, SP, SM, [SC] with a maximum <RID>ASTM D 4318</RID> liquid limit of [35] 
[_____], maximum <RID>ASTM D 4318</RID> plasticity index of [12] [_____], and a maximum of 25 percent by weight passing <RID>
ASTM D 1140</RID>,<MET> 75 micrometers</MET><ENG> No. 200</ENG> sieve.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8   Select Material</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if there is not a requirement for select material 
in the project.  It is important to specify select material under footings and 
slabs to minimize settlement and to ensure stability of a structure.  Consideration 
should be made of the sensitivity of the structure to total and/or differential 
settlements related to the structural design.  This is particularly true of 
add-on structures and structures to be founded partly on fill and partly on 
natural ground.  For crib retaining wall, not more than 10 percent by weight 
of the fill material shall be finer than<MET> 75 micrometers</MET><ENG> No. 200</ENG> sieve.  Also, 
specify coefficient of permeability within the range of<MET> 0.01 to 1.0 mm per second</MET><ENG>
 0.002 to 0.20 feet per minute</ENG> and soil classification GW, GP, SW and SP.  Indicate 
with cross sections or section details on the contract drawings the limits or 
extents of any controlled fills or backfills.  Specify class of material that 
is acceptable in the fill or backfill giving preference to any types available 
at or near the site.  Select appropriate values for Atterberg limits and percentage 
of fines and specify maximum thickness of lifts for compaction.</NPR><BRK/>
<BRK/>
<NPR>If suitable materials for this project are limited to materials classified as 
GW, GP, SW, or SP, delete the bracketed sentences of this paragraph.  Coordinate 
requirements with a geotechnical engineer.  Select fill used for structures 
should extend a minimum of<MET> 1.5 m</MET><ENG> 5 feet</ENG> outside the building foundation lines 
or other building elements gaining support from the fill.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide materials classified as [GW,] [GP,] [SW,] [SP,] or [_____] by <RID>ASTM D 2487</RID> where indicated.  [The liquid 
limit of such material shall not exceed [35] [_____] percent when tested in accordance with <RID>ASTM D 4318</RID>. The 
plasticity index shall not be greater than [12] [_____] percent when tested in accordance with <RID>ASTM D 4318</RID>, and 
not more than [35] [_____] percent by weight shall be finer than<MET> 75 micrometers</MET><ENG> No. 200</ENG> sieve when tested in 
accordance with <RID>ASTM D 1140</RID>.]  [Coefficient of permeability shall be a minimum of<MET> [0.01] [_____] mm per second</MET><ENG>
 [0.002] [_____] feet per minute</ENG> when tested in accordance with <RID>ASTM D 2434</RID>.]</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where California Bearing Ratio values are needed include the following 
paragraph:</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Bearing Ratio:  At<MET> 2.5 mm</MET><ENG> 0.1 inch</ENG> penetration, the bearing ratio shall be [_____] percent at 95 percent <RID>ASTM D 1557</RID>
 maximum density as determined in accordance with <RID>ASTM D 1883</RID> for a laboratory soaking period of not less than 
4 days.  [Maximum expansion shall be [_____] percent.]  [The combined material shall conform to the following 
sieve analysis:]]</TXT><BRK/>
<MET><TBL><THD><BRK/>
               <HL1>Sieve Size</HL1>                      <HL1>Percent Passing by Weight</HL1><BRK/></THD>
<BRK/>
                  63 mm                                   100<BRK/>
                4.75 mm                               40 - 85<BRK/>
                2.00 mm                               20 - 80<BRK/>
              425 micrometers                         10 - 60<BRK/>
               75 micrometers                          5 - 25<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
               <HL1>Sieve Size</HL1>                      <HL1>Percent Passing by Weight</HL1><BRK/></THD>
<BRK/>
                2 1/2 inches                              100<BRK/>
                  No. 4                               40 - 85<BRK/>
                  No. 10                              20 - 80<BRK/>
                  No. 40                              10 - 60<BRK/>
                  No. 200                              5 - 25<BRK/></TBL>
</ENG><BRK/></SPT>
<SPT><TTL>2.1.9   Topsoil</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If seeding is minor, use requirements specified herein.  Otherwise, edit 
Section 32 92 19 SEEDING, and cover requirements (for most projects) therein.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Provide as specified in Section <SRF>32 92 19</SRF>SEEDING.]</TXT><BRK/>
<BRK/>
<TXT>[Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, 
rocks larger than<MET> 25 mm</MET><ENG> one inch</ENG> diameter, brush, weeds, toxic substances, and other material detrimental to 
plant growth.  Amend topsoil pH range to obtain a pH of 5.5 to 7.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   POROUS FILL FOR CAPILLARY WATER BARRIER</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 33</RID> fine aggregate grading with a maximum of 3 percent by weight passing <RID>ASTM D 1140</RID>,<MET> 75 micrometers</MET><ENG> No. 
200</ENG> sieve, [or] [<MET>37.5 mm</MET> <ENG>1-1/2 inches</ENG> and no more than 2 percent by weight passing the <MET>4.75 mm</MET> <ENG>No. 4</ENG> size sieve] 
[or coarse aggregate Size 57, 67, or 77] and conforming to the general soil material requirements specified in 
paragraph entitled "Satisfactory Materials."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   UTILITY BEDDING MATERIAL</TTL><BRK/>
<BRK/>
<TXT>Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance 
with <RID>AWWA C600</RID>, Type 4, except as specified herein.  Backfill to top of pipe shall be compacted to 95 percent 
of <RID>ASTM D 698</RID> maximum density.  Plastic piping shall have bedding to spring line of pipe.  Provide <RID>ASTM D 2321</RID>
 materials as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Class I:  Angular,<MET> 6 to 40 mm</MET><ENG> 0.25 to 1.5 inches</ENG>, graded stone, including a number of fill 
materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed 
shells.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Class II:  Coarse sands and gravels with maximum particle size of<MET> 40 mm</MET><ENG> 1.5 inches</ENG>, including 
various graded sands and gravels containing small percentages of fines, generally granular and 
noncohesive, either wet or dry.  Soil Types GW, GP, SW, and SP are included in this class as 
specified in <RID>ASTM D 2487</RID>.</ITM><BRK/>
<BRK/>
<SPT>[<TTL>2.3.1   Sand</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this section to define the requirements for sand used in normal backfill 
or pipe bedding. In general, any locally available fine aggregate for concrete 
or asphalt mixtures will suffice and may be specified by local gradation and 
specification number in lieu of "SW" or "SP."  Drawings (details) should clearly 
show where <HL1>sand</HL1> backfill or bedding is required.  Delete this paragraph if sand 
is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Clean, coarse-grained sand classified as [_____ in accordance with Section [_____] [gradation _____] of the [DOT] 
[_____] State Standard] or [SW] [or] [SP] by <RID>ASTM D 2487</RID> for [bedding] [and] [backfill] [as indicated].</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.3.2   Gravel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use this section to define the requirements for any gravel or crushed 
rock used in normal backfill or pipe bedding.  In general, locally available 
coarse aggregate for concrete will suffice and may be specified by local gradation 
and specification number in lieu of "GW" or "GP." Maximum size of aggregate 
should not be more than <MET>25 mm per 300 mm</MET> <ENG>one inch per foot</ENG> of pipe diameter 
or <MET>75 mm</MET> <ENG>3 inches</ENG> maximum.  Refer to pipe manufacturer's criteria for more stringent 
requirements, if any, on aggregate size and gradation.  On drawings (details), 
clearly show where <HL1>gravel</HL1> backfill or bedding is required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Clean, coarsely graded natural gravel, crushed stone or a combination thereof [identified as [_____] in accordance 
with Section [_____] [gradation _____] of the [DOT] [_____] State Standard] or having a classification of [GW] 
[GP] in accordance with <RID>ASTM D 2487</RID> for [bedding] [and] [backfill] [as indicated].  [Maximum particle size shall 
not exceed<MET> [75] [_____] mm</MET><ENG> [3] [_____] inches</ENG>.]</TXT><BRK/>
<BRK/>
]</SPT></SPT>[<SPT><TTL>2.4   SEWAGE ABSORPTION TRENCHES OR PITS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete these paragraphs when sewage absorption trenches or pits are not 
included in the project.  Consult a geotechnical engineer and local standards 
in selecting bracketed information.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.4.1   Porous Fill</TTL><BRK/>
<BRK/>
<TXT>Backfill material consisting of clean crushed rock or gravel having a gradation [such that 100 percent passes 
the<MET> 50 mm</MET><ENG> 2 inch</ENG> sieve and zero percent passes the<MET> 12.5 mm</MET><ENG> 1/2 inch</ENG> sieve.] [conforming to the requirements of 
gradation<MET> [4.75 mm]</MET><ENG> [No. 4]</ENG> [_____] for coarse aggregate in <RID>ASTM C 33</RID>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Cover</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select appropriate bracketed information to correspond to the design 
indicated on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Filter fabric] [Concrete] [Kraft paper conforming to <RID>FS A-A-203</RID>, Grade B, No. 2,<MET> 22.7 kg</MET><ENG> 50 pound</ENG> weight] [or 
a layer of straw at least<MET> 50 mm</MET><ENG> 2 inches</ENG> thick] as indicated.</TXT><BRK/>
<BRK/></SPT>
</SPT>]<SPT><TTL>2.5   BORROW</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose one of the following options.  Choose the first option when borrow 
material has to come from off site.  Choose the second option when use of a 
Government borrow pit is available.  Edit paragraph to suit requirements for 
use of a Government borrow pit.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government 
property.]</TXT><BRK/>
<BRK/>
<TXT>[Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government 
property, except that borrow materials conforming to [common fill] [and] [fill and backfill material] [satisfactory 
material] [_____] may be obtained from the Government borrow pit.  The Government borrow pit is located [as indicated] 
[within a haul distance of [_____]<MET> kilometers</MET><ENG> miles</ENG> from the work site].  If the Government borrow pit is used, 
the Contractor shall perform clearing, grubbing, and stripping required for providing access to suitable borrow 
material.  Dispose of materials from clearing and grubbing operations [off Government property] [at the Government 
landfill indicated].  Strip top<MET> 300 mm</MET><ENG> 12 inches</ENG> of soil material from borrow area and stockpile.  After removal 
of borrow material, regrade borrow pit using stockpiled soil material to contours which will blend in with adjacent 
topography.  Maximum side slopes shall be two horizontal to one vertical.  Excavation and backfilling of borrow 
pit shall ensure proper drainage.]</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.6   BACKFILL FOR UNDERDRAINAGE SYSTEMS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete these paragraphs entirely when there is no subsurface drainage 
or where underdrainage requirements are completely described in another section.  
The type or types of pipe to be used will be indicated on the drawings.  Where 
a Contractor's option is to be permitted, the types that are acceptable will 
be included in the specification. Add the requirements for a specialized subsurface 
drain, if necessary, to what is specified in this section.  Consult a geotechnical 
engineer to determine specific grading requirements of granular filters and 
backfill materials and suitability of filter fabric.  Include typical cross 
section detail of subsurface drain type or options on contract drawings.</NPR><BRK/>
<BRK/>
<NPR>The thickness and gradation of granular fill material for subsurface drains 
will be determined by soil conditions and subsoil drainage requirements.</NPR><BRK/>
<BRK/>
<NPR>In Table 1, choose one of the three options for each of the three types.  The 
gradations shown on Table 1 may be altered to fit project requirements or additional 
gradations may be added to fit requirements of various subsurface drains within 
the project.  The material placed adjacent to perforated pipe and open joints 
(without filter fabric wrapping) will be of a size that will prevent the entrance 
of any of the porous material into the drain.  This material shall be a minimum 
of<MET> 150 mm</MET><ENG> 6 inches</ENG> thick on the side of the pipe where the perforations are 
and around all joints.  Thicknesses of granular fill, especially for subsurface 
drains with two types of material, will be clearly shown on the drawings.  Where 
site conditions require more than two types of granular fill for drains, the 
drawings will indicate the areas of different gradation and the table will expanded 
using additional types to show different gradations for different locations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Clean sand, crushed rock, or gravel meeting the following requirements:</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Check gradations against size of pipe openings.  Consult a geotechnical 
engineer if alternate gradations (Type III) of special backfill materials are 
desired.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[a.  Perforated or Slotted-Wall Pipe:  Backfill meeting requirements of [Type I] material as 
specified in Table 1.]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Open-joint pipe (drain tile) will not be used for general airfield or 
heliport construction, drainage systems for structures, or for drains crossing 
or adjacent to paved areas.  Open-joint pipe will be used only for subsoil drainage 
for drill areas, parade grounds, athletic fields, and other areas subject to 
lightweight vehicle traffic only, and where conditions justify its use.  Consult 
the Government before use.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[b.  Open Joint Pipe:  [Type III] backfill consisting of both Type I and Type II materials as 
specified in Table 1.]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Consult with a geotechnical engineer to determine coarse aggregate size, 
which is dependent on the flow anticipated.  Specify Type II gradation, if appropriate, 
or specify a special, Type III gradation.  Make sure that detail of this type 
drain is included on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[c.  Blind or French Drains:  Backfill consisting of [Type II] [Type III] material as specified 
in Table 1.]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where filter fabric is used in construction of backfills, any type of 
pipe or drain is acceptable unless conditions dictate that only one be used.  
In critical applications filter fabric should not be used in subsurface drains 
adjacent to soils with 85 percent or more passing the<MET> 75 micrometers</MET><ENG> No. 200</ENG>
 sieve.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[d.  Any Type Drain Used With Filter Fabric:  [Clean gravel or crushed stone or gravel conforming 
to <RID>ASTM C 33</RID> coarse aggregate grading size 57, 67, or 7] [fill consisting of [Type I] [or] [Type 
II] [Type III] material as specified in Table 1].]</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the applicable paragraph(s) from the following.</NPR><BRK/>
<BRK/>
<NPR>The thickness and gradation of granular fill material for subsurface drains 
will be determined by soil conditions and subsoil drainage requirements.</NPR><BRK/>
<BRK/>
<NPR>In Table 1, choose one of the three options for each of the three types.  The 
gradations shown on Table 1 may be altered to fit project requirements or additional 
gradations may be added to fit requirements of various subsurface drains within 
the project.  The material placed adjacent to perforated pipe and open joints 
(without filter fabric wrapping) will be of a size that will prevent the entrance 
of any of the porous material into the drain.  This material shall be a minimum 
of<MET> 150 mm</MET><ENG> 6 inches</ENG> thick on the side of the pipe where the perforations are 
and around all joints.  Thicknesses of granular fill, especially for subsurface 
drains with two types of material, will be clearly shown on the drawings.  Where 
site conditions require more than two types of granular fill for drains, the 
drawings will indicate the areas of different gradation and the table will expanded 
using additional types to show different gradations for different locations.</NPR><BRK/>
<AST/><BRK/></NTE>
<MET><TBL><THD><BRK/>
<HL4><HL1>TABLE 1</HL1></HL4><BRK/>
<BRK/>
                   [<HL1>Type I</HL1>            <HL1>Type II</HL1>          <HL1>Type III</HL1><BRK/>
                 [Gradation E 11    [Gradation 57      [Gradation [_____]<BRK/>
                 <RID>ASTM C 33</RID>]         <RID>ASTM C 33</RID>]           [_____]]]<BRK/>
<BRK/>
  [[<RID>ASTM D 422</RID><BRK/>
  <HL1>Sieve Size]</HL1>    <HL1>[Percent Passing]</HL1>  <HL1>[Percent Passing]</HL1>  <HL1>[Percent Passing]</HL1><BRK/></THD>
<BRK/>
      37.5 mm            --                100              [_____]<BRK/>
      25.0 mm            --              90 - 100           [_____]<BRK/>
      9.5 mm            100              25 - 60            [_____]<BRK/>
      4.75 mm         95 - 100            5 - 40            [_____]<BRK/>
      2.36 mm            --               0 - 20            [_____]<BRK/>
      1.18 mm         45 - 80               --              [_____]<BRK/>
  300 micrometers     10 - 30               --              [_____]<BRK/>
  150 micrometers      0 - 10               --              [_____]]<BRK/>
<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4><HL1>TABLE 1</HL1></HL4><BRK/>
<BRK/>
                  [<HL1>Type I</HL1>            <HL1>Type II</HL1>              <HL1>Type III</HL1><BRK/>
                  [Gradation E 11    [Gradation 57        [Gradation [_____]]<BRK/>
                  <RID>ASTM C 33</RID>]         <RID>ASTM C 33</RID>]             [_____]]<BRK/>
<BRK/>
  [[<RID>ASTM D 422</RID><BRK/>
  <HL1>Sieve Size]</HL1>    <HL1>[Percent Passing]</HL1>   <HL1>[Percent Passing]</HL1>    <HL1>[Percent Passing]</HL1><BRK/></THD>
<BRK/>
  1.5 inches          --                   100                [_____]<BRK/>
  1 inch              --                 90 - 100             [_____]<BRK/>
  3/8 inch            100                25 - 60              [_____]<BRK/>
  No. 4             95 - 100              5 - 40              [_____]<BRK/>
  No. 8               --                  0 - 20              [_____]<BRK/>
  No. 16            45 - 80                --                 [_____]<BRK/>
  No. 50            10 - 30                --                 [_____]<BRK/>
  No. 100            0 - 10                --                 [_____]]<BRK/>
<BRK/></TBL>
</ENG><BRK/>
]</SPT><SPT><TTL>2.7   FILTER FABRIC</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where filter fabric is used in construction of backfills, any type of 
pipe or drain is acceptable unless conditions dictate that only one be used.  
In critical applications Filter fabric should be used with caution in subsurface 
drains adjacent to soils with 85 percent or more fines passing the<MET> 75 micrometers</MET><ENG>
 No. 200</ENG> sieve.  Values stated below are absolute minimums for the class indicated.</NPR><BRK/>
<BRK/>
<NPR>Delete this paragraph when filter fabric will not be used on the project.  Adjust 
information in brackets to fit the needs of the project.  Class A material is 
usually specified when material being compacted has very coarse sharp angular 
edges and requires a compaction percentage greater than 95 percent ASTM D 698, 
or when trenches are more than<MET> 3 m</MET><ENG> 10 feet</ENG> deep.  Class B is specified with 
smooth graded surfaces having no sharp angular projections, no sharp angular 
aggregate, and when compaction requirements are less than 95 percent ASTM D 
698.  Where fabric will not be covered or where it will exposed to direct sunlight, 
such as when it is, used for silt dams, include the requirement for ultraviolet 
resistance.  Where fabric is used for different applications, the AOS requirement 
or strength may vary.  Drawings should indicate specific requirements for different 
applications.  Specify cloth that retains the soil being protected, yet that 
has openings large enough to permit drainage and prevent clogging.  The standard 
wording in the guide specification concerning Apparent Opening Size will be 
suitable for all projects except in critical areas.  However, in critical areas 
select the "apparent opening sizes" (AOS) and "percent open area" based on the 
following criteria:</NPR><BRK/>
<BRK/>
<NPR>1.  Filter cloth adjacent to granular materials containing 50 percent or less 
by weight fines (materials passing<MET> 75 micrometers</MET><ENG> No. 200</ENG> sieve):</NPR><BRK/>
<BRK/>
<NPR>a.  The nearest opening size of AOS sieve (nearest U.S. Standard Sieve) divided 
by the 85-percent size of the soil, is equal to or greater than two or three.</NPR><BRK/>
<BRK/>
<NPR>b.  Open area not to exceed 36 percent.</NPR><BRK/>
<BRK/>
<NPR>In critical areas to reduce the chance of clogging, no cloth should be specified 
with an open area less than 4 percent or an AOS with openings smaller than the 
openings of a U.S. Standard Sieve Size<MET> 150 micrometers</MET><ENG> No. 100</ENG>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a pervious sheet of polyester, nylon, glass or polypropylene [, ultraviolet resistant] filaments woven, 
spun bonded, fused, or otherwise manufactured into a nonraveling fabric with uniform thickness and strength. 
Fabric shall have the following manufacturer certified minimum average roll properties as determined by <RID>ASTM D 4759</RID>
:</TXT><BRK/>
<MET><TBL><THD><BRK/>
                                                 <HL1>Class A</HL1>         <HL1>Class B</HL1><BRK/></THD>
<BRK/>
      a.  Grab tensile strength (<RID>ASTM D 4632</RID>)    min. [800]      [356] N<BRK/>
          machine and transversed direction<BRK/>
<BRK/>
      b.  Grab elongation (<RID>ASTM D 4632</RID>)          min. [15]       [15] percent<BRK/>
          machine and transverse direction<BRK/>
<BRK/>
      c.  Puncture resistance (<RID>ASTM D 4833</RID>)      min. [356]      [111] N<BRK/>
<BRK/>
      d.  Mullen burst strength (<RID>ASTM D 3786</RID>)    min. [2,000]    [896] kPa<BRK/>
<BRK/>
      e.  Trapezoidal Tear (<RID>ASTM D 4533</RID>)         min. [222]      [111] N<BRK/>
<BRK/>
      [f.  Apparent Opening Size (<RID>ASTM D 4751</RID>)   [_____]         [_____]]<BRK/>
<BRK/>
      [f.  Apparent Opening Size (<RID>ASTM D 4751</RID>)      See Criteria Below<BRK/>
<BRK/>
          (1)  Soil with 50 percent or less particles by weight passing 75<BRK/>
               micrometers Sieve, AOS less than 0.6 mm (greater than 600<BRK/>
               micrometers Sieve)<BRK/>
<BRK/>
          (2)  Soil with more than 50 percent particles by weight passing 75<BRK/>
               mircometers Sieve, AOS less than 0.297 mm (greater than 300<BRK/>
               micrometers Sieve)]<BRK/>
<BRK/>
      g.  Permeability (<RID>ASTM D 4491</RID>)               [k fabric greater<BRK/>
                                                   than k Soil]<BRK/>
<BRK/>
      [h.  Ultraviolet Degradation (<RID>ASTM D 4355</RID>)   70 percent Strength<BRK/>
                                                   retained at 150 hours]<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
                                                 <HL1>Class A</HL1>       <HL1>Class B</HL1><BRK/></THD>
<BRK/>
      a.  Grab tensile strength (<RID>ASTM D 4632</RID>)    min. [180]    [80] lbs.<BRK/>
          machine and transversed direction<BRK/>
<BRK/>
      b.  Grab elongation (<RID>ASTM D 4632</RID>)          min. [15]     [15] percent<BRK/>
          machine and transverse direction<BRK/>
<BRK/>
      c.  Puncture resistance (<RID>ASTM D 4833</RID>)      min. [80]     [25] lbs.<BRK/>
<BRK/>
      d.  Mullen burst strength (<RID>ASTM D 3786</RID>)    min. [290]    [130] psi.<BRK/>
<BRK/>
      e.  Trapezoidal Tear (<RID>ASTM D 4533</RID>)         min. [50]     [25] lbs.<BRK/>
<BRK/>
      [f.  Apparent Opening Size (<RID>ASTM D 4751</RID>)   [_____]       [_____]]<BRK/>
<BRK/>
      [f.  Apparent Opening Size (<RID>ASTM D 4751</RID>)     See Criteria Below<BRK/>
<BRK/>
          (1)  Soil with 50 percent or less particles by weight passing US<BRK/>
               No. 200 Sieve, AOS less than 0.6 mm (greater than #30<BRK/>
               US Std. Sieve)<BRK/>
<BRK/>
          (2)  Soil with more than 50 percent particles by weight passing US<BRK/>
               No. 200 Sieve, AOS less than 0.297 mm (greater than #50 US<BRK/>
               Std. Sieve)]<BRK/>
<BRK/>
      g.  Permeability (<RID>ASTM D 4491</RID>)               [k fabric greater<BRK/>
                                                   than k Soil]<BRK/>
<BRK/>
      [h.  Ultraviolet Degradation (<RID>ASTM D 4355</RID>)   70 percent Strength<BRK/>
                                                   retained at 150 hours]<BRK/></TBL>
</ENG><BRK/></SPT>
[<SPT><TTL>2.8   MATERIAL FOR PIPE CASING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate on the contract drawings all construction requirements conforming 
to the standards of the railroad or highway owner. Indicate limits of right-of-way 
and any other site requirements or dimensions.  Where traffic can be interrupted, 
trenching in a pipeline casing is more economical with the same advantages of 
allowing future work without interruption of traffic.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.8.1   Casing Pipe</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM A 139/A 139M</RID>, Grade B, or <RID>ASTM A 252</RID>, Grade 2, smooth wall pipe. Casing size shall be of the outside diameter 
and wall thickness as indicated.  Protective coating is not required on casing pipe.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.2   Wood Supports</TTL><BRK/>
<BRK/>
<TXT>Treated Yellow Pine or Douglas Fir, rough, structural grade.  Provide wood with nonleaching water-borne pressure 
preservative (ACA or CCA) and treatment conforming to <RID>AWPA P5</RID> and <RID>AWPA C2</RID>, respectively.  Secure wood supports 
to carrier pipe with stainless steel or zinc-coated steel bands.</TXT><BRK/>
<BRK/></SPT>
</SPT>]<SPT><TTL>2.9   MATERIAL FOR RIP-RAP</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Make sure there is no duplication of rip-rap requirements between this 
and other specification sections.  In paragraph entitled "Material for Rip-Rap," 
refer to standard specifications for rip-rap if local specifications are satisfactory 
and available.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[[Bedding material] [Grout] [Filter fabric] and rock conforming to [these requirements] [DOT] [_____] State Standard] 
for construction indicated.</TXT><BRK/>
<BRK/>
[<SPT><TTL>2.9.1   Bedding Material</TTL><BRK/>
<BRK/>
<TXT>Consisting of sand, gravel, or crushed rock, well graded, [or poorly graded] with a maximum particle size of<MET> 
50 mm</MET><ENG> 2 inches</ENG>.  Material shall be composed of tough, durable particles.  Fines passing the<MET> 75 micrometers</MET><ENG> No. 
200</ENG> standard sieve shall have a plasticity index less than six.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.9.2   Grout</TTL><BRK/>
<BRK/>
<TXT>Composed of cement, water, an air-entraining admixture, and sand mixed in proportions of one part portland cement 
to [two] [_____] parts of sand, sufficient water to produce a workable mixture, and an amount of admixture which 
will entrain sufficient air to produce durable grout, as determined by the Contracting Officer.  Mix grout in 
a concrete mixer.  Mixing time shall be sufficient to produce a mixture having a consistency permitting gravity 
flow into the interstices of the rip-rap with limited spading and brooming.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>2.9.3   Rock</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Adjust weights in brackets to fit application.  Take local practice into 
consideration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Rock fragments sufficiently durable to ensure permanence in the structure and the environment in which it is 
to be used.  Rock fragments shall be free from cracks, seams, and other defects that would increase the risk 
of deterioration from natural causes.  The size of the fragments shall be such that no individual fragment exceeds 
a weight of<MET> [68] [_____] kg</MET><ENG> [150] [_____] pounds</ENG> and that no more than 10 percent of the mixture, by weight, 
consists of fragments weighing<MET> 0.91 kg</MET><ENG> 2 pounds</ENG> or less each.  Specific gravity of the rock shall be a minimum 
of [2.50] [_____].   The inclusion of more than trace [1 percent] [_____] quantities of dirt, sand, clay, and 
rock fines will not be permitted.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>2.10   BURIED WARNING AND IDENTIFICATION TAPE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete paragraph if tape is not required in the project.  The use of 
a plastic warning tape for identification is mandatory for buried hazardous 
utilities such as electrical conduit, gas lines, fuel lines, high pressure nitrogen, 
high pressure water and steam lines, domestic sewage force mains, industrial 
waste force mains and industrial sewers carrying hazardous, explosive, or toxic 
waste.  Coordinate color codes with other specification sections and conform, 
if possible, to local practice for identifying buried utilities.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Polyethylene plastic] [and] [metallic core or metallic-faced, acid- and alkali-resistant, polyethylene plastic] 
warning tape manufactured specifically for warning and identification of buried utility lines.  Provide tape 
on rolls,<MET> 75 mm</MET><ENG> 3 inch</ENG> minimum width, color coded as specified below for the intended utility with warning and 
identification imprinted in bold black letters continuously over the entire tape length.   Warning and identification 
to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording.  Color and printing shall be permanent, 
unaffected by moisture or soil.</TXT><BRK/>
<TBL><THD><BRK/>
<HL4>Warning Tape Color Codes</HL4><BRK/></THD>
<BRK/>
                      [Yellow:]           [Electric]<BRK/>
                      [Yellow:]           [Gas, Oil; Dangerous Materials]<BRK/>
                      [Orange:]           [Telephone and Other <BRK/>
                                            Communications]<BRK/>
                      [Blue:]             [Water Systems]<BRK/>
                      [Green:]            [Sewer Systems]<BRK/>
                      [White:]            [Steam Systems]<BRK/>
                      [Gray:]             [Compressed Air]<BRK/></TBL>
<BRK/>
<SPT>[<TTL>2.10.1   Warning Tape for Metallic Piping</TTL><BRK/>
<BRK/>
<TXT>Acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements 
specified above.  Minimum thickness of tape shall be<MET> 0.08 mm</MET><ENG> 0.003 inch</ENG>.  Tape shall have a minimum strength 
of<MET> 10.3 MPa</MET><ENG> 1500 psi</ENG> lengthwise, and<MET> 8.6 MPa</MET><ENG> 1250 psi</ENG> crosswise, with a maximum 350 percent elongation.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.10.2   Detectable Warning Tape for Non-Metallic Piping</TTL><BRK/>
<BRK/>
<TXT>Polyethylene plastic tape conforming to the width, color, and printing requirements specified above.  Minimum 
thickness of the tape shall be<MET> 0.10 mm</MET><ENG> 0.004 inch</ENG>.  Tape shall have a minimum strength of<MET> 10.3 MPa</MET><ENG> 1500 psi</ENG> lengthwise 
and<MET> 8.6 MPa</MET><ENG> 1250 psi</ENG> crosswise.  Tape shall be manufactured with integral wires, foil backing, or other means 
of enabling detection by a metal detector when tape is buried up to<MET> 920 mm</MET><ENG> 3 feet</ENG> deep.  Encase metallic element 
of the tape in a protective jacket or provide with other means of corrosion protection.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.11   DETECTION WIRE FOR NON-METALLIC PIPING</TTL><BRK/>
<BRK/>
<TXT>Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   PROTECTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Shoring and Sheeting</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Contractor will have the responsibility of designing the trench shoring 
and sheeting system or obtaining a suitable trench box on all trench excavations 
over<MET> 1.5 m</MET><ENG> 5 feet</ENG> deep or where it is known that in-situ soils lack the stability 
to hold near vertical faces.  Where sufficient room is available, the Contractor 
may slope back trench walls rather than having to use a shoring system.  The 
Government is responsible for supplying the designer with any historic subsurface 
soil data that might be available.  All such historical or new subsurface soil 
data demonstrating soil characteristics, stability, etc., will be included on 
the contract drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide shoring [bracing] [cribbing] [trench boxes] [underpinning] [and] [sheeting] where indicated.  In addition 
to Section 25 A and B of <RID>EM 385-1-1</RID> [and other requirements set forth in this contract], include provisions in 
the shoring and sheeting plan that will accomplish the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Prevent undermining of pavements, foundations and slabs.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Contractor should not be given the opportunity to slope the faces 
of excavations in lieu of providing shoring unless all the following conditions 
are met:</NPR><BRK/>
<BRK/>
<NPR>1.  The excavation is less than<MET> 6 m</MET><ENG> 20 feet</ENG> in depth.</NPR><BRK/>
<BRK/>
<NPR>2.  There are no adjacent structures, roads, or pavements that will affect the 
excavation.</NPR><BRK/>
<BRK/>
<NPR>3.  No equipment, stored material, or overlying material will affect the excavation.</NPR><BRK/>
<BRK/>
<NPR>4.  Vibration from equipment, traffic, or blasting will not affect the excavation.</NPR><BRK/>
<BRK/>
<NPR>5.  There will be no ground water problems.</NPR><BRK/>
<BRK/>
<NPR>6.  Surcharges will not affect the excavation.</NPR><BRK/>
<BRK/>
<NPR>7.  Station operational considerations permit laying back the slopes of the 
excavation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">b.  Prevent slippage or movement in banks or slopes adjacent to the excavation.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[c.  Allow for the abandonment of shoring and sheeting materials in place in critical areas 
as the work is completed.  In these areas, backfill the excavation to [the elevation indicated] 
[within<MET> 900 mm</MET><ENG> 3 feet</ENG> of the finished grade] [_____] and remove the remaining exposed portion 
of the shoring before completing the backfill.]</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Drainage and Dewatering</TTL><BRK/>
<BRK/>
<TXT>Provide for the collection and disposal of surface and subsurface water encountered during construction.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.2.1   Drainage</TTL><BRK/>
<BRK/>
<TXT>So that construction operations progress successfully, completely drain construction site during periods of construction 
to keep soil materials sufficiently dry.  The Contractor shall establish/construct storm drainage features (ponds/basins) 
at the earliest stages of site development, and throughout construction grade the construction area to provide 
positive surface water runoff away from the construction  activity and/or provide temporary ditches, [dikes,] 
swales, and other drainage features and equipment as required to maintain dry soils[, prevent erosion and undermining 
of foundations].  When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent 
construction features develop, remove unsuitable material and provide new soil material as specified herein.  
It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans 
and specifications and to employ necessary measures to permit construction to proceed.  Excavated slopes and 
backfill surfaces shall be protected to prevent erosion and sloughing.  Excavation shall be performed so that 
the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually 
and effectively drained.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2.2   Dewatering</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Check depth of proposed utilities and foundations relative to the existing 
ground water elevation prior to editing.  Revise as needed when specific methods 
of dewatering are required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes 
and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction.  
French drains, sumps, ditches or trenches will not be permitted within<MET> 0.9 m</MET><ENG> 3 feet</ENG> of the foundation of any 
structure, except with specific written approval, and after specific contractual provisions for restoration of 
the foundation area have been made.  Control measures shall be taken by the time the excavation reaches the water 
level in order to maintain the integrity of the in situ material.  While the excavation is open, the water level 
shall be maintained continuously, at least [_____]<MET> m</MET><ENG> feet</ENG> below the working level.</TXT><BRK/>
<BRK/>
<TXT>[Operate dewatering system continuously until construction work below existing water levels is complete.  Submit 
performance records weekly.] [Measure and record performance of dewatering system at same time each day by use 
of observation wells or piezometers installed in conjunction with the dewatering system.]  [Relieve hydrostatic 
head in previous zones below subgrade elevation in layered soils to prevent uplift.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.3   Underground Utilities</TTL><BRK/>
<BRK/>
<TXT>Location of the existing utilities indicated is approximate.  The Contractor shall physically verify the location 
and elevation of the existing utilities indicated prior to starting construction.  [The Contractor shall contact 
the [Public Works Department] [_____] for assistance in locating existing utilities.]  [The Contractor shall 
scan the construction site with electromagnetic and sonic equipment and mark the surface of the ground where 
existing underground utilities are discovered.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Machinery and Equipment</TTL><BRK/>
<BRK/>
<TXT>Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's 
risk.  Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or 
damaged.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   SURFACE PREPARATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If special site preparation notes are indicated, they should be referenced 
here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.2.1   Clearing and Grubbing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If selective clearing is required, the maximum or minimum tree diameter 
should be specified, measured at<MET> 1.5 m</MET><ENG> 4 1/2 feet</ENG> from the existing ground. 
If merchantable timber is requested by the station, insert and edit the following 
paragraph:</NPR><BRK/>
<BRK/>
<NPR>"Cut merchantable timber into (logs) (cord wood) and store on site where directed.  
Merchantable timber will remain the property of the Government."</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and  vegetation and other items that would 
interfere with construction operations within the [clearing limits] [within lines <MET>1.5 m</MET> <ENG>5 feet</ENG> outside of each 
building and structure line] [_____].  Remove stumps entirely.  Grub out matted roots and roots over<MET> 50 mm</MET><ENG> 2 
inches</ENG> in diameter to at least<MET> 460 mm</MET><ENG> 18 inches</ENG> below existing surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Stripping</TTL><BRK/>
<BRK/>
<TXT>Strip suitable soil from the site where excavation or grading is indicated and stockpile separately from other 
excavated material.  Material unsuitable for use as topsoil [shall be wasted] [shall be stockpiled and used for 
backfilling].  Locate topsoil so that the material can be used readily for the finished grading.  Where sufficient 
existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable 
for use as topsoil.  Protect topsoil and keep in segregated piles until needed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Unsuitable Material</TTL><BRK/>
<BRK/>
<TXT>Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete 
slabs.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   EXCAVATION</TTL><BRK/>
<BRK/>
<TXT>Excavate to contours, elevation, and dimensions indicated.  Reuse excavated materials that meet the specified 
requirements for the material type required at the intended location.  Keep excavations free from water. Excavate 
soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction 
due to exposure to weather.  Excavations below indicated depths will not be permitted except to remove unsatisfactory 
material.  Unsatisfactory material encountered below the grades shown shall be [removed as directed].  Refill 
with [backfill and fill material] [satisfactory material] [select material] [porous fill] and compact to [95] 
[_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>] maximum density.  Unless specified otherwise, refill excavations 
cut below indicated depth with [backfill and fill material] [satisfactory material] [select material] [porous 
fill] and compact to [95] [_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>] maximum density.  Satisfactory material 
removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced 
with satisfactory materials to the indicated excavation grade; except as specified for spread footings.  Determination 
of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated 
shall be done under the direction of the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Structures With Spread Footings</TTL><BRK/>
<BRK/>
<TXT><TST>Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement.</TST>
  Fill over excavations with concrete during foundation placement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Pile Cap Excavation and Backfilling</TTL><BRK/>
<BRK/>
<TXT><TST>Excavate to bottom of pile cap prior to placing or driving piles, unless authorized otherwise by the Contracting 
Officer.</TST>  Backfill and compact overexcavations and changes in grade due to pile driving operations to 95 percent 
of <RID>ASTM D 698</RID> maximum density.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Pipe Trenches</TTL><BRK/>
<BRK/>
<TXT>Excavate to the dimension indicated.  Grade bottom of trenches to provide uniform support for each section of 
pipe after pipe bedding placement.  Tamp if necessary to provide a firm pipe bed.  Recesses shall be excavated 
to accommodate bells and joints so that pipe will be uniformly supported for the entire length.  Rock, where 
encountered, shall be excavated to a depth of at least <MET>150 mm</MET> <ENG>6 inches</ENG> below the bottom of the pipe.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>3.3.4   Hard Material [and Rock] Excavation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where rock excavation is planned, foundation section details or typical 
grading or trench cross sections on plans should show the required limits of 
rock excavation and any special refill or bedding requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Remove hard material [and rock] to elevations indicated in a manner that will leave foundation material in an 
unshattered and solid condition. Roughen level surfaces and cut sloped surfaces into benches for bond with concrete.  
Protect shale from conditions causing decomposition along joints or cleavage planes and other types of erosion.  <TST>
Removal of hard material [and rock] beyond lines and grades indicated will not be grounds for a claim for additional 
payment unless previously authorized by the Contracting Officer.  Excavation of the material claimed as rock 
shall not be performed until the material has been cross sectioned by the Contractor and approved by the Contracting 
Officer.  Common excavation shall consist of all excavation not classified as rock excavation.</TST></TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>3.3.5   Excavated Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When spoil areas or borrow areas are within the limits of Government-controlled 
land, additional requirements based on the following, and as appropriate for 
the project, will be included in the contract document.  Locations of areas 
will be indicated, or the approximate distances from the project site will be 
specified.  Generally, unburned vegetative material and surplus excavated material 
will be disposed of in inconspicuous spoil areas where no future construction 
is planned.  If economically justifiable, surplus suitable excavated material 
may be stockpiled or may be disposed of in areas where future construction is 
planned and where fill will be required.  Spoil materials will be so placed 
and the worked portions of spoil areas and borrow areas will be so graded and 
shaped as to minimize soil erosion, siltation of drainage channels, and damage 
to existing vegetation.  The degree of compaction will be specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent 
work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess 
of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in 
Paragraph "DISPOSITION OF SURPLUS MATERIAL."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6   Final Grade of Surfaces to Support Concrete</TTL><BRK/>
<BRK/>
<TXT>Excavation to final grade shall not be made until just before concrete is to be placed.  [For pile foundations, 
the excavation shall be stopped at an elevation <MET>150 to 300 mm</MET> <ENG>6 to 12</ENG> inches above the bottom of the footing 
before driving piles.  After pile driving has been completed, the remainder of the excavation shall be completed 
to the elevations shown.] Only excavation methods that will leave the foundation rock in a solid and unshattered 
condition shall be used.  Approximately level surfaces shall be roughened, and sloped surfaces shall be cut as 
indicated into rough steps or benches to provide a satisfactory bond.  Shales shall be protected from slaking 
and all surfaces shall be protected from erosion resulting from ponding or flow of water.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   SUBGRADE PREPARATION</TTL><BRK/>
<BRK/>
<TXT>Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with 
satisfactory materials as directed by the Contracting Officer.  The surface shall be scarified to a depth of <MET>
150 mm</MET> <ENG>6 inches</ENG> before the fill is started.  Sloped surfaces steeper than 1 vertical to 4 horizontal shall be 
plowed, stepped, benched, or broken up so that the fill material will bond with the existing material.  When 
subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of <MET>150 
mm,</MET> <ENG>6 inches,</ENG> pulverized, and compacted to the specified density.  When the subgrade is part fill and part excavation 
or natural ground, the excavated or natural ground portion shall be scarified to a depth of <MET>300 mm</MET> <ENG>12 inches</ENG> 
and compacted as specified for the adjacent fill.  Material shall not be placed on surfaces that are muddy, frozen, 
or contain frost.  Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled 
rollers, or other approved equipment well suited to the soil being compacted.  Material shall be moistened or 
aerated as necessary [to plus or minus [_____] percent of optimum moisture] [to provide the moisture content 
that will readily facilitate obtaining the specified compaction with the equipment used].  Minimum subgrade density 
shall be as specified herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Proof Rolling</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify proof rolling when the quality of the existing subgrade is questionable.  
Proof rolling can be used to verify that no unsatisfactory material is present 
(no bid quantity required, location shown or specified) or to locate suspected 
unsatisfactory material (indicate a bid quantity to be removed).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) 
which would promote degradation of an otherwise acceptable subgrade.  [After stripping,] proof roll the existing 
subgrade of the [building] [_____] with six passes of a<MET> [dump truck loaded with 6 cubic meters of soil]</MET> [<MET> 13.6 
meter ton </MET><ENG>15 ton</ENG>, pneumatic-tired roller.]  Operate the [roller] [truck] in a systematic manner to ensure the 
number of passes over all areas, and at speeds between<MET> 4 to 5.5 kilometers per hour</MET><ENG> 2 1/2 to 3 1/2 miles per 
hour</ENG>.  [When proof rolling under buildings, the building subgrade shall be considered to extend<MET> 1.5 m</MET><ENG> 5 feet</ENG> 
beyond the building lines, and one-half of the passes made with the roller shall be in a direction perpendicular 
to the other passes.]  Notify the Contracting Officer a minimum of 3 days prior to proof rolling.  Proof rolling 
shall be performed in the presence of the Contracting Officer.  Rutting or pumping of material shall be undercut 
[as directed by the Contracting Officer] [to a depth of [_____]<MET> mm</MET><ENG> inches</ENG>] and replaced with [fill and backfill] 
[select] material.  [Bids shall be based on replacing approximately [_____]<MET> square meters</MET><ENG> square yards</ENG>, with 
an average depth of [_____]<MET> mm</MET><ENG> inches</ENG> at various locations.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   SUBGRADE FILTER FABRIC</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph in its entirety if filter fabric is not used for 
subgrade stabilization.  Vegetation such as grass may remain when no other subgrade 
preparation is indicated.  Overlap length may be adjusted to fit design requirements. 
Drawings should indicate location and extent of filter fabric in typical cross 
sections.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Place synthetic fiber filter fabric as indicated directly on prepared subgrade free of [vegetation,] stumps, 
rocks larger than<MET> [50 mm]</MET><ENG> [2 inches]</ENG> [_____] diameter and other debris which may puncture or otherwise damage 
the fabric.  Repair damaged fabric by placing an additional layer of fabric to cover the damaged area a minimum 
of<MET> [0.9 m]</MET><ENG> [3 feet]</ENG>[_____] overlap in all directions.  Overlap fabric at joints a minimum of <MET> 0.9 m</MET><ENG> 3 feet</ENG>.  
Obtain approval of filter fabric installation before placing fill or backfill.  Place fill or backfill on fabric 
in the direction of overlaps and compact as specified herein.  Follow manufacturer's recommended installation 
procedures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   FILLING AND BACKFILLING</TTL><BRK/>
<BRK/>
<TXT>Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying 
lift.</TXT><BRK/>
<BRK/>
<SPT>[<TTL>3.6.1   Common Fill Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete bracketed item when a pile-supported structure is not in the job.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide for general site [and under [porous fill of] pile-supported structures].[Use satisfactory materials.]  
Place in<MET> [150] [_____] mm</MET><ENG> [6] [_____] inch</ENG> lifts.  Compact areas not accessible to rollers or compactors with 
mechanical hand tampers.  Aerate material excessively moistened by rain to a satisfactory moisture content.  
Finish to a smooth surface by blading, rolling with a smooth roller, or both.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.6.2   Backfill and Fill Material Placement</TTL><BRK/>
<BRK/>
<TXT>Provide for paved areas and under concrete slabs, except where select material is provided.  Place in<MET> [150] [_____] 
mm</MET><ENG> [6] [_____] inch</ENG> lifts.  Do not place over wet or frozen areas.  Place backfill material adjacent to structures 
as the structural elements are completed and accepted.  Backfill against concrete only when approved.  Place 
and compact material to avoid loading upon or against the structure.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.6.3   Select Material Placement</TTL><BRK/>
<BRK/>
<TXT>Provide under [porous fill of] structures not pile supported.  Place in<MET> [150] [_____] mm</MET><ENG> [6] [_____] inch</ENG> lifts.  
Do not place over wet or frozen areas.  Backfill adjacent to structures shall be placed as structural elements 
are completed and accepted.  Backfill against concrete only when approved.  Place and compact material to avoid 
loading upon or against structure.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.6.4   Backfill and Fill Material Placement Over Pipes and at Walls</TTL><BRK/>
<BRK/>
<TXT>Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems 
have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris.  Backfill 
shall be brought to indicated finish grade [and shall include backfill for outside grease interceptors and underground 
fuel tanks].  Where pipe is coated or wrapped for protection against corrosion, the backfill material up to an 
elevation <MET>600 mm</MET> <ENG>2 feet</ENG> above sewer lines and <MET>300 mm</MET> <ENG>1 foot</ENG> above other utility lines shall be free from stones 
larger than <MET>25 mm</MET> <ENG>1 inch</ENG> in any dimension.  Heavy equipment for spreading and compacting backfill shall not be 
operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top 
of footing; the area remaining shall be compacted in layers not more than <MET>100 mm</MET> <ENG>4 inches</ENG> in compacted thickness 
with power-driven hand tampers suitable for the material being compacted.  Backfill shall be placed carefully 
around pipes or tanks to avoid damage to coatings, wrappings, or tanks.  Backfill shall not be placed against 
foundation walls prior to 7 days after completion of the walls.  As far as practicable, backfill shall be brought 
up evenly on each side of the wall and sloped to drain away from the wall.  </TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>3.6.5   Porous Fill Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The compacted thickness of capillary water barrier will be indicated 
and will not be less than 100 mm (4 inches).  The paragraph will be deleted 
where site conditions make the barrier unnecessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide under floor and area-way slabs on a compacted subgrade.  Place in<MET> [100] [_____] mm</MET><ENG> [4] [_____] inch</ENG> lifts 
with a minimum of two passes of a hand-operated plate-type vibratory compactor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.6   Trench Backfilling</TTL><BRK/>
<BRK/>
<TXT>Backfill as rapidly as construction, testing, and acceptance of work permits.  Place and compact backfill under 
structures and paved areas in<MET> [150] [_____] mm</MET><ENG> [6] [_____] inch</ENG> lifts to top of trench and in<MET> [150] [_____] mm</MET><ENG>
 [6] [_____] inch</ENG> lifts to<MET> 300 mm</MET><ENG> one foot</ENG> over pipe outside structures and paved areas.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7   BORROW</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Coordinate this paragraph with the requirements in Part 2 Products.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow 
materials shall be obtained as specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8   BURIED WARNING AND IDENTIFICATION TAPE</TTL><BRK/>
<BRK/>
<TXT>Provide buried utility lines with utility identification tape.  Bury tape<MET> 300 mm</MET><ENG> 12 inches</ENG> below finished grade; 
under pavements and slabs, bury tape<MET> 150 mm</MET><ENG> 6 inches</ENG> below top of subgrade.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9   BURIED DETECTION WIRE</TTL><BRK/>
<BRK/>
<TXT>Bury detection wire directly above non-metallic piping at a distance not to exceed<MET> 300 mm</MET><ENG> 12 inches</ENG> above the 
top of pipe.  The wire shall extend continuously and unbroken, from manhole to manhole.  The ends of the wire 
shall terminate inside the manholes at each end of the pipe, with a minimum of<MET> 0.9 m</MET><ENG> 3 feet</ENG> of wire, coiled, 
remaining accessible in each manhole.  The wire shall remain insulated over it's entire length.   The wire shall 
enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the 
frame and the chimney seal.  For force mains, the wire shall terminate in the valve pit at the pump station end 
of the pipe.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10   COMPACTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use 90% of ASTM D 698 or ASTM D 1557 for General Site Compaction of cohesionless 
materials on Army projects and 85% of same for Navy projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>ARMY NOTE:  See TM 5-818-1, TM 5-818-7, TM 5-825-2 and DM 21.3 for criteria 
and design guidelines.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Specify most jobs using ASTM D 698 compaction, except for roads, airfields, 
and other heavily loaded areas, which should use ASTM D 1557 compaction.  Specify 
compaction in terms of one compaction effort (ASTM D 698 or ASTM D 1557), if 
possible.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Determine in-place density of existing subgrade; if required density exists, no compaction of existing subgrade 
will be required.  [Density requirements specified herein are for cohesionless materials.  When cohesive materials 
are encountered or used, density requirements may be reduced by 5 percent.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.10.1   General Site</TTL><BRK/>
<BRK/>
<TXT>Compact underneath areas designated for vegetation and areas outside the<MET> 1.5 meter</MET><ENG> 5 foot</ENG> line of the paved area 
or structure to [85] [90] [_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>].  [Compact expansive materials to not 
less than [   ] percent nor more than [   ] percent.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.2   Structures, Spread Footings, and Concrete Slabs</TTL><BRK/>
<BRK/>
<TXT>Compact top<MET> 300 mm</MET><ENG> 12 inches</ENG> of subgrades to [95] [_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>].  Compact [common 
fill] [fill and backfill material] [select material] to [95] [_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3   Adjacent Area</TTL><BRK/>
<BRK/>
<TXT>Compact areas within<MET> 1.5 m</MET><ENG> 5 feet</ENG> of structures to [90] [_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.4   Paved Areas</TTL><BRK/>
<BRK/>
<TXT>Compact top<MET> 300 mm</MET><ENG> 12 inches</ENG> of subgrades to [95] [_____] percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>].  Compact fill 
and backfill materials to 95 percent of [<RID>ASTM D 698</RID>] [<RID>ASTM D 1557</RID>].</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>3.10.5   Airfield Pavements</TTL><BRK/>
<BRK/>
<TXT>Compact top<MET> 600 mm</MET><ENG> 24 inches</ENG> below finished pavement or top<MET> 300 mm</MET><ENG> 12 inches</ENG> of subgrades, whichever is greater, 
to [100] [_____] percent of <RID>ASTM D 1557</RID>; compact fill and backfill material to [100] [_____] percent of <RID>ASTM D 1557</RID>
.</TXT><BRK/>
<BRK/></SPT>
]</SPT>[<SPT><TTL>3.11   PIPELINE CASING UNDER [RAILROAD] [AND] [PAVEMENT]</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate on the contract drawings all construction requirements conforming 
to the standards of the railroad or highway owner. Indicate limits of right-of-way 
and any other site requirements or dimensions.  Where traffic can be interrupted, 
trenching in a pipeline casing is more economical with the same advantages of 
allowing future work without interruption of traffic.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide new smooth wall steel pipeline casing under [new] [existing] [railroad] [and] [pavement] [in a trench] 
[by the boring and jacking method of installation].  Provide each new pipeline casing, where indicated and to 
the lengths and dimensions shown, complete and suitable for use with the new piped utility as indicated.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.1   Earthwork for Pipeline Casings</TTL><BRK/>
<BRK/>
<TXT>Provide excavation, sheet piling, shoring, dewatering, and backfilling for pipeline casings under this section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2   Steel Cased Pipelines</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate on the contract drawings all construction requirements conforming 
to the standards of the railroad or highway owner.  Indicate limits of right-of-way 
and any other site requirements or dimensions.  Where traffic can be interrupted, 
trenching in a pipeline casing is more economical with the same advantages of 
allowing future work without interruption of traffic.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Excavate and place bedding and backfill as indicated.]  [Install pipeline casing by dry boring and jacking method 
as follows:]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.2.1   Hole for Pipeline Casing</TTL><BRK/>
<BRK/>
<TXT>Mechanically bore holes and case through the soil with a cutting head on a continuous auger mounted inside the 
casing pipe.  Weld lengths of pipe together in accordance with <RID>AWS D1.1/D1.1M</RID>.  Do not use water or other fluids 
in connection with the boring operation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.2   Cleaning</TTL><BRK/>
<BRK/>
<TXT>Clean inside of the pipeline casing of dirt, weld splatters, and other foreign matter which would interfere with 
insertion of the piped utilities by attaching a pipe cleaning plug to the boring rig and passing it through the 
pipe.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.3   Piped Utilities</TTL><BRK/>
<BRK/>
<TXT>Provide in casing using wood supports adjusted to obtained grades and elevations indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.4   End Seals</TTL><BRK/>
<BRK/>
<TXT>After installation of piped utilities in pipeline casing, provide watertight end seals at each end of pipeline 
casing between pipeline casing and piping utilities.  Provide watertight [end seals as indicated.] [segmented 
elastomeric end seals.]</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT>][<SPT><TTL>3.12   SPECIAL EARTHWORK REQUIREMENTS FOR SUBSURFACE DRAINS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Open-joint pipe (drain tile) will not be used for general airfield or 
heliport construction, drainage systems for structures, or for drains crossing 
or adjacent to paved areas.  Open-joint pipe will be used only for subsoil drainage 
for drill areas, parade grounds, athletic fields, and other areas subject to 
lightweight vehicle traffic only, and where conditions justify its use.</NPR><BRK/>
<BRK/>
<NPR>Delete these paragraphs entirely when there is no subsurface drainage or where 
underdrainage requirements are completely described in another section.  The 
type or types of pipe to be used will be indicated on the drawings.  Where a 
Contractor's option is to be permitted, the types that are acceptable will be 
included in the specification. Add the requirements for a specialized subsurface 
drain, if necessary, to what is specified in this section.  Consult a geotechnical 
engineer to determine specific grading requirements of granular filters and 
backfill materials and suitability of filter fabric.  Include typical cross 
section detail of subsurface drain type or options on contract drawings.</NPR><BRK/>
<BRK/>
<NPR>The thickness and gradation of granular fill material for subsurface drains 
will be determined by soil conditions and subsoil drainage requirements.</NPR><BRK/>
<BRK/>
<NPR>At Table 1, choose one of the three options for each of the three types.  The 
gradations shown on Table 1 may be altered to fit project requirements or additional 
gradations may be added to fit requirements of various subsurface drains within 
the project.  The material placed adjacent to perforated pipe and open joints 
(without filter fabric wrapping) will be of a size that will prevent the entrance 
of any of the porous material into the drain.  This material shall be a minimum 
of<MET> 150 mm</MET><ENG> 6 inches</ENG> thick on the side of the pipe where the perforations are 
and around all joints.  Thicknesses of granular fill, especially for subsurface 
drains with two types of material, will be clearly shown on the drawings.  Where 
site conditions require more than two types of granular fill for drains, the 
drawings will indicate the areas of different gradation and the table will expanded 
using additional types to show different gradations for different locations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Excavate to dimensions indicated.  Provide a bedding surface of no more than <MET>25 mm</MET><ENG>one inch</ENG> of [sand] [gravel] 
[Type I subdrain backfill material] and place on compacted [native soil] [impermeable material] as indicated. 
Backfill [blind or french drains] [around and over the pipes after pipe installation has been approved].  Place 
special granular filter material in<MET> 150 mm</MET><ENG> 6 inch</ENG> lifts and compact with mechanical, vibrating plate tampers 
or rammers until no further consolidation can be achieved.  Compact backfill overlying the special granular filter 
material as specified for adjacent or overlying work.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.12.1   Granular Backfill Without Filter Fabric</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate with material specifications in Part 2.  Consult a geotechnical 
engineer to determine optimum thickness of granular filter material and modify 
information in brackets if necessary.  Indicate on drawings where different 
types of drains are to be used.  Delete requirements for types of drains that 
are not included in the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.12.1.1   Perforated or Slotted Wall Pipe</TTL><BRK/>
<BRK/>
<TXT>Place granular material as pipe is laid and extend fit for a minimum of [one] pipe diameter on each side of and<MET>
 450 mm</MET><ENG> 18 inches</ENG> above the top of the pipe.  Place a layer of [kraft paper] [_____,] on top of granular filter 
before continuing with the backfill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.1.2   Open-Joint Pipe</TTL><BRK/>
<BRK/>
<TXT>Place both types of granular material specified as pipe is laid forming an aggregate filter around the pipe.  
Provide [Type II] material to envelope the pipe a minimum of one-half the pipe diameter or twice the maximum 
aggregate size, whichever is larger, on each side and on top of the pipe. Place [Type I] material next to and 
on top of the [Type II] material to provide a total fill extending at least [one] pipe diameter on each side 
of and<MET> 450 mm</MET><ENG> 18 inches</ENG> above the top of the pipe.  Place a layer of [kraft paper] [______,] on top of the granular 
filter before continuing with the backfill.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.2   Granular Backfill Using Filter Fabric</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate with material specifications in Part 2.  Consult soils engineer 
to determine optimum thickness of granular filter material and modify information 
in brackets if necessary.  Indicate on drawings where different types of drains 
are to be used.  Delete requirements for types of drains that are not included 
in the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.12.2.1   Perforated or Slotted Wall Pipes</TTL><BRK/>
<BRK/>
<TXT>Wrap one layer of filter fabric around pipe in such a manner that longitudinal overlaps are in unperforated or 
unslotted quadrants of the pipe.  Overlap fabric a minimum of<MET> 50 mm</MET><ENG> 2 inches</ENG>.  Secure fabric to pipe so that 
backfill material does not infiltrate through overlaps.  Place granular material and extend it for [one] pipe 
diameter, minimum of<MET> 150 mm</MET><ENG> 6 inches</ENG> on each side of and<MET> 450 mm</MET><ENG> 18 inches</ENG> above top of pipe.  Place a layer of 
filter fabric on top of granular filter before continuing with backfill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.2   Open-Joint Pipe</TTL><BRK/>
<BRK/>
<TXT>Wrap one layer of filter fabric around pipe joints overlapping a minimum of<MET> 50 mm</MET><ENG> 2 inches</ENG> in the longitudinal 
direction and extending at least<MET> 150 mm</MET><ENG> 6 inches</ENG> on both sides of the joint.  Secure fabric to pipe so that backfill 
material does not infiltrate through overlaps.  Place granular material specified and extend it for a minimum 
of [one] pipe diameter on each side of and<MET> 450 mm</MET><ENG> 18 inches</ENG> above top of pipe.  Place a layer of filter fabric 
on top of granular filter before continuing with backfill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.3   Blind or French Drains</TTL><BRK/>
<BRK/>
<TXT>Install filter cloth in trenches with smoothly graded sides and bottom, free of cavities or projecting rocks.  
Lay the cloth flat but not stretched [and secure with anchor pins].  Place filter cloth so that drain water must 
pass through the cloth into the specified granular filter material. Overlap ends at least of<MET> 300 mm</MET><ENG> 12 inches</ENG>
.  Place backfill on filter cloth in the direction of overlaps.  Where fabric is damaged, place a new piece of 
filter cloth over damaged area and overlap at least of<MET> 300 mm</MET><ENG> 12 inches</ENG> in every direction.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT>][<SPT><TTL>3.13   EARTHWORK REQUIREMENTS FOR SEWAGE ABSORPTION [TRENCHES] [PITS]</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete these paragraphs when sewage absorption trenches or pits are not 
included in the project.  Consult geotechnical engineer and local standards 
in selecting bracketed information in paragraph entitled "Earthwork Requirements 
for Sewage Absorption [Trenches] [Pits]" to conform with design indicated on 
the drawings.  Coordinate with requirements for exterior sanitary sewer systems. 
Provide details on drawings indicating specific construction requirements as 
suggested by Sketch 02302-1.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide sewage absorption [trench] [pit] as indicated.  [Grade trenches uniformly downward to ends of laterals.]  
[Place [pre-cast concrete base ring] [concrete footing] for pit sections at the elevation indicated. Assemble 
succeeding sections as indicated and as recommended by manufacturer.]  Place porous fill [around and over pipe] 
[around absorption pit] as indicated.  Take special care to prevent displacement of or damage to [pipe] [pit 
walls].  Cover porous fill with [kraft paper] [filter fabric] [______] [a concrete cover] as indicated before 
continuing with backfill for adjacent or overlying work.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>3.14   RIP-RAP CONSTRUCTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Make sure there is no duplication of rip-rap requirements between this 
and other specification sections.  In paragraph entitled "Material for Rip-Rap," 
refer to standard specifications for rip-rap if local specifications are satisfactory 
and available.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select information in brackets to best describe rip-rap construction.  
Provide detail or typical section through rip-rap on drawings as well as all 
dimensions necessary for estimating and construction.  If DOT standard specifications 
are referenced for rip-rap construction, paragraphs entitled "Preparation" through 
"Grouting" may be deleted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Construct rip-rap [on bedding material] [on filter fabric] [with grout] [in accordance with [DOT] [_____] State 
Standard, paragraph [_____]] in the areas indicated.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.14.1   Preparation</TTL><BRK/>
<BRK/>
<TXT>Trim and dress indicated areas to conform to cross sections, lines and grades shown within a tolerance of<MET> 30 
mm</MET><ENG> 0.1 foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14.2   Bedding Placement</TTL><BRK/>
<BRK/>
<TXT>Spread [filter fabric] bedding material uniformly to a thickness of at least<MET> [75] [_____] mm</MET><ENG> [3] [_____] inches</ENG>
 on prepared subgrade as indicated.  [Compaction of bedding is not required.  Finish bedding to present even 
surface free from mounds and windrows.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14.3   Stone Placement</TTL><BRK/>
<BRK/>
<TXT>Place rock for rip-rap on prepared bedding material to produce a well graded mass with the minimum practicable 
percentage of voids in conformance with lines and grades indicated.  Distribute larger rock fragments, with dimensions 
extending the full depth of the rip-rap throughout the entire mass and eliminate "pockets" of small rock fragments.  
Rearrange individual pieces by mechanical equipment or by hand as necessary to obtain the distribution of fragment 
sizes specified above.  [For grouted rip-rap, hand-place surface rock with open joints to facilitate grouting 
and do not fill smaller spaces between surface rock with finer material.  Provide at least one "weep hole" through 
grouted rip-rap for every<MET> 4.65 square meters</MET><ENG> 50 square feet</ENG> of finished surface.  Weep holes shall consist of 
columns of bedding material,<MET> 100 mm</MET><ENG> 4 inches</ENG> in diameter, extending up to the rip-rap surface without grout.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.14.4   Grouting</TTL><BRK/>
<BRK/>
<TXT>[Prior to grouting, wet rip-rap surfaces.  Grout rip-rap in successive longitudinal strips, approximately<MET> 3 m</MET><ENG>
 10 feet</ENG> in width, commencing at the lowest strip and working up the slope.  Distribute grout to place of final 
deposit and work into place between stones with brooms, spades, trowels, or vibrating equipment.  Take precautions 
to prevent grout from penetrating bedding layer.  Protect and cure surface for a minimum of 7 days.]</TXT><BRK/>
<BRK/></SPT>
</SPT>]<SPT><TTL>3.15   FINISH OPERATIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.15.1   Grading</TTL><BRK/>
<BRK/>
<TXT>Finish grades as indicated within<MET> 30 mm</MET><ENG> one-tenth of one foot</ENG>.  Grade areas to drain water away from structures.  
Maintain areas free of trash and debris.  For existing grades that will remain but which were disturbed by Contractor's 
operations, grade as directed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.2   Topsoil and Seed</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If seeding is minor, use requirements specified herein.  Otherwise, edit 
Section 32 92 19 and cover requirements therein.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Provide as specified in Section <SRF>32 92 19</SRF> SEEDING.]</TXT><BRK/>
<BRK/>
<TXT>[Scarify existing subgrade.  Provide<MET> 100 mm</MET><ENG> 4 inches</ENG> of topsoil for newly graded finish earth surfaces and areas 
disturbed by the Contractor.  Topsoil shall not be placed when the subgrade is frozen, excessively wet, extremely 
dry, or in a condition otherwise detrimental to seeding, planting, or proper grading.  [Additional topsoil will 
not be required if work is performed in compliance with stripping and stockpiling requirements.]  [If there is 
insufficient on-site topsoil meeting specified requirements for topsoil, provide topsoil required in excess of 
that available.]  Seed shall match existing vegetation.  Provide seed at<MET> 2.5 kg per 100 square meters</MET><ENG> 5 pounds 
per 1000 square feet</ENG>.  Provide <RID>CID A-A-1909</RID>, Type I, Class 2, 10-10-10 analysis fertilizer at<MET> 12.2 kg per 100 
square meters</MET><ENG> 25 pounds per 1000 square feet</ENG>.  [Provide commercial agricultural limestone of 94-80-14 analysis 
at<MET> 34.2 kg per 100 square meters</MET><ENG> 70 pounds per 1000 square feet</ENG>.]  Provide mulch and water to establish an acceptable 
stand of grass.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.15.3   Protection of Surfaces</TTL><BRK/>
<BRK/>
<TXT>Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur.  
Repair or reestablish damaged grades, elevations, or slopes.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.16   DISPOSITION OF SURPLUS MATERIAL</TTL><BRK/>
<BRK/>
<TXT>[Waste in Government disposal area [indicated] [which is located within a haul distance of [_____]<MET> kilometers</MET><ENG>
 miles</ENG>.]  [Remove from Government property] surplus or other soil material not required or suitable for filling 
or backfilling, and brush, refuse, stumps, roots, and timber.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.17.1   Sampling</TTL><BRK/>
<BRK/>
<TXT><TST>Take the number and size of samples required to perform the following tests.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.2   Testing</TTL><BRK/>
<BRK/>
<TXT><TST>Perform one of each of the following tests for each material used. Provide additional tests for each source change.</TST></TXT><BRK/>
<BRK/>
<SPT><TTL>3.17.2.1   <SUB>Fill and Backfill</SUB> Material Testing</TTL><BRK/>
<BRK/>
<TXT><TST>Test fill and backfill material in accordance with <RID>ASTM C 136</RID> for conformance to <RID>ASTM D 2487</RID> gradation limits; <RID>
ASTM D 1140</RID> for material finer than the<MET> 75 micrometers</MET><ENG> No. 200</ENG> sieve; <RID>ASTM D 4318</RID> for liquid limit and for plastic 
limit; <RID>ASTM D 698</RID> or <RID>ASTM D 1557</RID> for moisture density relations, as applicable.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.2.2   <SUB>Select Material</SUB> Testing</TTL><BRK/>
<BRK/>
<TXT><TST>Test select material in accordance with <RID>ASTM C 136</RID> for conformance to <RID>ASTM D 2487</RID> gradation limits; <RID>ASTM D 1140</RID>
 for material finer than the<MET> 75 micrometers</MET><ENG> No. 200</ENG> sieve; <RID>ASTM D 698</RID> or <RID>ASTM D 1557</RID> for moisture density relations, 
as applicable.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.2.3   <SUB>Porous Fill</SUB> Testing</TTL><BRK/>
<BRK/>
<TXT><TST>Test porous fill in accordance with <RID>ASTM C 136</RID> for conformance to gradation specified in <RID>ASTM C 33</RID>.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.17.2.4   <SUB>Density Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Density test frequency can vary from one test per<MET> 10 square meter</MET><ENG> 100 
square feet</ENG> for small areas up to one test per<MET> 900 square meter</MET><ENG> 10,000 square 
feet</ENG>.  The following table will also help establish test frequency for various 
situations:</NPR><BRK/>
<MET><TBL><THD><BRK/>
                     Location of<BRK/>
  <HL1>Material Type</HL1>      <HL1>Material</HL1>               <HL1>Test Frequency</HL1><BRK/></THD>
<BRK/>
  Undisturbed       Structures              Two random tests in<BRK/>
  native soil                               building footings and<BRK/>
                                            two tests on subgrade<BRK/>
                                            within building line.<BRK/>
<BRK/>
  Fills and         Structures              One test per structure<BRK/>
  backfills         (adjacent to)           per 200 sq. m taken 300<BRK/>
                                            mm below finished grade.<BRK/>
<BRK/>
  Subgrades         Site (except            One test per lift per 250<BRK/>
                    airfields)              sq. m<BRK/>
<BRK/>
  Embankments       Any                     One test per lift per 400<BRK/>
  or borrow                                 cubic m placed.<BRK/>
<BRK/>
  Native soil       Any                     One test or one test per<BRK/>
  subgrade                                  900 sq. m whichever is<BRK/>
  other than                                greater.<BRK/>
  structures<BRK/>
  and parking<BRK/>
<BRK/>
  Borrow            Any                     One test per lift per 400<BRK/>
                                            cubic m placed.<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
                    Location of<BRK/>
  <HL1>Material Type</HL1>      <HL1>Material</HL1>               <HL1>Test Frequency</HL1><BRK/></THD>
<BRK/>
  Undisturbed       Structures              Two random tests in<BRK/>
  native soil                               building footings and<BRK/>
                                            two tests on subgrade<BRK/>
                                            within building line.<BRK/>
<BRK/>
  Fills and         Structures              One test per structure<BRK/>
  backfills         (adjacent to)           per 2,000 sq. ft taken<BRK/>
                                            12 inches below<BRK/>
                                            finished grade.<BRK/>
<BRK/>
  Subgrades         Site (except            One test per lift per<BRK/>
                    airfields)              2,500 sq. ft<BRK/>
<BRK/>
  Embankments       Any                     One test per lift per<BRK/>
  or borrow                                 500 cubic yds placed.<BRK/>
<BRK/>
  Native soil       Any                     One test or one test per<BRK/>
  subgrade                                  10,000 sq. ft, whichever<BRK/>
  other than                                is greater.<BRK/>
  structures<BRK/>
  and parking<BRK/>
<BRK/>
  Borrow            Any                     One test per lift per<BRK/>
                                            500 cubic yds placed.<BRK/></TBL>
</ENG><BRK/>
<AST/></NTE><BRK/>
<TXT><TST>Test density in accordance with <RID>ASTM D 1556</RID>, or <RID>ASTM D 2922</RID> and <RID>ASTM D 3017</RID>.  When <RID>ASTM D 2922</RID> and <RID>ASTM D 3017</RID>
 density tests are used, verify density test results by performing an <RID>ASTM D 1556</RID> density test at a location 
already <RID>ASTM D 2922</RID> and <RID>ASTM D 3017</RID> tested as specified herein.  Perform an <RID>ASTM D 1556</RID> density test at the start 
of the job, and for every 10 <RID>ASTM D 2922</RID> and <RID>ASTM D 3017</RID> density tests thereafter.  Test each lift at randomly 
selected locations every<MET> [200] [_____] square meters</MET><ENG> [2000] [_____] square feet</ENG> of existing grade in fills for 
structures and concrete slabs, and every<MET> [250] [_____] square meters</MET><ENG> [2500] [_____] square feet</ENG> for other fill 
areas and every<MET> [200] [_____] square meters</MET><ENG> [2000] [_____] square feet</ENG> of subgrade in cut.</TST>  Include density test 
results in daily report.</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">[a.  Bedding and backfill in trenches:  One test per<MET> [15] [_____] meters</MET><ENG> [50] [_____] linear 
feet</ENG> in each lift.]</ITM><BRK/>
<BRK/></SPT>
<SPT>[<TTL>3.17.2.5   <SUB>Moisture Content Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include moisture content test requirements in Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In the stockpile, excavation or borrow areas, a minimum of two tests per day per type of material or source of 
materials being placed is required during stable weather conditions.  During unstable weather, tests shall be 
made as dictated by local conditions and approved moisture content shall be tested in accordance with <RID>ASTM D 2216</RID>
.  Include moisture content test results in daily report.</TXT><BRK/>
<BRK/>
]</SPT></SPT></SPT></PRT>    <END/><BRK/>
<BRK/></SEC>