USACE / NAVFAC / AFCESA / NASA               UFGS-31 73 00 (November 2008)<BRK/>
                                             -----------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA> (CW)              Superseding<BRK/>
                                             UFGS-31 73 00 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 31 73 00</SCN><BRK/>
<BRK/>
<STL>TUNNEL AND SHAFT GROUTING</STL><BRK/>
<DTE>11/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>tunnel and shaft 
grouting applicable to constructing new and repairing existing underground structures</SCP>
.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section <SRF>01 22 00.00 10</SRF> MEASUREMENT AND PAYMENT is included in the 
project specifications, this paragraph title (UNIT PRICES) should be deleted 
from this section and the remaining appropriately edited subparagraphs below 
should be inserted into Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.1   Mobilization and Demobilization</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.1.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs of assembling all plant and equipment at the site preparatory to initiating the 
work and for removing it when the drilling and grouting has been completed.  Sixty (60) percent of the contract 
lump-sum price for mobilization and demobilization will be paid following completion of moving onto the site, 
including complete assembly, in working order, of all equipment necessary to perform the required drilling and 
grouting operations.  The remaining forty (40) percent of the contract lump-sum price will be paid when all equipment 
has been removed from the site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.1.2   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  lump sum.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.2   Drilling Grout Holes</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.2.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with drilling and redrilling grout holes; washing and pressure testing 
of grout holes; containing and disposing of waste water and waste grout; clean-up of the site; furnishing, handling, 
transporting and storing of grout materials; and for furnishing all labor and supplies incidental to the work.  
[Unless otherwise specified, no][No] separate payment will be made for any material constituent of the grout, 
including cement and/or chemical grout materials placed in the performance of contract grouting.  No payment 
will be made for grout, or the material constituents thereof, wasted due to improper anchorage of grout pipe 
or connections, or which is wasted due to negligence on the part of the Contractor, nor for grout which is rejected 
by the Contracting Officer because of improper mixing.  Payment will be made at the applicable contract unit 
prices for materials contained in grout which are wasted, where the wasting is not due to negligence on the part 
of the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Drilling of grout holes will be measured for payment on the basis of the linear<MET> meters</MET><ENG> feet</ENG> of holes actually 
drilled in concrete, rock or soil, as shown or as directed, including all intermediate holes at locations where 
pipe was not installed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  linear<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.3   Drilling Drain Holes</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.3.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with drilling of drain holes actually drilled in concrete, rock, or 
soil, as shown or as directed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Drilling of drain holes will be measured for payment on the basis of the linear<MET> meters</MET><ENG> feet</ENG> of holes actually 
drilled in concrete, rock, or soil, as shown or as directed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  linear<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.4   Drilling Exploratory Holes</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.4.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with drilling of exploratory holes.[  Core boxes shall be provided 
at no additional cost to the Government.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Drilling of exploratory holes will be measured for payment on the basis of the linear<MET> meters</MET><ENG> feet</ENG> of holes actually 
drilled in concrete, rock, or soil, as directed by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  linear<MET> meter</MET><ENG> foot</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.5   Placing Grout</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select appropriate alternatives.</NPR><BRK/>
<BRK/>
<NPR>Under certain conditions it may be desirable to include a pay item for standby 
time for Government directed suspension of drilling or grouting operations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.5.1   Payment</TTL><BRK/>
<BRK/>
<TXT>[Payment will be made for costs associated with satisfactorily placing grout in contact grout holes[ and behind 
steel liner], which includes full compensation for[ furnishing all materials,] proportioning the mix as directed,[ 
drilling grout holes if necessary,] and mixing and injecting the grout as specified or as directed.][Payment 
will be made for costs associated with satisfactorily placing grout in grout holes, which includes full compensation 
for proportioning the mix, mixing, and injecting the grout as specified or as directed.  Separate payment will 
be made for all materials used in [contact ]grout as provided in unit price pay item(s) "Portland Cement in Grout" 
"Mineral Filler in Grout", "Sand in Grout", "Fluidifier in Grout", and "Chemicals in Chemical Grout".]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.5.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>The operation of placing grout will be measured for payment on the basis of the number of[<MET> cubic meters</MET><ENG> cubic 
feet</ENG> of the component materials (bulk materials), satisfactorily placed, exclusive of water [and fluidifier] 
and regardless of the proportions of the mixes, measured individually as specified in unit price pay items "Portland 
Cement in Grout", "Mineral Filler in Grout", and "Sand in Grout".][hours of satisfactory placing regardless of 
the proportions of the mixes.  Measurement will begin with the initiation of grout injection at the proper elevation 
or stage and continue until grout injection ceases, for a given hole, exclusive downtime.  Downtime is defined 
as any failure to inject grout continuously, except for intermittent grouting as directed by the Contacting Officer.  
Time will be measured cumulatively to the next whole hour of operation.  Payment for placing grout in holes will 
be based on the total amount of time required for satisfactorily placing grout, determined by reducing the total 
number of minutes of operation to the nearest whole hour.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.5.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  [cubic<MET> meter</MET><ENG> foot</ENG>][nearest whole hour].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.6   Connections to Grout Holes</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.6.1   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The price to be inserted in this paragraph should be determined on the 
basis of the estimated cost to the Contractor for the operation of moving the 
grout supply line onto the hole.  This price should not include any allowance 
for pipe or other materials used in making the connections.  This unit price 
pay item may be optional for grout payment on an hourly basis.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Payment will be made for costs associated with connections to grout holes at a rate of [_____] dollars per connection.] 
[Payment for only one connection will be made for each hole regardless of the number of settings.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Connections to grout holes will be measured for payment per connection for each time the grout supply line is 
connected to the ring grout hole or an exploratory hole for the purpose of injecting grout, regardless of the 
number of times such connections are made per hole or the amount of grout actually injected.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  each.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.7   Portland Cement in Grout</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.7.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with Portland cement in grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.7.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Portland cement in grout will be measured for payment on the basis of the number of<MET> cubic meters (42.6 kg)</MET><ENG> cubic 
feet (94 pounds)</ENG> of cement used in the grout satisfactorily placed in ring grout holes and in filling exploratory 
holes, or wasted when such wasting is not due to the Contractor's negligence.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.7.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: <MET> meter (42.6 kg)</MET><ENG> cubic foot (94 pounds)</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.8   Mineral Filler in Grout</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.8.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with mineral filler in grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.8.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Mineral filler in grout will be measured for payment on the basis of the number of<MET> cubic meters (36.3 kg)</MET><ENG> cubic 
feet (80 pounds)</ENG> of filler used in the grout and satisfactorily placed in grout holes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.8.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: <MET> cubic meter (36.3 kg)</MET><ENG> cubic foot (80 pounds)</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.9   Sand in Grout</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.9.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with sand in grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.9.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Sand in grout will be measured for payment on the basis of the number of<MET> cubic meters</MET><ENG> cubic feet</ENG> of sand [, dry 
rodded measurement,] used in the grout satisfactorily placed in ring grout holes or in filling exploratory holes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.9.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic foot.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.10   Fluidifier in Grout</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.10.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with fluidifier in grout [, including full allowance for the payment 
by the Contractor of all required royalties].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Fluidifier in grout will be measured for payment on the basis of the number of pounds of fluidifier used in the 
grout satisfactorily placed in ring grout holes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: <MET> kilogram</MET><ENG> pound</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.11   Chemicals in Chemical Grout</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.11.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with chemicals in chemical grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.11.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Chemicals in chemical grout will be measured for payment on the basis of the number of gallons of chemicals actually 
used in grout mixtures satisfactorily placed in ring grout holes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.11.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: <MET> kilogram</MET><ENG> pound</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.12   Steel Pipe and Fittings</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.12.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with embedded grout and drain hole pipe and fittings remaining in the 
permanent work, which includes costs for removal of pipe and fittings, and patching and cleanup pursuant to Section 
<SRF>31 73 00</SRF> TUNNEL AND SHAFT GROUTING, paragraph PATCHING AND CLEANUP.  All pipe and fittings removed shall become 
the property of the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.12.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Embedded pipe and fittings through which holes will be drilled and grouted, as shown and as directed or approved, 
will be measured for payment on the basis of the actual<MET> [kilograms][linear meters]</MET><ENG> [pounds][linear feet]</ENG>[, as 
differentiated by pipe size and schedule number,] of satisfactorily installed pipe and fittings left in place.  
No additional allowance will be made for [overweight][differences] caused by installation of oversized pipe (diameter 
or length) and pipes that are not specified or approved.  Upon completion of the grouting, no additional allowance 
will be made for costs of cutting off and removing from the project site all grout pipe connections protruding 
from the inside face of the concrete liner.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.12.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: <MET> kilogram</MET><ENG> pound</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.13   Pressure Washing and Pressure Testing</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.13.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for pressure washing, and pressure testing of grout holes and pressure testing of exploratory 
holes, which includes the cost of preliminary washing, materials for washing and testing, and making and breaking 
connections incidental to the work.  Payment will be based upon the total amount of time required for pressure 
washing and pressure testing, determined by reducing the total number of minutes of operation to the nearest 
whole hour.  No payment will be made for time lost due to fault or negligence of the Contractor, or due to defective 
equipment furnished by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.13.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Pressure washing and pressure testing will be measured for payment on the basis of the actual time water pumps 
are operating.  Pressure washing and pressure testing will be measured from the time pumping is begun on a hole 
or section of a hole until the time pumping is completed on the hole or section of the hole as determined by 
the Contracting Officer.  Time will be measured cumulatively to the next whole minute of operations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.13.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  nearest whole hour.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B16.3</RID><RTL>(2006) Malleable Iron Threaded Fittings, Classes 150 and 300</RTL><BRK/><BRK/><RID>ASME B16.5</RID><RTL>(2003) Standard for Pipe Flanges and Flanged Fittings:  NPS 1/2 Through NPS 24</RTL><BRK/><BRK/><RID>ASME B16.9</RID><RTL>(2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 53/A 53M</RID><RTL>(2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless</RTL><BRK/><BRK/><RID>ASTM C 117</RID><RTL>(2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 494/C 494M</RID><RTL>(2008a) Standard Specification for Chemical Admixtures for Concrete</RTL><BRK/><BRK/><RID>ASTM C 618</RID><RTL>(2008a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete</RTL><BRK/><BRK/><RID>ASTM C 937</RID><RTL>(2002) Grout Fluidifier for Preplaced-Aggregate Concrete</RTL><BRK/><BRK/><RID>ASTM C 939</RID><RTL>(2002) Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method)</RTL><BRK/><BRK/><RID>ASTM C 940</RID><RTL>(1998a; R 2003) Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory</RTL><BRK/><BRK/><RID>ASTM C 942</RID><RTL>(1999; R 2004) Compressive Strength of Grouts for Preplaced-Aggregate Concrete in the Laboratory</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>COE CRD-C 400</RID><RTL>(1963) Requirements for Water for Use in Mixing or Curing Concrete</RTL><BRK/><BRK/><RID>EM 1110-1-3500</RID><RTL>(1995) Chemical Grouting</RTL><BRK/><BRK/><RID>EM 1110-2-2901</RID><RTL>(1997) Tunnels and Shafts in Rock</RTL><BRK/><BRK/><RID>EM 1110-2-3506</RID><RTL>(1984) Grouting Technology</RTL><BRK/><BRK/><RID>EM 385-1-1</RID><RTL>(2008) Safety and Health Requirements Manual</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The work will be under the direction of the Contracting Officer or his 
authorized representative, i.e., Government Representative who will be an engineering 
geologist or geotechnical engineer experienced in the design and grouting of 
tunnels and shafts.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>This section describes the equipment, materials, and procedures to perform drilling and grouting work.  It covers 
the equipment and materials to use; drilling grout, drain and exploratory holes; installing grouting pipe and 
fittings; connections to grout holes; furnishing, handling, transporting, storing, mixing, and injecting grout; 
handling, controling,  and disposing of drill cuttings, waste water, and waste grout; patching finished grout 
and exploratory holes; final cleanup upon completion of work and all other operations incidental to drilling 
and grouting.  The work consists of drilling exploratory and drain holes as directed or shown and performing 
[contact][ and ][tunnel and shaft][and ][steel liner][ and ][ring curtain] grouting as shown.  Exploratory drilling 
may be required to define problem areas or verify results ahead of the working face or through the lining during 
construction.  The total amount of drilling and grouting required is not known and will be determined by conditions 
encountered as the work progresses.  Grouting mixes, pressures, pumping rates, and the sequence in which holes 
are drilled and/or grouted will be determined in the field and shall be as directed.  Work under this section 
shall be in accordance with <RID>EM 1110-1-3500</RID>, <RID>EM 1110-2-2901</RID>, and <RID>EM 1110-2-3506</RID></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Drilling Operations</SUB></ITM><BRK/>
<ITM><SUB>Pressure Washing and Pressure Testing Operations</SUB></ITM><BRK/>
<ITM><SUB>Cement and Chemical Grouting Operations</SUB></ITM><BRK/>
<BRK/>
<ITM>  Duplicate records of all grout hole and drain hole drilling operations, all pressure washing 
and pressure testing operations, and all cement and chemical grouting operations.  The Government  
must receive the originals of all such records before final payment will be processed.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Qualifications</SUB></ITM><BRK/>
<BRK/>
<ITM>  Evidence that the grouting specialist or grouting foreman has had at least 3 years experience 
within the past 5 years on similar grouting type projects.</ITM><BRK/>
<BRK/>
<ITM><SUB>Grouting Equipment</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A plan of the proposed grouting equipment types and layout for approval.[  An example of a 
typical grouting equipment layout is included at the end of this section.]</ITM><BRK/>
<BRK/>
<ITM><SUB>Grout Application</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  The method to be used in applying the grout.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Grouting Material Samples</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Samples of grouting material for Government testing and approval.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   <SUB>QUALIFICATIONS</SUB></TTL><BRK/>
<BRK/>
<TXT>Grouting shall be performed by a specialty Contractor or subcontractor experienced and competent in [cement grouting] 
[chemical grouting] [both cement and chemical grouting].  Perform all grouting work under the direct field supervision 
of a qualified grouting specialist or grouting foreman whose qualifications have been provided to the Contracting 
Officer.  The foreman or specialist shall supervise the performance of the work in compliance with these specifications.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   SEQUENCING</TTL><BRK/>
<BRK/>
<TXT>Perform grouting in the work sequence as shown and as specified.  [[Contact grouting][ and/or ][grouting behind 
steel liner] shall be done at a reasonable time following installation of the permanent liner and prior to any 
application of internal or external water pressure, air shock, or vibration.][  Tunnel and shaft grouting or 
ring grouting shall be done at the appropriate time during the excavation/muck/support mining cycle to achieve 
the desired water flow reduction or stabilization prior to the passage of any water within the tunnel or shaft.]  
Grouting, once started, shall normally proceed to completion without significant interruption.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   GROUTING MATERIALS</TTL><BRK/>
<BRK/>
<TXT>Provide grout of a nonshrink type and normally composed of water, cement, and fluidifier with shrinkage compensators 
(expanding agents).  Use sand, admixtures to vary grout properties, and mineral fillers as specified or approved.  
The grout mixes will be designed or approved by the Contracting Officer and will be varied to meet the characteristics 
of each hole or situation as determined by the conditions encountered.  The various materials furnished shall 
conform to the following paragraphs.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Water</TTL><BRK/>
<BRK/>
<TXT>[Furnish the water used in the grout.  It shall be fresh, clean, and free of sewage, oil, or organic matter and 
injurious amounts of acid, alkali, and salts or other damaging substances as determined by <RID>COE CRD-C 400</RID>.][Water 
suitable for use in the work will be furnished by the Government.  The Contractor shall provide any necessary 
connections and extensions to the Government supply line.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Cement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer should insert the Section number and title that specifies the 
storage requirements for cement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide cement used in grout conforming to the requirements of <RID>ASTM C 150</RID>, portland cement Type [_____].  Store 
cement in accordance with Section [<SRF>[_____]</SRF>] [_____].  Employ methods of handling, transporting, and storage that 
are satisfactory to the Contracting Officer.  Only cement furnished in cloth or paper bags will be accepted for 
use in the work unless bulk cement is approved.  Store a sufficient quantity of cement at or near the site of 
the work to ensure that grouting operations will not be delayed due to shortage of cement.  Care shall be taken 
in storage and handling to protect the cement from contamination and moisture.  In the event the cement contains 
lumps or foreign matter that will not pass through a standard #100 mesh screen, remove the cement from the work 
site and replace it at no cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   Sand</TTL><BRK/>
<BRK/>
<TXT>Sand for grout shall consist of hard, tough, durable, uncoated particles.  It may be composed of [natural sand][manufactured 
sand][a combination of natural and manufactured sand].  The shape of the particles shall be generally rounded 
or cubical and shall not contain more than 5 percent of flat or elongated pieces having a maximum dimension in 
excess of five times the minimum dimension.  If the sand is a combination of separately processed sizes, classification, 
or a combination of natural and manufactured sands, the different components shall be batched separately, or, 
subject to written approval, blended prior to delivery to the mixing plant.  The sand shall be well-graded from 
fine to coarse, and the gradation, as determined in accordance with <RID>ASTM C 136</RID> and <RID>ASTM C 117</RID>, shall conform 
to the following requirements:</TXT><BRK/>
<BRK/>
<TBL><THD>      SIEVE DESIGNATION                CUMULATIVE PERCENTAGE BY WEIGHT<BRK/>
  (U.S. STANDARD SQUARE MESH)               PASSING        RETAINED <BRK/></THD>
            8                                100             0<BRK/>
           16                               95-100          0-5<BRK/>
           30                               60-85          15-40<BRK/>
           50                               20-50          50-80<BRK/>
          100                               10-30          70-90<BRK/>
          200                                0-5           95-100</TBL><BRK/>
<BRK/>
<TXT>In addition to the grading limits shown, all sand used in the work shall have a fineness modulus within the range 
of 1.50 to 2.00.  The grading of the sand as delivered to the mixes, during any 24-hour period of operation, 
shall be controlled so that the fineness moduli of samples taken will not vary more than 0.10 from the average 
fineness modulus.  The results of previous tests and the service record may be used to determine the acceptability 
of the sand.  Sand shall be stored in a manner to facilitate drainage and avoid the inclusion of any foreign 
materials in the grout.  The storage piles shall be constructed to prevent segregation and contamination.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.4   Admixtures</TTL><BRK/>
<BRK/>
<TXT>An admixture is any material other than water, sand, and cement added to the grout immediately before or during 
its mixing to alter its chemical or physical properties to a desired characteristic during its fluid or plastic 
state.  Admixtures shall conform to <RID>ASTM C 494/C 494M</RID> at the time of acceptance testing sample submittal; furnish 
certification from the manufacturer that the material meets all the requirements of these specifications.  All 
admixtures to be used in each batch of grout shall be separately packaged and weighed prior to use.  Grout fluidifier 
and expanding agents shall conform to the requirements of <RID>ASTM C 937</RID>.  Accelerator additive shall be calcium 
chloride (CaCl<SBS>2</SBS>) in amounts up to 2 percent of the cement by weight or an approved product manufactured for the 
specific purpose of accelerating grout set-up time.  The calcium chloride shall be granular or flaked and added 
to the grout by dissolving it in a portion of the mix water.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   Mineral Filler</TTL><BRK/>
<BRK/>
<TXT>Fillers used in grout as replacement for a portion of the cement shall be fly ash composed of finely divided 
siliceous residue and in accordance with <RID>ASTM C 618</RID>, Class F.  The maximum amount of fly ash should not exceed 
30 percent of the cement by weight.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6   Chemical Grouting Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designers should seek information from chemical grout suppliers and manufacturers 
and other reference material on the subject about which type(s) of chemical 
grout is best suited for their particular application and job.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Grouting materials shall be nonflammable and the type used in grouts that are either water-based (gel forming) 
or water-reactive (foam forming).  Only the following water-based chemical types shall be used; silicates, acrylates, 
polyacrylamides, acrylamides (only certain products), modified tannin, and epoxy resins.  Only the following 
water-reactive chemical types shall be used; polyurethanes and elastomers.  Chemical compounds shall be EPA approved.  
A sufficient quantity of chemical grouting materials shall be stored at or near the work site to ensure that 
grouting operations will not be delayed due to storage of these materials.  Storage requirements, mixing, and 
handling of all component materials as well as the grout mixture itself shall be in accordance with the manufacturer's 
or supplier's recommendations.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Drilling and grouting equipment shall be of a type, capacity, and mechanical condition suitable for the work, 
as approved by the Contracting Officer.  Power, compressed air, all other equipment, and the layout thereof shall 
meet the requirements of local, State, and Federal regulations and codes, both with respect to safety and otherwise.  
The use of gasoline internal combustion engines for operation of drilling and grouting equipment underground 
is not permitted.  Internal combustion engines shall be diesel powered fitted with suitable and efficient scrubbers 
and in compliance with <RID>EM 385-1-1</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.2.1   Drilling Equipment</TTL><BRK/>
<BRK/>
<TXT>Use standard drilling equipment of the rotary, percussion, or rotary-percussion type to perform grout hole, drain 
hole, and exploratory hole drilling.  The use of hand-held equipment, such as jackhammer or jackleg percussion-type 
drills for drilling holes above the horizontal, is not permitted.  The equipment shall be of a type and condition 
that will allow a drilling rate which will not delay the work and will be adequate to maintain an alignment within 
a tolerance of 4 percent or less of the depth.  All drilling equipment shall be properly maintained and a sufficient 
supply of bits, tools, and spare parts shall be kept at the job site to avoid delays.  In the case of equipment 
breakdown, repairs shall be made promptly.  Exploratory drilling shall be accomplished using rotary core drilling 
rigs and equipment.  A standard ball bearing, swivel type, triple-tube, or double-tube core barrel shall be used 
at all times when drilling exploratory holes.  The core barrel shall be of a length, generally<MET> 1.5 or 3 meters</MET><ENG>
 5 or 10 feet</ENG>, appropriate for the working space and the type of material being drilled.  Appropriate coring 
bits for exploratory holes and drain holes shall be NW size except wire line bits shall be NQ in size or as directed.  
Grout hole sizes shall be EW.  A wire line system shall be used on downward inclined holes that are<MET> [15][_____] 
meters</MET><ENG> [50][_____] feet</ENG> or greater in depth.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   <SUB>Grouting Equipment</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.2.1   Cement Grouting Equipment</TTL><BRK/>
<BRK/>
<TXT>An example of a typical grouting equipment layout is included at the end of this section.  The grout plant shall 
be capable of supplying, mixing, stirring, and pumping the grout as specified.  The plant shall have a minimum 
capacity of<MET> [0.11][_____] cubic meters per minute</MET><ENG> [4][_____] cubic feet per minute (cfm)</ENG> of grout injected at 
a pressure not greater than<MET> [690][_____] kPa</MET><ENG> [100][_____] pounds per square inch (psi)</ENG>.  It shall be maintained 
in first-class operating condition at all times, and any grout hole lost or damaged due to mechanical failure 
of equipment or inadequacy of grout supply shall be replaced at no expense to the Government.  Grouting equipment 
to be furnished shall include the following:</TXT><BRK/>
<BRK/>
<LST>a.  Air or electrically powered grout pump(s) of the progressive cavity (helical screw) type that is 
free of surging are capable of pumping a great range of grout consistencies, provide close control of 
pumping pressures and variable rates of injection, and can be easily and quickly serviced during grouting 
operations.  A minimum of one spare grout pump and spare pump parts shall be available on site during 
all grouting operations.</LST><BRK/>
<BRK/>
<LST>b.  Grout mixers either mechanically driven, high-speed, shear-type tub mixers with either vertical or 
horizontal drum, or high-speed colloidal mixers.  Mixers shall be capable of effectively mixing and stirring 
a capacity of at least<MET> 0.11 cubic meters</MET><ENG> 4 cubic feet</ENG> of grout with water to cement ratios from 0.6:1 
to 6.0:1 and achieve mixing by constant rapid circulation of grout.  The mixer shall be equipped with 
a suitable volume-measuring water metering device for batching water for the grout mix.  The water meter 
shall be calibrated to read in<MET> cubic meters and thousandths</MET><ENG> cubic feet and tenths</ENG> and designed in a manner 
that after each delivery the hands can be conveniently set back to zero.  The water meter shall have 
a certificate of calibration from an independent laboratory.  Prior to each use, the water meter shall 
be checked for accuracy and, if necessary, recalibrated.</LST><BRK/>
<BRK/>
<LST>c.  Holding tank(s) or sump(s) of the mechanically agitated type to provide a high volume and continuous 
injection of grout.  The sump shall be capable of holding the solids of the mix in suspension and have 
a capacity of at least<MET> 0.34 cubic meters</MET><ENG> 12 cubic feet</ENG> of grout or three times the capacity of the mixing 
system.  Volume of grout used from the agitator holding tank(s) or sump(s) shall be measured by a vertical 
graduated stick or marks at different levels in the tank(s)/sump(s).</LST><BRK/>
<BRK/>
<LST>d.  Valves, pressure gauges, grout lines, header arrangements, and accessories as necessary to provide 
a continuous supply of grout and accurate pressure control.  Grout shall be conveyed between the pump 
and the hole using a [single-line system consisting of a pipe or hose or combination of both extending 
from the pump discharge to the header at the hole collar with grout injection rate controlled by the 
pump speed][ or ][circulating double-line system composed of a supply line to the header at the hole 
collar and a return line from the header to the grout pump, sump, or holding tank].  Grout lines shall 
consist of either black steel pipe or reinforced rubber or plastic hose or a combination of both.  The 
maximum inside diameter of all grout lines shall be<MET> 25 millimeters</MET><ENG> 1 inch</ENG>.  The grout injection rate 
for the single-line system shall be controlled by the pump speed so that settlement of solids within 
the lines will not occur when pumping at or above the minimum discharge capacity of the pump.  The pressure 
in the double-line system shall be controlled by one or more valves on the control line.  The distance 
between the hole and the pump or holding tanks shall be as short as possible to minimize the accumulation 
of solids and possible clogging.  Pressure gauges shall be high precision, graduated with divisions not 
greater than<MET> 10 kPa</MET><ENG> 2 psi</ENG> on the dial face, calibrated and certified correct prior to use.  Gauges shall 
be tested for accuracy[ daily] during the work by cross comparison with a standard set of oil-filled 
gauges.  The moving parts of all gauges shall be protected from dust, grit, and direct contact with grout.</LST><BRK/>
<BRK/>
<LST>e.  Flow cone(s) to ascertain the fluidity of grout mixtures.  The flow cone and method of test shall 
be in accordance with <RID>ASTM C 939</RID>.</LST><BRK/>
<BRK/>
<LST>f.  Telephone or radio communications between the grout plant and the hole being grouted when the site 
conditions such as distance, noise level, or visual obstructions negatively impact on the proper control 
of grouting operations.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2.2   Chemical Grouting Equipment</TTL><BRK/>
<BRK/>
<TXT>The chemical grout plant shall be of the continuous mixing and pumping type.  Provide all chemical grouting equipment 
in strict compliance with the grout manufacturer or supplier recommendations for the specific grout and <SUB>grout 
application</SUB> approved by the Contracting Officer.  All equipment shall be of a type, capacity, and mechanical 
condition suitable for doing the work, compatible with the chemical to be handled, and maintained in first-class 
operating conditions throughout the job.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.3   GROUT</TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Cement Grout</TTL><BRK/>
<BRK/>
<TXT>Design the grout mixture to expand [3 to 5 percent][2 to 4 percent] when tested in accordance with <RID>ASTM C 940</RID>
.  Grout flow time-of-efflux, when tested in accordance with <RID>ASTM C 939</RID> shall be [between 10 and 30 seconds].  
The unconfined compressive strength of the solidified grout shall range between<MET> [3.5 and 13.8][13.8 and 20] MPa</MET><ENG>
 [500 and 2,000][2,000 and 3,000] psi</ENG> when tested in accordance with <RID>ASTM C 942</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   Chemical Grout</TTL><BRK/>
<BRK/>
<TXT>Chemical grout shall be composed of commercially available materials consisting of base material, reactant, water, 
and accelerator if required.  Set times for chemical grout shall be controllable from 1 to 30 minutes following 
injection.  All components shall be compatible with each other and with the rock or soil and groundwater.  The 
Contractor and manufacturer shall certify that the proposed grout is chemically stable and will not render surrounding 
groundwater unpotable.[  The grout mix shall be such that when injected in medium dense Ottawa 20-30 sand and 
tested by an approved method, the unconfined compressive strength of the grouted sand shall average at least<MET> 
690 kPa</MET><ENG> 100 psi</ENG>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.3   <SUB>Grouting Material Samples</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Designer should insert the name and address of the Division Laboratory 
where material samples are to shipped and tested.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Ship grouting material samples for acceptance laboratory testing to:</TXT><BRK/>
<BRK/>
<LST>[_____] Division Laboratory</LST><BRK/>
<LST>[_____]</LST><BRK/>
<LST>[_____]</LST><BRK/>
<BRK/>
<TXT>The samples shall include:</TXT><BRK/>
<BRK/>
<LST>a.  5 sacks (or<MET> 213 kg</MET><ENG> 470 pounds</ENG>) of cement</LST><BRK/>
<LST>b.  <MET>68 kg</MET><ENG> 150 pounds</ENG> of mineral filler</LST><BRK/>
<LST>c.  <MET>2.25 kg</MET><ENG> 5 pounds</ENG> of additive(s)</LST><BRK/>
<LST>d.  <MET>0.75 cubic meter</MET><ENG> 1 cubic yard</ENG> of sand</LST><BRK/>
<LST>e.  <MET>4 L</MET><ENG> 1 gallon</ENG> of chemical grout (to include reactant and catalyst)</LST><BRK/>
<BRK/>
<TXT>Each sample shall be from the manufacturer or supplier and representative of the materials to be used in the 
work or from the shipment received at the work site.  Shipment shall be made to permit arrival at the lab 28 
calendar days before the earliest start of grouting.  Any substitution of materials after mix design is approved 
will require a new mix design and an additional 28 days.  State the intended grout pumping temperature range.  
Grout mixes will be designed and approved only for the stated temperature range.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   PIPE AND FITTINGS</TTL><BRK/>
<BRK/>
<TXT>All pipe shall conform to <RID>ASTM A 53/A 53M</RID> standard weight.  The fittings shall be malleable iron Type I in accordance 
with <RID>ASME B16.3</RID>, <RID>ASME B16.5</RID>, and <RID>ASME B16.9</RID>, Class 150.  Pipe shall be black steel of the diameter shown or as 
directed.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   GROUT, DRAINAGE, AND EXPLORATORY HOLES</TTL><BRK/>
<BRK/>
<TXT>Holes through shotcrete or concrete or into the surrounding rock, for the purpose of injecting grout or air release 
and providing drainage, shall be at the location in the direction and to the depths shown or as directed or approved.  
Form holes by embedding pipe in the concrete or shotcrete at the time of placing or made by drilling through 
the concrete, shotcrete, or rock as indicated below for the various kinds of holes.  All grout, drainage, and 
exploratory holes shall be drilled using only water or compressed air.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Embedded Pipe</TTL><BRK/>
<BRK/>
<TXT>Provide all metal pipe and fittings required for constructing grout holes, grout hole connections, and air vents.  
All pipe and fittings embedded in concrete shall be cleaned thoroughly of dirt, grease, grout, and mortar immediately 
before embedding and shall be firmly held in position and protected from damage or displacement while the concrete 
is being placed.  Great care shall be taken to avoid premature clogging of pipes and any pipe that becomes clogged 
or obstructed before completion of operations shall be cleaned out in a satisfactory manner or replaced at the 
expense of the Contractor.  All piping required for the work shall be cut, threaded, fabricated, and installed, 
as required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Grout and Vent Hole Drilling</TTL><BRK/>
<BRK/>
<TXT>Grout and vent holes shall be located as shown and as directed.  Grout holes drilled through shotcrete or concrete 
shall be of sufficient size to permit the caulking or grouting of short lengths of<MET> 40 mm</MET><ENG> 1-1/2 inch</ENG> diameter 
pipe into the hole for attachment of the grout supply line.  Grout hole diameters in rock shall be as shown within 
a tolerance of<MET> 6 mm</MET><ENG> 0.25 inch</ENG> and not less than<MET> 35 mm</MET><ENG> 1-3/8 inch</ENG> at the point of deepest penetration.  The size 
of completed grout holes shall be checked frequently during the work to assure proper hole diameters are achieved.  
It is anticipated that the required depth of [ring][tunnel and shaft] grout holes will not exceed<MET> [15][_____] 
m</MET><ENG> [50][_____] feet</ENG>.  Protect each hole drilled from becoming clogged or obstructed by means of a cap or other 
suitable device on the collar.  The use of greases, "rod dope," or other lubricants on the drill rods or in grout 
holes will not be permitted.  No core recovery will be required, and the drilling fluid shall be water or compressed 
air.  During the drilling of grout holes, take all precautionary measures to control dust, fumes, and noise in 
conformity with [other sections of these specifications and] the applicable local, State, and Federal laws, codes, 
and regulations.  No drilling of tunnel and shaft or ring grout holes shall be accomplished until all contact 
grouting within<MET> [60][_____] m</MET><ENG> [200][_____] feet</ENG> has been completed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Drain Hole Drilling</TTL><BRK/>
<BRK/>
<TXT>Drainage holes shall be located as shown and as directed, and drilled through the permanent liner after all grouting 
from holes within<MET> [60][_____] m</MET><ENG> [200][_____] feet</ENG> has been completed.  Drain hole diameters shall be as shown 
but not less than<MET> [50][_____] mm</MET><ENG> [2][_____] inches</ENG> with a tolerance of<MET> 6 mm</MET><ENG> 0.25 inch</ENG> for their full lengths.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Exploratory Hole Drilling</TTL><BRK/>
<BRK/>
<TXT>Perform exploratory drilling as directed when required to determine the condition of the rock prior to grouting 
or the effectiveness of the grouting operations.  Such drilling may be required at any inclination and in advance 
of the excavation face or from the perimeter of the tunnel or shaft.  Exploratory drill hole depths may vary 
but will not exceed a maximum of<MET> [15][_____] m</MET><ENG> [50][_____] feet</ENG>.  The entire length of each exploratory hole 
shall be core drilled using water or compressed air.  Core size shall be[ either] NW (<MET>54 mm</MET><ENG> 2-1/8 inch</ENG> diameter)[ 
or HQ (<MET>54 mm</MET><ENG> 2-1/2 inch</ENG> diameter)].  Core drilling shall be performed by competent and experienced drillers and 
special care shall be taken to obtain cores in as good condition as possible.  Core logging [will][shall] be 
performed by [the Government Representative][a qualified geologist experienced in core logging].  Suitable wooden 
core boxes [will be furnished by the Government][as shown in Section [<SRF>[_____]</SRF>] [_____] shall be furnished by 
the Contractor] for core storage in a suitable area on site.  Core boxes shall be protected from the weather 
prior to being delivered to the storage area upon completion of each exploratory drill hole.  Place the core 
in the boxes in the correct sequence with each run marked by accurately labeled wooden blocks according to the 
measured distances in the holes.  No box shall contain cores from more than one hole.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5   Disposal of Drill Cuttings</TTL><BRK/>
<BRK/>
<TXT>Remove drill cuttings and water produced during the drilling process from the tunnel or shaft area on a routine 
basis to avoid buildup that may impede the function of temporary or permanent drainage system components such 
as slotted pipe, sumps, and pumps.  Drill cuttings shall be disposed of at an approved location outside the tunnel 
or shaft.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   GROUTING PROCEDURES</TTL><BRK/>
<BRK/>
<TXT>Perform grouting in the presence and under the direction of the Contracting Officer.  Remove cement grout, which 
is not injected into the hole within 1 hour after mixing (30 minutes if the mix contains fluidifier with expanding 
agent), from the mixer, sump, and supply line and waste it.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Washing and Pressure Testing Holes</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Develop the appropriate form to record test results and attach it to 
the end of this section.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Immediately before the injection of grout into any hole drilled for the purpose of tunnel and shaft grouting 
or exploratory drilling, the hole shall be thoroughly washed under pressure and then pressure tested to provide 
an indication of potential grout take.</TXT><BRK/>
<BRK/>
<LST>a.  All intersected rock seams and crevices containing clay or other washable materials shall be washed 
with water and air under pressure to remove as much of these materials as practicable (normally this 
means until the return wash water runs clean).  The maximum pressure at which air and water are introduced 
for any separate washing operation shall be as directed.</LST><BRK/>
<BRK/>
<LST>b.  All holes sufficiently tight to build up the maximum required pressure shall be washed at such pressure, 
and the washing shall continue as long as there is any increase in the rate at which water is taken.  
Holes in which the required pressure cannot be reached or maintained shall be washed as long as there 
is any increase in the rate of flow or drop in pressure when the pump is delivering a capacity flow.  
Open holes in which no pressure can be built up shall be washed for a period of 5 minutes or for such 
a period of time as fracture-filling is being removed, as determined by the venting of muddy water through 
surface openings or other grout holes.  Water pressure testing shall also be required in grout holes 
and exploration holes for the purpose of either assessing the grout take potential or the imperviousness 
of a grouted area.</LST><BRK/>
<BRK/>
<LST>c.  The necessary fittings, a gauge for measuring hydraulic water pressure up to<MET> [690][_____] kPa</MET><ENG> [100][_____] 
psi</ENG> and a meter large enough to measure<MET> 0.14 cubic meter per minute to the nearest 0.001 cubic meter</MET><ENG> 
5 cfm to the nearest 0.1 cubic foot</ENG> shall be provided.  The volume of water available at the drill hole 
shall be a minimum of<MET> [0.11][_____] cubic meters per minute</MET><ENG> [4][_____] cfm</ENG>.  Drill holes shall be tested 
as directed with clean water under a continuous pressure as determined in the field.  After the waterline 
or header has been secured to the collar of the hole, water shall be pumped into the system until approximately<MET>
 [100][_____] kPa</MET><ENG> [15][_____] psi</ENG> pressure is obtained.  The pressure shall be maintained by control 
of a bypass valve and the flow test continued for 5 minutes.  If no flow occurs, the pressure shall be 
shut in and held for 5 minutes and any pressure drop recorded.  Both the hold test and the flow test 
may be repeated in the same interval if necessary to confirm indications of grout take or tightness of 
an already grouted area.  During each test, record the data on the Government supplied form [, ___ Form 
___, dated ______].  Drilling, washing, and water pressure testing in previously grouted areas shall 
not take place before 24 hours following the completion of all the planned grouting in that particular 
area.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Contact Grouting</TTL><BRK/>
<BRK/>
<TXT>Contact grouting is defined as the injection of grout behind cast-in-place concrete lining (shaft and/or tunnel), 
or grouting behind the initial support system, to achieve continuous contact between the lining and the surrounding 
rock or soil.  Tunnel plug contact grouting is also included in this definition.  Perform contact grouting in 
such a manner as to ensure that all voids between the concrete or initial support members and the rock or soil 
face will be filled with grout.  No pressure washing or testing is required prior to injecting grout.  Cast-in-place 
concrete final lining shall have been in place at least [7][_____] days before grouting commences.  Grout shall 
be a [neat ][sanded ][[cement][chemical] grout] mixture.  The grouting of any hole shall not be terminated until 
all voids have been filled to the maximum extent practicable and the Government Representative directs the Contractor 
to stop grouting.  Vent pipes, for the release of air and water during grouting of crown overbreak cavities[ 
which may not be filled with concrete], shall be provided as shown and in such locations as directed or approved.  
The installation requirements of paragraph EMBEDDED PIPE shall apply to vent pipes.  Contact grouting shall be 
done at the highest safe pressure as directed but initially not exceeding<MET> [69][_____] kPa</MET><ENG> [10][_____] psi</ENG>.  Grouting 
shall be initiated from the lower end and at the invert of a tunnel and the grout behind the liner displaced 
upward.  Grouting in the tunnel crown area may require secondary grouting to completely fill all the void space 
due to overbreak.  Such secondary grouting shall be done with expansive grout mixtures after the initial contact 
grout has been injected and set up.  For shaft linings, grout holes or nipples shall be radially located and 
grouted from inside the shaft.  Split spaced grout injection holes or nipples may be necessary in shaft liner 
grouting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   [Grouting Behind a Steel Liner</TTL><BRK/>
<BRK/>
<TXT>This type of grouting, often called "skin" grouting, shall consist of placing neat cement grout in the annular 
space surrounding a steel liner or "can" to fill the void between the steel liner and the cast-in-place concrete 
final lining.  Grouting procedures are the same as those described in paragraph CONTACT GROUTING with the following 
exceptions:</TXT><BRK/>
<BRK/>
<LST>a.  Grout holes and sealing plugs shall be provided in the steel liner plates during fabrication.  The 
pattern shall be as shown.</LST><BRK/>
<BRK/>
<LST>b.  Grouting equipment shall be such that sudden surges in pressure at refusal do not occur.</LST><BRK/>
<BRK/>
<LST>c.  Grout hole plugs shall be ground flush with the steel liner and finished smooth.</LST><BRK/>
<BRK/>
<LST>d.  After grouting is completed, the Government Representative will sound the liner with hammer blows 
to determine if all voids are filled. If directed, additional grout holes shall be drilled and tapped 
to receive a nipple.  The use of a cutting torch to cut-in and weld-on a nipple is prohibited.]</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4   Tunnel, shaft, and Ring Curtain Grouting</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Tunnel, shaft, and ring curtain grouting are defined as the grouting 
in areas of the work including, but not limited to, ahead of the tunnel or shaft 
face or along any reach of tunnel or shaft to control water flows or aid in 
stabilizing and filling voids in the formation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Accomplish tunnel, shaft, and ring curtain grouting at the locations shown and/or as directed.  Any grout hole 
that is lost or damaged due to mechanical failure of equipment, inadequacy of grout supply, or Contractor error 
shall be replaced by another hole or holes at the Contractor's expense.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.4.1   Grout Injection (Cement Grout)</TTL><BRK/>
<BRK/>
<LST>a.  If the water pressure testing indicates a relatively tight hole, start grouting with a thin grout 
mixture.  For an open hole condition, the water-cement ratio shall be reduced accordingly and, with the 
grout pump operating as nearly as practicable at constant speed at all times, the ratio shall be reduced 
further, if necessary, until the required pressure has been reached.  If the pressure tends to rise too 
high, as determined by the Government Representative, the water-cement ratio shall be changed as directed.  
Grout mixes shall be in the proportions directed by the Government Representative who will direct changes 
to suit the conditions existing in the particular grout hole.  The water-cement ratio by volume will 
be varied to meet the characteristics of each hole as revealed by the pressure washing and testing operations 
and will normally range between [3.0:1.0 and 0.6:1.0][[_____] and [_____]].</LST><BRK/>
<BRK/>
<LST>b.  Grouting pressures shall be varied as directed with conditions encountered in the respective holes.  
If it is found impossible to reach the required pressure after pumping a reasonable volume of grout at 
the minimum workable water-cement ratio, a sanded grout mix shall be used, the pumping speed shall be 
reduced, or pumping stopped temporarily and intermittent grouting shall be performed, allowing sufficient 
time between grout injections for the grout to stiffen. If necessary to relieve premature stoppage, periodic 
applications of water under pressure shall be made at the direction of the Government Representative.  
If the desired results are not obtained with this mix, grouting in the hole shall be discontinued, if 
so directed.</LST><BRK/>
<BRK/>
<LST>c.  In such event, the hole shall be cleaned, the grout allowed to set, and additional drilling and grouting 
be done in this hole or in the adjacent area, as directed, until the desired resistance is built up.  
Under no conditions shall the pressure or rate of pumping be increased suddenly, because either may produce 
a water-hammer effect which may promote stoppage.  After the grouting of any hole is completed, the pressure 
shall be maintained by means of a stopcock or other suitable device until the grout has set to the extent 
that it will be retained in the hole.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4.2   Refusal</TTL><BRK/>
<BRK/>
<TXT>The grouting of any hole shall not be considered complete until that hole refuses to take grout at a rate of 
less than [<MET>0.015 cubic meter</MET><ENG> 0.5 cubic foot</ENG> of solids (cement) per 1/2 hour][<MET>0.03 cubic meter</MET><ENG> 1.0 cubic foot</ENG> 
of solids (cement) per 10 minutes] at whatever grout mixture and pressure is being used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4.3   Grout in Drains</TTL><BRK/>
<BRK/>
<TXT>If leakage of grout into drains occurs, immediately stop the grouting operations and remove all grout from the 
drains by washing, to the satisfaction of the Contracting Officer.  No separate payment will be made for such 
work.  Such stopping of grouting operations and washing of drains shall be repeated as often as required to complete 
the grouting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4.4   Stage Grouting</TTL><BRK/>
<BRK/>
<TXT>Stage grouting is the procedure by which a grout hole or a ring curtain hole is drilled, pressure tested, and 
grouted in successive stages within progressively deeper zones from the top of the grout hole, either from the 
ground surface or from the tunnel or shaft wall, to the depth shown or as directed, prepared for grouting, and 
then grouted.  After the grout has achieved an initial set, the hole shall be washed, cleaned, and deepened and 
then grouted to the bottom of the next stage.  If the Contractor allows the grout to harden within the grout 
hole, no payment will be made for redrilling the grout hole.  A minimum period of [24][_____] hours shall elapse 
between the completion of grouting in one stage and the start of drilling for the next stage.  This procedure 
shall be repeated for the full depth of the grout application.  Grouting pressures shall be increased [as directed][as 
shown] as successive stages deepen the grout holes.  Normally the grout holes shall be split spaced by locating 
secondary holes midway between two previously drilled and grouted primary holes, and the stage grouting process 
shall be repeated until the desired results are attained for the full depth of the grout application.  Tertiary 
and succeeding series of split spaced holes shall also be drilled and grouted in stages if directed by the Government 
Representative.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4.5   Grout Injection (Chemical Grout)</TTL><BRK/>
<BRK/>
<TXT>In the zones to be chemically grouted, chemical grouting shall be performed in such a way as to produce a continuous 
cylinder or mass of chemically grouted ground outside the excavation perimeter of the tunnel or shaft in either 
soils or finely fissured rock strata, increasing the strength and reducing the permeability of the material.  
Grout in place shall be chemically stable and nontoxic for the environment in which it is placed.  Excavation 
through grouted areas shall not commence until the grouting work has been completed and approved by the Government 
Representative.  Regrouting shall be performed if the required degree of waterproofing and/or stabilization is 
not achieved by the first application.  The method of injection shall be the continuous mixing method, with the 
proper amounts of grout base material, water, reactant, and accelerator automatically proportioned and continuously 
supplied at proper flow rates and pressures.  The batch system of mixing grout shall not be permitted unless 
high volumes of chemical grout with shortened gel times are necessary in flowing water conditions.  The base 
material and the water-accelerator-catalyst solution shall pass through parallel separate hoses to a suitable 
baffling chamber near the top of the hole.  A sampling cock, to allow frequent gel time checks, shall be placed 
after the baffling chamber.  Suitable check valves shall be placed in the grout lines at the proper locations 
to prevent backflow and unintentional gelations.  All mixing, handling, pumping, and injection operations shall 
be in accordance with the manufacturer's recommendations.  A technical representative of the manufacturer or 
supplier shall be present at the work site during the initial grouting operations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.4.6   [Grout Injection Pipes</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The following paragraph may be specified for grouting when it is desirable 
to exercise maximum control over the grout injection process, i.e., to grout 
or regrout at any specific depth.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Grout pipes are commercially available or field fabricated as illustrated by the attached sketch.  Perform installation 
with care to assure the sealing grout encapsulates the entire pipe and completely fills the annulus.  Grout used 
to fill the annulus shall consist of portland cement, bentonite and fly ash, be thick enough to prevent infiltration 
into the soil or rock, and be of low strength and brittle.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2.5   Waste Water and Grout</TTL><BRK/>
<BRK/>
<TXT>Waste grout that cannot be placed or injected prior to initial set or maximum specified time limit.  If such 
grout is mixed at the direction or approval of the Government Representative, it will be paid for at the applicable 
contract unit prices for the material constituents of the wasted grout.  During the progress of the work, provide 
for adequate disposal of all wash and waste water and remove all waste grout, on a daily basis if necessary, 
to maintain a safe and effective grouting operation.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   PATCHING AND CLEANUP</TTL><BRK/>
<BRK/>
<TXT>Upon completion of the grouting operations, remove all grout supply connections from embedded pipe to a minimum 
depth of<MET> 25 mm</MET><ENG> 1-inch</ENG>, measured from the face of the concrete [shotcrete].  Holes or depressions thus formed 
shall be patched with a damp-pack mortar composed of water, one part portland cement to two parts sand.  One 
teaspoonful of aluminum powder will be added to each sack of cement used in the mortar mix to compensate for 
shrinkage.  An unpolished, nonleafing powder of high purity and low grease will be used.  Damp-pack mortar shall 
be just moist enough to form a ball in the hands.  It shall be thoroughly tamped into the hole using hard wooden 
tools.  The patching shall be done in a neat workmanlike manner to provide a surface smoothness at least equal 
to undisturbed areas of the final lining.  Exploratory holes which have not been grouted shall be packed to the 
full depth of the final lining with tightly rammed dry mortar and then patched as described above.  Prior to 
final acceptance of the work, the interior surface of the final lining shall be cleaned of excess cement or chemical 
grout, mortar, oil, and grease to the greatest extent practicable, as determined by the Government Representative.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4   RECORDS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Attach ENG FORM 1836 to the end of this section.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare, on a daily basis, records of all grout hole and drain hole <SUB>drilling operations</SUB>, all <SUB>pressure washing 
and pressure testing operations</SUB> and all <SUB>cement and chemical grouting operations</SUB>.  These records shall include:  
driller's logs of all grout holes, drain holes, and exploratory holes; pressure washing information and pressure 
testing results[ on Government provided form]; grouting data including time of each change of operation, rate 
of pumping, grouting pressures, changes in water-cement ratio, changes in proportions of additives such as fluidifier, 
accelerator, or sand, and amounts of various materials injected[ on Government provided form]; [core logging 
data on Government provided ENG FORM 1836 at a vertical scale of 1 inch equals 1 foot]; and other data considered 
necessary as determined by the Government Representative.  Blank report forms of the type to be used are attached 
at the end of this specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   CONTRACTOR QUALITY CONTROL</TTL><BRK/>
<BRK/>
<TXT>In accordance with Section <SRF>01 45 01</SRF> USACE QUALITY CONTROL, establish and maintain quality control that specifically 
includes, but is not limited to, inspections to assure that:</TXT><BRK/>
<BRK/>
<LST>a.  The specified qualification requirements are met.</LST><BRK/>
<BRK/>
<LST>b.  Drilling and grouting equipment is provided as specified and maintained in satisfactory condition.</LST><BRK/>
<BRK/>
<LST>c.  The required amount of [cement is][chemical grout materials are] kept on hand during grouting operations.</LST><BRK/>
<BRK/>
<LST>d.  Grouting is performed in the presence of a Government Representative.</LST><BRK/>
<BRK/>
<LST>e.  Required records are kept and submitted as specified.</LST><BRK/>
<BRK/>
<LST>f.  Accurate [cement][chemical] grout mixture proportions are maintained [as directed][as recommended 
by the manufacturer or supplier].</LST><BRK/>
<BRK/>
<LST>g.  Materials are properly protected from moisture and contamination after delivery and transportation 
to the site.</LST><BRK/>
<BRK/>
<LST>h.  Only approved materials are used.</LST><BRK/>
<BRK/>
<LST>i.  The quantity of bulk materials used equals the computed amount.</LST><BRK/>
<BRK/></SPT>