<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA      UFGS-32 13 13.06 (August 2008)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Superseding <BRK/>
                                    UFGS-32 13 13.06 (July 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 32 13 13.06</SCN><BRK/>
<BRK/>
<STL>[PERVIOUS] PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for pervious and impervious <SCP>
small portland cement concrete paving jobs such as roads, streets, sidewalks, 
and parking lots</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The extent and location of the work to be accomplished should be indicated 
on the project drawings, or included in the project specifications.  Precast 
structural concrete and portland cement pavements for airports are not included 
in this specifications.</NPR><BRK/>
<BRK/>
<NPR>Porous PCCP should not be used in areas with extensive winter maintenance and 
in areas where high wind is common (material can be wind blown and clog the 
pavement pores). Additionally, this pavement should not be used where there 
is heavy truck traffic.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ACI INTERNATIONAL (ACI)</ORG><BRK/><BRK/><RID>ACI 211.1</RID><RTL>(1991; R 2002) Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete</RTL><BRK/><BRK/><RID>ACI 301</RID><RTL>(2005; Errata 2008) Specifications for Structural Concrete</RTL><BRK/><BRK/><RID>ACI 305R</RID><RTL>(1999; Errata 2006) Hot Weather Concreting</RTL><BRK/><BRK/><RID>ACI 306.1</RID><RTL>(1990; R 2002) Standard Specification for Cold Weather Concreting</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 184/A 184M</RID><RTL>(2006) Standard Specification for Fabricated Deformed Steel Bar Mats for Concrete Reinforcement</RTL><BRK/><BRK/><RID>ASTM A 615/A 615M</RID><RTL>(2008b) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement</RTL><BRK/><BRK/><RID>ASTM A 775/A 775M</RID><RTL>(2007b) Standard Specification for Epoxy-Coated Steel Reinforcing Bars</RTL><BRK/><BRK/><RID>ASTM A 966/A 966M</RID><RTL>(2008) Standard Test Method for Magnetic Particle Examination of Steel Forgings Using Alternating Current</RTL><BRK/><BRK/><RID>ASTM C 1077</RID><RTL>(2008) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation</RTL><BRK/><BRK/><RID>ASTM C 1260</RID><RTL>(2007) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)</RTL><BRK/><BRK/><RID>ASTM C 143/C 143M</RID><RTL>(2008) Standard Test Method for Slump of Hydraulic-Cement Concrete</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 171</RID><RTL>(2007) Standard Specification for Sheet Materials for Curing Concrete</RTL><BRK/><BRK/><RID>ASTM C 172</RID><RTL>(2008) Standard Practice for Sampling Freshly Mixed Concrete</RTL><BRK/><BRK/><RID>ASTM C 231</RID><RTL>(2008c) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method</RTL><BRK/><BRK/><RID>ASTM C 260</RID><RTL>(2006) Standard Specification for Air-Entraining Admixtures for Concrete</RTL><BRK/><BRK/><RID>ASTM C 309</RID><RTL>(2007) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete</RTL><BRK/><BRK/><RID>ASTM C 31/C 31M</RID><RTL>(2008a) Standard Practice for Making and Curing Concrete Test Specimens in the Field</RTL><BRK/><BRK/><RID>ASTM C 33</RID><RTL>(2007) Standard Specification for Concrete Aggregates</RTL><BRK/><BRK/><RID>ASTM C 494/C 494M</RID><RTL>(2008a) Standard Specification for Chemical Admixtures for Concrete</RTL><BRK/><BRK/><RID>ASTM C 595</RID><RTL>(2008) Standard Specification for Blended Hydraulic Cements</RTL><BRK/><BRK/><RID>ASTM C 618</RID><RTL>(2008a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete</RTL><BRK/><BRK/><RID>ASTM C 78</RID><RTL>(2008) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)</RTL><BRK/><BRK/><RID>ASTM C 94/C 94M</RID><RTL>(2007) Standard Specification for Ready-Mixed Concrete</RTL><BRK/><BRK/><RID>ASTM C 989</RID><RTL>(2006) Standard Specification for Ground Granulated Blast-Furnace Slag for Use in Concrete and Mortars</RTL><BRK/><BRK/><RID>ASTM D 6270</RID><RTL>(2008) Use of Scrap Tires in Civil Engineering Applications</RTL><BRK/><BRK/></REF><REF><ORG>U.S. GENERAL SERVICES ADMINISTRATION (GSA)</ORG><BRK/><BRK/><RID>FS L-C-530</RID><RTL>(Rev C) Coating, Pipe, Thermoplastic Resin</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   RELATED SECTIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Pervious pavement systems shall be installed in areas with gently sloping 
or flat ground, light traffic, limited heavy truck use, and where pavements 
will not receive snow and ice treatments (salt, sand, or chemical).  Consult 
manufacturer's recommendations for cold regions, arid regions, and regions with 
high wind erosion.  Parking lots are generally good pervious pavement applications.  
Installing pervious pavement systems contributes to the following LEED credit: 
SS6.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Pervious pavement systems shall use Section <SRF>32 11 16.16</SRF> [BASE COURSE FOR RIGID] [AND SUBBASE COURSE FOR FLEXIBLE] 
[SUBBASE COURSE FOR PERVIOUS] PAVING <SRF>32 11 24</SRF> GRADED CRUSHED AGGREGATE BASE COURSE FOR PERVIOUS PAVEMENT, in 
addition to this section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Submittals must be limited to those necessary for adequate quality control.  
The importance of an item in the project should be one of the primary factors 
in determining if a submittal for the item should be required.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy projects.<BRK/>
<BRK/>
Submittal items not designated with a "G" are considered as being for information 
only for Army projects and for Contractor Quality Control approval for Navy 
projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for Contractor Quality Control approval.][for information only.  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.]  The following shall 
be submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Curing materials</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Admixtures</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Dowel</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Reinforcement</SUB></ITM>]<BRK/>
<BRK/>
<ITM>  Submit a complete list of materials including type, brand and applicable reference specifications.</ITM><BRK/>
<BRK/>
<TAI OPT="NAVY"><ITM><SUB>Cementitious Materials</SUB>; (LEED)</ITM></TAI><BRK/>
<BRK/>
<TAI OPT="NAVY"><ITM><SUB>Aggregate</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM>  Submit documentation indicating percentage of post-industrial and post-consumer recycled content 
per unit of product.  Indicate relative dollar value of recycled content products to total dollar 
value of products included in project.</ITM></TAI><BRK/>
<BRK/>
<TAI OPT="NAVY">[<ITM><SUB>Local/Regional Materials</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM>  Submit documentation indicating distance between manufacturing facility and the project site.  
Indicate distance of raw material origin from the project site.  Indicate relative dollar value 
of local/regional materials to total dollar value of products included in project.</ITM>]</TAI><BRK/>
<BRK/>
<TAI OPT="NAVY">[<ITM><SUB>Albedo</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM>  Provide information identifying the reflectance of the pavement.</ITM>]</TAI><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
[<ITM><SUB>Field-Constructed Mockup</SUB></ITM>]<BRK/>
<BRK/>
<LST><SUB>SD-05 Design Data</SUB></LST><BRK/>
<BRK/>
<ITM>Concrete <SUB>mix design</SUB></ITM><BRK/>
<BRK/>
<ITM>  Thirty days minimum prior to concrete placement, submit a mix design, with applicable tests, 
for each strength and type of concrete for approval.  Submit a complete list of materials including 
type; brand; source and amount of cement, fly ash, slag, and admixtures; and applicable reference 
specifications.  Provide mix proportion data using at least three different water-cement ratios 
for each type of mixture, which will produce a range of strength encompassing those required 
for each class and type of concrete required.  Submittal shall clearly indicate where each mix 
design will be used when more than one mix design is submitted.  Obtain acknowledgement of approvals 
prior to concrete placement.  Submit a new mix design for each material source change.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Aggregate</SUB> tests</ITM><BRK/>
<BRK/>
<ITM><SUB>Concrete slump tests</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Air content tests</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Flexural strength tests</SUB></ITM><BRK/>
<BRK/>
[<ITM><SUB>Cementitious materials</SUB></ITM>]<BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Ready-mixed concrete plant</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Batch tickets</SUB></ITM><BRK/>
<BRK/>
<ITM><SUB>Cementitious materials</SUB></ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
[<ITM><SUB>Local/Regional Materials</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM>  LEED documentation relative to local/regional materials credit in accordance with LEED Reference 
Guide. Include in LEED Documentation Notebook.</ITM>]<BRK/>
<BRK/>
<ITM><SUB>Cementitious Materials</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM><SUB>Aggregate</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM>  LEED documentation relative to recycled content credit in accordance with LEED Reference Guide. 
Include in LEED Documentation Notebook.</ITM><BRK/>
<BRK/>
<ITM><SUB>Albedo</SUB>; (LEED)</ITM><BRK/>
<BRK/>
<ITM>  LEED documentation relative to heat island effect - non-roof credit in accordance with LEED 
Reference Guide. Include in LEED Documentation Notebook.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 94/C 94M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Ready-mixed Concrete Plant</SUB> Certification</TTL><BRK/>
<BRK/>
<TXT>Provide documentation that the ready-mix plant is certified by the National Ready-Mix Concrete Association (NRMCA).</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   Required Information</TTL><BRK/>
<BRK/>
<TXT>Submit copies of laboratory test reports showing that the mix has been successfully tested to produce concrete 
with the properties specified and that mix will be suitable for the job conditions.  The laboratory test reports 
shall include mill test and all other test for cementitious materials, aggregates, and admixtures.  Provide maximum 
nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage 
retained verses sieve size.  Test reports shall be submitted along with the concrete mix design.  Sampling and 
testing of materials, concrete mix design, sampling and testing in the field shall be performed by a commercial 
testing laboratory which conforms to <RID>ASTM C 1077</RID>.  The laboratory shall be approved in writing by the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   <SUB>Batch Tickets</SUB></TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 94/C 94M</RID>.  Submit mandatory batch ticket information for each load of ready-mixed concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4   <SUB>Field-Constructed Mockup</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Mockup and other permeability and pervious pavement requirements in this 
section are required only for pervious pavements.  Pervious pavement (porous 
pavement, permeable pavement) is a porous surface with an underlying stone reservoir 
to temporarily store surface runoff before it infiltrates into the subsoil.  
This porous surface replaces traditional pavement, allowing parking lot storm 
water to infiltrate directly and receive water quality treatment.  Pervious 
asphalt and concrete appear to be the same as traditional pavement from the 
surface, but are manufactured without "fine" materials, and incorporate void 
spaces to allow infiltration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Install minimum <MET>21 square meters</MET><ENG>225 square feet</ENG> to demonstrate typical joints, surface finish, texture, color, 
permeability, and standard of workmanship.  When Contracting Officer determines that mockup does not meet requirements, 
demolish and remove it from the site and install another until the mockup is accepted.  Keep accepted mockup 
undisturbed during construction as a standard for judging completed paving.  Accepted mockup may be incorporated 
into final work when approved by Contracting Officer.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   SUSTAINABLE DESIGN REQUIREMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   <SUB>Local/Regional Materials</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Using local materials can help minimize transportation impacts, including 
fossil fuel consumption, air pollution, and labor.  Using materials harvested 
and manufactured within a 500 mile radius from the project site contributes 
to the following LEED credit: MR5.  Coordinate with Section 01 33 29 LEED(tm) 
DOCUMENTATION.  Use second option if Contractor is choosing local materials 
in accordance with Section 01 33 29 LEED(tm) DOCUMENTATION.  First option shall 
not be used for USACE projects.  Army projects shall include second option only 
if pursuing this LEED credit.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Use materials or products extracted, harvested, or recovered, as well as manufactured, within a <ENG>[500][_____] 
mile </ENG><MET>[800][_____] kilometer </MET>radius from the project site, if available from a minimum of three sources.][See 
Section <SRF>01 33 29</SRF> LEED(tm) DOCUMENTATION for cumulative total local material requirements.  Pavement materials 
may be locally available.]</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.1   <SUB>Cementitious Materials</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  <MET>ASTM C 595M</MET><ENG>ASTM C 595</ENG> covers four kinds of blended hydraulic cements.  
The four types are as follows:</NPR><BRK/>
<BRK/>
<NPR>1.  Portland Blast - Furnace Slag Cement (Type IS).</NPR><BRK/>
<BRK/>
<NPR>2.  Portland - Pozzolan Cement (Types IP and P).</NPR><BRK/>
<BRK/>
<NPR>3.  Slag Cement (Type S).</NPR><BRK/>
<BRK/>
<NPR>4.  Pozzolan - Modified Portland Cement (Type I (PM).</NPR><BRK/>
<BRK/>
<NPR>For sulfate resistance consider using types IS (MS) or IP (MS), II, and V.</NPR><BRK/>
<BRK/>
<NPR>Types IS-A, IP-A, PA, SA, and PM-A are air-entrained cements but should not 
be specified because of inability to control air content and lack of uniformity.</NPR><BRK/>
<BRK/>
<NPR>Type S cement should not be used when special characteristics (including control 
of alkali-silica reaction problems) are desired.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Cement is 10 to 15 percent of concrete, but is more energy intensive 
than the other constituents.  Use the minimum amount of cement required for 
a project to produce quality concrete.  Fly ash is not commonly used as a replacement 
for portland cement at the 40 percent level and needs to be tested extensively 
for compatibility and performance if used in this manner.  Include the last 
sentence of the following paragraph if fly ash replaces 40 percent of portland 
cement.  Concrete and cement are EPA designated products for recycled content.  
See Section 01670 RECYCLED/RECOVERED MATERIALS and include minimum recycled 
content options unless designer determines that justification for non-use exists.  
Designer must verify suitability, availability and adequate competition (including 
verification of bracketed percentages included in this guide specification) 
before specifying products meeting EPA minimum recycled content.<BRK/>
<BRK/>
Use of materials with recycled content, calculated on the basis of post-industrial  
and post-consumer percentage content, contributes to the following LEED credit:  
MR4.  Coordinate with Section 01 33 29 LEED(tm) DOCUMENTATION. Designer must 
verify suitability, availability and adequate competition (including verification 
of bracketed percentages included in this guide specification) before specifying 
product recycled content requirements. Use second option if Contractor is choosing 
recycled content products in accordance with Section 01 33 29 LEED(tm) DOCUMENTATION. 
Army projects shall specify recycled content exceeding EPA requirements only 
if pursuing this LEED credit.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Cementitious materials in concrete mix shall be 50 percent non-portland cement pozzolanic materials by weight.  
[Provide test data demonstrating compatibility and performance of concrete satisfactory to Contracting Officer.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1.1   Cement</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 150</RID>, Type I or II [III, for high early concrete] [or V] [or <RID>ASTM C 595</RID>, Type IS, IP, or P] with maximum 
alkali content of 0.60%.  Cement certificate shall include test results in accordance with <RID>ASTM C 150</RID>, including 
equivalent alkalies indicated in the Supplementary Optional Chemical Requirements.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  A maximum alkali content of 0.40% is more desirable and should be used 
where available, but is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT><TTL>2.1.1.2   Fly Ash and Pozzolan</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Fly ash, pozzolan, and slag cement may produce uneven discoloration of 
the concrete during the early stages of construction, depending upon the type 
of curing provided.  Fly ash or pozzolan meeting the specified test results, 
which are more stringent than ASTM C 618, should provide acceptable end results.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ASTM C 618</RID>, Type F, except that the maximum allowable loss on ignition shall be 6%, maximum available alkalies 
content shall be 1.5%, and maximum calcium oxide (CaO) content 8%.  Fly ash certificates shall include test results 
in accordance with ASTM C 618, including available alkalies indicated in the Supplementary Optional Chemical 
Requirements.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: A maximum calcium oxide content of 2% is more desirable but not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT><TTL>2.1.1.3   Slag</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 989</RID>, Ground Granulated Blast Furnace Slag (GGBFS), Grade 100 or 120.  Certificates shall include test 
results in accordance with <RID>ASTM C 989</RID>.</TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: GGBFS Grade 120 is more desirable but Grade 100 is allowed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
</SPT><SPT><TTL>2.1.2   Water</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 94/C 94M</RID>, fresh, clean, and potable.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   <SUB>Aggregate</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>Use of materials with recycled content, calculated on the basis of post-industrial  
and post-consumer percentage content, contributes to the following LEED credit:  
MR4.  Coordinate with Section 01 33 29 LEED(tm) DOCUMENTATION. Designer must 
verify suitability, availability and adequate competition (including verification 
of bracketed percentages included in this guide specification) before specifying 
product recycled content requirements. Use second option if Contractor is choosing 
recycled content products in accordance with Section 01 33 29 LEED(tm) DOCUMENTATION. 
Army projects shall specify recycled content only if pursuing this LEED credit.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Aggregate shall contain a minimum of [5][10][_____] percent post-consumer recycled content, or a minimum of 
[20][40][_____] percent post-industrial recycled content.][See Section <SRF>01 33 29</SRF> LEED(tm) DOCUMENTATION for cumulative 
total recycled content requirements.  Aggregate may contain post-consumer or post-industrial recycled content.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.3.1   Alkali Reactivity Test</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  While not wholly conclusive, petrographic examination (ASTM C 295) and 
the Chemical Test Method (ASTM C 28/c 28M9) are valuable indicators.  However, 
chemical test results may not be correct for aggregates containing carbonates 
of calcium, magnesium or ferrous iron, such as calcite, dolomite, magnesite 
or siderite; or silicates of magnesium such as serpentine. The Concrete Prism 
Test (ASTM C 1293) is also a valuable indicator. However, none of the methods 
above constitutes a substitute for the modified ASTM C 1260.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The most important rocks and mineral known to be deleteriously reactive 
with the alkalies in Portland cement are listed in ASTM C 33 (and ASTM C 294). 
However, this list is not inclusive, and particles having a glassy or micro-crystalline 
structure should be considered suspect. Reactive aggregates are widespread in 
the United States, being especially common in the western half and southeastern 
portions.  However, generalizations concerning area distribution of reactive 
aggregates should not be relied upon for important work.  Contract documents 
for important concrete projects should include provisions for preventing such 
aggregate being used, if possible, or requiring their use exclusively with low-alkali 
cements, suitable blended cements, or pozzolanic admixtures as available and 
as required to avoid deleterious effects on the concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Aggregates to be used in all concrete shall be evaluated and tested by the Contractor for alkali-aggregate reactivity 
in accordance with <RID>ASTM C 1260</RID>.  The types of aggregates shall be evaluated in a combination which matches the 
contractors' proposed mix design (including Class F fly ash or GGBF slag), utilizing the modified version of <RID>
ASTM C 1260</RID>.  Test results of the combination shall have a measured expansion of less than 0.08 percent at 16 
days. Should the test data indicate an expansion of greater than 0.08%, the aggregate(s) shall be rejected and 
the contractor shall submit new aggregate sources for retesting or may submit additional test results incorporating 
Lithium Nitrate for consideration.</TXT><BRK/>
<BRK/>
<TXT><RID>ASTM C 1260</RID> shall be modified as follows to include one of the following options:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Utilize the contractor's proposed low alkali Portland cement and Class F fly ash in combination 
for the test proportioning. The laboratory shall use the contractor's proposed percentage of 
cement and fly ash.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Utilize the contractor's proposed low alkali Portland cement and ground granulated blast 
furnace (GGBF) slag in combination for the test proportioning.  The laboratory shall use the 
contractor's proposed percentage of cement and GGBF.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Utilize the contractor's proposed low alkali Portland cement and Class F fly ash and ground 
granulated blast furnace (GGBF) slag in combination for the test proportioning.  The laboratory 
shall use the contractor's proposed percentage of cement, fly ash and GGBF.</ITM><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  It is recommended that the various types of aggregates also be evaluated 
separately, in accordance with the original ASTM C 1260, to ascertain the specific 
reactivity of each aggregate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
<SPT><TTL>2.1.3.2   Fine Aggregates</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 33</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3.3   Coarse Aggregates</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the maximum nominal size aggregate.  No. 67<MET> 20 mm to No. 4.75 mm 
sieve</MET><ENG> 3/4 inch to No. 4 sieve</ENG> or No. 57<MET> 25.0 mm to 4.75 mm sieve</MET><ENG> one inch to 
No. 4 sieve</ENG> are typical.  Use the largest aggregate size which will accomodate 
rebar spacing and form spacing as per ACI.  Allow No. 467<MET> 37.5 mm to 4.75 mm</MET><ENG>
 1 1/2 inch to No. 4 sieve</ENG> when ACI clearance requirements are meet, especially 
for concrete slabs and pavements without rebar.  Maximum aggregate size should 
not exceed:<BRK/>
<BRK/>
1.  1/5 the dimension of nonreinforced members.<BRK/>
<BRK/>
2.  3/4 the clear spacing between reinforcing bars or between reinforcing bars 
and forms.<BRK/>
<BRK/>
3.  1/3 the depth of nonreinforced slabs on the ground.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><RID>ASTM C 33</RID>.</TXT><BRK/>
<BRK/></SPT>
<TAI OPT="NAVY"><SPT><TTL>2.1.3.4   Tire Aggregate</TTL><BRK/>
<BRK/>
<TXT>Comply with <RID>ASTM D 6270</RID>, [Class I Fill][Class II Fill].</TXT><BRK/>
<BRK/></SPT>
</TAI></SPT><SPT><TTL>2.1.4   <SUB>Admixtures</SUB></TTL><BRK/>
<BRK/>
<TXT><TST><RID>ASTM C 494/C 494M</RID>: Type A, water reducing; Type B, retarding; Type C, accelerating; Type D, water-reducing and 
retarding; and Type E, water-reducing and accelerating admixture.  Do not use calcium chloride admixtures.  Where 
not shown or specified, the use of admixtures is subject to written approval of the Contracting Officer.</TST></TXT><BRK/>
<BRK/>
<TXT><RID>ASTM C 260</RID>: Air-entraining.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   Reinforcement</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.5.1   <SUB>Dowel</SUB> Bars</TTL><BRK/>
<BRK/>
<TXT>Bars shall conform to <RID>ASTM A 615/A 615M</RID>,<MET> [Grade 300] [Grade 420]</MET><ENG> [Grade 40] [Grade 60]</ENG> for plain billet-steel 
bars of the size and length indicated.  Remove all burrs and projections from the bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5.2   Coated Dowel Bars</TTL><BRK/>
<BRK/>
<TXT>Bars shall conform to <RID>ASTM A 615/A 615M</RID>,<MET> [Grade 300] [Grade 420]</MET><ENG> [Grade 40] [Grade 60]</ENG> for plain billet-steel 
bars of the size and length indicated.  Remove all burrs or projections from the dowel bars.  Coating system 
shall conform to <RID>FS L-C-530</RID>, Type 2.  Coat the bars with a double coat system or an epoxy coating system for 
resistance to penetration of oil and salt solutions.  The systems shall be in accordance with manufacturer's 
recommendation for coatings which are not bondable to concrete.  Bond the coating to the dowel bar to resist 
laps or folds during movement of the joint.  Coating thickness shall be<MET> 0.175 mm</MET><ENG> 7 mils</ENG> minimum and<MET> 0.5 mm</MET><ENG> 20 
mils</ENG> maximum.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5.3   Tie Bars</TTL><BRK/>
<BRK/>
<TXT>Bars shall be billet or axle steel deformed bars and conform to <RID>ASTM A 615/A 615M</RID> or <RID>ASTM A 966/A 966M</RID><MET> [Grade 
300] [Grade 420]</MET><ENG> [Grade 40] [Grade 60]</ENG>.  [Epoxy coated in accordance with <RID>ASTM A 775/A 775M</RID>.]</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>2.1.5.4   <SUB>Reinforcement</SUB></TTL><BRK/>
<BRK/>
<TXT>Deformed steel bar mats shall conform to <RID>ASTM A 184/A 184M</RID>.  Bar reinforcement shall conform to [<RID>ASTM A 615/A 615M</RID>
] [<RID>ASTM A 966/A 966M</RID>],<MET> [Grade 300] [Grade 420]</MET><ENG> [Grade 40] [Grade 60]</ENG>.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>2.1.6   <SUB>Curing Materials</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.6.1   White-Burlap-Polyethylene Sheet</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 171</RID>, <MET>0.10 mm</MET><ENG>0.004 inch</ENG> thick white opaque polyethylene bonded to <MET>0.31 kg per meter</MET><ENG>10 oz/linear yard</ENG> <MET>(1.0 
meter)</MET><ENG>(40 inch)</ENG> wide burlap.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6.2   Liquid Membrane-Forming Compound</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 309</RID>, white pigmented, Type 2, Class B, free of paraffin or petroleum.</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>2.1.6.3   Liquid Chemical Sealer-Hardener Compound</TTL><BRK/>
<BRK/>
<TXT>Compound shall be magnesium fluosilicate which when mixed with water seals and hardens the surface of the concrete.  
Do not use on exterior slabs exposed to freezing conditions.  Compound shall not reduce the adhesion of resilient 
flooring, tile, paint, roofing, waterproofing, or other material applied to concrete.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>2.1.7   Joint Fillers and Sealants</TTL><BRK/>
<BRK/>
<TXT>Provide as specified in Section [<SRF>32 01 19</SRF> FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS][
<SRF>32 13 73</SRF> COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS].  [New joints shall match existing alignment.]</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>2.1.8   Edge Restraints</TTL><BRK/>
<BRK/>
<TXT>Edge restraints for pervious systems shall be [concrete][_____].</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>2.2   CONCRETE PAVEMENT</TTL><BRK/>
<BRK/>
<SPT><TTL>2.2.1   <SUB>Albedo</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The urban heat island effect forms as vegetation is replaced by low reflectivity 
materials such as dark colored paving.  These surfaces absorb - rather than 
reflect - the sun's heat, causing surface temperatures and urban ambient temperatures 
to be <MET>1 to 6 degrees C</MET><ENG>2 to 10 degrees F</ENG> hotter than surrounding rural areas.  
Using high-albedo materials contributes to the following LEED credit: SS7.  
Coordinate with Section 01 33 29 LEED(tm) DOCUMENTATION.  Army projects shall 
specify bracketed LEED option only if pursuing this LEED credit.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TAI OPT="NAVY">[Installed system shall have a minimum solar reflectance of 0.3.]</TAI>[  Installed system must meet the requirements 
of LEED heat island effect non-roof credit.]</TXT><BRK/>
<BRK/></SPT>
[<SPT><TTL>2.2.2   Permeability</TTL><BRK/>
<BRK/>
<TXT>Installed system shall have a minimum permeability rate of [60][_____] percent.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>2.3   CONTRACTOR-FURNISHED <SUB>MIX DESIGN</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The<MET> 3.79 MPa</MET><ENG> 550 psi</ENG> flexural strength specified in paragraph entitled 
"Flexural Tests" is based on<MET> 4.48 MPa</MET><ENG> 650 psi</ENG> flexural strength,<MET> 35 MPa</MET><ENG> 5,000 
psi</ENG> compressive strength, specified in paragraph entitled "CONTRACTOR-FURNISHED 
MIX DESIGN."  If other flexural strength is specified in paragraph entitled 
"CONTRACTOR-FURNISHED MIX DESIGN," modify paragraph entitled "Flexural Tests."  
See Section 02751, "Reinforced Cement Concrete Pavement for Roads and Airfields" 
for further information.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This specification is based on a flexural strength basis.  For small 
jobs<MET> 75 cubic meters or less</MET><ENG> 100 cubic yards or less</ENG>, compressive strength may 
be used.  In that case modify these paragraphs to reflect a compressive strength 
basis.</NPR><BRK/>
<BRK/>
<NPR>NOTE:  Allowable Air Content:  Select 5 percent air content for maximum aggregate 
size of<MET> 37.5 or 50 mm</MET><ENG> 1 1/2 or 2 inches</ENG>, and 6 percent air content for maximum 
aggregate size for<MET> 19 or 25 mm</MET><ENG> 3/4 or one inch</ENG>.</NPR><BRK/>
<BRK/>
<NPR>NOTE:  Minimum Cement Factor:  The cement required to produce concrete strength 
of<MET> 4.48 MPa</MET><ENG> 650 psi</ENG> at 28 days is generally sufficient to provide durable concrete 
and resistance to surface abrasion.  In localities of substandard aggregates 
or when concrete is machine finished without vibration or finished with hand 
tools, a minimum cement factor should be specified.  Specifying a minimum cement 
factor will not necessarily provide the specified flexural strength and additional 
cement may be required.  The actual amount of cement required to obtain the 
required strength is decided by the Contractor based on mix designs for local 
aggregates and type of equipment and methods to be used in the field production 
of the concrete.  Select a minimum cement factor to compensate for poor quality 
aggregates, seawater exposure, and for sites of difficult concrete placement 
conditions.  Guidance for minimum cement contents for suitability, durability 
and workability of concrete is frequently given in the State Standard Specifications.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate with Contracting Officer for mix design requirement to satisfy 
project albedo and permeability needs.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Contractor-furnished mix design concrete shall be designed in accordance with <RID>ACI 211.1</RID> except as modified herein, 
and the mix design shall be as specified herein under paragraph entitled "Submittals."  The concrete shall have 
a minimum flexural strength of <MET>[4.48][_____]MPa</MET><ENG>[650][_____] pounds per square inch</ENG> at 90 days.  The concrete 
may be air entrained.  If air entrainment is used the air content shall be [5.0 plus or minus 1.5 percent][6.0 
plus or minus 1.5 percent].  Maximum size aggregate for slip forming shall be <MET>38 mm</MET><ENG>1.5 inches</ENG>.  The minimum cementitious 
factor is <MET>335 kg per cubic meter</MET><ENG>564 lbs per cubic yard</ENG> and slump shall be <MET>25 mm to 75 mm</MET><ENG>1 to 3 inches</ENG> (or less 
when slip form is used.</TXT><BRK/>
<BRK/>
<TXT>If the cementitious material is not sufficient to produce concrete of the flexural strength required it shall 
be increased as necessary, without additional compensation under the contract.  The cementitious factor shall 
be calculated using cement, Class F fly ash, and or GGBF slag.  The mix shall use a cement replacement (by weight) 
of 25%-35% Class F fly ash, or 40%-50% GGBF slag, or a combination of the two.  In the combination, each 5% of 
Class F fly ash shall be replaced by 8% GGBF slag.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
[<SPT><TTL>3.1   PREPARATION FOR PERVIOUS SYSTEMS</TTL><BRK/>
<BRK/>
<TXT>Verify compacted subgrade, granular base or stabilized soil is acceptable and ready to support paving and imposed 
loads.  Install edge restraints per the drawings and manufacturer's recommendations.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>3.2   FORMS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Construction</TTL><BRK/>
<BRK/>
<TXT>Construct forms to be removeable without damaging the concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Coating</TTL><BRK/>
<BRK/>
<TXT>Before placing the concrete, coat the contact surfaces of forms [except existing pavement sections where bonding 
is required,] with a non-staining mineral oil, non-staining form coating compound, or two coats of nitro-cellulose 
lacquer.  [When using existing pavement as a form, clean existing concrete and then coat with asphalt emulsion 
bondbreaker before concrete is placed.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Grade and Alignment</TTL><BRK/>
<BRK/>
<TXT>Check and correct grade elevations and alignment of the forms immediately before placing the concrete.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   REINFORCEMENT</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Dowel Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:   For projects which require dowel bars or coated dowel bars, show location, 
size, and tolerances on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install bars accurately aligned, vertically and horizontally, at indicated locations and to the dimensions and 
tolerances indicated.  Before installation thoroughly grease the sliding portion of each dowel.  Dowels must 
remain in position during concrete placement and curing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Coated Dowel Bars</TTL><BRK/>
<BRK/>
<TXT>Install bars, accurately aligned vertically and horizontally, at indicated locations and to the dimensions and 
tolerances indicated.  Reject coatings which are perforated, cracked or otherwise damaged.  While handling avoid 
scuffing or gouging of the coatings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Tie Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:   When tie bars are required in the contract, indicate location on drawings.  
Show bar size and spacing required and method of support.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install bars, accurately aligned horizontally and vertically, at indicated locations.  [For slipform construction, 
insert bent tie bars by hand or other approved means.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.4   Setting Slab Reinforcement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:   For contracts which require reinforcing steel, specify the type, size 
and material of reinforcement.  Edit paragraph to specify method of placement 
as appropriate for thickness of the concrete.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Reinforcement shall be positioned on suitable chairs prior to concrete placement.  At expansion, contraction 
and construction joints, place the reinforcement as indicated.  Reinforcement, when placed in concrete, shall 
be free of mud, oil, scale or other foreign materials.  Place reinforcement accurately and wire securely.  The 
laps at splices shall be<MET> 300 mm</MET><ENG> 12 inches</ENG> minimum and the distances from ends and sides of slabs and joints shall 
be as indicated.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   MEASURING, MIXING, CONVEYING, AND PLACING CONCRETE</TTL><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Measuring</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 94/C 94M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Mixing</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 94/C 94M</RID>, except as modified herein.  Begin mixing within 30 minutes after cement has been added to aggregates.  
When the air temperature is greater than<MET> 29.4 degrees C</MET><ENG> 85 degrees F</ENG>, reduce mixing time and place concrete within 
60 minutes.  Additional water may be added to bring slump within required limits as specified in Section 11.7 
of <RID>ASTM C 94/C 94M</RID>, provided that the specified water-cement ratio is not exceeded.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.3   Conveying</TTL><BRK/>
<BRK/>
<TXT><RID>ASTM C 94/C 94M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.4   Placing</TTL><BRK/>
<BRK/>
<TXT>Follow guidance of <RID>ACI 301</RID>, except as modified herein.  Do not exceed a free vertical drop of<MET> 0.90 m</MET><ENG> 3 feet</ENG> from 
the point of discharge.  Place concrete continuosly at a uniform rate, with minimum amount of segregation, without 
damage to the grade and without unscheduled stops except for equipment failure or other emegencies.  If this 
occurs within <MET>3 m</MET><ENG>10 feet</ENG> of a previously placed expansion joint, remove concrete back to joint, repair any damage 
to grade, install a construction joint and continue placing concrete only after cause of the stop has been corrected.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.5   Vibration</TTL><BRK/>
<BRK/>
<TXT>Immediately after spreading concrete, consolidate concrete with internal type vibrating equipment along the boundaries 
of all slabs regardless of slab thickness, and interior of all concrete slabs<MET> 150 mm</MET><ENG> 6 inches</ENG> or more in thickness.  
Limit duration of vibration to that necessary to produce consolidation of concrete.  Excessive vibration will 
not be permitted.  Vibrators shall not be operated in concrete at one location for more than 15 seconds.  <TST>At 
the option of the Contractor, vibrating equipment of a type approved by the Contracting Officer may be used to 
consolidate concrete in unreinforced pavement slabs less than<MET> 150 mm</MET><ENG> 6 inches</ENG> thick.</TST></TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.5.1   Vibrating Equipment</TTL><BRK/>
<BRK/>
<TXT>Operate equipment, except hand-manipulated equipment, ahead of the finishing machine.  Select the number of vibrating 
units and power of each unit to properly consolidate the concrete.  Mount units on a frame that is capable of 
vertical movement and, when necessary, radial movement, so vibrators may be operated at any desired depth within 
the slab or be completely withdrawn from the concrete.  Clear distance between frame-mounted vibrating units 
that have spuds that extend into the slab at intervals across the paving lane shall not exceed<MET> 750 mm</MET><ENG> 30 inches</ENG>
.  Distance between end of vibrating tube and side form shall not exceed<MET> 50 mm</MET><ENG> 2 inches</ENG>.  For pavements less 
than<MET> 250 mm</MET><ENG> 10 inches</ENG> thick, operate vibrators at mid-depth parallel with or at a slight angle to the subbase.  
For thicker pavements, angle vibrators toward the vertical, with vibrator tip preferably about<MET> 50 mm</MET><ENG> 2 inches</ENG>
 from subbase, and top of vibrator a few<MET> mm</MET><ENG> inches</ENG> below pavement surface.  Vibrators may be pneumatic, gas driven, 
or electric, and shall be operated at frequencies within the concrete of not less than 8,000 vibrations per minute.  
Amplitude of vibration shall be such that noticeable vibrations occur at<MET> 450 mm</MET><ENG> 1.5 foot</ENG> radius when the vibrator 
is inserted in the concrete to the depth specified.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4.6   Cold Weather</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:   Calcium chloride accelerators should not be permitted for reinforced 
concrete and in concrete in contact with aluminum or other non-ferrous materials.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Except with authorization, do not place concrete when ambient temperature is below<MET> 5 degrees C</MET><ENG> 40 degrees F</ENG> or 
when concrete is likely to be subjected to freezing temperatures within 24 hours.  When authorized, when concrete 
is likely to be subjected to freezing within 24 hours after placing, heat concrete materials so that temperature 
of concrete when deposited is between<MET> 18 and 27 degrees C</MET><ENG> 65 and 80 degrees F</ENG>.  Methods of heating materials 
are subject to approval of the Contracting Officer.  Do not heat mixing water above<MET> 74 degrees C</MET><ENG> 165 degrees 
F</ENG>.  Remove lumps of frozen material and ice from aggregates before placing aggregates in mixer.  Follow practices 
found in <RID>ACI 306.1</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.7   Hot Weather</TTL><BRK/>
<BRK/>
<TXT>Maintain required concrete temperature in accordance with Figure 2.1.5 in <RID>ACI 305R</RID> to prevent evaporation rate 
from exceeding<MET> 0.98 kg of water per square meter</MET><ENG> 0.2 pound of water per square foot</ENG> of exposed concrete per hour.  
Cool ingredients before mixing or use other suitable means to control concrete temperature and prevent rapid 
drying of newly placed concrete.  After placement, use fog spray, apply monomolecular film, or use other suitable 
means to reduce the evaporation rate.  Start curing when surface of fresh concrete is sufficiently hard to permit 
curing without damage.  Cool underlying material by sprinkling lightly with water before placing concrete.  Follow 
practices found in <RID>ACI 305R</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   PAVING</TTL><BRK/>
<BRK/>
<TXT>[Install pervious paving system in accordance with manufacturer's recommendations and as indicated.  Install 
surface elevation of the paving system <ENG>1/8 to 1/4 inch</ENG><MET>3 to 6 mm</MET> above adjacent drainage inlets, concrete collars, 
or channels.  Manufacturer's recommendations shall take precedence over the specifications in the event of conflicting 
requirements between the two.  ]Pavement shall be constructed with paving and finishing equipment utilizing [fixed 
forms] [slipforms].</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Consolidation</TTL><BRK/>
<BRK/>
<TXT>The paver vibrators shall be inserted into the concrete not closer to the underlying material than <MET>50 mm.</MET> <ENG>2 inches.</ENG>
  The vibrators or any tamping units in front of the paver shall be automatically controlled so that they shall 
be stopped immediately as forward motion ceases.  Excessive vibration shall not be permitted.  Concrete in small, 
odd-shaped slabs or in locations inaccessible to the paver mounted vibration equipment shall be vibrated with 
a hand-operated immersion vibrator.  Vibrators shall not be used to transport or spread the concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   Operation</TTL><BRK/>
<BRK/>
<TXT>When the paver is operated between or adjacent to previously constructed pavement (fill-in lanes), provisions 
shall be made to prevent damage to the previously constructed pavement, including keeping the existing pavement 
surface free of any  debris, and placing rubber mats beneath the paver tracks.  Transversely oscillating screeds 
and extrusion plates shall overlap the existing pavement the minimum possible, but in no case more than <MET>200 mm.</MET>
 <ENG>8 inches.</ENG></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3   Required Results</TTL><BRK/>
<BRK/>
<TXT>The paver-finisher shall be operated to produce a thoroughly consolidated slab throughout, true to line and grade 
within specified tolerances.  The paver-finishing operation shall produce a surface finish free of irregularities, 
tears, voids of any kind, and any other discontinuities.  It shall produce only a very minimum of paste at the 
surface.  Multiple passes of the paver-finisher shall not be permitted.  The equipment and its operation shall 
produce a finished surface requiring no hand finishing, other than the use of cutting straightedges, except in 
very infrequent instances.  No water, other than true fog sprays (mist), shall be applied to the concrete surface 
during paving and finishing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4   Fixed Form Paving</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete bracketed sentences on overlay pavements if not applicable.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Forms shall be steel, except that wood forms may be used for curves having a radius of <MET>45 m</MET> <ENG>150 feet</ENG> or less, 
and for fillets.  Forms may be built up with metal or wood, added only to the base, to provide an increase in 
depth of not more than 25 percent.  The base width of the form shall be not less than eight-tenths of the vertical 
height of the form, except that forms <MET>200 mm</MET> <ENG>8 inches</ENG> or less in vertical height shall have a base width not 
less than the vertical height of the form.  Wood forms for curves and fillets shall be adequate in strength and 
rigidly braced.  Forms shall be set on firm material cut true to grade so that each form section when placed 
will be firmly in contact with the underlying layer for its entire base.  Forms shall not be set on blocks or 
on built-up spots of underlying material.  [Forms for overlay pavements and for other locations where forms must 
be set on existing pavements shall be held securely in place with stakes or by other approved methods.  Holes 
in existing pavements for form stakes shall be carefully drilled without cracking or spalling the existing pavement.  
Prior to setting forms for paving operations, the Contractor shall demonstrate the proposed form setting procedures 
at an approved location and shall not proceed further until the proposed method is approved.]  Forms shall remain 
in place at least 12 hours after the concrete has been placed.  Forms shall be removed without injuring the concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5   Slipform Paving</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Retain slipform paving as an option unless the designer has specific, 
valid reasons for deleting it.  Be sure all other paragraphs correlate with 
choice made here.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The slipform paver shall shape the concrete to the specified and indicated cross section in one pass, and shall 
finish the surface and edges so that only a very minimum amount of hand finishing is required.  Dowels shall 
not be installed by dowel inserters attached to the paver or by any other means of inserting the dowels into 
the plastic concrete.  [If a keyway is required, a <MET>0.45 to 0.55 mm</MET> <ENG>26 gauge</ENG> thick metal keyway liner shall be 
installed as the keyway is extruded.  [The keyway liner shall be protected and shall remain in place and become 
part of the joint.]]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.6   Placing Reinforcing Steel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete bracketed item if CRCP is not being constructed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Reinforcement shall be positioned on suitable chairs securely fastened to the subgrade prior to concrete placement.  
[If reinforcing for Continuously Reinforced Concrete Pavement (CRCP) is required, the entire operating procedure 
and equipment proposed shall be submitted for approval at least 30 days prior to proposed start of paving.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.7   Placing Dowels and Tie Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete references to slipform paving installation of dowels and tie bars 
if slipform paving is not allowed.  Delete references to installation in contraction 
joints if not required.  Delete bracketed references to tie bars, if tie bars 
are not used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Dowels shall be installed with alignment not greater than <MET>1 mm per 100 mm.</MET> <ENG>1/8 inch per ft.</ENG> Except as otherwise 
specified below, location of dowels shall be within a horizontal tolerance of plus or minus <MET>15 mm</MET><ENG>5/8 inch</ENG> and 
a vertical tolerance of plus or minus <MET>5 mm.</MET> <ENG>3/16 inch.</ENG>  The portion of each dowel intended to move within the 
concrete or expansion cap shall be painted with one coat of rust inhibiting primer paint, and then oiled just 
prior to placement.  [Dowels] [and tie bars] in joints shall be omitted when the center of the [dowel] [tie bar] 
is located within a horizontal distance from an intersecting joint equal to or less than one-fourth of the slab 
thickness.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.7.1   Contraction Joints</TTL><BRK/>
<BRK/>
<TXT>[Dowels] [and] [tie bars] in longitudinal and transverse contraction joints within the paving lane shall be held 
securely in place by means of rigid metal basket assemblies.  The [dowels] [and tie bars] shall be welded to 
the assembly or held firmly by mechanical locking arrangements that will prevent them from becoming distorted 
during paving operations.  The basket assemblies shall be held securely in the proper location by means of suitable 
anchors.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.7.2   Construction Joints-Fixed Form Paving</TTL><BRK/>
<BRK/>
<TXT>Installation of [dowels] [and tie bars] shall be by the bonded-in-place method, supported by means of devices 
fastened to the forms.  Installation by removing and replacing in preformed holes will not be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.7.3   Dowels Installed in Hardened Concrete</TTL><BRK/>
<BRK/>
<TXT>Installation shall be by bonding the dowels into holes drilled into the hardened concrete.  Holes approximately <MET>
3 mm</MET> <ENG>1/8 inch</ENG> greater in diameter than the dowels shall be drilled into the hardened concrete.  Dowels shall 
be bonded in the drilled holes using epoxy resin injected at the back of the hole before installing the dowel 
and extruded to the collar during insertion of the dowel so as to completely fill the void around the dowel.  
Application by buttering the dowel shall not be permitted.  The dowels shall be held in alignment at the collar 
of the hole, after insertion and before the grout hardens, by means of a suitable metal or plastic collar fitted 
around the dowel.  The vertical alignment of the dowels shall be checked by placing the straightedge on the surface 
of the pavement over the top of the dowel and measuring the vertical distance between the straightedge and the 
beginning and ending point of the exposed part of the dowel.  [Where tie bars are required in longitudinal construction 
joints of slipform pavement, bent tie bars shall be installed at the paver, in front of the transverse screed 
or extrusion plate.  If tie bars are required, a standard keyway shall be constructed, and the bent tie bars 
shall be inserted into the plastic concrete through a <MET>0.45 to 0.55 mm</MET> <ENG>26 gauge</ENG> thick metal keyway liner.  Tie 
bars shall not be installed in preformed holes.  The keyway liner shall be protected and shall remain in place 
and become part of the joint.  Before placement of the adjoining paving lane, the tie bars shall be straightened, 
without spalling the concrete around the bar.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.7.4   Expansion Joints</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Dowels in expansion joints shall be installed by the bonded-in-place method or by bonding into holes drilled 
in hardened concrete, using procedures specified above.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.6   FINISHING CONCRETE</TTL><BRK/>
<BRK/>
<TXT>Start finishing operations immediately after placement of concrete.  Use finishing machine, except hand finishing 
may be used in emergencies and for concrete slabs in inaccessible locations or of such shapes or sizes that machine 
finishing is impracticable.  Finish pavement surface on both sides of a joint to the same grade.  Finish formed 
joints from a securely supported transverse bridge.  Provide hand finishing equipment for use at all times.  
Transverse and longitudinal surface tolerances shall be<MET> 6 mm in 3 m</MET><ENG> 1/4 inch in 10 feet</ENG>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.6.1   Side Form Finishing</TTL><BRK/>
<BRK/>
<TXT>Strike off and screed concrete to the required [crown] [slope] and cross-section by a power-driven transverse 
finishing machine.  <TST>Transverse rotating tube or pipe shall not be permitted unless approved by the Contracting 
Officer.</TST>  Elevation of concrete shall be such that, when consolidated and finished, pavement surface will be 
adequately consolidated and at the required grade.  Equip finishing machine with two screeds which are readily 
and accurately adjustable for changes in pavement [crown] [slope] and compensation for wear and other causes.  
Make as many passes over each area of pavement and at such intervals as necessary to give proper compaction, 
retention of coarse aggregate near the finished surface, and a surface of uniform texture, true to grade and 
[crown] [slope].  Do not permit excessive operation over an area, which will result in an excess of mortar and 
water being brought to the surface.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.6.1.1   Equipment Operation</TTL><BRK/>
<BRK/>
<TXT>Maintain the travel of machine on the forms without lifting, wobbling, or other variation of the machine which 
tend to affect the precision of concrete finish.  Keep the tops of the forms clean by a device attached to the 
machine.  During the first pass of the finishing machine, maintain a uniform ridge of concrete ahead of the front 
screed for its entire length.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.1.2   Joint Finish</TTL><BRK/>
<BRK/>
<TXT>Before concrete is hardened, correct edge slump of pavement, exclusive of edge rounding, in excess of<MET> 6 mm</MET><ENG> 0.02 
foot</ENG>.  Finish concrete surface on each side of construction joints to the same plane, and correct deviations 
before newly placed concrete has hardened.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.1.3   Hand Finishing</TTL><BRK/>
<BRK/>
<TXT>Strike-off and screed surface of concrete to elevations slightly above finish grade so that when concrete is 
consolidated and finished pavement surface is at the indicated elevation.  Vibrate entire surface until required 
compaction and reduction of surface voids is secured with a strike-off template.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.1.4   Longitudinal Floating</TTL><BRK/>
<BRK/>
<TXT>After initial finishing, further smooth and consolidate concrete by means of hand-operated longitudinal floats.  
Use floats that are not less than<MET> 3.65 m</MET><ENG> 12 feet</ENG> long and<MET> 150 mm</MET><ENG> 6 inches</ENG> wide and stiffened to prevent flexing 
and warping.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6.2   Texturing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer must select type of texturing required by the using service, 
retain that subparagraph, and delete the others.  If no guidance is given, the 
usual default method should be burlap drag.  Edit bracketed sentence as appropriate.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the type of texturing for roads.  Climatic conditions must be 
considered for exposed concrete.  When required, specify surfaces to receive 
brooming.</NPR><BRK/>
<BRK/>
<NPR>1.  Specify wire brooming for non-skid concrete surface textures.  Permit steel 
or new fiber brooms.</NPR><BRK/>
<BRK/>
<NPR>2.  Specify broomed finish, if required in lieu of burlap drag finish.  Broomed 
finish may cause excessive tire wear and is not recommended, except for special 
conditions in which light mechanical brooming may be desirable.</NPR><BRK/>
<BRK/>
<NPR>3.  Additional information is published by American Concrete Paving Association 
(ACPA) in Technical Bulletins No. 6 (1969) and No. 19 (1975), Interim Recommendations 
for the Construction of Skid-Resistant Concrete Pavement and Guideline for Texturing 
of Portland Cement Concrete Highway Pavements, respectively.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Before the surface sheen has disappeared and before the concrete hardens, the surface of the pavement shall be 
given a texture as described herein.  Following initial texturing on the first day of placement, the Placing 
Foreman, Contracting Officer representative, and a representative of the Using Agency shall inspect the texturing 
for compliance with design requirements.  After curing is complete, all textured surfaces shall be thoroughly 
power broomed to remove all debris.  [Any type of transverse texturing shall produce grooves in straight lines 
across each lane within a tolerance of plus or minus <MET>13 mm</MET> <ENG>1/2 inch</ENG> of a true line.]  The concrete in areas of 
recesses for tie-down anchors, lighting fixtures, and other outlets in the pavement shall be finished to provide 
a surface of the same texture as the surrounding area.</TXT><BRK/>
<BRK/>
[<SPT><TTL>3.6.2.1   Burlap Drag Finish</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose this paragraph or the paragraph above, or the paragraph below.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Before concrete becomes non-plastic, finish the surface of the slab by dragging on the surface a strip of clean, 
wet burlap measuring from<MET> 0.91 to 3 m</MET><ENG> 3 to 10 feet</ENG> long and<MET> 600 mm</MET><ENG> 2 feet</ENG> wider than the width of the pavement.  
Select dimension of burlap drag so that at least<MET> 0.91 m</MET><ENG> 3 feet</ENG> of the material is in contact with the pavement.  
Drag the surface so as to produce a finished surface with a fine granular or sandy texture without leaving disfiguring 
marks.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>3.6.2.2   Brooming</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose this paragraph or one of the two paragraphs above.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Finish the surface of the slab by brooming the surface with a new wire broom at least<MET> 450 mm</MET><ENG> 18 inches</ENG> wide.  
Gently pull the broom over the surface of the pavement from edge to edge just before the concrete becomes non-plastic.  
Slightly overlap adjacent strokes of the broom.  Broom perpendicular to centerline of pavement so that corrugations 
produced will be uniform in character and width, and not more than<MET> 2 mm</MET><ENG> 1/16 inch</ENG> in depth.  Broomed surface 
shall be free from porous spots, irregularities, depressions, and small pockets or rough spots such as may be 
caused by accidentally disturbing particles of coarse aggregate embedded near the surface.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>3.6.2.3   Wire-Comb Texturing</TTL><BRK/>
<BRK/>
<TXT>Surface texture transverse to the pavement center line shall be applied using a mechanical wire comb drag.  The 
comb shall be capable of traversing the full width of the pavement in a single pass at a uniform speed and with 
a uniform pressure.  Successive passes of the comb shall be overlapped the minimum necessary to obtain a continuous 
and uniformly textured surface.  The scores shall be <MET>2 to 5 mm</MET> <ENG>1/16 to 3/16 inch</ENG> deep, <MET>1.5 to 3 mm</MET> <ENG>1/16 to 1/8 
inch</ENG> wide, and spaced <MET>10 mm</MET> <ENG>3/8 inch</ENG> apart.</TXT><BRK/>
<BRK/></SPT>
][<SPT><TTL>3.6.2.4   Surface Grooving</TTL><BRK/>
<BRK/>
<TXT>The areas indicated on the drawings shall be grooved with a spring tine drag producing individual grooves <MET>6 mm</MET>
 <ENG>1/4 inch</ENG> deep and <MET>6 mm</MET><ENG>1/4 inch</ENG> wide at a spacing between groove centerlines of <MET>50 mm.</MET> <ENG>2 inches.</ENG>  These grooves 
shall be cut perpendicular to the centerline.  Before grooving begins, the concrete shall be allowed to stiffen 
sufficiently to prevent dislodging of aggregate.  Grooves shall not be cut within <MET>150 mm</MET> <ENG>6 inches</ENG> of a transverse 
joint or crack.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>3.6.3   Edging</TTL><BRK/>
<BRK/>
<TXT>At the time the concrete has attained a degree of hardness suitable for edging, carefully finish slab edges, 
including edges at formed joints, with an edge having a maximum radius of<MET> 3 mm</MET><ENG> one-eighth inch</ENG>.  [When brooming 
is specified for the final surface finish, edge transverse joints before starting brooming, then operate broom 
to obliterate as much as possible the mark left by the edging tool without disturbing the rounded corner left 
by the edger.]  Clean by removing loose fragments and soupy mortar from corners or edges of slabs which have 
crumbled and areas which lack sufficient mortar for proper finishing.  Refill voids solidly with a mixture of 
suitable proportions and consistency and refinish.  Remove unnecessary tool marks and edges.  Remaining edges 
shall be smooth and true to line.  [Install edge restraints of pervious systems per the drawings and manufacturer's 
recommendations.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.4   Repair of Surface Defects</TTL><BRK/>
<BRK/>
<TXT>Follow guidance of <RID>ACI 301</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7   CURING AND PROTECTION</TTL><BRK/>
<BRK/>
<TXT>Protect concrete adequately from injurious action by sun, rain, flowing water, [frost,] mechanical injury, tire 
marks and oil stains, and do not allow it to dry out from the time it is placed until the expiration of the minimum 
curing periods specified herein.  Use White-Burlap-Polyethylene Sheet or liquid membrane-forming compound, except 
as specified otherwise herein. Do not use membrane-forming compound on surfaces where its appearance would be 
objectionable, on surfaces to be painted, where coverings are to be bonded to concrete, or on concrete to which 
other concrete is to be bonded.  Maintain temperature of air next to concrete above<MET> 5 degrees C</MET><ENG> 40 degrees F</ENG> 
for the full curing periods.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.7.1   White-Burlap-Polyethylene Sheet</TTL><BRK/>
<BRK/>
<TXT>Wet entire exposed surface thoroughly with a fine spray of water, saturate burlap but do not have excessive water 
dripping off the burlap and then cover concrete with White-Burlap-Polyethylene Sheet, burlap side down.  Lay 
sheets directly on concrete surface and overlap<MET> 300 mm</MET><ENG> 12 inches</ENG>.  Make sheeting not less than<MET> 450 mm</MET><ENG> 18 inches</ENG>
 wider than concrete surface to be cured, and weight down on the edges and over the transverse laps to form closed 
joints.  Repair or replace sheets when damaged during curing.  Check daily to assure burlap has not lost all 
moisture.  If moisture evaporates, resaturate burlap and re-place on pavement (re-saturation and re-placing shall 
take no longer than 10 minutes per sheet).  Leave sheeting on concrete surface to be cured for at least 7 days.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.2   Liquid Membrane-Forming Compound Curing</TTL><BRK/>
<BRK/>
<TXT>Apply compound immediately after surface loses its water sheen and has a dull appearance and before joints are 
sawed.  Agitate curing compound thoroughly by mechanical means during use and apply uniformly in a two-coat continuous 
operation by suitable power-spraying equipment.  Total coverage for the two coats shall be at least<MET> 4 liters</MET><ENG> 
one gallon</ENG> of undiluted compound per<MET> 20 square meters</MET><ENG> 200 square feet</ENG>.  Compound shall form a uniform, continuous, 
coherent film that will not check, crack, or peel and shall be free from pinholes or other imperfections.  Apply 
an additional coat of compound immediately to areas where film is defective.  Respray concrete surfaces that 
are subject to heavy rainfall within 3 hours after curing compound has been applied in the same manner.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.7.2.1   Protection of Treated Surfaces</TTL><BRK/>
<BRK/>
<TXT>Keep concrete surfaces to which liquid membrane-forming compounds have been applied free from vehicular traffic 
and other sources of abrasion for not less than 72 hours.  Foot traffic is allowed after 24 hours for inspection 
purposes.  Maintain continuity of coating for entire curing period and repair damage to coating immediately.</TXT><BRK/>
<BRK/></SPT>
</SPT>[<SPT><TTL>3.7.3   Liquid Chemical Sealer-Hardener</TTL><BRK/>
<BRK/>
<TXT>Apply sealer-hardener to interior floors not receiving floor covering and floors located under access flooring.  
Apply the sealer-hardener in accordance with manufacturer's recommendations.  Seal or cover joints and openings 
in which joint sealant is to be applied as required by the joint sealant manufacturer.  The sealer-hardener shall 
not be applied until the concrete has been moist cured and has aged for a minimum of 30 days.  Apply a minimum 
of two coats of sealer-hardener.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>3.8   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.8.1   Sampling</TTL><BRK/>
<BRK/>
<TXT>The Contractor's approved laboratory shall collect samples of fresh concrete in accordance with <RID>ASTM C 172</RID> during 
each working day as required to perform tests specified herein. Make test specimens in accordance with <RID>ASTM C 31/C 31M</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.2   Consistency Tests</TTL><BRK/>
<BRK/>
<TXT><TST>The Contractor's approved laboratory shall perform <SUB>concrete slump tests</SUB> in accordance with <RID>ASTM C 143/C 143M</RID>.  
Take samples for slump determination from concrete during placement.  Perform tests at the beginning of a concrete 
placement operation and and for each batch (minimum) or every<MET> 16 cubic meters</MET><ENG> 20 cubic yards</ENG> (maximum) of concrete 
to ensure that specification requirements are met. In addition, perform tests each time test beams and cylinders 
are made.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.3   <SUB>Flexural Strength Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This specification is based on a flexural strength basis.  For small 
jobs compressive strength may be used.  In that case modify these paragraphs 
to reflect a compressive strength basis.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT><TST>The Contractor's approved laboratory shall test for flexural strength in accordance with <RID>ASTM C 78</RID>.  Make four 
test specimens for each set of tests.  Test two specimens at [7][28] days, and the other two at [28][90] days.</TST>
  Concrete strength will be considered satisfactory when the minimum of the [28][90]-day test results equals 
or exceeds the specified [28][90]-day flexural strength, and no individual strength test is less than<MET> [3.79] 
[_____] MPa</MET><ENG> [550] [_____] pounds per square inch</ENG>.  If the ratio of the [7][28]-day strength test to the specified 
[28][90]-day strength is less than 65 percent, make necessary adjustments for conformance.  Frequency of flexural 
tests on concrete beams shall be not less than four test beams for each<MET> 38 cubic meters</MET><ENG> 50 cubic yards</ENG> of concrete, 
or fraction thereof, placed.  Concrete which is determined to be defective, based on the strength acceptance 
criteria therein, shall be removed and replaced with acceptable concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.4   <SUB>Air Content Tests</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Test air-entrained concrete for air content at the same frequency as specified for slump tests.  Determine percentage 
of air in accordance with <RID>ASTM C 231</RID> on samples taken during placement of concrete in forms.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.5   Surface Testing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Drawings should clearly show all pavement joint intersection elevations, 
and specific required deviations from a plane surface for such special features 
as crowns, drainage inlets, etc.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Surface testing for surface smoothness [, edge slump] and plan grade shall be performed as indicated below by 
the Testing Laboratory.  The measurements shall be properly referenced in accordance with paving lane identification 
and stationing, and a report given to the Government within 24 hours after measurement is made.  A final report 
of surface testing, signed by a Registered Engineer, containing all surface measurements and a description of 
all actions taken to correct deficiencies, shall be provided to the Government upon conclusion of surface testing.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.8.5.1   Surface Smoothness Requirements</TTL><BRK/>
<BRK/>
<TXT>The finished surfaces of the pavements shall have no abrupt change of <MET>3 mm</MET><ENG>1/8 inch</ENG> or more, and [all pavements 
shall be within the tolerances specified when checked with a <MET>4 meter</MET><ENG>12 foot</ENG> straightedge:  <MET>5 mm</MET><ENG>1/5 inch</ENG> longitudinal 
and <MET>6.5 mm</MET><ENG>1/4 inch</ENG> transverse directions for roads and streets and <MET>6.5 mm</MET><ENG>1/4 inch</ENG> for both directions for other 
concrete surfaces, such as parking areas.][variations in final pervious surface shall not be more than <ENG>[3/8][_____] 
inch</ENG><MET>[10][_____] mm</MET> under a <MET>3.0 m</MET><ENG>10 foot</ENG> straightedge.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.5.2   Surface Smoothness Testing Method</TTL><BRK/>
<BRK/>
<TXT>The surface of the pavement shall be tested with the straightedge to identify all surface irregularities exceeding 
the tolerances specified above.  The entire area of the pavement shall be tested in both a longitudinal and a 
transverse direction on parallel lines approximately <MET>4.5 m</MET> <ENG>15 feet</ENG> apart.  The straightedge shall be held in 
contact with the surface and moved ahead one-half the length of the straightedge for each successive measurement.  
The amount of surface irregularity shall be determined by placing the straightedge on the pavement surface and 
allowing it to rest upon the two highest spots covered by its length and measuring the maximum gap between the 
straightedge and the pavement surface, in the area between these two high points.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8.6   Plan Grade Testing and Conformance</TTL><BRK/>
<BRK/>
<TXT>The surfaces shall vary not more than <MET>18 mm</MET> <ENG>0.06 foot</ENG> above or below the plan grade line or elevation indicated.  
Each pavement category shall be checked by the Contractor for conformance with plan grade requirements by running 
lines of levels at intervals to determine the elevation at each joint intersection.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.7   Test for Pavement Thickness</TTL><BRK/>
<BRK/>
<TXT>Measure during concrete placement to determine in-place thickness of concrete pavement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.8   Reinforcement</TTL><BRK/>
<BRK/>
<TXT>Inspect reinforcement prior to installation to assure it is free of loose flaky rust, loose scale, oil, mud, 
or other objectionable material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.9   Dowels</TTL><BRK/>
<BRK/>
<TXT><TST>Inspect dowel placement prior to placing concrete to assure that dowels are of the size indicated, and are spaced, 
aligned and painted and oiled as specified.  Dowels shall not deviate from vertical or horizontal alignment after 
concrete has been placed by more than<MET> 3 mm per 300 mm</MET><ENG> 1/8 inch per foot</ENG>.</TST></TXT><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Suggestions for improvement of this specification will be welcomed using 
the Navy "Change Request Forms" subdirectory located in SPECSINTACT in Jobs 
or Masters under "Forms/Documents" directory or DD Form 1426.  Suggestions should 
be forwarded to:</NPR><BRK/>
<NED/><BRK/>
<NPR>Commander</NPR><BRK/>
<NPR>Naval Facilities Engineering Command</NPR><BRK/>
<NPR>Engineering Innovation and Criteria Office, Code EICO</NPR><BRK/>
<NPR>1510 Gilbert Street</NPR><BRK/>
<NPR>Norfolk, VA 23511-2699</NPR><BRK/>
<BRK/>
<NPR>FAX:  (757) 322-4416 or</NPR><BRK/>
<NPR>Email: cgs@efdlant.navfac.navy.mil</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/></SPT>
</SPT><SPT><TTL>3.9   WASTE MANAGEMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Diverting waste from the landfill contributes to the following LEED credit: 
MR2.  Coordinate with Section 01 33 29 LEED(tm) DOCUMENTATION.  Designer shall 
verify that items are able to be disposed of as specified.<BRK/>
<BRK/></NPR>
<BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In accordance with the Waste Management Plan.[  Protect excess material from contamination and return to manufacturer, 
or reuse on-site for walkways, patching, ditch beds, speed bumps, or curbs.]</TXT><BRK/>
<BRK/></SPT>
</PRT>    <END/><BRK/></SEC>