USACE / NAVFAC / AFCESA / NASA                 UFGS-33 24 13 (August 2008)<BRK/>
                                               ---------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                     Superseding<BRK/>
                                               UFGS-33 24 13 (April 2008)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 33 24 13</SCN><BRK/>
<BRK/>
<STL>GROUNDWATER MONITORING WELLS</STL><BRK/>
<DTE>08/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>ground water monitoring 
wells for hazardous and non-hazardous waste sites</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.<BRK/>
<BRK/>
This guide specification includes tailoring options for AFCESA, NAVFAC, NASA 
and USACE.  Selection or deselection of a tailoring option will include or exclude 
that option in the section, but editing the resulting section to fit the project 
is still required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use Section <SRF>34 23 00</SRF> EXTRACTION WELLS for ground water extraction and 
associated testing to contain and remove groundwater from the aquifer.<BRK/>
<BRK/>
In most monitoring wells, because optimum yield from the well is not as critical 
to achieve as it is in production or extraction wells, and because extensive 
development is more difficult to accomplish in small diameter wells, screens 
are usually designed to have smaller openings, so that less formation material 
will be pulled into the well during the development and sampling.<BRK/>
<BRK/>
Use Section <SRF>33 20 00</SRF> WATER WELLS for water supply wells and associated testing.<BRK/>
<BRK/>
Use Section <SRF>33 26 00.00 10</SRF> RELIEF WELLS for projects relating to the relief 
of excess hydrostatic pressures adjacent to dams, locks, levees or other water 
retaining structures.</NPR><BRK/>
<BRK/>
<NPR>Coordinate and specify the appropriate pump for the specified well in a separate 
section.</NPR><BRK/>
<BRK/>
<NPR>Include the following in the drawings, and any other information necessary to 
indicate layout and general configuration of the well:</NPR><BRK/>
<BRK/>
<NPR>1.  Diameter of drilled hole</NPR><BRK/>
<BRK/>
<NPR>2.  Casing diameter</NPR><BRK/>
<BRK/>
<NPR>3.  Well screen diameter, length, location, and slotted opening size</NPR><BRK/>
<BRK/>
<NPR>4.  Minimum depth of casing and minimum depth well screen</NPR><BRK/>
<BRK/>
<NPR>5.  Limits of primary and secondary filter packs</NPR><BRK/>
<BRK/>
<NPR>6.  Limits of bentonite seal and grout seal</NPR><BRK/>
<BRK/>
<NPR>7.  Type of cap, cover, or seal required at top of well.</NPR><BRK/>
<BRK/>
<NPR>Include the applicable state and local regulatory references where appropriate 
in the body of the specification.</NPR><BRK/>
<BRK/>
<NPR>Use the following specifications in conjunction with this section:</NPR><BRK/>
<BRK/>
<TAI OPT="NAVFAC"><NPR>UFGS <SRF>00 22 13</SRF> SUPPLEMENTARY INSTRUCTIONS TO BIDDERS</NPR></TAI><BRK/>
<BRK/>
<NPR>UFGS <SRF>01 35 29</SRF> SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS</NPR><BRK/>
<BRK/>
<NPR>UFGS <SRF>01 35 29.13</SRF> HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED 
SITES</NPR><BRK/>
<BRK/>
<TAI OPT="USACE"><NPR>UFGS <SRF>01 32 01.00 10</SRF> PROJECT SCHEDULE</NPR></TAI><BRK/>
<BRK/>
<TAI OPT="NAVFAC"><NPR>[UFGS <SRF>01 32 16.00 20</SRF> [DESIGN AND ]CONSTRUCTION PROGRESS DOCUMENTATION] or</NPR><BRK/>
<BRK/>
<NPR>[UFGS <SRF>01 32 17.00 20</SRF> NETWORK ANALYSIS SCHEDULES (NAS)]</NPR></TAI><BRK/>
<BRK/>
<TAI OPT="USACE"><NPR>UFGS <SRF>01 45 01</SRF> USACE QUALITY CONTROL</NPR><BRK/>
<BRK/>
<NPR>UFGS <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL</NPR></TAI><BRK/>
<BRK/>
<NPR>UFGS <SRF>02 81 00</SRF> TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
[<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph will be deleted if the work is in one lump-sum contract 
price.  If it is retained and more detail is needed, items of consideration 
may include:  test holes, monitoring well drilling and sampling, geophysical 
logging, non-hazardous sludge, pumpable liquids, analytical (PCB &amp; asbestos), 
analytical (contaminated water), piping removal or capping and sealing, and 
remainder of work.  Coordinate this paragraph with the bidding schedule.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment for each specified item is made at the contract unit price for that item.  Payment includes full compensation 
for equipment, materials and labor for drilling; removal and disposal of temporary casing, cuttings, and drill 
fluid; preparation of borehole logs; and sample handling, containers, storage, and testing.  Measure depth, logging, 
installation, casing, riser pipe, and well screen by linear distance.  Payment is not allowed for test holes 
or <SUB>monitoring wells</SUB> abandoned due to construction practices not in accordance with this specification, or for 
the convenience of the Contractor.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.1   <TST>Test Holes</TST></TTL><BRK/>
<BRK/>
<TXT>If the total depth of the test hole is greater than that specified in the contract for "Test Holes, and Samples," 
the additional depth is paid for at the contract unit price for "Additional Test Hole Depth."  If the test hole 
is developed into the permanent monitoring well, no separate payment is made for the test hole.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2   Monitoring Well Drilling and Sampling</TTL><BRK/>
<BRK/>
<TXT>If the total depth of the monitoring well is greater than that specified in the contract for "Monitoring Wells 
and Samples," the additional depth is paid for at the contract unit price for "Additional Monitoring Well Depth."</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3   Geophysical Logging</TTL><BRK/>
<BRK/>
<TXT>The "Geophysical Logging" unit price includes interpretation of the logs and their delivery to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4   Casing/Riser Pipe Selection and Installation</TTL><BRK/>
<BRK/>
<TXT>Payment is made for length of blank casing actually installed in the well.  Payment includes compensation for 
decontamination and installation of the casing/riser pipe, cap, tail piece (if any), end cap and centralizers; 
and for the furnishing and installing of the well identification tag with information recorded thereon, or well 
marking in accordance with contract.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.5   Monitoring Well Screen</TTL><BRK/>
<BRK/>
<TXT>Payment is made for monitoring well screen actually installed in the well.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6   Filter Pack Construction</TTL><BRK/>
<BRK/>
<TXT>Filter pack construction is measured by the cubic<MET> meter</MET><ENG> foot</ENG>.  Payment includes compensation for furnishing, 
delivering, storage, decontamination, <TST>analytical testing</TST>, and installing the filter pack.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.7   Bentonite Seal</TTL><BRK/>
<BRK/>
<TXT>The bentonite seal is measured by the cubic<MET> meter</MET><ENG> foot</ENG>.  Payment includes full compensation for hydrating, and 
tremieing necessary for the work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.8   Grout Placement</TTL><BRK/>
<BRK/>
<TXT>The cement and/or bentonite grout <RID>ASTM C 1107/C 1107M</RID>, and <RID>ASTM D 4380</RID>,used in the annulus above the bentonite 
seal is paid by the cubic<MET> meter</MET><ENG> foot</ENG> used.  Payment includes compensation for cement, mixing of the grout, and 
pumping of grout, bentonite, mixing of bentonite grout, and pumping of bentonite grout, necessary for the work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.9   Monitoring Well Development</TTL><BRK/>
<BRK/>
<TXT>Payment for monitoring well development is made by the hour.  Payment includes compensation for pumping, surging, 
bailing, sample photograph, discharge water containers, and disposal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10   Monitoring Well Completion Aboveground</TTL><BRK/>
<BRK/>
<TXT>Payment includes compensation for protective covers, keyed-alike padlocks, locking caps, project photographs, 
concrete well pads, gravel, and protective steel posts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.11   Monitoring Well or Test Hole Decommissioning/Abandonment</TTL><BRK/>
<BRK/>
<TXT>Permanent decommissioning/abandonment of monitoring wells or test holes is paid for only if it becomes necessary 
to abandon a well or test hole as specified, and only for work completed and accepted as specified.  Payment 
includes compensation for drilling, casing removal, well sampling, materials, cement, mixing of cement, bentonite, 
and water, pumping of grout, equipment, removal of foreign objects, and transportation necessary to abandon the 
well or test hole and for the required well or test hole abandonment records.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.12   Site Cleanup</TTL><BRK/>
<BRK/>
<TXT>Separate payment is not made for cleanup of the site.  Cleanup means restoring the site to its pre-construction 
condition, in accordance with paragraph SITE CLEANUP.  Cleanup is considered part of and incidental to the drilling, 
construction, and/or decommissioning of the monitoring well.</TXT><BRK/>
<BRK/></SPT>
</SPT>]<SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<BRK/>
<NPR>State and/or local regulations/requirements may also need to be referenced.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN WATER WORKS ASSOCIATION (AWWA)</ORG><BRK/><BRK/><RID>AWWA 10084</RID><RTL>(2005) Standard Methods for the Examination of Water and Wastewater</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 312/A 312M</RID><RTL>(2008a) Standard Specification for Seamless, Welded, and Heavily Worked Austenitic Stainless Steel Pipes</RTL><BRK/><BRK/><RID>ASTM C 1107/C 1107M</RID><RTL>(2008) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 150</RID><RTL>(2007) Standard Specification for Portland Cement</RTL><BRK/><BRK/><RID>ASTM C 387/C 387M</RID><RTL>(2008) Standard Specification for Packaged, Dry, Combined Materials for Mortar and Concrete</RTL><BRK/><BRK/><RID>ASTM D 1586</RID><RTL>(2008a) Penetration Test and Split-Barrel Sampling of Soils</RTL><BRK/><BRK/><RID>ASTM D 1785</RID><RTL>(2006) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120</RTL><BRK/><BRK/><RID>ASTM D 2216</RID><RTL>(2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass</RTL><BRK/><BRK/><RID>ASTM D 2487</RID><RTL>(2006e1) Soils for Engineering Purposes (Unified Soil Classification System)</RTL><BRK/><BRK/><RID>ASTM D 2488</RID><RTL>(2006) Description and Identification of Soils (Visual-Manual Procedure)</RTL><BRK/><BRK/><RID>ASTM D 422</RID><RTL>(1963; R 2007) Particle-Size Analysis of Soils</RTL><BRK/><BRK/><RID>ASTM D 4318</RID><RTL>(2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils</RTL><BRK/><BRK/><RID>ASTM D 4380</RID><RTL>(1984; R 2006) Standard Test Method for Density of Bentonitic Slurries</RTL><BRK/><BRK/><RID>ASTM D 4750</RID><RTL>(1987; R 2001) Determining Subsurface Liquid Levels in a Borehole or Monitoring Well (Observation Well)</RTL><BRK/><BRK/><RID>ASTM D 5079</RID><RTL>(2008) Preserving and Transporting Rock Core Samples</RTL><BRK/><BRK/><RID>ASTM D 5088</RID><RTL>(2002; R 2008) Decontamination of Field Equipment Used at Nonradioactive Waste Sites</RTL><BRK/><BRK/><RID>ASTM D 5092</RID><RTL>(2004e1) Design and Installation of Ground Water Monitoring Wells in Aquifers</RTL><BRK/><BRK/><RID>ASTM D 5299</RID><RTL>(1999; R 2005) Decommissioning of Ground Water Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities</RTL><BRK/><BRK/><RID>ASTM D 5521</RID><RTL>(2005) Development of Ground-Water Monitoring Wells in Granular Aquifers</RTL><BRK/><BRK/><RID>ASTM D 5608</RID><RTL>(2001; R 2006) Decontamination of Field Equipment Used at Low Level Radioactive Waste Sites</RTL><BRK/><BRK/><RID>ASTM D 6725</RID><RTL>(2001) Standard Practice for Direct Push Installation of Prepacked Screen Monitoring Wells.</RTL><BRK/><BRK/><RID>ASTM F 480</RID><RTL>(2006b) Thermoplastic Well Casing Pipe and Couplings Made in Standard Dimension Ratios (SDR), SCH 40 and SCH 80</RTL><BRK/><BRK/></REF><REF><ORG>FORESTRY SUPPLIERS INC. (FSUP)</ORG><BRK/><BRK/><RID>FSUP 77341</RID><RTL>(1999) Munsell (R) Soil Color Charts</RTL><BRK/><BRK/></REF><REF><ORG>GEOLOGICAL SOCIETY OF AMERICA (GSA)</ORG><BRK/><BRK/><RID>GSA RCC00100R</RID><RTL>(1980) Rock Color Chart</RTL><BRK/><BRK/></REF><REF><ORG>NSF INTERNATIONAL (NSF)</ORG><BRK/><BRK/><RID>NSF 14</RID><RTL>(2008) Plastics Piping System Components and Related Materials</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>EM 385-1-1</RID><RTL>(2008) Safety and Health Requirements Manual</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)</ORG><BRK/><BRK/><RID>EPA 530/F-93/004</RID><RTL>(1993; Rev O; Updates I, II, IIA, IIB, and III) Test Methods for Evaluating Solid Waste (Vol IA, IB, IC, and II) (SW-846)</RTL><BRK/><BRK/><RID>EPA 600/4-79/020</RID><RTL>(1983) Methods for Chemical Analysis of Water and Wastes</RTL><BRK/><BRK/><RID>EPA SW-846</RID><RTL>(Third Edition; Update IV) Test Methods for Evaluating Solid Waste: Physical/Chemical Methods</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>49 CFR 172</RID><RTL>Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer must ensure that well design meets or exceeds Federal, state, 
and local installation requirements.  Additional criteria may apply for monitoring 
wells at radioactive, mixed, biological, solid, or medical waste sites.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Construct each monitoring well to yield chemically representative ground water samples of the screened interval 
for chemical analysis, and to allow for the accurate measurement of ground water depths relative to the top of 
the well riser, by use of electrical, wetted tape, or acoustical methods.  The screened interval is that portion 
of a monitoring well which is directly open to the host aquifer by way of openings in the well screen and indirectly 
open to the aquifer by way of the filter pack (or other permeable material) extending continuously below and/or 
above the screen.</TXT><BRK/>
<BRK/>
[<SPT><TTL>1.3.1   Prepacked Screen Monitoring Wells</TTL><BRK/>
<BRK/>
<TXT>Materials and installation of prepacked screen monitoring wells are to conform to the requirements of <RID>ASTM D 6725</RID>
.</TXT><BRK/>
<BRK/></SPT>
]<SPT><TTL>1.3.2   <SUB>Installation Plan</SUB></TTL><BRK/>
<TAI OPT="USACE"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Monitoring Well Installation Plan may need to be included as a part 
of the Field Sampling Plan (FSP) which is a part of the Sampling and Analysis 
Plan (SAP) required in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL.<BRK/>
<BRK/>
The FSP is described in EM 200-1-3, Requirements for the Preparation of Sampling 
and Analysis Plans.  EM 200-1-3 outlines the SAP format requirements, which 
include monitoring well installation.</NPR><BRK/>
<BRK/>
<NPR>EM 200-1-3 may be downloaded at the following Internet site:  </NPR><BRK/>
<AST/><BRK/></NTE>
</TAI><TAI OPT="AFCESA,NASA,NAVFAC"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Monitoring Well Installation Plan may need to be included as a part 
of the Field Sampling Plan (FSP) which is a part of the Sampling and Analysis 
Plan (SAP), and as required in Section <SRF>00 22 13</SRF> SUPPLEMENTARY INSTRUCTIONS TO 
BIDDERS.</NPR><BRK/>
<AST/><BRK/></NTE>
</TAI><BRK/>
<TXT>Incorporate the following requirements into the Contractor's Monitoring Well Installation Plan and follow in 
the field.  <TAI OPT="AFCESA,NASA,NAVFAC">Sampling and Testing is to be conducted in accordance with the guidelines as stated in:  "Department 
of Defense Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing", November 2007.</TAI>
  Include in the plan, but do not limit to a discussion of the following:</TXT><BRK/>
<BRK/>
<LST>a.  Description of well drilling methods, and installation procedures, including any temporary casing 
used, placement of filter pack and seal materials, drill cuttings and fluids disposal, and soil/rock 
sample disposition.</LST><BRK/>
<BRK/>
<LST>b.  Description of well construction materials, including well screen, riser pipe, centralizers, tailpiece 
(if used), filter pack and filter pack gradation, bentonite, drilling fluid additives (if used), drilling 
water, cement, and well protective measures.</LST><BRK/>
<BRK/>
<LST>c.  Description of quality control procedures to be used for placement of filter pack and seals in the 
boring, including depth measurements.</LST><BRK/>
<BRK/>
<LST>d.  Forms to be used for written boring logs, installation diagrams of wells, geophysical logs, well 
development records, well sampling data records, state well registration forms, and well abandonment 
records.</LST><BRK/>
<BRK/>
<LST>e.  Description of contamination prevention and well materials and equipment decontamination procedures.</LST><BRK/>
<BRK/>
<LST>f.  Description of protective cover surface completion procedures, including any special design criteria/features 
relating to frost heave prevention.  Include the maximum frost penetration for the site in this description.</LST><BRK/>
<BRK/>
<LST>g.  Description of well development methods to be used.</LST><BRK/>
<BRK/>
<LST>h.  List of applicable publications, including state and local regulations and standards.</LST><BRK/>
<BRK/>
<LST>i.  List of personnel assignments for this project, and personnel qualifications.</LST><BRK/>
<BRK/>
<LST>j.  Description of well decommissioning/abandonment procedures.</LST><BRK/>
<BRK/>
<LST>k.  Description of in-situ permeability determination techniques, if testing is required.</LST><BRK/>
<BRK/>
<LST>l.  Description and discussion of geophysical techniques to be employed at the site.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Performance Requirements</TTL><BRK/>
<BRK/>
<TXT>Install each monitoring well to prevent aquifer contamination by the drilling operation and equipment, intra- 
and inter-aquifer contamination, and vertical [or horizontal] seepage of surface water adjacent to the well into 
the subsurface, especially the monitoring well intake zone.  Perform work in conformance with <RID>EPA 530/F-93/004</RID>
, <RID>EPA 600/4-79/020</RID>,[ and] <RID>EPA SW-846</RID>[.]<TAI OPT="USACE">[, and ][<RID>EM 385-1-1</RID>.]</TAI></TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.][information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  Submit the following in 
accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Installation Diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  As-built installation diagram for each monitoring well installed, prepared by the geologist 
present during well installation operations, within [_____] working days of the completion of 
the well installation procedure.</ITM><BRK/>
<BRK/>
<ITM><SUB>Survey Maps and Notes</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Survey maps and notes, including a tabulated list of all monitoring wells and monuments, copies 
of all field books, maps showing the locations, and elevations of all monitoring wells, and 
all computation sheets within [_____] working days after completion of the survey.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Borehole Logs</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Original borehole logs, within [_____] working days after completion of the boring and well 
installation procedures.</ITM><BRK/>
<BRK/>
<ITM><SUB>Installation Diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Installation diagram for each monitoring well within [_____] working days of the completion 
of the installation.</ITM><BRK/>
<BRK/>
<ITM><SUB>Well Development Records</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Monitoring well development record, for each monitoring well, within [_____] working days 
of the completion of development.</ITM><BRK/>
<BRK/>
<ITM><SUB>Geophysical Logs</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Geophysical logs within [_____] working days of the completion of said logging.</ITM><BRK/>
<BRK/>
<ITM><SUB>Well Decommissioning/Abandonment Records</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Well decommissioning record, for each well, or test hole abandoned, within [_____] working 
days of the completion of the abandonment procedure.</ITM><BRK/>
<BRK/>
<ITM><SUB>Project Photographs</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Photographs taken before, during, and after completion of the work, of each well installation 
site.  Also photographs of any rock that is cored at the site.</ITM><BRK/>
<BRK/>
<ITM><SUB>Monitoring Wells</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Catalog data for monitoring well screens (to include the screen slot size), casing, riser 
pipe, filter pack material, bentonite, cement, centralizers, surface protective covers, well 
vaults, locking caps, airline oil filters for pneumatic drilling, dedicated sampling equipment, 
and chemical specifications on drill lubricants and tracers, if used.  Include any information, 
written or otherwise, supplied by the manufacturers or suppliers of the above listed items.</ITM><BRK/>
<BRK/>
<ITM><SUB>Qualifications</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Personnel qualification documentation.</ITM><BRK/>
<BRK/>
<ITM><SUB>Permits</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A copy of all permits, licenses, or other requirements necessary for execution of the work.  
Before beginning work,notify local United States Geological Survey office (USGS) [and the] [State 
Environmental Protection office] [State Geological Agency] [state health department] [local 
health department] [Department of natural Resources] of the type and location of wells to be 
constructed, the method of construction and anticipated schedule for construction of the wells.  
Furnish a copy of all such correspondence.</ITM><BRK/>
<BRK/>
<ITM><SUB>Installation Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  A plan, as specified in paragraph INSTALLATION PLAN, describing the drilling methods, sampling, 
and monitoring well construction and well development [30] [_____] calendar days prior to beginning 
drilling operations.  Mobilization activities may start prior to submittal of the plan.  Provide 
the plan approved and signed by a geologist [experienced in hazardous waste projects] as specified 
in paragraph QUALIFICATIONS.</ITM><BRK/>
<BRK/>
<ITM><SUB>Documentation and Quality Control Reports</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Reports for well construction and development.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Water Source</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  <TST>Decontamination and drilling water source analytical test results.</TST></ITM><BRK/>
<BRK/>
<ITM><SUB>Filter Pack</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  <TST>Filter pack material test results; sieve and chemical analyses.</TST></ITM><BRK/>
<BRK/>
<ITM><SUB>Drilling Fluid Additive</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  <TST>Manufacturer's data, if available, including analytical test results of the additive, if not 
a part of the manufacturer's data.</TST></ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   Notification</TTL><BRK/>
<BRK/>
<TXT>Notify the [Installation Environmental Coordinator (IEC)] [_____] [and] the Contracting Officer [_____] days 
prior to drilling.  The [Contracting Officer] [Contractor] [Installation Environmental Coordinator (IEC)] [_____] 
[is] [are] responsible for contacting the [State of [_____]] [USEPA] in accordance with the applicable reporting 
requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>Qualifications</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide an onsite geologist with at least [3] [_____] years experience in hazardous waste projects, soil and 
rock logging, and monitoring well installation, registered in the state of [_____], responsible for all geophysical 
and borehole logging, drilling, well installation, developing and testing activities.  Provide a driller licensed 
in the state of [_____], according to the state requirements.  Perform and provide geophysical log interpretation 
done by a qualified log analyst, demonstrating competence through background, training, and experience when so 
called upon.  Furnish Contractor documentation proving a minimum of [_____] years of monitor well installation 
experience, and appropriate health and safety personnel on staff as specified in Section <SRF>01 35 29.13</SRF> HEALTH, 
SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED SITES, and personnel qualified to perform the necessary 
chemical sampling as presented in the approved Sampling and Analysis Plan<TAI OPT="USACE">, prepared as specified in Section 
<SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL</TAI>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Store and maintain monitoring well materials in a clean, uncontaminated condition throughout the course of the 
project.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   SITE CONDITIONS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If needed, edit and add Section <SRF>31 11 00</SRF> CLEARING AND GRUBBING.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Access to each monitoring well site, including any utility clearance, <SUB>permits</SUB>, licenses, or other requirements 
and the payment thereof necessary for execution of the work is the responsibility of the [Contractor] [Government].  
Obtaining rights-of-entry is the responsibility of the [Contractor] [Government].  Visit each proposed well location 
to observe any condition that may hamper transporting equipment or personnel to the site.[  If clearing or relocation 
is necessary, the [Contractor,] [Installation Environmental Coordinator,] and the Contracting Officer [shall] 
[will] agree on a suitable clearing, or relocation plan and the location of any required access road.]</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   WELL CASING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The selection of well casing/riser pipe, and screen materials should 
be made with due consideration to geochemistry, anticipated lifetime of the 
monitoring program, well depth, chemical parameters to be monitored, and other 
site-specific factors.  Normally 50 or 100 mm (2 or 4 inch) inside diameter 
well casing, and screen should be used; however, larger casing diameters may 
be necessary where dedicated purging, or sampling equipment is used, or where 
the well is screened in a deep formation.  Schedule 40 casing is commonly used 
for monitoring wells, but schedule 80 is sometimes used for larger diameter 
PVC casing.</NPR><BRK/>
<BRK/>
<NPR>Welding is not a recommended procedure for the installation of a monitoring 
well; however, there may be occasions when it is necessary to weld outer/protective 
casing, or drive casing at the site.  It may be unsafe to weld if certain volatile 
organics are present.  Safety precautions should be addressed in the site safety 
and health plan.  In addition to the safety consideration, it may be undesirable 
to use metal well casing if metals are the contaminants of concern, which would 
preclude welding of metal well pipe.  Appropriate welding standards, such as 
AWWA C206, Field Welding of Steel Water Pipe, must be referenced if welding 
is anticipated.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide new monitoring well casing/riser<MET> [102] [_____] mm</MET><ENG> [4] [_____] inch</ENG> nominal internal diameter, schedule 
[40] [_____] flush-joint threaded [[<RID>ASTM D 1785</RID> polyvinyl chloride (PVC)] [PTFE] [_____] pipe, meeting the requirements 
of <RID>NSF 14</RID>, with required fittings conforming to <RID>ASTM F 480</RID> flush thread male by female fittings] [Type 304 stainless 
steel.  The minimum wall thickness shall be schedule 5S meeting the requirements of <RID>ASTM A 312/A 312M</RID>].  Do not 
use pop rivets or screws.  Provide a [PVC] [stainless steel] [PTFE] [_____], [locking] [non-locking] cap, that 
threads or slips onto the top of the well casing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   CENTRALIZERS</TTL><BRK/>
<BRK/>
<TXT>Attach [stainless steel] [PVC] [PTFE] centralizers to the well casing when monitoring wells are over<MET> [6] [_____] 
m</MET><ENG> [20] [_____] feet</ENG> in length.  Centralizers are not required if the monitoring wells are installed through hollow-stem 
augers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   WELL SCREEN</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Continuous wrap screen is commonly used for monitoring wells; the type 
screen is not normally designated by schedule; however, the end fittings are, 
and must be, compatible with the schedule of the well casing.  The schedule 
of the end fittings of the screen and the screen must be specified, if slotted 
pipe well screen is required.<BRK/>
<BRK/>
The screen slot size for monitor wells is commonly 0.25 mm (0.010 inch) for 
fine-grained formations or 0.5 mm (0.020 inch) for coarser grained formations.<BRK/>
<BRK/>
Monitoring well screen length is typically 1.5 to 3 meters (5 to 10 feet), but 
should be designed for the particular case to be monitored; however, when monitoring 
ground water quality at the top of the water table, screen lengths of 3 and 
6 meters (10 and 20 feet) are commonly used.  Screens of more than 6 meters 
(20 feet) are rarely used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide monitoring well screen, designed and constructed in accordance with paragraph SYSTEM DESCRIPTION, consisting 
of new commercially fabricated flush-joint threaded<MET> [102] [_____] mm</MET><ENG> [4] [_____] inch</ENG> nominal internal diameter 
[polyvinyl chloride (PVC)] [type 304 stainless steel] [_____][continuous wrap] [schedule [40] [_____] slotted], 
non-clogging design.  [Provide schedule [40] [_____] end fittings on the continuous wrap screen.]  Provide required 
fittings conforming to <RID>ASTM F 480</RID>, flush thread male by female.  Provide screen slot size [as determined by the 
Contractor, and approved by the Government] [<MET>[0.25] [0.50] [_____] mm</MET><ENG> [0.010] [0.020] [_____] inch</ENG>], and screen 
length of [[_____]<MET> meters</MET><ENG> feet</ENG>] [or as determined by the Contractor].  Seal the bottom section of the screen 
watertight by means of a flush threaded end cap of the same material as the well screen, within<MET> 150 mm</MET><ENG> 6 inches</ENG>
 of the open portion of the screen.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4   <SUB>FILTER PACK</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide filter pack consisting of clean, washed, rounded to sub-rounded siliceous material free from calcareous 
grains or material.  Organic matter, soft, friable, thin, or elongated particles are not permissible.  Determine 
the gradation of the filter pack using the grain size analysis data obtained as required in paragraph Sampling.  
Use a uniformity coefficient for the filter pack material not exceeding 2.5.  Fill an airtight<MET> liter</MET><ENG> pint</ENG> size 
[plastic] [glass] container with a sample of filter pack material and furnish to the Contracting Officer for 
each well to serve as a quality control.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   BENTONITE SEAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Slurry seals can be used as when the seal location is too far below water 
to allow for pellet or containerized-bentonite placement, or within a narrow 
well-borehole annulus.<BRK/>
<BRK/>
See paragraph BENTONITE SEAL note.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide a bentonite seal, intended to keep grout from entering the filter pack, consisting of hydrated granular, 
or pelletized, sodium montmorillonite furnished in sacks or buckets from a commercial source, free of impurities 
which adversely impact the water quality.  If the bentonite seal is located above any borehole fluid levels, 
place a layer of fine sand at the top of the bentonite seal, to provide an additional barrier to any downward 
migration of grout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   CEMENT AND BENTONITE GROUT</TTL><BRK/>
<BRK/>
<TXT>Provide cement grout with a mixture of a maximum of<MET> 26 liters of approved water per 42.6 kg</MET><ENG> 7 gallons of approved 
water per 94 lb</ENG> bag of portland cement, conforming to <RID>ASTM C 150</RID>, Type [I] [_____].  Add no more than 5 percent 
by weight of bentonite powder to reduce shrinkage, hold the cement in suspension prior to the grout set.  Use 
sodium bentonite powder and/or granules for high-solids bentonite grout.  Mix water from an approved source with 
these powders or granules to form a thick bentonite slurry, consisting of a mixture of bentonite and the manufacturer's 
recommended volume of water to achieve an optimal seal.  The slurry shall contain at least 20 percent solids 
by weight and have a density of<MET> 4.3 kg per liter</MET><ENG> 9.4 lb per gallon</ENG> of water or greater.  Provide additional construction 
details for grout placement above the bentonite seal for frost heave protection as directed in paragraph Protective 
Cover Placement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7   CONCRETE PAD OR GRAVEL BLANKET</TTL><BRK/>
<BRK/>
<TXT>Construct a [concrete pad] [coarse gravel blanket] around the protective cover at the ground surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8   PROTECTIVE COVERS</TTL><BRK/>
<BRK/>
<TXT>Equip monitoring wells with [a steel] [a stainless steel] [a cast iron] [an aluminum] lockable protective casing/enclosure 
set over the well casing, set in the concrete pad or surface seal.  Provide weather resistant padlocks which 
use the same key (keyed-alike) on the protective covers, or lockable caps for all wells.  Cap any well that is 
to be temporarily removed from service or left incomplete due to delay in construction with a watertight cap 
and equipped with a vandal resistant cover.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9   PROTECTIVE POSTS</TTL><BRK/>
<BRK/>
<TXT>Provide and place [four] [_____]<MET> [75] [_____] mm</MET><ENG> [3] [_____] inch</ENG> diameter, [schedule 40 carbon steel] [_____], <MET>
[2] [_____] meter</MET><ENG> [6] [_____] foot</ENG> long, primed and painted, conforming to Section <SRF>09 90 00</SRF> PAINTING, GENERAL, 
[orange] [_____] protective posts around the monitoring well.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10   CONTAINERIZATION OF DEVELOPMENT WATER, AND DRILL CUTTINGS</TTL><BRK/>
<BRK/>
<TXT>Provide D.O.T. approved drums, containers, or vessels for containment of water removed during development and 
testing operations, and cuttings from the drilling operations, as specified in <RID>49 CFR 172</RID>.  Furnish polyethylene 
and steel drums with lids, lid gaskets, bolts, chain of custody forms and drum labels.  Mark each drum label 
in accordance with <RID>49 CFR 172</RID> in addition to the following information:</TXT><BRK/>
<BRK/>
<LST>a.  drum number,</LST><BRK/>
<LST>b.  site name,</LST><BRK/>
<LST>c.  well name and number,</LST><BRK/>
<LST>d.  contents and date,</LST><BRK/>
<LST>e.  approximate depth of material contained in each drum, and</LST><BRK/>
<LST>f.  the name and phone number of the [Installation Environmental Coordinator (IEC)] [Contracting Officer] 
[_____].</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11   SAMPLE CONTAINERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete requirements for boxing core, if rock coring is not anticipated 
at the site.  <TAI OPT="USACE">Rock core samples should be containerized, boxed and stored in 
accordance with ER 1110-1-1803, EM 200-1-3, EM 1110-1-1804, and EM 1110-1-4000.</TAI></NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Place cuttings, and driven samples for geotechnical purposes, in air-tight<MET> liter</MET><ENG> pint</ENG> size [plastic] 
[glass] Contractor furnished containers and labeled with the project name, date of sample, monitoring 
well number and depth at which the sample was taken.</LST><BRK/>
<BRK/>
<LST>b.  Label both the container and lid in permanent indelible ink.  Place jars in partitioned [cardboard] 
[_____] Contractor furnished boxes.  Label boxes with project number and well number.</LST><BRK/>
<BRK/>
<LST>c.  Prepare and preserve core samples for transport as described in <RID>ASTM D 5079</RID>.  Place cored rock samples 
in [wooden] [_____] core boxes as indicated on the drawings.  Place spacers in the proper positions in 
the core boxes to show the location and actual extent of voids and core losses as clearly as possible.  
Make the spacers of [wood] [_____] [or some other relatively light material], which is of sufficient 
strength to withstand jarring and crushing in handling, and of a strongly contrasting color pattern so 
that core losses are accented either by direct observation or in photographs.  In the smaller sizes, 
up to and including<MET> 150 mm</MET><ENG> 6 inches</ENG>, provide spacers of the same width as the cores.  Label the outside 
and the inside of the core box lid with the project name, hole number, date sampled, location, surface 
elevation, core box number, and interval of depth of core.  Show the information on the label such that 
it can clearly be read in photographs of the core box.  Also label both ends of the core box with the 
hole number and box number.  Place the core in the core box starting at the left hand corner on the hinge 
side and running to the right.  Place successive cores down the hole in successive troughs, starting 
from the back and working toward the front of the box so that the core can be read in the same manner 
as a printed page, from left to right, when standing in front of the open box.</LST><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   PROTECTION OF EXISTING CONDITIONS</TTL><BRK/>
<BRK/>
<TXT>Maintain all existing survey monuments and monitoring wells, and protect them from damage from equipment and 
vehicular traffic.  Immediately report and repair any items damaged by the Contractor.  Re-install monitoring 
wells requiring replacement due to Contractor negligence according to these specifications.  Protect wells scheduled 
for abandonment from damage so that abandonment may be performed according to these specifications.  Prior to 
excavation, obtain written approval from the local utility companies to drill at each site, to avoid disturbing 
buried utilities.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   PREPARATION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Decontamination</TTL><BRK/>
<BRK/>
<LST>a.  Clean the drill rig, drill rods, drill bits, augers, temporary casing, well developing equipment, 
tremie pipes, grout pumping lines, and other associated equipment with high-pressure hot water/steam 
prior to drilling at each monitoring well location.  Perform decontamination in accordance with <RID>ASTM D 5088</RID>
 <RID>ASTM D 5608</RID>, at a central decontamination station located in an area that is remote from, and cross- 
or down-gradient from the well being drilled.</LST><BRK/>
<BRK/>
<LST>b.  Clean screen and well casing with high-pressure hot water immediately prior to installation in the 
well.  The use of factory sealed (plastic wrapped) screen and well casing does not waive this requirement 
for pre-installation cleaning.  Decontaminate samplers in accordance with the Sampling and Analysis Plan.</LST><BRK/>
<BRK/>
<LST>c.  Use only water for cleaning from a Government approved source.  Sample and test the water source 
used for cleaning for the constituents specified in the Sampling and Analysis Plan prior to use at the 
site.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Decontamination Station</TTL><BRK/>
<BRK/>
<LST>a.  Construct a temporary decontamination pad onsite, bermed and slightly inclined towards a sump located 
in one of the back corners of the pad.  Line the pads and berms with plastic sheeting to contain decontamination 
water.  Place plywood  sheeting, exterior grade, over the plastic sheeting to prevent damage to the plastic 
and allow the drill rig and heavy equipment to use the pad.</LST><BRK/>
<BRK/>
<LST>b.  Make the minimum dimensions of the pad the length and width of the drill rig, plus<MET> 1.2 m</MET><ENG> 4 feet</ENG> per 
side to allow access and steam cleaning.  Use yellow ribbon to encircle the decontamination pad.</LST><BRK/>
<BRK/>
<LST>c.  Pump water collected in the sump using a "trash" pump to transfer water to a<MET> 200 liter</MET><ENG> 55 gallon</ENG> 
drum labeled "Decontamination Pad Sump Water."  Transfer solid waste to a separate<MET> 200 liter</MET><ENG> 55 gallon</ENG>
 drum labeled "Decontamination Pad Sump Sludge."</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   <SUB>Water Source</SUB></TTL><BRK/>
<BRK/>
<TXT>If well drilling/installation requires the use of water, prior to its use at the site, sample and test the water 
source, and obtain approval from the Contracting Officer for the constituents specified in the Sampling and Analysis 
Plan.  The Contractor is responsible for locating the source, obtaining the water from the source, transporting 
it to, and storing it at the site.  Obtain a water sample from the container used in transporting the water to 
the site before the water is used for decontamination, and sample, test, and secure approval in accordance with 
the above requirements.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   INSTALLATION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Drilling Method</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete prohibition against drilling aids where such aids are required 
and not otherwise prohibited.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Use a drilling method which prevents the collapse of formation material against the well screen and 
casing during installation of the well.  Make the inside diameter of any temporary casing used sufficient 
to allow accurate placement of the screen, riser, centralizer(s), filter pack, seal and grout.</LST><BRK/>
<BRK/>
<LST>b.  The use of drilling aids such as bentonite, other clay-based agents, or any other foreign matter 
capable of affecting the characteristics of the ground water is prohibited.  Any <SUB>drilling fluid additive</SUB>
 used shall be inorganic in nature.  Grease or oil on drill rods, casing, or auger joints are not permitted; 
however, PTFE tape or vegetable oil (in solid phase form) are acceptable.</LST><BRK/>
<BRK/>
<LST>c.  Provide a drill rig free from leaks of fuel, hydraulic fluid, and oil which may contaminate the borehole, 
ground surface or drill tools.  During construction of the wells, use precautions to prevent tampering 
with the well or entrance of foreign material, and prevent runoff from entering the well during construction.  
If there is an interruption in work, such as overnight shutdown or inclement weather, close the well 
opening with a watertight uncontaminated cover.  Secure the cover in place or weighted down so that it 
cannot be removed except with the aid of the drilling equipment or through the use of drill tools.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   <TST>Test Hole Requirements</TST></TTL><BRK/>
<BRK/>
<TXT>Drill one test hole for every monitoring well or well cluster installed.  A well cluster, as defined in this 
specification, is two or more wells completed (screened) to different depths in a single borehole or in a series 
of boreholes in close proximity (<MET>3 m </MET><ENG> 10 feet</ENG> or less) to each other.  The test hole may be converted to the 
permanent monitor well.  Log test holes in accordance with paragraph BOREHOLE LOGS, and if temporary casing is 
used, use in accordance with paragraph Decontamination.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Sampling</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Sampling and Testing is to be conducted in accordance with the guidelines 
as stated in:  "Department of Defense Policy and Guidelines for Acquisitions 
Involving Environmental Sampling or Testing", November 2007.</NPR><BRK/>
<AST/><BRK/></NTE>
<TAI OPT="USACE"><NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Sampling for chemical and geotechnical analysis may be combined to allow 
for obtaining samples for both if that accomplishes project requirements.  If 
this is done, however, the geotechnical sampling must be coordinated with the 
requirements in Section <SRF>01 35 45.00 10</SRF> CHEMICAL DATA QUALITY CONTROL for sampling 
for chemical analysis.  If rock is cored at the site, and it is determined that 
it should be retained, it should be boxed, and photographed.  Its storage, and 
later disposal should be in accordance with ER 1110-1-1803, and the proper storage 
and handling protocol for such material as may be required by other Federal, 
state, or local laws, regulations and permits.  Sampling procedures are described 
in EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans.  
Guidance for preserving and preparing core samples for transport can be found 
in ASTM D 5079</NPR><BRK/>
<AST/><BRK/></NTE>
</TAI><BRK/>
<SPT><TTL>3.3.3.1   Sampling for Chemical Analysis</TTL><BRK/>
<BRK/>
<TXT>Include sampling requirements for obtaining and preserving samples for chemical analysis in the Sampling and 
Analysis Plan, conforming to:  DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or 
Testing, November, 2007.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3.2   Sampling for Geotechnical Analysis</TTL><BRK/>
<BRK/>
<LST>a.  Take samples of all materials penetrated by each drilled well/test hole.  Perform soil sampling with 
a stainless steel split tube sampler using standard sampling techniques in accordance with <RID>ASTM D 1586</RID>
.  Extract samples from their in-situ environment in as near an intact, minimally disturbed condition 
as technically practical.  Retrieve samples according to <RID>ASTM D 1586</RID> at least every<MET> [1] [_____] meter</MET><ENG>
 [5] [_____] feet</ENG> from each test hole.  Obtain samples continuously through the area expected to be screened.</LST><BRK/>
<BRK/>
<LST>b.  Provide sieve analyses of all drive sampled material, conducted in accordance with <RID>ASTM C 136</RID>.  Clean 
drive sample tools with high-pressure hot water/steam between sampling events within the same boring.  
Place drive-sampled materials in airtight containers and label as specified in paragraph SAMPLE CONTAINERS, 
and deliver to the Contracting Officer designated facility.  Test representative soil samples for grain-size 
distribution by mechanical means <RID>ASTM D 422</RID> (sieves down to the <MET>0.074 mm (No. 200)</MET> <ENG>No. 200</ENG> size according 
to <RID>ASTM C 136</RID>), moisture content according to <RID>ASTM D 2216</RID> and Atterberg limits according to <RID>ASTM D 4318</RID>
.  Prepare description and identification of soils in accordance with <RID>ASTM D 2488</RID>, laboratory classification 
of soils in accordance with <RID>ASTM D 2487</RID>, and perform sampling to allow completion of the documents described 
in paragraph Borehole Logs.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.4   Geophysical Logging</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The requirement to obtain borehole geophysical surveys is optional.  
While it may not be necessary to require a borehole geophysical survey at a 
site where a great deal is known about the subsurface, at another site, where 
very little, or nothing is known, it may be prudent to require a borehole geophysical 
survey.  When it is deemed necessary to require a borehole geophysical survey, 
the specific type of survey should be specified.  This recommendation is made 
by the project geologist.  The project geologist should also determine what 
geophysical logging is not allowed by state regulations, before specifying them.  
See EM 1110-1-1802, Geophysical Exploration.  Guidance for planning and conducting 
borehole geophysical logging may be found in ASTM D 5753.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Geophysically log the total depth of each test hole drilled.  Document geophysical logging in accordance with 
paragraph Geophysical Logs.  Run [one successful natural gamma ray or gamma-gamma for the full depth, (top to 
bottom of test hole);] [one successful neutron in the fluid filled portion of the hole, (top to bottom of test 
hole);] [one successful (top to bottom of test hole) spontaneous potential (self-potential);] [and,] [one successful 
(top to bottom of test hole) resistivity log], for each test hole.  Perform log analyses and interpretations 
by a person qualified in accordance with paragraph QUALIFICATIONS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.5   Borehole Diameter and Depth</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  State regulations may require more than 50 mm (2 inches) of annular space 
between the boring wall and the sides of the entered riser pipe and screen.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide sufficient diameter in  borings for monitoring well installation to permit at least<MET> 50 mm</MET><ENG> 2 inches</ENG> of 
annular space between the boring wall and all sides of the centered riser pipe and screen.  Determine depths 
of individual borings [ as specified in the approved Monitoring Well Installation Plan] [as indicated on the 
drawings] [_____], with actual depth adequate to allow for the collection of representative ground water samples 
for chemical analysis at the time of initial sampling.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6   Screen, Well Casing/Riser Pipe Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Depending on the nature of the contaminants to be sampled, the screen 
may be required to be placed below or across the water table.  Caps for the 
flush-to-ground, or manhole type surface completion should not be vented, or 
loose fitted.  Caps for these type completions should be water tight.  Delete 
the requirements for centralizers if they are not required per paragraph CENTRALIZERS.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Provide the monitoring well screen in length [as shown on the drawings] [[____]<MET> mm</MET><ENG> feet</ENG> long] [as 
determined by the Contractor and approved by the Government], with specified bottom cap securely attached, 
set to the appropriate depth.</LST><BRK/>
<BRK/>
<LST>b.  Place the bottom of the well screen no more than<MET> 1 m</MET><ENG> 3 feet</ENG> above the bottom of the drilled borehole.  
Place the well screen in the appropriate location in the borehole so that the completed monitoring well 
functions in accordance with paragraphs SYSTEM DESCRIPTION and WELL ACCEPTANCE.</LST><BRK/>
<BRK/>
<LST>c.  Provide sieve analyses of all drive sampled material, conducted in accordance with <RID>ASTM C 136</RID>.  Place 
the well screen [as specified on the drawings] [at [_____]].  Join the screen and well casing/riser pipe 
sections by flush threaded watertight joints, with the well casing/riser pipe extending upwards from 
the screen to an elevation appropriate for the surface completion described in paragraph Protective Cover 
Placement.  Do not allow the well screen and riser pipe to drop or fall uncontrolled into the borehole.  
Clean the screen and well casing/riser pipe with high pressure hot water/steam just prior to installation; 
allowing no foreign material to remain on the screen and well casing before installation.  The use of 
factory-sealed (plastic wrapped) screen, free from painted markings, does not waive requirements for 
pre-installation cleaning.</LST><BRK/>
<BRK/>
<LST>d.  Provide watertight flush threaded joints and fastenings ; solvent glue or set screws are not permitted.</LST><BRK/>
<BRK/>
<LST>e.  Make the well centered and plumb by the use of a minimum of [_____] stainless steel centralizers, 
in accordance with paragraph CENTRALIZERS, spaced 120 degrees apart at intervals not exceeding<MET> [6] [_____] 
m</MET><ENG> [20] [_____] feet</ENG> along the length of the casing.  Do not place centralizers on the screened interval 
or within the bentonite seal.  Verify the alignment of the well by passing a<MET> 1500 mm</MET><ENG> 5 foot </ENG>long section 
of rigid pipe<MET> 6 mm</MET><ENG> 1/4 inch</ENG> smaller in diameter than the inside diameter of the casing through the entire 
well.  If the pipe does not pass freely, the well will not be accepted.  Thoroughly clean the pipe section 
with high pressure hot water prior to each test.  Use temporary casing, hollow stem augers or other measures, 
as necessary, to prevent collapse of the boring against the well screen and well casing/riser pipe prior 
to placement of the filter pack and sealing materials.  Install a cap on the top of the riser pipe, either 
vented, or a telescopic fit, constructed to preclude binding to the well casing caused by tightness of 
fit, unclean surfaces, or weather conditions.  Make cap secure enough to preclude the introduction of 
foreign material into the well, yet allow pressure equalization between the well and the atmosphere.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.7   Filter Pack Placement</TTL><BRK/>
<BRK/>
<LST>a.  After the screen and well casing have been concentrically placed in the hole, construct the approved 
filter pack around the screen by filling the entire space between the screen and the wall of the hole 
over the selected screened interval.  Place the lowermost<MET> [300] [_____] mm</MET><ENG> [1] [_____] foot</ENG> of filter 
pack in the boring prior to installation of the well screen, serving as a base on which to place the 
screen.  Lower a tremie pipe having an inside nominal diameter of not less than<MET> 25 mm</MET><ENG> 1 inch</ENG>, to the 
bottom of the annulus between the hole and well.  Clean the tremie pipe with high pressure hot water/steam 
prior to each use.  Arrange the tremie pipe so that water and filter pack material fed at uniform rates 
are discharged as the filter pack material fills the hole from the bottom up.  Raise the tremie pipe 
at a rate that will keep the bottom of the pipe no more than<MET> [1500] [_____] mm</MET><ENG> [5] [_____] feet</ENG> above 
the top of the surface of the filter pack level, and no more than<MET> [600] [_____] mm</MET><ENG> [2] [_____] feet</ENG> below 
the surface of the filter pack level at all times.</LST><BRK/>
<BRK/>
<LST>b.  Dumping filter pack material from the surface of the ground and agitating the well in an effort to 
settle the filter material is not allowed.  Install the filter pack continuously and without interruption 
until the filter pack has been placed [to a minimum of<MET> 1 meter</MET><ENG> 3 feet</ENG> above the top of the screen in 
the monitoring well] [to a height equal to 20 percent of the length of the screen] [to within no more 
than [______]<MET> meters</MET><ENG> feet</ENG> of the top of the ground surface].  Directly measure the depth to the top of 
the filter pack and record.  Obtain any additional water required to be added to the filter pack material 
in accordance with paragraph Water Source.</LST><BRK/>
<BRK/>
<LST>c.  Protect filter pack material from contamination prior to placement by either storing it in plastic 
lined bags, or in a location protected from the weather and contamination on plastic sheeting.  Transport 
filter pack material to the well site in a manner which prevents contamination by other soils, oils, 
grease, and other chemicals.  Remove temporary drill casing, if installed, or auger simultaneously with 
the above operation.  Minimize lifting of the riser pipe when withdrawing the temporary casing/auger.  
Place filter pack material in lifts no greater than<MET> 1 m</MET><ENG> 3 foot</ENG> prior to retraction of the temporary casing/auger.  
Leave a minimum of<MET> 150 mm</MET><ENG> 6 inches</ENG> of filter pack in the temporary casing/auger at all times during filter 
pack installation.  Take frequent measurements inside the annulus during retraction to ensure that the 
filter pack is properly placed.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.8   Bentonite Seal</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Sufficient time should be allowed for the bentonite seal to hydrate and 
form a low permeable seal before grout is placed in the annular space above 
the bentonite seal.  By not allowing enough time, grout material could infiltrate 
into the seal and possibly into the filter pack.  It is recommended waiting 
a minimum of 3 to 4 hours for hydration of bentonite pellets, or tablets.  If 
bentonite chips are used, the minimum hydration time could be twice as long.  
Normally bentonite chips should only be used if it is necessary to install a 
seal in a deep water column.  Because of their high moisture content and slow 
swelling tendencies, chips can be dropped through a water column more readily 
than a material with low moisture content, such as pellets or  tablets.  Bentonite 
chips should not be placed in the vadose zone.  When installing a bentonite 
seal in the vadose zone, potable water should be added to the bentonite for 
it to properly hydrate.  The amount of water is dependent on the formation.  
It is recommended that the bentonite seal be placed in lifts, with each lift 
allowed to hydrate for a minimum period of time.  For more guidance consult 
EM 1110-1-4000.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Place a minimum<MET> 1 m</MET><ENG> 3 foot</ENG> thick hydrated bentonite seal on top of the filter pack in a manner which prevents 
bridging of the bentonite in the annulus, such that the bottom of the bentonite seal is a minimum of<MET> 1 m</MET><ENG> 3 feet</ENG>
 above the top of the filter pack.  Directly measure the depth to the top of the bentonite seal and record immediately 
after placement, without allowance for swelling.  If the bentonite seal is located above any borehole fluid levels, 
place a<MET> [300] [_____] mm</MET><ENG> [1] [_____] foot</ENG> layer of fine sand at the top of the bentonite seal.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.9   Grout Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  There is a provision for placing a high-solids bentonite grout in the 
annulus above the bentonite seal rather than cement grout.  This may be better 
in areas of the country where the monitoring wells will be susceptible to frost 
heave.  If it is required that the protective casing be anchored in-place with 
cement grout, this should be done in accordance with paragraph Protective Cover 
Placement.  The depth of maximum frost penetration should be determined before 
design of the monitoring well installation.  The susceptibility of the soils 
to frost action should also be determined beforehand.  Guidance for determining 
frost penetration may be found in UFC 3-130-06 or FM 5-430-00-1.  There may 
be a need for a provision to grout the annular space in lifts in deep wells 
to ensure that any PVC or other type casing will not be collapsed by the weight 
and/or heat created by the chemical reaction of cement grout.  If grouting in 
lifts is for some reason not acceptable, the well should be designed to withstand 
greater external pressures.  This may mean using higher schedule casing, or 
steel instead of PVC, for example.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Mechanically mix a [non-shrinking cement] [high-solids bentonite] grout, in accordance with paragraph CEMENT 
AND BENTONITE GROUT, and placed in one continuous operation into the annulus above the bentonite seal to [within 
[_____]<MET> mm</MET><ENG> feet</ENG> of] [the ground surface] [the maximum depth of frost penetration (frost line)].  Make grout injection 
in accordance with <RID>ASTM D 5092</RID>.  If the casing interval to be grouted is less than<MET> 4.5 m</MET><ENG> 15 feet</ENG>, and without 
fluids after any drill casing is removed, place the grout either by pouring or pumping.  Thoroughly clean the 
tremie pipe with high pressure hot water/steam before use in each well.  Construct the bottom of the tremie pipe 
to direct the discharge to the sides rather than downward, keeping the discharge end of the tremie pipe submerged 
at all times.  Add additional grout from the surface to maintain the level of the grout at the land surface as 
settlement occurs.  Work is not permitted in the well within [24] [_____] hours after cement grouting.  Verify 
the alignment of the well by passing a<MET> 1.5 m</MET><ENG> 5 foot</ENG> long section of rigid [PVC] [stainless steel] [PTFE] [_____] 
pipe<MET> 6 mm</MET><ENG> 1/4 inch</ENG> smaller in diameter than the inside diameter of the casing through the entire well.  If the 
pipe does not pass freely, the well will not be accepted.  Thoroughly clean the pipe section with high pressure 
hot water/steam prior to each test.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.10   Concrete or Gravel Pad Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Some states may require that the surface seal extend to depths of 3 m 
(10 feet), or greater to ensure sanitary protection of the well.  The surface 
seal may be an extension of the annular seal installed above the filter pack 
or it may be a separate "surface" seal emplaced on top of the annular seal.  
Also, in extreme cold climates, it may be better, if allowed by state and local 
regulations, to fill the annular space above the bentonite well seal, or filter 
pack, with bentonite grout and construct the well "pad" of coarse gravel, rather 
than concrete.  Concrete well pads sometimes have a tendency to crack and breakup 
in cold regions.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Construct a [concrete pad with a minimum radius of<MET> [600] [_____] mm</MET><ENG> [2] [_____] feet</ENG> from the protective casing 
and<MET> 100 mm</MET><ENG> 4 inch</ENG>] [coarse gravel blanket with a minimum radius of<MET> [1200] [_____] mm</MET><ENG> [4] [_____] feet</ENG> from the 
protective casing and<MET> 150 mm</MET><ENG> 6 inch</ENG>] thick, sloped away from the well around the well casing at the final ground 
level elevation.  [Prior to placement of the gravel blanket, backfill any depression existing around the well 
borehole to the level of the surrounding ground surface with [near-surface drill cuttings from the well] [clay] 
[_____].]  [Furnish pre-packaged, dry, combined concrete materials for the well pads conforming to <RID>ASTM C 387/C 387M</RID>
 normal weight, normal strength concrete.  Combine the dry materials with potable water and mix in an approved 
mixer or container until uniform in consistency and color.  Limit water to the minimum amount possible.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.11   Protective Cover Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If frost heave is not a concern at the site, the requirement for the 
annular space between the protective casing and the well riser to be filled 
with dry bentonite may be deleted.  The cement grout may then be placed outside 
of, and inside the protective casing to the ground surface as would be specified 
in paragraph Grout Placement.</NPR><BRK/>
<BRK/>
<NPR>It may be necessary to require that the protective posts be supplemented with 
barbed wire in livestock grazing areas.  Additional guidance on monitoring well 
protection may be found in ASTM D 5787</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide all monitoring wells with a [steel] [_____] lockable protective enclosure set in the annular seal over 
the well casing with keyed-alike locks on the protective covers for all wells.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.11.1   Protective Steel Casing</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  Install a protective steel casing around the well casing/riser pipe by placing the protective casing 
into the annular seal.  Clean the protective casing with high-pressure hot water/steam prior to installation 
to ensure that it is free of any contamination.  Provide a protective casing with an inside diameter 
of at least<MET> 100 mm</MET><ENG> 4 inches</ENG> greater than the nominal diameter of the well riser.  Fit the protective 
casing with a locking cap and install so that there is a maximum<MET> 61 mm</MET><ENG> 0.2 foot</ENG> clearance between the 
top of the in-place inner well casing cap and the bottom of the protective casing locking cap when in 
the locked position.</LST><BRK/>
<BRK/>
<LST>b.  Position and maintain the protective casing in a plumb position.  Extend the bottom of the protective 
casing a minimum of<MET> 750 mm</MET><ENG> 2.5 feet</ENG> below the top of the ground surface; extending a minimum of<MET> [750] 
[_____] mm</MET><ENG> [2.5] [_____] feet</ENG> below the maximum depth of frost penetration (frost line); and anchored 
into the cement grout annular seal; and also extending at least<MET> 750 mm</MET><ENG> 2.5 feet</ENG> above the surface of 
the ground.  Seal and immobilize the protective casing in concrete placed around the outside of the protective 
casing, then place dry bentonite pellets, or granules, in the annular space below ground level within 
the protective casing.</LST><BRK/>
<BRK/>
<LST>c.  Provide the protective casing with a<MET> 6 mm</MET><ENG> 1/4 inch</ENG> diameter drain hole installed just above the top 
of the [concrete pad] [gravel blanket].  Place coarse sand or pea gravel in the annular space between 
the protective casing and the riser pipe, above the drain hole, to within<MET> 75 mm</MET><ENG> 3 inches</ENG> from the top 
of the riser pipe.  [Install [four] [_____] protective steel posts, located<MET> 1200 mm</MET><ENG> 4 feet</ENG> from the well, 
equally spaced around the [concrete pad] [gravel blanket].  Fill the steel posts with cement.  Do not 
install the posts in the concrete pad, but a<MET> 150-300 mm</MET><ENG> 0.5-1.0 foot</ENG> distance from the edge of the concrete 
pad.  Set the posts in cement, and extending a minimum of<MET> 1 m</MET><ENG> 3 feet</ENG> above the ground surface, with at 
least one third of the posts' total length below ground surface.]</LST><BRK/>
<BRK/></SPT>
[<SPT><TTL>3.3.11.2   Flush-to-Ground Utility Vault</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if not applicable for the project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install a flush-to-ground protective steel utility vault or manhole around the well casing/riser pipe which has 
been cut off below grade.  Construct the flush mounted protective utility vault or manhole with a concrete ground 
surface seal.  Extend the ground surface seal to, but not beyond, the total depth of the flush mounted protective 
utility vault.  Install the ground surface seal around the flush mounted protective utility vault but do not 
place between the flush mounted protective utility vault and the well casing.  Do not install the flush mounted 
protective utility vault in areas subject to ponding or flooding.  Provide the wording "ground water monitoring 
well" on the flush mounted protective cover's lid or manhole cover on its outer surface.  Install flush mounted 
protective utility vaults through an impervious surface such as asphalt or concrete.  If an impervious surface 
does not exist, create one to support the weight of the traffic in the area.  Provide a flush mounted protective 
utility vault consisting of a watertight metal casing with an inside diameter at least<MET> 100 mm</MET><ENG> 4 inches</ENG> greater 
than the inside diameter of the monitoring well casing, made of one continuous metal piece or two metal pieces 
which are joined with a continuous weld; and a minimum length of<MET> [300] [_____] mm</MET><ENG> [12] [_____] inches</ENG>.  Allow 
no more than<MET> 200 mm</MET><ENG> 8 inches</ENG> between the top of the monitoring well casing and the top of the flush mounted protective 
utility vault after installation.  Provide the flush mounted protective utility vault with an exterior flange 
or lugs.  Do not allow the flush mounted protective utility vault to extend below the top of the cement/bentonite 
annular space seal.  To prevent damage from frost heave, extend the concrete surrounding the utility vault a 
minimum of<MET> 300 mm</MET><ENG> 1 foot</ENG> below the frost line.  Provide the  flush mounted protective utility vault or the monitoring 
well with a locking mechanism and a watertight cap.</TXT><BRK/>
<BRK/></SPT>
]</SPT><SPT><TTL>3.3.12   Well Identification</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Local well identification requirements should be specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Affix a corrosion resistant metal tag to the exterior and interior of the protective cover.  Provide the metal 
tag stamped with the [U.S. Army Corps of Engineers CE [_____]] [_____], well identification number, elevation 
of the highest point on the rim of the well casing or riser pipe, elevation of the ground surface at the well, 
well coordinates, date of well installation, and the top of the protective casing elevation in<MET> meters</MET><ENG> feet</ENG> as 
determined according to paragraph SURVEYS.  Use identification numbers for the monitoring wells as indicated 
on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.13   Well Development</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Well development locally improves or restores the aquifer's hydraulic 
conductivity and removes undesirable materials from the aquifer near the well 
screen, thus yielding a more representative ground water sample.  The most appropriate 
development method and acceptance criteria to use will vary according to the 
hydrologic characteristics of the aquifer, the drilling method used and the 
type of well completion.  The following specification is performance based.  
The designer may specify a method which has been shown to work well in the project 
area.  In some instances, e.g., very fine-grained sediments, some karst terrains, 
the well development criteria may not be obtainable.  Development criteria should 
be modified if such conditions are known or suspected to exist.  The U.S. Environmental 
Protection Agency (EPA) may, according to their Technical Enforcement Guidance 
Document (TEGD), 530/R-93/001, consider a well improperly completed if a well 
yields turbid samples (turbidity greater than or equal to 5 NTUs) after development.  
If the local EPA Region enforces this criteria, it may be necessary to include 
a requirement that the well be developed until a turbidity of less than or equal 
to 5 NTUs is achieved.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Within 7 days of completion of each well, but no sooner than [48] [_____] hours after cement grouting is completed, 
develop the well.  Perform development using only mechanical surging or over pumping or a combination thereof 
in accordance with <RID>ASTM D 5521</RID>.  Include details of the proposed development method in the Monitoring Well Installation 
Plan.  Maintain a well development record in accordance with paragraph Well Development Records.  Development 
is complete when:</TXT><BRK/>
<BRK/>
<LST>a.  Well water is clear to the unaided eye,</LST><BRK/>
<BRK/>
<LST>b.  Sediment thickness in the well is less than [1 percent of the screen length] [<MET>30 mm</MET><ENG> 0.1 foot</ENG>],</LST><BRK/>
<BRK/>
<LST>c.  A minimum of three times the standing water volume in the well plus three times the volume of all 
added water and drilling fluid lost during drilling and installation of the well is removed, and</LST><BRK/>
<BRK/>
<LST>d.  Temperature, specific conductivity, pH, oxidation-reduction potential (ORP), dissolved oxygen (DO), 
and turbidity readings, measured before, twice during and after development operations, have stabilized.  
Stabilization means [variation of less than 0.2 pH units, variation of <HL1>+</HL1> <MET>1 degree Celsius,</MET><ENG> 1 degree Fahrenheit,</ENG>
 <HL1>+</HL1> 3 percent change in specific conductance; <HL1>+</HL1> 10mV for ORP; and <HL1>+</HL1> 10 percent for DO, and turbidity, 
measured between three consecutive readings with one casing volume of water removed between each reading] 
[_____].  Determine ORP in accordance with <RID>AWWA 10084</RID>.  Conduct temperature, specific conductance, DO, 
turbidity, and pH readings in accordance with <RID>EPA 600/4-79/020</RID>.  At completion of well development, collect 
approximately<MET> 0.5 liter</MET><ENG> 1 pint</ENG> of well water in a clear glass jar.  Label the jar with project name, 
well number and date; and photographed using 35 mm color print film.  Suitably backlight the subject 
in the photograph (minimally<MET> 125 x 174 mm</MET><ENG> 5 x 7 inch</ENG>) close-up to show the clarity of the water and any 
suspended sediment.  The photograph and negative are a part of the well development record.  Water removed 
during development and testing operations shall be [contained in D.O.T. approved drums, containers or 
vessels and disposed of by [_____], in accordance with paragraphs CONTAINERIZATION OF DEVELOPMENT WATER, 
AND DRILL CUTTINGS, and Drilling Waste Disposal] [discharged to the ground surface at least [_____]<MET> meters</MET><ENG>
 feet</ENG> from the well in a down gradient area].</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14   In-Situ Permeability Determination</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  In some fine grained aquifers, the period of time for the aquifer to 
reach equilibrium may exceed 24 hours and testing should be performed no sooner 
than 48 or more hours after the well is developed.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Determine the in-situ permeability for each well following development but no sooner than [48] [_____] hours 
after development.  After the well is developed and allowed to equilibrate for at least 24 hours, and before 
in-situ permeability testing, measure and record the static water level in the well.  Determine, for each well 
installed, the in-situ permeability of the screened formation using an appropriate method after the well has 
been developed.  State proposed details of the methods expected to be used and references for those methods in 
the Monitoring Well Installation Plan.  Except for formation water from the well, do not introduce any other 
water or liquid into the well.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.15   Drilling Waste Disposal</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer must address disposal of drill cuttings, rock core, grout 
or bentonite slurry, and other solid or liquid materials bailed, pumped, or 
otherwise removed from the borehole during drilling, well installation, completion, 
and well development procedures within all appropriate regulatory requirements.  
The nature of these wastes (whether hazardous or not) will potentially vary 
between well sites on a single project.  On a remedial action project, it may 
be prudent to dispose of drilling and well installation waste in coordination 
with other project waste streams.  In some instances, rock core may be determined 
to be contaminated and must be handled accordingly.  Refer to EPA/540/G-91/009, 
Management of Investigation-Derived Waste From Site Investigations and EPA OSWER 
Directive 9345.3-03FS, April 1992, Guide to Management of Investigation-Derived 
Wastes, for discussion of some issues relevant to Superfund projects.  State/local 
regulations must also be considered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Dispose of slurry, drill cuttings, rock core; other solid or liquid material bailed, pumped, or otherwise removed 
from the borehole during drilling, installation, completion, and well development procedures; and fluids from 
material/equipment decontamination activities by [_____].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   SURVEYS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Guidance for installing survey markers can be found in EM 1110-1-1002 
Survey Markers and Monumentation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Establish coordinates and elevations for each monitoring well/test hole.  Determine horizontal coordinates to 
the closest<MET> 300 mm</MET><ENG> 1.0 foot</ENG> and referenced to the State Plane Coordinate System, or Universal Transverse Mercator 
(UTM).  If the State Plane Coordinate System/UTM is not readily available, use an existing local grid system.  
Obtain a ground elevation to the closest<MET> 30 mm</MET><ENG> 0.1 foot</ENG> at each well.  The highest point on the top of the riser 
pipe serves as a measurement point; reference this elevation and survey to the nearest<MET> 3 mm</MET><ENG> 0.01 foot</ENG> using the 
National Geodetic Vertical Datum of [1929] [1988].  If the datum is not readily available, use the existing local 
vertical datum.  Plot the location, identification, coordinates, and elevations of the well and monuments on 
maps with a scale large enough to show their location with reference to other structures.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   WELL DECOMMISSIONING/ABANDONMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Guidance for decommissioning of monitoring wells may also be found in 
EM 1110-1-4000.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Any well disapproved by the Contracting Officer, or any well decommissioned/abandoned by the Contractor for any 
reason shall be decommissioned/abandoned according to the requirements of the State of [_____], <RID>ASTM D 5299</RID>, 
and the requirements of these specifications.  Well decommissioning/abandonment includes the removal of all materials 
left in the borehole/well, excluding the filter pack, and including backfill materials, casing, screen, and any 
other material placed into the hole before the decision was made to abandon the borehole/well.  Grout test holes 
decommissioned/abandoned for any reason from the bottom to within [_____]<MET> mm</MET><ENG> feet</ENG> of the top of the ground surface 
according to the protocol for grout/bentonite placement established in paragraph Grout Placement, using the grout 
mix specified in paragraph CEMENT AND BENTONITE GROUT.  Backfill the top [_____]<MET> mm</MET><ENG> feet</ENG> with [material appropriate 
for the intended land use] [_____].  Maintain a well decommissioning/abandonment record as specified in paragraph 
Well Decommissioning/Abandonment Records.  Measure groundwater levels, if encountered before the decision is 
made for decommissioning/abandonment, in all borings prior to backfilling.  Include these water levels in the 
well decommissioning/abandonment records.  No well may be decommissioned/abandoned without the approval of the 
Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   WELL ACCEPTANCE</TTL><BRK/>
<BRK/>
<TXT>It is the responsibility of the Contractor to properly design, construct, install, develop, and test all monitoring 
wells according to the requirements of this specification so that they are suitable for the intended purpose.  
If the Contractor installs wells that are not functional or not in accordance with these specifications, the 
Contracting Officer will disapprove the well and direct the Contractor to repair or replace it, and to abandon 
the disapproved well in accordance with this specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   SITE CLEANUP</TTL><BRK/>
<BRK/>
<TXT>After completion of the work, remove tools, appliances, surplus materials, temporary drainage, rubbish, and debris 
incidental to work .  Backfill excavation and vehicular ruts and dress to conform with the existing landscape 
or terrain.  Utilities, structures, roads, fences, or any other pre-existing item which must be repaired or replaced 
due to the Contractor's negligence are the Contractor's responsibility; accomplish repair or replacement prior 
to completion of this contract.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8   <SUB>DOCUMENTATION AND QUALITY CONTROL REPORTS</SUB></TTL><BRK/>
<BRK/>
<TXT>Establish and maintain documentation and quality control reports for well construction and development to record 
the desired information and to assure compliance with contract requirements, including, but not limited to, the 
following:</TXT><BRK/>
<BRK/>
<SPT><TTL>3.8.1   <SUB>Borehole Logs</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Borehole logging requirements can be found in EM 1110-1-4000, Monitor 
Well Design, Installation, and Documentation at Hazardous and/or Toxic Waste 
Sites.  Requirements can also be found in ASTM D 2113 and ASTM D 5434.  If rock 
is cored at the site, and it is deemed necessary to determine the rock quality 
designation (RQD) of the core for design purposes, the RQD should also be shown 
on the boring log.  Guidance for determining the RQD may be found in ASTM D 
6032.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepare and complete a borehole log for each boring drilled, prepared by the geologist present onsite during 
all well drilling and installation activities.  Provide the log scale at<MET> [10] [_____] mm equals [300] [_____] 
mm</MET><ENG> [1] [_____] inch equals [1] [_____] foot</ENG>.  Keep copies current and complete of all well logs in the field 
at each well site and make available at all times for inspection by the Contracting Officer.  Include, as a minimum, 
the following:</TXT><BRK/>
<BRK/>
<LST>a.  Name of the project and site.</LST><BRK/>
<BRK/>
<LST>b.  Boring/well identification number.</LST><BRK/>
<BRK/>
<LST>c.  Location of boring (coordinates, if available).</LST><BRK/>
<BRK/>
<LST>d.  Make and manufacturer's model designation of drilling equipment and name of drilling firm.</LST><BRK/>
<BRK/>
<LST>e.  Date boring was drilled.</LST><BRK/>
<BRK/>
<LST>f.  Reference data for all depth measurements.</LST><BRK/>
<BRK/>
<LST>g.  Name of driller and name and signature of geologist preparing log.</LST><BRK/>
<BRK/>
<LST>h.  Nominal hole diameter and depth at which hole diameter changes.</LST><BRK/>
<BRK/>
<LST>i.  Total depth of boring.</LST><BRK/>
<BRK/>
<LST>j.  Method of drilling, including sampling methods and sample depths, including those attempted with 
no recovery.  Indication of penetration resistance such as drive hammer blows given in blows per<MET> 150 
mm</MET><ENG> 6 inches</ENG> of driven sample tubes.  Include in information hammer weight and drop distance.  Record 
information such as rod size, bit type, pump type, etc..  Also include a description of any temporary 
casing used, drill fluids and fluid additives used, if any, including brand name and amount used, along 
with the reason for and start (by depth) of its use, and, if measured, mud viscosities and weight.</LST><BRK/>
<BRK/>
<LST>k.  Depth of each change of stratum.  If location of strata change is approximate, it shall be so stated.</LST><BRK/>
<BRK/>
<LST>l.  Description of the material of which each stratum is composed, in accordance with [<RID>ASTM D 2488</RID>] [_____], 
and/or standard rock nomenclature, as necessary.  Include in soil  parameters for logging , but do not 
limit to, classification, depositional environment and formation, if known, Unified Soil Classification 
Symbol, secondary components and estimated percentages, color (using <RID>FSUP 77341</RID> or <RID>GSA RCC00100R</RID>), plasticity, 
consistency (cohesive soil), density (non-cohesive soil), moisture content, structure and orientation, 
and grain angularity.</LST><BRK/>
<BRK/>
<LST>m.  Include in rock core parameters for logging , but do not be limit to, rock type, formation, modifier 
denoting variety (shaly, calcareous, siliceous, etc.), color (using <RID>GSA RCC00100R</RID>), hardness, degree 
of cementation, texture, crystalline structure and orientation, degree of weathering, solution or void 
conditions, primary and secondary permeability, and lost core.</LST><BRK/>
<BRK/>
<LST>n.  Also include the results of any chemical field screening  on the boring log.  Prepare classification 
in the field at the time of sampling.  Also duly note and record the results of visual observation of 
the material encountered, and any unusual odor detected.</LST><BRK/>
<BRK/>
<LST>o.  Depth of any observed fractures, weathered zones, or any abnormalities encountered.</LST><BRK/>
<BRK/>
<LST>p.  Depth and estimated percent of drill fluid loss or lost circulation.  Measures taken to regain drill 
water circulation.  Significant color changes in the drilling fluid return.</LST><BRK/>
<BRK/>
<LST>q.  Depth to water, and any non-aqueous phase liquids (NAPLs) and date measured before, during, and after 
each drilling shift, and prior to well installation.  Provide and maintain at each well under construction 
a portable water, and NAPL level measuring device of sufficient length to measure the water/NAPL level 
to<MET> [50] [_____] meter</MET><ENG> [165] [_____] foot</ENG> depth.  Make the device onsite at all times and provide graduated 
measuring wire in<MET> mm</MET><ENG> 0.01 foot</ENG>.  Take water and NAPL level measurements to the nearest<MET> mm</MET><ENG> 0.01 foot</ENG>.</LST><BRK/>
<BRK/>
<LST>r.  Box or sample number.  Depths and the number of the core boxes and/or samples shall be recorded at 
the proper interval.</LST><BRK/>
<BRK/>
<LST>s.  Percent Rock Core Recovery.  The percent core recovery for the individual drill runs, if rock is 
cored, shall be shown.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.2   <SUB>Installation Diagrams</SUB></TTL><BRK/>
<BRK/>
<TXT>The well will not be accepted before the geologic logs and installation diagrams are received.  Clearly illustrate 
in the diagram the as-built condition of the well and include, but do not limit to the following items:</TXT><BRK/>
<BRK/>
<LST>a.  Name of the project and site.</LST><BRK/>
<BRK/>
<LST>b.  Well identification number.</LST><BRK/>
<BRK/>
<LST>c.  Name of driller and name and signature of the geologist preparing diagram.</LST><BRK/>
<BRK/>
<LST>d.  Date of well installation.</LST><BRK/>
<BRK/>
<LST>e.  Description of material from which the well is constructed, including well casing/riser pipe and 
screen material, centralizer composition, if used, diameter and schedule of casing and screen, gradation 
of filter pack, lithologic description, brand name (if any), source, and processing method, and method 
of placement of the filter pack, bentonite seal type (pellets, granules, chips, or slurry), grout type 
(cement or high-solids bentonite) and type of protective cover (protective casing or flush-to-ground).</LST><BRK/>
<BRK/>
<LST>f.  Total depth of well.</LST><BRK/>
<BRK/>
<LST>g.  Nominal hole diameter.</LST><BRK/>
<BRK/>
<LST>h.  Depth to top and bottom of screen, and filter pack.</LST><BRK/>
<BRK/>
<LST>i.  Depth to top and bottom of any seals installed in the well boring (grout or bentonite).</LST><BRK/>
<BRK/>
<LST>j.  Type of cement and/or bentonite used, mix ratios of grout, method of placement and quantities used.</LST><BRK/>
<BRK/>
<LST>k.  Elevations/depths/heights of key features of the well, such as top of well casing/riser pipe, top 
and bottom of protective casing, ground surface, the depth of maximum frost penetration (frost line), 
bottom of well screen, top and bottom of filter pack, and top and bottom of seal.</LST><BRK/>
<BRK/>
<LST>l.  Other pertinent construction details, such as slot size and percent open area of screen, type of 
screen, and manufacturer of screen.</LST><BRK/>
<BRK/>
<LST>m.  Well location by coordinates.  A plan sheet shall also be included showing the coordinate system 
used and the location of each well.  A plan sheet is not required for each well installation diagram; 
multiple wells may be shown on the same sheet.</LST><BRK/>
<BRK/>
<LST>n.  Static water level upon completion of the well.</LST><BRK/>
<BRK/>
<LST>o.  Special problems and their resolutions; e.g., grout in wells, lost casing, or screens, bridging, 
etc.</LST><BRK/>
<BRK/>
<LST>p.  Description of surface completion.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.3   <SUB>Well Development Records</SUB></TTL><BRK/>
<BRK/>
<TXT>Prepare and submit a monitoring well development record for each monitoring well installed under the supervision 
of the geologist present during well installation operations.  Include the following information on the well 
development record , but do not limit to the following:</TXT><BRK/>
<BRK/>
<LST>a.  Date, time, and elevation of water level in the well, before development.</LST><BRK/>
<BRK/>
<LST>b.  Depth to bottom of well, name of project and site, well identification number, and date of development.</LST><BRK/>
<BRK/>
<LST>c.  Method used for development, to include size, type and make of equipment, bailer, and/or pump used 
during development.</LST><BRK/>
<BRK/>
<LST>d.  Time spent developing the well by each method, to include typical pumping rate, if pump is used in 
development.</LST><BRK/>
<BRK/>
<LST>e.  Volume and physical character of water removed, to include changes during development in clarity, 
color, particulates, and odor.</LST><BRK/>
<BRK/>
<LST>f.  Volume of water added to the well, if any.</LST><BRK/>
<BRK/>
<LST>g.  Volume and physical character of sediment removed, to include changes during development in color, 
and odor.</LST><BRK/>
<BRK/>
<LST>h.  Source of any water added to the well.</LST><BRK/>
<BRK/>
<LST>i.  Clarity of water before, during, and after development.  Nephelometric turbidity unit (NTU) measurements.</LST><BRK/>
<BRK/>
<LST>j.  Total depth of well and the static water level in accordance with <RID>ASTM D 4750</RID>from top of the casing, 
immediately after pumping/development, and 24 consecutive hours after development.</LST><BRK/>
<BRK/>
<LST>k.  Readings of pH, specific conductance, DO, ORP, and temperature taken before, during, and after development.</LST><BRK/>
<BRK/>
<LST>l.  Name and job title of individual developing well.</LST><BRK/>
<BRK/>
<LST>m.  Name and/or description of the disposal facility/area, for the waters removed during development.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.4   <SUB>Geophysical Logs</SUB></TTL><BRK/>
<BRK/>
<TXT>Prepare, complete, and submit geophysical for each monitoring well/test hole installed.  Include the following 
information on the logs as a minimum:</TXT><BRK/>
<BRK/>
<LST>a.  Project name.</LST><BRK/>
<BRK/>
<LST>b.  Test hole/monitoring well identification number.</LST><BRK/>
<BRK/>
<LST>c.  Location of test hole (coordinates, and state, and county name).</LST><BRK/>
<BRK/>
<LST>d.  Date test hole was drilled.</LST><BRK/>
<BRK/>
<LST>e.  Fluid level in test hole before logging.</LST><BRK/>
<BRK/>
<LST>f.  Fluid type and temperature.</LST><BRK/>
<BRK/>
<LST>g.  Fluid resistance in ohm-m.</LST><BRK/>
<BRK/>
<LST>h.  Casing type, diameter, and elevation (top and bottom).</LST><BRK/>
<BRK/>
<LST>i.  Cement type and elevation (top and bottom).</LST><BRK/>
<BRK/>
<LST>j.  Screen type, diameter, and elevation (top and bottom).</LST><BRK/>
<BRK/>
<LST>k.  Date and time test hole was logged.</LST><BRK/>
<BRK/>
<LST>l.  Reference elevation for all depth measurements.</LST><BRK/>
<BRK/>
<LST>m.  Operator's name.</LST><BRK/>
<BRK/>
<LST>n.  Equipment name and address.</LST><BRK/>
<BRK/>
<LST>o.  Logger type and number.</LST><BRK/>
<BRK/>
<LST>p.  Tool type.</LST><BRK/>
<BRK/>
<LST>q.  Detector type (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>r.  Source type (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>s.  Source size (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>t.  Source spacing (Nuclear Log only).</LST><BRK/>
<BRK/>
<LST>u.  Tool length, cable head to detector.</LST><BRK/>
<BRK/>
<LST>v.  Calibration.</LST><BRK/>
<BRK/>
<LST>w.  Logging speed<MET> cm/min</MET><ENG> ft/min</ENG>.</LST><BRK/>
<BRK/>
<LST>x.  Log vert. scale<MET> m/cm</MET><ENG> ft/in</ENG>.</LST><BRK/>
<BRK/>
<LST>y.  Module settings.</LST><BRK/>
<BRK/>
<LST>z.  Recorder settings.</LST><BRK/>
<BRK/>
<LST>aa. Document all field problems, including equipment malfunctions.  This should include the steps taken 
to solve the problem and how the log might have been affected.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.5   <SUB>Well Decommissioning/Abandonment Records</SUB></TTL><BRK/>
<BRK/>
<TXT>Include in decommissioning/abandonment records, as a minimum, the following:</TXT><BRK/>
<BRK/>
<LST>a.  Project name.</LST><BRK/>
<BRK/>
<LST>b.  Well or test hole number.</LST><BRK/>
<BRK/>
<LST>c.  Well/boring location, depth and diameter.</LST><BRK/>
<BRK/>
<LST>d.  Date of decommissioning/abandonment.</LST><BRK/>
<BRK/>
<LST>e.  Method of decommissioning/abandonment.</LST><BRK/>
<BRK/>
<LST>f.  All materials used in the decommissioning/abandonment procedure and the interval in which test materials 
were placed.</LST><BRK/>
<BRK/>
<LST>g.  Casing, and or other items left in hole by depth, description, and composition.</LST><BRK/>
<BRK/>
<LST>h.  Description and total quantity of grout used initially.</LST><BRK/>
<BRK/>
<LST>i.  Description and daily quantities of grout used to compensate for settlement.</LST><BRK/>
<BRK/>
<LST>j.  Water or mud level (specify) prior to grouting and date measured.</LST><BRK/>
<BRK/>
<LST>k.  The reason for decommissioning/abandonment of the monitoring well/test hole.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.6   <SUB>Project Photographs</SUB></TTL><BRK/>
<BRK/>
<TXT>Before, during, and after completion of work, take a minimum of [one view] [[_____] views] of each well installation.  
If rock is cored at the site, after the core has been logged dampen the core, if it has dried, neatly arrange 
in the core box, and take<MET> [80] [_____] x [120] [_____] mm</MET><ENG> [3] [_____] x [5] [_____] inch</ENG> color print photographs, 
mounted and enclosed back-to-back in a double face clear plastic sleeve punched to fit standard three ring binders.  
Provide color prints with  an information box, <MET>[20] [_____] x [50] [_____] mm</MET><ENG> [1-1/2] [_____] x [3-1/2] [_____] 
inches</ENG>, showing (typewritten) the following information:</TXT><BRK/>
<BRK/>
<TXT>   Project No.                  Contract No.</TXT><BRK/>
<BRK/>
<TXT>   Contractor/Photographer:</TXT><BRK/>
<BRK/>
<TXT>   Photograph No.               Date/Time:</TXT><BRK/>
<BRK/>
<TXT>   Description:</TXT><BRK/>
<BRK/>
<TXT>   Direction of View:</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.7   <SUB>Survey Maps and Notes</SUB></TTL><BRK/>
<BRK/>
<TXT>Prepare and submit a tabulated list of all monitoring wells and monuments, copies of all field books, maps showing 
the locations, and elevations of all monitoring wells, and all computation sheets, consisting of the designated 
number of the well or monument, the X and Y coordinates, and all the required elevations.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><END/><BRK/></SEC>