<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA      UFGS-33 82 00 (April 2006)<BRK/>
                                    ------------------------------<BRK/>
Preparing Activity:  <PRA>NAVFAC</PRA>         Replacing without change<BRK/>
                                    UFGS-16711 (August 2004)<BRK/>
                                    <BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 33 82 00</SCN><BRK/>
<BRK/>
<STL>TELECOMMUNICATIONS OUTSIDE PLANT (OSP)</STL><BRK/>
<DTE>04/06</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers <SCP>exterior telecommunications Outside Plant 
consisting of the campus distributor, outside copper and fiber optic (FO) cable 
media, and associated hardware necessary to support communications systems at 
facility installations including permanently constructed buildings</SCP>.  This specification 
covers outside plant (OSP) campus fiber optic and copper cable media for supporting 
information technology transfer systems to include voice, data, video, imaging, 
security, and audio systems used by various facilities.  This guide specification 
is to be used in the preparation of project construction specifications.<BRK/>
<BRK/>
Coordinate with Section <SRF>27 10 00</SRF> BUILDING TELECOMMUNICATIONS CABLING SYSTEM 
and ensure that copper cable and fiber optic cable interconnecting components 
and patch cord assemblies mechanically intermate.<BRK/>
<BRK/>
Use Section <SRF>33 71 01</SRF> OVERHEAD TRANSMISSION AND DISTRIBUTION, and Section 
<SRF>33 71 02.00 20</SRF> UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION, on Navy 
projects and Section <SRF>33 70 02.00 10</SRF> UNDERGROUND TRANSMISSION AND DISTRIBUTION 
SYSTEM, UNDERGROUND on Army projects for exterior telecommunications pathway 
requirements (typical throughout this section).<BRK/>
<BRK/>
For Navy projects use UFC 3-580-10, NAVY AND MARINE CORPS INTRANET (NMCI) STANDARD 
CONSTRUCTION PROCESSES for design guidance related to telecommunications infrastructure.  
Confirm specific system requirements with the using Activity.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestion on this specification are welcome and should be directed 
to the technical proponent of the specification.  A listing of the <URL HREF="http://www.ccb.org/UFGS/ufgstoc.htm">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.</NPR><BRK/>
<AST/><BRK/></NTE>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This section will be used in conjunction with any other guide specifications 
required by the design.  Show following information on project drawings:</NPR><BRK/>
<BRK/>
<NPR>1.  Where specification identifies type, size, color, finish, or other definitive 
information to be "as indicated" the engineer shall show the information on 
the drawings.</NPR><BRK/>
<BRK/>
<NPR>2.  Location and dimensions of manholes, handholes, ducts, and location and 
size of cables.</NPR><BRK/>
<BRK/>
<NPR>3.  Types of wire and cable; number and sizes of conductors and conduits.</NPR><BRK/>
<BRK/>
<NPR>4.  Special conditions.</NPR><BRK/>
<BRK/>
<NPR>5.  Include tensioning and sag data on drawings in tabular form for aerial cable 
installation.</NPR><BRK/>
<BRK/>
<NPR>Provide a minimum of 12 single-mode fibers per fiber optic cable.  Coordinate 
with activity and Base Communications Office (BCO) to determine fiber optic 
cabling requirements.  Provide fiber optic cabling to piers in accordance with 
UFC 4-150-02, DESIGN: DOCKSIDE UTILITIES for Navy projects only.</NPR><BRK/>
<BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification. The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
 <BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
 <BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to in the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM B 1</RID><RTL>(2001; R 2007) Standard Specification for Hard-Drawn Copper Wire</RTL><BRK/><BRK/><RID>ASTM B 8</RID><RTL>(2004) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft</RTL><BRK/><BRK/><RID>ASTM D 1557</RID><RTL>(2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)</RTL><BRK/><BRK/><RID>ASTM D 709</RID><RTL>(2001; R 2007) Laminated Thermosetting Materials</RTL><BRK/><BRK/></REF><REF><ORG>INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)</ORG><BRK/><BRK/><RID>IEEE C2</RID><RTL>(2007; Errata 2007; INT 2008) National Electrical Safety Code</RTL><BRK/><BRK/><RID>IEEE Std 100</RID><RTL>(2000) The Authoritative Dictionary of IEEE Standards Terms</RTL><BRK/><BRK/></REF><REF><ORG>INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)</ORG><BRK/><BRK/><RID>ICEA S-87-640</RID><RTL>(2006) Fiber Optic Outside Plant Communications Cable</RTL><BRK/><BRK/><RID>ICEA S-98-688</RID><RTL>(2006) Broadband Twisted Pair, Telecommunications Cable Aircore, Polyolefin Insulated Copper Conductors</RTL><BRK/><BRK/><RID>ICEA S-99-689</RID><RTL>(2006) Broadband Twisted Pair Telecommunications Cable Filled, Polyolefin Insulated Copper Conductors</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA C62.61</RID><RTL>(1993) Gas Tube Surge Arresters on Wire Line Telephone Circuits</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)</ORG><BRK/><BRK/><RID>TIA J-STD-607-A</RID><RTL>(2002) Commercial Building Grounding (Earthing)  and Bonding Requirements for Telecommunications</RTL><BRK/><BRK/><RID>TIA TIA/EIA-455-204</RID><RTL>(2000) Standard for Measurement of Bandwidth on Multimode Fiber</RTL><BRK/><BRK/><RID>TIA-455-107A</RID><RTL>(1999) Component Reflectance or Link/System Return Loss using a Loss Test Set</RTL><BRK/><BRK/><RID>TIA-455-46A</RID><RTL>(1990) FOTP-46 Spectral Attenuation Measurement for Long-Length, Graded-Index Optical Fibers</RTL><BRK/><BRK/><RID>TIA-455-78</RID><RTL>(2002B) FOTP-78 Optical Fibres - Part 1-40:  Measurement Methods and Test Procedures - Attenuation</RTL><BRK/><BRK/><RID>TIA-472D000-A</RID><RTL>(1993) Fiber Optic Communications Cable for Outside Plant Use</RTL><BRK/><BRK/><RID>TIA-492AAAA-A</RID><RTL>(1998; R 2002) 62.5-um Core Diameter/125-um Cladding Diameter Class 1a Graded-Index Multimode Optical Fibers</RTL><BRK/><BRK/><RID>TIA-492AAAB</RID><RTL>(1998; R 2002) 50-Um Core Diameter/125-Um Cladding Diameter Class IA Graded-Index Multimode Optical Fibers</RTL><BRK/><BRK/><RID>TIA-492CAAA</RID><RTL>(1998; R 2002) Class IVA Dispersion-Unshifted Single-Mode Optical Fibers</RTL><BRK/><BRK/><RID>TIA-492E000</RID><RTL>(1996; R 2002) Class IVd Nonzero-Dispersion Single-Mode Optical Fibers for the 1550 nm Window (ANSI/TIA/EIA-492E000)</RTL><BRK/><BRK/><RID>TIA-526-14-A</RID><RTL>(1998) OFSTP-14A Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant</RTL><BRK/><BRK/><RID>TIA-526-7</RID><RTL>(2002) Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant OFSTP-7</RTL><BRK/><BRK/><RID>TIA-568-C.3</RID><RTL>(2008e1) Optical Fiber Cabling Components Standard</RTL><BRK/><BRK/><RID>TIA-590-A</RID><RTL>(1997) Standard for Physical Location and Protection of Below Ground Fiber Optic Cable Plant</RTL><BRK/><BRK/><RID>TIA-758-A</RID><RTL>(2004) Customer-Owned Outside Plant Telecommunications Cabling Standard</RTL><BRK/><BRK/><RID>TIA/EIA-455-B</RID><RTL>(1998) Standard Test Procedure for Fiber Optic Fibers, Cables, Transducers, Sensors, Connecting and Terminating Devices, and other Fiber Optic Components</RTL><BRK/><BRK/><RID>TIA/EIA-568-B.1</RID><RTL>(2001 Addendums 2001, 2003, 2003, 2003, 2004, 2007) Commercial Building Telecommunications Cabling Standard - Part 1: General Requirements</RTL><BRK/><BRK/><RID>TIA/EIA-568-B.2</RID><RTL>(2001) Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted Pair Cabling Components</RTL><BRK/><BRK/><RID>TIA/EIA-569-A</RID><RTL>(1998; Addenda 2000, 2001) Commercial Building Standards for Telecommunications Pathways and Spaces</RTL><BRK/><BRK/><RID>TIA/EIA-598-B</RID><RTL>(2001) Optical Fiber Cable Color Coding</RTL><BRK/><BRK/><RID>TIA/EIA-606-A</RID><RTL>(2002) Administration Standard for the Telecommunications Infrastructure</RTL><BRK/><BRK/></REF><REF><ORG>THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)</ORG><BRK/><BRK/><RID>SSPC SP 6</RID><RTL>(7) Commercial Blast Cleaning</RTL><BRK/><BRK/></REF><REF><ORG>U.S. DEPARTMENT OF AGRICULTURE (USDA)</ORG><BRK/><BRK/><RID>RUS 1755</RID><RTL>Telecommunications Standards and Specifications for Materials, Equipment and Construction</RTL><BRK/><BRK/><RID>RUS Bull 1751F-630</RID><RTL>(1996) Design of Aerial Plant</RTL><BRK/><BRK/><RID>RUS Bull 1751F-640</RID><RTL>(1995) Design of Buried Plant, Physical Considerations</RTL><BRK/><BRK/><RID>RUS Bull 1751F-643</RID><RTL>(2002) Underground Plant Design</RTL><BRK/><BRK/><RID>RUS Bull 1751F-815</RID><RTL>(1979) Electrical Protection of Outside Plant</RTL><BRK/><BRK/><RID>RUS Bull 1753F-201</RID><RTL>(1997) Acceptance Tests of Telecommunications Plant (PC-4)</RTL><BRK/><BRK/><RID>RUS Bull 1753F-401</RID><RTL>(1995) Splicing Copper and Fiber Optic Cables (PC-2)</RTL><BRK/><BRK/><RID>RUS Bull 345-50</RID><RTL>(1979) Trunk Carrier Systems (PE-60)</RTL><BRK/><BRK/><RID>RUS Bull 345-65</RID><RTL>(1985) Shield Bonding Connectors (PE-65)</RTL><BRK/><BRK/><RID>RUS Bull 345-72</RID><RTL>(1985) Filled Splice Closures (PE-74)</RTL><BRK/><BRK/><RID>RUS Bull 345-83</RID><RTL>(1979; Rev Oct 1982) Gas Tube Surge Arrestors (PE-80)</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 497</RID><RTL>(2001; Rev thru Jun 2004) Protectors for Paired Conductor Communication Circuits</RTL><BRK/><BRK/><RID>UL 510</RID><RTL>(2005; Rev thru Aug 2005) Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape</RTL><BRK/><BRK/><RID>UL 83</RID><RTL>(20086) Standard for Thermoplastic-Insulated Wires and Cables</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.2   RELATED REQUIREMENTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose Section 27 10 00 if it is used on the project.  Choose  Section 
33 71 01, OVERHEAD TRANSMISSION AND DISTRIBUTION, and Section 33 71 02.00 20, 
UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION for Navy projects or Section 
33 70 02.00 10, UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND 
for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Section <SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS CABLING SYSTEM, ][Section <SRF>33 71 01</SRF>, OVERHEAD TRANSMISSION AND 
DISTRIBUTION, and [Section <SRF>33 71 02.00 20</SRF>, UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION][Section 
<SRF>33 70 02.00 10</SRF>, UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND] apply to this section with additions 
and modifications specified herein.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3   DEFINITIONS</TTL><BRK/>
<BRK/>
<TXT>Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be 
as defined in <RID>TIA/EIA-568-B.1</RID>, <RID>TIA/EIA-568-B.2</RID>, <RID>TIA-568-C.3</RID>, <RID>TIA/EIA-569-A</RID>, <RID>TIA/EIA-606-A</RID>, and <RID>IEEE Std 100</RID> and 
herein.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Campus Distributor (CD)</TTL><BRK/>
<BRK/>
<TXT>A distributor from which the campus backbone cabling emanates. (International expression for main cross-connect 
- (MC).)</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Entrance Facility (EF) (Telecommunications)</TTL><BRK/>
<BRK/>
<TXT>An entrance to the building for both private and public network service cables (including antennae) including 
the entrance point at the building wall and continuing to the entrance room or space.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Entrance Room (ER) (Telecommunications)</TTL><BRK/>
<BRK/>
<TXT>A centralized space for telecommunications equipment that serves the occupants of a building.  Equipment housed 
therein is considered distinct from a telecommunications room because of the nature of its complexity.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   Building Distributor (BD)</TTL><BRK/>
<BRK/>
<TXT>A distributor in which the building backbone cables terminate and at which connections to the campus backbone 
cables may be made.  (International expression for intermediate cross-connect - (IC).)</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   Pathway</TTL><BRK/>
<BRK/>
<TXT>A physical infrastructure utilized for the placement and routing of telecommunications cable.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SYSTEM DESCRIPTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>For Army projects only:  For MCA projects, telephone switch upgrades and line 
cards are procured and installed using funds provided by ISEC outside of the 
construction contract.  Other types of projects, such as Army Reserve, DOD and 
work for others, may require that the switch upgrade and line cards be added 
to this section to be procured and installed as part of the construction contract.  
Choose the last bracketed sentences for Navy and Marine Corps projects only.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The telecommunications outside plant consists of cable, conduit, manholes, poles, etc. required to provide signal 
paths from the closest point of presence to the new facility, including free standing frames or backboards, interconnecting 
hardware, terminating cables, lightning and surge protection modules at the entrance facility.  The work consists 
of providing, testing and making operational cabling, interconnecting hardware and lightning and surge protection 
necessary to form a complete outside plant telecommunications system for continuous use.[  The telecommunications 
contractor must coordinate with the NMCI contractor concerning layout and configuration of the EF telecommunications 
and OSP.  The telecommunications contractor may be required to coordinate work effort for access to the EF telecommunications 
and OSP with the NMCI contractor.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy,  Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are [for information only.][for Contractor Quality Control approval.]  When used, a designation following the 
"G" designation identifies the office that will review the submittal for the Government.  The following shall 
be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Telecommunications Outside Plant</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Telecommunications Entrance Facility Drawings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>In addition to Section 01 33 00 SUBMITTAL PROCEDURES, provide shop drawings in accordance with 
paragraph SHOP DRAWINGS.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Wire and cable</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Cable splices, and connectors</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Closures</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Building protector assemblies</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Protector modules</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Cross-connect terminal cabinets</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
 <NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete submittal for spare parts on Navy projects.  Spare parts requirements 
are provided in Section 01 78 23 OPERATION AND MAINTENANCE DATA on Navy projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM>[<SUB>Spare Parts</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]]</ITM><BRK/>
<BRK/>
<ITM>Submittals shall include the manufacturer's name, trade name, place of manufacture, and catalog 
model or number.  Submittals shall also include applicable federal, military, industry, and 
technical society publication references.  Should manufacturer's data require supplemental information 
for clarification, the supplemental information shall be submitted as specified in paragraph 
REGULATORY REQUIREMENTS and as required for certificates in Section 01 33 00 SUBMITTAL PROCEDURES.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Pre-installation tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Acceptance tests</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Outside Plant Test Plan</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
 <ITM><SUB>Telecommunications Contractor</SUB> Qualifications[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Key Personnel</SUB> Qualifications[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>Minimum <SUB>Manufacturer's Qualifications</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-08 Manufacturer's Instructions</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Building protector assembly installation</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Cable tensions</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM><SUB>Fiber Optic Splices</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
 <ITM>Submit instructions prior to installation.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-09 Manufacturer's Field Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Factory Reel Test Data</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Telecommunications outside plant (OSP)</SUB>, Data Package 5[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>Commercial off-the-shelf manuals shall be provided for operation, installation, configuration, 
and maintenance of products provided as a part of the telecommunications outside plant (OSP).  
Submit operations and maintenance data in accordance with Section <SRF>01 78 23</SRF>, OPERATION AND MAINTENANCE 
DATA and as specified herein not later than[ 2][ _____] months prior to the date of beneficial 
occupancy.  In addition to requirements of Data package 5, include the requirements of paragraphs 
TELECOMMUNICATIONS OUTSIDE PLANT SHOP DRAWINGS and TELECOMMUNICATIONS ENTRANCE FACILITY DRAWINGS.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-11 Closeout Submittals</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Record Documentation</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>In addition to other requirements, provide in accordance with paragraph RECORD DOCUMENTATION.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Shop Drawings</TTL><BRK/>
<BRK/>
<TXT>Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, 
control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation.  
Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment 
and the interconnection between each item of equipment.  Drawings shall indicate adequate clearance for operation, 
maintenance, and replacement of operating equipment devices.  Submittals shall include the nameplate data, size, 
and capacity.  Submittals shall also include applicable federal, military, industry, and technical society publication 
references.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.1.1   <SUB>Telecommunications Outside Plant</SUB> Shop Drawings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate drawings with Section <SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS 
CABLING SYSTEM, if used, to ensure activity responsible for telecommunications 
system maintenance and administration maintains a single complete and accurate 
set of drawings for the entire telecommunications system.<BRK/>
<BRK/>
Choose bracketed option for RCDD approved drawings on Navy projects where multiple 
splices in the outside cable plant are required or when more than one telecommunications 
manhole and associated ductbanks are required.  Choose the last bracketed sentence 
for facilities that currently have telecommunications outside plant drawings 
that require updating as a result of project installation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide Outside Plant Design in accordance with <RID>TIA-758-A</RID>, <RID>RUS Bull 1751F-630</RID> for aerial system design, and <RID>RUS Bull 1751F-643</RID>
 for underground system design.  Provide T0 shop drawings that show the physical and logical connections from 
the perspective of an entire campus, such as actual building locations, exterior pathways and campus backbone 
cabling on plan view drawings, major system nodes, and related connections on the logical system drawings in 
accordance with <RID>TIA/EIA-606-A</RID>.  Drawings shall include wiring and schematic diagrams for fiber optic and copper 
cabling and splices, copper conductor gauge and pair count, fiber pair count and type, pathway duct and innerduct 
arrangement, associated construction materials, and any details required to demonstrate that cable system has 
been coordinated  and will properly support the switching and transmission system identified in specification 
and drawings.[  Provide Registered Communications Distribution Designer (RCDD) approved drawings of the telecommunications 
outside plant.][  Update existing telecommunication Outside Plant T0 drawings to include information modified, 
deleted or added as a result of this installation in accordance with <RID>TIA/EIA-606-A</RID>.]  The <SUB>telecommunications 
outside plant (OSP)</SUB> shop drawings shall be included in the operation and maintenance manuals.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.1.2   <SUB>Telecommunications Entrance Facility Drawings</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose the last bracketed sentence when Section <SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS 
CABLING SYSTEMS is included in the specifications.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Provide T3 drawings for EF Telecommunications in accordance with <RID>TIA/EIA-606-A</RID> that include telecommunications 
entrance facility plan views, pathway layout (cable tray, racks, ladder-racks, etc.), mechanical/electrical layout, 
and[ cabinet][, rack][, backboard][ and] wall elevations.  Drawings shall show layout of applicable equipment 
including incoming cable stub or connector blocks, building protector assembly, outgoing cable connector blocks, 
patch panels and equipment spaces and cabinet/racks.  Drawings shall include a complete list of equipment and 
material, equipment rack details, proposed layout and anchorage of equipment and appurtenances, and equipment 
relationship to other parts of the work including clearance for maintenance and operation.  Drawings may also 
be an enlargement of a congested area of T1 or T2 drawings.][Provide T3 drawings for EF Telecommunications as 
specified in the paragraph TELECOMMUNICATIONS SPACE DRAWINGS of Section <SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS 
CABLING SYSTEMS.]  The telecommunications entrance facility shop drawings shall be included in the operation 
and maintenance manuals.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.2   Telecommunications Qualifications</TTL><BRK/>
<BRK/>
<TXT>Work under this section shall be performed by and the equipment shall be provided by the approved telecommunications 
contractor and key personnel.  Qualifications shall be provided for:  the telecommunications system contractor, 
the telecommunications system installer, the supervisor (if different from the installer), and the cable splicing 
and terminating personnel.  A minimum of 30 days prior to installation, submit documentation of the experience 
of the telecommunications contractor and of the key personnel.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.2.1   <SUB>Telecommunications Contractor</SUB> Qualifications</TTL><BRK/>
<BRK/>
<TXT>The telecommunications contractor shall be a firm which is regularly and professionally engaged in the business 
of the applications, installation, and testing of the specified telecommunications systems and equipment.  The 
telecommunications contractor shall demonstrate experience in providing successful telecommunications systems 
that include outside plant and broadband cabling within the past 3 years.  Submit documentation for a minimum 
of three and a maximum of five successful telecommunication system installations for the telecommunications contractor.  
Each of the key personnel shall demonstrate experience in providing successful telecommunications systems in 
accordance with <RID>TIA-758-A</RID> within the past 3 years.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2.2   <SUB>Key Personnel</SUB> Qualifications</TTL><BRK/>
<BRK/>
<TXT>Provide key personnel who are regularly and professionally engaged in the business of the application, installation 
and testing of the specified telecommunications systems and equipment.  There may be one key person or more key 
persons proposed for this solicitation depending upon how many of the key roles each has successfully provided.  
Each of the key personnel shall demonstrate experience in providing successful telecommunications systems within 
the past 3 years.</TXT><BRK/>
<BRK/>
<TXT>Cable splicing and terminating personnel assigned to the installation of this system or any of its components 
shall have training in the proper techniques and have a minimum of 3 years experience in splicing and terminating 
the specified cables.  Modular splices shall be performed by factory certified personnel or under direct supervision 
of factory trained personnel for products used.</TXT><BRK/>
<BRK/>
<TXT>Supervisors and installers assigned to the installation of this system or any of its components shall have factory 
or factory approved certification from each equipment manufacturer indicating that they are qualified to install 
and test the provided products.</TXT><BRK/>
<BRK/>
<TXT>Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations 
for each of the key personnel.  Documentation for each key person shall include at least two successful system 
installations provided that are equivalent in system size and in construction complexity to the telecommunications 
system proposed for this solicitation.  Include specific experience in installing and testing telecommunications 
outside plant systems, including broadband cabling, and provide the names and locations of at least two project 
installations successfully completed using[ optical fiber and] copper telecommunications cabling systems.  All 
of the existing telecommunications system installations offered by the key persons as successful experience shall 
have been in successful full-time service for at least 18 months prior to the issuance date for this solicitation.  
Provide the name and role of the key person, the title, location, and completed installation date of the referenced 
project, the referenced project owner point of contact information including name, organization, title, and telephone 
number, and generally, the referenced project description including system size and construction complexity.</TXT><BRK/>
<BRK/>
<TXT>Indicate that all key persons are currently employed by the telecommunications contractor, or have a commitment 
to the telecommunications contractor to work on this project.  All key persons shall be employed by the telecommunications 
contractor at the date of issuance of this solicitation, or if not, have a commitment to the telecommunications 
contractor to work on this project by the date that the bid was due to the Contracting Officer.</TXT><BRK/>
<BRK/>
<TXT>Note that only the key personnel approved by the Contracting Officer in the successful proposal shall do work 
on this solicitation's telecommunications system.  Key personnel shall function in the same roles in this contract, 
as they functioned in the offered successful experience.  Any substitutions for the telecommunications contractor's 
key personnel requires approval from The Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2.3   Minimum <SUB>Manufacturer's Qualifications</SUB></TTL><BRK/>
<BRK/>
<TXT>Cabling, equipment and hardware manufacturers shall have a minimum of[ 3][____] years experience in the manufacturing, 
assembly, and factory testing of components which comply with, <RID>TIA/EIA-568-B.1</RID>, <RID>TIA/EIA-568-B.2</RID> and <RID>TIA-568-C.3</RID>
.  In addition, cabling manufacturers shall have a minimum of[ 3][____] years experience in the manufacturing 
and factory testing of cabling which comply with <RID>ICEA S-87-640</RID>, <RID>ICEA S-98-688</RID>, and <RID>ICEA S-99-689</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.3   <SUB>Outside Plant Test Plan</SUB></TTL><BRK/>
<BRK/>
<TXT>Prepare and provide a complete and detailed test plan for field tests of the outside plant including a complete 
list of test equipment for the[ copper conductor][ and][ optical fiber] cables, components, and accessories for 
approval by the Contracting Officer.  Include a cut-over plan with procedures and schedules for relocation of 
facility station numbers without interrupting service to any active location.  Submit the plan at least[ 30][____] 
days prior to tests for Contracting Officer approval.  Provide outside plant testing and performance measurement 
criteria in accordance with <RID>TIA/EIA-568-B.1</RID> and <RID>RUS Bull 1753F-201</RID>.  Include procedures for certification, validation, 
and testing that includes fiber optic link performance criteria.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.4   Standard Products</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose 2 years and 6000 hours for Navy projects and 1 year and 3000 hours 
for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide materials and equipment that are standard products of manufacturers regularly engaged in the production 
of such products which are of equal material, design and workmanship and shall be the manufacturer's latest standard 
design that has been in satisfactory commercial or industrial use for at least[ 2][ 1] year[s] prior to bid opening.  
The[ 2][ 1]-year period shall include applications of equipment and materials under similar circumstances and 
of similar size.  The product shall have been on sale on the commercial market through advertisements, manufacturers' 
catalogs, or brochures during the[ 2][ 1]-year period.  Products supplied shall be specifically designed and 
manufactured for use with outside plant telecommunications systems.  Where two or more items of the same class 
of equipment are required, these items shall be products of a single manufacturer; however, the component parts 
of the item need not be the products of the same manufacturer unless stated in this section.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.4.1   Alternative Qualifications</TTL><BRK/>
<BRK/>
<TXT>Products having less than a[ 2][ 1]-year field service record will be acceptable if a certified record of satisfactory 
field operation for not less than[ 6000][ 3000] hours, exclusive of the manufacturers' factory or laboratory 
tests, is provided.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.4.2   Material and Equipment Manufacturing Date</TTL><BRK/>
<BRK/>
<TXT>Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified 
otherwise.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6.5   Regulatory Requirements</TTL><BRK/>
<BRK/>
<TXT>In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the 
word, "shall" had been substituted for "should" wherever it appears.  Interpret references in these publications 
to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.  Equipment, 
materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of <RID>
NFPA 70</RID> unless more stringent requirements are specified or indicated.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.5.1   Independent Testing Organization Certificate</TTL><BRK/>
<BRK/>
<TXT>In lieu of the label or listing, submit a certificate from an independent testing organization, competent to 
perform testing, and approved by the Contracting Officer.  The certificate shall state that the item has been 
tested in accordance with the specified organization's test methods and that the item complies with the specified 
organization's reference standard.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.7   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Ship cable on reels in<MET> [152][305][_____] meter ([500][1000][_____] feet)</MET><ENG> [500][1000][_____] feet</ENG> length with 
a minimum overage of 10 percent.  Radius of the reel drum shall not be smaller than the minimum bend radius of 
the cable.  Wind cable on the reel so that unwinding can be done without kinking the cable.  Two meters of cable 
at both ends of the cable shall be accessible for testing.  Attach permanent label on each reel showing length, 
cable identification number, cable size, cable type, and date of manufacture.  Provide water resistant label 
and the indelible writing on the labels.  Apply end seals to each end of the cables to prevent moisture from 
entering the cable.  Reels with cable shall be suitable for outside storage conditions when temperature ranges 
from minus 40 degrees C to plus 65 degrees C, with relative humidity from 0 to 100 percent.  Equipment, other 
than cable, delivered and placed in storage shall be stored with protection from weather, humidity and temperature 
variation, dirt and dust, or other contaminants in accordance with manufacturer's requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8   MAINTENANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.8.1   <SUB>Record Documentation</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate record documentation with Section <SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS 
CABLING SYSTEM and choose the second bracketed paragraph if Section 
<SRF>27 10 00</SRF> is used on the project.  EIA TIA/EIA-606-A describes the necessary 
data fields and reports for hard copy, spreadsheet and electronic media as well 
as cable management software requirements.  Check with activity to determine 
if cable management software is currently employed at the activity and ensure 
contractor is required to provide necessary data input to update the existing 
system with information associated with project installation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide the activity responsible for telecommunications system maintenance and administration a single complete 
and accurate set of record documentation for the entire telecommunications system with respect to this project.</TXT><BRK/>
<BRK/>
[<TXT>Provide T5 drawings including documentation on cables and termination hardware in accordance with <RID>TIA/EIA-606-A</RID>
.  T5 drawings shall include schedules to show information for cut-overs and cable plant management, patch panel 
layouts, cross-connect information and connecting terminal layout as a minimum.  T5 drawings shall be provided[ 
in hard copy format][ on electronic media using Windows based computer cable management software.][  A licensed 
copy of the cable management software including documentation, shall be provided.][  Update existing record documentation 
to reflect campus distribution T0 drawings and T3 drawing schedule information modified, deleted or added as 
a result of this installation.]  Provide the following T5 drawing documentation as a minimum:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Cables - A record of installed cable shall be provided in accordance with <RID>TIA/EIA-606-A</RID>.  
The cable records shall [include only the required data fields][include the required data fields 
for each cable and complete end-to-end circuit report for each complete circuit from the assigned 
outlet to the entry facility ]in accordance with <RID>TIA/EIA-606-A</RID>.  Include manufacture date of 
cable with submittal.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Termination Hardware - Provide a record of installed patch panels, cross-connect points, 
campus distributor and terminating block arrangements and type in accordance with <RID>TIA/EIA-606-A</RID>
.  Documentation shall include [only ]the required data fields[ as a minimum] in accordance 
with <RID>TIA/EIA-606-A</RID>.</ITM><BRK/>
<BRK/>
]<TXT>[Provide record documentation as specified in Section <SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS CABLING SYSTEM.]</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>1.8.2   <SUB>Spare Parts</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Do not use this paragraph for Navy projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>In addition to the requirements of Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA, provide a complete list of 
parts and supplies, with current unit prices and source of supply, and a list of spare parts recommended for 
stocking.  Spare parts shall be provided no later than the start of field testing.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>1.9   WARRANTY</TTL><BRK/>
<BRK/>
<TXT>The equipment items shall be supported by service organizations which are reasonably convenient to the equipment 
installation in order to render satisfactory service to the equipment on a regular and emergency basis during 
the warranty period of the contract.</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS AND EQUIPMENT</TTL><BRK/>
<BRK/>
<TXT>Products supplied shall be specifically designed and manufactured for use with outside plant telecommunications 
systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   TELECOMMUNICATIONS ENTRANCE FACILITY</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The EF Telecommunications consists of the telecommunications service 
entrance to the building, including the entrance through the building wall, 
and continuing to the ER Telecommunications (if required).  The EF Telecommunications 
contains the backbone pathways and campus distributor that link the building 
distributors (BD)s in the main terminal space and to other buildings in campus 
situations.  Antenna entrances, if used, also constitute part of the EF Telecommunications.</NPR><BRK/>
<BRK/>
<NPR>The EF Telecommunications may contain both the CD and BD for the building.  
Facilities with few telecommunications requirements may house all telecommunications 
cabling and equipment required for that facility in the EF Telecommunications.  
Coordinate this section with Section <SRF>27 10 00</SRF> BUILDING TELECOMMUNICATIONS CABLING 
SYSTEM and provider of building telecommunications cabling system when Section 
<SRF>27 10 00</SRF> is used on a project.  Other than building protector assemblies and 
modules, components for telecommunications spaces are specified in Section 
<SRF>27 10 00</SRF>.  If Section <SRF>27 10 00</SRF> is not used, copy the required components from 
Section <SRF>27 10 00</SRF> and paste them under this paragraph.  Edit the component requirements 
as necessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.2.1   <SUB>Building Protector Assemblies</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Interbuilding backbone cables shall be terminated on protected entrance 
terminals and in a housing (when so directed) using current industry standard 
practice.  Certain types of terminals are mounted on the outside walls of buildings.  
Outside terminal should be the exception and not the norm, and should only be 
installed on small buildings (e.g., storage sheds, small warehouses, guard gates, 
etc.).  Copper cable termination components are specified in Section 
<SRF>27 10 00</SRF>, BUILDING TELECOMMUNICATIONS CABLING SYSTEM.  If the project does not 
include Section 16710 copy connector blocks or patch panel information and paste 
information into this section under this paragraph heading and edit as necessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide self-contained[ 5 pin][ screw type] unit supplied with a field cable stub factory connected to protector 
socket blocks to terminate and accept protector modules for [_____] pairs of outside cable.  Building protector 
assembly shall have interconnecting hardware for connection to interior cabling at full capacity.  Provide manufacturers 
instructions for <SUB>building protector assembly installation</SUB>.  Provide copper cable interconnecting hardware as 
specified in Section 16710, BUILDING TELECOMMUNICATIONS CABLING SYSTEM.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.2   <SUB>Protector Modules</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Protector modules are not required for interbuilding cable runs of 42.7 
m (140 feet) or less, directly buried or in underground conduit, where a continuous 
metallic cable shield or a continuous metallic conduit containing the cable 
is bonded to each building grounding electrode system.</NPR><BRK/>
<BRK/>
<NPR>Solid-state surge protectors provide protection for sensitive equipment because 
it incorporates a fast semiconductor switch with operating voltage nearly independent 
of transient rise time.  Otherwise, use heavy duty gas tube protection modules 
unless area lightning damage probability is very high.  Select the type of protector 
module required depending on their performance in categories of impulse life, 
maximum surge impulse and 60 Hz current carrying capacity.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide in accordance with <RID>UL 497</RID>[ three][ two]-electrode gas tube or solid state type[ 5 pin][ screw type] rated 
for the application.  Provide gas tube protection modules in accordance with <RID>RUS Bull 345-83</RID> and shall be[ heavy 
duty, A&gt;10kA, B&gt;400, C&gt;65A][ maximum duty, A&gt;20kA, B&gt;1000, C&gt;200A] where A is the maximum single 
impulse discharge current, B is the impulse life and C is the AC discharge current in accordance with <RID>NEMA C62.61</RID>
.  The gas modules shall shunt high voltage to ground, fail short, and be equipped with an external spark gap 
and heat coils in accordance with <RID>UL 497</RID>.  Provide the number of surge protection modules equal to the number 
of pairs of exterior cable of the building protector assembly.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2.3   Fiber Optic Terminations</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Fiber Optic termination components are specified in Section <SRF>27 10 00</SRF>, 
BUILDING TELECOMMUNICATIONS CABLING SYSTEM.  If the project does not include 
Section <SRF>27 10 00</SRF> copy enclosure type connectors and adapters and paste information 
into this section under this paragraph heading and edit as necessary.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide fiber optic cable terminations as specified in Section 16710, BUILDING TELECOMMUNICATIONS CABLING SYSTEM.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3   <SUB>CLOSURES</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Copper Conductor Closures</TTL><BRK/>
<BRK/>
<SPT><TTL>2.3.1.1   Aerial Cable Closures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Design of aerial plant should be in accordance with RUS Bull 1751F-630, 
Design of Aerial Plant.  Indicate sizes on drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide cable closure assembly consisting of a frame with clamps, a lift-off polyethylene cover, cable nozzles, 
and drop wire rings.  Closure shall be suitable for use on Figure 8 cables.  Closures shall be free breathing 
and suitable for housing[ straight-through type][ branch type][ of the type indicated] splices of non-pressurized 
communications cables and shall be sized as indicated.  The closure shall be constructed with ultraviolet resistant 
PVC.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.1.2   Underground Cable Closures</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate sizes on drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">a.  Aboveground:  Provide aboveground closures constructed of[ not less than 14 gauge steel][ 
ultraviolet resistant PVC] and acceptable for[ pole][ stake] mounting in accordance with <RID>RUS 1755</RID>
.910.  Closures shall be sized and contain a marker as indicated.  Covers shall  be secured 
to prevent unauthorized entry.</ITM><BRK/>
  <BRK/>
<ITM INDENT="-0.33">b.  Direct burial:  Provide buried closure suitable for enclosing a straight, butt, and branch 
splice in a container into which can be poured an encapsulating compound.  Closure shall have 
adequate strength to protect the splice and maintain cable shield electrical continuity in the 
buried environment.  Encapsulating compound shall be reenterable and shall not alter the chemical 
stability of the closure.  Provide filled splice cases in accordance  with <RID>RUS Bull 345-72</RID>.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  In vault or manhole:  Provide underground closure suitable to house a straight, butt, and 
branch splice in a protective housing into which can be poured an encapsulating compound.  Closure 
shall be of suitable thermoplastic, thermoset, or stainless steel material supplying structural 
strength necessary to pass the mechanical and electrical requirements in a vault or manhole 
environment.  Encapsulating compound shall be reenterable and shall not alter the chemical stability 
of the closure.  Provide filled splice cases in accordance  with <RID>RUS Bull 345-72</RID>.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.3.2   Fiber Optic Closures</TTL><BRK/>
<BRK/>
 <SPT><TTL>2.3.2.1   Aerial</TTL><BRK/>
<BRK/>
<TXT>Provide aerial closure that is free breathing and suitable for housing splice organizer of non -pressurized cables.  
Closure shall be constructed from heavy PVC with ultraviolet resistance.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2.2   Direct Burial</TTL><BRK/>
<BRK/>
<TXT>Provide buried closure suitable to house splice organizer in protective housing into which can be poured an encapsulating 
compound.  Closure shall have adequate strength to protect the splice and maintain cable shield electrical continuity, 
when metallic, in buried environment.  Encapsulating compound shall be reenterable and shall not alter chemical 
stability of the closure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2.3   In Vault or Manhole</TTL><BRK/>
<BRK/>
<TXT>Provide underground closure suitable to house splice organizer in a protective housing into which can be poured 
an encapsulating compound.  Closure shall be of thermoplastic, thermoset, or stainless steel material supplying 
structural strength necessary to pass the mechanical and electrical requirements in a vault or manhole environment.  
Encapsulating compound shall be reenterable and shall not alter the chemical stability of the closure.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.4   PAD MOUNTED <SUB>CROSS-CONNECT TERMINAL CABINETS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate size on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide in accordance with <RID>RUS 1755</RID>.910 and the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Constructed of 14 gauge steel or[_____].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Equipped with a double set of hinged doors with closed-cell foam weatherstripping.  Doors 
shall be locked and contain a marker as indicated.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Equipped with spool spindle bracket, mounting frames, binding post log,[ and] jumpering 
instruction label[, and load coil mounting provisions].</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Complete with cross connect modules to terminate number of pairs as indicated.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Sized as indicated.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5   <SUB>CABLE SPLICES, AND CONNECTORS</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.5.1   Copper Cable Splices</TTL><BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE:  Multipair splices are insulation displacement (IDC) type splices.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide[ multipair,[ foldback][ in-line]][ single pair,[ in-line][ butt][ box tap]] splices of a moisture resistant,[ 
two][ three][____]-wire [ insulation displacement] connector held rigidly in place to assure maximum continuity 
in accordance with <RID>RUS Bull 1753F-401</RID>.  Cables greater than 25 pairs shall be spliced using multipair splicing 
connectors, which accommodate 25 pairs of conductors at a time.  Provide correct connector size to accommodate 
the cable gauge of the supplied cable.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.5.2   Copper Cable Splice Connector</TTL><BRK/>
<BRK/>
<TXT>Provide splice connectors with a polycarbonate body and cap and a tin-plated brass contact element.  Connector 
shall accommodate 22 to 26 AWG solid wire with a maximum insulation diameter of<MET> 1.65 mm (0.065 inch)</MET><ENG> 0.065 inch</ENG>
.  Fill connector with sealant grease to make a moisture resistant connection, in accordance with <RID>RUS Bull 1753F-401</RID>
.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.5.3   Fiber Optic Cable Splices</TTL><BRK/>
<BRK/>
<TXT>Provide fiber optic cable splices and splicing materials for[ fusion][ mechanical] methods at locations shown 
on the construction drawings.  The splice insertion loss shall be 0.3 dB maximum when measured in accordance 
with <RID>TIA-455-78</RID> using an Optical Time Domain Reflectometer (OTDR).  Splices shall be designed for a return loss 
of 40.0 db max for single mode fiber when tested in accordance with <RID>TIA-455-107A</RID>.  Physically protect each fiber 
optic splice by a splice kit specially designed for the splice.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.5.4   Fiber Optic Splice Organizer</TTL><BRK/>
<BRK/>
<TXT>Provide splice organizer suitable for housing fiber optic splices in a neat and orderly fashion.  Splice organizer 
shall allow for a minimum of<MET> 1 m (3 feet)</MET><ENG> 3 feet</ENG> of fiber for each fiber within the cable to be neatly stored 
without kinks or twists.  Splice organizer shall accommodate individual strain relief for each splice and allow 
for future maintenance or modification, without damage to the cable or splices.  Provide splice organizer hardware, 
such as splice trays, protective glass shelves, and shield bond connectors in a splice organizer kit.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.5.5   Shield Connectors</TTL><BRK/>
<BRK/>
<TXT>Provide connectors with a stable, low-impedance electrical connection between the cable shield and the bonding 
conductor in accordance with <RID>RUS Bull 345-65</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6   CONDUIT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use Section 33 71 02.00 20, UNDERGROUND UNDERGROUND TRANSMISSION AND 
DISTRIBUTION, on Navy projects and Section 33 70 02.00 10, UNDERGROUND TRANSMISSION 
AND DISTRIBUTION SYSTEM, UNDERGROUND on Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide conduit as specified in[ Section <SRF>33 71 02.00 20</SRF>, UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION.][ 
Section <SRF>33 70 02.00 10</SRF>, UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND.]</TXT><BRK/>
 <BRK/></SPT>
<SPT><TTL>2.7   PLASTIC INSULATING TAPE</TTL><BRK/>
<BRK/>
<TXT><RID>UL 510</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8   <SUB>WIRE AND CABLE</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For Army projects follow guidelines set forth in USAISEC Technical Guide 
for Installation Information Infrastructure Architecture (I3A) or The Army Common 
User Information Transport Network (CUITN).  Army ECB 2007-22 is available electronically 
at <URL HREF="http://www.wbdg.org/ccb/ARMYCOE/COEECB/ecb_2007_22.pdf">http://www.wbdg.org/ccb/ARMYCOE/COEECB/ecb_2007_22.pdf</URL>.  Interbuilding backbone 
cabling is the cable (optical fiber and copper) media between the campus distributors 
of multiple buildings within a base complex (campus environment).  Interbuilding 
backbone cable plant terminates in the telecommunications entrance facility, 
the first terminating point in a building.  Cable may be direct buried, aerial, 
or underground (in conduit and ducts).  The preferred method is underground 
with the cable terminating in the telecommunications entrance facility.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.8.1   Copper Conductor Cable</TTL><BRK/>
<BRK/>
<TXT>Solid copper conductors, covered with an extruded solid insulating compound.  Insulated conductors shall be twisted 
into pairs which are then stranded or oscillated to form a cylindrical core.  For special high frequency applications, 
the cable core shall be separated into compartments.  Cable shall be completed by the application of a suitable 
core wrapping material, a corrugated copper or plastic coated aluminum shield, and an overall extruded jacket.  
Telecommunications contractor shall verify distances between splice points prior to ordering cable in specific 
cut lengths.  Gauge of conductor shall determine the range of numbers of pairs specified; 19 gauge (6 to 400 
pairs), 22 gauge (6 to 1200 pairs), 24 gauge (6 to 2100 pairs), and 26 gauge (6 to 3000 pairs).  Copper conductor 
shall conform to the following:</TXT><BRK/>
<BRK/>
<SPT><TTL>2.8.1.1   Underground</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For WESTNAVFACENGCOM projects, delete this paragraph.</NPR><BRK/>
<BRK/>
<NPR>Use RUS 1755.390 for filled cable and RUS 1755.890 for filled cable with expanded 
insulation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide filled cable meeting the requirements of <RID>ICEA S-99-689</RID> and [ <RID>RUS 1755</RID>.390][ <RID>RUS 1755</RID>.890].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.1.2   Aerial</TTL><BRK/>
<BRK/>
<TXT>Provide filled cable meeting the requirements of[ <RID>ICEA S-99-689</RID>][ <RID>ICEA S-98-688</RID>], and <RID>RUS 1755</RID>.390  except that 
it shall be suitable for aerial installation and shall be Figure 8 distribution wire with<MET> 26,700 N (6,000 pound)</MET><ENG>
 6,000 pound</ENG> Class A galvanized steel or<MET> 26,700 N (6,000 pound)</MET><ENG> 6,000 pound</ENG> aluminum-clad steel strand.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.1.3   Screen</TTL><BRK/>
<BRK/>
<TXT>Provide screen-compartmental core cable filled cable meeting the requirements of <RID>ICEA S-99-689</RID> and <RID>RUS 1755</RID>.390.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.8.2   Fiber Optic Cable</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Single-mode fiber optic cable is recommended for all fiber optic cable 
runs.  Designer should identify whether multimode will be used.  Multimode fiber 
system may be installed only if an existing communication network is being extended.  
If multimode fiber is used, single-mode fiber should also be placed for future 
use.  Designer will indicate on the drawings the number of optical fibers required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide[ single-mode, 8/125-um, 0.10 aperture 1310 nm fiber optic cable in accordance with <RID>TIA-492CAAA</RID>][ single-mode, 
8/125-um, 0.10 aperture 1550 nm fiber optic cable in accordance with <RID>TIA-492E000</RID>][ and ][ multimode 62.5/125-um, 
0.275 aperture fiber optic cable in accordance with <RID>TIA-492AAAA-A</RID>][ multimode 50/125-um, 0.275 aperture fiber 
optic cable in accordance with <RID>TIA-492AAAB</RID>], <RID>TIA-472D000-A</RID>, and <RID>ICEA S-87-640</RID> including any special requirements 
made necessary by a specialized design.  Provide[ 12][ ____] optical fibers[ as indicated].  Fiber optic cable 
shall be specifically designed for outside use with loose buffer construction.  Provide fiber optic color code 
in accordance with <RID>TIA/EIA-598-B</RID></TXT><BRK/>
<BRK/>
<SPT><TTL>2.8.2.1   Strength Members</TTL><BRK/>
<BRK/>
<TXT>Provide[ central][ non-central],[ non-metallic][ metallic] strength members with sufficient tensile strength 
for installation and residual rated loads to meet the applicable performance requirements in accordance with <RID>
ICEA S-87-640</RID>.  The strength member is included to serve as a cable core foundation to reduce strain on the fibers, 
and shall not serve as a pulling strength member.</TXT><BRK/>
<BRK/></SPT>
<SPT>[<TTL>2.8.2.2   Shielding or Other Metallic Covering</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if no additional physical protection is required 
or if aerial cable is specified.  Designer must select the shield or metallic 
covering material required.  Bare aluminum, coated aluminum, copper, copper 
alloy and copper and steel laminate are used as shielding tapes.  Copper and 
stainless steel, coated stainless steel and bare low carbon steel are use for 
cable armoring.  The copper alloy or stainless steel should be used for rodent 
protection.  If additional physical protection is required use the dual aluminum 
and steel tape shield.  Dual tape construction is normally used for armor protection 
of cables.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide[ copper, copper alloy or copper and steel laminate][ copper and stainless steel, coated stainless steel 
or bare low carbon steel][ bare aluminum or coated aluminum],[ single][ dual] tape covering or shield in accordance 
with <RID>ICEA S-87-640</RID>.</TXT><BRK/>
<BRK/>
]</SPT><SPT><TTL>2.8.2.3   Performance Requirements</TTL><BRK/>
<BRK/>
<TXT>Provide fiber optic cable with optical and mechanical performance requirements in accordance with <RID>ICEA S-87-640</RID>
.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.8.3   Grounding and Bonding Conductors</TTL><BRK/>
<BRK/>
<TXT>Provide grounding and bonding conductors in accordance with <RID>RUS 1755</RID>.200, <RID>TIA J-STD-607-A</RID>, <RID>IEEE C2</RID>, and <RID>NFPA 70</RID>
.  Solid bare copper wire meeting the requirements of <RID>ASTM B 1</RID> for sizes No. 8 AWG and smaller and stranded bare 
copper wire meeting the requirements of <RID>ASTM B 8</RID>, for sizes No. 6 AWG and larger.  Insulated conductors shall 
have 600-volt, Type TW insulation meeting the requirements of <RID>UL 83</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9   T-SPAN LINE TREATMENT REPEATERS</TTL><BRK/>
<BRK/>
<TXT>Provide as indicated.  Repeaters shall be pedestal mounted with non-pressurized housings, sized as indicated 
and shall meet the requirements of <RID>RUS Bull 345-50</RID>.</TXT><BRK/>
<BRK/></SPT>
 <SPT><TTL>2.10   POLES AND HARDWARE</TTL><BRK/>
<BRK/>
<TXT>Provide poles and hardware as specified in Section <SRF>33 71 01</SRF>, OVERHEAD TRANSMISSION AND DISTRIBUTION.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11   CABLE TAGS IN MANHOLES, HANDHOLES, AND VAULTS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer must coordinate with the base communications office and use 
the current base standard for labeling, if one exists and choose the as indicated 
bracketed option.  Show the labeling scheme on the drawings that the telecommunications 
contractor is required to follow.  If no labeling standard exists provide labeling 
for cable tags in accordance with TIA/EIA-606-A and choose the bracketed option 
for TIA/EIA-606-A labeling.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide tags for each telecommunications cable or wire located in manholes, handholes, and vaults.  Cable tags 
shall be[ stainless steel][ or][ polyethylene] and labeled[ as indicated][ in accordance with <RID>TIA/EIA-606-A</RID>].  
Handwritten labeling is unacceptable.</TXT><BRK/>
<BRK/>
<SPT>[<TTL>2.11.1   Stainless Steel</TTL><BRK/>
<BRK/>
<TXT>Provide stainless steel, cable tags<MET> 41.25 mm (1 5/8 inches)</MET><ENG> 1 5/8 inches</ENG> in diameter<MET> 1.58 mm (1/16 inch)</MET><ENG> 1/16 
inch</ENG> thick minimum, and circular in shape.  Tags shall be die stamped with numbers, letters, and symbols not 
less than<MET> 6.35 mm (0.25 inch)</MET><ENG> 0.25 inch</ENG> high and approximately<MET> 0.38 mm (0.015 inch)</MET><ENG> 0.015 inch</ENG> deep in normal 
block style.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>2.11.2   Polyethylene Cable Tags</TTL><BRK/>
<BRK/>
<TXT>Provide tags of polyethylene that have an average tensile strength of<MET> 22.4 MPa (3250 pounds per square inch)</MET><ENG> 
3250 pounds per square inch</ENG>; and that are<MET> two millimeter (0.08 inch)</MET><ENG> 0.08 inch</ENG> thick (minimum), non-corrosive 
non-conductive; resistive to acids, alkalis, organic solvents, and salt water; and distortion resistant to<MET> 77 
degrees C (170 degrees F)</MET><ENG> 170 degrees F</ENG>.  Provide<MET> 1.3 mm (0.05 inch)</MET><ENG> 0.05 inch</ENG> (minimum) thick black polyethylene 
tag holder.  Provide a one-piece nylon, self-locking tie at each end of the cable tag.  Ties shall have a minimum 
loop tensile strength of<MET> 778.75 N (175 pounds)</MET><ENG> 175 pounds</ENG>.  The cable tags shall have black block letters, numbers, 
and symbols<MET> 25 mm (one inch)</MET><ENG> one inch</ENG> high on a yellow background.  Letters, numbers, and symbols shall not fall 
off or change positions regardless of the cable tags' orientation.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>2.12   BURIED WARNING AND IDENTIFICATION TAPE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Buried warning tape requirements are specified in paragraph BURIED WARNING 
AND IDENTIFICATION TAPE in Section 31 00 00, EARTHWORK.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide fiber optic media marking and protection in accordance with <RID>TIA-590-A</RID>.  Provide color, type and depth 
of tape as specified in paragraph BURIED WARNING AND IDENTIFICATION TAPE in Section <SRF>31 00 00</SRF>, EARTHWORK.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13   GROUNDING BRAID</TTL><BRK/>
<BRK/>
<TXT>Provide grounding braid that provides low electrical impedance connections for dependable shield bonding  in 
accordance with <RID>RUS 1755</RID>.200.  Braid shall be made from flat tin-plated copper.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14   MANUFACTURER'S NAMEPLATE</TTL><BRK/>
<BRK/>
<TXT>Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial 
number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.15   FIELD FABRICATED NAMEPLATES</TTL><BRK/>
<BRK/>
<TXT>Provide laminated plastic nameplates in accordance with <RID>ASTM D 709</RID> for each patch panel, protector assembly, 
rack, cabinet and other equipment or as indicated on the drawings.  Each nameplate inscription shall identify 
the function and, when applicable, the position. Nameplates shall be melamine plastic,<MET> 3 mm (0.125 inch)</MET><ENG> 0.125 
inch</ENG> thick, white with[ black][_____] center core.  Surface shall be matte finish.  Corners shall be square.  
Accurately align lettering and engrave into the core.  Minimum size of nameplates shall be<MET> 25 by 65 mm (one by 
2.5 inches)</MET><ENG> one by 2.5 inches</ENG>.  Lettering shall be a minimum of<MET> 6.35 mm (0.25 inch)</MET><ENG> 0.25 inch</ENG> high normal block 
style.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16   TESTS, INSPECTIONS, AND VERIFICATIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.16.1   <SUB>Factory Reel Test Data</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Test 100 percent OTDR test of FO media at the factory in accordance with <RID>TIA/EIA-568-B.1</RID> and <RID>TIA-568-C.3</RID>.  Use <RID>
TIA-526-7</RID> for single mode fiber and <RID>TIA-526-14-A</RID> Method B for multi mode fiber measurements.  Calibrate OTDR 
to show anomalies of 0.2 dB minimum.  Enhanced performance filled OSP copper cables, referred to as Broadband 
Outside Plant (BBOSP), shall meet the requirements of <RID>ICEA S-99-689</RID>.  Enhanced performance air core OSP copper 
cables shall meet the requirements of <RID>ICEA S-98-688</RID>.  Submit test reports, including manufacture date for each 
cable reel and receive approval before delivery of cable to the project site.</TST></TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   INSTALLATION</TTL><BRK/>
<BRK/>
<TXT>Install all system components and appurtenances in accordance with manufacturer's instructions <RID>IEEE C2</RID>, <RID>NFPA 70</RID>
, and as indicated.  Provide all necessary interconnections, services, and adjustments required for a complete 
and operable telecommunications system.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Contractor Damage</TTL><BRK/>
<BRK/>
<TXT>Promptly repair indicated utility lines or systems damaged during site preparation and construction.  Damages 
to lines or systems not indicated, which are caused by Contractor operations, shall be treated as "Changes" under 
the terms of the Contract Clauses.  When Contractor is advised in writing of the location of a nonindicated line 
or system, such notice shall provide that portion of the line or system with "indicated" status in determining 
liability for damages.  In every event, immediately notify the Contracting Officer of damage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Cable Inspection and Repair</TTL><BRK/>
<BRK/>
<TXT>Handle cable and wire provided in the construction of this project with care.  Inspect cable reels for cuts, 
nicks or other damage.  Damaged cable shall be replaced or repaired to the satisfaction of the Contracting Officer.  
Reel wraps shall remain intact on the reel until the cable is ready for placement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Direct Burial System</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Indicate minimum radius allowed.  Buried warning tape requirements are 
specified in paragraph BURIED WARNING AND IDENTIFICATION TAPE in Section 31 
00 00, EARTHWORK.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Installation shall be in accordance with <RID>RUS Bull 1751F-640</RID>.  Under railroad tracks, paved areas, and roadways 
install cable in conduit encased in concrete.  Slope ducts to drain.  Excavate trenches by hand or mechanical 
trenching equipment.  Provide a minimum cable cover of<MET> 610 mm (24 inches)</MET><ENG> 24 inches</ENG> below finished grade.  Trenches 
shall be not less than<MET> 155 mm (6 inches)</MET><ENG> 6 inches</ENG> wide and in straight lines between cable markers.  Do not use 
cable plows.  Bends in trenches shall have a radius of not less than<MET> [915][_____] mm ([36][_____] inches)</MET><ENG> [36][_____] 
inches</ENG>.  Where two or more cables are laid parallel in the same trench, space laterally at least<MET> 78 mm (3 inches)</MET><ENG>
 3 inches</ENG> apart.  When rock is encountered, remove it to a depth of at least<MET> 78  mm (3 inches)</MET><ENG> 3 inches</ENG> below 
the cable and fill the space with sand or clean earth free from particles larger than<MET> 6 mm (1/4 inch)</MET><ENG> 1/4 inch</ENG>
.  Do not unreel and pull cables into the trench from one end.  Cable may be unreeled on grade and lifted into 
position.  Provide color, type and depth of warning tape as specified in paragraph BURIED WARNING AND IDENTIFICATION 
TAPE in Section <SRF>31 00 00</SRF>, EARTHWORK.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.3.1   Cable Placement</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Separate cables crossing other cables or metal piping from the other cables or pipe by not 
less than<MET> [78][_____] mm ([3][_____] inches)</MET><ENG> [3][_____] inches</ENG> of well tamped earth.  Do not 
install circuits for communications under or above traffic signal loops.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Cables shall be in one piece without splices between connections except where the distance 
exceeds the lengths in which the cable is furnished.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Avoid bends in cables of small radii and twists that might cause damage.  Do not bend cable 
and wire in a radius less than 10 times the outside diameter of the cable or wire.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Leave a horizontal slack of approximately<MET> 915 mm (3 feet)</MET><ENG> 3 feet</ENG> in the ground on each end 
of cable runs, on each side of connection boxes, and at points where connections are brought 
aboveground.  Where cable is brought aboveground, leave additional slack to make necessary connections.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3.2   Identification Slabs [Markers]</TTL><BRK/>
<BRK/>
<TXT>Provide a marker at each change of direction of the cable, over the ends of ducts or conduits which are installed 
under paved areas and roadways and over each splice.  Identification markers shall be of concrete, approximately<MET>
 508 mm (20 inches)</MET><ENG> 20 inches</ENG> square by<MET> 155 mm (6 inches)</MET><ENG> 6 inches</ENG> thick.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3.3   Backfill for Rocky Soil</TTL><BRK/>
<BRK/>
<TXT>When placing cable in a trench in rocky soil, the cable shall be cushioned by a fill of sand or selected soil 
at least<MET> 53 mm (2 inches)</MET><ENG> 2 inches</ENG> thick on the floor of the trench before placing the cable or wire.  The backfill 
for at least<MET> 103 mm (4 inches)</MET><ENG> 4 inches</ENG> above the wire or cable shall be free from stones, rocks, or other hard 
or sharp materials which might damage the cable or wire.  If the buried cable is placed less than<MET> 610 mm (24 
inches)</MET><ENG> 24 inches</ENG> in depth[, a protective cover of[ metal][ concrete] shall be used].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.4   Cable Protection</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use Section 33 71 02.00 20, UNDERGROUND UNDERGROUND TRANSMISSION AND 
DISTRIBUTION, on Navy projects and Section 33 70 02.00 10, UNDERGROUND TRANSMISSION 
AND DISTRIBUTION SYSTEM, UNDERGROUND on Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide direct burial cable protection in accordance with <RID>NFPA 70</RID> and as specified in[ Section 
<SRF>33 71 02.00 20</SRF>, UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION.][ Section <SRF>33 70 02.00 10</SRF>, UNDERGROUND 
TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND.]  Galvanized conduits which penetrate concrete (slabs, pavement, 
and walls) shall be PVC coated and shall extend from the first coupling or fitting outside either side of the 
concrete minimum of<MET> 155 mm per 305 mm (6 inches per 12 inches)</MET><ENG> 6 inches per 12 inches</ENG> burial depth beyond the 
edge of the surface where cable protection is required; all conduits shall be sealed on each end.  Where additional 
protection is required, cable may be placed in galvanized iron pipe (GIP) sized on a maximum fill of 40% of cross-sectional 
area, or in concrete encased<MET> 103 mm (4 inches)</MET><ENG> 4 inches</ENG> PVC pipe.  Conduit may be installed by jacking or trenching.  
Trenches shall be backfilled with earth and mechanically tamped at<MET> 155 mm (6 inches)</MET><ENG> 6 inches</ENG> lift so that the 
earth is restored to the same density, grade and vegetation as adjacent undisturbed material.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.4.1   Cable End Caps</TTL><BRK/>
<BRK/>
<TXT>Cable ends shall be sealed at all times with coated heat shrinkable end caps.  Cables ends shall be sealed when 
the cable is delivered to the job site, while the cable is stored and during installation of the cable.  The 
caps shall remain in place until the cable is spliced or terminated.  Sealing compounds and tape are not acceptable 
substitutes for heat shrinkable end caps.  Cable which is not sealed in the specified manner at all times will 
be rejected.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.5   Underground Duct</TTL><BRK/>
 <NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use Section 33 71 02.00 20, UNDERGROUND UNDERGROUND TRANSMISSION AND 
DISTRIBUTION, on Navy projects and Section 33 70 02.00 10, UNDERGROUND TRANSMISSION 
AND DISTRIBUTION SYSTEM, UNDERGROUND on Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide underground duct and connections to existing[ manholes,][ handholes,][ concrete pads,][ and][ existing 
ducts] as specified in[ Section <SRF>33 71 02.00 20</SRF>, UNDERGROUND UNDERGROUND TRANSMISSION AND DISTRIBUTION][ Section 
<SRF>33 70 02.00 10</SRF>, UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND] with any additional requirements 
as specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.6   Reconditioning of Surfaces</TTL><BRK/>
 <NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use Section 33 71 02.00 20, UNDERGROUND UNDERGROUND TRANSMISSION AND 
DISTRIBUTION, on Navy projects and Section 33 70 02.00 10, UNDERGROUND TRANSMISSION 
AND DISTRIBUTION SYSTEM, UNDERGROUND on Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide reconditioning of surfaces as specified in[ Section <SRF>33 71 02.00 20</SRF>, UNDERGROUND UNDERGROUND TRANSMISSION 
AND DISTRIBUTION.][ Section <SRF>33 70 02.00 10</SRF>, UNDERGROUND TRANSMISSION AND DISTRIBUTION SYSTEM, UNDERGROUND.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.7   Penetrations</TTL><BRK/>
<BRK/>
<TXT>Caulk and seal cable access penetrations in walls, ceilings and other parts of the building.  Seal openings around 
electrical penetrations through fire resistance-rated wall, partitions, floors, or ceilings in accordance with 
Section <SRF>07 84 00</SRF>, FIRESTOPPING.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.8   Cable Pulling</TTL><BRK/>
<BRK/>
<TXT>Test duct lines with a mandrel and swab out to remove foreign material before the pulling of cables.  Avoid damage 
to cables in setting up pulling apparatus or in placing tools or hardware.  Do not step on cables when entering 
or leaving the manhole.  Do not place cables in ducts other than those shown without prior written approval of 
the Contracting Officer.  Roll cable reels in the direction indicated by the arrows painted on the reel flanges.  
Set up cable reels on the same side of the manhole as the conduit section in which the cable is to be placed.  
Level the reel and bring into proper alignment with the conduit section so that the cable pays off from the top 
of the reel in a long smooth bend into the duct without twisting.  Under no circumstances shall the cable be 
paid off from the bottom of a reel.  Check the equipment set up prior to beginning the cable pulling to avoid 
an interruption once pulling has started.  Use a cable feeder guide of suitable dimensions between cable reel 
and face of duct to protect cable and guide cable into the duct as it is paid off the reel.  As cable is paid 
off the reel, lubricate and inspect cable for sheath defects.  When defects are noticed, stop pulling operations 
and notify the Contracting Officer to determine required corrective action.  Cable pulling shall also be stopped 
when reel binds or does not pay off freely.  Rectify cause of binding before resuming pulling operations.  Provide 
cable lubricants recommended by the cable manufacturer.  Avoid bends in cables of small radii and twists that 
might cause damage.  Do not bend cable and wire in a radius less than 10 times the outside diameter of the cable 
or wire.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.8.1   <SUB>Cable Tensions</SUB></TTL><BRK/>
<BRK/>
<TXT>Obtain from the cable manufacturer and provide to the Contracting Officer, the maximum allowable pulling tension.  
This tension shall not be exceeded.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.8.2   Pulling Eyes</TTL><BRK/>
<BRK/>
<TXT>Equip cables<MET> 32 mm (1.25 inches)</MET><ENG> 1.25 inches</ENG> in diameter and larger with cable manufacturer's factory installed 
pulling-in eyes.  Provide cables with diameter smaller than<MET> 32 mm (1.25 inches)</MET><ENG> 1.25 inches</ENG> with heat shrinkable 
type end caps or seals on cable ends when using cable pulling grips.  Rings to prevent grip from slipping shall 
not be beaten into the cable sheath.  Use a swivel of<MET> 19 mm (3/4 inch)</MET><ENG> 3/4 inch</ENG> links between pulling-in eyes 
or grips and pulling strand.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.8.3   Installation of Cables in Manholes, Handholes, and Vaults</TTL><BRK/>
<BRK/>
<TXT>Do not install cables utilizing the shortest route, but route along those walls providing the longest route and 
the maximum spare cable lengths. Form cables to closely parallel walls, not to interfere with duct entrances, 
and support cables on brackets and cable insulators at a maximum of<MET> 1220 mm (4 feet)</MET><ENG> 4 feet</ENG>.  In existing manholes, 
handholes, and vaults where new ducts are to be terminated, or where new cables are to be installed, modify the 
existing installation of cables, cable supports, and grounding as required with cables arranged and supported 
as specified for new cables.  Identify each cable with corrosion-resistant embossed metal tags.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.9   Aerial Cable Installation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include tensioning and sag data on drawings in tabular form.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Pole installation shall be as specified in Section <SRF>33 71 01</SRF>, OVERHEAD TRANSMISSION AND DISTRIBUTION.  Where physical 
obstructions make it necessary to pull distribution wire along the line from a stationary reel, use cable stringing 
blocks to support wire during placing and tensioning operations.  Do not place ladders, cable coils, and other 
equipment on or against the distribution wire.  Wire shall be sagged in accordance with the data shown.  Protect 
cable installed outside of building less than<MET> 2.5 meters (8 feet)</MET><ENG> 8 feet</ENG> above finished grade against physical 
damage.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.9.1   Figure 8 Distribution Wire</TTL><BRK/>
<BRK/>
<TXT>Perform spiraling of the wire within 24 hours of the tensioning operation. Perform spiraling operations at alternate 
poles with the approximate length of the spiral being<MET> 4575 mm (15 feet)</MET><ENG> 15 feet</ENG>.  Do not remove insulation from 
support members except at bonding and grounding points and at points where ends of support members are terminated 
in splicing and dead-end devices.  Ground support wire at poles to the pole ground.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.9.2   Suspension Strand</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include tensioning and sag data on drawings in tabular form.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Place suspension strand as indicated.  Tension in accordance with the data indicated.  When tensioning strand, 
loosen cable suspension clamps enough to allow free movement of the strand.  Place suspension strand on the road 
side of the pole line.  In tangent construction, point the lip of the suspension strand clamp toward the pole.  
At angles in the line, point the suspension strand clamp lip away from the load.  In level construction place 
the suspension strand clamp in such a manner that it will hold the strand below the through-bolt.  At points 
where there is an up-pull on the strand, place clamp so that it will support strand above the through-bolt.  
Make suspension strand electrically continuous throughout its entire length, bond to other bare cables suspension 
strands and connect to pole ground at each pole.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.9.3   Aerial Cable</TTL><BRK/>
<BRK/>
<TXT>Keep cable ends sealed at all times using cable end caps.  Take cable from reel only as it is placed.  During 
placing operations, do not bend cables in a radius less than 10 times the outside diameter of cable.  Place temporary 
supports sufficiently close together and properly tension the cable where necessary to prevent excessive bending.  
In those instances where spiraling of cabling is involved, accomplish mounting of enclosures for purposes of 
loading, splicing, and distribution after the spiraling operation has been completed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.10   Cable Splicing</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.10.1   Copper Conductor Splices</TTL><BRK/>
<BRK/>
<TXT>Perform splicing in accordance with requirements of <RID>RUS Bull 1753F-401</RID> except that direct buried splices and 
twisted and soldered splices are not allowed.  Exception does not apply for pairs assigned for carrier application.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.10.2   <SUB>Fiber Optic Splices</SUB></TTL><BRK/>
<BRK/>
<TXT>Fiber optic splicing shall be in accordance with manufacturer's recommendation and shall exhibit an insertion 
loss[ not greater than 0.2 dB for fusion splices][ not greater than 0.4 db for mechanical splices].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.11   Surge Protection</TTL><BRK/>
<BRK/>
<TXT>All cables and conductors, except fiber optic cable, which serve as communication lines through off-premise lines, 
shall have surge protection installed at each end which meet the requirements of <RID>RUS Bull 1751F-815</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.12   Grounding</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer should verify the existence of grounding facilities.  It is 
essential that all grounding facilities, new and existing, conform with IEEE 
C2, NFPA 70, MIL-HDBK-419, and MIL-STD-188-124.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide grounding and bonding in accordance with <RID>RUS 1755</RID>.200, <RID>TIA J-STD-607-A</RID>, <RID>IEEE C2</RID>, and <RID>NFPA 70</RID>.  Ground 
exposed noncurrent carrying metallic parts of telephone equipment, cable sheaths, cable splices, and terminals.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.12.1   Telecommunications Master Ground Bar (TMGB)</TTL><BRK/>
<BRK/>
<TXT>The TMGB is the hub of the basic telecommunications grounding system providing a common point of connection for 
ground from outside cable, CD, and equipment.  Establish a TMGB for connection point for cable stub shields to 
connector blocks and CD protector assemblies as specified in Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEMS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.12.2   Incoming Cable Shields</TTL><BRK/>
<BRK/>
<TXT>Shields shall not be bonded across the splice to the cable stubs.  Ground shields of incoming cables in the EF 
Telecommunications to the TMGB.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.12.3   Campus Distributor Grounding</TTL><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Protection assemblies:  Mount CD protector assemblies directly[ on the telecommunications 
backboard][ in the telecommunications [rack][cabinet]].  Connect assemblies mounted on each 
vertical frame with No. 6 AWG copper conductor to provide a low resistance path to TMGB.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[b.  TMGB connection:  Connect TMGB to TGB with copper conductor with a total resistance of 
less than 0.01 ohms.]</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT>[<TTL>3.1.13   Cut-Over</TTL><BRK/>
<BRK/>
<TXT>All necessary transfers and cut-overs, shall be accomplished by the telecommunications contractor.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>3.2   LABELING</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Labels</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide labeling in accordance with EIA TIA/EIA-606-A using a mechanical 
device for printing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Provide labeling for new cabling and termination hardware located within the facility in accordance with <RID>TIA/EIA-606-A</RID>
.  Handwritten labeling is unacceptable.  Stenciled lettering for cable and termination hardware shall be provided 
using[ thermal ink transfer process][ laser printer][____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Cable Tag Installation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Verify cable labeling requirements with the local Activity.  Label in 
accordance with TIA/EIA-606-A for activities without current labeling standards.  
Choose appropriate cable labeling requirements based on verification results.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Install cable tags for each telecommunications cable or wire located in manholes, handholes, and vaults including 
each splice.[  Tag only new wire and cable provided by this contract.][  Tag new wire and cable provided under 
this contract and existing wire and cable which are indicated to have splices and terminations provided by this 
contract.]  The labeling of telecommunications cable tag identifiers shall be[ as indicated][ in accordance with <RID>
TIA/EIA-606-A</RID>].[  Tag legend shall be as indicated.]  Do not provide handwritten letters.  Install cable tags 
so that they are clearly visible without disturbing any cabling or wiring in the manholes, handholes, and vaults.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.3   Termination Hardware</TTL><BRK/>
<BRK/>
<TXT>Label patch panels, distribution panels, connector blocks and protection modules using color coded labels with 
identifiers in accordance with <RID>TIA/EIA-606-A</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   FIELD APPLIED PAINTING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Select the second bracketed sentence if Section 09 90 00, PAINTS AND 
COATINGS is used on the project and delete the subparagraphs for CLEANING, PRIMING, 
and FINISH COAT.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Provide ferrous metallic enclosure finishes in accordance with the following procedures.  Ensure that surfaces 
are dry and clean when the coating is applied.  Coat joints and crevices.  Prior to assembly, paint surfaces 
which will be concealed or inaccessible after assembly.  Apply primer and finish coat in accordance with the 
manufacturer's recommendations.][Provide ferrous metallic enclosure finishes as specified in Section 
<SRF>09 90 00</SRF>, PAINTS AND COATINGS.]</TXT><BRK/>
<BRK/>
<SPT>[<TTL>3.3.1   Cleaning</TTL><BRK/>
<BRK/>
<TXT>Clean surfaces in accordance with <RID>SSPC SP 6</RID>.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.3.2   Priming</TTL><BRK/>
<BRK/>
<TXT>Prime with a two component polyamide epoxy primer which has a bisphenol-A base, a minimum of 60 percent solids 
by volume, and an ability to build up a minimum dry film thickness on a vertical surface of<MET> 0.127 mm (5.0 mils)</MET><ENG>
 5.0 mils</ENG>.  Apply in two coats to a total dry film thickness of<MET> 0.127 to 0.2 mm (5 to 8 mils)</MET><ENG> 5 to 8 mils</ENG>.</TXT><BRK/>
<BRK/>
]</SPT><SPT>[<TTL>3.3.3   Finish Coat</TTL><BRK/>
<BRK/>
<TXT>Finish with a two component urethane consisting of saturated polyester polyol resin mixed with aliphatic isocyanate 
which has a minimum of 50 percent solids by volume.  Apply to a minimum dry film thickness of<MET> 0.05 to 0.076 mm 
(2 to 3 mils)</MET><ENG> 2 to 3 mils</ENG>.  Color shall be the manufacturer's standard.</TXT><BRK/>
<BRK/>
]</SPT></SPT><SPT><TTL>3.4   FIELD FABRICATED NAMEPLATE MOUNTING</TTL><BRK/>
<BRK/>
<TXT>Provide number, location, and letter designation of nameplates as indicated.  Fasten nameplates to the device 
with a minimum of two sheet-metal screws or two rivets.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   FIELD QUALITY CONTROL</TTL><BRK/>
<BRK/>
<TXT>Provide the Contracting Officer[ 10][ _____] working days notice prior to[ each][ _____] test.  Provide labor, 
equipment, and incidentals required for testing.  Correct defective material and workmanship disclosed as the 
results of the tests.  Furnish a signed copy of the test results to the Contracting Officer within 3 working 
days after the tests for each segment of construction are completed.  Perform testing as construction progresses 
and do not wait until all construction is complete before starting field tests.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   <SUB>Pre-Installation Tests</SUB></TTL><BRK/>
<BRK/>
<TXT><TST>Perform the following tests on cable at the job site before it is removed from the cable reel.  For cables with 
factory installed pulling eyes, these tests shall be performed at the factory and certified test results shall 
accompany the cable.</TST></TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1.1   Cable Capacitance</TTL><BRK/>
<BRK/>
<TXT><TST>Perform capacitance tests on at least 10 percent of the pairs within a cable to determine if cable capacitance 
is within the limits specified.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.2   Loop Resistance</TTL><BRK/>
<BRK/>
<TXT><TST>Perform DC-loop resistance on at least 10 percent of the pairs within a cable to determine if DC-loop resistance 
is within the manufacturer's calculated resistance.</TST></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.3   Pre-Installation Test Results</TTL><BRK/>
<BRK/>
<TXT>Provide results of pre-installation tests to the Contracting Officer at least[ 5][ _____] working days before 
installation is to start.  Results shall indicate reel number of the cable, manufacturer, size of cable, pairs 
tested, and recorded readings.  When pre-installation tests indicate that cable does not meet specifications, 
remove cable from the job site.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.2   <SUB>Acceptance Tests</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer should delete tests that are not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Perform acceptance testing in accordance with <RID>RUS Bull 1753F-201</RID> and as further specified in this section.  Provide 
personnel, equipment, instrumentation, and supplies necessary to perform required testing.  Notification of any 
planned testing shall be given to the Contracting Officer at least[ 14][____] days prior to any test unless specified 
otherwise.  Testing shall not proceed until after the Contractor has received written Contracting Officer's approval 
of the test plans as specified.  Test plans shall define the tests required to ensure that the system meets technical, 
operational, and performance specifications.  The test plans shall define milestones for the tests, equipment, 
personnel, facilities, and supplies required.  The test plans shall identify the capabilities and functions to 
be tested.  Provide test reports in booklet form showing all field tests performed, upon completion and testing 
of the installed system.  Measurements shall be tabulated on a pair by pair or strand by strand basis.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.2.1   Copper Conductor Cable</TTL><BRK/>
<BRK/>
<TST><TXT>Perform the following acceptance tests in accordance with <RID>TIA-758-A</RID>:</TXT><BRK/>
<BRK/>
<LST>a.  Wire map (pin to pin continuity)</LST><BRK/>
<BRK/>
<LST>b.  Continuity to remote end</LST><BRK/>
<BRK/>
<LST>c.  Crossed pairs</LST><BRK/>
<BRK/>
<LST>d.  Reversed pairs</LST><BRK/>
<BRK/>
<LST>e.  Split pairs</LST><BRK/>
<BRK/>
<LST>f.  Shorts between two or more conductors</LST><BRK/></TST>
 <BRK/></SPT>
<SPT><TTL>3.5.2.2   Fiber Optic Cable</TTL><BRK/>
<BRK/>
<NTE><AST/><BRK/>
<NPR>NOTE:  The OTDR works on the principal of the amount of light that is reflected 
back to the source and therefore gives an estimated loss value.  Typically, 
the OTDR can be used for locating problems causing high attenuation.  It should 
be noted, however, that the distances needed for accurate OTDR readings must 
exceed 100 m (328 ft).  To overcome the long tail on the trace due to the initial 
reflection at the OTDR connector, a "dead-zone fiber" with a length exceeding 
the displayed pulse duration may be used between the OTDR connector and the 
specimen.  (Numerically, pulse length in meters corresponds to approximately 
one-tenth the pulse duration in ns.) To avoid the tail, the dead-zone fiber 
length may be up to 20 times the pulse length, depending upon characteristics 
of the individual OTDR.  Recommend a 20 meter (66 feet) jumper minimum, for 
testing fiber optic cabling using the OTDR, however on long cabling runs this 
length may be inadequate to overcome the dead-zone and potentially skew test 
results.  Select 850 or 1300 nanometer light source for multimode fiber and 
1310 or 1550 nanometer light source for single-mode fiber.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Test fiber optic cable in accordance with <RID>TIA/EIA-455-B</RID> and as further specified in this section.  Two optical 
tests shall be performed on all optical fibers: Optical Time Domain Reflectometry (OTDR) Test, and Attenuation 
Test.  In addition, a Bandwidth Test shall be performed on all multimode optical fibers.  These tests shall be 
performed on the completed end-to-end spans which include the near-end pre-connectorized single fiber cable assembly, 
outside plant as specified, and the far-end pre-connectorized single fiber cable assembly.</TXT><BRK/>
<BRK/>
<TST><ITM INDENT="-0.33">a.  OTDR Test:  The OTDR test shall be used to determine the adequacy of the cable installations 
by showing any irregularities, such as discontinuities, micro-bendings or improper splices for 
the cable span under test.  Hard copy fiber signature records shall be obtained from the OTDR 
for each fiber in each span and shall be included in the test results.  The OTDR test shall 
be measured in both directions.  A reference length of fiber,<MET>[ 20][ ____] m ([ 66][ ____]feet)</MET><ENG>
[ 66][ ____] feet</ENG> minimum, used as the delay line shall be placed before the new end connector 
and after the far end patch panel connectors for inspection of connector signature.  Conduct 
OTDR test and provide calculation or interpretation of results in accordance with <RID>TIA-526-7</RID> 
for single-mode fiber and <RID>TIA-526-14-A</RID> for multimode fiber.  Splice losses shall not exceed 
0.3 db.</ITM></TST><BRK/>
<BRK/>
<TST><ITM INDENT="-0.33">b.  Attenuation Test: End-to-end attenuation measurements shall be made on all fibers, in both 
directions, using a[ 850][ 1300][ 1310][ 1550] nanometer light source at one end and the optical 
power meter on the other end to verify that the cable system attenuation requirements are met 
in accordance with[ <RID>TIA-455-46A</RID> for multimode][ and][ <RID>TIA-526-7</RID> for single-mode] fiber optic 
cables.  The measurement method shall be in accordance with <RID>TIA-455-78</RID>.  Attenuation losses 
shall not exceed 0.5 db/km at 1310 nm and 1550 nm for single-mode fiber.  Attenuation losses 
shall not exceed 5.0 db/km at 850 nm and 1.5 db/km at 1300 nm for multimode fiber.</ITM></TST><BRK/>
<BRK/>
<TST><ITM INDENT="-0.33">c.  Bandwidth Test: The end-to-end bandwidth of all multimode fiber span links shall be measured 
by the frequency domain method.  The bandwidth shall be measured in both directions on all fibers.  
The bandwidth measurements shall be in accordance with <RID> TIA TIA/EIA-455-204</RID>.</ITM></TST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.3   Soil Density Tests</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Choose one of the following options.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<ITM INDENT="-0.33">[a.  <TST>Determine soil-density relationships for compaction of backfill material in accordance 
with <RID>ASTM D 1557</RID>, Method D.</TST>]</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">[b.  Determine soil-density relationships as specified for soil tests in Section <SRF>31 00 00</SRF>, EARTHWORK.]</ITM><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>