USACE / NAVFAC / AFCESA / NASA                UFGS-34 11 00 (April 2008)<BRK/>
                                              ----------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                    Superseding<BRK/>
                                              UFGS-34 11 00 (January 2007)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 34 11 00</SCN><BRK/>
<BRK/>
<STL>RAILROAD TRACK AND ACCESSORIES</STL><BRK/>
<DTE>04/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>new railroads after 
the roadbed has been prepared, and railroad rehabilitation</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This section will be used only for railroad construction after the roadbed 
has been prepared.  Sections <SRF>31 11 00</SRF> CLEARING AND GRUBBING and <SRF>31 00 00</SRF> EARTHWORK 
will be used for specifying roadbed preparation.  CAUTION: Coordination of this 
section with other sections of the specifications and with the project drawings 
is required.  For Civil Works projects edit this section to reference the appropriate 
UFGS identified in the header as "Preparing Activity:  <PRA>USACE</PRA>  -CW" (ex: UFGS-03 
30 04 CONCRETE FOR MINOR STRUCTURES).</NPR><BRK/>
<BRK/>
<NPR>The following information should be shown on the drawings:</NPR><BRK/>
<BRK/>
<NPR>a.  Location of various sizes of rail if required.</NPR><BRK/>
<BRK/>
<NPR>b.  Approximate location of compromise joints.</NPR><BRK/>
<BRK/>
<NPR>c.  Locations of accessories such as welded joints, rail anchors, guard rails, 
gage rods, bonded and grounded track, etc.</NPR><BRK/>
<BRK/>
<NPR>d.  Locations of items of equipment such as derails and car bumpers.</NPR><BRK/>
<BRK/>
<NPR>e.  Location of turnouts, including dimensions from point of switch and center 
of last switch tie.  Also type of switch stand and quantity and location of 
switch ties.</NPR><BRK/>
<BRK/>
<NPR>f.  Track section with all needed dimensions.</NPR><BRK/>
<BRK/>
<NPR>g.  Superelevation locations and amounts.</NPR><BRK/>
<BRK/>
<NPR>h.  Highway grade crossing location, type, and details (cross-sections) as required.  
Standard details for each type of crossing are available on CADD through the 
PCASE program.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  When lump-sum payment is desired in the Invitation for Bids for work 
covered under this section the UNIT PRICES paragraphs will be deleted and subsequent 
paragraphs renumbered.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each bid item will be measured by the unit listed in the Bid Schedule.  Materials must be actually used or installed 
in the completed work.  No measurement will be made for wasted materials or materials used for the convenience 
of the Contractor.  The quantities thus determined will be paid for at their respective unit prices as shown 
in the Unit Price Schedule.  This payment will constitute full compensation for furnishing materials, equipment, 
and labor and incidentals necessary to complete the work required, and for removing and properly disposing of 
replaced materials.  Any required work or materials, such as lubricants and creosote, which are not listed on 
the Unit Price Schedule, shall be considered subsidiary to the items listed, and their cost shall be included 
in the costs for the listed items.  Bid items are self-explanatory except as described below.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.1   Rail</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Use the following paragraph for new track construction.  Use paragraphs 
Out-of-Face Rail Replacement and Spot Rail Replacement below for rehabilitation 
work.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Rail will be paid for on a unit price per linear<MET> meter</MET><ENG> ft</ENG> of rail weight shown in the Unit Price Schedule.  Stock 
rails and closure rails will be included for payment in the turnout unit price.  The rails in road crossings 
will be included for payment for rail.  Payment [will] [will not] include such items as [furnishing the rail,] 
[cutting and drilling the rail,] [installing the rail,] [and] [delivering the old rail removed from track to 
the designated storage area].</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.1.1   Out-of-Face Rail Replacement</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the linear<MET> meter of 30.5 m</MET><ENG> ft of 100 ft</ENG> or more of contiguous replacement rail acceptably 
installed.  Payment will be at the contract unit price per linear<MET> meter</MET><ENG> ft</ENG> for "Out-of-Face Rail Replacement".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.1.2   Spot Rail Replacement</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the linear<MET> meter of less than 30.5 m</MET><ENG> ft of less than 100 ft</ENG> of contiguous replacement 
rail acceptably installed.  Existing rails which are adjusted in the track during spot rail replacement will 
not be measured for payment.  Existing rails which must be transposed or exchanged during spot rail replacement, 
as determined by the Contracting Officer, [will] [will not] be measured for payment.  Payment will be at the 
contract unit price per linear<MET> meter</MET><ENG> ft</ENG> for "Spot Rail Replacement".</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.2   Joint Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List joint bars required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Joint bars will be paid for at the unit price per pair under "Furnish Joint Bars" for the following items:  [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3   Compromise Joints</TTL><BRK/>
<BRK/>
<TXT>Compromise joints will be paid for at the contract unit price per joint for "Furnish Compromise Joint".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4   Turnouts</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.4.1   New Turnouts</TTL><BRK/>
<BRK/>
<TXT>Turnout construction will be measured and paid for at the contract unit price for "Furnish and Install New Turnouts".  
Each turnout shall include the complete switch, switch stand, connecting rod, switch rods, attachments, switch 
points, slide plates, rail braces, frog, fillers, joint bars and track bolts for the switch and frog, switch 
ties, and all other required items, including rail, rail anchors, standard tie plates, and spikes.  Ballast will 
be paid for at the unit price for ballast.  The pay limit for turnout construction begins at the center of the 
No. "0" tie at the front of the turnout to the last long switch tie of the rear of the turnout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.2   Turnout Repair</TTL><BRK/>
<BRK/>
<TXT>The following are turnout and track crossing unit price pay items:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  "Switch Repair"</ITM><BRK/>
<BRK/>
<ITM>(1)  "Replace Switch Stand" - Each</ITM><BRK/>
<ITM>(2)  "Replace Switch Points" - Each</ITM><BRK/>
<ITM>(3)  "Install or Replace Heel Fillers" - Each</ITM><BRK/>
<ITM>(4)  "Install or Replace Heel Filler Bolt Assembly" - Each</ITM><BRK/>
<ITM>(5)  "Install or Replace Switch Plates" - Each</ITM><BRK/>
<ITM>(6)  "Install or Replace Switch Braces" - Each</ITM><BRK/>
<ITM>(7)  "Remove and Respike Braces and Plates" - Each</ITM><BRK/>
<ITM>(8)  "Adjust Adjustable Braces" - Each</ITM><BRK/>
<ITM>(9)  "Install or Replace Switch Rods and Clips" - Each</ITM><BRK/>
<ITM>(10)  "Replace Connecting Rod" - Each</ITM><BRK/>
<ITM>(11)  "Grind and Dress Switch Point and Adjacent Stockrail" - Each</ITM><BRK/>
<ITM>(12)  "Clean, Adjust, and Lubricate Switch" - Each</ITM><BRK/>
<ITM>(13)  "Rebuild Switch Point Protector" - Each</ITM><BRK/>
<ITM>(14)  "Rebuild Switch Point" - Each</ITM><BRK/>
<ITM>(15)  "Paint Switch Stand</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  "Frog Repair"</ITM><BRK/>
<BRK/>
<ITM>(1)  "Replace Frog" - Each</ITM><BRK/>
<ITM>(2)  "Install or Replace Frog Plates or Hook Plates" - Each</ITM><BRK/>
<ITM>(3)  "Rebuild Frog" - Each</ITM><BRK/>
<ITM>(4) "Grind and Dress Frog, Install or Replace Frog Bolt Assembly" - Each</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  "Guard Rail Repair"</ITM><BRK/>
<BRK/>
<ITM>(1)  "Replace Guard Rail" - Each</ITM><BRK/>
<ITM>(2)  "Install or Replace Guard Rail Plates" - Each</ITM><BRK/>
<ITM>(3)  "Install or Replace Guard Rail Bolt Assembly" - Each</ITM><BRK/>
<ITM>(4)  "Install or Replace Guard Rail Fillers" - Each</ITM><BRK/>
<ITM>(5)  "Install or Replace Clamp Assembly including Fillers and Wedges" - Each</ITM><BRK/>
<ITM>(6)  "Tighten all Bolts in Turnouts" - Each</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.5   Track Crossing</TTL><BRK/>
<BRK/>
<TXT>Track crossings will be paid for at the contract unit price for "Furnish and Install Track Crossing".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6   Crossties and Switch Ties</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If only one of the AREMA Manual standard crosstie grades listed below 
is to be used, list only the specified grade and delete the other grade.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Crossties will be measured for each defective crosstie removed and for each new crosstie acceptably furnished 
and installed as indicated.  Switch ties will be measured for each length of defective switch tie removed and 
for each length of new switch tie acceptably furnished and installed as indicated.  Defective crossties and switch 
ties removed become the property of the Contractor.  Crossties will be paid for at the contract unit price for 
each type listed below:</TXT><BRK/>
<BRK/>
<TXT>"<MET>152 by 203 mm</MET><ENG> 6 by 8 in</ENG>  Grade Crosstie"</TXT><BRK/>
<TXT>"<MET>178 by 229 mm</MET><ENG> 7 by 9 in</ENG>  Grade Crosstie"</TXT><BRK/>
<BRK/>
<TXT>Switch ties will be paid for at the contract unit price each for the length of switch tie listed below:</TXT><BRK/>
<BRK/>
<TXT>"<MET>2.74 m</MET><ENG> 9 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>3.05 m</MET><ENG> 10 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>3.35 m</MET><ENG> 11 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>3.66 m</MET><ENG> 12 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>3.96 m</MET><ENG> 13 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>4.27 m</MET><ENG> 14 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>4.57 m</MET><ENG> 15 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>4.88 m</MET><ENG> 16 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<TXT>"<MET>5.18 m</MET><ENG> 17 ft 0 in</ENG> Switch Tie"</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.7   Geotextiles</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove this paragraph when Geotextiles are not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Geotextile quantities will be paid for at the unit price as shown on the Unit Price Schedule.  Payment for material 
used in laps, seams, or extra lengths such as anchorage and for associated equipment such as securing pins along 
with the associated materials, equipment, labor, and operations is included in the contract unit price for "geotextile" 
and shall not be paid for separately.  For payment purposes, installed geotextile will be measured in place to 
the nearest<MET> square meter</MET><ENG> square yard</ENG> of placement area.  Only material must be actually used or installed in 
the completed work will be paid for.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.8   Ballast, Out-of-Face Surface and Aligning</TTL><BRK/>
<BRK/>
<TXT>Ballast shall be measured based upon certified scale tickets for railcars or other delivery vehicles.  Payment 
for ballast material will be made at the contract unit price per net<MET> metric ton</MET><ENG> ton</ENG> of each gradation acceptably 
furnished and placed in track for "Furnish and Place Ballast". Copies of waybills and delivery tickets shall 
be submitted during the progress of work.  Before the final statement is allowed, file certified waybills and 
delivery tickets for ballast actually used.  Out-of-Face Surface and Aligning will be measured by the unit<MET> track-meter</MET><ENG>
 track-ft</ENG> for each<MET> track-meter</MET><ENG> track-ft</ENG> of raise of each type or fraction thereof, acceptably performed.  Payment 
will be at the contract unit price per track<MET> meter</MET><ENG> ft</ENG> for each item given below:</TXT><BRK/>
<BRK/>
<TXT>"Out-of-Face Surface and Aligning - skin Lift"</TXT><BRK/>
<TXT>"Out-of-Face Surface and Aligning - <MET>51 mm</MET><ENG> 2 in</ENG> Raise"</TXT><BRK/>
<TXT>"Out-of-Face Surface and Aligning - <MET>102 mm</MET><ENG> 4 in</ENG> Raise"</TXT><BRK/>
<TXT>"Out-of-Face Surface and Aligning - <MET>152 mm</MET><ENG> 6 in</ENG> Raise"</TXT><BRK/>
<TXT>"Out-of-Face Surface and Aligning - <MET>[_____] mm</MET><ENG> [_____] in</ENG> Raise"</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.9   Subballast</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove this paragraph when Subballast is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Subballast shall be measured based upon certified scale tickets.  Payment for subballast material will be made 
at the contract unit price per net<MET> metric ton</MET><ENG> ton</ENG> of each gradation acceptably furnished and placed and compacted 
on the track bed for "Furnish, Place, and Compact Subballast."  Copies of waybills and delivery tickets shall 
be submitted during the progress of work.  Before the final statement is allowed, file certified waybills and 
delivery tickets for subballast actually used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10   Bridge Work</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Remove this paragraph when Bridge Work is not required in the contract.  
This paragraph should be edited to include payment for the items shown if they 
are not paid for separately under the Bidding Schedule.</NPR><BRK/>
<BRK/>
<NPR>Open deck bridge repair would not be track construction.  Repair would require 
bridge tie renewals and wood guard rail renewals as separate items.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The following items relating to bridge repair will be measured separately for payment and are described under 
other sections of these specifications.</TXT><BRK/>
<TBL><MET><THD><BRK/>
                    ITEM DESCRIPTION                    UNIT<BRK/></THD>
<BRK/>
               Timber Pile Repair                      Lin m<BRK/>
               Timber Pile Replacement                 Lin m<BRK/>
               Shotcrete Repair                        Square m <BRK/>
               Bridge Tie Replacement (Open-deck)      Each<BRK/>
               Rivet Replacement                       Each<BRK/>
               Gabion and Gabion Mattress              Cubic m<BRK/></MET>
</TBL><TBL><ENG><THD><BRK/>
                    ITEM DESCRIPTION                    UNIT<BRK/></THD>
<BRK/>
               Timber Pile Repair                      Lin ft<BRK/>
               Timber Pile Replacement                 Lin ft<BRK/>
               Shotcrete Repair                        Square ft<BRK/>
               Bridge Tie Replacement (Open-deck)      Each<BRK/>
               Rivet Replacement                       Each<BRK/>
               Gabion and Gabion Mattress              Cubic yd<BRK/></ENG>
</TBL><BRK/>
<TXT>All other work relating to bridge repairs will not be measured but will be paid for under the contract lump sum 
prices listed below for work at the following locations:  [_____].</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.10.1   Lump Sum Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for each lump sum shall be full compensation for all material, labor, equipment, and incidentals necessary 
to complete the work as shown on the drawings and as specified herein.  Lump sum payment will be exclusive of 
those items specifically covered by the unit prices referenced above.  The lump sum payment items include, but 
are not limited to, permitting, traffic maintenance, demolition, excavation, excavation supports, backfill, clearing, 
grubbing, protection of utilities and signals, timber repairs, temporary supports, jacking bridges, concrete 
construction, ballast retaining walls, pipe, end walls, removal and reinstallation of existing track, surface 
preparation, and painting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10.2   Track over Ballasted-deck Bridges</TTL><BRK/>
<BRK/>
<TXT>Repair of track over ballasted-deck bridges will be measured and paid for at the contract unit price for the 
applicable repair item.  Removal of track over ballasted-deck bridges which are to be repaired is considered 
incidental to the bridge repair.  Reconstruction of track over open deck bridges will be measured per track<MET> m</MET><ENG>
 ft</ENG> and paid for at the contract unit price for TRACK CONSTRUCTION AND OUT-OF-FACE RELAY.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.11   Track Spikes</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the unit keg for each keg of spikes acceptably furnished.  Payment will be at the contract 
unit price per keg under "Furnished Track Spikes".  Payment [will] [will not] be made for installation incidental 
to tie replacement or rail relay.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.12   Track Bolt Assemblies</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List required bolt sizes.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Track bolt assemblies shall include bolt, spring washer (nutlock and nut).  Measurement will be for each bolt 
furnished of the following sizes:  [_____].  Payment will be at the contract unit price per each "Furnished Track 
Bolt Assembly".  Payment [will] [will not] be made for installation incidental to rail joint repair or rail relay.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.13   Tie Plates</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List tie plate sizes required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Measurement will be for each tie plate acceptably furnished of the following size:  [_____].  Payment will be 
at the contract unit price per each under "Furnish Tie Plates".  Payment [will] [will not] be made for installation 
incidental to tie replacement or rail relay.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.14   Rail Anchors</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List rail weight and section for which anchors are required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Measurement will be for each anchor of the following weight [_____] and section [_____] acceptably furnished 
and installed.  Payment will be at the contract unit price for "Furnish and Install Rail Anchors".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.15   Insulated Joints</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List rail weight and section for which insulated joints are required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Insulated joints will be measured for each insulated joint acceptably furnished and installed and will be paid 
for at the contract unit price for "Furnished and Installed Insulated Joints".  Insulated joints will be required 
for the following rail weight [_____] and section [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.16   New Bumpers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List type of bumpers required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>New bumpers of [_____] type will be measured for each bumper acceptably furnished and installed.  Payment for 
furnishing and installing new bumpers will be at the contract unit price per each under "Furnish and Install 
New Bumpers".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.17   New Wheelstops</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List type of wheelstops required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>New wheelstops of [_____] type will be measured by the unit pair for each pair of wheelstops acceptably furnished 
and installed.  Payment for furnishing and installing new wheelstops will be at the contract unit price for each 
pair for "Furnish and Install New Wheelstops".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.18   Salvaged Bumpers and Wheelstops</TTL><BRK/>
<BRK/>
<TXT>Salvage of existing track bumpers and wheelstops will be measured and paid for each bumper or pair of wheel stops 
salvaged.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.19   Install Bumpers</TTL><BRK/>
<BRK/>
<TXT>Installation of salvaged bumpers will be measured for each bumper under "Install Track Bumper".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.20   Install Wheelstops</TTL><BRK/>
<BRK/>
<TXT>Installation of salvaged wheelstops will be measured for each pair of wheelstops acceptably installed and will 
be paid for at the contract unit price for "Install Wheelstops".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.21   Cushion Head for Bumper</TTL><BRK/>
<BRK/>
<TXT>Payment for furnishing and installing cushion head will be at the contract unit price per each new cushion bumper 
head.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.22   Fastenings</TTL><BRK/>
<BRK/>
<TXT>Payment for fastenings used in the installation or reinstallation of bumping post, wheelstops, or cushion head 
for bumpers are considered incidental and included in the installation pay item for each.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.23   Inner Guard Rail</TTL><BRK/>
<BRK/>
<TXT>Inner guard rail will be measured by the linear<MET> m</MET><ENG> ft</ENG> of rail acceptably furnished and installed and will be paid 
for at the contract unit price for furnished and installed "Inner Guard Rail".  Each rail of dual guard rail 
installations will be measured separately.  The other track materials (OTM, i.e., joint bars, bolt assemblies, 
tie plates and spikes) will be included with the guard rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.24   Adjusted gage Rods</TTL><BRK/>
<BRK/>
<TXT>Readjusting existing gage rods, as designated by the Contracting Officer, will be measured for each and be paid 
for at the contract unit price per each under "Adjust gage Rods".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.25   New gage Rods</TTL><BRK/>
<BRK/>
<TXT>New gage rods will be measured for each gage rod acceptably furnished and installed and will be paid for at the 
contract unit price for "Furnish and Install gage Rods".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.26   Salvaged gage Rods</TTL><BRK/>
<BRK/>
<TXT>Removal and salvage of existing gage rods will be measured and paid for at the contract unit price for each under 
"Salvage gage Rod".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.27   Installed Salvaged gage Rods</TTL><BRK/>
<BRK/>
<TXT>Installation of salvaged gage rods will be measured for each gauge rod acceptably installed and will be paid 
for at the contract unit price for each under "Install Salvaged gage Rods".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.28   New Derails</TTL><BRK/>
<BRK/>
<TXT>New derails will be measured and paid for at the contract unit price per each new derail acceptably furnished 
and installed under the bid item "Furnish and Install New Derail".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.29   Installed Derails</TTL><BRK/>
<BRK/>
<TXT>Installation of salvaged derails will be measured for each derail acceptably installed and will be paid for at 
the contract unit price for each under "Install Derail".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.30   Rail Welding</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.30.1   Rail Welding Thermite</TTL><BRK/>
<BRK/>
<TXT>Thermite rail welding to eliminate joints will be measured for payment based upon the number of rails welded 
and accepted by the Contracting Officer.  Payment will be made for costs associated with rail welding of Government 
furnished and Contractor furnished rails.  No payment will be made for  replacement welds found unacceptable 
by ultrasonic testing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.30.2   Rail Welding Electric Arc</TTL><BRK/>
<BRK/>
<TXT>Electric Arc rail welding of [rebuilt rail ends] [engine burns] [_____] will be measured for payment based upon 
the number of rails welded and accepted by the Contracting Officer.  Payment will be made for costs associated 
with rail welding of Government furnished and Contractor furnished rails.  No payment will be made for replacement 
rails or replacement welds found unacceptable by ultrasonic testing.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.31   Rail Joint Gap Adjustment</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the unit for each rail gap acceptably adjusted by replacing rail.  Rail gaps which are 
created by rail adjusting (pulling or bumping) operations will not be measured for payment.  Payment will be 
at the contract unit price per each under "Spot Rail Replacement".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.32   Rail Joint Repair</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the unit for each joint acceptably repaired (disassembly, cleaning, inspection, repairing 
any rail end mismatch, and reassembly with new bolt assemblies).  Joints which are repaired coincident with adjacent 
other repair work, such as spot rail replacement, will not be measured for payment.  Payment will be at the contract 
unit price per each under "Rail Joint Repair".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.33   Respiking</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the unit for each<MET> 90.7 kg</MET><ENG> 200 pound</ENG> keg utilized in track respiking.  Respiking of joints 
located in a rail which is being shifted as part of a regaging operation will not be measured for payment.  Spiking 
of ties installed under this contract will not be measured for payment.  Respiking of ties in areas of "Rail 
Joint Repair" will not be measured for payment.  Payment will be made at the contract unit price per tie under 
"Respiking".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.34   Rail Cropping</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the unit for each rail end acceptably cropped and redrilled.  Payment will be at the contract 
unit price for "Rail Cropping".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.35   Tighten Bolts</TTL><BRK/>
<BRK/>
<TXT>Measurement will be made by the track<MET> km</MET><ENG> mile</ENG> of bolts tightened, or removing and installing bolts that cannot 
be tightened, or replacing bolts that are missing.  Payment will be made at the contract unit price for<MET> km</MET><ENG> mile</ENG>
 or portion thereof under "Tighten Bolts".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.36   Bolt Assembly Replacement</TTL><BRK/>
<BRK/>
<TXT>Measurement will be by the unit for each bolt assembly acceptably replaced.  Payment will be at the contract 
unit price for "Bolt Assembly Replacement".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.37   Track Construction</TTL><BRK/>
<BRK/>
<TXT>Track construction is defined as the initial construction of track or total reconstruction of track from the 
subgrade up.  The pay item "Track Construction" includes all plant, equipment, and labor necessary to install 
rail, ties, and track materials and construct the track in accordance with this specification.  Track materials 
shall be furnished under their respective pay items in the contract Unit Price Schedule.  Track construction 
will be measured and paid for by the track<MET> m</MET><ENG> ft</ENG> for construction acceptably performed at the contract unit price 
for "Track Construction".</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  Reconstruction of track through grade crossings and between points<MET> 6 meters</MET><ENG> 20 ft</ENG> beyond 
the outside limits of the crossing surface as shown will be considered to be track construction.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">b.  Track relocation or realignment of existing track by more than<MET> 1 meter</MET><ENG> 3 ft</ENG> when associated 
with the relocation of turnouts or other work will be measured and paid for as "Track Construction".</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">c.  Minor shifting of existing track associated with the replacement of turnouts, or any shifting 
less than<MET> 1 meter</MET><ENG> 3 ft</ENG> is considered to be minor work incidental to related lining and surfacing 
work.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">d.  Where track construction abuts a turnout, the pay limit for construction of various items 
will be the center of the No. "0" tie in front of the turnout and the last long switch tie at 
the rear of the turnout and shall not include turnout.</ITM><BRK/>
<BRK/>
<ITM INDENT="-0.33">e.  Rail, ties, and other track materials for use in track construction will be included for 
measurement and payment under the respective contract unit prices for furnishing that material.  
Ballast and subballast will be measured and paid for at the contract unit prices for "Furnish 
and Install Ballast" and "Furnish, Place, and Compact Subballast".  Costs for surfacing and 
alignment will be included in the contract unit price for "Track Construction".</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.38   Track Removal and Salvage</TTL><BRK/>
<BRK/>
<TXT>Removal of track will be measured by the<MET> track-meter</MET><ENG> track-ft</ENG>, acceptably removed, and materials salvaged, inspected, 
inventoried, marked, stacked, and transported to designated storage sites.  Track removal and salvage will be 
paid at the contract unit price per track<MET> meter</MET><ENG> ft</ENG> under "Track Removal and Salvage".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.39   Track Removal and Scrap</TTL><BRK/>
<BRK/>
<TXT>Track removal and scrap will be measured by the track<MET> meter</MET><ENG> ft</ENG> of track acceptably removed and all of the scrap 
materials removed from the installation.  Track removal and scrap will be paid for at the contract unit price 
per track<MET> meter</MET><ENG> ft</ENG> of "Track Removed and Scraped".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.40   Turnout Removal and Salvage</TTL><BRK/>
<BRK/>
<TXT>Turnout removal and salvage consist of removing all turnout materials, including switch ties.  Limits of the 
turnout removal and salvage will be from the switch point to the last long switch tie.  Also, included is the 
transportation of the materials to the designated storage site.  The removal and salvage will be measured for 
each turnout removed and turnout material salvaged.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.41   Straight Rail Turnout</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Straight rail turnout is performed when a turnout is removed, but one 
track is to remain in service.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Straight rail turnout consists of installing crossties in place of switch ties and replacing the previously removed 
switch and frog with rail and other track materials.  The straight rail turnout will be measured for each turnout 
removed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.42   Rail Bonds</TTL><BRK/>
<BRK/>
<TXT>Rail bonds will be measured for each bond acceptably furnished and installed and will be paid for at the contract 
unit price for each of the following:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  "Furnish and Install Railhead Bonds"</ITM><BRK/>
<ITM INDENT="-0.33">b.  "Furnish and Install Duplex Web Bonds"</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.43   Rail Grounds</TTL><BRK/>
<BRK/>
<TXT>Rail grounds, including grounding rods, connecting cables, and hardware will be measured by the unit for each 
rail ground assembly acceptably furnished and installed and will be paid for at the contract unit price for each 
"Ground Assembly" furnished and installed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.44   Removal of Existing Crossing Surfaces</TTL><BRK/>
<BRK/>
<TXT>Removal and disposal of existing crossing surfaces and adjacent pavements will be measured by the square<MET> meter</MET><ENG>
 yard</ENG> of surface or pavement acceptably removed and will be paid for at the contract unit price for "Pavement 
Removal".  Removal of aggregate crossings will not be measured for payment as this work is considered incidental 
to "Track Construction".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.45   Salvage of Grade Crossing Panel</TTL><BRK/>
<BRK/>
<TXT>Salvage of existing grade crossing panels and other materials will be measured by the track<MET> meter</MET><ENG> ft</ENG> of crossing 
surface acceptably salvaged and will be paid for at the contract unit price per track<MET> m</MET><ENG> ft</ENG> under "Grade Crossing 
Panel Salvage".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.46   Track Removal and Track Construction Through Crossings</TTL><BRK/>
<BRK/>
<TXT>Track removal through crossings will be measured by the track<MET> meter</MET><ENG> ft</ENG> and paid for as "Track Removal".  Track 
construction using existing rail through crossings will be measured and paid for at the contract unit prices 
as specified in the appropriate sections of this specification.  Track construction furnishing rail and other 
track material will be measured and paid for at the unit prices as specified in the appropriate sections of this 
specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.47   Grade Crossing Surface Installation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Throughout this section, delete crossing types not applicable to the 
work by coordinating with the project standard drawings and cross sections.  
Designer should add a separate bid item for signs if required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Grade crossing surface installation will be measured by the track<MET> meter</MET><ENG> ft</ENG> of crossing surface acceptably installed 
and paid for at the contract unit prices for the items listed below:</TXT><BRK/>
<TBL><THD><BRK/>
       TYPE                  DESCRIPTION<BRK/></THD>
<BRK/>
        1        GRAVEL:  (SEMI-PERMANENT)<BRK/>
        1A       GRAVEL:  WITH TIMBER HEADERS<BRK/>
        2        TIMBER:  FULL DEPTH<BRK/>
        2A       TIMBER:  FULL DEPTH, PREFABRICATED TIMBER SECTIONAL<BRK/>
        3        ASPHALT:  FULL-DEPTH WITH TIMBER HEADERS<BRK/>
        4        CONCRETE:  CAST-IN-PLACE<BRK/>
        4A       CONCRETE:  PRECAST CROSSING PANELS/SYSTEMS<BRK/>
        5        RUBBER (ELASTOMERIC)<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>1.1.48   Subdrains</TTL><BRK/>
<BRK/>
<TXT>Subdrains acceptably installed will be measured and paid for by the linear<MET> meter</MET><ENG> ft</ENG> at the contract unit price 
for "Grade Crossing Subdrains".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.49   Conduit</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if grade crossing conduit is not required for automatic 
crossing protection warning devices.  Installation should be considered if future 
crossing signal installation is anticipated.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>PVC cable conduit of<MET> 100 mm</MET><ENG> 4 in</ENG> diameter acceptably installed will be measured and paid for by the linear<MET> m</MET><ENG> 
ft</ENG> at the contract unit price for "Grade Crossing Conduit".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.50   Cleaning Flangeways</TTL><BRK/>
<BRK/>
<TXT>Cleaning the gage side flangeways in grade crossings shall be considered incidental work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.51   Ultrasonic Testing of Rail</TTL><BRK/>
<BRK/>
<TXT>Ultrasonic testing will be measured by the track<MET> meter</MET><ENG> ft</ENG> and will be paid for as "Ultrasonic Testing".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.52   Electric Arc Welding</TTL><BRK/>
<BRK/>
<TXT>Electric arc welding will be measured and paid for by the item, rebuilt in the track or in the shop and installed 
in the track.  Items to be included are as follows:</TXT><BRK/>
<BRK/>
<ITM INDENT="-0.33">a.  "Switch point", each.</ITM><BRK/>
<ITM INDENT="-0.33">b.  "Frog", each.</ITM><BRK/>
<ITM INDENT="-0.33">c.  "Batter rail end", each.</ITM><BRK/>
<ITM INDENT="-0.33">d.  "Guard rail", each.</ITM><BRK/>
<ITM INDENT="-0.33">e.  "Engine burn", each.</ITM><BRK/>
<ITM INDENT="-0.33">f.  "Railroad crossing", each.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)</ORG><BRK/><BRK/><RID>AASHTO HB-17</RID><RTL>(2002; Errata 2003; Errata 2005) Standard Specifications for Highway Bridges</RTL><BRK/><BRK/><RID>AASHTO M 288</RID><RTL>(2006) Standard Specification for Geotextile Specification for Highway Applications</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN RAILWAY ENGINEERING AND MAINTENANCE-OF-WAY ASSOCIATION (AREMA)</ORG><BRK/><BRK/><RID>AREMA Eng Man</RID><RTL>(2008) Manual for Railway Engineering</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)</ORG><BRK/><BRK/><RID>ASNT CP-189</RID><RTL>(2006) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN WELDING SOCIETY (AWS)</ORG><BRK/><BRK/><RID>AWS D1.1/D1.1M</RID><RTL>(2008) Structural Welding Code - Steel</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)</ORG><BRK/><BRK/><RID>AWPA C2</RID><RTL>(2003) Lumber, Timber, Bridge Ties and Mine Ties - Preservative Treatment by Pressure Processes</RTL><BRK/><BRK/><RID>AWPA C3</RID><RTL>(2003) Piles - Preservative Treatment by Pressure Processes</RTL><BRK/><BRK/><RID>AWPA C6</RID><RTL>(1999) Crossties and Switch Ties - Preservative Treatment by Pressure Processes</RTL><BRK/><BRK/><RID>AWPA M2</RID><RTL>(2001) Standard for Inspection of Treated Wood Products</RTL><BRK/><BRK/><RID>AWPA M6</RID><RTL>(1996) Brands Used on Forest Products</RTL><BRK/><BRK/><RID>AWPA P2</RID><RTL>(2001) Standard for Creosote Solutions</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM A 242/A 242M</RID><RTL>(2004e1) Standard Specification for High-Strength Low-Alloy Structural Steel</RTL><BRK/><BRK/><RID>ASTM A 325</RID><RTL>(2007a) Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength</RTL><BRK/><BRK/><RID>ASTM A 325M</RID><RTL>(2008) Standard Specification for Structural Bolts, Steel, Heat Treated, 830 Mpa Minimum Tensile Strength (Metric)</RTL><BRK/><BRK/><RID>ASTM A 490</RID><RTL>(2008a) Standard Specification for Structural Bolts, Alloy Steel, Heat Treated, 150 ksi Minimum Tensile Strength</RTL><BRK/><BRK/><RID>ASTM A 490M</RID><RTL>(2004ae1) Standard Specification for High-Strength Steel Bolts, Classes 10.9 and 10.9.3, for Structural Steel Joints (Metric)</RTL><BRK/><BRK/><RID>ASTM A 992/A 992M</RID><RTL>(2006a) Standard Specification for Structural Steel Shapes</RTL><BRK/><BRK/><RID>ASTM C 117</RID><RTL>(2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing</RTL><BRK/><BRK/><RID>ASTM C 127</RID><RTL>(2007) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate</RTL><BRK/><BRK/><RID>ASTM C 131</RID><RTL>(2006)Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine</RTL><BRK/><BRK/><RID>ASTM C 136</RID><RTL>(2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates</RTL><BRK/><BRK/><RID>ASTM C 142</RID><RTL>(1997; R 2004) Standard Test Method for Clay Lumps and Friable Particles in Aggregates</RTL><BRK/><BRK/><RID>ASTM C 535</RID><RTL>(2003e1) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine</RTL><BRK/><BRK/><RID>ASTM C 702</RID><RTL>(1998; R 2003) Reducing Samples of Aggregate to Testing Size</RTL><BRK/><BRK/><RID>ASTM C 88</RID><RTL>(2005) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate</RTL><BRK/><BRK/><RID>ASTM D 1241</RID><RTL>(2007) Materials for Soil-Aggregate Subbase, Base, and Surface Courses</RTL><BRK/><BRK/><RID>ASTM D 1310</RID><RTL>(2001; R 2007) Flash Point and Fire Point of Liquids by Tag Open-Cup Apparatus</RTL><BRK/><BRK/><RID>ASTM D 1556</RID><RTL>(2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method</RTL><BRK/><BRK/><RID>ASTM D 1557</RID><RTL>(2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)</RTL><BRK/><BRK/><RID>ASTM D 217</RID><RTL>(2002; R 2008) Cone Penetration of Lubricating Grease</RTL><BRK/><BRK/><RID>ASTM D 2171</RID><RTL>(2007) Viscosity of Asphalts by Vacuum Capillary Viscometer</RTL><BRK/><BRK/><RID>ASTM D 3740</RID><RTL>(2008) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction</RTL><BRK/><BRK/><RID>ASTM D 3776</RID><RTL>(2007) Mass Per Unit Area (Weight) of Fabric</RTL><BRK/><BRK/><RID>ASTM D 402</RID><RTL>(2008) Distillation of Cut-Back Asphaltic (Bituminous) Products</RTL><BRK/><BRK/><RID>ASTM D 4354</RID><RTL>(1999; R 2004) Sampling of Geosynthetics for Testing</RTL><BRK/><BRK/><RID>ASTM D 4355</RID><RTL>(2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus</RTL><BRK/><BRK/><RID>ASTM D 445</RID><RTL>(2006) Standard Test Method for Kinematic Viscosity of Transparent and Opaque Liquids (and the Calculation of Dynamic Viscosity)</RTL><BRK/><BRK/><RID>ASTM D 4491</RID><RTL>(1999a; R 2004e1) Water Permeability of Geotextiles by Permittivity</RTL><BRK/><BRK/><RID>ASTM D 4595</RID><RTL>(2005) Tensile Properties of Geotextiles by the Wide-Width Strip Method</RTL><BRK/><BRK/><RID>ASTM D 4751</RID><RTL>(2004) Determining Apparent Opening Size of a Geotextile</RTL><BRK/><BRK/><RID>ASTM D 4759</RID><RTL>(2002; R 2007) Determining the Specification Conformance of Geosynthetics</RTL><BRK/><BRK/><RID>ASTM D 4791</RID><RTL>(2005e1) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate</RTL><BRK/><BRK/><RID>ASTM D 566</RID><RTL>(2002) Dropping Point of Lubricating Grease</RTL><BRK/><BRK/><RID>ASTM D 6938</RID><RTL>(2007a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)</RTL><BRK/><BRK/><RID>ASTM D 75</RID><RTL>(2003) Standard Practice for Sampling Aggregates</RTL><BRK/><BRK/><RID>ASTM E 11</RID><RTL>(2004) Wire Cloth and Sieves for Testing Purposes</RTL><BRK/><BRK/><RID>ASTM F 405</RID><RTL>(2005) Corrugated Polyethylene (PE) Tubing and Fittings</RTL><BRK/><BRK/></REF><REF><ORG>U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)</ORG><BRK/><BRK/><RID>MUTCD</RID><RTL>(2000) Manual of Uniform Traffic Control Devices</RTL><BRK/><BRK/></REF><REF><ORG>UNDERWRITERS LABORATORIES (UL)</ORG><BRK/><BRK/><RID>UL 651</RID><RTL>(2005; Rev thru May 2007) Standard for Schedule 40 and 80 Rigid PVC Conduit and Fittings</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Bridge Repair</SUB>; <SUB>G, [_____]</SUB></ITM><BRK/>
<BRK/>
<ITM>  Shop drawings necessary for the construction and erection of the railroad bridge work.  Provide 
shop drawings made from measurements taken at the site wherever possible or from established 
measurements, when actual measurements are not available.  The Contractor is responsible for 
the accuracy of the established measurements, the information furnished to the subContractors 
for the preparation of their Shop Drawings, and the checking of all Shop Drawings.  Drawings 
shall bear the stamp of a Professional Engineer.</ITM><BRK/>
<BRK/>
<ITM><SUB>As-Built Drawings</SUB>; <SUB>G, [_____]</SUB></ITM><BRK/>
<BRK/>
<ITM>  One set of reproducible originals of the final as-built drawings for each automatic crossing 
protection installation prior to final acceptance by the Contracting Officer.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Wood Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Name of the tie manufacturer, Rail Tie Association membership, the wood species proposed, 
the quantities of ties for each specie proposed, and product data for the ties to be furnished, 
including the type of seasoning to be utilized, prior to ordering the ties.</ITM><BRK/>
<BRK/>
<ITM><SUB>Engineered Polymer Composite Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Name of the tie manufacturer, dimensions, and  the pre-drill size as recommended by the tie 
manufacturer for the type and size fastening system being used.</ITM><BRK/>
<BRK/>
<ITM><SUB>Steel Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Name of the tie manufacturer, dimensions, type of fixation and  the chemical analysis of the 
steel.</ITM><BRK/>
<BRK/>
<ITM><SUB>Concrete Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Name of the tie manufacturer, dimensions, type of fixation and the chemical analysis of the 
concrete mix.</ITM><BRK/>
<BRK/>
<ITM><SUB>New Jointed Rail</SUB>; <SUB>G, [_____]</SUB><BRK/>
<SUB>Relay Rail</SUB>; <SUB>G, [_____]</SUB><BRK/>
<SUB>Joint Bars</SUB><BRK/>
<SUB>Compromise Joint Bars</SUB></ITM>.<BRK/>
<BRK/>
<ITM>  Manufacturer's data on new rail including:  rail weight, rail section, drilling, rail length, 
date rolled, and the name of the mill where the rail was rolled. Include chemical analysis for 
Industrial Grade Rail. For relay rail the required information shall include weight, section, 
lengths, and the name of the supplier.  Provide the maximum allowable vertical wear on the rail 
head and the maximum allowable horizontal wear on the side of the rail.  The design of the joint 
bars and compromise joint bars proposed to be furnished with each rail section shall also be 
provided.</ITM><BRK/>
<BRK/>
<ITM><SUB>Miscellaneous Track Materials</SUB></ITM><BRK/>
<BRK/>
<ITM>  Manufacturer's data for all track materials to be furnished.</ITM><BRK/>
<BRK/>
<ITM><SUB>Crossing Material or Surface</SUB></ITM><BRK/>
<BRK/>
<ITM>  Within 30 days of the Notice to Proceed, the brand name of the premanufactured crossing material 
or crossing surface material proposed for use along with manufacturer's literature concerning 
the product; and for built-in-place crossings, the type of materials to be used along with manufacturer's 
literature.</ITM><BRK/>
<BRK/>
<ITM>  Detailed installation procedure for the premanufactured crossing material or crossing surface 
material proposed for use within 30 days of the notice to proceed.</ITM><BRK/>
<BRK/>
<ITM><SUB>Acceptable Replacement Materials</SUB>; <SUB>G, [_____]</SUB></ITM><BRK/>
<BRK/>
<ITM>  Performance data for components or products proposed as an equivalent to those specified.  
The Contracting Officer's written approval is required for any such equivalent type component 
or product proposed to be used.</ITM><BRK/>
<BRK/>
<ITM><SUB>Traffic Maintenance and Detour Plans</SUB>; <SUB>G, [_____]</SUB></ITM><BRK/>
<BRK/>
<ITM>  Traffic maintenance and detour plans for approval.</ITM><BRK/>
<BRK/>
<ITM><SUB>Thermite Welding Procedures</SUB>; <SUB>G, [_____]</SUB></ITM><BRK/>
<BRK/>
<ITM>  A detailed statement covering the step-by-step procedures to be employed in making the welds, 
including a complete description of each of the following items, as applicable, and any other 
essential characteristics included in the welding procedures:</ITM><BRK/>
<BRK/>
<ITM>  a.  The manufacturer's trade name for the welding process.</ITM><BRK/>
<BRK/>
<ITM>  b.  The method used for cutting and cleaning the rail ends.  Flame cutting of rail ends will 
not be allowed.</ITM><BRK/>
<BRK/>
<ITM>  c.  The minimum and maximum spacing between rail ends.</ITM><BRK/>
<BRK/>
<ITM>  d.  The method used for maintaining the rails in alignment during welding.</ITM><BRK/>
<BRK/>
<ITM>  e.  The method used for preheating, including time and temperature.</ITM><BRK/>
<BRK/>
<ITM>  f.  The tapping procedure, including the minimum time required to cool the weld under the 
mold insulation.</ITM><BRK/>
<BRK/>
<ITM>  g.  The method used, including a description of special tools and equipment, for removing 
the upset metal and finishing the weld to the final contour.</ITM><BRK/>
<BRK/>
<ITM>  h.  Quality control procedures to be followed.</ITM><BRK/>
<BRK/>
<ITM>  i.  The contractual agreements with any subcontractor employed by the Contractor in doing 
the work.</ITM><BRK/>
<BRK/>
<ITM><SUB>Electric Arc Welding</SUB></ITM><BRK/>
<BRK/>
<ITM>  A detailed specification covering the step-by-step procedures to be employed in making the 
electric arc welds.  A complete description of each of the following items as applicable and 
any other essential characteristics shall be included in the procedure specifications.</ITM><BRK/>
<BRK/>
<ITM>  a.  Type, size, and capacity of electric welding machine (250 amp minimum), grinder and other 
equipment.  Also, type and size of material (welding rod or wire).</ITM><BRK/>
<BRK/>
<ITM>  b.  The method to be used to remove defective and excess metal prior to welding (arcair or 
grinding).</ITM><BRK/>
<BRK/>
<ITM>  c.  The method to be used to prevent warping.</ITM><BRK/>
<BRK/>
<ITM>  d.  The method used for preheating, including time and temperature.</ITM><BRK/>
<BRK/>
<ITM>  e.  The method of applying metal buildup and slag removal.</ITM><BRK/>
<BRK/>
<ITM>  f.  The method of securing original contour of items welded.</ITM><BRK/>
<BRK/>
<ITM>  g.  Quality control procedures to be followed.</ITM><BRK/>
<BRK/>
<ITM>  h.  Welding materials (rod or wire), name and manufacturer of materials (low carbon steel) 
for welding rail, rail frogs, guard rails, switch point protectors, and switch points without 
manganese inserts and materials (manganese alloy) for welding manganese frogs, RBM frogs, manganese 
switch point inserts and manganese railroad crossing inserts or castings.</ITM><BRK/>
<BRK/>
<ITM><SUB>Materials and Samples</SUB></ITM><BRK/>
<BRK/>
<ITM>  A complete schedule of the materials proposed for installation within 60 days of receipt of 
notice to proceed, and before installation of the materials; the schedule shall include a list 
of equipment proposed for the work.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-04 Samples</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Geotextile</SUB></ITM><BRK/>
<BRK/>
<ITM>  Geotextile samples for testing.  Submit samples a minimum of [30] [60] [90] [_____] days prior 
to the beginning of installation of the geotextiles.  One sample shall be provided for each 
20 units (rolls, panels, etc.) of geotextile to be used in the contract.  All samples shall 
be from the same production lot as will be supplied for the contract.  Samples shall be identified 
by the manufacturer's name, brand name, lot designation, and project name.  The minimum size 
of sample submitted for testing shall be the full width of the geotextile by<MET> [1.7] [9] [_____] 
m</MET><ENG> [5] [30] [______] ft</ENG>.</ITM><BRK/>
<BRK/>
<ITM><SUB>Ballast</SUB></ITM><BRK/>
<ITM><SUB>Subballast</SUB></ITM><BRK/>
<BRK/>
<ITM>  Samples of the ballast [and subballast] material for testing.  Submit samples a minimum of 
[30] [60] [90] [_____] days prior to the installation of the material.  Samples shall be obtained 
from the quarry, supplier, or other source that will be used to provide the ballast [and subballast] 
materials for this project using the methods described in <RID>ASTM D 75</RID>.  [One representative sample 
of not less than<MET> 90.6 kg</MET><ENG> 200 lbs</ENG> of ballast material shall be submitted for each<MET> 9070 MT</MET><ENG> 10,000 
ton</ENG> of ballast to be installed.] [One representative sample of not less than<MET> 90.6 kg</MET><ENG> 200 lbs</ENG>
 of subballast material shall be submitted for each<MET> 9070 MT</MET><ENG> 10,000 ton</ENG> of subballast to be installed.]</ITM><BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Sampling and Testing</SUB></ITM><BRK/>
<BRK/>
<ITM>  One certified copy of Test Reports for each test performed on the ballast [and subballast] 
within 2 working days of the test completion.</ITM><BRK/>
<BRK/>
<ITM><SUB>Wood Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certified [test] [and] [inspection] reports for crossties and switch ties subsequent to treatment, 
a minimum of seven calendar days prior to any ties being installed in track.  [Test] [and] [inspection] 
reports shall contain the information required by Part 7 of <RID>AWPA M2</RID>.</ITM><BRK/>
<BRK/>
<ITM><SUB>Engineered Polymer Composite Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certified test reports for crossties and switch ties, a minimum of seven calendar days prior 
to any ties being installed in track.  Test reports shall document compliance of the ties to 
the performance criteria in Chapter 30, Part 5 of <RID>AREMA Eng Man</RID>.</ITM><BRK/>
<BRK/>
<ITM><SUB>Concrete Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certified test reports for ties and fastening system, a minimum of seven calendar days prior 
to any ties being installed in track.  Test reports shall document the testing required by Chapter 
30 of <RID>AREMA Eng Man</RID>.</ITM><BRK/>
<BRK/>
<ITM><SUB>Geotextiles</SUB></ITM><BRK/>
<BRK/>
<ITM>  Independent testing laboratory's certified test reports for geotextiles, including necessary 
analysis and interpretation.  These reports shall provide results of the laboratory testing 
performed on samples of the geotextile material delivered to the jobsite.  Test reports shall 
be submitted at least [5] [_____] working days prior to the installation of the geotextile.</ITM><BRK/>
<BRK/>
<ITM><SUB>Ultrasonic Test</SUB></ITM><BRK/>
<BRK/>
<ITM>  Results of the ultrasonic rail testing.  Results shall list defects and rail stationing.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Wood Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certificates of compliance prior to any ties being installed in track.</ITM><BRK/>
<BRK/>
<ITM><SUB>Engineered Polymer Composite Ties</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certificates of compliance prior to any ties being installed in track.</ITM><BRK/>
<BRK/>
<ITM><SUB>Ballast</SUB><BRK/>
<SUB>Subballast</SUB></ITM><BRK/>
<BRK/>
<ITM>  Certificates of Compliance for the ballast [and] [subballast] materials to be installed in 
this project.</ITM><BRK/>
<BRK/>
<ITM><SUB>Materials and Samples</SUB></ITM><BRK/>
<BRK/>
<ITM>  Manufacturer's certificates of conformance for the following materials:</ITM><BRK/>
<BRK/>
<ITM>  a.  Rail.</ITM><BRK/>
<ITM>  b.  Tie plates.</ITM><BRK/>
<ITM>  c.  Track bolts, nuts, and spring washers.</ITM><BRK/>
<ITM>  d.  Joint bars.</ITM><BRK/>
<ITM>  e.  Rail anchors.</ITM><BRK/>
<ITM>  f.  Track spikes.</ITM><BRK/>
<ITM>  g.  Turnouts.</ITM><BRK/>
<ITM>  h.  Rail welding process.</ITM><BRK/>
<ITM>  i.  Premanufactured car bumpers.</ITM><BRK/>
<ITM>  j.  Premanufactured road crossings and/or crossing surfaces.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Rail</SUB></ITM><BRK/>
<ITM><SUB>Turnouts and Track Crossings</SUB></ITM><BRK/>
<ITM><SUB>Switches</SUB></ITM><BRK/>
<ITM><SUB>Grade Crossings</SUB></ITM><BRK/>
<BRK/>
<ITM>  Submit Data package 1 in accordance with Section <SRF>01 78 23</SRF> OPERATION AND MAINTENANCE DATA.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Track Construction</TTL><BRK/>
<BRK/>
<TXT>Perform track construction under the direction of qualified and competent supervisory personnel experienced in 
railroad construction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   Welding</TTL><BRK/>
<BRK/>
<TXT>Perform welding under the direct supervision of an experienced welding supervisor or foreman.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.5   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   <SUB>Materials and Samples</SUB></TTL><BRK/>
<BRK/>
<TXT>The Contracting Officer will notify the Contractor of the materials approved or disapproved.  Disapproved materials 
that have already been delivered to the project site, shall be promptly segregated from the approved materials 
and removed from the premises.  If materials are disapproved, <SUB>acceptable replacement materials</SUB> shall be provided 
at no additional cost to the Government.  Initial approval by the Contracting Officer will not prevent the removal 
and replacement of materials that are materially defective or materials not meeting this specification that are 
discovered during construction and/or routine quality control/quality assurance operations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   <SUB>Geotextiles</SUB></TTL><BRK/>
<BRK/>
<TXT>Ship and store geotextiles in their original ultraviolet resistant cover until the day of installation.  Protect 
geotextiles from vandalism, temperatures greater than<MET> 60 degrees C</MET><ENG> 140 degrees F</ENG>, dirt, dust, mud, debris, moisture, 
sunlight, and ultraviolet rays.  Geotextiles delivered to the project site shall be clearly labeled on the material 
cover to show the manufacturer's name, brand name, fabric type, location and date manufactured, lot identification, 
width, and length.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   PROJECT/SITE CONDITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.6.1   Temporary Work</TTL><BRK/>
<BRK/>
<TXT>Provide, during construction, suitable roads and crossings with all necessary lights, signs, drainage, and other 
appurtenances required for safe public and local travel.  Erect and maintain suitable temporary fences where 
required to prevent trespass upon work or damage to adjoining property.  Drainage shall be maintained, and the 
accumulation of water that might affect the stability of the roadbed will not be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.2   Traffic Control</TTL><BRK/>
<BRK/>
<TXT>Traffic control devices shall comply with <RID>MUTCD</RID>.  Suitable warning signs shall be placed near the beginning of 
the work site and well ahead of the work site for alerting approaching traffic from both directions.  Small markers 
shall be placed along newly painted lines or freshly placed raised markers to control traffic and prevent damage 
to newly painted surfaces or displacement of raised pavement markers.  Painting equipment shall be marked with 
large warning signs indicating slow-moving painting equipment in operation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.3   Welding</TTL><BRK/>
<BRK/>
<TXT>Welding shall not be performed in rain, snow, or other inclement weather without adequately protecting the weld 
from the elements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.4   License Agreement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Designer should assess the need to include this paragraph and its 
subparagraphs in the project specifications.  Delete if not applicable.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The work under this contract is being accomplished under a license agreement between the [_____] RAIL CORPORATION 
(hereinafter referred to as the Railroad Company) and the UNITED STATES OF AMERICA executed on [_____].</TXT><BRK/>
<BRK/>
<SPT><TTL>1.6.4.1   Provisions and Requirements</TTL><BRK/>
<BRK/>
<TXT>The following provisions and requirements are made a part of this contract in order for the UNITED STATES OF 
AMERICA to perform its obligations under the License agreement:</TXT><BRK/>
<BRK/>
<LST>a.  Perform the work in conformance with the standards of care and practice appropriate to the nature 
of the work.</LST><BRK/>
<BRK/>
<LST>b.  Allow the Railroad Company to view and inspect the work at any time.</LST><BRK/>
<BRK/>
<LST>c.  The Contractor shall not enter the Railroad Company's premises until specifically authorized by the 
Contracting Officer.  Notify the Contracting Officer at least 7 days prior to the planned date for entering 
the premises of the Railroad Company.</LST><BRK/>
<BRK/>
<LST>d.  Take any safety precautions that the Railroad Company deems necessary.  No equipment, unless being 
utilized to perform work on the railroad track, shall be located within<MET> 3.5 m</MET><ENG> 12 ft</ENG> of the centerline 
of the nearest railroad track.  Such equipment allowed within<MET> 3.5 m</MET><ENG> 12 ft</ENG> of the centerline of the nearest 
railroad track shall be attended at all times.</LST><BRK/>
<BRK/>
<LST>e.  Furnish evidence of Workmen's Compensation coverage for both itself and for all subContractors.</LST><BRK/>
<BRK/>
<LST>f.  Maintain at all times during any construction, maintenance, or removal work, the following insurance 
coverages:</LST><BRK/>
<BRK/>
<ITM>(1) Contractor's Public Liability and Property Damage Liability Insurance, including automobile 
coverage, with a combined single limit of $2,000,000 per occurrence;</ITM><BRK/>
<BRK/>
<ITM>(2) For each subcontractor, Contractor's Protective Public Liability and Property Damage Liability 
Insurance, including automobile coverage, with a combined single limit of $2,000,000 per occurrence;</ITM><BRK/>
<BRK/>
<ITM>(3) Railroad Protective Public Liability and Property Damage Liability Insurance with a combined 
single limit of $2,000,000 per occurrence.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.6.4.2   Insurance Policy Requirements</TTL><BRK/>
<BRK/>
<TXT>The Railroad Protective Liability policy shall name the [_____] Rail Corporation, [_____] Corporation, and [_____] 
as the named insureds and shall include an endorsement in the form appearing in the Standard Provisions of the 
contract documents.  Furnish to the Railroad Company, the Railroad Protective Liability policy and the certificates 
evidencing the other insurance coverage required in this section.  Each policy and/or certificate shall provide 
that cancellation of the insurance cannot be accomplished unless at least ten (10) days notice is given to the 
Railroad Company.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   <SUB>BALLAST</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  No. 5 ballast should only be used around turnouts and other areas requiring 
a smooth walking surface.  Depth of ballast will be indicated on the drawings.</NPR><BRK/>
<BRK/>
<NPR>A wide choice of materials may be used for ballast, depending on economics and 
availability.  Prepared ballast is preferred since production can be controlled.  
The use of unprepared ballast for heavy-duty track will increase maintenance 
requirements.  The inapplicable types of ballast will be deleted, and brackets 
will be removed.  The size number will be indicated in this paragraph.  Normally, 
prepared ballast will be used conforming to sizes of gradations established 
by AREMA Manual.  Ballast, crushed stone and slag numbers 4, 4A, or 5 are acceptable.  
Size numbers 4 and 4A are typically mainline ballast materials.  Size number 
5 is typically used on yard and house tracks.  Any or all of these sizes can 
be specified, with a Contractor's option.  The depth and other details of the 
ballast section will be shown on the contract drawings.<BRK/>
<BRK/>
Blast furnace slag should be considered a last choice or limited to areas with 
low rainfall and moisture and obtained from a source that is known to have provided 
good performing ballast in recent years.  Most slag ballast tend to cement together 
over time or otherwise disintegrate more rapidly than better quality crushed 
rock.  Water seems to accelerate this process.  (This behavior is much like 
some poorer quality limestones.)  Thus, unless its performance is already well 
known, using slag for ballast is much riskier than using crushed rock.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Prepared ballast shall be crushed stone, [crushed air-cooled blast-furnace slag,][ or ][crushed steel furnace 
slag] Size No. [4,][ 4A,][ or ][5] conforming to Chapter 1, Part 2, of <RID>AREMA Eng Man</RID> for quality, soundness and 
gradation.  In the portion retained on each sieve specified, the crushed gravel shall contain at least 90 percent 
by weight of crushed pieces having two or more freshly fractured faces with the area of each face being at least 
equal to 75 percent of the smallest midsectional area of the plane.  When two fractures are contiguous, the angle 
between planes of the fractures shall be at least 30 degrees in order to count as two fractured faces.  Flat 
and elongated particle dimension ratio used in <RID>ASTM D 4791</RID> shall be 1:3.  Ballast materials shall meet the property 
requirements shown in TABLE I.</TXT><BRK/>
<MET><TBL><THD><BRK/>
<HL4>TABLE I.  MINIMUM PROPERTY REQUIREMENTS - BALLAST</HL4><BRK/>
<BRK/>
      Property         Maximum Value  Minimum Value  Test Method<BRK/>
     ___________      _____________  _____________  ____________<BRK/></THD>
<BRK/>
   Percent passing        1.0 percent      --      <RID>ASTM C 136</RID><BRK/>
     0.075 sieve                                   <RID>ASTM C 117</RID><BRK/>
     (No. 200 Sieve)<BRK/>
<BRK/>
   Bulk specific gravity<BRK/>
     Rock                      --         2.60     <RID>ASTM C 127</RID><BRK/>
     Blast furnace slag        --         2.30<BRK/>
<BRK/>
   Absorption<BRK/>
     Rock                 2.0 percent      --      <RID>ASTM C 127</RID><BRK/>
     Blast furnace slag   5.0 percent      --<BRK/>
<BRK/>
   Clay lumps and         0.5 percent      --      <RID>ASTM C 142</RID><BRK/>
     friable particles<BRK/>
<BRK/>
   Degradation           35 percent        --      <RID>ASTM C 535</RID><BRK/>
     Soundness<BRK/>
<BRK/>
   Sodium sulfate        10 percent        --      <RID>ASTM C 88</RID><BRK/>
     - 5 cycles<BRK/>
<BRK/>
   Flat or elongated      5 percent        --      <RID>ASTM D 4791</RID><BRK/>
     particles<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>TABLE I.  MINIMUM PROPERTY REQUIREMENTS - BALLAST</HL4><BRK/>
<BRK/>
      Property          Maximum Value  Minimum Value  Test Method<BRK/>
     ___________        _____________  _____________  ____________<BRK/></THD>
<BRK/>
   Percent passing        1.0 percent      --        <RID>ASTM C 136</RID><BRK/>
     No. 200 Sieve                                   <RID>ASTM C 117</RID><BRK/>
<BRK/>
   Bulk specific gravity<BRK/>
     Rock                      --         2.60       <RID>ASTM C 127</RID><BRK/>
     Blast furnace slag        --         2.30<BRK/>
<BRK/>
   Absorption<BRK/>
     Rock                 2.0 percent      --        <RID>ASTM C 127</RID><BRK/>
     Blast furnace slag   5.0 percent      --<BRK/>
<BRK/>
   Clay lumps and         0.5 percent      --        <RID>ASTM C 142</RID><BRK/>
     friable particles<BRK/>
<BRK/>
   Degradation           35 percent        --        <RID>ASTM C 535</RID><BRK/>
     Soundness<BRK/>
<BRK/>
   Sodium sulfate        10 percent        --        <RID>ASTM C 88</RID><BRK/>
     - 5 cycles<BRK/>
<BRK/>
   Flat or elongated      5 percent        --        <RID>ASTM D 4791</RID><BRK/>
     particles</TBL></ENG><BRK/>
<BRK/></SPT>
<SPT><TTL>2.2   <SUB>SUBBALLAST</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Subballast should be used in frost areas where the ballast thickness 
requirement exceeds 254 mm (10 inches).  Where subballast in necessary, indicate 
the kind of subballast to be used; the depth and other details of subballast 
section will be shown on the contract drawings.  In some cases, the subballast 
material may be substituted for the lower portion of the ballast layer.  The 
subballast is often constructed as a filter layer between the ballast and subgrade.  
Gradation of subballast generally ranges from the largest subgrade particles 
to the smaller or middle ballast particle sizes.  Where practical, subballast 
should be placed in layers and thoroughly compacted to form a stable foundation 
for the ballast.  AREMA Manual has a procedure for selecting gradation based 
on gradation of ballast and subgrade.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Subballast shall consist of aggregate-soil materials conforming to an <RID>ASTM D 1241</RID> Type I, Gradation [A] [B] [C] 
[D] mixture.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   <SUB>GEOTEXTILE</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Requirements for geotextile will be deleted unless a thorough investigation 
indicates that geotextile is necessary.  Where geotextile is necessary, subballast 
is recommended and the following information should be shown on the drawings:</NPR><BRK/>
<BRK/>
<NPR>a.  Locations for geotextile installation.</NPR><BRK/>
<BRK/>
<NPR>b.  Locations for drainage work, including subdrains to provide drainage for 
the geotextile.</NPR><BRK/>
<BRK/>
<NPR>c.  Typical cross-section through track showing rail, tie, ballast, subballast, 
geotextile, and subgrade with dimensions.</NPR><BRK/>
<BRK/>
<NPR>d.  Locations for disposal of spoil materials.</NPR><BRK/>
<BRK/>
<NPR>Numerical values listed in TABLE II, except AOS, represent Minimum Average Roll 
Values (MARV) and are the value in the weaker principal direction as defined 
in AASHTO M 288.</NPR><BRK/>
<BRK/>
<NPR>Color should be grey or tinted to prevent "snow blindness" of personnel during 
installation.</NPR><BRK/>
<BRK/>
<NPR>The permeability of the geotextile should be at least five times greater than 
the permeability of the subgrade soil, but not less than the specified value.  
The pressure used to measure the nominal thickness (necessary to calculate the 
permeability) in ASTM D 1777 should be based on the pressure expected to be 
placed on the geotextile in the installation.</NPR><BRK/>
<BRK/>
<NPR>Most railroad applications use overlap as a method of joining separate pieces 
of geotextile.</NPR><BRK/>
<BRK/>
<NPR>See UFC 3-230-01 for additional information on subsurface drainage and filtration 
criteria.</NPR><BRK/>
<BRK/>
<NPR>The minimum depth of ballast for the track section being constructed/reconstructed 
is to be specified.  However, where geotextiles are used in the track structure, 
the minimum depth of ballast/subballast between the tie and the geotextile of 
300 mm (12 in.) should be enforced to avoid severe damage to the geotextile.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.3.1   Physical Property Requirements</TTL><BRK/>
<BRK/>
<TXT>The geotextile shall be a nonwoven, pervious sheet of polymeric material and shall consist of long-chain synthetic 
polymers composed of at least 95 percent by weight polyolefins, polyesters, or polyamides.  The use of woven 
slit film geotextiles (i.e. geotextiles made from yarns of a flat, tape-like character) will not be allowed.  
The geotextile shall contain stabilizers and/or inhibitors as necessary to make the filaments resistant to deterioration 
from ultraviolet light and heat exposure, particularly prior to placement and coverage.  The fibers shall be 
formed into a network which will be dimensionally stable.  The edges of the geotextile shall be finished in a 
way to prevent the outer fibers from being pulled away from the geotextile.  The geotextile shall exceed the 
applicability property requirements stated in TABLE II.</TXT><BRK/>
<MET><TBL><THD><BRK/>
<HL4>TABLE II -  PROPERTY REQUIREMENTS-GEOTEXTILE</HL4><BRK/>
<BRK/>
        PROPERTY            MINIMUM REQUIREMENTS*      TEST METHOD<BRK/></THD>
<BRK/>
   Weight**                   0.57 kg/0.836 sq m    <RID>ASTM D 3776</RID><BRK/>
                            (15 oz/sq yd)                Option B<BRK/>
<BRK/>
   Color                      Grey or tinted                 --<BRK/>
<BRK/>
   Strength                   Class 1               <RID>AASHTO M 288</RID><BRK/>
<BRK/>
   Apparent opening size    Less than 0.22 mm       <RID>ASTM D 4751</RID><BRK/>
   (AOS) (maximum           (No. 70 sieve)<BRK/>
   required valve)<BRK/>
<BRK/>
   Permittivity               0.1 per sec           <RID>ASTM D 4491</RID><BRK/>
<BRK/>
   Ultraviolet degradation   50 percent strength    <RID>ASTM D 4355</RID><BRK/>
   at 500 hours                 retained<BRK/>
                           <BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>TABLE II -  PROPERTY REQUIREMENTS-GEOTEXTILE</HL4><BRK/>
<BRK/>
        PROPERTY            MINIMUM REQUIREMENTS*      TEST METHOD<BRK/></THD>
<BRK/>
   Weight**                  15 oz/sq yd            <RID>ASTM D 3776</RID><BRK/>
                                                         Option B<BRK/>
<BRK/>
   Color                      Grey or tinted                 --<BRK/>
<BRK/>
   Strength                   Class 1               <RID>AASHTO M 288</RID><BRK/>
<BRK/>
   Apparent opening size    Less than 0.22 mm       <RID>ASTM D 4751</RID><BRK/>
   (AOS) (maximum           (No. 70 sieve)<BRK/>
   required valve)<BRK/>
<BRK/>
   Permittivity               0.1 per sec           <RID>ASTM D 4491</RID><BRK/>
<BRK/>
   Ultraviolet degradation   50 percent strength    <RID>ASTM D 4355</RID><BRK/>
   at 500 hours                 retained<BRK/>
<BRK/>
*These property requirements are Minimum Average Roll Values in the weaker principal direction.<BRK/>
<BRK/>
**Geotextile selection shall not be limited by the minimum weight shown.  Selection shall be based on the other property 
requirements listed.  Heavier geotextiles have shown greater resistance to abrasion.<BRK/></TBL>
</ENG><BRK/></SPT>
<SPT><TTL>2.3.2   Dimensional Requirements</TTL><BRK/>
<BRK/>
<TXT>Each roll of geotextile shall match the roadbed width and be at least<MET> 3.6 m</MET><ENG> 12 ft</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   <SUB>JOINT BARS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: Lone toe joint bars are not recommended for high used tracks. </NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Joint bars shall be of the size, shape, and punching pattern to fit the rail being joined.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.4.1   New Joint Bars</TTL><BRK/>
<BRK/>
<TXT>New joint bars shall be used with new rail, and shall be of the "toeless" and "head free design" to match rail 
section.  New joint bars shall conform to the requirements of "Specifications For High-Carbon Steel Joint Bars" 
or "Specifications For Quenched Carbon-Steel Joint Bars and Forged Compromise Joint Bars" found in Chapter 4, 
Part 2 of <RID>AREMA Eng Man</RID> for the joint bar and assemblies recommended in Chapter 4, Part 1 of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Used Joint Bars</TTL><BRK/>
<BRK/>
<TXT>Used joint bars in good condition shall be used with relay rail only.  The type of joint bar shall be  "toeless" 
type.  The used "long toe" type of joint bar shall not be employed where, because of the tie plate punching pattern, 
the spike slots are used to spike the rail to alignment at the joints.  Used joint bars shall be straight, free 
from cracks, breaks, and other visual defects.  Excessive rust, dirt, and other foreign materials on the joint 
bars are not permitted.  Used joint bars shall be of the proper size to make good contact with the underside 
of the rail head and the top of the rail base on the rails being joined.  Joint bars shall have alternating round 
and oval bolt holes.  Bolt holes shall not show excessive wear that would prevent use of the oval neck track 
bolt normally used with that joint bar.  Joint bars that have been flame-gouged, flame cut, or otherwise altered 
shall be considered scrap and shall not be used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.3   <SUB>Compromise Joint Bars</SUB></TTL><BRK/>
<BRK/>
<TXT>Compromise joint bars shall be of the size, shape, and punching pattern to fit the rail sizes and sections being 
joined.  Only factory designed and constructed (forged or cast) compromise joint bars shall be used to join rails 
of different sizes.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.4.3.1   New Compromise Joint Bars</TTL><BRK/>
<BRK/>
<TXT>Compromise joint bars shall conform to the requirements of "Specifications For Quenched Carbon-Steel Joint Bars 
and Forged Compromise Joint Bars" found in Chapter 4, Part 2 of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.3.2   Used Compromise Joint Bars</TTL><BRK/>
<BRK/>
<TXT>Requirements for joint bars in paragraph Used Joint Bars shall also apply to used compromise joint bars.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.5   GREASE</TTL><BRK/>
<BRK/>
<TXT>Grease for lubricating moving parts in turnouts and other trackwork shall have the following typical characteristics:</TXT><BRK/>
<TBL><BRK/>
   Calcium Soap, percent                                9.0<BRK/>
   Solid Additive (Graphite),percent                   11.5<BRK/>
<MET><BRK/>
   Penetration, <RID>ASTM D 217</RID> at 25 degrees C worked     340<BRK/>
<BRK/>
   Dropping Point <RID>ASTM D 566</RID> at 25 degrees C          101/214<BRK/>
<BRK/>
   Oil Viscosity, square mm/record at 40 degrees C     81.8<BRK/>
   <RID>ASTM D 445</RID> SUS at 38 degrees C                     379<BRK/></MET>
<ENG><BRK/>
   Penetration, <RID>ASTM D 217</RID> at 77 degrees F worked     340<BRK/>
<BRK/>
   Dropping Point <RID>ASTM D 566</RID> at 77 degrees F          101/214<BRK/>
<BRK/>
   Oil Viscosity, cSt at 104 degrees F                 81.8<BRK/>
   <RID>ASTM D 445</RID> SUS at 100 degrees F                    379<BRK/></ENG>
</TBL><BRK/>
<TXT>Other types of grease or lubricating oil (like SoyTrak) may be used provided that the grease or oil has been 
used successfully by local commercial railroads and has the approval of the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6   OIL FOR CORROSION PROTECTION</TTL><BRK/>
<BRK/>
<TXT>Oil for protecting rail and other track materials from corrosion, except joints, shall conform to the following 
general specification:</TXT><BRK/>
<TBL><BRK/>
    Asphalt, 100 penetration<BRK/>
    minimum 45 percent                            <RID>ASTM D 402</RID><BRK/>
<MET><BRK/>
    Flash point, minimum 55 degrees C             <RID>ASTM D 1310</RID><BRK/>
<BRK/>
    Viscosity, kinematic, 60 degrees C            <RID>ASTM D 2171</RID><BRK/>
    480 to 700 sq mm/s <BRK/></MET>
<ENG><BRK/>
    Flash point, minimum 130 degrees F            <RID>ASTM D 1310</RID><BRK/>
<BRK/>
    Viscosity, kinematic, 140 degrees F           <RID>ASTM D 2171</RID><BRK/>
    480 to 700 centistokes<BRK/></ENG>
</TBL><BRK/></SPT>
<SPT><TTL>2.7   <SUB>RAIL</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>2.7.1   <SUB>New Jointed Rail</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Designer will indicate the desired rail weight and section.  Rail weights/sections 
recommended for new rail purchases include:  115 RE, 132 RE, 133 RE, and 136 
RE.</NPR><BRK/>
<BRK/>
<NPR>The designer will insert the rail section and the drilling pattern for each 
rail section required.  Recommended rail drillings and joint bar punchings are 
found in Chapter 4, Part 1 of AREMA Manual.  An example specification for 57 
kg (115 lbs) rail and a 6-hole joint bar would be:<BRK/>
<BRK/>
RAIL                     DRILLING<BRK/>
<BRK/>
115RE         89-152-152 mm (3-1/2, 6, 6 inch)</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.7.1.1   General Requirements</TTL><BRK/>
<BRK/>
<TXT>New jointed rail shall comply with the following:</TXT><BRK/>
<BRK/>
<LST>a.  Rail Lengths:  New rail shall be a [_____]<MET> kg/m</MET><ENG> lbs/yd</ENG> section or heavier and shall conform to the 
specifications in Chapter 4, Parts 1 and 2 of <RID>AREMA Eng Man</RID> that were in effect at the time of its manufacture.  
New rail shall be provided in<MET> [11.9][24.4] m</MET><ENG> [39][80] ft</ENG> lengths.</LST><BRK/>
<BRK/>
<LST>b.  Rail Drilling:  New rail shall be provided with the rail ends drilled.  Drilling shall be uniform 
and to the patterns specified.</LST><BRK/>
<TBL><THD><BRK/>
                 RAIL                      DRILLING<BRK/></THD>
<BRK/>
                [_____]                     [_____]</TBL><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.1.2   New Industrial Grade Rail</TTL><BRK/>
<BRK/>
<TXT>All steel shall be produced in an electric furnace and be continuous cast, free of hydrogen.  All injurious hot 
marks, or surface imperfections shall be culled out and eliminated. Rail shall control cooled to AREMA specifications.  
Rail shall be rolled in accordance with the general physical dimensional requirements of AREMA design but shall 
meet the Section tolerances and Chemical Composition listed below.</TXT><BRK/>
<TBL><BRK/>
<THD>SECTION TOLERANCES</THD><BRK/>
<BRK/>
      Height          <MET>+1.5 to -0.7 mm</MET><ENG>+0.060 to -0.025 inch</ENG><BRK/>
      Head Width      <MET>+1.2 to -1.1 mm</MET><ENG>+0.045 to -0.045 inch</ENG><BRK/>
      Base Width      <MET>+1.5 to -1.5 mm</MET><ENG>+0.060 to -0.060 inch</ENG><BRK/>
      Web Width       <MET>+1.5 to -0.7 mm</MET><ENG>+0.060 to -0.025 inch</ENG><BRK/></TBL>
<TBL><BRK/>
<THD>GENERAL COMPOSITION</THD><BRK/>
<BRK/>
                                          <HL1>         PRODUCT ANALYSIS %         </HL1><BRK/>
      ELEMENT    CHEMICAL ANALYSIS %      UNDER MINIMUM         OVER MAXIMUM<BRK/>
      Carbon         0.65 to 0.85            0.04                  0.04<BRK/>
      Manganese      0.70 to 1.30            0.06                  0.06<BRK/>
      Phosphorus Max.        0.040                                 0.008<BRK/>
      Sulfur Maximum         0.050                                 0.008<BRK/>
      Silicon        0.10 to 0.50                                  0.50<BRK/></TBL>
<BRK/>
<TXT>Rail shall be ultrasonically tested to the following calibration guidelines:</TXT><BRK/>
<TBL><BRK/>
<THD>CALIBRATION GUIDLINES</THD><BRK/>
<BRK/>
      Head      <MET>2.4 mm</MET><ENG>0.10 inch</ENG> Flat bottom Hole<BRK/>
      Web       <MET>3.2 mm</MET><ENG>0.13 inch</ENG> Flat Bottom Hole<BRK/>
      Base      <MET>3.2 mm X 12.7 mm</MET><ENG>.013 x 0.50 inch</ENG> Slot<BRK/></TBL>
<BRK/>
<TXT>Rail shall be straightened for line in a press or roller straightener.  End straightness shall meet the following 
guidelines:</TXT><BRK/>
<TBL><BRK/>
<BRK/>
            Droop      <MET>1.0 mm</MET><ENG>0.040 inch</ENG> Maximum<BRK/>
            Dip        <MET>1.0 mm</MET><ENG>0.040 inch</ENG> Maximum<BRK/>
            Hook       <MET>1.0 mm</MET><ENG>0.040 inch</ENG> Maximum<BRK/></TBL>
<BRK/></SPT>
</SPT><SPT><TTL>2.7.2   Used Jointed Rail</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Due to the ever-changing markets for used rail, it may be beneficial 
to allow the Contractor the option to provide an acceptable rail section for 
relay.  Hence, the list of acceptable rail sections, acceptable rail weights, 
and sections should be chosen for compatibility with the existing rail and to 
minimize the number of different rail weights and sections on the installation.  
Delete unacceptable weights/sections from the list.  Normally, rail less than 
115 lbs should not be purchased for DOD track.</NPR><BRK/>
<BRK/>
<NPR>The designer will insert the rail section and the drilling pattern for each 
rail section required.  To the greatest extent practical, the specified drillings 
should match the drilling pattern in the existing rail that is to remain in 
track.  Recommended rail drillings and joint bar punchings are found in Chapter 
4, Part 1 of AREMA Manual.  An example specification for 57 kg (115 lbs) rail 
and a 6-hole joint bar would be:<BRK/>
<BRK/>
RAIL                     DRILLING<BRK/>
<BRK/>
115RE         89-152-152 mm (3-1/2, 6, 6 inch)</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.7.2.1   Relief Rail</TTL><BRK/>
<BRK/>
<TXT>Used rail for spot rail replacement of defective rails (relief rail) shall be the same weight, section, drilling, 
and length as the rail being replaced.  Relief rail shall meet the requirements specified for relay rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.2.2   <SUB>Relay Rail</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Relay rail is typically available in nominal lengths of 10.1 and 11.9 
meters (33 and 39 ft).  Relay rail can be justified if the construction cost 
is substantially below that of new rail.</NPR><BRK/>
<BRK/>
<NPR>A comparison of the usable metal in the heads of a new 57 kg/m (115-lbs) RE 
rail and a 57 kg/m (115-lbs) relay rail shows that the relay rail has about 
32 percent less usable metal.  Based on construction cost, the rail constitutes 
about 47 percent of the total track above roadbed; therefore, for economy, track 
constructed with 57 kg/m (115-lbs) relay rail should cost at least 15 percent 
(33 percent times 0.47 equals about 15 percent) less than track constructed 
with new 57 kg/m (115-lbs) rail.  Other conditions can be evaluated in a similar 
manner.</NPR><BRK/>
<BRK/>
<NPR>Specifying relay rail that meets AREMA is not adequate for military track.  
AREMA permits excessive end batter because rail ends are intended to be cropped 
off before welding.  All relay rail should have ultrasonic inspection after 
it is installed.  For Army projects the default values in Table IV are the maximum 
values.  For Navy projects, the maximum wear shall be 5 mm (3/16 inch) for the 
top and 3 mm (1/8 inch) for the side.</NPR><BRK/>
<BRK/>
<NPR>FORSCOM projects require the used of 115RE, 132RE, 133RE or 136RE rail sections.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Relay rail shall be control cooled.  [Used rail for out of face replacement and new construction shall be<MET> 45 
kg/m</MET><ENG> 90 lb/yd</ENG> or heavier and shall have the same section and drilling pattern for each rail weight.  Acceptable 
rail weights and sections are:  [90 ARA-A,] [100 ARA-B,] [112 AREA,] [115 AREA,] [130 AREA,] [132 AREA,] [133 
AREA,] [136 AREA,] [_____]] [All relay rail provided shall be the same section.]Relay rail shall not be cut into 
jointed rail from continuous welded rail.</TXT><BRK/>
<BRK/>
<LST>a.  Rail Drilling:  Relay rail shall be provided with the rail ends drilled.  Drilling shall be uniform 
and to the patterns specified.</LST><BRK/>
<TBL><THD><BRK/>
                 RAIL                      DRILLING<BRK/></THD>
<BRK/>
                [_____]                     [_____]<BRK/></TBL>
<BRK/>
<LST>b.  Length:  Relay rail shall be standard<MET> [10.1] [11.9] m</MET><ENG> [33] [39] ft</ENG> lengths.  Not more than 10 percent 
of the lot may be shorts.  No rail shorter than<MET> 8.2 m</MET><ENG> 27 ft</ENG> will be accepted.</LST><BRK/>
<BRK/>
<LST>c.  Maximum Allowable Wear:  For each rail, the average top wear shall meet the requirements on Table 
IV, except rail in turnouts which shall conform to paragraph Maximum Wear Used Rails Installed in Turnouts.  
Side wear shall be measured<MET> 16 mm</MET><ENG> 5/8 in</ENG> below the original top of rail.</LST><BRK/>
<BRK/>
<LST>d.  Condition and Appearance:  Relay rail shall be free from obvious defects and clean in appearance.  
Rail that has severe pitting and corrosion or has been flame-gouged, or spike nipped will not be accepted.  
Rail shall be straight from line and surface and free from any kinks or bends.  Rail bases shall be solid 
and free from visual defects such as plate wear, spike notching, pitting, and flame-gouging.  All existing 
bond wires shall be removed from relay rail by shear cutting old cables immediately adjacent to the weld 
or pin.  Bond wire heads shall be completely removed from the gage side.</LST><BRK/>
<BRK/>
<ITM>(1) Maximum Allowable Lip:  Lip or overflow shall not exceed<MET> 3 mm</MET><ENG> 1/8 inch</ENG> on either side of 
the rail head.</ITM><BRK/>
<BRK/>
<ITM>(2) Engine Burns:  Engine burns shall not be greater than<MET> 13 mm</MET><ENG> 1/2 inch</ENG> diameter and<MET> 0.8 mm</MET><ENG>
 1/32 inch</ENG> deep.  A maximum of 6 engine burns is allowed per rail and engine burns shall not 
affect more than 25 percent of the total order.</ITM><BRK/>
<BRK/>
<ITM>(3) End Batter and Chipping:  Rail end batter shall not exceed a maximum of<MET> 3 mm</MET><ENG> 1/8 inch</ENG> when 
measured<MET> 13 mm</MET><ENG> 1/2 inch</ENG> from the rail end with a<MET> 460 mm</MET><ENG> 18 inch</ENG> straightedge laid only on the 
rail being measured.  Chipped or broken rail ends will not be accepted.</ITM><BRK/>
<BRK/>
<ITM>(4) Running Surface Damage:  Running surface damage shall not exceed<MET> 6 mm</MET><ENG> 1/4 inch</ENG> long by<MET> 13 
mm</MET><ENG> 1/2 inch</ENG> wide, and shall be not greater than<MET> 1.5 mm</MET><ENG> 1/32 inch</ENG> deep.  Flat spots are not permitted 
on the rail head.</ITM><BRK/>
<BRK/>
<ITM>(5) Defects Not Permitted:  Relay rail having any of the following defects shall not be accepted:  
bolt hole cracks or breaks, broken base, breaks, crushed head, detail fracture, engine burn 
fracture, head-web separation, piped rail, horizontal split head, vertical split head, torch 
cut rail ends, torch cut bolt holes, and compound or transverse fissures.  The presence of any 
of these defects in the rail render that rail as scrap.</ITM><BRK/>
<TBL><MET><THD><BRK/>
           <HL4>TABLE IV.  ALLOWABLE WEAR LIMITS FOR RELAY RAIL</HL4><BRK/>
<BRK/>
          <HL1>Nominal Rail</HL1>            <HL1>Maximum Allowable Wear, mm</HL1><BRK/>
                                  <BRK/>
          <HL1>Weight, kg/m  </HL1>                 <HL1>Top </HL1>            <HL1>Side</HL1><BRK/>
                <BRK/></THD>
<BRK/>
           57.0 or less                  3.2              6.4<BRK/>
           Greater than 57.0             6.4              9.5<BRK/></MET>
<ENG><THD><BRK/>
<HL4>TABLE IV.  ALLOWABLE WEAR LIMITS FOR RELAY RAIL</HL4><BRK/>
<BRK/>
           <HL1>Nominal Rail </HL1>            <HL1>Maximum Allowable Wear, in.</HL1>        <HL1>Weight, lbs/yds </HL1>               <HL1>Top</HL1>             <HL1>
Side</HL1><BRK/>
          ______________________        _____           _______<BRK/></THD>
<BRK/>
          Less than 115                  1/8             1/4<BRK/>
          115 or Greater                 1/4             3/8<BRK/></ENG>
</TBL><BRK/></SPT>
</SPT><SPT><TTL>2.7.3   Welded Rail</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  While the use of continuously welded rail and concrete ties may be beneficial 
in some situations, the cost effectiveness for general use for DOD track has 
not been proven at this time.  A thorough life-cycle cost analysis should be 
performed prior to specifying these materials.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>New rail shall be, [_____]<MET> kg/m</MET><ENG> lbs</ENG>, [_____] section and shall conform to Chapter 4, Part 2 of <RID>AREMA Eng Man</RID>.  
Relay rail shall conform to TABLE IV, [_____]<MET> kg/m</MET><ENG> lbs</ENG>.  Relay rail that is to be welded shall meet the criteria 
specified in Chapter 4, Part 2 of <RID>AREMA Eng Man</RID> for welded rail.  Mingling of new and relay rail will not be 
permitted.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.8   TIE PLATES</TTL><BRK/>
<BRK/>
<SPT><TTL>2.8.1   General</TTL><BRK/>
<BRK/>
<TXT>Tie plates shall be of the dimensions and punching pattern (A or B) to fit the rail.  New tie plates conforming 
to Chapter 5, Part 1 of <RID>AREMA Eng Man</RID> shall be used with new rail.  Used tie plates in good condition may  be 
used with relay rail and shall be the dimensions as originally specified by <RID>AREMA Eng Man</RID>.  The used tie plates 
shall not be smaller than<MET> 190.5 by 254 mm</MET><ENG> 7-1/2 by 10 inch</ENG> for use with relay rail having nominal weights less 
than<MET> 49.6 kg/m</MET><ENG> 100 lbs/yd</ENG>, or not smaller than<MET> 190.5 by 279 mm</MET><ENG> 7-1/2 by 11 inch</ENG> double-shoulder for use with 
relay rail having nominal weights of<MET> 49.6 kg/m</MET><ENG> 100 lbs/yd</ENG> and greater.  Both flat and canted plates will be required 
to match the existing tie plates that are in track.  Canted tie plates shall be used in all new rail and relay 
out-of-face rail replacements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.2   Used Tie Plates</TTL><BRK/>
<BRK/>
<TXT>Used tie plates shall be free from excessive rust, pitting, mechanical damage, and dirt and other foreign materials.  
Cracked or broken plates shall be considered as scrap and shall not be used.  Shoulders on the tie plates shall 
project a minimum of<MET> 6 mm</MET><ENG> 1/4 inch</ENG> above the plane of the rail seat.  The thickness of the tie plate shall be 
at least<MET> 13 mm</MET><ENG> 1/2 inch</ENG> when measured anywhere in the rail seat area.  Spike holes shall be square and not corroded, 
worn, or mechanically enlarged.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9   <SUB>WOOD TIES</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Because of differences in treatability of the many species of wood used 
to manufacture railroad ties, installations should limit the number of acceptable 
species to those most commonly used in their geographic area.  Red Oak, White 
Oak, and Southern Pine will provide good service in the eastern states while 
Douglas Fir will generally be more available in the western states.  Southern 
Pine should not be used as mainline ties or as switch ties.  Gum and pine ties 
are not recommended for use in areas having high humidity, such as the southeastern 
states.  If unsure about the most appropriate species of wood for timber ties 
in the job geographic area, the engineering department of the local commercial 
railroad should be consulted.</NPR><BRK/>
<BRK/>
<NPR>The size and form of the crossties will be inserted in this paragraph using 
the following guidance.</NPR><BRK/>
<BRK/>
<NPR>a.  For main lines, access tracks, or other tracks where the movement may be 
classified as heavy or the desired speed is in excess of 64.4 km/hr (40 miles 
per hour), crossties will be not less than 178 mm (7 in.) thick by 229 mm (9 
in.) wide.  The length of crossties will be 2.591 m (8 ft 6 in.) or 2.743 m 
(9 ft).</NPR><BRK/>
<BRK/>
<NPR>b.  For yard or body, industrial, storage, siding, and running tracks, and for 
access tracks where the movement is not classified as heavy, crossties not less 
than 152 mm (6 in.) thick by 203 mm (8 in.) wide can be used.  The length of 
crossties will either be 2.438 m (8 ft) or 2.591 m (8 ft 6 in.).</NPR><BRK/>
<BRK/>
<NPR>c.  For road crossings, ties 178 mm (7 in.) thick by 229 mm (9 in.) wide and 
2.743 m (9 ft) long will be required, unless the manufacturer recommends a different 
length.</NPR><BRK/>
<BRK/>
<NPR>d.  If locally available, oak is preferred for switch ties.  A bill of material 
for switch ties should be provided on the drawings for each proposed type of 
turnout.  AREMA Track Plans, Plan 912 contains bills of switch ties for various 
size turnouts and crossovers.</NPR><BRK/>
<BRK/>
<NPR>Other local species may be listed if used by railroads in the area.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>All ties shall be new.  Species shall be Ash, Beech, Red and White Oak, [Gum,] [Spruces] [_____] [Pine,] [Douglas 
Fir,] [and] [other Fir].  Switch ties shall be Ash or Oak.  Conditioning and seasoning shall conform to the requirements 
of <RID>AWPA C6</RID> for the individual wood species.  Ties shall be well seasoned.  Prior to preservative treatment, wood 
ties shall be dried to the oven dry moisture content, or less, as specified in paragraph 3.14 of <RID>AWPA C6</RID>.  The 
wood may be air dried, vapor dried, or boultonized.  Ties which are to be dried by artificial means shall be 
conditioned and treated as soon as possible after sawing, but no more than 30 days later.  The temperature used 
for boultonizing shall be as high as possible but in no case less than<MET> 94 degrees C</MET><ENG> 200 degrees F</ENG>.  Vapor dried 
ties shall be transferred from drying cylinders to treatment cylinders as quickly as possible to avoid loss of 
heat from the seasoned ties.  Ties shall be pressure treated in accordance with Chapter 30, Part 3 of <RID>AREMA Eng Man</RID>
 by the empty cell process with a 60/40 creosote/coal tar solution (Grade C) in accordance with <RID>AWPA P2</RID> to a 
minimum retention of<MET> 128 kg/cu m</MET><ENG> 8 lbs/cu ft</ENG> of wood.  Bridge ties shall be treated in accordance with paragraph 
Bridge Ties.  Record treatment as specified in <RID>AWPA M2</RID>.  Treated ties shall be permanently marked or branded 
by the producer in accordance with <RID>AWPA M6</RID>.  Ties shall be produced by a member of the Railway Tie Association.  
All ties, except Southern, Red, and Ponderosa Pine, shall be incised on all four sides in the pattern specified 
in <RID>AREMA Eng Man</RID>, Chapter 30, Part 3, prior to treatment.  Splits shall not be longer than<MET> 100 mm</MET><ENG> 4 inch</ENG> and 
not wider than<MET> 5 mm</MET><ENG> 1/4 in</ENG> at either end.  Splits longer than<MET> 100 mm</MET><ENG> 4 inch</ENG> but not longer than the width of 
the face in which the split appears, will be acceptable if specified anti-splitting devices are installed with 
the splits compressed.  Any required adzing and drilling for spikes shall be performed prior to treatment.  Notify 
the Contracting Officer at least 15 days prior to the shipment of any treated ties or timbers from the manufacturer's 
plant, to provide the Government the opportunity to inspect the materials before shipment.  When inspections 
of onsite materials result in product rejection, promptly segregate and remove rejected material from the premises.  
The Government may also charge the Contractor any additional cost of inspection or test when prior rejection 
makes reinspection or retesting necessary.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.9.1   Crossties</TTL><BRK/>
<BRK/>
<TXT>Wood crossties shall conform to Chapter 30, Part 3 of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/>
<LST>a.  Wood crossties except at road crossings:  Wood ties shall be sawed and shall be not less than [_____]<MET>
 mm</MET><ENG> inch</ENG> thick and [_____]<MET> mm</MET><ENG> inch</ENG> wide.  The length shall be<MET> [2.44] [2.6] [2.75] m</MET><ENG> [8.0] [8.5] [9.0] 
ft</ENG>.</LST><BRK/>
<BRK/>
<LST>b.  Wood crossties at road crossings:  Wood ties shall be sawed and shall not be less than<MET> 178 mm thick 
and 229 mm wide</MET><ENG> 7 inch thick and 9 inch wide</ENG>.  The length shall be<MET> 2.75 m</MET><ENG> 9 ft</ENG>, unless recommended otherwise 
by the manufacturer of crossing surface materials.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.2   Switch Ties</TTL><BRK/>
<BRK/>
<TXT>Switch ties shall conform to Chapter 30, Part 3 of <RID>AREMA Eng Man</RID> and shall be sawed<MET> 178 mm</MET><ENG> 7 inch</ENG> thick and<MET> 229 
mm</MET><ENG> 9 inch</ENG> wide.  The length and quantities shall be as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.3   Bridge Ties</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph and paragraphs Ballasted-Deck Bridge Ties and Open-Deck 
Bridge Ties if bridge work is not included in the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The method for treatment of bridge ties shall be in accordance with <RID>AWPA C2</RID>.  The treatment standards shall be 
based on the type of deck on the bridge.  Any drilling of bolt holes shall be performed prior to treatment.  
The ties shall be sawed to dimensions and furnished in the quantities indicated on the contract drawings.  Field 
verify all dimensions and quantities prior to furnishing timber bridge ties.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.9.3.1   Ballasted-Deck Bridge Ties</TTL><BRK/>
<BRK/>
<TXT>Ties for use in track over ballasted deck bridges shall be standard crossties.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.3.2   Open-Deck Bridge Ties</TTL><BRK/>
<BRK/>
<TXT>Bridge ties for open-deck bridges shall be sized on two sides and of adequate size to distribute the track load 
to all stress-carrying stringers.  Preservative treatment shall be in accordance with <RID>AWPA C2</RID> for above-ground 
exposure.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9.4   Tie Plugs</TTL><BRK/>
<BRK/>
<TXT>Tie plugs shall fit holes from which spikes are drawn.  The plugs shall comply and be treated in accordance with 
Chapter 30, Part 3 Section 3.1.5 of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.9.5   Anti-splitting Devices</TTL><BRK/>
<BRK/>
<TXT>Crossties and switch ties shall be equipped on each end with gang nail end plates anti-splitting devices of the 
type specified, regardless of whether or not the wood has shown any tendency to split.  Products used shall conform 
to Chapter 30, Part 3 Sections 3.1.6 and 3.1.7 of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.10   BRIDGE TIMBERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if bridge work is not included in the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Bridge timbers include all structural members such as stringers, caps, and posts.  Timbers shall be incised on 
two sides.  Creosote preservative treatment shall be in accordance with <RID>AWPA C2</RID>for above ground exposure and 
shall have fire-retardant coating for creosoted wood in accordance with <RID>AREMA Eng Man</RID>, Chapter 7 Section 1.11.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11   BRIDGE LUMBER</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if bridge work is not included in the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Lumber used in decks and bracing above the waterline shall be treated for above ground exposure.  Lumber used 
in retaining walls, fender systems, and bracing below the high waterline shall be treated for soil contact exposure.  
Preservative treatment shall be in accordance with <RID>AWPA C2</RID> and <RID>AREMA Eng Man</RID>, Chapter 73.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12   BRIDGE PILES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if bridge work is not included in the contract.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Preservative treatment of piles shall conform to <RID>AWPA C3</RID> and <RID>AREMA Eng Man</RID>, Chapter 7, Part 1, Section 1.9 for 
piles.  Piles used as friction or end-bearing piles shall be a First-Class pile in accordance with <RID>AREMA Eng Man</RID>
, Chapter 7, Part 1, Section 1.9.4.  Second-class piles can be used in retaining walls, dolphins, and fender 
systems supports.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13   <SUB>ENGINEERED POLYMER COMPOSITE TIES</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Engineered polymer composite ties, also commonly known as plastic ties, 
are a relatively new technology compared to the more conventional sawn wood 
and concrete ties.  Engineered polymer composite ties are inherently resistant 
to moisture, rot, and insects and may be preferred for certain locations.   
Besides out-of-face applications, engineered polymer composite ties can be used 
for maintenance (intermingled) replacement of deteriorated wood crossties.</NPR><BRK/>
<BRK/>
<NPR>Recommended size requirements for engineered polymer composite ties follow the 
same basic guidance as in the NOTE for paragraph WOOD TIES above pertaining 
to wood tie sizes.<BRK/>
<BRK/>
Engineered composite ties are designed to use the same tie spacing and ballast 
structure as wood ties.  The ties can be installed using conventional hardware 
and installation equipment.  Specific installation detials, such as which fasteners 
work best, size of pre-drill holes, etc., should be based on the manufacturer's recommendations.<BRK/>
<BRK/>
For increased lateral and longitudinal track stability, engineered polymer composite 
ties can be manufactured with specially designed surface patterns to create 
a mechanical interlock between the tie and the ballast.  Individual manufacturers 
have different proprietary designs to provide a range of lateral track stability.  
Experinece has shown that this interlock (track stability) can be achieved with 
little or no train traffic commonly needed upon replacement of wood ties.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Engineered polymer composite ties shall conform to Chapter 30, Part 5 of <RID>AREMA Eng Man</RID>.  The ties shall incorporate 
a surface pattern to provide a minimum single tie lateral push result of<MET> 11.1 kN</MET><ENG> 2,500 lbf</ENG> after no more than 
100,000 gross tons of accumulated traffic.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.13.1   Crossties</TTL><BRK/>
<BRK/>
<LST>a.  Engineered polymer composite crossties, except at road crossings, shall be not less than [_____]<MET> 
mm</MET><ENG> inch</ENG> thick and [_____]<MET> mm</MET><ENG> inch</ENG> wide.  The length shall be<MET> [2.44] [2.6] [2.75] m</MET><ENG> [8.0] [8.5] [9.0] 
ft</ENG>.</LST><BRK/>
<BRK/>
<LST>b.  Engineered polymer composite crossties at road crossings shall not be less than<MET> 178 mm thick and 
229 mm wide</MET><ENG> 7 inch thick and 9 inch wide</ENG>.  The length shall be<MET> 2.75 m</MET><ENG> 9 ft</ENG>, unless recommended otherwise 
by the manufacturer of the crossing surface materials.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13.2   Switch Ties</TTL><BRK/>
<BRK/>
<TXT>Switch ties shall conform to Chapter 30, Part 5 of <RID>AREMA Eng Man</RID> and shall be<MET> 178 mm</MET><ENG> 7 inch</ENG> thick and<MET> 229 mm</MET><ENG> 
9 inch</ENG> wide.  The length and quantities shall be as shown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13.3   Ballasted-Deck Bridge Ties</TTL><BRK/>
<BRK/>
<TXT>Engineered composite ties for use in track over ballasted deck bridges shall be standard crossties.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.13.4   Tie Plugs</TTL><BRK/>
<BRK/>
<TXT>Tie plugging may be utilized in engineered polymer composite ties in similar fashion as they are used in sawn 
wood ties.  Polymer-based plugging compounds (e.g., polyurethane) are recommended.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.14   <SUB>STEEL TIES</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  AREMA has a lighter weight steel tie section than specified below that 
can be used for yard tracks subject to light loads.  Section minimum properties 
shall be changed to: <BRK/>
      Length             <MET>2540 mm</MET><ENG> 100 inch</ENG><BRK/>
      Width              <MET>260 mm</MET><ENG> 10.2 inch</ENG><BRK/>
      Thickness          <MET>10 mm</MET><ENG> 0.4 inch</ENG><BRK/>
      Section Depth      <MET>97 mm</MET><ENG> 3.8 inch</ENG><BRK/>
      Moment of inertia  <MET>316 cm<SPS>4</SPS></MET><ENG> 7.6 in<SPS>4</SPS></ENG></NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Steel ties shall conform to Chapter 30 of <RID>AREMA Eng Man</RID>.  Steel ties shall be constructed with hook-in shoulders 
of a<MET> 178 mm</MET><ENG> 7 inch</ENG> minimum spade.  Ties shall be design and furnished with elastic type rail fixation system 
for Pandrol E clips or safelock, or an approved equal.  Ties shall have a brand rolled into the material indicating 
the section and manufacturer.  Steel ties shall have the following minimum section:</TXT><BRK/>
<TBL><BRK/>
<THD>Steel Ties</THD><BRK/>
 Length             <MET>2590 mm</MET><ENG> 102 inch</ENG><BRK/>
      Width              <MET>300 mm</MET><ENG> 11.8 inch</ENG><BRK/>
      Thickness          <MET>10 mm</MET><ENG> 0.4 inch</ENG><BRK/>
      Section Depth      <MET>118 mm</MET><ENG> 4.6 inch</ENG><BRK/>
      Moment of inertia  <MET>610 cm<SPS>4</SPS></MET><ENG> 14.6 in<SPS>4</SPS></ENG><BRK/></TBL>
<BRK/>
<TXT>Ties shall be manufactured from steel free of injurious segregation with a minimum tensile strength of<MET> 312 MPa</MET><ENG>
 45,000 psi</ENG>.  Steel shall have the chemical composition conforming to <RID>ASTM A 242/A 242M</RID> or <RID>ASTM A 992/A 992M</RID></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.15   <SUB>CONCRETE TIES</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete if concrete ties are not required.  Concrete ties may be preferred 
for certain locations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Concrete ties and fastening system shall comply with the material and strength requirements specified in Chapter 
30 of <RID>AREMA Eng Man</RID> for [monoblock] [reinforced two-block] [prestressed two-block] ties.  Concrete ties shall 
be a minimum of [<MET>2.44 m</MET><ENG> 8 ft</ENG>] [_____] in length, width of [_____], and height of [_____].  Concrete ties shall 
have a factored design positive bending moment of [_____]<MET> kN-m</MET><ENG> Inch-kips</ENG> at center of seat.  Concrete shall be 
furnished with dual durometer rubber pads, which have 50 to 60 shore A durometer on the bottom surface and 75 
to 85 Shore A durometer reinforced rubber on the top surface.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16   <SUB>TURNOUTS AND TRACK CROSSINGS</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Detailed information on frogs may be found in AREMA Track Plans.  Self-guarded 
frogs, in accordance with AREMA Track Work Plan No. 641 and Notes, may be specified 
in place of rigid-bolted frogs except:  (1) for tracks where the design speed 
exceeds 48.3 km/hr (30 miles per hour), or (2) for track installations outside 
the United States.  Spring rail frogs shall not be used on military track.  
The type of switch lamp required will be indicated on the drawings.  The type 
or types required will be retained in the contract specification and those not 
required will be deleted.  Those lamps with reflector units only are preferred 
and will be specified where possible.  Those lamps with reflectors and daylight 
disks will be used only at important crossovers or turnouts from main running 
tracks.  Illuminated switch lamps will not be specified except for special main 
track movements, or as required by the serving railroad or by special regulations.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The component parts of the turnouts to be furnished shall be the products of manufacturers regularly engaged 
in the manufacture of such products, and shall essentially duplicate items that have been in satisfactory use 
at least 2 years prior to bid opening.  The parts need not all be made by the same manufacturer, but each turnout 
shall be the product of a single firm.  Switch assemblies, stands, frogs, and guardrails assemblies shall conform 
to the requirements of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.16.1   Rail and Joint Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The rail weight and section to be used in each turnout and track crossing 
constructed, reconstructed, or having steel replaced will be shown on the Contract 
Drawings and/or listed in this paragraph along with the turnout or crossing 
identification number and turnout size number.  Example:<BRK/>
<BRK/>
  TURNOUT     SIZE OR<BRK/>
  TRACK OR    CROSSING<BRK/>
CROSSING ID    ANGLE     RAIL   DRILLING<BRK/>
<BRK/>
    T51        No. 8     90RA   72-138 mm<BRK/>
                                (2-11/16-5-1/2 inch)<BRK/>
Designer may want new rail in turnouts to match new switch points.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Rail, joint bars, and miscellaneous track materials used in turnout and track crossing construction shall be 
furnished and installed as part of the complete turnout or crossing.  Rail and miscellaneous track materials 
used in turnout and track crossing construction shall be the weight and section [shown on the contract drawings] 
[as listed:</TXT><BRK/>
<TBL><THD><BRK/>
                  TURNOUT      SIZE OR<BRK/>
                  TRACK OR     CROSSING<BRK/>
                CROSSING ID     ANGLE        RAIL       DRILLING<BRK/></THD>
<BRK/>
                  [_____]      [_____]      [_____]     [_____]]<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>2.16.2   Maximum Wear Used Rails Installed in Turnouts</TTL><BRK/>
<BRK/>
<TXT>[The average top (vertical) wear shall be<MET> 3 mm</MET><ENG> 1/8 in</ENG> or less.  Gage side head wear shall not exceed<MET> 3 mm</MET><ENG> 1/8 
inch]  [All rail installed in turnouts shall be new].</ENG></TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.3   Frogs, Switches, Guardrails and Appurtenances</TTL><BRK/>
<BRK/>
<TXT>Frogs, switches, guardrails and appurtenances shall be  materials suitable for use in heavy tonnage main track.  
Used turnout materials shall have been fully reconditioned and shall be within plus or minus<MET> 3 mm</MET><ENG> 1/8 inch</ENG> of 
the original specification for that turnout design.  Materials used in the turnout shall be of the same weight 
and section.  Materials shall be in good condition and free from excessive rust, dirt, and other foreign materials.  
The rail weight and section shall be as specified.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.16.3.1   <SUB>Switches</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List length, type, and quantity of switchpoints and size, type, and quantity 
of other turnout materials required for turnout repairs in the drawings schedule.  
If new switch points are required, edit the following paragraphs accordingly.  
Switch point Detail 5000 can also be used.  Designer may want new rail in turnouts 
to match new switch points.  The Navy recommends the use of maganese tipped 
switch points on the side opposite the turnout side of the switch.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Switches for new turnout construction or complete turnout replacement shall be<MET> 5029 mm</MET><ENG> 16 feet and 6 inches</ENG> reinforced 
straight split switches with graduated risers generally conforming to <RID>AREMA Eng Man</RID>, Plan Number 112.  Switch 
materials used to replace defective materials shall be as indicated.</TXT><BRK/>
<BRK/>
<LST>a.  Switch points shall be new.  Switch point detail shall be <RID>AREMA Eng Man</RID>, Plan No. 221, Detail 4000 
or 6100.  [One switch point in each turnout shall be maganese tipped in accordance with <RID>AREMA Eng Man</RID>
, Plan No. 220-52-E-82, installed on the side opposite the turnout side of the switch (example the right 
switch point shall be maganese tipped on a left hand turnout).]</LST><BRK/>
<BRK/>
<LST>b.  Switch rods and connecting rods shall be new.</LST><BRK/>
<BRK/>
<LST>c.  Gage plates, switch plates, slide plates, and heel plates shall either be new or used and in good 
condition and not worn or corroded.  Rail braces shall be either rigid or adjustable.  For a given turnout 
all rail braces shall be of the same design.</LST><BRK/>
<BRK/>
<LST>d.  Heel blocks shall be either cast or forged steel and be either new or used and in good condition.  
New heel block bolt assemblies shall be provided and shall be heat treated.  The heel joint bars shall 
be either new or used in good condition and manufactured for the purpose.  If floating heel blocks are 
used, special no. 5 double shoulder plates shall be used to maintain <MET>160 mm</MET><ENG>6.25 inch</ENG> heel spread.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.3.2   Frogs</TTL><BRK/>
<BRK/>
<TXT>Frogs shall be [bolted rail] [railbound manganese] [solid manganese self-guarded] in the sizes indicated.</TXT><BRK/>
<BRK/>
<LST>a.  Frogs shall be [new] [remanufactured].  Cracked or broken used frog castings shall not be used.  
Cracked or broken frog castings that have been repaired by welding are not acceptable and shall not be 
used.  Remanufactured frogs shall meet the following wear requirements:</LST><BRK/>
<BRK/>
<ITM>(1) Frog points shall be in good condition and not be worn, chipped, or broken.</ITM><BRK/>
<BRK/>
<ITM>(2) Maximum allowable wear on used or reconditioned frogs shall be:<BRK/>
<BRK/>
Frog Point:                          <MET>3 mm </MET><ENG>1/8 in</ENG><BRK/>
Top Surface:                         <MET>3 mm </MET><ENG>1/8 in</ENG><BRK/>
Raised Guarding Face (Self-Guarded)  <MET>3 mm </MET><ENG>1/8 in</ENG><BRK/>
All Wear Surfaces                    <MET>3 mm </MET><ENG>1/8 in</ENG></ITM><BRK/>
<BRK/>
<ITM>(3) Minimum flangeway depth for used frogs shall be<MET> 45 mm</MET><ENG> 1-3/4 inch</ENG>.  Minimum flangeway width 
shall be<MET> 48 mm</MET><ENG> 1-7/8 inch</ENG>.</ITM><BRK/>
<BRK/>
<LST>b.  Frog bolts, nuts, lock washers, and headlocks shall all be new.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.3.3   New or Replacement Guard Rails</TTL><BRK/>
<BRK/>
<TXT>New or replacement guard rails shall be a minimum of<MET> 4.6 m</MET><ENG> 15 ft</ENG> in length and shall be new or used in good condition.  
Guard rails shall be of any of the following designs:  Tee rail in accordance with <RID>AREMA Eng Man</RID>, Plan No. 504, 
solid manganese steel in accordance with <RID>AREMA Eng Man</RID>, Plan No. 510, or an acceptable hook flange design.  For 
used guard rails the guard face shall be smooth and not worn more than<MET> 3 mm</MET><ENG> 1/8 inch</ENG> from its new condition.  
Guard rails bolted to the running rails shall be equipped with fillers.  When fillers are installed or repaired 
new bolt assemblies shall be used.  All bolts, nuts, and associated hardware shall be new.  Clamped guard rails 
shall be equipped with block wedges, filler wedges, and cotter keys.  Guard rail plates shall be new or acceptable 
replacements.  Single-shoulder tie plates used with guard rails shall be installed with the shoulder on the inside 
flush against the base of the guard rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.3.4   Hook Plates</TTL><BRK/>
<BRK/>
<TXT>Hook plates shall be new or acceptable used material and shall be of the designs and lengths indicated on <RID>AREMA Eng Man</RID>
, Plan Nos. 112 and 241.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.3.5   Switch Stands</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The type and manufacturer of switch stand should be the same as presently 
used at the jobsite or serving railroad.  Mixing positive-action and automatic-action 
switch stands on the same military base is not recommended.  Examples of acceptable 
types of stands are Racor models 22 and 36D, or Bethlehem Steel models 51A and 
53.  Other specialty designs, like a rotary wheel switch stand, may be also 
required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  New or replacement switch stands shall conform to <RID>AREMA Eng Man</RID>, Plan 251-64 and shall be new or 
fully reconditioned, low-stand type with model number [Bethlehem Steel model 51A][_____].  Switch stand 
shall be [automatic-action][semi-automatic action (spring)] [positive-action (rigid)] with [adjustment 
from the top with shims through a moveable cover][spring connecting rods][adjustable connecting rods][_____].</LST><BRK/>
<BRK/>
<LST>b.  Existing switch stands, staffs and targets, where not designated for replacement, shall be reconditioned 
by cleaning to bare metal and then painted with one coat of metal primer.[  The interior portion of the 
stands, including mechanisms, shall be cleaned and re-lubricated.]  The switch stand staff shall be painted 
with two coats of black enamel paint.  Switch targets shall be similarly prepared and painted with two 
coats of red or white enamel paint to indicate switch position in accordance with normal railroad practice.</LST><BRK/>
<BRK/>
<LST>c.  Each stand shall be equipped with one of the following switch lamps as indicated on the project plans:</LST><BRK/>
<BRK/>
<ITM>(1) Reflecting Type:  Approved reflecting switch lamps fitted with standard commercial-type 
double red and white reflecting lenses but without day signal targets.</ITM><BRK/>
<BRK/>
<ITM>(2) Reflecting Type with Daylight Disk:  Approved reflecting switch lamps fitted with standard 
commercial-type double red and white reflecting lenses, and with day signal targets.</ITM><BRK/>
<BRK/>
<ITM>(3) Illuminated Type:  Approved illuminated lamps with primary battery, battery housing, and 
cable.</ITM><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.16.4   Track Crossings</TTL><BRK/>
<BRK/>
<TXT>Track crossings shall be new and shall be fabricated in accordance with <RID>AREMA Eng Man</RID>, Plan No. [_____].  Rail 
weight and section shall be [_____].  Tie layout shall be in accordance with <RID>AREMA Eng Man</RID>, Plan No. [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.5   Rail Braces</TTL><BRK/>
<BRK/>
<TXT>Rail braces shall be either the fixed or adjustable type and shall be of standard manufacture.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.17   <SUB>GRADE CROSSINGS</SUB></TTL><BRK/>
<BRK/>
<TXT>Recyclable materials used in Grade Crossings shall conform to EPA requirements in accordance with Section 
<SRF>01 62 35</SRF> RECYCLED / RECOVERED MATERIALS.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.17.1   <SUB>Crossing Material or Surface</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Coordinate this paragraph with the drawings showing the typical railroad 
crossing cross-section and details.</NPR><BRK/>
<BRK/>
<NPR>Where suitable local materials meeting state specifications for a granular highway 
base course material are available, those materials may be substituted for the 
ASTM D 1241 material specified below.  Ballast or subballast materials may also 
be used for semi-permanent aggregate crossings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Roadway width shall be as indicated in the contract drawings.  Crossing material or surface shall comply with 
the following:</TXT><BRK/>
<BRK/>
<LST>a.  A semi-permanent aggregate crossing shall be constructed of compacted crushed aggregate placed between 
the rails and as short approaches to the track.  The aggregate shall be a crushed gravel or crushed stone 
material conforming to the requirements of [ballast] [subballast] [<RID>ASTM D 1241</RID>, Type I, Gradations A 
or B].</LST><BRK/>
<BRK/>
<LST>b.  A permanent aggregate crossing shall be constructed of compacted crushed aggregate placed in the 
track between bond timbers header as indicated.  The crushed aggregate shall be [ballast] [subballast] 
[a crushed aggregate material conforming to the requirements of <RID>ASTM D 1241</RID>, Type I, Gradations A or 
B].</LST><BRK/>
<BRK/>
<LST>c.  Full-depth timber crossings shall be [constructed-in-place] [prefabricated].  Timber road crossing 
materials shall be [oak] [acceptable hardwood].  Seasoning and treatment shall conform to the requirements 
of <RID>AWPA C6</RID> and paragraph WOOD TIES.</LST><BRK/>
<BRK/>
<LST>d.  Bituminous paving materials for full-depth asphaltic cement concrete (bituminous) crossing with bond 
timbers flangeway headers shall conform to the applicable State of [_____] Highway Specification for 
a [_____] type mix design.  Bond timbers shall be [oak] [acceptable hardwood].  Seasoning and treatment 
shall conform to <RID>AWPA C6</RID> and paragraph WOOD TIES.</LST><BRK/>
<BRK/>
<LST>e.  Concrete pavement materials for full-depth, cast-in-place concrete crossings shall conform to the 
requirements of Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE] [<SRF>03 30 00</SRF> CAST-IN-PLACE CONCRETE].</LST><BRK/>
<BRK/>
<LST>f.  Premanufactured, precast concrete panels for grade crossings shall be constructed of reinforced concrete 
having a minimum 28-day compressive strength of<MET> 34.5 MPa</MET><ENG> 5,000 psi</ENG>.  Each panel shall be manufactured 
to meet HS20-44 loading in accordance with <RID>AASHTO HB-17</RID>, with 30% impact increment.  Loading shall be 
based on single axle loads of<MET> 14,500 kg</MET><ENG> 32,000 lbs</ENG>.  Precast crossing panels shall be the product of 
a company regularly engaged in the manufacture of such panels, and whose products have been successfully 
used in the commercial railroad industry for at least 2 years.</LST><BRK/>
<BRK/>
<LST>g.  Panels for premanufactured elastomeric crossing systems shall be full depth.  Elastomeric systems 
with or without steel composition grade crossing panels shall be the product of a company regularly engaged 
in the manufacture of such products, and whose products have been successfully used in the commercial 
railroad industry for at least 2 years.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.2   Rail</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The use of 57 kg (115 lbs) rail as the minimum through crossings and 
for 6 m (20 ft) on either side of the crossing is recommended.  The use of welded 
joints or long (24.4 m (78 feet)) rail for the crossing area is also recommended 
to eliminate any joints in the crossing area.  The use of 178 mm by 229 mm by 
2.74 m (7 inches by 9 inches. by 9 feet) long ties is recommended throughout 
the crossing area.  Although 2.59 m (8-1/2 feet) ties are acceptable, they are 
the minimum length that should be used in the crossing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Rail within the road crossing and for at least<MET> 6 m</MET><ENG> 20 ft</ENG> on either side of the crossing shall be [_____] [115RE] 
as specified in paragraph Rail and Joint Bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.3   Ties</TTL><BRK/>
<BRK/>
<TXT>Ties within the road crossing and for at least<MET> 6 m</MET><ENG> 20 ft</ENG> on either side of the crossing shall be hardwood or 
polymer composite and shall be as specified in paragraphs Crossties and Switch Ties.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.4   Track Materials</TTL><BRK/>
<BRK/>
<TXT>For premanufactured crossing surfaces or systems, tie plates, spikes or other rail fasteners, rail anchors, and 
other track materials shall conform to the manufacturer's recommendations.  Unless specified by the crossing 
manufacturer, track materials shall be as specified in paragraph MISCELLANEOUS TRACK MATERIALS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.5   Threaded Fasteners and Screw Spikes</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Screw spikes having an ultimate tensile strength of 483 MPa (70,000 psi) 
are commercially available.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Threaded fasteners for use in grade crossings shall be of the sizes and lengths specified by the grade crossing 
manufacturer or as indicated for built-in-place crossings.  Screw spikes shall have a minimum ultimate tensile 
strength of<MET> 414 MPa</MET><ENG> 60,000 psi</ENG> and shall be galvanized for corrosion protection.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.6   Pipe for Subdrains</TTL><BRK/>
<BRK/>
<TXT>Pipe for subdrains shall be<MET> [152] [203] [_____] mm</MET><ENG> [6] [8] [_____] inch</ENG> diameter corrugated, perforated [polyethylene 
complying with <RID>ASTM F 405</RID>] [bituminous coated galvanized corrugated steel].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.7   Cable Conduit</TTL><BRK/>
<BRK/>
<TXT>Cable conduit under grade crossings shall be<MET> 102 mm</MET><ENG> 4 inch</ENG> diameter PVC pipe conforming to <RID>UL 651</RID>, and shall 
be a minimum of Schedule 80.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.18   <SUB>MISCELLANEOUS TRACK MATERIALS</SUB></TTL><BRK/>
<BRK/>
<TXT>Miscellaneous track materials shall be as follows:</TXT><BRK/>
<BRK/>
<SPT><TTL>2.18.1   Spikes</TTL><BRK/>
<BRK/>
<SPT><TTL>2.18.1.1   Track Spikes</TTL><BRK/>
<BRK/>
<TXT>Track spikes shall be new and shall conform to Chapter 5, Part 2 of <RID>AREMA Eng Man</RID>.  Track spikes size<MET> 152 by 
16 mm</MET><ENG> 6 by 5/8 inch</ENG> shall be used with<MET> 49.6 kg/m</MET><ENG> 100 lbs</ENG> or heavier rail.  Track spikes<MET> 140 by 14 mm</MET><ENG> 5-1/2 by 
9/16 inch</ENG> shall be used with<MET> 44.6 kg/m</MET><ENG> 90 lb</ENG> and under rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.1.2   Bridge Spikes</TTL><BRK/>
<BRK/>
<TXT>[Minimum<MET> 19 mm</MET><ENG> 3/4 in</ENG> diameter washer head screw spikes that allow a minimum of<MET> 127 mm</MET><ENG> 5 inch</ENG> penetration into 
the stringers shall be used to connect the bridge ties to the stringers on an open-deck bridge, in accordance 
with <RID>AREMA Eng Man</RID>, Chapter 7, Part 7.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.18.2   Bolts, Nuts, and Spring Washers</TTL><BRK/>
<BRK/>
<TXT>New track bolts, nuts, and spring washers shall be used throughout the project for both new and relay rail.[  
Bolts shall be used in both steel and timber bridge connections.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.18.2.1   Bolts and Nuts</TTL><BRK/>
<BRK/>
<TXT>The various rail, joint bars, and rail drillings require various lengths and diameters of bolt assemblies.  Determine 
the number of bolt assemblies of each size required.  All bolt diameters shall be the largest possible for a 
given rail drilling and joint bar punching.  Track bolts and nuts shall conform to Chapter 4, Part 2 of <RID>AREMA Eng Man</RID>
.  Track bolts shall be long enough to leave at least two threads exposed after the nut is tightened.[  Steel 
bridge connections shall use<MET> <RID>ASTM A 325M</RID></MET><ENG> <RID>ASTM A 325</RID></ENG> or<MET> <RID>ASTM A 490M</RID></MET><ENG> <RID>ASTM A 490</RID></ENG> bolts.  Timber bridge connections 
shall use hot dip galvanized steel bolts, minimum<MET> 19 mm</MET><ENG> 3/4 in</ENG> diameter with lengths as required.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.2.2   Spring Washers</TTL><BRK/>
<BRK/>
<TXT>Spring washers and nuts shall be sized to ensure that the spring washer develops its full reactive force and 
does not jam into the joint bar hole.  Spring washers shall be of the size to fit the bolt and nut used and shall 
conform to Chapter 4, Part 2 and Section M12 of <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.18.3   Rail Anchors</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE: The number and position of rail anchors will be shown on the drawings 
and will be based on amount of traffic, character of traffic, and local conditions.  
When required, anchors will be placed in accordance with AREMA recommendations 
for "Light Density Lines" in Chapter 5 of AREMA Manual.  This recommendation 
calls for 16 anchors per 11.9 meters (39-ft) length of track, that is 8 anchors 
to resist movement in each direction.  Where heavy traffic, steep grades or 
other factors result in rail creeping additional anchors may be specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Where special tools are required to install or remove anchors, furnish a minimum of one tool for each 5,000 anchors, 
or fraction thereof, not to exceed 5 tools per job.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.18.3.1   New Installation</TTL><BRK/>
<BRK/>
<TXT>Rail anchors for new installations shall be [new] [repinched].  Sizes shall conform to the various sizes of rail 
on the project and conform to "Specifications for Rail Anchors" in Chapter 5, Part 7 of <RID>AREMA Eng Man</RID>.  Anchors 
may be either drive-on or spring type.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.3.2   Salvaged Rail Anchors</TTL><BRK/>
<BRK/>
<TXT>Rail anchors salvaged from the track being removed shall become the property of the Contractor and shall be removed 
from the site.  No used anchors shall be reinstalled unless they have been repinched.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.3.3   Rail Clips and Fasteners</TTL><BRK/>
<BRK/>
<TXT>Provide single tight fit clips with fillers as necessary to fit rail section furnished.  Clip or fastener design 
shall anchor rail against longitudinal movement.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.18.4   Insulated Joints</TTL><BRK/>
<BRK/>
<TXT>Insulated joints shall conform to applicable portions of Chapter 4, Part 2 of <RID>AREMA Eng Man</RID>.  Conventional continuous 
insulated joints with fibre insulation shall not be used.  Unless otherwise directed by the Contracting Officer, 
insulated joints shall be for the following rail sections, rail drilling, and number of joints:</TXT><BRK/>
<TBL><THD><BRK/>
             RAIL SECTION          DRILLING           NO. JOINTS<BRK/></THD>
<BRK/>
               [_____]         [_____] - [_____]        [_____]<BRK/></TBL>
<BRK/></SPT>
<SPT><TTL>2.18.5   Bumping Posts, Cushion Heads and Wheelstops</TTL><BRK/>
<BRK/>
<TXT>Bumping posts, cushion heads, and wheelstops shall be new and shall be of a standard design that has been in 
use by commercial railroad industry for at least 5 years.  Bumping posts, cushion heads, and wheelstops shall 
be manufactured by a company regularly engaged in the manufacture of these products.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.18.5.1   Bumping Posts</TTL><BRK/>
<BRK/>
<TXT>Bumping posts shall be of all-steel construction, shall bolt firmly onto the rail, and shall be of a type designed 
for general service.  Bumping posts shall have tension with<MET> 3800 mm<SPS>2</SPS></MET><ENG> 6 sq inch</ENG> cross-sectional area and compression 
members with a moment of inertia not less than<MET> 15 X 10<SPS>6</SPS> mm<SPS>4</SPS></MET><ENG> 37 inch<SPS>4</SPS></ENG> of A36 steel.  Bumping post shall be capable 
of withstanding a yield load of<MET> 2450 kN</MET><ENG> 550,000 pounds</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.5.2   Cushion Heads</TTL><BRK/>
<BRK/>
<TXT>Cushion heads shall be of all steel construction, shall firmly bolt, attach, or clamp onto the bumper or end 
dock (platform or ramp).  Cushion heads shall resist<MET> 356 kN</MET><ENG> 80,000 lbs</ENG> of compression.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.5.3   Wheelstops</TTL><BRK/>
<BRK/>
<TXT>Wheelstops shall be of all-steel construction, shall firmly bolt or clamp onto the rail, and shall be of a type 
designed for general service.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.18.6   Used Bumping Posts and Wheelstops</TTL><BRK/>
<BRK/>
<TXT>Do not furnish used bumping posts and wheelstops.  Used bumping posts and wheelstops [shall be salvaged from 
existing tracks which are removed or rebuilt under this Contract] [will be provided by the Government].  New 
fastening materials shall be used to install or reinstall used bumping posts or wheelstops.  Furnish new fastening 
materials conforming to the applicable sections of this specification.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.7   Inner Guard Rail</TTL><BRK/>
<BRK/>
<TXT>Inner guard rail shall be Class IV or better used rails as indicated in Part 2, Chapter 4, "Inspection Classification 
of Second Hand Rail for Welding", of <RID>AREMA Eng Man</RID>.  Rail shall be<MET> 36 kg/m</MET><ENG> 80 lbs/yd</ENG> or greater.  All rails used 
at any one inner guard rail location shall be the same weight and section.  Joint bars shall match the rail provided 
and shall be in good condition.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.8   Gage Rods</TTL><BRK/>
<BRK/>
<SPT><TTL>2.18.8.1   New Gage Rods</TTL><BRK/>
<BRK/>
<TXT>New gage rods shall be the double-clamp style manufactured in conformance with "Specifications for Special Trackwork" 
of <RID>AREMA Eng Man</RID>.  The double clamp style gage rods shall be threaded on both ends and shall be equipped with 
four malleable steel casting clamps to rigidly hold both sides of the base of both rails.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.8.2   Used Gage Rods</TTL><BRK/>
<BRK/>
<TXT>Do not furnish used gage rods.  Used gage rods [will be provided by the Government] [shall be salvaged from existing 
track].  Salvaged gage rods shall be cleaned and inspected prior to reinstallation.  Bent or broken gage rods 
shall be scrapped.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.18.9   Derails</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Derails may be either a hinged type, a sliding type, or a switch point 
derail.  The contract drawings should indicate the required location, type, 
size, and direction.  Sliding type derails are typically installed with a derail 
stand and operating mechanism for throwing the derail.  A split switch derail 
is to be installed where absolute protection is required.  If a switch point 
derail is to be installed, the project plans will show the layout of the switch 
point derail and this paragraph will be modified accordingly.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.18.9.1   New Derails</TTL><BRK/>
<BRK/>
<TXT>New derails shall be of a standard design that has been in use by the commercial railroad industry for at least 
5 years.  Derails shall be of all-steel construction and shall be designed to be permanently spiked to a crosstie.  
Derails shall be either one-way or two-way as indicated. Derails shall be either sliding type or hinged type 
as indicated.  When the type of derail indicated requires a derail stand, connecting rod, and operating mechanism 
for proper operation, the derail and all necessary components shall be provided as a unit.  The locations, sizes, 
and directions of the derails shall be as indicated on the contract drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.9.2   Used Derails</TTL><BRK/>
<BRK/>
<TXT>Do not furnish used derails.  Used derails [will be provided by the Government] [shall be salvaged from existing 
tracks that are removed or rebuilt under this Contract].  New track spikes and other fastening materials shall 
be used to install or reinstall the used derails.  Furnish new fastening materials conforming to the applicable 
sections of this specification and  <RID>AREMA Eng Man</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.19   SALVAGED MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.19.1   Dunnage</TTL><BRK/>
<BRK/>
<TXT>Pallets, sills, and other material used for packaging and stacking salvaged track items shall be clean, free 
of decay or other defect, and sufficiently sturdy for the service intended.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.2   Marking Paint</TTL><BRK/>
<BRK/>
<TXT>Marking paint shall be a good quality oil-based spray marking paint or a good quality oil-based paint marker.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.3   Salvaging Rail</TTL><BRK/>
<BRK/>
<TXT>Salvage rail as directed; the Government will make available salvaged rail to the Contractor subject to the following:</TXT><BRK/>
<BRK/>
<LST>a.  Nondefective and reclaimable rails salvaged from existing tracks may be used to execute spot rail 
replacement work at other locations of the project, subject to review and approval of the materials by 
the Contracting Officer.</LST><BRK/>
<BRK/>
<LST>b.  Reclaimable defective rails may be used to construct inner guard rails provided all defects can be 
cropped off.  Detailed inspection shall be made of such rails to ensure that rails which contain critical 
defects such as transverse defects, head-web separations, vertical split heads, pipe, split webs, etc., 
are not incorporated in the work.  Loose rails located along the right-of-way shall be inspected and 
used as directed.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.4   Joint Bars</TTL><BRK/>
<BRK/>
<TXT>Nondefective joint bars salvaged from existing tracks may be used to execute spot replacement work at other locations 
of the project, subject to review and approval of the material by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.5   Tie Plates</TTL><BRK/>
<BRK/>
<TXT>Tie plates salvaged from existing tracks, which are not either broken, cracked, or severely corroded or worn, 
may be used to execute the work subject to review and approval of the material by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.20   RAIL BONDING AND GROUNDING</TTL><BRK/>
<BRK/>
<SPT><TTL>2.20.1   Rail Bonds</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Designer will select the length of web bonds based on the joint bar 
size; 600 mm (24 in.) joint bars require 854 mm (34 in.) bond wires, and 900 
mm (36 in.) joint bars require 1154 mm (46 in.) bond wires.</NPR><BRK/>
<BRK/>
<NPR>Double bonding is required for crossing signals only (installation of both rail 
head and web bonds).</NPR><BRK/>
<BRK/>
<NPR>If only static electricity bonding/grounding (without signals or lightning protection) 
is required, the size of cables may be reduced.  If local experience indicates 
drive in tight connections performs satisfactorily, 12 mm drive in tight from 
American Steel drive socket terminal # 34100 type CPN or approved equal can 
be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Rail bonds shall be exothermic type ("Cadweld") bonds applied to the field side of the rail head[, or<MET> [1154] 
mm</MET><ENG> [46] inch</ENG> bonds welded to the rail web].  The bond cables shall be flexible bare copper stranded 1/0 AWG cables 
with preformed ends.  Bond cables shall be flexible bare copper stranded cables with preformed ends and shall 
conform to applicable requirements of <RID>AREMA Eng Man</RID> Vol. 3.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.2   Grounding Rods</TTL><BRK/>
<BRK/>
<TXT>Grounding rods shall be [<MET>19 mm</MET><ENG> 3/4 in</ENG> diameter copper clad steel rods] [<MET>25 mm</MET><ENG> 1 inch</ENG> diameter zinc-coated steel 
rods].  The minimum length of ground rods shall be<MET> 2.5 m</MET><ENG> 8 ft</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3   Ground Connection Cables</TTL><BRK/>
<BRK/>
<TXT>Connections between the grounding system or ground rods and rails shall be made with a bare flexible copper stranded 
2/0 AWG cable.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.4   Electrical Connecting Hardware</TTL><BRK/>
<BRK/>
<TXT>Electrical connecting hardware shall be bronze pressure bar type materials having no rotating parts coming in 
direct contact with conductors.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.21   WELDING</TTL><BRK/>
<BRK/>
<SPT><TTL>2.21.1   Rail Welding Kits</TTL><BRK/>
<BRK/>
<TXT>Kits for thermite type rail welds shall be approved by the Contracting Officer before use.  Provide welding kits 
for all rail sections used and no differentiation will be made between Contractor-furnished and Government-furnished 
rail sections for measurement and payment purposes.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.21.2   Electrodes</TTL><BRK/>
<BRK/>
<TXT>Provide AWS low-hydrogen, high tensile 140-16 (extrapolation) or 25-20 electrode, Grade 310-16 and 310-15 stainless 
steel rod welding electrodes.  Provide electrodes of the smallest practical diameter worked at the lowest compatible 
current.  Coating on low-hydrogen type electrodes shall be thoroughly dry when the electrode is provided.  Use 
electrodes taken from hermetically sealed packages within one hour of the time the package is opened.  Electrodes 
not used within this one-hour period and electrodes taken from non-hermetically sealed packages shall be dried 
for at least one hour between<MET> 371 and 427 degrees C</MET><ENG> 700 and 800 degrees F</ENG>.  Electrodes so dried may be stored 
at temperatures between<MET> 107 and 205 degrees C</MET><ENG> 225 and 400 degrees F</ENG> until used, or, if not stored and not used 
within one hour sfter this drying is completed, shall be re-dried before use.  Do not use electrodes which have 
been wet.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   REMOVAL, SALVAGE, AND DISPOSITION OF MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete paragraphs which are not applicable to the salvaged materials.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Tracks and segments of track shall not be dismantled until approved to do by the Contracting Officer.  The following 
materials shall be salvaged by the Contractor for later use by the Government.  Some of these items will be used 
in the repair of tracks as indicated.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Materials To Be Salvaged</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide list of materials to be salvaged.  For example:  "All 90RA Rail, 
All 90RA Joint Bars".</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Materials to be salvaged for later use by the Government are:</TXT><BRK/>
<BRK/>
<LST>a.  [_____].</LST><BRK/>
<BRK/>
<LST>b.  [_____].</LST><BRK/>
<BRK/>
<TXT>Other materials shall become the property of the Contractor and shall be removed from the project.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Methods and Procedures</TTL><BRK/>
<BRK/>
<TXT>The Contractor may use any methods to dismantle the track, provided proper measures are taken to ensure the safety 
of the laborers and the general public, and no damage is caused to track components to be salvaged or other tracks 
and structures which are indicated to remain.  Methods of removal of existing tracks shall not cause damage to 
adjacent sidewalks or paved roadways.  Damage to these facilities caused by the Contractor shall be restored 
at Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.3   Inventory of Track Materials</TTL><BRK/>
<BRK/>
<TXT>Keep a detailed inventory of excess and salvaged track materials stockpiled for the Government.  Detailed inventory 
shall be recorded in appropriate format and furnished to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4   Inspection and Reconditioning of Used Track Materials</TTL><BRK/>
<BRK/>
<TXT>Salvaged track materials shall be cleaned and inspected for defects to determine their suitability for further 
use.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.1.4.1   Cleaning By Hand or Mechanical Means</TTL><BRK/>
<BRK/>
<TXT>Rail, joint bars, gage rods, tie plates, rail anchors, and other materials shall be cleaned by hand or mechanical 
means to remove all adhering dirt and heavy rusting so that the bare steel can be examined.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4.2   Visual Examination of Rails</TTL><BRK/>
<BRK/>
<TXT>Rails shall be visually examined for evidence of defects such as those illustrated on  Form 402-A found in Chapter 
4 Part 3 of <RID>AREMA Eng Man</RID>.  Such defects shall be brought to the attention of the Contracting Officer who will 
be the final judge as to the serviceability of the rail.  Rails having bolt hole cracks or end batter under paragraph 
TRACK REPAIR that can be reconditioned for use by cropping and redrilling shall be marked at the location of 
the defect with yellow paint.  Rails with other defects or which cannot be reconditioned shall be rejected as 
scrap and shall be marked with bright red paint and stacked separately.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4.3   Visual Examination of Joint Bars</TTL><BRK/>
<BRK/>
<TXT>Existing joint bars and compromise joint bars which are removed and no longer required at that location due to 
rail replacement or other work may be cleaned and reused at other locations, subject to review and approval of 
the Contracting Officer.  Joint bars and compromise joints that are not reused shall be salvaged or scrapped.  
Joint bars shall be visually examined for defects and wear.  Joint bars with bolt hole or spike slot cracks shall 
be scrapped.  Bars which do not fit tightly against the rail or bars in which the bolt holes are excessively 
corroded or worn shall be scrapped.  The Contracting Officer will be the final judge of the serviceability of 
joint bars.  Scrapped bars shall be marked with bright red paint and stacked separately.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4.4   Visual Examination of Gage Rods</TTL><BRK/>
<BRK/>
<TXT>Gage rods shall be visually examined for bends, cracks, or breaks.  Bent, cracked, or broken gage rods shall 
be considered as scrap, marked with bright red paint and stacked separately.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4.5   Visual Examination of Tie Plates and Rail Anchors</TTL><BRK/>
<BRK/>
<TXT>Tie plates and rail anchors shall be visually examined for cracks, breaks, excessive wear, and excessive corrosion.  
Track material with these defects shall be considered scrap, marked with bright red paint and stacked separately.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4.6   Gage Rods</TTL><BRK/>
<BRK/>
<TXT>Gage rods which exist in tangent track and in curved track with a curvature of 10 degrees or less shall be removed 
and salvaged.  Salvaged gage rods that have been inspected and cleaned shall be reused to the maximum extent 
possible.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.4.7   Grade Crossing Materials</TTL><BRK/>
<BRK/>
<TXT>Existing premanufactured grade crossing panels, rail and other track materials shall be salvaged as indicated, 
or as designated by the Contracting Officer.  All salvaged materials shall remain the property of the Government, 
and shall be reinstalled as indicated or shall be transported to the military installation storage yard.  Grade 
crossing materials to be salvaged shall be removed, cleaned as required for proper reinstallation, marked or 
labeled as necessary for proper reinstallation, and transported to the reinstallation location or to the storage 
yard.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.5   Transport and Stack Excess and Salvaged Materials</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.5.1   Material Not Used In Track Repair</TTL><BRK/>
<BRK/>
<TXT>Excess and salvaged materials which are not used in track repair work shall be stacked at a site on the military 
installation designated by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5.2   Stacking of Rails</TTL><BRK/>
<BRK/>
<TXT>Rails shall be stacked on approved sills a minimum of<MET> 152 mm</MET><ENG> 6 inch</ENG> above the ground.  Rails shall be stacked 
with the heads up and with the ends even.  Each layer shall be separated by at least three<MET> 50 by 100 mm</MET><ENG> 2 by 
4 inch</ENG> wood strips evenly spaced along the length of the rail.  Rail shall be grouped by weight, section, drilling, 
condition, length, and amount of wear.  The weight, section, drilling, and length shall be marked on one of the 
rails near the mid-height of the stack.  These markings shall be painted neatly near one end of the rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5.3   Stacking of Joint Bars, Gage Rods, and Tie Plates</TTL><BRK/>
<BRK/>
<TXT>Joint bars, gage rods, and tie plates shall be sorted by section, punching and condition and shall be stacked 
on pallets.  Each pallet stack shall be steel banded for forklift handling.  The maximum weight on any pallet 
shall be<MET> 680 kg</MET><ENG> 1,500 lbs</ENG>.  Compromise joint bars shall be wired together in pairs and stacked on pallets, separate 
from other bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5.4   Containers</TTL><BRK/>
<BRK/>
<TXT>Rail anchors shall be sorted by type and size and placed in kegs, steel drums, or other approved containers.  
Containers shall be labeled with the rail weight and section.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.5.5   Stacking of Special Trackwork Materials</TTL><BRK/>
<BRK/>
<TXT>Special trackwork materials shall be palletized and stacked as directed by the Contracting Officer.  The rail 
weight, rail section, and length shall be marked on each switch point.  The weight, section, and frog number 
shall be marked on the side of each frog casting.  Other switch materials salvaged shall be placed in steel drums 
and labeled as to rail weight, section, length of points, and turnout size.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.1.6   Material to be Scrapped</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove or edit above paragraphs and retain this paragraph when materials 
are to be scrapped.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[All material] [_____] shall be scrapped and shall become the property of the Contractor.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   PLACEMENT OF BALLAST [AND SUBBALLAST]</TTL><BRK/>
<BRK/>
<TXT>Ballast [and Subballast] shall be placed to the lines and grades indicated.  The average thickness shall be within<MET>
 6 mm</MET><ENG> 0.25 inch</ENG> of the thickness shown on the drawings  Subgrade shall conform to the requirements of Section 
<SRF>31 00 00</SRF> EARTHWORK.  Ballast [and Subballast] shall not be placed on soft, muddy, or frozen areas.  Where the 
prepared subgrade (roadbed) is soft, muddy, rutted, exhibits severe depressions, or is otherwise damaged, the 
ballast [and subballast] shall not be placed until the damaged subgrade has been repaired and the area has been 
approved by the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Subballast</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove these paragraphs when subballast is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.2.1.1   Subballast Placement</TTL><BRK/>
<BRK/>
<TXT>Subballast shall be placed in [two]  uniform horizontal lifts of not more than<MET> 152 mm</MET><ENG> 6 inch</ENG> for the full width 
of the cross-section to the total depth indicated.  Each subballast layer shall be shaped to a section conforming 
to the subballast section shown on the drawings and shall be thoroughly compacted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.1.2   Subballast Compaction</TTL><BRK/>
<BRK/>
<TXT>Each subballast lift shall be compacted using approved compaction equipment.  The roller weights, vibration frequencies 
(where applicable), tire pressures (where applicable), and number of passes shall be sufficient to obtain in-place 
densities across the full width of the subballast and throughout the entire depth of the layer of not less than 
95 percent of the <RID>ASTM D 1557</RID> laboratory maximum dry density for the subballast material.  Prior to placement 
of subsequent subballast layers the top of the previous layer shall be scarified to a depth of approximately<MET> 
50 mm</MET><ENG> 2 inch</ENG> to insure proper bond of the layers.Density shall be field measured in accordance with <RID>ASTM D 1556</RID>
(base plate, as shown in the drawing shall be used) [or <RID>ASTM D 6938</RID>.  The calibration curves shall be checked 
and adjusted, if necessary, using only the sand cone method as described in paragraph Calibration, of the ASTM 
publication.  Tests performed in accordance with <RID>ASTM D 6938</RID> result in a wet unit weight of soil and <RID>ASTM D 6938</RID>
 shall be used to determine the moisture content of the soil.  The calibration curves furnished with the moisture 
gages shall also be checked along with density calibration checks as described in <RID>ASTM D 6938</RID>.  The calibration 
checks of both the density and moisture gages shall be made by the prepared containers of material method, as 
described in paragraph Calibration, in <RID>ASTM D 6938</RID>, on each different type of material to be tested at the beginning 
of a job and at intervals as directed.]  One field density tests shall be taken for each 1000 square<MET> meters</MET><ENG> yards</ENG>
 of each layer of material placed in each area.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2.2   Ballast</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.2.1   Ballast Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show detail of ballast section on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Number 5 AREMA ballast shall be placed in the tracks where indicated; <MET>50 mm</MET><ENG> 2 inch</ENG> of Number 5 ballast shall 
be used near turnouts and for<MET> 10 m</MET><ENG> 30 feet</ENG> each side of the switch stand to provide a smooth walking surface 
for railroad employees.  All other areas shall require size AREMA Number [4] [4A] ballast.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2.2   Ballast Distribution</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For projects where large amounts of track are being ballasted, ballast 
distribution from railcars is beneficial.  The provision of a Government locomotive 
and crew to move ballast cars for the Contractor may result in a lower unit 
cost for ballast distribution.  If the installation has a locomotive available 
for use, insert the point of contact and telephone number for arranging use 
of the locomotive.  Examples would be "... Rail Movements Branch, Directorate 
of Logistics, extension 1234 at least 4 hours ..."  If no locomotive is available 
indicate that Government locomotive is not available and the Contractor shall 
provide equipment to unload ballast in paragraph LOCOMOTIVE.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Ballast shall not be distributed until the [subgrade] [subballast] has been approved by the Contracting Officer.  
No payment will be made for ballast which is distributed without the Contracting Officer's approval.</TXT><BRK/>
<BRK/>
<LST>a.  Ballast distribution shall be to the depth indicated and may be from either trucks or railroad cars.  
[If available, the Government will furnish a locomotive for unloading ballast along the track if a carload 
or more is used.  Arrangements for use of the locomotive shall be made by contacting [_____] at least 
[_____] hours in advance of the time the locomotive is needed.] [A government locomotive is not available 
for unloading ballast.]</LST><BRK/>
<BRK/>
<LST>b.  Forming of ruts that would impair proper roadway drainage shall be prevented when distributing ballast 
from trucks and off track equipment.  Any ruts formed greater than<MET> 25 mm</MET><ENG> 1 inch</ENG> shall be leveled and 
graded to drain. </LST><BRK/>
<BRK/>
<LST>c.  Ballast shall be unloaded as close as possible to the point of use so that unnecessary handling is 
prevented.  Excess ballast shall be picked up and redistributed at the Contractor's expense.  If additional 
ballast is required for dressing, it shall be added at no increase in unit price.</LST><BRK/>
<BRK/>
<LST>d.  Ballast cars shall not be released until they have been inspected.  Ballast cars may be weighed by 
the Government before and after dumping the ballast at no cost to the Contractor.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2.3   Ballast Below Ties</TTL><BRK/>
<BRK/>
<TXT>For new construction, the last<MET> 100 mm</MET><ENG> 4 inches</ENG> ballast below the tie, the shoulder ballast and the ballast in 
the tie cribs shall be placed subsequent to the rail and tie installation.  For surfacing existing track, the 
ballast shall be placed subsequent to rail and tie replacements.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.3   TRACK CONSTRUCTION AND OUT-OF-FACE RELAY</TTL><BRK/>
<BRK/>
<TXT>Track construction not covered specifically herein shall be in accordance with AREMA recommendations and recommended 
practices.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Roadbed Preparation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the roadbed will require any major amount of preparation, such as 
compaction or provisions for drainage not covered by other sections of the specifications, 
this paragraph will be either revised or augmented to cover the work required, 
or Section <SRF>31 00 00</SRF> EARTHWORK will be added.  If no roadbed preparation is required, 
delete this paragraph.  If geotextiles are used, the "road crossing" tailoring 
option should be on to get the reference paragraph requirements for geotextiles.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Clearing and grubbing, grading, excavation, embankment preparation, and subgrade preparation shall be performed 
in accordance with Section [_____].  Roadbed surface, grade, and drainage shall be approved prior to any distribution 
of construction material.  Where the subgrade or roadbed is damaged during distribution of materials, ruts and 
depressions shall be filled and compacted and the roadbed surface reapproved prior to track construction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Geotextile for Track Construction</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this paragraph if geotextile is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Geotextile shall be installed between the subgrade and the ballast as shown.  Installation shall be in accordance 
with subparagraph Geotextile Installation under paragraph Highway Crossings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Unloading the Materials</TTL><BRK/>
<BRK/>
<TXT>The use of picks in the handling of ties will not be permitted.  Rails shall be unloaded from cars with an approved 
derrick or crane and placed with the head up without dropping and with sufficient support under the base.  Rails 
of proper length shall be distributed as necessary for road crossings, switches, joint spacing, and other special 
conditions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.4   Ties</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The center to center spacing will be inserted in the blank space in this 
paragraph in accordance with the following:</NPR><BRK/>
<BRK/>
<NPR>a.  For main lines, access tracks, or other tracks where the movement may be 
classified as heavy or the desired speed is in excess of 32 km/hr (20 miles 
per hour), 480 to 560 mm (19.5 in.) spacing will be used.</NPR><BRK/>
<BRK/>
<NPR>b.  For body tracks in yards, sidings, running tracks, and access tracks, where 
the train speed is less than 32 km/hr (20 miles per hour) and train movement 
is not classified as heavy, a 530 to 610 mm (21 in.) spacing will be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Standard center-to-center spacing of crossties shall be<MET> [50][53] mm</MET><ENG> [19.5][21] inch</ENG>.  Switch ties and bridge 
ties shall be spaced as indicated on the drawings.  Ties shall be laid perpendicular to the center line of the 
track with the grain up (heartwood side down) for wood ties.  The best ties shall be used at the rail joints.  
The ends of ties on one side of the track shall be parallel to the rail and the center of the tie shall be on 
the approximate center line of the track.  The ends shall be aligned on the inside of curves and shall continue 
on that side until reaching a curve in the opposite direction.  On double tracks, the ties shall be aligned on 
the outside ends.  The top surface of ties shall provide full bearing for the tie plates.  Adzing of wood ties 
shall be restricted to that necessary to provide a sound true bearing for the tie plate.  Adzing in excess of<MET>
 5 mm</MET><ENG> 0.2 inch</ENG> will not be permitted.  Where adzing is necessary, the cut surface of the wood tie shall be completely 
saturated with creosote or other approved preservatives.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.5   Tie Plates</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For track rehabilitation where the track does not currently have tie 
plates, plates should be installed on each new tie installed.  As defective 
ties are replaced, tie plates are installed with the new ties and with time 
the entire track has plates.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Tracks shall be fully tie-plated.  Tie plates shall be free of dirt and other foreign material when installed.  
Tie plates shall be placed so that the rails will have full bearing on the plate, and the plate will have full 
bearing on the tie.  Tie plates shall be set at right angles to the rail with the outside shoulder against the 
base of the rail, and centered on the tie.  Canted tie plates shall be installed to cant the rail inward.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6   Rail</TTL><BRK/>
<BRK/>
<TXT>The base of the rail and the surface of the tie and tie plate shall be free of dirt and other foreign materials 
prior to laying rail.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.6.1   Laying Rail</TTL><BRK/>
<BRK/>
<TXT>Rail shall be laid without bumping or striking, to standard gage (<MET>1.435 m</MET><ENG> 4 ft 8-1/2 inch</ENG> between points<MET> 16 mm</MET><ENG>
 5/8 inch</ENG> below the top of the rail) on tangents and on curves up to 12 degrees.  For curves 12 degrees and greater, 
the gage shall be widened<MET> 3.2 mm</MET><ENG> 1/8 in</ENG> for each increment of 2 degrees to a maximum of<MET> 1.448 m</MET><ENG> 4 ft 9 inch</ENG>, 
in accordance with TABLE V.  The track shall be gaged at every third tie as spikes are being driven.</TXT><BRK/>
<MET><TBL><THD><BRK/>
<HL4>TABLE V.  TRACK GAGE FOR HIGH DEGREE OF CURVATURE</HL4><BRK/>
<BRK/>
<HL4>Degree of Curvature (per 30.5 m (100-ft) chord)</HL4><BRK/>
<HL4>_____________________________________________</HL4><BRK/>
<BRK/>
        Equal to or               But<BRK/>
        Greater Than           Less  Than        Track Gage<BRK/>
        (Deg - Min)           (Deg - Min)        m   (Ft - In.)<BRK/>
     ___________________  ___________________   ________________<BRK/></THD>
<BRK/>
           0 - 00               12 - 00         1.435 (4 - 8-1/2)<BRK/>
          12 - 01               14 - 00         1.438 (4 - 8-5/8)<BRK/>
          14 - 01               16 - 00         1.441 (4 - 8-3/4)<BRK/>
          16 - 01               18 - 00         1.445 (4 - 8-7/8)<BRK/>
          18 - 01               20 - 00         1.448 (4 - 9)<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>TABLE V.  TRACK GAGE FOR HIGH DEGREE OF CURVATURE</HL4><BRK/>
<BRK/>
<HL4>Degree of Curvature per 100-ft chord</HL4><BRK/>
<HL4>___________________________________________</HL4><BRK/>
<BRK/>
        Equal to or         But Equal to or<BRK/>
        Greater Than           Less Than         Track Gage<BRK/>
        (Deg - Min)           (Deg - Min)       (Ft - In.)<BRK/>
     ___________________  ___________________   ______________<BRK/></THD>
<BRK/>
           0 - 00               12 - 00         4 - 8-1/2<BRK/>
          12 - 01               14 - 00         4 - 8-5/8<BRK/>
          14 - 01               16 - 00         4 - 8-3/4<BRK/>
          16 - 01               18 - 00         4 - 8-7/8<BRK/>
          18 - 01               20 - 00         4 - 9<BRK/></TBL>
</ENG><BRK/>
<LST>a.  Jointed rails shall be laid, one at a time, with space allowance for expansion being provided between 
rail ends in accordance with TABLE VI.</LST><BRK/>
<BRK/>
<LST>b.  Gaps between rail ends in insulated joints shall only be sufficient to permit insertion of standard 
end posts.</LST><BRK/>
<BRK/>
<LST>c.  A standard rail thermometer shall be used to determine the rail temperature.  The thermometer shall 
be laid close to the web on the side of the rail base which is shaded from the sun's rays in advance 
of the laying operation and left there long enough to accurately record the temperature.  The Contractor 
quality control representative shall see that rail temperature is checked frequently and that proper 
rail expansion shims are used.  All thermometers shall be calibrated against the Contracting Officer's 
rail thermometer which will have been accurately calibrated and will be considered as the standard.</LST><BRK/>
<BRK/>
<LST>d.  Except through turnouts and at insulated joints, the staggering of the joints on one side shall not 
vary more than<MET> [460] [500] mm</MET><ENG> [18] [20] inch</ENG> in either direction from the center of the opposite rail.</LST><BRK/>
<BRK/>
<LST>e.  Rails less than<MET> 10 m</MET><ENG> 33 ft</ENG> in length shall not be used in out-of-face rail relay.  However, rails 
not less than<MET> 4 m</MET><ENG> 13 ft</ENG> long may be used for final connections to existing rails to prevent joints from 
occurring at prohibited locations or to provide the specified joint stagger in curves.</LST><BRK/>
<BRK/>
<LST>f.  Rail joints shall not occur in or within<MET> 6 m</MET><ENG> 20 ft</ENG> of a road crossing, alongside of or within<MET> 1.5 
m</MET><ENG> 5 ft</ENG> of the end of any switch or turnout guard rail, or the end of any open deck bridge.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.2   Joints</TTL><BRK/>
<BRK/>
<TXT>The joints in opposite rails shall be staggered one-half the rail length but not less than<MET> 3.5 m</MET><ENG> 12 ft</ENG> apart, 
except closer joints may be required at turnouts and insulated joints.  Rail less than<MET> 4 m</MET><ENG> 13 ft</ENG> in length shall 
not be installed in track.  No joint shall be less than<MET> 2 m</MET><ENG> 6 ft</ENG> from the ends of open-deck bridges, or less 
than<MET> 1 m</MET><ENG> 3 ft</ENG> from switch points.  No joint shall be installed within<MET> 6 m</MET><ENG> 20 ft</ENG> of a road crossing, outer perimeter 
of any structure, or any location which restricts access to the joint.  Where joints are required in these areas, 
the joints shall be welded.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.3   Expansion Allowance</TTL><BRK/>
<BRK/>
<TXT>Allowance for expansion shall be provided at rail joints by using rail-expansion metal shims.  Shims shall be 
removed to within 12 rails of the laying.  Shims shall be of the thickness shown in TABLE VI.  The temperature 
of the rail shall be determined by use of a thermometer placed on the rail base on the side away from the sun.  
Typical rail gap gages are as shown.</TXT><BRK/>
<MET><TBL><THD><BRK/>
<HL4>TABLE VI.  SHIM THICKNESS</HL4><BRK/>
<BRK/>
  10.1 m (33 Ft) Rail   11.9 m (39-Ft) Rail   24.4 m (78-Ft) Rail<BRK/>
  99 Joints per km      84 Joints per km      42 Joints per km<BRK/>
  ___________________   ____________________ ____________________<BRK/>
<BRK/>
  Rail        Shim      Rail        Shim      Rail        Shim<BRK/>
  Temperature Thickness Temperature Thickness Temperature Thickness<BRK/>
  (degrees C) (mm)      (degrees C) (mm)       degrees C) (mm)<BRK/>
  ___________ _________ ___________ _________ ___________ _________<BRK/></THD>
<BRK/>
   Below -23     8       Below -14    8        Below 2      8<BRK/>
   -23 to -10    6       -14 to -4    6        2 to 8       6<BRK/>
   -9 to 1       5       -3 to 7      5        9 to 16      5<BRK/>
    2 to 15      3        8 to 18     3        17 to 23     3<BRK/>
    over 16      2        over 19     2        over 24      2<BRK/></TBL>
</MET><ENG><TBL><THD><BRK/>
<HL4>TABLE VI.  SHIM THICKNESS</HL4><BRK/>
<BRK/>
  33-Ft Rail             39-Ft Rail                78-Ft Rail<BRK/>
  160 Joints per Mi      135 Joints per Mi         68 Joints per Mi<BRK/>
  __________________   ___________________    ______________________<BRK/>
<BRK/>
  Rail        Shim      Rail        Shim      Rail        Shim<BRK/>
  Temperature Thickness Temperature Thickness Temperature Thickness<BRK/>
  (degrees F) (in.)     (degrees F) (in.)     (degrees F) (in.)<BRK/>
  ___________ _________ ___________ _________ ___________ _________<BRK/></THD>
<BRK/>
   Below -10    5/16     Below 6      5/16     Below 35    5/16<BRK/>
   -10 to 14    1/4      6 to 25      1/4      35 to 47    1/4<BRK/>
    15 to 34    3/16     26 to 45     3/16     48 to 60    3/16<BRK/>
    35 to 59    1/8      46 to 65     1/8      61 to 73    1/8<BRK/>
    over 60     1/16     over 66      1/16     over 74     1/16<BRK/></TBL>
</ENG><BRK/></SPT>
<SPT><TTL>3.3.6.4   Cutting Rail</TTL><BRK/>
<BRK/>
<TXT>Only rail saws or track chisels shall be used to cut rail.  New holes shall be drilled using a standard template.  
Holes shall not be burned in rail.  Holes cut with a torch will not be accepted.  When drilling of rail is necessary, 
all chips and burrs shall be removed before applying joints.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.5   Matching Rails</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove this paragraph when relay rail is not used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Where relay rail is used, matching adjacent rails shall not cause lipped or uneven joints.  Any mismatched rail 
ends shall be welded to provide proper match.  Rail end mismatch shall not exceed<MET> 3 mm</MET><ENG> 1/8 in</ENG> on gage or tread 
portions of rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.6   Rail Replacement</TTL><BRK/>
<BRK/>
<TXT>The following procedures apply to rail replacement work:</TXT><BRK/>
<BRK/>
<LST>a.  Spot rail replacement is defined as replacement of<MET> 30 m</MET><ENG> 100 ft</ENG> or less of contiguous rails, usually 
with rails of the same section.  Installation of relief rail in place of defective rail is considered 
spot rail replacement.  Replacement of more than<MET> 30 m</MET><ENG> 100 ft</ENG> of contiguous rails shall be considered 
to be out-of-face rail relay.</LST><BRK/>
<BRK/>
<LST>b.  If spikes are withdrawn, the holes shall be plugged with treated tie plugs of proper size to fit 
the hole, prior to replacement of rail.  If spikes are withdrawn and spikes are to be redriven in existing 
spike holes, the holes shall be plugged with treated tie plugs prior to redriving the spike.  Tie plugs 
shall not be installed in prebored holes unless spikes have been driven and withdrawn.</LST><BRK/>
<BRK/>
<LST>c.  All ties shall be spiked with new spikes in accordance with paragraph Spot Tie Replacement.</LST><BRK/>
<BRK/>
<LST>d.  Ensure that rail ends at joints are not lipped or uneven.  Tread portion (vertical) or gage side 
(horizontal) rail end mismatch shall be no greater than<MET> 2 mm</MET><ENG> 1/16 inch</ENG>.  Rail end mismatch greater than<MET>
 2 mm</MET><ENG> 1/16 inch</ENG> shall be corrected by welding and grinding on the smaller rail.  Grinding the larger 
rail is not permitted unless approved by the Contracting Officer.  Welded transitions shall be made at 
a rate of 1 to 80.</LST><BRK/>
<BRK/>
<LST>e.  Rails removed from track will be designated by the Contracting Officer as relay (for use on project), 
reclaimer (to be salvaged and stockpiled), or scrap.  Joint bars removed from track will be designated 
as relay, reclaimer, or scrap.  Mark scrap materials as scrap using bright red paint, transport them 
off the military installation or to the military installation temporary scrapyard.  Relay materials required 
to complete other repair work of this contract shall be transported to the location of need.  Reclaimer 
materials shall be classified and inventoried and stacked at the military installation storage site, 
all as indicated for salvage materials in paragraph Removal, Salvage, and Disposition of Materials.</LST><BRK/>
<BRK/>
<LST>f.  Metal rail expansion shims shall be used when laying rail.  Wood sticks or other material shall not 
be used as shims.  Provide a sufficient supply of each shim available to permit rail laying to progress 
without delay.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.7   Out-of-Face Rail Relay</TTL><BRK/>
<BRK/>
<TXT>Replace existing rail with the designated new or used rail between designated limits in a continuous operation.  
It is expected that replacement of one rail of a given track will be completed prior to replacement of the opposite 
rail.  Used rail shall be laid [with previous gage side wear facing out, unless required to match existing wear 
patterns] [as directed by the Contracting Officer].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6.8   Spot Rail Replacement</TTL><BRK/>
<BRK/>
<TXT>Spot rail replacements shall be made where necessary to replace existing defective rails or to compensate for 
rail joint gap adjustments.</TXT><BRK/>
<BRK/>
<LST>a.  Replacement Rail:  Replacement rail shall be of equal length or longer than the rail it replaces.  
The minimum length of rail used shall be<MET> 4 m</MET><ENG> 13 ft</ENG>.</LST><BRK/>
<BRK/>
<LST>b.  Spot Rail Replacement Resulting in Joint Staggers:  Unless otherwise approved by the Contracting 
Officer on a case by case basis, spot rail replacement shall not result in joint staggers less than<MET> 1.33 
m</MET><ENG> 4 ft</ENG>.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.7   Joint Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The location of compromise joints will be shown on the drawings.  Where 
compromise joints are required, the portion of this paragraph in brackets will 
be retained.  If compromise joints are not required, the portion of this paragraph 
in brackets will be deleted.</NPR><BRK/>
<BRK/>
<NPR>AREMA Manual recommends an initial bolt tension of between 89,000 and 133,000 
newtons (20,000 and 30,000 lbs) per bolt in order to overcome the surface roughness 
and provide proper seating for the joint bars.  After application of traffic, 
tension in the bolt is lost relatively rapidly and may lose from 22,000 to 44,000 
newtons (5,000 to 10,000 lbs) per bolt in the first month.  Therefore, retightening 
of all track bolts after some period of time is necessary.  Bolt tension recommended 
for subsequent tightening  is within the range of 67,000 to 111,000 newtons 
(15,000 to 25,000 lbs) per bolt.  The torque required to develop the specified 
tension in a bolt is approximately as follows:</NPR><BRK/>
<TBL><THD><BRK/>
                      BOLT DIAMETER          TORQUE*<BRK/>
                      (mm)   (in.)     (N m)   (ft-lbs)<BRK/></THD>
<BRK/>
                      19      3/4       340      250<BRK/>
                      22      7/8       408      300<BRK/>
                      25       1        476      350<BRK/>
                      29     1-1/8      544      400<BRK/>
<BRK/>
                  *For well oiled bolts with clean threads.</TBL><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Joint bars shall be clean.  Rail joints shall be installed so that bars are not cocked between the base and head 
of the rail.  Bars shall be properly seated in the rail and the full number of correct-size bolts, nuts, and 
spring washers installed.  Bolts shall be placed with nuts alternately on inside and outside of rail.  A corrosion 
resistant lubricant shall be applied to the bolt threads prior to application of nuts.  Bolts shall be tightened 
to torque of approximately [_____]<MET> N-m</MET><ENG> ft-lbs</ENG>, beginning at the center of the joint and working both ways to 
the ends of the joint.  After the track has been in service [, but before acceptance of the work,] all bolts 
shall be checked and retightened to a torque of approximately [_____]<MET> N-m</MET><ENG>ft-lbs</ENG>.  [Rail of different sections 
shall be connected by properly fitting compromise joint bars.  The mismatch for compromise joints for either 
tread surface or on the gage side shall not exceed<MET> 3 mm</MET><ENG> 1/8 inch</ENG>].  Defective joint bars designated on the contract 
drawings, discovered by the Contractor during track repair operations, or as identified by the Contracting Officer 
shall be replaced with acceptable joint bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.8   Spiking</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.8.1   Spiking Procedures</TTL><BRK/>
<BRK/>
<TXT>Rail shall be spiked promptly after being laid.  Spikes shall be started and driven vertically and square with 
the rail.  Engineered polymer composite ties shall be pre-drilled in accordance with manufacturer's recommendations 
for size and depth.  Spikes shall be driven to allow approximately<MET> 3 to 5 mm</MET><ENG> 1/8 to 3/16 inch</ENG> space between the 
underside of the spike and the top of the rail base.  Spikes shall not be overdriven, or straightened while being 
driven.  Spikes shall not be installed through the slots in skirted-type, slotted joint bars (angle bars).  Spikes 
shall not be driven against the ends of joint bars.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.8.2   Number of Spikes</TTL><BRK/>
<BRK/>
<TXT>Four rail-holding spikes shall be used on each tie on tangents and curves less than 4 degrees.  Spikes on the 
gage side of the running rail shall be placed directly across from each other and the spikes on the field side 
of the running rail shall be placed directly across from each other.  Spikes on the gage side shall be offset 
longitudinally from the field spike and all four spikes shall be rail-holding spikes next to the base of the 
rail.  This pattern shall be held consistent.  On curves 4 degrees or greater, but not more than 36 degrees, 
six spikes shall be used on each tie with the spikes located as follows:  One rail-holding spike on the field 
side and two rail-holding spikes on the gage side for both rails.  [Curves 36 degrees and greater shall be spiked 
with eight spikes per tie, located as follows:  One rail-holding spike and one plate-holding spike on the field 
side and two rail-holding spikes on the gage side for both rails.]  Eight rail-holding spikes shall be used on 
each tie through road crossings.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.9   Tie Plugs</TTL><BRK/>
<BRK/>
<TXT>If spikes are withdrawn from wood ties, the holes shall be swabbed with creosote and plugged with creosoted tie 
plugs of proper size to fit the hole.  If spikes are withdrawn and spikes are to be reinserted in existing spike 
holes, the holes shall be swabbed with creosote and plugged with creosoted tie plugs prior to redriving the spike.  
Tie plugs shall not be installed in prebored holes unless spikes have been driven and withdrawn.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.10   Rail Anchor Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate this paragraph with paragraph Rail Anchors in PART 2.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Rail anchors shall be located as indicated on the project plans.  Where the use of rail anchors is indicated, 
apply a minimum of [_____] anchors per<MET> 11.9 m</MET><ENG> 39 ft</ENG> of rail in the pattern indicated on the project drawings.  
The rail anchors shall be spaced approximately uniformly along the rail length.  Rail anchors shall be installed 
to the gage side of the rail against the same tie face on opposite rails.  Rail anchors shall grip the base of 
the rail firmly and shall have full bearing against the face of the tie.  Rail anchors shall not be moved by 
driving them along the rail.  Rail anchors shall not be applied to track on an open-deck bridge.  Where anchors 
are used on track approaching an open deck bridge, every third tie shall be box anchored for at least four rail 
lengths, off each end of the bridge.  Rail shall be anchored immediately after spiking and before rail has experienced 
a large temperature change.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.11   Inner Guard Rails</TTL><BRK/>
<BRK/>
<TXT>Guard rails shall be installed on bridges and trestles as indicated.  Guard rails shall be approximately<MET> 280 
mm</MET><ENG> 11 inch</ENG> from the gage side of track rails and shall extend a minimum of<MET> 15 m</MET><ENG> 50 ft</ENG> beyond the structure.  
The ends shall be curved inward and beveled.  Guard rails shall be fully bolted.  Guard rails shall not be higher 
than the running rail and shall not be more than<MET> 25 mm</MET><ENG> 1 inch</ENG> lower than the running rail.  Each guard rail shall 
be spiked with two spikes to each tie but shall not be tie-plated.  Unfit track rail in short lengths may be 
used for guardrails.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.12   Derails</TTL><BRK/>
<BRK/>
<TXT>Derails shall be properly installed where indicated.  Derailed equipment shall not foul other tracks.  Installation 
shall be in accordance with the manufacturer's instructions.  Where no specific installation instructions are 
available for salvaged derails, reinstallation shall be in accordance with good track construction practice to 
ensure proper performance of their intended function.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.13   Superelevation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Superelevation on military railroad track should not exceed 100 mm (4 
inches).  Superelevation for each curve will be shown on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Curves shall be superelevated as shown on the drawings unless otherwise directed by the Contracting Officer.  
Superelevation shall be obtained by raising the outside rail of the curve.  The inside rail shall be maintained 
at grade.  The maximum superelevation will be [_____]<MET> mm</MET><ENG> inch</ENG>.  Full superelevation shall be carried throughout 
each curve, unless otherwise directed or shown on the drawings.  Superelevation runoff shall be at a uniform 
rate, and shall extend at least the full length of the spirals.  The normal rate of superelevation runoff will 
be<MET> 13 mm per 9.4 m</MET><ENG> 1/2 inch per 31 ft</ENG>; however, this may be increased to<MET> 25 mm in 9.4 m</MET><ENG> 1 inch in 31 ft</ENG> with 
the prior approval of the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14   Preliminary Surfacing</TTL><BRK/>
<BRK/>
<TXT>The preliminary alignment and surfacing gangs shall follow the unloading of the ballast.  Rail renewal, tie renewal, 
bolt tightening, and ballast placement shall be complete prior to commencement of surfacing and alignment work.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.14.1   Lifts</TTL><BRK/>
<BRK/>
<LST>a.  The track, after being aligned, shall be brought to grade and surface in lifts not exceeding<MET> 100 
mm</MET><ENG> 4 in</ENG> each.  After each lift, the ballast shall be tamped.  When using jacks, they shall be placed 
close enough together to prevent undue bending of rail or stress of rail and joint.  Both rails shall 
be raised at one time and as uniformly as possible, except where superelevation is required.  The track 
shall be so lifted that after a period of not less that 5 train operations (70<MET> metric ton</MET><ENG> ton</ENG> ballast 
car) after the last lift, it will be necessary to give the track a final lift of between<MET> 25 and 50 mm</MET><ENG>
 1 and 2 inch</ENG> to bring it to grade.</LST><BRK/>
<BRK/>
<LST>b.  In areas where major track resurfacing is not required, perform a "skin lift" tamping operation to 
ensure that the ties are adequately tamped, the ballast section is adequately compacted and dressed, 
and to correct minor deficiencies in surface and alignment.  The rise in skin lift areas shall be<MET> 25 
mm</MET><ENG> 1 in</ENG> or less and usually will not require that additional ballast be placed.</LST><BRK/>
<BRK/>
<LST>c.  A<MET> 50 mm</MET><ENG>2 inch</ENG> rise shall provide an average<MET> 50 mm</MET><ENG>2 inch</ENG> raise in the track being surfaced.</LST><BRK/>
<BRK/>
<LST>d.  A<MET> 100 mm</MET><ENG> 4 in</ENG> rise shall provide an average<MET> 100 mm</MET><ENG>4 inch</ENG> raise in the track being surfaced, and shall 
be made in at least two lifts not to exceed<MET> 50 mm</MET><ENG> 2 inches</ENG> per lift.</LST><BRK/>
<BRK/>
<LST>e.  A<MET> 150 mm</MET><ENG> 6 inch</ENG> raise shall provide an average<MET> 150 mm</MET><ENG> 6 inch</ENG> raise in the track being surfaced, and 
shall be made in at least 2 lifts.  The initial lift shall not exceed<MET> 100 mm</MET><ENG> 4 inch</ENG> with the final lift 
not to exceed<MET> 70 mm</MET><ENG> 2-1/2 inch</ENG>.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14.2   Tamping</TTL><BRK/>
<BRK/>
<TXT>Raising and tamping of track shall be performed with an automatic, vibratory, squeeze type power tamper with 
16 tamping heads, capable of raising both rails simultaneously and maintaining cross-level.  The equipment to 
be used for surfacing operations is subject to approval by the Contracting Officer.  Every tie in the track shall 
receive two or more full insertions of the tamping heads.  Ballast shall be power-tamped under both sides of 
ties from each end to a point [<MET>300 mm</MET><ENG> 12 inches</ENG> inside each rail for<MET> 2.4 m</MET><ENG> 8-ft</ENG> ties,] [<MET>380 mm</MET><ENG> 15 inches</ENG> inside 
each rail for<MET> 2.6 m</MET><ENG> 8 feet-6 inch</ENG> ties,] [and] [<MET>460 mm</MET><ENG> 18 inches</ENG> inside each rail for<MET> 2.7 m</MET><ENG> 9 ft</ENG> ties].  The 
center shall be filled with ballast, but tamping will not be permitted in the center of the tie between the above 
stated limits.  Both ends of the ties shall be tamped simultaneously and tamping inside and outside of the rail 
shall be done at the same time.  Tamping tools shall not be used with more than 35% wear and shall be worked 
opposite each other on the same tie.  Ballast under switch ties and road crossing ties shall be tamped the entire 
length of each tie.  All ties shall be tamped to provide solid bearing against the base of the rail after the 
track or turnout is raised to grade at final surfacing.  All down ties shall be brought up to the base of rail 
and shall be machine tamped.  The resultant track surface and alignment shall be uniform and smooth.  Tamping 
of track in snow or frozen ballast conditions will not be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14.3   Replacement of Ties</TTL><BRK/>
<BRK/>
<TXT>After tamping has been completed and the jacks removed, all ties pulled loose shall be replaced to their proper 
position, respiked and retamped to provide full bearing against the rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14.4   Track Off The Ends of Open Deck Bridges</TTL><BRK/>
<BRK/>
<TXT>Track off the ends of open deck bridges shall maintain the same grade as the track on the bridge for a minimum 
of<MET> 8 m</MET><ENG> 25 ft</ENG> beyond the bridge abutment and then transition smoothly to meet established track grades.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14.5   Runoff of Track Raises</TTL><BRK/>
<BRK/>
<TXT>The runoff at the end of a rise shall not exceed<MET> 13 mm in 9.4 m</MET><ENG> 0.5 inches in 31 ft</ENG> of track unless otherwise 
approved by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.14.6   Horizontal Realignment</TTL><BRK/>
<BRK/>
<TXT>Horizontal realignment of curved track shall be established using manual or mechanical means as described in 
the <RID>AREMA Eng Man</RID> Chapter 5, Part 3 Section 3.2, "String Lining of Curves by the Chord Method".</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.15   Final Surfacing</TTL><BRK/>
<BRK/>
<TXT>After preliminary surfacing has been completed, grade and line stakes shall be checked and the track brought 
to grade and alignment.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.15.1   Final Tamping</TTL><BRK/>
<BRK/>
<TXT>Track shall be brought to grade and the ballast retamped in the manner described for preliminary surfacing, except 
that the tamping distance inside the rail shall be decreased from<MET> 300 to 250 mm for 2.4 m ties, 380 to 330 mm 
for 2.6 ties, and 460 to 410 mm for 2.7</MET><ENG> 12 to 10 inch for 8 ft. ties, 15 to 13 inch for 8 ft 6 inch ties, and 
18 to 16 inch for 9 ft</ENG> ties.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.15.2   Final Alignment</TTL><BRK/>
<BRK/>
<TXT>The track shall be given a final aligning conforming to the established track centers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.15.3   Final Dressing</TTL><BRK/>
<BRK/>
<TXT>After the final alignment the ballast shall be dressed to the section indicated.  After final dressing ballast 
shall not cover the tops of the ties.  The portion of the subgrade outside the ballast line shall be left with 
a full, even surface and the shoulder of the subgrade shall be properly dressed to the indicated section to provide 
proper drainage away from the track.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.15.4   Surplus Ballast</TTL><BRK/>
<BRK/>
<TXT>Surplus ballast remaining after final surfacing and dressing of the ballast section shall be distributed or otherwise 
disposed of as directed by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.16   Cleanup</TTL><BRK/>
<BRK/>
<TXT>Upon completion of the work, [remove all rubbish, waste, and discarded materials generated by the work from the 
project area] [dispose of rubbish, waste, and discarded materials in an approved manner as directed by the Contracting 
Officer].  Areas where the Contractor has worked, including but not limited to, project areas, material storage 
sites, and borrow or disposal areas shall be left in a clean, well-graded, and well-drained condition.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.16.1   Shoulder Removal and Reconstruction</TTL><BRK/>
<BRK/>
<TXT>Where track construction or rehabilitation operations result in deposition of materials along the track shoulders 
that would impede the free drainage of the geotextile and track structure, remove the material.  Where [undercutting] 
[ploughing] operations leave fouled shoulder materials that impede free drainage of the geotextile and the track 
structure, the shoulder material shall be removed, and the ballast shoulders shall be reconstructed using the 
materials and dimensions as indicated.  Areas where shoulder removal and reconstruction are required [are] [are 
not] indicated on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.16.2   Spoil Materials</TTL><BRK/>
<BRK/>
<TXT>Spoil materials removed from the track shall be disposed of [as indicated] [off site at the Contractor's expense].  
Spoil materials shall not be placed on the shoulders, in ditches, in drains, or in other areas where they would 
impede the flow of water away from the track.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.17   Final Adjustments</TTL><BRK/>
<BRK/>
<TXT>Sixty calendar days after the track has been accepted and put into operation, perform, at no cost to the Government, 
necessary resurfacing adjustments to leave the track in alignment and on grade.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.18   Tolerances for Finished Track</TTL><BRK/>
<BRK/>
<TXT>Completed track shall meet the following tolerances.  Track not meeting the tolerances specified below shall 
be repaired to meet these requirements, at no additional cost to the Government.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.18.1   Gage</TTL><BRK/>
<BRK/>
<TXT>Track gage shall be within plus<MET> 6 mm</MET><ENG> 1/4 inch</ENG> or minus<MET> 3 mm</MET><ENG> 1/8 inch</ENG> of standard gage.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.18.2   Alignment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The alignment and track surface tolerances for out-of-face surfacing 
of secondary track (less than 16 km/hour (10 MPH)) may be doubled from the values 
given below if alignment is not critical.  Horizontal alignment and profile 
drawings are recommended.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Alignment shall be measured as the deviation of the mid-offset of a<MET> 18.9 m</MET><ENG> 62 ft</ENG> line, with the ends of the line 
at points on the gage side of the line rail, <MET>16 mm</MET><ENG> 5/8 inch</ENG> below the top of the railhead.  Either rail may be 
used as the line rail on tangent track; however, the same rail shall be used for the entire length of the tangent.  
The outside rail in a curve is always the line rail.  Alignment on tangents shall not deviate from uniformity 
more than<MET> 13 mm</MET><ENG> 1/2 inch</ENG>.  Alignment on curves shall not deviate from uniformity more than<MET> 10 mm</MET><ENG> 3/8 inch</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.18.3   Track Surface</TTL><BRK/>
<BRK/>
<TXT>Track surface shall meet the following requirements:</TXT><BRK/>
<BRK/>
<LST>a.  The runoff at the end of a raise shall not exceed<MET> 13 mm</MET><ENG> 1/2 inch</ENG> in any<MET> 9.4 m</MET><ENG> 31 ft</ENG> of rail.</LST><BRK/>
<BRK/>
<LST>b.  The deviation from design profile on either rail at the mid-ordinate of a<MET> 18.9 m</MET><ENG> 62 ft</ENG> chord shall 
not exceed<MET> 13 mm</MET><ENG> 1/2 in</ENG>.</LST><BRK/>
<BRK/>
<LST>c.  Deviation from design elevations on spirals shall not exceed<MET> 13 mm</MET><ENG> 1/2 inch</ENG>.</LST><BRK/>
<BRK/>
<LST>d.  Deviation from zero cross level at any point on tangent or from designated superelevation on curves 
or spirals shall not exceed<MET> 13 mm</MET><ENG> 1/2 in</ENG>.</LST><BRK/>
<BRK/>
<LST>e.  The difference in cross level between any two points less than<MET> 18.9 m</MET><ENG> 62 ft</ENG> apart on tangents, and 
on curves between spirals shall not exceed<MET> 13 mm</MET><ENG> 1/2 in</ENG>.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.18.4   Guard Face Gage</TTL><BRK/>
<BRK/>
<TXT>Guard face gage is the distance between the guard lines measured across the track at right angles to the gage 
line, and is measured at the point of frog on both sides of the turnout.  The design value for guard face gage 
is<MET> 1340 mm</MET><ENG> 52-3/4 inch</ENG>.  Guard face gage shall be within plus or minus<MET> 3 mm</MET><ENG> 1/8 inch</ENG> of the design value.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.18.5   Guard Check Gage</TTL><BRK/>
<BRK/>
<TXT>Guard check gage is the distance between the gage line of a frog and the guard line of its guard rail, or guarding 
face, measured across the track at right angles to the gage line.  The design value for guard check gage is<MET> 1388 
mm</MET><ENG> 54-5/8 inch</ENG>.  Guard check gage shall be within plus or minus<MET> 3 mm</MET><ENG> 1/8 inch</ENG> of the design value.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.4   TURNOUTS AND TRACK CROSSINGS</TTL><BRK/>
<BRK/>
<TXT>Turnouts and crossovers shall be located as indicated on the drawings.  Switch, frog and guardrail assemblies 
shall be complete.  Stock rails shall be accurately bent.  Changes in rail weight or section will not be permitted 
within the limits of the switch ties.  Headblocks shall be at right angles to the main track and shall be securely 
spiked in place.  Except where directed otherwise, switch stands shall be installed so that when the switch is 
set for the normal position, the connecting rod keeps the points closed with a pulling force.  Switches shall 
be properly adjusted.  Switch components and slide plates shall be lubricated.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Turnout Reconstruction</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List the turnout identification numbers and/or other identifying information, 
such as location or milepost on the drawings.  Indicate the appropriate work 
required on each turnout.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>3.4.1.1   Install Salvaged Turnouts</TTL><BRK/>
<BRK/>
<TXT>Turnouts shall be reconstructed using Government materials, except switch ties which are furnished and installed.  
This work includes transporting the turnout from the Government stockpile to the installation site and reconstruction 
of the turnout.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.2   Salvage and Install Turnouts</TTL><BRK/>
<BRK/>
<TXT>Turnouts shall be salvaged (removed) and installed.  This work consists of removal of the turnout, transporting 
to the installation site all turnout materials except the switch ties, and reconstructing the turnout using new 
switch ties.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.3   Turnout Removal and Salvaged or Scrapped</TTL><BRK/>
<BRK/>
<TXT>Materials from turnouts that are removed from the track and that are not to be reinstalled, shall be either salvaged 
or scrapped as indicated on the drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.4   Trackbed</TTL><BRK/>
<BRK/>
<TXT>The trackbed shall be prepared by excavating and wasting existing ballast or subgrade materials and establishing 
a firm top of subgrade as indicated on the contract drawings.[  Subballast shall be placed as indicated and compacted.][  
Geotextile shall be placed to the limits indicated.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.5   Replacement Turnout</TTL><BRK/>
<BRK/>
<TXT>The replacement turnout shall be constructed at the location indicated on the contract drawings.  Replacement 
turnouts shall be located so that the point of frog remains at the same location as the original turnout point 
of frog.  Dimensions, details, and configuration of each turnout shall be as indicated on <RID>AREMA Eng Man</RID>, Plans 
Nos. 910 and 911.  Switch ties shall be placed as indicated on <RID>AREMA Eng Man</RID>, Plans Nos. 112 and 912, except 
that even<MET> meter</MET><ENG> foot</ENG> increments in length of switch ties may at Contractor's option  be substituted for<MET> 150 mm</MET><ENG>
 6 inch</ENG> increments in length of switch ties.  The end of a switch tie shall not be within<MET> 355 mm</MET><ENG> 14 inch</ENG> of a 
spike.  Connecting tracks shall be shifted to their new alignments as shown on the contract drawings and all 
tracks connected to the replacement turnout.  Tracks shall be placed within<MET> 30 mm</MET><ENG> 0.1 ft</ENG> of design alignment 
prior to ballasting work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.6   Matching</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Allow at least 50 mm (2 in.) of clearance between moving parts of the 
switch and the top of the ballast.  One hundred mm (four in.) is the minimum 
clearance in Northern climates, where snow and ice accumulation and heaving 
occur.  Select the appropriate clearance for the project location.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Switch points/stock rails, rail joints, frog castings, and other parts of the turnout that must fit together 
shall fit properly and be of the proper match.  Both rail ends at all rail joints throughout the turnout and 
at the joints at the frog shall be matched on both the top (tread portion) and on the gage side of the rail.  
Rail end welding and grinding [are][are not] acceptable methods to achieve a good match.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.7   Placing of Ballast</TTL><BRK/>
<BRK/>
<TXT>Ballast shall be placed as required and the turnout brought to proper grade in a minimum of three lifts.  The 
initial lift shall not exceed<MET> 100 mm</MET><ENG> 4 inch</ENG>.  The final lift shall not exceed<MET> 50 mm</MET><ENG> 2 inch</ENG> and all tracks shall 
be brought into final alignment at that time.  Tamping, ballast dressing requirements, and alignment tolerances 
shall be as indicated in paragraph TRACK CONSTRUCTION AND OUT-OF-FACE RELAY.  Ballast level in cribs beneath 
the connecting rod, switch point rails, and switch rods shall be at least<MET> 100 mm</MET><ENG> 4 inch</ENG> below any steel.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.8   Existing Switch Stand</TTL><BRK/>
<BRK/>
<TXT>The existing switch stand, or a replacement stand if specified, shall be installed and the switch operating mechanisms 
adjusted so that the switch operates smoothly and without excessive force being required.  All switch plates 
and connection points in the switch rod shall be lubricated with a switch lubricant, which does not allow sand 
or debris to adhere to the lubricant.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.1.9   Rail Anchors</TTL><BRK/>
<BRK/>
<TXT>All switch ties shall be box-anchored to the extent possible. Ties shall be anchored only when box-anchors can 
be applied to every rail on the tie.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4.2   Turnout Repair</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Designer will list the turnout identification numbers and/or other identifying 
information, such as location or milepost, along with the requirements in a 
schedule on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Turnouts which will remain in their existing location but require repairs shall be indicated in the "Schedule 
of Turnout Repairs" on the contract drawings and repaired as specified below.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.2.1   Switch Ties</TTL><BRK/>
<BRK/>
<TXT>Defective switch ties shall be removed and replaced.  Existing nondefective switch ties shall remain in place.  
Replacement switch ties shall be installed at a uniform spacing, but not greater than<MET> 530 mm</MET><ENG> 21 inch</ENG> center to 
center.  The end of a switch tie shall not be within<MET> 36 mm</MET><ENG> 14 inch</ENG> of a spike.  Switch ties shall not be interlaced, 
where one tie penetrates the crib area of another tie.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2.2   Bolt Tightening</TTL><BRK/>
<BRK/>
<TXT>All bolts in all turnouts within the project area shall be tightened.  Any bolt that cannot be tightened shall 
be replaced with a bolt assembly of the proper diameter and length.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2.3   Rebuild Switch Points and Protectors, Frogs, and Guard Rails</TTL><BRK/>
<BRK/>
<TXT>Switchpoints, frogs, guard rails, or switch point protectors shall be rebuilt as specified in paragraph ELECTRIC 
ARC WELDING.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2.4   Regage Closure Rails</TTL><BRK/>
<BRK/>
<TXT>Track shall be regaged from heel of switch to the toe of frog.  Regaging shall be performed as specified in paragraph 
TRACK CONSTRUCTION AND OUT-OF-FACE RELAY.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>3.5   HIGHWAY CROSSINGS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Subdrains are recommended on all highway crossings.  Drawings should 
show location of outfall pipe.  Density requirements can be deleted if a separate 
specification section is provided for subgrade preparation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Highway and other grade crossings within the project shall be constructed as indicated on the contract drawings.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Subgrade</TTL><BRK/>
<BRK/>
<TXT>[For new construction, the subgrade in the crossing area and for<MET> 6 m</MET><ENG> 20 ft</ENG> beyond each end of the crossing shall 
be bladed to a level surface and compacted to at least 90 percent CE55 maximum dry density for cohesive materials 
or 95 percent CE55 maximum dry density for cohesionless materials.][For track rehabilitation, old contaminated 
ballast and subballast shall be excavated a minimum<MET> 300 mm</MET><ENG> 12 inch</ENG> below the design elevation of the bottom of 
the tie, <MET>300 mm</MET><ENG> 12 inch</ENG> beyond the ends of the ties, and for at least<MET> 6 m</MET><ENG> 20 ft</ENG> beyond each end of the crossing.  
The subgrade shall be bladed to a level surface.]  Drainage areas shall be cleaned and sloped away from the crossing 
in both directions along the track and the roadway.  [Surface ditches][Subdrains] shall be installed as indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2   Geotextile Installation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate these paragraphs with paragraph GEOTEXTILE.  Delete these 
paragraphs if geotextile is not required.</NPR><BRK/>
<BRK/>
<NPR>The width of the geotextile should cover the entire width of the roadbed with 
no longitudinal seams or overlaps.  Where mechanized geotextile laying equipment 
will be used to place the geotextile, the maximum diameter of the geotextile 
rolls should not exceed the capability of the equipment to be used on the project.</NPR><BRK/>
<BRK/>
<NPR>Prior to the placement of the cover material (ballast or subballast), the geotextile 
may be anchored in several ways, i.e., pins, small ballast piles, ballast bags, 
etc.  If fixing of the geotextile is critical and adverse conditions exist, 
e.g., steep slopes or high winds, the specification can detail anchoring requirements, 
e.g., pin length and spacing.  Care should be taken to prevent or quickly release 
any tension caused by anchoring and placement of the geotextile cover materials.  
Excessive tension can cause bridging of irregularities beneath the geotextile 
and increase the potential for puncture.</NPR><BRK/>
<BRK/>
<NPR>If there is reason to suspect movement which will reduce overlap, provision 
should be made in the specification to remove cover materials at selected areas 
in order to determine if required overlap is being maintained after cover placement.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Geotextile shall be placed between the subgrade and the ballast section in the crossing area and for<MET> 6 m</MET><ENG> 20 ft</ENG>
 beyond each end of the crossing.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.2.1   Preparation</TTL><BRK/>
<BRK/>
<TXT>Surfaces on which geotextiles will be placed shall be prepared in accordance with the applicable portions of 
this specification and shall be free of irregularities such as sags, cavings, erosion, or vegetation.  Any irregularities 
shall be corrected to ensure continuous, intimate contact of the geotextile with the whole surface.  Any loose 
material or debris shall be removed prior to geotextile placement.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.2   Placement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete paragraph "b." if a protective sand layer is not specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<LST>a.  When geotextile is to be installed in an existing track following removal of the ballast by undercutting 
or ploughing, special care shall be taken to remove as many of the large ballast particles that remain 
on the roadbed surface as possible.</LST><BRK/>
<BRK/>
<LST>b.  A protective sand layer<MET> 50 mm</MET><ENG> 2 inch</ENG> thick [or subballast] shall be placed on top of the geotextile 
after it has been installed.</LST><BRK/>
<BRK/>
<LST>c.  The geotextile shall be carefully placed on the prepared surface with the long dimension parallel 
to the prepared surface.  The geotextile shall be placed free of wrinkles, folds, creases, and tension.  
The geotextile shall be held in place by pins, small aggregate piles or  ballast bags, until it is completely 
covered.  The geotextile shall be covered immediately after placement in track.  The maximum exposure 
time for the geotextile, from removal of the protective shipping cover to placement of the ballast/subballast 
cover materials which prevent exposure to sunlight, shall be 2 consecutive days.</LST><BRK/>
<BRK/>
<LST>d.  The minimum overlap of geotextile splicing seams shall be<MET> 900 mm</MET><ENG> 36 inch</ENG>.  If several geotextile 
units are placed with the required overlap prior to the placement of the [ballast][subballast], the overlap 
distance of each overlap shall be checked as placement of [ballast][subballast] approaches the overlap.  
Ensure that the required overlap exists when the geotextile is covered.</LST><BRK/>
<BRK/>
<LST>e.  The geotextile shall remain free of any contamination such as mud, dust, sediment, debris, etc., 
that will impair its function.  Contamination shall be removed without damage to the geotextile or to 
the prepared surface at the Contractor's expense.  If the geotextile is damaged, its function impaired 
by the cleaning efforts, or if it cannot be properly cleaned, repair the prepared surface, if necessary, 
and replace the damaged or impaired geotextile with geotextile meeting requirements of this specification.  
Equipment shall not operate in direct contact with the geotextile.  Surface drainage, as much as possible, 
shall be directed away from the geotextile installation area to prevent accumulation of mud, debris, 
and sediment.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.3   Placement of Cover Material</TTL><BRK/>
<BRK/>
<TXT>Placement of [ballast][subballast] cover material in contact with the geotextile shall be performed ensuring 
intimate contact of the geotextile with the prepared surface and with the cover material.  The placement shall 
be performed without damage to the geotextile including tears, punctures, or abrasion.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.4   Equipment Operations on the Cover Material</TTL><BRK/>
<BRK/>
<TXT>A minimum depth of<MET> 200 mm</MET><ENG> 8 inch</ENG> of cover material shall be placed over the geotextile before equipment is allowed 
to operate on the covered geotextile.  Equipment operations on the covered geotextile shall be limited to those 
necessary for track construction and equipment turning will not be allowed on the covered geotextile.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.5   Minimum Ballast Depth</TTL><BRK/>
<BRK/>
<TXT>The minimum depth of ballast between the bottom of the tie and the top of the geotextile shall be<MET> 300 mm</MET><ENG> 12 inch</ENG>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.6   Tamping Operations</TTL><BRK/>
<BRK/>
<TXT>Tamping of ballast materials shall be performed by setting the tamping force and insertion depth to the minimum 
necessary to adequately tamp the track.  The tamper operator shall monitor the depth of tamping and limit the 
depth to prevent detrimental effects of the tamper feet on the geotextile.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.2.7   Double Layers</TTL><BRK/>
<BRK/>
<TXT>Double layers of geotextile will not be allowed, except for splicing overlaps at seams.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.3   Ballast Placement and Surfacing</TTL><BRK/>
<BRK/>
<TXT>Ballast shall be placed and tamped as specified in paragraph TRACK CONSTRUCTION AND OUT-OF-FACE RELAY except 
that in crossings, the ballast between the ties shall be thoroughly compacted with a vibratory compactor, or 
other approved means, after each raise.  The ballast shall be tamped for the entire length of the crossties for 
highway crossings.  The track shall receive final alignment and surfacing prior to placement of the crossing 
surface.  Final surfacing shall bring the track to the final grade and alignment as indicated on the contract 
drawings.  Where the crossing involves two or more tracks, the top of the rail for all tracks shall form a plane 
with the adjacent roadway surface.  The top of rail elevation shall be<MET> 50 to 100 mm</MET><ENG> 2 to 4 inches</ENG> above surrounding 
pavement elevation, with a smooth transition of pavement.  The ballast in the cribs and on the shoulders shall 
be compacted using a vibratory plate compactor or other approved means.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4   Ties</TTL><BRK/>
<BRK/>
<TXT>[Hardwood][Concrete][Polymer Composite] ties shall be used.  Spacing shall be a minimum of<MET> 500 mm</MET><ENG> 20 inches</ENG> center 
to center.  For premanufactured grade crossings, ties shall conform to the manufacturer's recommendations for 
the type of grade crossing surface materials being used.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5   Tie Plates, Spikes, and Anchors</TTL><BRK/>
<BRK/>
<TXT>All ties within the crossing and for<MET> 6 m</MET><ENG> 20 ft</ENG> beyond each end of the crossing shall be fully tie plated, and 
spiked with 4 rail-holding spikes per tie plate.  [Each tie within the crossing shall be fully box anchored.] 
[Rubber tie pads shall be installed between the tie and tie plate on all ties within the crossing area and for<MET>
 6 m</MET><ENG> 20 ft</ENG> beyond each end of the crossing.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.6   Rail</TTL><BRK/>
<BRK/>
<TXT>Rail within the crossing area and for<MET> 6 m</MET><ENG> 20 ft</ENG> beyond each end of the crossing shall be, at a minimum, <MET>[57][_____] 
kg/m</MET><ENG> [115][_____] lbs/yd</ENG>.  Rail [shall] [shall not] be protected from corrosion by application of an approved 
rust inhibitor.  Bolted joints will not be permitted in any Type 2, Type 3, Type 4, or Type 5 crossing or within<MET>
 6 m</MET><ENG> 20 ft</ENG> of either edge of the crossing surface.  Bolted joints will be eliminated by either field welding 
the joints to form continuous rail throughout this area or by using<MET> 24.4 m</MET><ENG> 78 ft</ENG> rail lengths.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.7   Lining and Surfacing</TTL><BRK/>
<BRK/>
<TXT>Rail shall be spiked to line and the track mechanically tamped and surfaced to the grade and alignment of the 
existing track and roadway.  Where the crossing involves two or more tracks, the top of rails for all tracks 
shall be brought to the same plane.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8   Crossing Surface</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide Typical Railroad Crossing cross section and details on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The surface of the highway shall be [in the same plane as][not greater than<MET> 6 mm</MET><ENG> 1/4 inch</ENG> higher than] the top 
of the rails for a distance of<MET> 600 mm</MET><ENG> 2 ft</ENG> outside of the rails for either single or multiple-track crossings.  
A smooth transition shall be made between the crossing surface and the adjoining pavement.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.8.1   Type 1 Aggregate Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 1 crossings shall be constructed by placing the aggregate material between the rails and outside of the 
rails to form an approach ramp as indicated in the contract drawings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.2   Type 1A Aggregate with Timber Flangeway Guards Crossings</TTL><BRK/>
<BRK/>
<TXT>The bond timber headers shall be installed with the edge of the timber solid against the edges of the tie plates 
prior to placement of the aggregate.  Headers shall fasten to the ties as indicated using the appropriate size 
and length fasteners.  After installation of the bond timber, the aggregate shall be placed in the track and 
on the outside approaches and compacted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.3   Type 2 Timber Plank Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 2 Type 2 crossings shall be installed as shown or in accordance with the manufacturer's instructions for 
prefabricated timber crossing units.  The surface of the crossing timbers shall form a smooth plane with the 
top of the rails and the adjacent roadway surface.  Crossing timbers shall be attached to the ties as indicated 
in the contract drawings using the appropriate size and length fasteners, unless otherwise specified by the manufacturer's 
instructions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.4   Type 3a Asphalt Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 3a crossings are full-depth asphalt crossings as shown in the contract drawings.  The asphalt shall be placed 
in lifts not to exceed<MET> 50 mm</MET><ENG> 2 inch</ENG> thick and shall be compacted with approved compaction equipment.  General 
requirements for asphalt placement are specified in [_____] State Highway Specifications.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.5   Type 3b Asphalt With Timber Flangeway Header Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 3b crossings are full-depth asphalt crossings as shown in the contract drawings.  The asphalt shall be placed 
in lifts not to exceed<MET> 50 mm</MET><ENG> 2 inch</ENG> thick and shall be compacted with approved compaction equipment.  General 
requirements for asphalt placement are specified in [_____] State Highway Specifications.   the flangeway timbers 
shall be installed prior to the placement of the asphalt pavement.  The  timbers shall be installed with the 
dappled edge of the timber solid against the ends of the tie plates.  Flangeway timbers shall fasten to the ties 
as indicated in the contract drawings using the appropriate size and length fasteners.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.6   Type 4a Cast-in-place Concrete Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 4 crossings shall be constructed as shown in the contract drawings using the materials specified herein.  
Concrete forming, reinforcement, and placement shall conform to the requirements of Section <SRF>03 11 13.00 10</SRF> STRUCTURAL 
CONCRETE FORMWORK, Section <SRF>03 20 01.00 10</SRF> CONCRETE REINFORCEMENT, and Section [<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL 
CONCRETE] [<SRF>03 30 00</SRF> CAST-IN-PLACE CONCRETE].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.7   Type 4b Prefabricated Concrete Panel Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 4A crossings and crossing materials shall be installed in accordance with the crossing manufacturer's instructions.  
Tie spacings and track materials used in the crossing shall be in accordance with the installation instructions 
and manufacturer's recommendations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.8.8   Type 5 Full Depth Rubber Crossings</TTL><BRK/>
<BRK/>
<TXT>Type 5 crossings and crossing materials shall be installed in accordance with the crossing manufacturer's printed 
instructions.  Tie spacings and track materials used in the crossing shall be in accordance with the installation 
instructions and manufacturer's recommendations.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.9   Signs and Signals</TTL><BRK/>
<BRK/>
<TXT>The type and location of railroad-highway crossing warning signs and signals shall conform to the requirements 
of <RID>MUTCD</RID>, Part VIII.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.9.1   Location and Positioning of Signs</TTL><BRK/>
<BRK/>
<TXT>Signs for both highway and railroad track installation shall be located and erected as shown.  Unless otherwise 
shown, signs shall be erected so that sign face is vertical and at a deflection angle of 87 degrees from the 
center of the highway lane or track which the sign serves and facing the direction of travel.  Where lanes or 
tracks are on curves, sign faces shall be on a deflection angle of 87 degrees to the tangent to the curve.  Signs 
shall be erected so that specular reflection is minimized or eliminated.  After installation is completed, the 
signs will be inspected during the day and at night by the Contracting Officer.  If specular reflection is apparent 
on any sign, its positioning shall be adjusted to eliminate or minimize this condition.  This adjustment and 
any subsequent adjustments shall be at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.9.2   Traffic Control</TTL><BRK/>
<BRK/>
<TXT>During installation of highway signs, provide for the safe and expeditious movement of traffic through the work 
area.  Provide schedule of lane closures, work zone safety and traffic control, and related items.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.10   Crossing Flangeways</TTL><BRK/>
<BRK/>
<TXT>Upon completion of the grade crossing installation, the flangeways through the crossing shall be a minimum of<MET>
 50 mm</MET><ENG> 2 inch</ENG> deep and between<MET> 65 and 75 mm</MET><ENG> 2-1/2 and 3 inches</ENG> wide.  Ensure that adequate flangeways are provided 
prior to installation of the final crossing surface.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.10.1   Flangeway Filler</TTL><BRK/>
<BRK/>
<TXT>Except for Type I crossings all open crossing flangeways shall be filled with [asphaltic concrete and compacted 
as indicated on the drawings][preformed rubber filler].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.10.2   Clean Grade Crossing Flangeways</TTL><BRK/>
<BRK/>
<TXT>Where grade crossing flangeways are obstructed (filled in), remove foreign material to provide a minimum<MET> 50 mm</MET><ENG>
 2 inch</ENG> depth and<MET> 65 mm</MET><ENG> 2-1/2 inch</ENG> width flangeways on the gage side of the rails.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.11   <SUB>As-Built Drawings</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit as-built drawings for each automatic crossing protection installation.  The materials and methods used 
to produce these drawings shall meet the requirements of this specification and shall result in drawings which 
are easy to revise without damage to the drawing.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   BONDING AND GROUNDING TRACK</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Whenever rail facilities are required for unloading fuel, ammunition, 
other flammable or explosive materials, or if the track is located adjacent 
to electrical equipment, the rails and related track materials capable of conducting 
electrical current must be bonded, grounded and insulated from the remaining 
track.  See UFC 4-860-01FA for details on which track must be bonded and grounded.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Track shall be bonded and grounded as indicated.  Where track is designated for bonding and grounding, the rails 
shall be bonded electrically continuous and effectively grounded.  Connections shall be made by exothermite welds  
in accordance with the manufacturer's instructions.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.6.1   Rail Joint Bond</TTL><BRK/>
<BRK/>
<TXT>Rail joints on both rails of designated track shall be bonded using an exothermic type bond.  The bond shall 
be applied to the field side of the rail [head] [web] unless otherwise approved by the Contracting Officer.  
Track to be bonded and grounded shall be electrically insulated from the remaining track using one of the specified 
insulated joints.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.2   Rail Cross-Bond and Ground</TTL><BRK/>
<BRK/>
<TXT>Rail cross-bond and ground shall be installed using an exothermic type bond.  The cross-bond shall be applied 
to the [rail head][rail web].  One cross-bond and ground shall be [installed at<MET> 30.5 m</MET><ENG> 100 ft</ENG> intervals along 
the designated tracks.][provided for each section of bonded and grounded track.]  Connections between grounding 
system or ground rods and rails shall be made with bare stranded copper cable, installed at least<MET> 300 mm</MET><ENG> 12 inch</ENG>
 below the bottom of the ties.  Ground rods shall be driven vertically full-length.  The top of the ground rod 
shall be located at the toe of the ballast slope and shall be a minimum of<MET> 300 mm</MET><ENG> 12 inch</ENG> below the top of the 
subgrade.  Maximum resistance to ground from any grounded rail or structure shall not exceed 25 ohms.  Make any 
corrections needed to reduce the resistance to below 25 ohms at no cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.3   Inspection of Rail Bond and Ground</TTL><BRK/>
<BRK/>
<TXT>Loose, damaged, or missing rail bond wires, cross bond wires, ground connections, and ground rods shall be visually 
inspected.  If there is a signal failure, bonding can be tested for current loss in the joints using a volt meter.  
Defective items shall be marked for repair.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.4   Rail Bonds At Signalized Grade Crossings</TTL><BRK/>
<BRK/>
<TXT>Bolted rail joints within the approach circuits to signalized highway grade crossings shall be double-bonded 
using both a rail head bond and a web bond.  Rail head and web bonds shall be installed in the locations indicated 
where the existing rail bonds are missing, broken, or otherwise ineffective.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.5   Existing Bonds</TTL><BRK/>
<BRK/>
<TXT>Protect existing rail bonds[, cross-bonds][, ground connections, and grounding rods] from damage.  Except for 
bonds attached to rails which are designated to be replaced in this contract, replacement of bonds damaged or 
destroyed by the Contractor's operation shall be replaced at no cost to the Government.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6.6   Removal of Defective Bonds</TTL><BRK/>
<BRK/>
<TXT>Rail head pin-type and welded-type bonds shall be removed by shear cutting old cables immediately adjacent to 
the weld or pin.  Rail web type pin bonds shall be removed by knocking the old pin out with a drift.  Flames 
or torches shall not be used to remove defective bonds.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.7   INSTALLATION OF MISCELLANEOUS TRACK MATERIALS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.7.1   Tie Plates</TTL><BRK/>
<BRK/>
<TXT>Tie plates shall be furnished to the work sites as required.  Excess tie plates, remaining at the conclusion 
of the contract, shall be delivered to the military installation storage site and stacked where directed by the 
Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.2   Insulated Joints</TTL><BRK/>
<BRK/>
<TXT>Insulated joints shall be installed where indicated and in accordance with the manufacturer's installation instructions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.3   Bumping Posts, Cushion Head, and Wheelstops</TTL><BRK/>
<BRK/>
<TXT>Bumping posts, cushion head, and wheelstops shall be [removed,][installed,][ or ][reinstalled][_____].  Installation 
shall be in accordance with the manufacturer's instructions.  Where no specific installation instructions are 
available for salvaged bumping posts and wheelstops, reinstallation shall be in accordance with good track construction 
practice to ensure proper performance.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.4   Inner Guard Rails</TTL><BRK/>
<BRK/>
<TXT>Inner guard rails shall be installed as detailed in the contract drawings.  Each rail shall be spiked to alternate 
crossties throughout the full length using two spikes per rail per tie; tie plates are not required.  Guard rails 
shall be installed using acceptable joint bars of the proper size to fit the rails being joined.  Each joint 
shall be bolted with at least two bolts and one fully tightened bolt per rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.5   Gage Rods</TTL><BRK/>
<BRK/>
<TXT>One gage rod shall be installed in the crib immediately ahead of the switch point of all turnouts.  Two gage 
rods shall be installed on the curved closure rail, one ahead of the joint, and one ahead of the toe of the frog 
in all turnouts.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.6   Installation of Joint Bars</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For low traffic volume tracks that are equipped with six hole angle bars, 
the bars may be installed by placing bolts in only the four center holes.  Modify 
paragraph as needed if six hole bars are used, and designate locations for four 
bolt use.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Joint bars shall be installed with their full number of bolt assemblies unless otherwise noted.  Bars shall be 
properly seated on the rail and the bolts tightened beginning at the center of the joint and working toward the 
ends of the bars, alternating between rails.  Bolts used shall be of the proper diameter and length for the rail 
and joint bars at the joint.  The use of extra washers to shim out track bolt nuts is prohibited.  Bolts with 
nuts shall be placed alternately on inside and outside of rail.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8   <SUB>BRIDGE REPAIR</SUB></TTL><BRK/>
<BRK/>
<TXT>Bridge repair shall be as follows:</TXT><BRK/>
<BRK/>
<SPT><TTL>3.8.1   State and Local Government Permits</TTL><BRK/>
<BRK/>
<TXT>Obtain necessary permits from state and local governments for work over public roads.  Prepare <SUB>traffic maintenance 
and detour plans</SUB>; submit them for approval to the appropriate authorities; erect and maintain signs, barricades, 
lighting, and other traffic control devices in accordance with <RID>MUTCD</RID>; pay for police details; and stage the work 
to provide for the continued safe public use of the roadways beneath the bridges.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.2   Work Hours</TTL><BRK/>
<BRK/>
<TXT>The Contractor may be required by local or state authorities to work at night or on split shifts to avoid peak 
traffic hours at bridges [_____].  No additional compensation will be made for any costs associated with meeting 
such requirements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.3   Schedule of Bridge Repair Work</TTL><BRK/>
<BRK/>
<TXT>The work of this project shall be scheduled to minimize the duration of interruptions to rail service.  Bridge 
repair work shall be scheduled so that to the maximum practical extent, bridges on the same line are taken out 
of service and repaired simultaneously.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.4   Timber Pile Repair</TTL><BRK/>
<BRK/>
<TXT>A timber pile can be spliced or shimmed to repair areas of deterioration or to compensate for settlement of the 
pile.  Any spliced pile shall achieve a bearing adequate for its design loading.  No more than 50 percent of 
the piles in a single bent shall be spliced, and no more than 25 percent of the piles in the entire substructure 
shall be spliced or shimmed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.5   Timber Pile Replacement</TTL><BRK/>
<BRK/>
<TXT>Any pile shall be replaced when it does not achieve adequate bearing, the pile has greater than 50 percent deterioration, 
or replacement is more economical.  [Replacement pile shall be driven along side existing piles] [A two pile 
support pier shall be constructed under the bridge cap to carry the load of the deteriorated pile].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.6   Bridge Tie Replacement Open-Deck Bridges</TTL><BRK/>
<BRK/>
<TXT>Where spot replacement of bridge ties is required, the existing tie shall be removed without permanently disturbing 
the track surface.  New bridge ties shall be of the proper wood species, structural grade, and size for the intended 
application.  Shimming of bridge ties will not be permitted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.8.7   Rivet Replacement</TTL><BRK/>
<BRK/>
<TXT>Where replacement is required, rivets shall be replaced with high-strength bolts as specified in Section 
<SRF>05 12 00</SRF> STRUCTURAL STEEL.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9   <SUB>ELECTRIC ARC WELDING</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  An electric flash butt mobile rail welder should be used on large projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Welding to repair or rebuild frogs, switch point, guard rails, switch point protectors and rails (engine burns, 
battered ends, etc.) shall be done in accordance with <RID>AREMA Eng Man</RID>, Chapter 5, Part 5,Section 5.10 and <RID>AWS D1.1/D1.1M</RID>
.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.1   Welding Supervision</TTL><BRK/>
<BRK/>
<TXT>Electric arc welding shall be performed under the direct supervision of an experienced welding supervisor or 
foreman and by a certified welder.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.2   Weather Conditions</TTL><BRK/>
<BRK/>
<TXT>Welding shall not be performed in rain, snow, or other inclement weather without adequate protection of the welding 
from the elements.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.3   Welding Manganese Frogs and Crossings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit these paragraphs as needed to match the project requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Bolts shall be tightened, spikes driven down and ties tamped under crossing and frogs for level surface, when 
welding manganese frogs and crossings.  Chips and cracks shall be ground out with grinding machine or gouged 
out with arcair gouging device even if crack goes through the entire casting.  When gouging device is used, no 
finished grinding of cracks or chips is required.  If cracks are gouged out to bottom of casting, reinforcement 
strap shall be [placed underneath the hole.][welded to the bottom of the hole in casting with the wire feed machine, 
allowing the frog or crossing to be welded back to level surface using the skip method.]</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.3.1   Manganese Overheating</TTL><BRK/>
<BRK/>
<TXT>Welder shall ensure that manganese is not overheated in this process.  If manganese shows signs of overheating, 
casting shall be air cooled and then welding process continued, repeating the process as many times as necessary 
to prevent manganese from overheating.  Flange carbons [shall][shall not] be used to keep welding metal out of 
flangeways.  Welded surface shall be built slightly higher than normal surface of casting so when ground, it 
will have sufficient weld metal to grind to a level surface.  A<MET> 600 mm</MET><ENG> 24 inch</ENG> straightedge shall be used to 
check this work.  Edges of flangeways and sides of points shall be ground in a roll manner, using a frog and 
crossing flangeway gage as a guide.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.3.2   Slotting</TTL><BRK/>
<BRK/>
<TXT>Manganese frogs and crossings shall be slotted with a<MET> 5 mm</MET><ENG> 3/16 inch</ENG> slotting wheel.  Connecting rail joints 
to frog shall also be welded, ground, and slotted in like manner.  The grinding and slotting process shall be 
repeated approximately 6 weeks from the time the frog is put back in service and thereafter when overflow appears 
on points and flangeways.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9.4   Welding Switch Points</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Field welding of switch points is not recommended.  Qualifications of 
welder are very important for this type of work.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Overflow of stock rail shall be ground off of ball of rail on both sides and switch point ground to where cracks 
and chips are ground out.  All grease and rust shall be ground off of point as far back as point is to be welded.  
Switch point shall be adjusted tight against stock rail and check gage.  If gage just ahead of switch point is 
tight, it shall be opened to where gage reads<MET> 6 mm</MET><ENG> 1/4 inch</ENG> open.  The following shall be done before starting 
to weld:  1) Open switch point and place rail flange carbon between switch point and stock rail.  2) Pull switch 
tight against carbon and hold with spike; another rail carbon can be placed just on top of reinforcement binding 
strap on point to use as guide for first welding pass; carbon can then be removed or left in place.  3) Grind 
switch point with surface grinder or utility grinder.  4) Apply graphite or oil to switch points and plates to 
prevent rusting and to make switch throw easier.  5) Check with proper authority to ensure ample time to complete 
welding, grinding and cooling before traffic is due.  Switch point shall be ground welded complete without chipping 
weld slag.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.5   Welding Switch Point Protectors</TTL><BRK/>
<BRK/>
<SPT><TTL>3.9.5.1   In Track</TTL><BRK/>
<BRK/>
<TXT>The following operations shall be performed:  1) Check with proper authority to ensure ample time to complete 
welding, grinding and cooling before traffic is due.  2) Use a steel ruler to determine the amount of weld needed 
on manganese switch point protectors; measure the top of the protector any place where there is no wear.  3) 
Grind out the work hardened surface and any cracks or chips.  4) Weld the protector with the semi-automatic wire 
feed machine slightly wider than the width of a new switch point protector; run a string bead along the bottom 
of the wear surface on the protector guard; leaving flux on this bead continue with string bead until protector 
is built back to size without overheating the protector.  If signs of overheating appear, use intermittent welding 
procedure.  5) Grind back the protector to the correct width.  6) Use roll method on top inside corner of protector.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.5.2   Out of Track</TTL><BRK/>
<BRK/>
<TXT>The following operations shall be performed:  1) Use a steel tape to determine the amount of weld needed on manganese 
switch point protectors; measure the top of the protector any place where there is no wear.  2) Ground out the 
work hardened surface and any cracks or chips.  3) Weld the protector with the semi-automatic wire feed machine 
to just a little wider than the width of a new switch point protector; the protector can be laid on its side 
and three flat beads run on wear surface of the protector guard; ground back to the size of a new protector.  
4) Use intermittent method and skip welding to keep protector from overheating.  5) Use the roll method on inside 
corner of running wear surface of guard.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9.6   Welding Engine Burns</TTL><BRK/>
<BRK/>
<TXT>The damaged steel of the rail shall be removed by grinding or arcair to get below the burn area into sound metal.  
Sufficient amount of metal shall be removed to eliminate all shatter cracks.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.9.6.1   Depth and Length Limitations</TTL><BRK/>
<BRK/>
<TXT>Engine burns requiring welds greater than<MET> 10 mm</MET><ENG> 3/8 inch</ENG> in depth below the top of the rail head shall not be 
repaired by welding and grinding.  While grinding out the damaged metal, the operation shall be stopped when 
it is discovered that the necessary weld will go too deep into the rail head.  The ground out portion shall be 
welded and joint bars shall be applied at the weld location with the rail undrilled at the middle bolt holes, 
centering the joint bars under the engine burn.  The supervisor of maintenance shall be immediately notified 
so that the rail can be removed from track.  These failed rails shall be disposed of in accordance with current 
instructions.  Engine burns which would require a weld longer than<MET> 200 mm</MET><ENG> 8 inch</ENG> shall not be welded.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.6.2   Ambient Limitations</TTL><BRK/>
<BRK/>
<TXT>Welding and grinding engine burns shall be avoided when the air temperature is below<MET> 0 degrees C</MET><ENG> 32 degrees F</ENG>
.  When welding is necessary below<MET> 0 degrees C</MET><ENG> 32 degrees F</ENG>, the heated area shall be protected by covering with 
insulating material to retard cooling.  Engine burns shall not be welded during rain or heavy snow.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.6.3   Number of Welds</TTL><BRK/>
<BRK/>
<TXT>Determine the maximum number of burns in a<MET> 12 m</MET><ENG> 39 ft</ENG> rail, or equivalent, that can be economically welded.  
Unless otherwise directed, when a rail has more than 8 burns needing repair, the rail shall be replaced.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.6.4   Welding Procedure</TTL><BRK/>
<BRK/>
<TXT>The burn shall be welded with semi-automatic wire feed machine.  The skip method shall be used in this process 
because no preheating or post heating is needed.  If engine burns are found in groups close together, ten to 
fifteen burns shall be ground out at a time, welding one pass at a time on each of the burns.  The process shall 
be repeated until all of the burns are completed to a surface just higher than the normal ball of the rail.  
The burn shall then be cooled until hand can be placed on it.  Welds shall be ground to a level surface with 
cup wheel attachment grinder.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.9.7   Welding Rail Joints</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove this paragraph when not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Bolts in the joint bars shall be tightened and the joint pulled to a level surface.  Joint bars shall be checked 
for wear and replaced if they are badly worn.  Six hole bars shall be used if available.  A straightedge shall 
be placed across the joint to determine the amount of batter.  The straightedge shall be a minimum of<MET> 450 mm</MET><ENG> 
18 inch</ENG> in length.  A rail joint with less than<MET> 3 mm</MET><ENG> 0.012 inch</ENG> of batter shall not be welded.  If batter is<MET> 
3 mm</MET><ENG> 0.012 inch</ENG> or more, the rail joint shall be built up.  If rail cracks or chipped out places are present 
in rail ends, they shall be melted out with acetylene torch, gouged out with arcair or ground out with grinder.  
If cracks or chips extend below ball, rail shall be replaced.  If horizontal crack in ball of rail extends more 
than<MET> 200 mm</MET><ENG> 8 inch</ENG> rail shall be replaced.  Rail ends shall be preheated to approximately<MET> 93 degrees C</MET><ENG> 200 degrees 
F</ENG> before welding.  Starting<MET> 40 mm</MET><ENG> 1-1/2 inches</ENG> from the end, the rail shall be built back as follows:  A strip 
shall be welded<MET> 25 mm</MET><ENG> 1 inch</ENG> into bead; the rail ends shall be ground to a level surface with surface grinder 
or cup wheel attachment; and rail joint shall be cross slotted with<MET> 5 mm</MET><ENG> 3/16 inch</ENG> grinding stone to keep rail 
ends from overlapping and chipping out.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.10   <SUB>THERMITE WELDING PROCEDURES</SUB></TTL><BRK/>
<BRK/>
<TXT>Thermite welding procedures shall be performed by a technician certified to meet <RID>ASNT CP-189</RID>, level II or III 
qualifications and comply with the following paragraphs:</TXT><BRK/>
<BRK/>
<SPT><TTL>3.10.1   End Preparation</TTL><BRK/>
<BRK/>
<TXT>Rails to be welded shall meet the requirements Section 2.2, "Specifications for Fabrication of Continuous Welded 
Rail" given in Chapter 4, Part 2 of <RID>AREMA Eng Man</RID>.  The rail ends shall be aligned in accordance with paragraph 
GAP AND ALIGNMENT.  Rail ends shall show no steel defects, dents, or porosity before welding.  Bolt holes shall 
not be made in, or permitted to remain in, the ends of the rail to be welded.  One handling hole may be made 
in each end of welded string.  Rail ends containing such holes shall be cut off during track construction.  Rail 
which must be cut for any reason shall be cut square and clean by means of approved rail saws or abrasive cutting 
wheels in accordance with Chapter 5 of <RID>AREMA Eng Man</RID>, Section 10.3, "Recommended Practice For Use of Abrasive 
Wheels".</TXT><BRK/>
<BRK/>
<SPT><TTL>3.10.1.1   Cleaning</TTL><BRK/>
<BRK/>
<TXT>The rails to be welded shall be cleaned of grease, oil, dirt, loose scale, and moisture to a minimum of<MET> 150 mm</MET><ENG>
 6 inch</ENG> back from the rail ends, including the railhead surface.  Cleaning shall be accomplished by use of a 
wire brush, to completely remove dirt and loose oxide and by use of oxygen-acetylene torch to remove grease, 
oil and moisture.  A power grinder with an abrasive wheel shall be used to remove scale rust, burrs, lipped metal 
and mill brands which would interfere with the fit of the mold, for<MET> 50 mm</MET><ENG> 2 inch</ENG> on each side of the ends.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.1.2   Gap and Alignment</TTL><BRK/>
<BRK/>
<TXT>The minimum and maximum spacing between rail ends shall be as specified by the rail welding kit manufacturer 
and the approved welding procedures.</TXT><BRK/>
<BRK/>
<LST>a.  The ends of the rails to be welded shall be properly gapped and aligned to produce a weld which shall 
conform to the alignment tolerances below.  Alignment of rail shall be done on the head of the rail.  
The rail gap and alignment shall be held without change during the complete welding cycle.</LST><BRK/>
<BRK/>
<LST>b.  Vertical alignment shall provide for a flat running surface.  Any difference of height of the rails 
shall be in the base.</LST><BRK/>
<BRK/>
<LST>c.  Horizontal alignment shall be done so that any difference in the width of heads of rails shall occur 
on the field side.  Horizontal offsets shall not exceed<MET> 1 mm</MET><ENG> 0.04 in</ENG> in the head and/or<MET> 3 mm</MET><ENG> 0.12 inch</ENG>
 in the base.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.10.2   Surface Misalignment Tolerance</TTL><BRK/>
<BRK/>
<TXT>Combined vertical offset and crown camber shall not exceed<MET> 3 mm/m</MET><ENG> 0.04 inch/feet</ENG> at<MET> 315 degrees C</MET><ENG> 600 degrees 
F</ENG> or less.  Combined vertical offset and dip camber shall not exceed<MET> 1 mm/m</MET><ENG> 0.01 inch/feet</ENG> at<MET> 315 degrees C</MET><ENG> 600 
degrees F</ENG> or less.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.3   Gage Misalignment Tolerance</TTL><BRK/>
<BRK/>
<TXT>Combined horizontal offset and horizontal kink camber shall not exceed<MET> 3 mm/m</MET><ENG> 0.04 inch/feet</ENG> at<MET> 315 degrees C</MET><ENG>
 600 degrees F</ENG> or less.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.4   Thermite Welding</TTL><BRK/>
<BRK/>
<TXT>Welding shall be done in accordance with Chapter 4, Part 2,Section 2.5 of <RID>AREMA Eng Man</RID>, articles "Thermite Welding 
- Rail Joints" and Section 2.2 "Specification for Fabrication of Continuous Welded Rail", except as modified 
by these specifications.  All welds shall be visually inspected at the time of welding.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.10.4.1   Thermite Weld Preheating</TTL><BRK/>
<BRK/>
<TXT>The rail ends shall be preheated prior to welding to a sufficient temperature and for sufficient time as indicated 
in the approved welding procedures to ensure full fusion of the weld metal to the rail ends without cracking 
of the rail or weld.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.4.2   Thermite Weld Cooling</TTL><BRK/>
<BRK/>
<TXT>The molds shall be left in place after tapping for sufficient time to permit complete solidification of the molten 
metal and proper slow cooling to prevent cracking and provide a complete weld with proper hardness and ductility.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.10.5   Weld Finishing and Tolerances</TTL><BRK/>
<BRK/>
<TXT>Welded joints in the finished track shall be brought to a true surface and alignment by means of a proper grinding 
or planing machine (shear).  Finish grinding shall be performed with an approved grinder operated by a skilled 
workman grinding evenly and leaving the joints in a smooth and satisfactory condition.  Finishing shall eliminate 
all cracks.  The completed weld shall be finished by mechanically controlled grinding in conformance with the 
following requirements:</TXT><BRK/>
<BRK/>
<LST>a.  A finishing deviation of not more than plus or minus<MET> 1 mm</MET><ENG> 0.01 in</ENG> of the parent section of the rail 
head surface will be allowed.  The gage side of the rail head shall be finished to plus or minus<MET> 1 mm</MET><ENG>
 0.01 in</ENG> of the parent section.</LST><BRK/>
<BRK/>
<LST>b.  Welds produced by welding kits which are specially designed to produce reinforced welds need not 
be ground in the finishing area except as necessary to remove fins, burrs, cracks, etc.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.6   Weld Quality</TTL><BRK/>
<BRK/>
<TXT>Each completed weld shall have full penetration and complete fusion and be entirely free of cracks or fissures.  
Welds shall meet the acceptance criteria given in <RID>AWS D1.1/D1.1M</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.10.7   Weld Numbering</TTL><BRK/>
<BRK/>
<TXT>Semi-permanently mark a sequential weld number on the rail immediately adjacent to the weld, using a quality 
lead paint marker at the time the weld is made.  Welds shall be numbered sequentially in the order in which they 
are made.  The Contracting Officer will provide the initial weld number.  Defective welds which are replaced 
shall be assigned a new sequential number by adding a letter to the defective weld number (e.g., defective weld 
347 would be replaced by 347A).</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.11   TRACK REPAIR</TTL><BRK/>
<BRK/>
<SPT><TTL>3.11.1   Cutting and Drilling of Rail</TTL><BRK/>
<BRK/>
<TXT>Use only rail saws and abrasive cutting wheels for this operation.  Other methods for cutting rail will not be 
acceptable.  Cuts shall be square and clean.  When given the option of cutting existing rail or new rail being 
installed, the existing rail shall be cut.  When new holes are necessary, they shall be drilled.  Holes shall 
not be punched, slotted, or burned with a torch.  Holes shall be of the size and located as shown on the contract 
drawings.  Drilled bolt holes shall be peened or ground to remove sharp edges.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2   Rail Joints</TTL><BRK/>
<BRK/>
<TXT>In areas which do not require out-of-face rail replacement, tighten all track bolts.  Defective track bolts, 
nuts and lock washers ("bolt assemblies"), and those that cannot be tightened shall be replaced.  This work shall 
include both spot replacement of assemblies at locations to be determined by the Contracting Officer ("Spot Bolt 
Assembly Replacement") and out-of-face replacement of all bolt assemblies within a rail joint ("Joint Repair").</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.2.1   Used Bolt Assemblies</TTL><BRK/>
<BRK/>
<TXT>Used bolt assemblies removed from rail joints shall become the Contractor's property and shall not be reincorporated 
in the work.  Existing bolt assemblies designated to be replaced shall be removed by methods which shall not 
damage joint bars or rails.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.2   Joint Repair</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  List locations where out-of-face joint repairs are required on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Replacement of defective joint bars and correction of rail-end mismatch, as designated or directed by the Contracting 
Officer, shall be defined as joint repair work.  At designated joint repair locations, both joint bars shall 
be removed from the rails and the rail ends inspected for damage or defects.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.3   Cleaning of Finishing Area</TTL><BRK/>
<BRK/>
<TXT>The finishing area shall be cleaned of mill scale, rust, and dirt by wire brushing, compressed air, solvents, 
or a combination of these or other methods.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.4   Rail Ends</TTL><BRK/>
<BRK/>
<TXT>The clean rail ends shall be jointly examined by the Contractor and the Contacting Officer for the presence of 
any rail defects that would make the rail unsuitable for further use at the location.  If a rail is determined 
to have an end defect, either crop or replace the rail.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.2.5   Joint Gap</TTL><BRK/>
<BRK/>
<TXT>Where pull-aparts have occurred, whether currently gapped or not, or where the rail joint gap exceeds<MET> 19 mm</MET><ENG> 3/4 
inch</ENG>, the joint gap shall be adjusted to the rail joint gap specified in TABLE VI.  Rail joint gap adjustment 
work shall be performed in conjunction with spot rail replacement work and bolt renewal work.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.11.3   Spiking</TTL><BRK/>
<BRK/>
<TXT>The proper gage, as indicated in this section, shall be verified immediately prior to spiking.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4   Spot Tie Replacement</TTL><BRK/>
<BRK/>
<TXT>Replace defective ties as marked in the field and as directed by the Contracting Officer.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.4.1   Paint Markings and Tie Inspection</TTL><BRK/>
<BRK/>
<TXT>Paint markings may exist on the existing rails and crossties.  Such markings do not necessarily indicate work 
within the scope of the contract.  Participate in a walk-through tie inspection with the Contracting Officer 
prior to commencement of tie replacement work.  The scope of the tie replacement work will be determined at that 
time and relevant paint markings made or touched up as required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.2   Additional Tie Work</TTL><BRK/>
<BRK/>
<TXT>In areas where existing ballast inhibits tie inspection, additional ties may be required beyond those marked.  
The scope of such additional tie work will be identified by the Contracting Officer as adjacent work progresses.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.3   Old Spikes, Rail Anchors, tags and Tie Plates</TTL><BRK/>
<BRK/>
<TXT>Old spikes shall be pulled and scrapped.  Rail anchors shall be removed, sorted, and salvaged.  Tie plates shall 
be removed, inspected and classified as either relay or scrap.  Scrap tie plates shall be marked scrap and shall 
not be reinstalled in the track.  Acceptable relay tie plates may be reused at that location or at other locations 
as required.  Old stationing tags will be removed and replace on the new tie.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.4   Humped Track</TTL><BRK/>
<BRK/>
<TXT>Where the track will not be surfaced, in order to prevent permanent distortion ("Humping") of the line and surface 
of the track when performing spot tie replacement, the tie cribs and ends shall be excavated, the old ties removed, 
and the new ties installed without jacking the rails.  Humped track shall be resurfaced at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.5   Minimal Humping</TTL><BRK/>
<BRK/>
<TXT>For spot or out-of-face tie replacement, where the track will be surfaced and aligned under this Contract, a 
minimal amount of humping will be allowed, provided the surfacing tolerances can be met.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.6   Fouled or Muddy Ballast</TTL><BRK/>
<BRK/>
<TXT>Fouled or muddy ballast, as identified by the Contracting Officer, shall be excavated and wasted outside of the 
track area where it will not interfere with drainage of the track.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.7   Insertion of New Ties</TTL><BRK/>
<BRK/>
<TXT>New wood ties shall be inserted in track with the heartwood down, square to the line of the rails.  Engineered 
polymer composite ties shall be inserted with the flat (tie plate) surface up, square to the line of the rails.</TXT><BRK/>
<BRK/>
<LST>a.  Ties shall be inserted so that the average tie spacing in any one rail length does not exceed<MET> 530 
mm</MET><ENG> 21 in</ENG> and so that the maximum spacing between any two ties does not exceed<MET> 610 mm</MET><ENG> 24 in</ENG> and the maximum 
spacing is not less than<MET> 460 mm</MET><ENG> 18 in</ENG>.</LST><BRK/>
<BRK/>
<LST>b.  Crosstie position at joints shall result in a "suspended joint" arrangement unless otherwise directed 
by the Contracting Officer.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.8   Positioning of Tie Plates</TTL><BRK/>
<BRK/>
<TXT>Tie plates shall be positioned on the tie so that the shoulder has full bearing against the base of the rail.  
The plate shall be centered on the tie width, except that the plate shall be positioned up to<MET> 13 mm</MET><ENG> 1/2 in</ENG> off-center 
if necessary to avoid spiking into an existing tie split.  Ensure that all tie plates in a given stretch of track 
are either canted or flat.  Canted and flat tie plates shall not be mixed within a given stretch of track.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.9   Re-spacing of existing ties</TTL><BRK/>
<BRK/>
<TXT>Re-spacing of ties is required to straighten slewed ties or to correct uneven tie spacing.  Crib and shoulder 
ballast shall be removed as required to facilitate sliding crossties to their final position or to insert new 
ties.  Spike mauls or sledges shall not be used to slide ties.  Rail anchors and ballast shall be installed immediately 
after ties are re-spaced.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.4.10   Track Gage</TTL><BRK/>
<BRK/>
<TXT>Track gage shall be set at the time of spiking.</TXT><BRK/>
<BRK/>
<LST>a.  Tangent Track.  For track rehabilitation or spot rail replacement on tangent, the track shall be 
regaged if the existing gage is less than<MET> 1420 mm</MET><ENG> 56 in</ENG> or is equal to or greater than<MET> 1460 mm</MET><ENG> 57-1/2 
in</ENG>.  These sections of track shall be regaged to conform with the gage of the adjacent track, but the 
gage after regaging shall be between<MET> 1430 and 1450 mm</MET><ENG> 56-1/4 and 57 in</ENG>.</LST><BRK/>
<BRK/>
<LST>b.  Curved Track.  Curved track shall be gaged as shown in TABLE V.</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.11.5   Joint Respiking</TTL><BRK/>
<BRK/>
<TXT>Many joints in track will be found with nonstandard spiking patterns and other deficiencies.  These include joints 
with no tie plates, plates which are positioned so that it is not possible to spike through the plate on both 
sides of the joint, spikes driven against the ends of skirted joint bars, and similar deficiencies.  Respike 
such joints in accordance with the following.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.11.5.1   Substitution of Tie Plates</TTL><BRK/>
<BRK/>
<TXT>When tie plates are available which will permit spiking through the tie plate at the edge of the joint bar skirts 
on both sides of the rail, they shall be substituted for existing plates.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.11.5.2   Respiked Joints</TTL><BRK/>
<BRK/>
<TXT>All joints which are respiked shall have existing spike holes plugged.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.11.6   Regaging</TTL><BRK/>
<BRK/>
<TXT>Where the existing track gage is less than<MET> 1420 mm</MET><ENG> 56 in</ENG> or is equal to or grater than<MET> 1460 mm</MET><ENG> 57-1/2 in</ENG>, or 
as designated by the Contracting Officer, the track shall be regaged.  These sections of track shall be regaged 
to conform with the gage of the adjacent track; the track gage after regaging shall be between<MET> 1430 and 1450 
mm</MET><ENG> 56-1/4 and 57 in</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12   <SUB>SAMPLING AND TESTING</SUB></TTL><BRK/>
<BRK/>
<TXT>Sampling and testing is the responsibility of the Contractor.  Sampling and testing shall be performed by an 
approved commercial testing laboratory, or by the Contractor, subject to approval.  If the Contractor elects 
to establish testing facilities, approval of such facilities shall be based on compliance with <RID>ASTM D 3740</RID>.  
Work requiring testing will not be permitted until the Contractor's facilities have been inspected and approved.  
The first inspection of the facilities will be at the expense of the Government and any subsequent inspections 
required because of failure of the first inspection shall be at the expense of the Contractor.  Such costs will 
be deducted from the total amount due the Contractor.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.12.1   Ballast [and Subballast] Samples</TTL><BRK/>
<BRK/>
<TXT>Periodic sampling and testing of ballast [and subballast] material shall be performed to ensure continued compliance 
with this specification.  During construction, one representative sample of the ballast [and subballast] material 
shall be taken from each<MET> 1818 metric tons</MET><ENG> 2,000 tons</ENG> of ballast [and subballast] delivered to determine the material 
gradation.  For each<MET> 9090 metric tons</MET><ENG> 10,000 tons</ENG> or a fraction thereof of ballast delivered, an additional amount 
of material shall be obtained in order to perform the quality and soundness tests specified.  Samples for material 
gradation, quality, and soundness tests shall be taken in conformance with <RID>ASTM D 75</RID>.  Test samples shall be 
reduced from field samples in conformance with <RID>ASTM C 702</RID>.  Sample sizes shall be sufficient to provide the minimum 
sample sizes required by the designated test procedures.  If any individual sample fails to meet the gradation 
requirement, placement shall be halted and immediate corrective action shall be taken to restore the specified 
gradation.  If any individual sample fails to meet the specified quality and soundness requirements, placement 
shall be halted and immediate corrective action shall be taken to restore the specified quality.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2   Ballast [and Subballast] Tests</TTL><BRK/>
<BRK/>
<SPT><TTL>3.12.2.1   Sieve Analyses</TTL><BRK/>
<BRK/>
<TXT>Sieve analyses shall be made in conformance with <RID>ASTM C 117</RID> and <RID>ASTM C 136</RID>.  Sieves shall conform to <RID>ASTM E 11</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.2   <TST>Bulk Specific Gravity and Absorption</TST></TTL><BRK/>
<BRK/>
<TXT>Bulk specific gravity and absorption tests shall be made in conformance with <RID>ASTM C 127</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.3   Percentage of Clay Lumps and Friable Particles</TTL><BRK/>
<BRK/>
<TXT>The percentage of clay lumps and friable particles shall be determined in conformance with <RID>ASTM C 142</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.4   <TST>Degradation Resistance</TST></TTL><BRK/>
<BRK/>
<TXT>Resistance to degradation of materials shall be determined in conformance with <RID>ASTM C 131</RID> and <RID>ASTM C 535</RID>.  Materials 
with gradations having 100 percent passing the<MET> 25 mm</MET><ENG> 1 in</ENG> sieve, shall be tested in conformance with <RID>ASTM C 131</RID>
.  Materials having gradations with particles larger than<MET> 25 mm</MET><ENG> 1 in</ENG> shall be tested in conformance with <RID>ASTM C 535</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.5   <TST>Soundness Test</TST></TTL><BRK/>
<BRK/>
<TXT>Soundness tests shall be made in conformance with <RID>ASTM C 88</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.2.6   <TST>Percentage of Flat or Elongated Particles</TST></TTL><BRK/>
<BRK/>
<TXT>The percentage of flat or elongated particles shall be determined in conformance with <RID>ASTM D 4791</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.12.3   Tie Inspection</TTL><BRK/>
<BRK/>
<TXT>The Contractor is responsible for the quality of the treated ties.  Each tie shall be permanently marked or branded 
by the producer in accordance with <RID>AWPA M6</RID>.  Each treated wood tie shall be inspected, in accordance with <RID>AWPA M2</RID>
, for conformance with the specified AWPA standards.  The 100 percent inspection shall be performed by an independent 
inspection agency approved by the Contracting Officer.  Inspection shall be made at the wood treatment site.  
The agency's report of inspection shall accompany delivery of the ties.  Core and check preservative treatment 
once per 1000 ties delivered to the construction site.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.12.4   Examination of Geotextile</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The amount of geotextile being installed and the criticalness of the 
installation determine the size and scope of the geotextile testing and quality 
control/quality assurance program.  Small jobs with minor importance may not 
warrant extensive preconstruction testing of the geotextile, and the manufacturer's 
Certificate of Compliance may be adequate for assuring that the physical properties 
are met.  However, for large projects and critical installations, regardless 
of size, a complete regimen of preconstruction and quality control testing should 
be specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Sample the geotextile upon delivery to the project site.  Sampling procedures used shall be those detailed in <RID>
ASTM D 4759</RID>and <RID>ASTM D 4354</RID> with the number of sample units selected from TABLE II of <RID>ASTM D 4354</RID>.  An independent 
testing laboratory shall perform the index property tests specified in TABLE II on each of the sample units and 
determine conformance with the minimum requirements of TABLE II.  Conformance shall be determined in accordance 
with <RID>ASTM D 4759</RID>.] [Geotextile seams expected to perform a reinforcement function shall be tested in accordance 
with <RID>ASTM D 4595</RID>.]  The Contracting Officer may examine any geotextiles for defects, damage, or nonconformance 
prior to installation.  Any geotextile not meeting the minimum property requirements of paragraph GEOTEXTILE, 
or geotextile that is determined to be damaged or defective shall be removed from the site and shall be replaced 
with additional geotextile meeting the requirements of this specification at no additional cost to the Government.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.13   INSPECTION AND FIELD TESTING</TTL><BRK/>
<BRK/>
<TXT>Perform quality control inspection and field testing.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.13.1   Track</TTL><BRK/>
<BRK/>
<TXT>Inspection shall be performed to ensure that all the requirements of these specifications are met.  Bolted joints 
shall be inspected for loose bolts and for smooth transitions between rails of different sections.  Rail, tie 
plates, and ties shall be checked to ensure that the rail is properly seated and has full bearing on the tie 
plate and tie.  Upon completion of construction, measurements of track gage, cross level, and alignment shall 
be taken and recorded at least once every<MET> [30] [60] [_____] m</MET><ENG> [100] [200] [_____] feet</ENG> of track centerline length.  
A copy of these measurements shall be provided to the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.2   Welded Joints - Visual Inspection</TTL><BRK/>
<BRK/>
<TXT>Quality control inspection and field testing shall be performed by a technician certified to meet <RID>ASNT CP-189</RID>
 level II or III qualifications with a minimum of one year experience in testing rail for defects.  Each welded 
joint shall be inspected in the presence of the Contracting Officer after removal of the mold and grinding of 
excess metal.  Pay particular attention to surface cracking, slag inclusion, gas pockets, and lack of fusion.  
Correct or replace, at no extra cost to the Government, any weld found defective.  The method of correction shall 
be as approved by the Contracting Officer.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.3   Electric Arc Welding Inspection</TTL><BRK/>
<BRK/>
<TXT>Electric arc welds shall be inspected to determine that the item welded conforms to the desired contour and contains 
no visible cracks or voids.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.4   <TST>Thermite Weld Joints Testing</TST></TTL><BRK/>
<BRK/>
<TXT>Each thermite weld joint shall be [ultrasonically tested] [dye tested] following the visual inspection.  The 
method of inspection and acceptance shall be in accordance with <RID>AWS D1.1/D1.1M</RID>.  Correct or replace defective 
welds, at no additional cost to the Government.  The method of correction shall be as approved by the Contracting 
Officer.  Ultrasonic testing [shall] [will] be performed by the [Contractor] [Government] after the rail has 
been installed in track.  The testing will determine whether or not each weld meets the criteria of paragraphs 
Gap and Alignment, Weld Finishing and Tolerances, and Weld Quality.  Welds made in the track which the Contracting 
Officer determines to be unacceptable shall be cut out of the rail and replaced by a section of new rail and 
two new welds.  Saw cuts shall be made at least<MET> 150 mm</MET><ENG> 6 in</ENG> from the centerline of the faulty weld.  Replacement 
welds and replacement rails shall be at the sole expense of the Contractor.  Replacement welds shall be renumbered 
as indicated.  Replacement welds made in track [shall] [will] be ultrasonically tested.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.5   <TST>Electric Arc Weld Testing</TST></TTL><BRK/>
<BRK/>
<TXT>The welds shall be visually inspected and the contours checked after completion and later tested by the ultrasonic 
method.  The [Government will] [Contractor shall] have the welds tested by the ultrasonic method.  The testing 
will determine whether or not each weld meets the quality criteria.  Defective welds will be removed and the 
item rewelded at the Contractors expense.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.6   Inspection of Geotextile</TTL><BRK/>
<BRK/>
<TXT>At the direction of the Contracting Officer, remove the cover material from the geotextile at 3 locations per<MET>
 km</MET><ENG> mile</ENG> so that the geotextile may be inspected for damage.  At each location, the cover material shall be removed 
to expose a<MET> 1.2 by 1.2 m</MET><ENG> 4 by 4 feet</ENG> section of the geotextile.  If punctures, tears, improper installation, 
other impairment or damage are found within this section, additional sections shall be excavated to determine 
the extent of the damage.  Damaged geotextile shall be repaired or replaced and recovered with ballast/subballast 
at the Contractor's expense.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.7   Testing Relay Rail</TTL><BRK/>
<BRK/>
<SPT><TTL>3.13.7.1   Testing for Wear</TTL><BRK/>
<BRK/>
<TXT>Each relay rail shall be checked for wear by the Contractor's quality control representative in the presence 
of the Contracting Officer after the material is delivered to the construction site.  Monitor the installation 
of track for defects in rail and joint bars being installed.  Rail and joint bars that are found to be defective 
shall not be installed in track.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.13.7.2   <TST>Testing for Defects</TST></TTL><BRK/>
<BRK/>
<TXT>Upon completion of the track construction, have the rail tested by ultrasonic methods.  <SUB>Ultrasonic test</SUB>ing shall 
be done by a Contractor normally engaged in this type of testing with a minimum of 5 years of experience.  Schedule 
a rail testing machine and notify the Contracting Officer of the type of machine and schedule.  Contractor furnished 
rails which are found to have any detectable defect at that time shall be removed and replaced at no additional 
cost to the Government.  Contractor furnished joint bars and compromise joint bars that are found to be cracked 
or broken shall be removed and replaced at no additional cost to the Government.</TXT><BRK/>
<TBL><THD><BRK/>
<HL4>TABLE VII</HL4><BRK/>
<BRK/>
<HL4>RECORD OF ITEMS REPAIRED OR REBUILT BY THE</HL4><BRK/>
<HL4>ELECTRIC ARC WELDING METHOD AND GRINDING</HL4><BRK/>
-------------------------------------------------------------------<BRK/>
   INSTALLATION ________________             TURNOUT NUMBER _______<BRK/>
                         (Circle)<BRK/>
   DATE_______ TIME_______AM/PM  AIR TEMP _____C*  WEATHER_________<BRK/>
-------------------------------------------------------------------<BRK/>
   ITEM REBUILT  DESCRIPTION    WEIGHT  LENGTH   LH RH   REINFORCED<BRK/>
-------------------------------------------------------------------<BRK/></THD>
<BRK/>
   Switch Point    [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   Frog            [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   Railroad<BRK/>
      Crossing     [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   Guard Rails     [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   Switch Point<BRK/>
      Protector    [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   Rail (Ends)     [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   Rail-Engine<BRK/>
      Burns        [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   [_____]         [_____]      [_____]  [_____]  [_____]  [_____] <BRK/>
-------------------------------------------------------------------<BRK/>
   *NOTE:  Determination will be made to the nearest 1/2 degree.<BRK/></TBL>
<BRK/>
<PGE/><TBL><THD><BRK/>
<HL4>RECORD OF FIELD WELD</HL4><BRK/></THD>
<BRK/>
-------------------------------------------------------------------<BRK/>
<BRK/>
  INSTALLATION_____________________________  WELD NUMBER ___________<BRK/>
<BRK/>
  FINAL INSTALLED<BRK/>
    LOCATION ________________________  TRACK _______________________<BRK/>
    STATION  ________________________  RAIL  Left   Right   (Circle)<BRK/>
<BRK/>
                                           AM<BRK/>
  DATE ______________  TIME ______________ PM (Circle)<BRK/>
<BRK/>
  AIR TEMPERATURE  ________ F*.  WEATHER ___________________________<BRK/>
  RAIL TEMPERATURE ________ F*.          ___________________________<BRK/>
<BRK/>
<BRK/>
  WELD KIT MANUFACTURER ____________________________________________<BRK/>
  RAIL GAP<BRK/>
    NEAREST<MET> 1.6 MM</MET><ENG> 1/16 IN</ENG>  ________________<BRK/>
    RAIL CUT REQUIRED?                              YES  NO (Circle)<BRK/>
  BACK RAIL<BRK/>
    MANUFACTURER _______________________ USED RAIL? YES  NO (Circle)<BRK/>
    YEAR/MONTH ROLLED _________________  HEAT NUMBER _______________<BRK/>
                                                     _______________<BRK/>
<BRK/>
  AHEAD RAIL<BRK/>
    MANUFACTURER _______________________ USED RAIL? YES  NO (Circle)<BRK/>
    YEAR/MONTH ROLLED _________________  HEAT NUMBER _______________<BRK/>
                                                     _______________<BRK/>
<BRK/>
  REMARKS___________________________________________________________<BRK/>
         ___________________________________________________________<BRK/>
         ___________________________________________________________<BRK/>
<BRK/>
  ULTRASONIC TEST DATE &amp; RESULTS ___________________________________<BRK/>
<BRK/>
  KIT MFG. REPRESENTATIVE<BRK/>
  PRESENT _________ WELDING FOREMAN ________________________________<BRK/>
          (Initial)                           (Signed)<BRK/>
<BRK/>
  CONTRACTING OFFICER'S<BRK/>
  REPRESENTATIVE<BRK/>
  PRESENT     ___________  RECORDER ________________________________<BRK/>
               (Initial)                    (Signed)<BRK/>
<BRK/>
              ___________  RECORDER ________________________________<BRK/>
               (Initial)                    (Signed)<BRK/>
<BRK/>
--------------------------------------------------------------------<BRK/>
  FOR GOVERNMENT USE ONLY<BRK/>
<BRK/>
  ULTRASONIC TEST DATE AND RESULTS _________________________________<BRK/>
--------------------------------------------------------------------<BRK/>
  *NOTE:  Determination will be made to the nearest 1/2 degree.<BRK/></TBL>
<BRK/></SPT>
</SPT></SPT></PRT>   <END/><BRK/></SEC>