<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA                UFGS-35 73 13 (January 2008)<BRK/>
                                              ----------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA> (CW)               Superseding<BRK/>
                                              UFGS-35 73 13 (April 2006)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 35 73 13</SCN><BRK/>
<BRK/>
<STL>EMBANKMENT FOR EARTH DAMS</STL><BRK/>
<DTE>01/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  This guide specification covers the requirements for <SCP>preparing the embankment 
and blanket foundations and placing and compacting all permanent fills and backfills</SCP>
.</NPR><BRK/>
<BRK/>
<NPR>Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.</NPR><BRK/>
<BRK/>
<NPR>Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification provides for furnishing all plant, labor, and 
equipment, and performing all operations in connection with the installation 
of settlement gages for the determination of increases in quantities of embankment 
materials resulting from settlement of the embankment foundation during construction, 
and for payment to the Contractor for such increases in quantities all in accordance 
with the contract drawings and these specifications.  These provisions will 
be included in a project specification when it is determined by the Contracting 
Officer that settlement in the range of 5 percent or more of the planned embankment 
height is anticipated over a considerable portion of the embankment foundation 
area.  They will also be used when gages are needed for engineering control 
purposes.  When settlement gages are to be used the following information will 
be indicated on the plans:</NPR><BRK/>
<BRK/>
<NPR>1.  The location of the gages as well as the stations at which zero settlement 
will be assumed.</NPR><BRK/>
<BRK/>
<NPR>2.  The detail construction of the foundation settlement gages to be used.  
Any applicable type of gage may be selected by the Contracting Officer.</NPR><BRK/>
<BRK/>
<NPR>The requirements for rock as prescribed herein are intended to be used on embankments 
involving rock fill sections.  Where rock for slope protection is specified, 
Section <SRF>35 31 19</SRF> STONE, CHANNEL. SHORELINE/COASTAL PROTECTION FOR STRUCTURES 
should be used.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If Section <SRF>01 22 00.00 10</SRF> MEASUREMENT AND PAYMENT is included in the 
project specifications, this paragraph title (UNIT PRICES) should be deleted 
from this section and the remaining appropriately edited subparagraphs below 
should be inserted into Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.1   Compacted Fill, Impervious</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.1.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with preparing the foundation of the embankment; spreading, harrowing, 
sprinkling, compacting, removing objectionable materials; and all other incidental work required for the construction, 
protection, and maintenance of the embankment.  This payment is in addition to any payment for excavating and 
transporting of the material as specified in Section <SRF>[_____]</SRF> [_____].  No separate payment will be made for uncompacted 
fill and all costs incidental to spreading, protecting, and maintenance of such fill shall be included in the 
contract price for excavation of the material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.1.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Compacted fill, impervious, will be measured for payment in place based upon the established limit lines and 
the payment lines indicated on the cross sections shown or as otherwise established.  Limit lines will be established 
by the volume between the foundation lines as determined on the basis of a survey made from excavation [including 
the cut-off trench] and accomplishment of foundation preparation (except scarifying) and the lines, grades and 
slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.1.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.2   Compacted Fill, Pervious</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.2.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with preparing the foundation of the embankment; spreading, harrowing, 
sprinkling, compacting, removing objectionable materials; and all other incidental work required for the construction, 
protection, and maintenance of the embankment.  This payment is in addition to any payment for excavating and 
transporting of the material as specified in Section <SRF>[_____]</SRF> [_____].  No separate payment will be made for uncompacted 
fill and all costs incidental to spreading, protecting, and maintenance of such fill shall be included in the 
contract price for excavation of the material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Compacted fill, pervious, will be measured for payment in place based upon the established limit lines and the 
payment lines indicated on the cross sections shown or as otherwise established.  Limit lines will be established 
by the volume between the foundation lines as determined on the basis of a survey made from excavation [including 
the cut-off trench ]and accomplishment of foundation preparation (except scarifying) and the lines, grades and 
slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.3   Compacted Fill, Random</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.3.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with preparing the foundation of the embankment and blanket; spreading, 
harrowing, sprinkling, compacting, removing objectionable materials; and all other incidental work required for 
the construction, protection, and maintenance of the embankment.  This payment is in addition to any payment 
for excavating and transporting of the material as specified in Section <SRF>[_____]</SRF> [_____].  No separate payment 
will be made for uncompacted fill and all costs incidental to spreading, protecting, and maintenance of such 
fill shall be included in the contract price for excavation of the material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Compacted fill, random, will be measured for payment in place based upon the established limit lines and the 
payment lines indicated on the cross sections shown or as otherwise established.  Limit lines will be established 
by the volume between the foundation lines as determined on the basis of a survey made from excavation [including 
the cut-off trench ]and accomplishment of foundation preparation (except scarifying) and the lines, grades and 
slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.3.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.4   Backfill, Impervious</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.4.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with preparing the foundation or contacting surfaces, and the spreading, 
compacting, wetting, and all other operations incidental to the placement of the backfill. This payment is in 
addition to any payment for excavating and transporting of the material as specified in Section <SRF>[_____]</SRF> [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Backfill, impervious, will be measured for payment in place based upon the established limit lines and the payment 
lines indicated on the cross sections shown or as otherwise established.  Limit lines will be established by 
the volume between the foundation lines as determined on the basis of a survey made from excavation and accomplishment 
of foundation preparation (except scarifying) and the lines, grades and slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.4.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.5   Backfill, [Pervious][Random]</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.5.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with preparing the foundation or contacting surfaces, and the spreading, 
compacting, wetting, and all other operations incidental to the placement of the backfill.  This payment is in 
addition to any payment for excavating and transporting of the material as specified in Section <SRF>[_____]</SRF> [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.5.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Backfill, [pervious] [random], will be measured for payment in place based upon the established limit lines and 
the payment lines indicated on the cross sections shown or as otherwise established.  Limit lines will be established 
by the volume between the foundation lines as determined on the basis of a survey made from excavation [including 
the cut-off trench ]and accomplishment of foundation preparation (except scarifying) and the lines, grades and 
slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.5.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.6   Filters</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If several classes of material are used, as in the case of a multi-layer 
filter, a separate pay item should be included for each class.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.6.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with mixing the materials to the required gradation, spreading, compacting, 
removing objectionable materials, and all other incidental work required for the construction, protection, and 
maintenance of the filter.  This payment is in addition to any payment for transporting of the material as specified 
in Section <SRF>[_____]</SRF> [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Filters will be measured for payment in place based upon the established limit lines and the payment lines indicated 
on the cross sections shown or as otherwise established.  Limit lines will be established by the volume between 
the foundation lines as determined on the basis of a survey made from excavation and accomplishment of foundation 
preparation (except scarifying) and the lines, grades and slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.6.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.7   Rock Fill</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If several classes of material are used, as in the case of a multi-layer 
filter, a separate pay item should be included for each class.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.7.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with rock fill, including all operations with quarrying, stockpiling, 
hauling, placing, removing objectionable material, and all other operations incidental to the placement of the 
rock fill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.7.2   Measurement</TTL><BRK/>
<BRK/>
<TXT>Rock fill will be measured for payment in place based upon the established limit lines and the payment lines 
indicated on the cross sections shown  or as otherwise established.  Limit lines will be established by the volume 
between the foundation lines as determined on the basis of a survey made from excavation and accomplishment of 
foundation preparation (except scarifying) and the lines, grades and slopes of the accepted embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.7.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.8   [Embankment for Foundation Settlement]</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this pay item if settlement gages are not specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.8.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment for costs associated with additional material placed because of foundation settlement will be made at 
the same contract price as the overlying embankment material.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.8.2   Measurement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Embankment for foundation settlement will be measured for payment based upon readings of settlement gages installed 
under the provisions of [Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS, ]paragraph PIEZOMETERS, SETTLEMENT GAGES, 
AND SURFACE REFERENCE MARKS, which will be computed as follows:</TXT><BRK/>
<BRK/>
<LST>a.  Zero settlement will be assumed at the upstream and downstream toes of the embankment and at the 
transverse [line][lines] indicated on the plans, which separate the zones where settlement gages will 
govern from the areas where no foundation settlement is anticipated and for which no volumetric adjustment 
will be made.</LST><BRK/>
<BRK/>
<LST>b.  A straight line variation will be assumed between individual settlement gages as well as between 
settlement gages and points of zero settlement.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.8.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.9   Additional Rolling for Compaction</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.9.1   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for costs associated with additional rolling for compaction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.9.2   Measurement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Additional rolling for compaction will be measured for payment on the basis of the number of roller hours the 
compaction equipment is operated in accomplishing the compaction specified in [Section <SRF>35 73 13</SRF> EMBANKMENT FOR 
EARTH DAMS, ]paragraph COMPACTION.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.9.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure: hour.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.10   Piezometer</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.10.1   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment will be made for costs associated with extending and maintaining the piezometers specified[ in Section 
<SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS] during construction, including measurements required to be made by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10.2   Measurement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Piezometers will be measured for payment on the basis of the number of piezometers specified[ in Section 
<SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.10.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  each.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.11   [Settlement Gages]</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete this pay item if settlement gages are not specified.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>1.1.11.1   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment will be made for costs associated with furnishing, installing, and maintaining the settlement gages during 
construction as specified[ in Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS], including measurements required to 
be made by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.11.2   Measurement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Settlement gages will be measured for payment on the basis of the number of gages to be installed as specified[ 
in Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.11.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  each.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.12   Surface Reference Marks</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.12.1   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment will be made for costs associated with furnishing, installing, and maintaining the surface reference 
marks during construction as specified[ in Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS], including measurements 
required to be made by the Contractor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.12.2   Measurement</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed reference to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Surface reference marks will be measured for payment on the basis of the number of marks to be installed as specified[ 
in Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH DAMS].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.12.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  each.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.1.13   Mortar and Concrete for Foundation Preparation</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1.13.1   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  See Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE, paragraph 
UNIT PRICES, to determine the appropriate unit price pay item which includes 
cement that should be inserted in this paragraph.</NPR><BRK/>
<BRK/>
<NPR>Delete the bracketed references to Section <SRF>35 73 13</SRF> if this paragraph is not 
moved to Section <SRF>01 22 00.00 10</SRF>.  Retain the bracketed reference to Section 
<SRF>03 30 53</SRF> if this paragraph is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Payment will be made for costs associated with [manufacturing, ]furnishing, delivering, placing, [finishing, 
]and curing of mortar and concrete for foundation and abutment preparation, except that the cement used in the 
mortar or concrete will be measured and paid for as specified in unit price pay item [_____][ in accordance with 
Section <SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE, paragraph UNIT PRICES].  No separate payment will be made 
for mortar used in filling open joints and cracks in bedrock surfaces in accordance with [Section <SRF>35 73 13</SRF> EMBANKMENT 
FOR EARTH DAMS, ]paragraph ROCK.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.13.2   Payment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete the bracketed references to Section <SRF>35 73 13</SRF> if this paragraph 
is not moved to Section <SRF>01 22 00.00 10</SRF>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Mortar and concrete used in foundation and abutment preparation will be measured for payment in place based upon 
the established limit lines and the payment lines indicated on the cross sections shown or as otherwise established.  
Limit lines will be established by the volume between the foundation lines as determined on the basis of a survey 
made from excavation [including the cut-off trench ]and accomplishment of foundation preparation (except scarifying) 
and the lines, grades and slopes of the accepted embankment.  Mortar and concrete used in filling spaces beneath 
rock overhangs and around protrusions as specified in [Section <SRF>35 73 13</SRF>EMBANKMENT FOR EARTH DAMS, ]paragraph 
ROCK, will be measured for payment as the actual volumes of such mortar and concrete as determined by field surveys 
made before and after placement of the mortar and concrete.  No measurement will be made for the mortar used 
in filling the open joints and cracks in the rock surface as specified in [Section <SRF>35 73 13</SRF> EMBANKMENT FOR EARTH 
DAMS, ]paragraph ROCK.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.13.3   Unit of Measure</TTL><BRK/>
<BRK/>
<TXT>Unit of measure:  cubic<MET> meter</MET><ENG> yard</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM D 1556</RID><RTL>(2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method</RTL><BRK/><BRK/><RID>ASTM D 2167</RID><RTL>(2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method</RTL><BRK/><BRK/><RID>ASTM D 2216</RID><RTL>(2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass</RTL><BRK/><BRK/><RID>ASTM D 2487</RID><RTL>(2006e1) Soils for Engineering Purposes (Unified Soil Classification System)</RTL><BRK/><BRK/><RID>ASTM D 6938</RID><RTL>(2007a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)</RTL><BRK/><BRK/><RID>ASTM D 698</RID><RTL>(2007e1) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))</RTL><BRK/><BRK/></REF><REF><ORG>U.S. ARMY CORPS OF ENGINEERS (USACE)</ORG><BRK/><BRK/><RID>EM 1110-2-1906</RID><RTL>(1970; Change 1 and 2) Laboratory Soils Testing</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   DEFINITIONS</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Embankment</TTL><BRK/>
<BRK/>
<TXT>Embankment, as used in these specifications, is efined as the earth [and rock ]fill portions of the dam structure 
and includes all types of earth fill and filter materials for the dam [and cut-off trench, ]and all other specified 
or directed earth and rock fills within the limits of the dam[, excepting those stone and filter materials used 
for slope protection, which are described in Section <SRF>[_____]</SRF>].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Compacted Fill</TTL><BRK/>
<BRK/>
<TXT>Compacted fill includes all fill, except backfill, deposited in layers and compacted by rolling or tamping.  
The types of compacted earth fill are:</TXT><BRK/>
<BRK/>
<LST>a. Impervious fill for the [cut-off trench][, horizontal and inclined impervious blankets,][ and ]impervious 
section of the embankment;</LST><BRK/>
<BRK/>
<LST>b.  Random fill adjacent to the impervious section and blankets;</LST><BRK/>
<BRK/>
<LST>c.  Pervious fill forming the upstream and downstream sections of the embankment, and</LST><BRK/>
<BRK/>
<LST>d.  Filter drainage layers forming the horizontal [and/or vertical or inclined] pervious drainage blankets[ 
designed to prevent the detrimental movement of soil particles].</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Uncompacted Fill</TTL><BRK/>
<BRK/>
<TXT>All fill, deposited in layers but not compacted except by the controlled movement of hauling and spreading equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   Backfill</TTL><BRK/>
<BRK/>
<TXT>Backfill, as used in these specifications, is defined as that excavation refill which cannot be placed around 
or adjacent to a structure until the structure is completed or until a specified time interval has elapsed after 
completion.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.5   Spalls</TTL><BRK/>
<BRK/>
<TXT>Stone fragments placed as transition between rock fill and[ earth fill][ filter material].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.6   Rock Fill</TTL><BRK/>
<BRK/>
<TXT>Those portions of the embankment where rock is used for purposes other than slope protection.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.4.1   Haul Roads</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  Where roads are to be used by other Contractors, the limits of responsibility 
should be stated in the specifications.</NPR><BRK/>
<BRK/>
<NPR>With reference to the coverage in this paragraph, it has been found advantageous 
to establish a project traffic pattern for jobs of considerable scope and to 
indicate on the plans acceptable haul road locations and to specify maximum 
grades and minimum road widths which are considered suitable.  Where project 
operations are varied and the use of haul roads by other Contractors is required, 
the specifications should so indicate.  Detailed requirements for haul roads 
should be based upon the anticipated length of time the roads will be in use, 
traffic load and probable types of hauling equipment applicable to the specific 
project.  This paragraph should be modified as necessary to clarify the requirements 
of the particular project.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Haul roads shall be [located as indicated and][located and] constructed as approved.  They shall be designed 
to maintain the intended traffic, to be free draining and shall be maintained in good condition throughout the 
contract period, unless otherwise directed.  Haul roads within the area of contact between the embankment and 
its foundation and abutments shall be removed and the area shall be treated as specified in paragraph PREPARATION 
OF FOUNDATION, PARTIAL FILL SURFACE, AND ABUTMENTS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.4.2   Stockpiling from Approved Borrow Sources</TTL><BRK/>
<BRK/>
<TXT>When the excavation from approved borrow sources progresses at a faster rate than placement in the fill is being 
accomplished, such excavated material shall be stockpiled at approved locations adjacent to the work until its 
use is authorized.  No payment will be made for such stockpiling nor for the reloading and hauling of this material 
to its final position in the embankment.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph may be modified to specify soils for various types of 
fill in accordance with the Unified Soil Classification System.  When this is 
done, the optional sentence should be selected.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Classification of soils will be in accordance with <RID>ASTM D 2487</RID>.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.1.1   General</TTL><BRK/>
<BRK/>
<TXT>The origin of any fill material in no way determines where it may be used in the embankment.  Materials for embankment 
fills shall be secured from required excavations and from the borrow areas indicated.  The intention is to use 
the most suitable materials obtainable from these sources.  Material to be wasted will be specifically designated 
at the time the material is excavated.  Materials containing brush, roots, sod or other perishable materials 
will not be considered suitable.  The suitability of the materials shall be subject to approval and their disposition 
in the embankment will be as directed.  Excavate in the borrow areas in the location determined by the Contracting 
Officer, whenever such control is necessary to obtain the type of material required for the embankment.  Mixing 
of materials during the excavating process at the borrow area may be required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Impervious Fill</TTL><BRK/>
<BRK/>
<TXT>Material for compacted impervious fill shall consist of [clays, silty clays, or clayey silts ]obtained from the 
designated borrow areas [or required excavation].  Silts and clays containing sand may be used, if such materials 
are sufficiently impermeable and suitable for compacting with a [tamping][ or ][rubber-tired] roller.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.3   Random Fill</TTL><BRK/>
<BRK/>
<TXT>Material for compacted random fill shall consist of any or all types of material which, from the standpoint of 
compacted stability, are suitable for use in the dam embankment.  Soft weathered rock, which breaks up under 
rolling to form essentially a soil and which compacts without excessive voids, may be used for random fill, if 
approved.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.4   Pervious Fill</TTL><BRK/>
<BRK/>
<TXT>Material for compacted pervious fill shall be clean, free draining sand or sand and gravel obtained from natural 
deposits [within borrow areas and from designated excavations][ or ][from sources designated].  Particles of 
material shall be free from any objectionable coating and not more than [_____ (__)] percent of the material, 
by weight, shall pass a<MET> 0.075 mm</MET><ENG> No. 200 sieve</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.5   Uncompacted Fill</TTL><BRK/>
<BRK/>
<TXT>Except as otherwise [indicated or ]required, material for uncompacted fill may consist of any or all types of 
material available from required excavations and designated borrow areas.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.6   Backfill</TTL><BRK/>
<BRK/>
<TXT>Backfill shall consist of material of a type and quality conforming to that specified for the contiguous embankment 
fill material, unless otherwise directed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.7   Filter Drainage Layers</TTL><BRK/>
<BRK/>
<TXT>Filter materials shall be composed of tough, durable particles; shall be reasonably free from thin, flat and 
elongated pieces; and shall contain no organic matter nor soft, friable particles in quantities considered objection-able 
by the Contracting Officer.  Filter materials shall consist of sand, gravel, or crushed stone, well graded between 
the limits specified below:</TXT><BRK/>
<TBL><BRK/>
<THD>             SIEVE SIZE        PERCENT BY WEIGHT PASSING<BRK/>
<BRK/></THD>
               [_____]                  [_____]<BRK/>
               [_____]                  [_____]<BRK/></TBL>
<BRK/>
<TXT>Gradation of the material shall be determined in accordance with <RID>EM 1110-2-1906</RID>.  All points on individual grading 
curves obtained from representative samples of filter material shall lie between the boundary limits as defined 
by smooth curves drawn through the tabulated grading limits plotted on a mechanical analysis diagram.  The individual 
grading curves within these limits shall not exhibit abrupt changes in slope denoting skip grading, scalping 
of certain sizes or other irregularities which would be detrimental to the proper functioning of the filter.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8   Rock Fill</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.8.1   Rock</TTL><BRK/>
<BRK/>
<TXT>Stone classed as "rock" shall be sound; well graded and free draining.[  The presence of rock meeting the requirements 
of slope protection, Section <SRF>[_____]</SRF> [_____], will not be objectionable.]  Rock shall be obtained from required 
excavation[ and from already existing stockpiles][ and from designated quarries].  Shales unsuitable for use 
as rock fill, mudstone and other unsuitable excavated material shall be wasted in designated spoil areas.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.8.2   Spalls</TTL><BRK/>
<BRK/>
<TXT>Spalls shall be obtained from the finer materials resulting from rock excavation.  The spalls shall be free of 
clay, silt, sand or debris and shall be composed of durable fragments of stone, reasonably well graded in sizes 
varying from [_____] as a minimum to [_____]<MET> mm</MET><ENG> inches</ENG> as a maximum.[  Crushed stone of like sizes and at least 
equal in quality will be acceptable in lieu of spalls.]</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   CONSTRUCTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1.1   Lines and Grades</TTL><BRK/>
<BRK/>
<TXT>Construct the embankment to the lines, grades and cross sections indicated, unless otherwise directed.  The Government 
reserves the right to increase or decrease the foundation widths or the embankment slopes or make such other 
changes in the embankment sections as may be deemed necessary to produce a safe structure.  Increases in height 
of section, made to compensate for shrinkage or consolidation of the embankment material subsequent to the completion 
of the embankment, will not exceed five (5) percent of the height above the foundation indicated.  The end slopes 
and side slopes of partial fill sections shall not be steeper than[ one vertical on [_____] horizontal][ those 
shown].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.1.2   Conduct on the Work</TTL><BRK/>
<BRK/>
<TXT>Maintain and protect the embankment in a satisfactory condition at all times until final completion and acceptance 
of all work under the contract.  If in the opinion of the Contracting Officer the hauling equipment causes horizontal 
shears or slick sides, rutting, quaking, heaving, cracking or excessive deformation of the embankment, limit 
the type, load or travel speed of the hauling equipment on the embankment.  Any approved embankment material 
which is lost in transit or rendered unsuitable after being placed in the embankment and before final acceptance 
of the work, shall be replaced in a satisfactory manner and no additional payment will be made therefor.  Excavate 
and remove from the embankment any material which the Contracting Officer considers objectionable, dispose of 
such material, and refill the excavated area as directed, all at no cost to the Government.  The Contractor may 
be required to remove, without additional payment, any embankment material placed outside of prescribed slope 
lines.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.2   PREPARATION OF FOUNDATION, PARTIAL FILL SURFACES AND ABUTMENTS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Earth</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Require twice as many coverages by the compaction equipment for the embankment 
foundation area as required for adjacent fills.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>After excavation or stripping of the embankment foundation[ and excavation of the cut-off trench] to the extent 
indicated or otherwise required, the sides of stump holes, test pits, and other similar cavities or depressions 
shall be broken down, where so directed, so as to flatten out the slopes, and the sides of the cut or hole shall 
be scarified to provide bond between the foundation material and the fill.[  The slopes and bottom of the cut-off 
trench shall be scarified, as directed.]  Unless otherwise directed, each depression shall be filled with either 
pervious, random, or impervious[, or rock] material dependent upon the type of material which is to be placed 
immediately above the foundation.  The fill shall be placed in layers, moistened, and compacted in accordance 
with the applicable provisions of paragraphs PLACEMENT, MOISTURE CONTROL, and COMPACTION.  Materials which cannot 
be compacted by roller equipment because of inadequate clearances shall be spread in [_____]<MET>-mm</MET><ENG>-inch</ENG> layers and 
compacted with power tampers to an extent equal to that of the contiguous embankment fill material.  After filling 
of depressions[ and cut-off trench] and immediately prior to placement of compacted fill in any section of the 
embankment, the foundation of such section shall be loosened thoroughly by scarifying, plowing, discing or harrowing 
to a minimum depth of<MET> 150 mm</MET><ENG> 6 inches</ENG>, and the moisture content shall be adjusted to the amount specified in 
paragraph MOISTURE CONTROL for the appropriate type of material, except in areas where this requirement is waived 
by the Contracting Officer.  After removal of roots or other debris turned up in the process of loosening, the 
entire surface of the embankment foundation area shall be compacted by [_____] complete coverages of the compaction 
equipment as specified for the appropriate type of fill.  Prior to placement of compacted fill on or against 
the surfaces of any partial fill section, all soft or loose material, all material containing cracks or gullies, 
and all material that does not conform with the specified zoning of the embankment shall be removed.  The remaining 
surface of the partial fill shall be loosened by scarifying, plowing, discing or harrowing to a minimum depth 
of<MET> 150 mm</MET><ENG> 6 inches</ENG>, and the moisture content shall be adjusted as specified in paragraph MOISTURE CONTROL for 
the appropriate type of material.  The surface of the partial fill section upon which fill is to be placed shall 
then be compacted as hereinafter specified for the appropriate type of fill.  No separate payment will be made 
for loosening and rolling the foundation area, the abutment area, or the surfaces of partial fill sections, but 
the entire cost thereof shall be included in the applicable contract price for fill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Rock</TTL><BRK/>
<BRK/>
<TXT>All rock surfaces upon which or against which embankment materials are to be placed shall be cleaned in accordance 
with the applicable provisions of Section <SRF>31 00 00</SRF> EARTHWORK.  Prior to the placement of embankment material 
upon or against a rock surface, all open joints and cracks in that surface shall be filled with mortar to the 
depths cleaned.  Those portions of such rock surfaces where, in the opinion of the Contracting Officer, the compaction 
of the embankment materials cannot be accomplished satisfactorily with power tampers or other specified compaction 
equipment, shall be filled with mortar or concrete as directed to the extent necessary to permit satisfactory 
use of the compaction equipment.  In no case shall a thin coat of mortar be left on smooth, intact rock surfaces.  
Large rock overhangs and protrusions shall be removed by the use of pre-splitting or line drilling techniques 
in such a manner as to minimize damage to the underlying rock, or the spaces beneath overhangs and around protrusions 
shall be filled with tamped concrete so that satisfactory compaction of embankment materials can be accomplished.  
Vertical surfaces shall not be more than<MET> 1.5 meters</MET><ENG> 5 feet</ENG> in height, and benches of sufficient width shall be 
provided as necessary so that the average slope of any rock face is not steeper than [_____] vertical on [_____] 
horizontal.  Mortar and concrete, including forming as necessary, shall conform with the applicable provisions 
of Section [<SRF>03 30 53</SRF> MISCELLANEOUS CAST-IN-PLACE CONCRETE][<SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL CONCRETE][_____].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   PLACEMENT</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.1   General</TTL><BRK/>
<BRK/>
<TXT>No fill shall be placed on any part of the embankment foundation until such areas have been inspected and approved.  
The gradation and distribution of materials throughout the compacted earth fill section of the dam shall be such 
that the embankment will be free from lenses, pockets, streaks, and layers of material differing substantially 
in texture or gradation from surrounding material of the same class.  Successive loads of material shall be dumped 
at locations on the fill as directed or approved.  No fill shall be placed upon a frozen surface, nor shall snow, 
ice, or frozen earth be incorporated in the embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Frozen Material</TTL><BRK/>
<BRK/>
<TXT>Embankment shall not be placed on a foundation which contains frozen material,[ or which has been subjected to 
freeze-thaw action].  This prohibition encompasses all foundation types, including the natural ground, all prepared 
subgrades, whether in an excavation or on an embankment, and all layers of previously placed and compacted earth 
fill which become the foundations for successive layers of earthfill.  All material that freezes or has been 
subjected to freeze-thaw action during the construction work, or during periods of temporary shutdowns, such 
as, but not limited to, nights, holidays, weekends, or winter shutdowns or earthwork operations, shall be removed 
to a depth that is acceptable to the Contracting Officer and replaced with new material.  Alternatively, the 
material shall be thawed, dried, reworked, and recompacted to the specified criteria before additional material 
is placed.  The Contracting Officer will determine when placement of fill shall cease due to cold weather.  The 
Contracting officer may elect to use average daily air temperatures, and/or physical observation of the soils 
for his determination.  Levee embankment material shall not contain frozen clumps of soil, snow, or ice.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.3   Rate of Placement</TTL><BRK/>
<BRK/>
<TXT>Unless otherwise directed, the embankment shall be maintained at approximately the same level regardless of the 
number of types of materials being placed,[ except that rock fills and the adjoining filter blankets shall be 
placed with sufficient lag to prevent mixture of embankment and filter blanket and/or rock materials][ and also 
excepting that placement of rock fill in the closure section may be delayed until completion of the compacted 
fill to elevation [_____]<MET> meters</MET><ENG> feet</ENG> m.s.l].  The rate of placement of materials in the embankment closure section 
shall be such that this section will be completed to elevation [_____]<MET> meters</MET><ENG> feet</ENG> m.s.l. within a period of 
[_____] calendar days from the authorized date of diversion, but in no event shall the rate of placement in this 
section be faster than required to construct the embankment to elevation [_____]<MET> meters</MET><ENG> feet</ENG> m.s.l. within [_____] 
days from the beginning of fill operations.  Subsequent to completion of the embankment closure section to elevation 
[_____]<MET> meters</MET><ENG> feet</ENG> m.s.l. and prior to the beginning of topping operations a period of [_____] calender days 
shall elapse, unless this provision is waived in writing by the Contracting Officer at the time of construction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.4   Impervious Fill</TTL><BRK/>
<BRK/>
<TXT>Impervious fill shall be placed in the impervious section[, cut-off trench,][ and impervious blanket].  In general, 
the more impervious materials shall be placed towards the center of the impervious section and the less impervious 
materials toward the [random][ or ][pervious] sections so that a transition in permeability is effected from 
the core to the [random][ or ][pervious] sections.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.5   Random Fill</TTL><BRK/>
<BRK/>
<TXT>Random fill shall be placed in the random sections of the embankment.  Except as specified below, limits of random 
sections shown indicate the maximum extent of random material.  When approved, pervious material may be substituted 
for random material in areas where random sections adjoin pervious sections.  In general, the more impervious 
of the random material shall be placed toward the impervious section or blanket and the more pervious of the 
random material shall be towards the outer edge of the random section so that a transition in permeability is 
effected from the impervious section to the [pervious section][outer portions of the embankment].  Where random 
materials are shown, in the upper portion of the central core, elevation [_____] and above, the more impervious 
of available random materials shall be  placed to the full core lines and no substitution with pervious material 
shall be made.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.6   Pervious Fill</TTL><BRK/>
<BRK/>
<TXT>Pervious fill shall be placed in the pervious sections of the embankment.  In general, the pervious sections 
of embankment shall be placed with the less pervious material near the [random][impervious] sections of the embankment 
and the more pervious materials near the outer slopes of the embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.7   Filter Drainage Layers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Where there are vertical or inclined filters and horizontal filters, 
a different tolerance may be indicated for each.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Sand filters][, gravel filters,][ and ][sand and gravel filters] shall be placed in the embankment in the manner 
described and to the lines and grades indicated.  Tolerance of plus or minus [_____]<MET> mm</MET><ENG> inches</ENG> will be allowed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.8   Rock</TTL><BRK/>
<BRK/>
<SPT><TTL>3.3.8.1   Rock Spalls</TTL><BRK/>
<BRK/>
<TXT>Spalls [and stones of<MET> 300 mm</MET><ENG> 12 inch</ENG> maximum size ]shall be placed on or against the gravel filter[ and on stripped 
and other areas] where indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.8.2   Rock Fill</TTL><BRK/>
<BRK/>
<TXT>The [upstream][,][ and ][downstream][ and rock drain] sections of the embankment shall be constructed of quarry 
run sizes of durable rock dumped and bulldozed into place in not greater than [_____]<MET> mm</MET><ENG> foot</ENG> lifts to the lines 
and grades shown, or as staked in the field, and in such manner as to produce a reasonably well graded mass with 
the smaller stones adjacent to [the filter material][the core section] and the larger sizes on the outer slopes 
of the embankment with no objectionable pockets of small stones or clusters of larger stones.  The placing shall 
be supplemented by such hand methods as are required to obtain even surfaces on the outside faces.  A tolerance 
of plus<MET> 300 mm</MET><ENG> 12 inches</ENG> and minus<MET> 150 mm</MET><ENG> 6 inches</ENG> from the slope lines and grades shown will be allowed in the 
finished surfaces of the rock fills, except that the extreme minus tolerance shall not be continuous over an 
area greater than<MET> 20 square meters</MET><ENG> 200 square feet</ENG>.  All bridging in rock fills shall be broken as well as all 
slabs and slabby rock.  Special care shall be exercised in placing rock fill in all areas within<MET> 1 m</MET><ENG> 3 feet</ENG> of 
structures to avoid damage to such structures.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3.9   Spreading</TTL><BRK/>
<BRK/>
<TXT>After dumping, the materials shall be spread by bulldozers or other approved means in approximately horizontal 
layers over the entire fill areas.  Unless otherwise directed, the thickness of these layers before compaction 
with tamping type rollers shall not be more than [_____]<MET> mm</MET><ENG> inches</ENG> for impervious materials nor more than [_____]<MET>
 mm</MET><ENG> inches</ENG> for other embankment materials, except backfill which shall be spread in accordance with paragraph 
BACKFILL.  Unless otherwise directed, the thickness of layers before compaction with rubber-tired rollers shall 
not be more than [_____]<MET> mm</MET><ENG> inches</ENG> for impervious materials, nor more than [_____]<MET> mm</MET><ENG> inches</ENG> for other embankment 
materials except backfill.  Pervious fill and filters, including spalls, shall be spread in layers not more than 
[_____]<MET> mm</MET><ENG> inches</ENG> in thickness.  As soon as practicable after commencement of construction of any section of 
the embankment, the [central portion thereof][area adjacent to the inclined or vertical filter drain] shall be 
raised or crowned with grades not to exceed [_____] percent so that the surface of the fill will drain freely 
and shall be so maintained throughout construction.  If the compacted surface of any layer of material, exclusive 
of filter material[ and rock fill], is determined to be too smooth to bond properly with the succeeding layers, 
it shall be loosened by harrowing, or by any other approved method, before the succeeding layer is placed.  At 
all times during the dumping and spreading processes, maintain a force of men adequate to remove all roots and 
debris from all embankment materials and all stones of greater than [_____]<MET> mm</MET><ENG> inches</ENG> in maximum dimension from 
impervious materials and greater than [_____]<MET> mm</MET><ENG> inches</ENG> in maximum dimension from pervious materials, except 
filters.  Stone so removed shall be placed in the outer slopes of the [fill][rock fill] and the roots and debris 
shall be removed from the embankment and disposed of in an approved manner.  The entire surface of any section 
of the embankment under construction shall be maintained in such condition that construction equipment can travel 
on any part of any one section.  Ruts in the surface of any layer shall be removed by scarifying before placing 
and compacting additional material.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   MOISTURE CONTROL</TTL><BRK/>
<BRK/>
<TXT>The materials in each layer of the fill shall contain the amount of moisture, within the limits, specified below 
or as directed, necessary to obtain the specified compaction.  Material that is not within the specified limits 
after compaction shall be reworked, regardless of density.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.4.1   Impervious Sections</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The Contracting Officer will normally use the test method prescribed 
by EM 1110-2-1906, LABORATORY SOILS TESTING.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The moisture content after compaction shall be as uniform as practicable throughout any one layer of impervious 
materials.  The moisture content after compaction as determined by <RID>ASTM D 2216</RID> shall be within the limits of 
[_____] percentage points above optimum and [_____] percentage points below optimum moisture content.  Material 
that is too wet shall be spread on the embankment and permitted to dry, assisted by discing or harrowing, if 
necessary, until the moisture content is reduced to an amount within the specified limits.  When the material 
is too dry, the Contractor will be required to sprinkle each layer on the fill.  Harrowing, or other approved 
methods will be required to work the moisture into the material until a uniform distribution of moisture is obtained.  
Water applied on a layer of fill shall be accurately controlled in amount so that free water will not appear 
on the surface during or subsequent to rolling.  Should too much water be added to any part of the embankment, 
so that the material is too wet to obtain the desired compaction, the rolling on that section of the embankment 
shall be delayed until the moisture content of the material is reduced to an amount within the specified limits.  
If it is impracticable to obtain the specified moisture content by wetting or drying the material on the fill, 
the Contractor may be required to prewet or dry back the material at the sources of excavation.  If, in the opinion 
of the Contracting Officer, the top or contact surfaces of the partial fill section become too dry to permit 
suitable bond between these surfaces and the additional fill to be placed thereon, loosen the dried materials 
by scarifying or discing to such depths as may be directed; dampen the loosened material to an acceptable moisture 
content; and compact this layer in accordance with the applicable requirements of paragraph COMPACTION, subparagraph 
IMPERVIOUS FILL, to densities comparable to the underlying embankment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.2   Random Sections</TTL><BRK/>
<BRK/>
<TXT>The upper and lower limits of moisture content, and the moisture control procedures for random materials shall 
be the same as that specified for impervious material, or pervious material, dependent upon which of these types 
it most nearly resembles.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.3   Pervious Section</TTL><BRK/>
<BRK/>
<TXT>Pervious material shall be wetted by sprinkling after spreading on the embankment and [the moisture content of 
each layer shall be maintained at the optimum for compaction] [each layer shall be kept in an approximately saturated 
condition] during rolling.  Prewetting of pervious material at the sources of excavation or borrow will not be 
required.  Sprinkling shall be done with hoses connected to header pipes along the faces of the embankment, by 
water trucks with pressure spray bars, or by any other approved method.  All connections in the water supply 
system, including the hose connections to the header pipes, shall be watertight.  Jets shall not be directed 
at the embankment with such force that the finer materials will be washed out.  The capacities of pumps and sizes 
of header pipes shall be sufficient to supply the required amount of water at all times.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.4   Filter Drainage Layers</TTL><BRK/>
<BRK/>
<TXT>Moisture control of graded gravel filter and bedding layers will not be required and sluicing will not be permitted.  
Moisture control of filters containing a predominate amount of sand particles will be as required for pervious 
materials specified in paragraph PERVIOUS SECTION.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.4.5   Rock Fill</TTL><BRK/>
<BRK/>
<TXT>No moisture control will be necessary on rock fills.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5   COMPACTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.5.1   Equipment</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTES:  With reference to the use of compaction equipment in this paragraph, 
the following precautions should be noted:</NPR><BRK/>
<BRK/>
<NPR>1.  Specifications should be written to insure that the type of compaction equipment 
will be used which, in the judgment of the Contracting Officer, is best suited 
to obtain the desired compaction of the material being utilized.  A requirement 
should be included in the specifications for the performance evaluation of each 
type of compaction equipment conforming with the specifications and intended 
for use by the Contractor at an early stage of embankment construction.  This 
equipment evaluation should be accomplished through analysis of test fill areas 
that are carefully constructed under representative working conditions with 
materials and moisture contents as specified.  Test fill areas may either be 
separate or part of the permanent work, and for clarity to prospective bidders, 
payment under a separate item is recommended to equitably cover costs of required 
variations in equipment coverages, possible changes in equipment loading or 
foot sizes, as well as intensified field soils testing.</NPR><BRK/>
<BRK/>
<NPR>2.  For tamping rollers that are either towed or self-propelled, with drums 
capable of being ballasted with fluid, the provision for a pressure relief valve 
and safety head is optional, and should be included at the discretion of the 
designer based on local experience and practice.  Over-pressurization of fluid 
ballasted compaction drums to the level of a safety hazard has been rare, but 
has occurred on several occasions at locations of high elevation and temperature.</NPR><BRK/>
<BRK/>
<NPR>3.  In compacting materials consisting of shales, sandstones, weathered rock 
and similar random materials, consideration should be given to specifying sheepfoot-type 
tamping equipment that has been modified by replacing the standard feet with 
"chisel" point tamper feet generally referred to as "shale breakers".  The end 
areas of these modified tamper feet range from 650 to 1000 square millimeters 
(1 to 1-1/2 square inches) and tend to break up weathered rock to prevent the 
bridling effect sometimes created by large rock particles.</NPR><BRK/>
<BRK/>
<NPR>4.  For compaction of sand and gravel fills or filter and drainage layers, equipment 
characteristics for both a large and small vibratory roller have been provided 
for optional selection by the designer, depending upon location, selected lift 
thickness, gradation, grain shape, and durability properties of the materials.  
The smaller roller, which utilizes an upper limit of 40 kN/m (9000 lbs. per 
foot) of drum length applied force, should be specified for materials which 
exhibit degradation under compaction.  Other options, based on construction 
experience may also be exercised.  For example, it has been found that improved 
trafficability can often be achieved when compacting clean, fine grained, uniform 
sands by specifying a drum driven self-propelled vibratory roller.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Compaction equipment shall conform to the following requirements and shall be used as prescribed in subsequent 
paragraphs.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.5.1.1   Tamping Rollers</TTL><BRK/>
<BRK/>
<LST>a.  Towed - Tamping rollers shall consist of two or more non-vibratory roller drums mounted side-by-side 
in a suitable frame and towed by either a crawler-type or rubber tired tractor having sufficient power 
to pull the roller satisfactorily when the drums are fully ballasted.  Each drum shall be free to pivot 
about an axis parallel to the direction of travel.  Rollers operated in tandem sets shall be controlled 
in a manner such that the prints produced by the tamping feet of the tandem units are staggered.  Each 
drum of a roller shall have an outside diameter of not less than<MET> 1.5 m</MET><ENG> 5 feet</ENG> and shall be not less than<MET>
 1.5 m</MET><ENG> 5 feet</ENG> in length.  The space between two adjacent drums, when on a level surface, shall not be 
less than<MET> 300 mm</MET><ENG> 12 inches</ENG> nor more than<MET> 375 mm</MET><ENG> 15 inches</ENG>.[  Each drum ballasted with fluid shall be 
equipped with at least one pressure-relief valve and with at least one safety head.  The safety head 
shall be equal to union-type safety heads equipped with rupture discs suitable for rupturing pressures 
between<MET> 350 and 500 kPa</MET><ENG> 50 and 75 psi</ENG> as manufactured by the Fike Metal Products Corporation, Blue Spring, 
Missouri.  The pressure relief valve is a manually operated valve and shall be opened periodically.  
Personnel responsible for opening pressure-relief valves shall be periodically instructed to ascertain 
that valve openings are free from plugging to assure that any pressure developed in roller drums is released 
at each inspection].  At least one tamping foot shall be provided for each<MET> 186 000 square mm</MET><ENG> 2 square 
feet</ENG> of drum surface.  The length of each tamping foot from the outside surface of the drum shall be 
not more than<MET> 275 mm</MET><ENG> 11 inches</ENG> and shall be maintained at not less than<MET> 225 mm</MET><ENG> 9 inches</ENG>.  The bearing 
surface of each tamping foot shall be flat with a surface area not less than<MET> 4500 square mm</MET><ENG> 7 square 
inches</ENG> nor more than<MET> 6500 square mm</MET><ENG> 10 square inches</ENG>.  During the operation of rolling, the spaces between 
the tamping feet shall be maintained clear of materials which would impair the effectiveness of the tampering 
rollers.  The weight of a roller when fully loaded shall be not less than<MET> 58 400 N/m</MET><ENG> 4,000 pounds per 
foot</ENG> of drum length, and the weight of a roller empty shall be not more than<MET> 36 500 N/m</MET><ENG> 2,500 pounds 
per foot</ENG> of drum length.  The bearing surface, tamping foot size, the drum loading, and the operation 
of the rollers shall be as required to obtain the desired compaction.  If more than one roller is used 
on any one layer of fill, all rollers so used shall be of the same type and essentially of the same dimensions.  
Rollers shall be drawn by crawler-type or rubber-tired tractors at a speed not to exceed<MET> 8 km/h</MET><ENG> 5.0 mph</ENG>
.  The use of rubber-tired towing equipment shall be discontinued if the tires leave ruts that prevent 
uniform compaction by the tamping roller, and the substitution of crawler-type towing equipment may be 
directed.</LST><BRK/>
<BRK/>
<LST>b.  Self-propelled - The use of self-propelled non-vibratory tamping rollers conforming with the following 
specification will be permitted, and their design and operation shall be subject to approval , and subject 
to the right, at any time during the prosecution of the work, to direct such modifications to the tamping 
feet or variations in roller drum weight where applicable, as may be found necessary to secure optimum 
compaction of the earth fill materials.  If use of self-propelled tamping rollers causes shearing of 
the fill, laminations in the fill, or results in inadequate compaction, the Contracting Officer may direct 
that such rollers be removed from the fill and that appropriate towed tamping rollers be used.  Two-or 
three-drum side-by-side units that are either in drive position or drawn by separate power equipment 
shall have a clearance between adjacent drums not less than<MET> 300 mm</MET><ENG> 12 inches</ENG> nor more than<MET> 375 mm</MET><ENG> 15 
inches</ENG>.  Two-drum or four-drum equipment separated by cab and differential and arranged in tandem must 
have its static weight equally distributed to all compaction drums and must have the tandem drums positioned 
such that the prints of the tamping feet produced by the tandem drums are staggered.  The surface on 
which the tamping feet are mounted shall have a minimum outside diameter of<MET> 1200 mm</MET><ENG> 4 feet</ENG> and at least 
one tamping foot for each<MET> 186 000 square mm</MET><ENG> 2 square feet</ENG> of drum surface.  The distance between the 
centers of any two adjacent tamping feet shall be not less than<MET> 225 mm</MET><ENG> 9 inches</ENG>.  The length of each 
tamping foot from the outside mounting surface of the drum shall be not more than<MET> 275 mm</MET><ENG> 11 inches</ENG> and 
shall be maintained at not less than<MET> 225 mm</MET><ENG> 9 inches</ENG>.  The bearing surface of each tamping foot shall 
be flat and have a surface area not less than<MET> 4500 square mm</MET><ENG> 7 square inches</ENG> nor more than<MET> 9000 square 
mm</MET><ENG> 14 square inches</ENG>.  Cupped recesses within the bearing surface of each tamping foot will be permitted 
but shall not exceed<MET> 13 mm</MET><ENG> 0.5 inches</ENG> in depth.  During rolling operations, the spaces between the tamping 
feet shall be maintained clear of materials which would impair the effectiveness of the tamping roller.  
The weight of all roller drums during compaction of fill materials shall be maintained uniform and with 
the weight per foot of drum length not less than<MET> 62 800 N</MET><ENG> 4,300 pounds</ENG>.  [For self-propelled rollers 
with drums capable of being ballasted with fluid, each drum shall be equipped with at least one pressure-relief 
valve and with at least one safety head.  The safety head shall be equal to union type safety heads equipped 
with rupture discs suitable for rupturing pressures between<MET> 350 and 500 kPa</MET><ENG> 50 and 75 psi</ENG> as manufactured 
by the Fike Metal Products Corporation, Blue Springs, Missouri.  The pressure relief valve is a manually 
operated valve and shall be opened periodically.  Personnel responsible for opening pressure-relief valves 
shall be periodically instructed to ascertain that valve openings are free from plugging to assure that 
any pressure developed in roller drums is released at each inspection.]  For self-propelled rollers in 
which steering is accomplished through the use of rubber-tired wheels, the tire pressure shall not exceed<MET>
 275 kPa</MET><ENG> 40 psi</ENG>.  The use of the compactor shall be discontinued if the tires leave ruts that prevent 
uniform compaction by the tamping roller and the substitution of appropriate towed tamping rollers may 
be directed.  When a self-propelled roller is provided with a dozer blade, coverages made with the blade 
in operation shall not be counted as compaction coverages.  Self-propelled rollers shall be operated 
at a speed not to exceed<MET> 8 km/h</MET><ENG> 5.0 mph</ENG>.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.2   Vibratory Rollers</TTL><BRK/>
<BRK/>
<TXT>Vibratory rollers for compacting rock fills, pervious sand and gravel fills, or filter and transition drainage 
layers shall be equipped with a smooth steel compaction drum and shall be operated at a frequency of vibration 
during compaction operations between 1100 and 1500 vpm.  Vibratory rollers may be either towed or self-propelled 
and shall have an unsprung drum weight that is a minimum of 60 percent of the rollers' static weight.  Towed 
rollers shall have at least 90 percent of their weight transmitted to the ground through the compaction drum 
when the roller is standing in a level position hitched to the towing vehicle.  Rollers for compacting rock fill, 
[sand and gravel fills, or filter and drainage layers] shall have a minimum static weight of<MET> 90 kN</MET><ENG> 20,000 pounds</ENG>
, a minimum dynamic force of<MET> 180 kN</MET><ENG> 40,000 pounds</ENG> when operating at 1400 vpm, and an applied force not less than<MET>
 130 kN/m</MET><ENG> 9,000 pounds per foot</ENG> of compaction drum length.  [Rollers for compacting sand and gravel fills or 
filter and drainage layers shall have a minimum static weight of<MET> 36 kN</MET><ENG> 8,000 pounds</ENG>, a minimum dynamic force 
of<MET> 71 kN</MET><ENG> 16,000 pounds</ENG> when operating at 1400 vpm, and an applied force not less than<MET> 22 kN</MET><ENG> 5,000 pounds</ENG> nor 
greater than<MET> 130 kN/m</MET><ENG> 9,000 pounds per foot</ENG> of compaction drum length.]  The level of amplitude and vibration 
frequency during compaction will be maintained uniform throughout the embankment zone within which it is operating.  
Rollers shall be operated at speeds not to exceed<MET> 2.4 km/h</MET><ENG> 1.5 mph</ENG>.  The equipment manufacturer shall furnish 
sufficient data, drawings, and computation for verification of the above specifications, and the character and 
efficiency of this equipment shall be subject to approval.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.3   Rubber-tired Rollers</TTL><BRK/>
<BRK/>
<TXT>Rubber-tired rollers shall have a minimum of four wheels equipped with pneumatic tires.  The tires shall be of 
such size and ply as can be maintained at tire pressures between<MET> 550 and 700 kPa</MET><ENG> 80 and 100 psi</ENG> for a<MET> 110 kN</MET><ENG> 
25,000 pound</ENG> wheel load during rolling operations.  The roller wheels shall be located abreast and be so designed 
that each wheel will carry approximately equal load in traversing uneven ground.  The spacing of the wheels will 
be such that the distance between the nearest edges of adjacent tires will be greater than 50 percent of the 
tire width of a single tire at the operating pressure for a<MET> 110 kN</MET><ENG> 25,000 pound</ENG> wheel load.  The roller shall 
be provided with a body suitable for ballast loading such that the load per wheel may be varied, from<MET> 80 to 110 
kN</MET><ENG> 18,000 to 25,000 pounds</ENG>.  The roller shall be towed at speeds not to exceed<MET> 8 km/h</MET><ENG> 5 mph</ENG>.  The character and 
efficiency of this equipment shall be subject to approval.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.1.4   Power Tampers</TTL><BRK/>
<BRK/>
<TXT>Compaction of material, in areas where it is impracticable to use a roller or tractor, as provided in paragraph 
EARTH, shall be performed by the use of approved power tampers.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.5.2   Impervious and Random Fill</TTL><BRK/>
<BRK/>
<TXT>After a layer of impervious or random fill material has been dumped and spread, it shall be harrowed if required, 
to break up and blend the fill materials, unless harrowing, as specified under paragraph IMPERVIOUS SECTIONS, 
is performed to obtain uniform moisture distribution.  Harrowing shall be performed with a heavy disc plow, or 
other approved harrow, to the full depth of the layer.  If one pass of the harrow does not accomplish the breaking 
up and blending of the materials, additional passes of the harrow may be required, but in no case will more than 
three passes of the harrow on any one layer be required for this purpose.  When the moisture content and the 
condition of the layer is satisfactory, the lift shall be compacted [to at least [_____] percent of maximum density 
as determined by <RID>ASTM D 698</RID>, prior to placement of the next layer.  Determination of in-place density shall be 
in accordance with <RID>ASTM D 1556</RID>, <RID>ASTM D 2167</RID>, and <RID>ASTM D 6938</RID>.][by [not less than ][[_____] complete coverages 
of the tampering roller][[_____] complete coverages of the rubber-tired roller].][  A complete coverage shall 
consist of the coverage of the entire lift to be compacted with the roller specified.][  A complete coverage 
shall consist of the application of compactive effort to the entire lift to be compacted with a single roller 
drum having the characteristics as specified in paragraph SELF-PROPELLED.  The use of four-drum self-propelled 
equipment that is laterally separated by operator's cab and differential may be used; however, two complete coverages 
of the lift to be compacted will be achieved by a subsequent offset trip of the roller for coverage of the previously 
uncompacted central portion of the roller path.]  Portions of the fill which are not accessible to the roller 
shall be placed in [_____]<MET> mm</MET><ENG> inch</ENG> layers loose measurement and compacted with power tampers to a degree equal 
to that obtained on the other portions of the compacted fill by rolling as specified.  Dumping, spreading, sprinkling, 
and compacting may be performed at the same time at different points along a section when there is sufficient 
area to permit these operations to proceed simultaneously.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.3   Pervious Fill</TTL><BRK/>
<BRK/>
<TXT>After each layer of pervious material has been dumped and spread, and the moisture content is in accordance with 
the provisions of paragraph PERVIOUS SECTION, the entire surface of the layer shall be compacted [to an average 
of [_____] percent minimum relative density][by not less than [_____] complete coverages of [the rubber-tired 
roller][the vibratory roller]].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.4   Additional Rolling for Compaction</TTL><BRK/>
<BRK/>
<TXT>If, in the opinion of the Contracting Officer, the desired compaction of any portion of the embankment is not 
secured by the minimum number of coverages specified, additional complete coverages shall be made over the surface 
area of such designated portion until the desired compaction has been obtained.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.5   Filter and Transition Drainage Layers</TTL><BRK/>
<BRK/>
<TXT>The requirements for compacted pervious fills will apply to these materials except for bedding layers under dumped 
riprap.  Bedding layers under dumped riprap will require no special compaction other than controlled movement 
of dumping and spreading equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5.6   Rock Fill</TTL><BRK/>
<BRK/>
<TXT>After the rock fill has been dumped and spread to the thickness specified, the entire surface of the layer shall 
be compacted by not less than [_____] complete coverages of the vibratory roller specified in paragraph VIBRATORY 
ROLLERS.  A complete coverage shall consist of the entire coverage of the area with one trip of the equipment 
specified.  Each trip of the roller shall overlap the adjacent trip not less than [_____]<MET> mm</MET><ENG> feet</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.6   UNCOMPACTED FILL</TTL><BRK/>
<BRK/>
<TXT>Material from required excavations and from the designated borrow areas shall be placed in the berms upstream 
and downstream from the dam embankment, as indicated or otherwise required.  The fill shall be dumped and spread 
in horizontal layers not to exceed [_____]<MET> mm</MET><ENG> inches</ENG> in thickness.  Compaction other than that obtained by the 
controlled movement of the hauling and spreading equipment over the area will not be required.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   BACKFILL</TTL><BRK/>
<BRK/>
<SPT><TTL>3.7.1   General</TTL><BRK/>
<BRK/>
<TXT>No backfill or other load shall be placed on or against concrete surfaces before expiration of the minimum period 
after placing the concrete as indicated below:</TXT><BRK/>
<TBL><BRK/>
               Walls and Vertical Faces     [_____] days<BRK/>
               Conduit                      [_____] days<BRK/></TBL>
<BRK/>
<TXT>Subsequent to [_____] days but prior to [_____] days after placing concrete in the conduit, backfill operations 
may be initiated but no rolling or hauling equipment will be permitted to pass over the conduit, or within<MET> 600 
mm</MET><ENG> 2 feet</ENG> of any part of the conduit.  During this period, backfill may be placed against the sides of the conduit 
and conduit collars and to a thickness of not more than<MET> 600 mm</MET><ENG> 2 feet</ENG> over the top of the conduit, if compaction 
is accomplished by power tampers as specified in paragraph POWER TAMPERS.  Before passage of hauling and rolling 
equipment over the top of the conduit or other structure will be permitted, the depth of fill over the concrete 
shall be sufficient to permit such passage without inducing harmful stresses or vibrations in the structure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.2   Placement</TTL><BRK/>
<BRK/>
<TXT>Backfill shall be placed in [_____]<MET> mm</MET><ENG> inch</ENG> layers and thoroughly compacted.  Unless otherwise directed, the 
placing and compacting of all backfill material and the control of its moisture content shall conform to the 
applicable provisions of paragraphs PLACEMENT, MOISTURE CONTROL, and COMPACTION.  Fill in back of wing walls 
shall be kept at approximately the same elevations as that of the backfill, gravel blankets, riprap, or derrick 
stone on the opposite side of the wall until placement has reached the maximum elevation of the materials to 
be placed on the toe of the wall.  Drainage openings through walls shall be kept open at all times.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.8   SLIDES</TTL><BRK/>
<BRK/>
<TXT>In the event of slides, in any part of the embankment prior to final acceptance of the work, remove material 
from the slide area, as directed, and rebuild such portion of the embankment.  In case it is determined that 
the slide was caused through the fault of the Contractor, the removal and disposal of material and the rebuilding 
of the embankment shall be performed without cost to the Government; otherwise this work will be paid for at 
the applicable contract unit prices for borrow excavation and compacted fill or backfill.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9   PIEZOMETERS, SETTLEMENT GAGES AND SURFACE REFERENCE MARKS</TTL><BRK/>
<BRK/>
<SPT><TTL>3.9.1   Government Installed Piezometers</TTL><BRK/>
<BRK/>
<TXT>A number of piezometers will be installed on the embankment foundations by the Government with its own forces.  
Connections and extensions of riser pipes shall be made by the Contractor with materials furnished by the Government.  
The elevation of the top of the riser pipe shall be determined immediately before and immediately after each 
extension is added to the pipe.  The top of such pipes shall be kept at least<MET> 600 mm</MET><ENG> 2 feet</ENG> above the embankment 
surface.  During construction, a mound of fill shall be placed around the riser pipes and shall be compacted 
to the same density and moisture content as the surrounding fill material.  Conduct the required operations in 
such a manner that the devices will not be damaged.  Suitable markers and guard posts shall be placed around 
the gages for protection.  No separate payment will be made for such protection or for special measures required 
in connection with the installation of these devices; all costs thereof shall be included in the contract prices 
bid for related items of work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.2   Location and Installation of Settlement Gages</TTL><BRK/>
<BRK/>
<TXT>Furnish and install settlement gages for determining foundation settlement during construction.  Type, arrangement 
and location of gages shall be as shown.  The areas in which adjustment in quantities will be made as a result 
of foundation settlement are as indicated on the plans.  The base plate shall be placed on a level surface of 
well compacted foundation material.  Determine the elevations of the base plates before placing fill material 
and again within 48 hours after completion of the embankment.  The elevation of the stem shall be determined 
immediately before and immediately after each extension is added.  These elevations will be verified by the Contracting 
Officer.  Care shall be taken to install the stem plumb.  Extend the stem in increments as the embankment rises 
but at no time shall the top of the stem be lower than<MET> 600 mm</MET><ENG> 2 feet</ENG> above the surface of the embankment.  Conduct 
these operations in such a manner that the gages will not be damaged.  Suitable guard posts shall be placed around 
the gages for protection.  Fill around the stem shall be compacted to the same density and moisture content as 
the surrounding material.  Any settlement gage damaged or destroyed due to fault or negligence on the part of 
the Contractor shall be restored or replaced by the Contractor at no additional cost to the Government as directed.  
No additional payment will be made for compaction of fill around and over the settlement gages or for interference 
with the Contractor's operations resulting from the settlement gage installations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.9.3   Surface Reference Marks</TTL><BRK/>
<BRK/>
<TXT>Furnish and install surface reference marks as shown.  Furnish the horizontal and vertical location of each reference 
mark with respect to established bench marks at the time of installation, and every [_____] calendar days thereafter 
until completion of the contract.  Conduct these operations in such a manner that the reference marks will not 
be disturbed or damaged.  Any reference mark disturbed or damaged due to negligence on the Contractor's part 
shall be replaced or repaired and the correct horizontal and vertical locations shall be furnished at the Contractor's 
expense.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>   <END/><BRK/></SEC>