<?xml version="1.0" encoding="windows-1252"?><SEC xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://si.ksc.nasa.gov/sidownloads/xml/specsintactSEC.xsd"><MTA NAME="SUBFORMAT" CONTENT="NEW"/><BRK/>
<HDR><AST/><BRK/>
USACE / NAVFAC / AFCESA / NASA                UFGS-43 11 00 (April 2008)<BRK/>
                                              --------------------------<BRK/>
Preparing Activity:  <PRA>USACE</PRA>                    Superseding<BRK/>
                                              UFGS-43 11 00 (January 2008)<BRK/>
<BRK/>
<HL4>UNIFIED FACILITIES GUIDE SPECIFICATIONS</HL4><BRK/>
<BRK/>
<HL4>References are in agreement with UMRL dated January 2009</HL4><BRK/>
<AST/><BRK/></HDR>
<BRK/>
<SCN>SECTION 43 11 00</SCN><BRK/>
<BRK/>
<STL>FANS/BLOWERS/PUMPS; OFF-GAS</STL><BRK/>
<DTE>04/08</DTE><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This guide specification covers the requirements for <SCP>fans, blowers or 
vacuum pumps and drive units</SCP>.<BRK/>
<BRK/>
Edit this guide specification for project specific requirements by adding, deleting, 
or revising text.  For bracketed items, choose applicable items(s) or insert 
appropriate information.<BRK/>
<BRK/>
Remove information and requirements not required in respective project, whether 
or not brackets are present.<BRK/>
<BRK/>
Comments and suggestions on this guide specification are welcome and should 
be directed to the technical proponent of the specification.  A listing of <URL HREF="http://65.204.17.188/report/ufgs.html">technical 
proponents</URL>, including their organization designation and telephone number, is 
on the Internet.<BRK/>
<BRK/>
Recommended changes to a UFGS should be submitted as a  <URL HREF="http://65.204.17.188/projnet/cms/public.html">Criteria Change Request 
(CCR)</URL>.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<PRT><TTL>PART 1   GENERAL</TTL><BRK/>
<BRK/>
<SPT><TTL>1.1   UNIT PRICES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  On many hazardous, toxic, radioactive waste (HTRW) projects, the Contractor 
is required to treat air or off-gas, as well as furnish the equipment.  Measurement 
and payment and unit pricing may be necessary to cover treatment costs.</NPR><BRK/>
<BRK/>
<NPR>When it is determined that lump sum contract is advisable this paragraph will 
be deleted.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Measurement and payment will be based on completed work performed in accordance with the drawings, specifications, 
and the contract payment schedules.  No additional payment will be made for installation, calibration or commissioning 
of the equipment.</TXT><BRK/>
<BRK/>
<SPT><TTL>1.1.1   Measurement</TTL><BRK/>
<BRK/>
<TXT>Volume of [air supplied] [off-gas treated] will be determined by initial and final meter readings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.1.2   Payment</TTL><BRK/>
<BRK/>
<TXT>Payment will be made for volume of [air supplied] [off-gas treated] at the contract unit price per actual cubic<MET>
 meter</MET><ENG> foot</ENG>.  Payment will include the furnishing of testing, plant, labor, and material and incidentals necessary 
to complete the work, as specified and as shown.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.2   REFERENCES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph is used to list the publications cited in the text of 
the guide specification.  The publications are referred to in the text by basic 
designation only and listed in this paragraph by organization, designation, 
date, and title.<BRK/>
<BRK/>
Use the Reference Wizard's Check Reference feature when you add a RID outside 
of the Section's Reference Article to automatically place the reference in the 
Reference Article.  Also use the Reference Wizard's Check Reference feature 
to update the issue dates.<BRK/>
<BRK/>
References not used in the text will automatically be deleted from this section 
of the project specification when you choose to reconcile references in the 
publish print process.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The publications listed below form a part of this specification to the extent referenced.  The publications are 
referred to within the text by the basic designation only.</TXT><BRK/>
<BRK/>
<REF><ORG>ACOUSTICAL SOCIETY OF AMERICA (ASA)</ORG><BRK/><BRK/><RID>ASA S2.19</RID><RTL>(1999; R 2004) Mechanical Vibration - Balance  Quality Requirements of Rigid Rotors, Part 1: Determination of Permissible Residual Unbalance, Including Marine Applications</RTL><BRK/><BRK/></REF><REF><ORG>AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL (AMCA)</ORG><BRK/><BRK/><RID>AMCA 210</RID><RTL>(2007) Laboratory Methods of Testing Fans for Aerodynamic Performance Rating</RTL><BRK/><BRK/><RID>AMCA 300</RID><RTL>(2005) Reverberant Room Method for Sound Testing of Fans</RTL><BRK/><BRK/><RID>AMCA 301</RID><RTL>(2005) Methods for Calculating Fan Sound Ratings from Laboratory Test Data</RTL><BRK/><BRK/><RID>AMCA 99</RID><RTL>(2003) Standards Handbook</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)</ORG><BRK/><BRK/><RID>ABMA 11</RID><RTL>(1990; R 1999) Load Ratings and Fatigue Life for Roller Bearings</RTL><BRK/><BRK/><RID>ABMA 9</RID><RTL>(1990; R 2000) Load Ratings and Fatigue Life for Ball Bearings</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)</ORG><BRK/><BRK/><RID>ACGIH-2092S</RID><RTL>(2004) Industrial Ventilation:  A Manual of Recommended Practice</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN GAS ASSOCIATION (AGA)</ORG><BRK/><BRK/><RID>AGA B109.2</RID><RTL>(2000)Diaphragm-Type Gas Displacement Meters (500 cubic ft./hour Capacity and Over)</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)</ORG><BRK/><BRK/><RID>AGMA 6011</RID><RTL>(2003i) Specifications for High Speed Helical Gear Units</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN PETROLEUM INSTITUTE (API)</ORG><BRK/><BRK/><RID>API Spec 6D</RID><RTL>(2008; Errata 2008; Errata 2008) Specification for Pipeline Valves</RTL><BRK/><BRK/></REF><REF><ORG>AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE)</ORG><BRK/><BRK/><RID>ASHRAE 52.1</RID><RTL>(1992; Interpretation 1 2007) Gravimetric and Dust-Spot Procedures for Testing Air-Cleaning Devices Used in General Ventilation for Removing Particulate Matter</RTL><BRK/><BRK/></REF><REF><ORG>ASME INTERNATIONAL (ASME)</ORG><BRK/><BRK/><RID>ASME B16.1</RID><RTL>(2005) Standard for Gray Iron Threaded Fittings; Classes 125 and 250</RTL><BRK/><BRK/><RID>ASME B16.40</RID><RTL>(2002; Errata 2003) Manually Operated Thermoplastic Gas Shutoffs and Valves in Gas Distribution Systems</RTL><BRK/><BRK/><RID>ASME B16.5</RID><RTL>(2003) Standard for Pipe Flanges and Flanged Fittings:  NPS 1/2 Through NPS 24</RTL><BRK/><BRK/><RID>ASME B40.100</RID><RTL>(2005) Pressure Gauges and Gauge Attachments</RTL><BRK/><BRK/><RID>ASME BPVC SEC VIII D1</RID><RTL>(2007; Addenda 2008) Boiler and Pressure Vessel Code; Section VIII, Pressure Vessels Division 1 - Basic Coverage</RTL><BRK/><BRK/><RID>ASME PTC 19.3</RID><RTL>(1974; R 2004) Temperature Measurement Instruments and Apparatus</RTL><BRK/><BRK/><RID>ASME PTC 25</RID><RTL>(2001) Pressure Relief Devices</RTL><BRK/><BRK/></REF><REF><ORG>ASTM INTERNATIONAL (ASTM)</ORG><BRK/><BRK/><RID>ASTM D 4167</RID><RTL>(1997; R 2007) Fiber-Reinforced Plastic Fans and Blowers</RTL><BRK/><BRK/><RID>ASTM F 1139</RID><RTL>(1988; R 2004) Steam Traps and Drains</RTL><BRK/><BRK/><RID>ASTM F 1508</RID><RTL>(1996; R 2004) Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services</RTL><BRK/><BRK/></REF><REF><ORG>ISA - INTERNATIONAL SOCIETY OF AUTOMATION (ISA)</ORG><BRK/><BRK/><RID>ISA MC96.1</RID><RTL>(1982) Temperature Measurement Thermocouples</RTL><BRK/><BRK/></REF><REF><ORG>MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY (MSS)</ORG><BRK/><BRK/><RID>MSS SP-25</RID><RTL>(2008) Standard Marking System for Valves, Fittings, Flanges and Unions</RTL><BRK/><BRK/><RID>MSS SP-72</RID><RTL>(1999) Standard for Ball Valves with Flanged or Butt-Welding Ends for General Service</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)</ORG><BRK/><BRK/><RID>NEMA ICS 1</RID><RTL>(2000; R 2005; R 2008) Standard for Industrial Control and Systems General Requirements</RTL><BRK/><BRK/><RID>NEMA ICS 6</RID><RTL>(1993; R 2006) Standard for Industrial Controls and Systems Enclosures</RTL><BRK/><BRK/><RID>NEMA MG 1</RID><RTL>(2007; Errata 2008) Standard for Motors and Generators</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)</ORG><BRK/><BRK/><RID>NFPA 70</RID><RTL>(2007; AMD 1 2008) National Electrical Code - 2008 Edition</RTL><BRK/><BRK/></REF><REF><ORG>NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)</ORG><BRK/><BRK/><RID>NIST SP 250</RID><RTL>(1991) Calibration Services Users Guide</RTL><BRK/><BRK/></REF><REF><ORG>U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)</ORG><BRK/><BRK/><RID>47 CFR 15</RID><RTL>Radio Frequency Devices</RTL><BRK/><BRK/></REF><REF><ORG>WATER ENVIRONMENT FEDERATION (WEF)</ORG><BRK/><BRK/><RID>WEF MOP OM-5</RID><RTL>(1984) Prime Movers:  Engines, Motors, Turbines, Pumps, Blowers &amp; Generators</RTL><BRK/><BRK/></REF></SPT><SPT><TTL>1.3   SYSTEM DESCRIPTION</TTL><BRK/>
<BRK/>
<SPT><TTL>1.3.1   Design Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Determine design wind speed from ASCE 7 or UFC 3-310-01.  Use 161 km/h 
(100 mph) minimum.  Use 1.2 kPa (25 psf) snow load for most heavy snow climates; 
delete snow load where maximum snow is not a factor. In some cases, local climates 
and topography will dictate that a value greater than 197 Pa (25 psf) be used 
for snow loading; this may be determined from ANSI A58.1, local codes, or by 
research and analysis of the effect of local climate and topography.  Coordinate 
with paragraph Seismic Requirements in PART 3.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Capacity and design of the air moving equipment and accessories shall be suitable for 24-hour full load service 
in an [outdoor] [indoor] [_____] location, and shall meet the following criteria.</TXT><BRK/>
<BRK/>
<LST>a.  Design Life</LST><BRK/>
<BRK/>
<ITM>Minimum                      [_____] years.</ITM><BRK/>
<BRK/>
<LST>b.  Altitude (above MSL)</LST><BRK/>
<BRK/>
<ITM>Minimum                      [_____]<MET> m</MET><ENG> ft</ENG>.</ITM><BRK/>
<BRK/>
<LST>c.  Barometric pressure</LST><BRK/>
<BRK/>
<ITM>Maximum                      [_____]<MET> kPa</MET><ENG> in Hg</ENG>.</ITM><BRK/>
<ITM>Minimum                      [_____]<MET> kPa</MET><ENG> in Hg</ENG>.</ITM><BRK/>
<BRK/>
<LST>d.  Ambient air temperature</LST><BRK/>
<BRK/>
<ITM>Maximum                      [_____] degrees<MET> C</MET><ENG> F</ENG>.</ITM><BRK/>
<ITM>Minimum                      [_____] degrees<MET> C</MET><ENG> F</ENG>.</ITM><BRK/>
<BRK/>
<LST>e.  Seismic parameters           [_____]</LST><BRK/>
<BRK/>
<LST>f.  Soil bearing capacity</LST><BRK/>
<BRK/>
<ITM>Maximum                      [_____]<MET> MPa</MET><ENG> psf</ENG>.</ITM><BRK/>
<BRK/>
<LST>g.  Wind speed</LST><BRK/>
<BRK/>
<ITM>Maximum                      [_____]<MET> km/h</MET><ENG> mph</ENG>.</ITM><BRK/>
<BRK/>
<LST>h.  Ground snow load</LST><BRK/>
<BRK/>
<ITM>Minimum                      [_____]<MET> kPa</MET><ENG> psf</ENG>.</ITM><BRK/>
<BRK/>
<LST>i.  Air relative humidity</LST><BRK/>
<BRK/>
<ITM>Maximum                      [100+] [_____] percent.</ITM><BRK/>
<ITM>Minimum                      [_____] percent.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.2   Selection Criteria</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Requirements included here may limit the selection of specified equipment.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Design air moving equipment using criteria based upon actual model developmental test data, and select it at 
a point within the maximum efficiency for a given impeller/casing combination.  Deviations within [10] [5] [3] 
percent of maximum efficiency are permissible.  Air moving equipment having impeller diameters larger than [90] 
[95] percent of the published maximum impeller diameter for the casing, or less than [15] [10] [5] percent larger 
than the published minimum impeller diameter for the casing, will be rejected.  Do not base acceptable maximum 
impeller diameter calculations on percentage of impeller diameter range for a given casing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.3   Performance Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide required information for each air mover identified on the drawings.  
Co-ordinate with PART 2 and delete inapplicable requirements.  Verify that more 
than one manufacturer's product can meet the efficiency requirement, ideally 
more than three.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Equipment identification number [_____] shall be [appropriate for the capacity requirements of this paragraph] 
[a fan] [a blower] [a vacuum pump] [_____].  [Standard] [Actual] output volume shall be a minimum of [_____]<MET> 
cubic meters/second</MET><ENG> cfs</ENG> at a [minimum inlet] [minimum positive discharge] pressure of [_____]<MET> kPa</MET><ENG> feet of water</ENG>
 [gage] [actual] [positive] [vacuum].  The minimum efficiency shall be [_____] percent under the stated conditions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.3.4   Service Conditions</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete chemical data if the equipment is designed to deliver a fresh 
air supply.  Standard materials will be adequate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Service [air supply to] [vapor collected from] [municipal landfill] [hazardous waste landfill] [petroleum spill] 
[subsurface remediation unit] [air stripper].  Anticipated contaminant concentration in the [air] [vapor] [off-gas] 
is:</TXT><BRK/>
<BRK/>
<LST>[_____]                          [_____] ug/L Maximum<BRK/>
                                      [_____] ug/L Average</LST><BRK/>
<BRK/>
<LST>pH                               [_____] Minimum<BRK/>
                                      [_____] Average<BRK/>
                                      [_____] Maximum</LST><BRK/>
<BRK/>
<LST>Sulfide                          [_____] mg/L Maximum<BRK/>
                                      [_____] mg/L Average</LST><BRK/>
<BRK/>
<LST>Ammonia                          [_____] mg/L Maximum<BRK/>
                                      [_____] mg/L Average</LST><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.4   SUBMITTALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Review submittal description (SD) definitions in Section <SRF>01 33 00</SRF> SUBMITTAL 
PROCEDURES and edit the following list to reflect only the submittals required 
for the project.  Submittals should be kept to the minimum required for adequate 
quality control.<BRK/>
<BRK/>
A “G” following a submittal item indicates that the submittal requires Government 
approval.  Some submittals are already marked with a “G”.  Only delete an existing 
“G” if the submittal item is not complex and can be reviewed through the Contractor’s 
Quality Control system.  Only add a “G” if the submittal is sufficiently important 
or complex in context of the project.<BRK/>
<BRK/>
For submittals requiring Government approval on Army projects, a code of up 
to three characters within the submittal tags may be used following the "G" 
designation to indicate the approving authority.  Codes for Army projects using 
the Resident Management System (RMS) are:  "AE" for Architect-Engineer; "DO" 
for District Office (Engineering Division or other organization in the District 
Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project 
Office.  Codes following the "G" typically are not used for Navy, Air Force, 
and NASA projects.<BRK/>
<BRK/>
Choose the first bracketed item for Navy, Air Force and NASA projects, or choose 
the second bracketed item for Army projects.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Government approval is required for submittals with a "G" designation; submittals not having a "G" designation 
are for [Contractor Quality Control approval.] [information only.  When used, a designation following the "G" 
designation identifies the office that will review the submittal for the Government.]  The following shall be 
submitted in accordance with Section <SRF>01 33 00</SRF> SUBMITTAL PROCEDURES:</TXT><BRK/>
<BRK/>
<LST><SUB>SD-02 Shop Drawings</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Detailed Drawings</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Drawings showing dimensions of the equipment and layout of the off-gas system and subsystems, 
as specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Detailed Process Flow Diagrams</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Flow diagram for process equipment associated with the off-gas system, as specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Piping and Instrumentation Diagram</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Piping and instrumentation diagram (P&amp;ID), as specified.</ITM><BRK/>
<BRK/>
<ITM><SUB>Control System</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Wiring and ladder diagrams.  Control sequences showing the control of the entire system.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-03 Product Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Flame Arrestor</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Rating, capacity and pressure differentials.  Make and model, catalog cuts, manufacturer's 
descriptive and technical literature including installation instructions.</ITM><BRK/>
<BRK/>
<ITM><SUB>Instrumentation</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM> <BRK/>
<BRK/>
<ITM>  Detailed manufacturer's data on the overall controls, sensors, process controllers, control 
operators, valves, interlocks and alarms.  Data describing in detail the equipment used.</ITM><BRK/>
<BRK/>
<ITM><SUB>Air Moving Equipment</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Capacities and pressure differentials; performance charts and curves (including the complete 
selection of impeller sizes for a given casing for centrifugal blowers).  Make and model, catalog 
cuts, manufacturer's descriptive and technical literature, including installation instructions.</ITM><BRK/>
<BRK/>
<ITM>  Approved diagrams showing the complete layout of the entire system, including equipment, piping, 
valves, wiring and control sequence.   Condensed operating instructions in typed form explaining 
preventative maintenance procedures, safe methods of checking the equipment for normal operation, 
and safe procedures for starting and stopping the equipment.   Diagrams and instructions, framed 
under glass or in approved laminated plastic, shall be posted where directed before acceptance 
testing of the systems.</ITM><BRK/>
<BRK/>
<ITM>  Complete list of equipment and materials.  A listing covering component items forming a system 
or items that are interrelated and scheduled to be coordinated and submitted concurrently.  
Certifications to be submitted with the pertinent drawings shall be so scheduled.  Include in 
the data tabular lists showing location, features, or other pertinent information regarding 
products, materials, equipment, or components to be used in the work.</ITM><BRK/>
<BRK/>
<ITM><SUB>Variable Speed Controls</SUB>[; <SUB>G</SUB>][; <SUB>G, [_____]</SUB>]</ITM><BRK/>
<BRK/>
<ITM>  Capacities and capacity ranges; performance charts and curves.  Make and model, catalog cuts, 
manufacturer's descriptive and technical literature, including installation instructions</ITM>.<BRK/>
<BRK/>
<ITM><SUB>Field Training</SUB></ITM><BRK/>
<BRK/>
<ITM>  Training course curriculum and training instructions 14 days prior to the start of training.</ITM><BRK/>
<BRK/>
<BRK/>
<LST><SUB>SD-06 Test Reports</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Field Testing</SUB></ITM><BRK/>
<BRK/>
<ITM>  Test reports in booklet form showing field tests performed to adjust each component and field 
tests performed to prove compliance with the specified performance criteria, upon completion 
and testing of the installed equipment.  Test methods used shall be identified and test results 
shall be recorded.  Indicate in each test report the final position of controls.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-07 Certificates</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Air Moving Equipment</SUB></ITM><BRK/>
<BRK/>
<ITM>  Written certification signed by an official authorized to certify on behalf of the manufacturer 
of the product, equipment or material, attesting that equipment has been tested and that it 
conforms to the specified requirements.  Statements shall be dated after contract award, shall 
state the Contractor's name and address, the project and location, and the specific requirements 
which are being certified.  Indicate in the certificate the methods of testing used.  In lieu 
of a certificate, a seal or label from a nationally recognized testing agency will be acceptable 
as evidence that the equipment conforms to agency requirements.</ITM><BRK/>
<BRK/>
<ITM><SUB>Manufacturer's Representative</SUB></ITM><BRK/>
<BRK/>
<ITM>  The names and qualifications of the manufacturer's representative and training engineers, 
and written certification from the manufacturer that the representative and trainers are qualified 
in the appropriate technical areas.</ITM><BRK/>
<BRK/>
<LST><SUB>SD-10 Operation and Maintenance Data</SUB></LST><BRK/>
<BRK/>
<ITM><SUB>Operating and Maintenance Instructions</SUB></ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] complete copies of operating instructions outlining the step-by-step procedures 
required for system startup, operation and shutdown.  Include in the operating instructions 
the following for system components: manufacturer's name, model number, service manual, parts 
list, and brief description of each piece of equipment and its basic operating features; flow 
diagrams; system layout showing piping, valves, and controls; [as-built] [approved] wiring and 
control diagrams; control sequence describing startup, operation, and shutdown; manufacturer's 
bulletins, cuts, and descriptive data.</ITM><BRK/>
<BRK/>
<ITM>  [Six] [_____] complete copies of maintenance instructions for each piece of equipment including 
the following: manufacturer's complete list of parts, recommended spare parts and supplies, 
with current unit prices and source of supply; routine maintenance procedures, including the 
requirements of <RID>WEF MOP OM-5</RID>, as a minimum; possible breakdowns and repairs; a troubleshooting 
guide to help the operator determine what steps must be taken to correct any equipment problems.</ITM><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5   QUALITY ASSURANCE</TTL><BRK/>
<BRK/>
<SPT><TTL>1.5.1   Contractor</TTL><BRK/>
<BRK/>
<TXT>Contractor shall have a minimum of [2] [3] [5] [_____] years of experience in the construction of systems for 
handling sour gas, condensable gas, off-gas or vapor.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.2   Single Source Supplier</TTL><BRK/>
<BRK/>
<TXT>Assign to a single supplier full responsibility for the furnishing of the off-gas moving system.  The designated 
single supplier, however, need not manufacture the system but shall coordinate the selection, assembly, installation, 
and testing of the entire system as specified herein.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.3   <SUB>Manufacturer's Representative</SUB></TTL><BRK/>
<BRK/>
<TXT>Provide the services of a manufacturer's field service representative who is experienced in the installation 
of the equipment furnished and who has complete knowledge of the proper operation and maintenance of the system.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.4   <SUB>Detailed Drawings</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit detailed drawings including location of components, layout and anchorage of equipment and appurtenances, 
equipment relationship to other parts of the work, clearances for maintenance and operation.  Drawings shall 
be to the approved scale.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.5   <SUB>Detailed Process Flow Diagrams</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit detailed process flow diagrams and data including, but not limited to: air and off-gas stream flows, direction 
of flow, range of flow rate and range of composition, identified by lines and arrows denoting the direction and 
destination of the flow; material, mass and energy balances for the entire air and off-gas system; subsystem 
equipment, operating capacity and operating conditions; blowers and pumps, valves and other in-line devices; 
sizes of conveying devices (pipe, ducts, etc.); number of parallel components or lines.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.5.6   <SUB>Piping and Instrumentation Diagram</SUB></TTL><BRK/>
<BRK/>
<TXT>Submit a piping and instrumentation diagram indicating:  process equipment; instrumentation; piping and valves; 
stacks, vents and dampers; control equipment (including sensors, process controllers, control operators, valves, 
interlocks, and alarms); labels and other necessary information to correlate to the process flow diagram.  The 
P&amp;ID shall include blowers and pumps, valves and other in-line devices.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>1.6   PARTNERING/PRE-INSTALLATION MEETING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Remove this paragraph when meeting is not required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Partnering] [Pre-installation] meeting will be required.  Ensure that involved subContractors, suppliers, and 
manufacturers are [notified] [represented].  Furnish the date and time of the meeting to the Contracting Officer 
for approval.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.7   DELIVERY, STORAGE, AND HANDLING</TTL><BRK/>
<BRK/>
<TXT>Store in a clean, dry location equipment delivered to the site and designated for storage; cover the equipment 
for protection against dust and moisture.  Equipment stored longer than 60 days shall have silica bags suspended 
in the outlet and inlet of unit, bearings shall be filled full of grease, unit shall be filled with oil, machine 
surfaces shall be coated with grease, and entire unit shall be enclosed with plastic or tarps.  Shaft of rotating 
equipment including motors shall be turned every two weeks to prevent flat spots on bearings.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.8   SEQUENCING AND SCHEDULING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate with the appropriate air pollution control equipment.  The 
temperature increase induced by the air moving equipment may affect the materials 
selected in other Sections of the contract.  Review the table of contents to 
assure that appropriate specifications have been included.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Details of and requirements for [stack] [vapor injection] [vapor extraction well construction] [_____] and treatment 
equipment are included in other sections of this specification.  Notify the Contracting Officer of any deviations 
from head conditions specified for the source and discharge to ensure coordination with this Section.  Pipe and 
valves not specified in this Section shall be in accordance with Section <SRF>31 21 00</SRF> PIPING; OFF-GAS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>1.9   EXTRA MATERIALS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph covers items to be furnished to the Government by the 
Contractor for future maintenance and repair.  Items that might be difficult 
to obtain because of color or pattern match, or spare parts needed to ensure 
continued operation of critical equipment should be included.   Specifications 
should identify the items, state the quantities required, and indicate to whom, 
when, and where items are to be delivered.  Insert text as required or remove 
this paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Deliver auxillary equipment, tools and spare parts at the same time as the equipment to which they pertain.  
Protect and safeguard the equipment, tools and parts until completion of the work, at which time they shall be 
delivered to the Contracting Officer.  Furnish auxiliary equipment and spare as follows:</TXT><BRK/>
<BRK/>
<LST>a.  Spare parts for each different item of material and equipment specified including the parts recommended 
by the manufacturer to be replaced after [1] [and] [3] [year] [years] service.</LST><BRK/>
<BRK/>
<LST>b.  For each air mover: one extra of each part used that is made from glass, hard rubber, or clear plastic; 
one complete set of gaskets; [4] [_____] air intake filter replacement cartridges.</LST><BRK/>
<BRK/>
<LST>c.  One complete set of special tools, calibration devices, and instruments [as recommended by the manufacturer 
for field maintenance of the system] [as required for operation, calibration, and maintenance of the 
equipment] shall be provided.  Special tools are considered to be those tools which, because of their 
limited use, are not normally available but which are necessary for the particular equipment.  Special 
tools shall be high-grade, smooth, forged, alloy, tool steel.</LST><BRK/>
<BRK/>
<LST>d.  One or more [tool boxes] [tool boards] [steel tool cases] complete with flat key locks, two keys, 
and clips or hooks to hold each special tool mounted [in the equipment room] [on the wall in a convenient 
location] [as directed by the Contracting Officer].</LST><BRK/>
<BRK/>
<LST>e.  One [pressure] [lever type] grease gun or other lubricating device for each type of grease required.</LST><BRK/>
<BRK/>
<LST>f.  [_____] sheaves of differing diameter covering the range of operation of belt driven equipment.</LST><BRK/>
<BRK/>
<LST>g.  [_____].</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>1.10   MAINTENANCE SERVICE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  This paragraph covers provisions for maintenance service as applicable 
to critical systems, equipment, and landscaping.  Insert text as required or 
remove this paragraph.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Maintenance service shall include [_____].</TXT><BRK/>
<BRK/></SPT>
</PRT><PRT><TTL>PART 2   PRODUCTS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1   MATERIALS AND EQUIPMENT</TTL><BRK/>
<BRK/>
<SPT><TTL>2.1.1   Standard Products</TTL><BRK/>
<BRK/>
<TXT>Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture 
of such products and that essentially duplicate equipment that has been in satisfactory operation at least [2] 
[_____] years prior to bid opening.  Equipment shall be supported by a service organization that is, in the opinion 
of the Contracting Officer, reasonably convenient to the site.  Pieces of equipment of the same types shall be 
products of the same manufacturer.  Equipment shall be new and unused, except for test equipment.  Materials 
may be reprocessed/recycled with equivalent durability and product warranty/guarantee.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.1.2   Nameplates</TTL><BRK/>
<BRK/>
<TXT>Each piece of equipment shall have a standard nameplate securely affixed in a conspicuous place showing the manufacturer's 
name, address, type or style, model, serial number, and catalog number.  In addition, the nameplate for each 
air moving unit shall show the capacity in standard cubic<MET> meters/second</MET><ENG> feet per minute (SCFM)</ENG> at rated speed 
in rpm and head in<MET> kPa</MET><ENG> inches of water</ENG>.  Nameplate for each electrical motor shall show, at least, the minimum 
information required by paragraph 10.38 of <RID>NEMA MG 1</RID>.  Any other information that the manufacturer may consider 
necessary to complete identification shall be shown on the nameplate.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.2   <SUB>AIR MOVING EQUIPMENT</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Coordinate these paragraphs with a schedule on the drawings showing the 
air moving equipment identification number and type and with paragraph Performance 
Requirements.  Delete inappropriate types of equipment or service.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Furnish and install air moving equipment complete with drive units, filters, controls and appurtenances indicated 
or specified.   Equipment shall be capable of operating at partial-load conditions without increased vibration 
over the normal vibration at full load operation and shall be capable of continuous operation down to the lowest 
step of unloading.  Provide each unit with unloading, vibration isolators, thermal overloads, high-and-low pressure 
safety cutoffs, low oil pressure cutout, internal motor-winding temperature sensing protection device, internal 
pressure relief valve, a complete oil charge, and protection against short cycling.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3   FANS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  See Section 1 (Fans and Systems) of AMCA 201 (Fan Application Manual) 
for additional guidance on selection of fans.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fans shall be centrifugal or propeller type as best suited for the application.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.3.1   Single-Stage</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Fan pressure will vary with fan revolutions per minute (RPM) ratio squared.  
Single stage equipment allows flow variation at low end pressure.</NPR><BRK/>
<BRK/>
<NPR>Fans are generally divided into two classifications based on the airflow through 
the impeller.  The classes are centrifugal and axial.  In axial fans, airflow 
is parallel to the shaft.  Axial fans are most commonly used in low static pressure 
applications, while centrifugal fans are used at higher static pressures.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A single-stage fan is allowable for the capacity range<MET> 0.025 to 50 cubic meters/second</MET><ENG> 53 to 106,000 cfm</ENG> at pressure 
ranges from<MET> 0.25 to 15 kPa</MET><ENG> 0.08 to 5 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.2   Industrial Centrifugal</TTL><BRK/>
<BRK/>
<TXT>An industrial centrifugal fan is allowable for the capacity range over<MET> 45 cubic meters/second</MET><ENG> 95,000 cfm</ENG> at pressure 
ranges from<MET> 7.5 to 12 kPa</MET><ENG> 2.5 to 4 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.3   Pressure Blower</TTL><BRK/>
<BRK/>
<TXT>A pressure blower fan is allowable for the capacity range of less than<MET> 2.4 cubic meters/second</MET><ENG> 5,100 cfm</ENG> at pressure 
ranges from<MET> 10 to 30 kPa</MET><ENG> 3.3 to 10 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.4   Multiple Stage</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Multiple stages limit volume and develop pressures toward the upper end.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A multi-stage pressure blower fan is allowable for the capacity of less than<MET> 3.3 cubic meters/second</MET><ENG> 7,000 cfm</ENG>
 at pressure ranges up to<MET> 70 kPa</MET><ENG> 23 feet of water column</ENG> or vacuum to<MET> -40 kPa</MET><ENG> -13 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.3.5   Backwards Inclined Impeller</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  If the flow is relatively clean, backwards inclined impeller fans should 
be specified for higher efficiency and quieter operation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A backwards inclined impeller fan is allowable for the capacity range over<MET> 190 cubic meters/second</MET><ENG> 403,000 cfm</ENG>
 and pressure ranges from<MET> 2.5 to 4.5 kPa</MET><ENG> 0.84 to 1.5 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.4   DYNAMIC BLOWERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Dynamic blowers should be designed for highest inlet pressure loss and 
highest inlet air temperature conditions within the design operating range.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Dynamic blowers shall be oil-free and of modular design with the required number of compression stages to comply 
with the specified operating requirements.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.4.1   Single Stage Centrifugal</TTL><BRK/>
<BRK/>
<TXT>A single stage centrifugal blower is allowable for pressure ranges from<MET> 0.25 to 7.5 kPa</MET><ENG> 0.084 to 2.5 feet of 
water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.2   Regenerative</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Regenerative blowers are compact single or multi-stage centrifugal blowers.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A regenerative blower is allowable for capacity up to<MET> 5 cubic meters/second</MET><ENG> 10,000 cfm</ENG> and pressure ranges of<MET>
 20 to 60 kPa</MET><ENG> 6.7 to 20 feet of water column</ENG> or vacuum up to<MET> -35 kPa</MET><ENG> -12 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.4.3   Axial Flow</TTL><BRK/>
<BRK/>
<TXT>An axial flow blower is allowable for pressure ranges higher than<MET> 70 kPa</MET><ENG> 23 feet of water column</ENG> or vacuum requirements 
greater than<MET> -40 kPa</MET><ENG> -13 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.5   POSITIVE DISPLACEMENT BLOWERS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.5.1   Rotary Lobe</TTL><BRK/>
<BRK/>
<TXT>A rotary lobe blower is allowable for capacity up to<MET> 14 cubic meters/second</MET><ENG> 30,000 cfm</ENG> at pressures higher than<MET>
 125 kPa</MET><ENG> 42 feet of water column</ENG> or up to<MET> 10 cubic meters/second</MET><ENG> 21,200 cfm</ENG> at vacuum up to<MET> -125 kPa</MET><ENG> -41.8 feet 
of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.5.2   Helical Screw</TTL><BRK/>
<BRK/>
<TXT>A helical screw blower is allowable for capacity up to<MET> 1 cubic meter/second</MET><ENG> 2,100 cfm</ENG> and pressure ranges of<MET> 
30 to 60 kPa</MET><ENG> 10 to 20 feet of water column</ENG> or vacuum up to<MET> -35 kPa</MET><ENG> -11.7 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.6   VACUUM PUMPS</TTL><BRK/>
<BRK/>
<SPT><TTL>2.6.1   Dry Rotary Blower</TTL><BRK/>
<BRK/>
<TXT>A dry rotary blower vacuum pump is allowed for vacuum flows of<MET> 1 cubic meter/second</MET><ENG> 2,100 cfm</ENG> at<MET> -90 kPa</MET><ENG> -30.1 
feet of water column</ENG> to<MET> 6 cubic meters/second</MET><ENG> 12,700 cfm</ENG> at<MET> -60 kPa</MET><ENG> -20.1 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.2   Water-Sealed Rotary Blower</TTL><BRK/>
<BRK/>
<TXT>A water-sealed rotary blower vacuum pump is allowed for vacuum flows of<MET> 1 cubic meter/second</MET><ENG> 2,100 cfm</ENG> at<MET> -80 
kPa</MET><ENG> -26.8 feet of water column</ENG> to<MET> 6 cubic meters/second</MET><ENG> 12,700 cfm</ENG> at<MET> -70 kPa</MET><ENG> -23.4 feet of water column</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.3   Rotary Vane</TTL><BRK/>
<BRK/>
<TXT>A rotary vane vacuum pump is allowed for vacuum flows of<MET> 2.5 cubic m/second</MET><ENG> 5,300 cfm</ENG> at<MET> -100 kPa</MET><ENG> -33.5 feet 
of water column</ENG> to<MET> 4.25 cubic m/second</MET><ENG> 9,000 cfm</ENG> at<MET> -60 kPa</MET><ENG> -20.1 feet of water column</ENG>.  Oil injection and outlet 
demisting systems shall be included for each rotary vane vacuum pump.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.6.4   Liquid Ring</TTL><BRK/>
<BRK/>
<TXT>A liquid ring vacuum pump is allowed for vacuum flows of<MET> 2.5 cubic m/second</MET><ENG> 5,300 cfm</ENG> at<MET> -80 kPa</MET><ENG> -26.8 feet of 
water column</ENG> to<MET> 8 cubic m/second</MET><ENG> 16,950 cfm</ENG> at<MET> -60 kPa</MET><ENG> -20.1 feet of water column</ENG>.  Water injection systems and 
outlet water separation systems shall be included for each liquid ring vacuum pump.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.7   CASING OR HOUSING</TTL><BRK/>
<BRK/>
<TXT>Casing or housing shall be of modular design to permit inspection or removal and replacement of wearing parts.  
Ample clearance shall be provided between the impeller or blades and casing.  Casing shall incorporate ribbed 
construction to resist heat accumulation, deflection and distortion under the specified operating conditions.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.7.1   Constructiion Materials</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Three types of spark resistant construction are available for fans as 
detailed by AMCA 99-0401 (Classification for Spark Resistant Construction).  
Temperature is limited to 177 degrees C (350 degrees F) when using aluminum 
parts.</NPR><BRK/>
<BRK/>
<NPR>Type A - all aluminum fan housing, inlet cone and wheel with a ground and polished 
steel shaft cover with an aluminum sleeve.</NPR><BRK/>
<BRK/>
<NPR>Type B - aluminum wheel and wear plate where shaft passes through the housing.</NPR><BRK/>
<BRK/>
<NPR>Type C - aluminum inlet cone and wear plate where shaft passes through the housing.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Fabrication shall be from [alloy steel] [monel] [316 stainless steel] [304 stainless steel] [heavy gauge hot 
rolled low carbon steel with continuous welds] [fiberglass in accordance with <RID>ASTM D 4167</RID>].  Construction shall 
be close grain cast [iron] [aluminum Type [A] [B] [C] in accordance with <RID>AMCA 99</RID>] of uniform quality and free 
from blowholes, porosity, hard spots, shrinkage defects, cracks, and other injurious defects.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.2   Single Piece Casing</TTL><BRK/>
<BRK/>
<TXT>Single piece casings shall have separate head plates.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.3   Horizontally Split Casing</TTL><BRK/>
<BRK/>
<TXT>Horizontally split casings shall be machined at the split to maintain the pressure without a gasket.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.4   Vertically Split Casing</TTL><BRK/>
<BRK/>
<TXT>Vertically split casings shall consist of rigid sections secured between inlet and outlet heads by steel tie 
rods.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.5   Connections</TTL><BRK/>
<BRK/>
<SPT><TTL>2.7.5.1   Inlet and Discharge Connections</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Threaded and sweat connections should be considered if flange-connected 
types are not available in small capacity units.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Inlet and discharge connections shall be <RID>ASME B16.1</RID> or <RID>ASME B16.5</RID><MET> [Class 125]</MET><ENG> [125 pound]</ENG> [_____] drilled and 
tapped flanges and shall be an integral part of the head.  Connections<MET> 75 mm</MET><ENG> 3 inches</ENG> in diameter and smaller 
shall be [threaded] [sweat] [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.5.2   Casing Drains</TTL><BRK/>
<BRK/>
<TXT>Tapped and plugged drains shall be provided at the low points in the casing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.7.5.3   Lifting Eyes</TTL><BRK/>
<BRK/>
<TXT>Casing shall have lifting eyes capable of supporting the equipment for installation and maintenance purposes.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.8   BLADES OR IMPELLERS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Require non-sparkling impeller material if it is likely that the mixture 
of air and other gases will be within the explosive limits during the project 
life.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Blades, vanes or impellers shall be cast or fabricated [iron] [aluminum] [aluminum alloy] [fiberglass] [monel] 
[steel] [carbon steel] [phenolic coated steel] [PTFE coated steel] [304 stainless steel] [316 stainless steel] 
[non-sparkling material].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.8.1   Dynamic Impellers</TTL><BRK/>
<BRK/>
<TXT>Guide or diffuser vanes configured to receive and direct flow to the downstream impeller shall be provided at 
the inlet to each centrifugal blower stage.  Centrifugal impellers shall be [open radial bladed] [closed backward 
bladed].  Multiple stage impeller hubs shall butt against each other either directly or through one piece metal 
spacers.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.8.2   Rotary Lobe Impellers</TTL><BRK/>
<BRK/>
<TXT>Rotary lobe impellers shall be of the straight, two-lobe involute type and shall operate without rubbing, liquid 
seals, or lubrication.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.9   SHAFT</TTL><BRK/>
<BRK/>
<TXT>Shaft shall be made of accurately machined, ground and polished high grade [ductile iron casting] [alloy steel] 
[stainless steel] [carbon steel]. Impellers or blade [and shaft shall be a common casting.] [assembly shall be 
mounted and keyed to the shaft and secured by a lock nut.]  Design shall permit inspection or replacement of 
the [seals] [and] [bearings] without [disconnecting suction or discharge piping] [disassembling the casing].   
The shaft shall be designed to operate at below [80] [90] percent of the first critical speed.  Shaft shall be 
of sufficient diameter, mass and strength to perform the work required with minimum vibration.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10   SEALS, GASKETS AND PACKING</TTL><BRK/>
<BRK/>
<TXT>Gasket and packing material selection shall be in accordance with Table 5-2 of <RID>WEF MOP OM-5</RID>.  Gasket and seal 
ratings shall encompass the maximum pressure or vacuum capacity of the equipment and the ranges of temperature 
and quality of the off-gas or air.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.10.1   Shaft Seals</TTL><BRK/>
<BRK/>
<TXT>Solid carbon mechanical ring shaft seals shall be provided where the shaft passes through the inlet and discharge 
heads.  Seals shall be [purged] [or] [non purged], [balanced] [or] [unbalanced] to conform to specified service 
requirements.  Ventilation to the atmosphere on the impeller side of shaft seals shall be provided to eliminate 
carry-over of lubricant into the air stream.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10.2   Internal Seals</TTL><BRK/>
<BRK/>
<TXT>Labyrinth seals shall be provided between blower stages.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.10.3   Bearing Seals</TTL><BRK/>
<BRK/>
<TXT>A [lip type oil] [grease] seal shall be provided at each bearing to prevent lubricant from leaking into the output.  
Ventilation of the impeller side of oil seals to atmosphere shall be provided to eliminate any carry-over of 
lubricant into the air stream.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.11   BEARINGS</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Verify bearing L-10 life requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<SPT><TTL>2.11.1   Shaft Bearings</TTL><BRK/>
<BRK/>
<TXT>Shaft shall be supported by anti-friction [spherical ball] [roller] bearings designed for both radial and thrust 
loads and sized for a minimum L-10 life of [30,000 hours] [50,000 hours] [5 years] continuous operation as defined 
by <RID>ABMA 9</RID> or <RID>ABMA 11</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.11.2   Blower Bearings</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete inapplicable lubrication methods.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each blower shall be provided with two [pressure, oil lubricated, sleeve type journal] [splash, oil lubricated, 
anti-friction type] [oil bath lubricated] [grease lubricated] bearings.  Bearings shall be self-aligning, shall 
be designed for both radial and thrust loads and shall be sized for an L-10 life of [30,000 hours] [50,000 hours] 
[5 years] continuous operation as defined by <RID>ABMA 9</RID> or <RID>ABMA 11</RID>.  It shall be possible to replace the bearings 
without disassembling the casing or disconnecting piping.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.12   DRIVE CONNECTION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Direct-driven equipment is limited to common synchronous motor speeds 
(3600, 1800, and 1200 rpm).  This equipment is usually noisier than belt-driven 
equipment because it tends to run at higher speeds. Motors that run slower than 
1800 rpm are expensive and not as readily available.</NPR><BRK/>
<BRK/>
<NPR>On belt-driven equipment, the speed is increased or decreased by changing pulleys 
or changing the diameter of adjustable pitch pulleys.  On a fixed air moving 
system, flow rate is directly proportional to speed.  The power requirement 
varies with the cube of the speed.  A 25 percent increase in speed raises the 
flow rate 25 percent, but it almost doubles the power requirement.  V-belts 
are generally used on positive displacement blowers.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each unit shall be [close coupled] [directly connected through a flexible coupling] [driven by a V-belt].</TXT><BRK/>
<BRK/>
<SPT><TTL>2.12.1   Coupling</TTL><BRK/>
<BRK/>
<TXT>Coupling shall be heavy-duty, flexible forged steel spacer coupling, keyed or locked to the shaft.  Disconnection 
shall be accomplished without removing the driver half of the driven unit half of the coupling from the shaft.  
Coupling outside surface shall be machined parallel to the axis of the shaft.  Coupling faces shall be machined 
perpendicular to the axis of the shaft.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.12.2   V-Belt Drive</TTL><BRK/>
<BRK/>
<TXT>V-belt drive shall be designed for not less than 150 percent of the driving motor capacity.  When belt drive 
is provided, an adjustable sheave to furnish not less than 20 percent speed adjustment shall be provided.   Sheaves 
shall be selected to provide the required capacity at the approximate midpoint of the adjustment.  The drive 
belt shall be [covered with an acoustically treated sheet metal guard] [or] [completely enclosed within the unit 
casing].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.13   GEARS</TTL><BRK/>
<BRK/>
<TXT>Gears shall be made of hardened, helical, alloy steel, manufactured in accordance with <RID>AGMA 6011</RID> with a minimum 
1.5 service factor applied to full power rating of the motor.  [Single speed centrifugal blower shall be furnished 
with high speed increasing gears.] [Positive displacement impellers shall be timed by a pair of machined, heat-treated, 
spur tooth timing gears.]  Timing gears shall be mounted on the impeller shafts on a tapered fit and secured 
by a lock nut.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14   LUBRICATION SYSTEM</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete inapplicable lubrication systems.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Drive shall be [pressure oil lubricated] [splash oil lubricated] [grease lubricated].  Timing gears and gear 
end bearings shall be [pressure oil lubricated] [splash oil lubricated].  Bearings and seals shall be lubricated 
as previously indicated.  System shall be designed to prevent leakage and contamination.  Oil-lubrication systems 
and vents shall be designed so that oil vapors do not enter the air stream or motor and the shaft bearings will 
be isolated.  Each oil reservoir shall be provided with an opening for filling, an overflow opening with overflow 
container at the proper location to prevent overfilling, and a drain at the lowest point.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.14.1   Pressure Oil</TTL><BRK/>
<BRK/>
<TXT>Pressure oil lubrication system shall be console mounted and shall include a main oil pump driven by the shaft, 
an auxiliary electric motor driven oil pump, an oil cooler, an oil [strainer] [or] [filter], oil reservoir with 
3-minute minimum retention time, and the switches, temperature and pressure gauges and controls necessary to 
protect unit.  The electric motor driving the auxiliary oil pump shall be totally enclosed fan cooled (TEFC), 
Design Type B in accordance with <RID>NEMA MG 1</RID>, shall have Class F insulation and shall be equipped with 120 volts 
space heaters.  Control shall be in accordance with <RID>NEMA ICS 1</RID>.  The lubrication system shall be factory piped 
and wired with minimal interconnecting piping between the console and the oil pump required in the field.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14.2   Splash Oil</TTL><BRK/>
<BRK/>
<TXT>Splash lubrication shall be provided by a slinger on the shaft splashing oil into the bearing whenever the compressor 
is running.  A constant level oiler located on the bearing housing or a metering orifice will be provided to 
maintain the oil level in the oil reservoir integral with the bearing housing.  A sight level gauge shall be 
provided in the bearing housing.  A labyrinth seal combined with an atmospheric vent shall be provided to prevent 
oil contamination of the air stream.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.14.3   Grease</TTL><BRK/>
<BRK/>
<TXT>Grease type bearings shall be equipped with grease fittings.  Grease tubing shall be extended to a convenient 
location if fittings are inaccessible.   Grease fittings shall be the type which prevents over-lubrication and 
over-pressurization.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.15   INTAKE FILTER</TTL><BRK/>
<BRK/>
<TXT>Intake [screen and filter] [filter] shall be installed on inlet to each unit.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.15.1   Efficiency</TTL><BRK/>
<BRK/>
<TXT>Intake filter shall be at least [90] [96] percent efficient when tested in compliance with <RID>ASHRAE 52.1</RID> dust spot 
method.  [High volume bag intake filter shall be provided for filtration down to<MET> 5 microns</MET><ENG> 2 mils</ENG> on vacuum pump 
intake.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.15.2   Surface Area</TTL><BRK/>
<BRK/>
<TXT>Minimum filter surface area shall be<MET> 1 square meter per 0.127 cubic m/second</MET><ENG> 1 square foot per 25 cubic feet/minute</ENG>
 to produce a filter flow through velocity of less than<MET> 0.127 m/second</MET><ENG> 25 feet per minute</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.15.3   Media</TTL><BRK/>
<BRK/>
<TXT>Filter media shall be [washable] [or] [disposable] dry type felt material made from [glass fiber,] [polyester,] 
fiber resistant to moisture and chemicals to which it will be exposed with<MET> 25 mm</MET><ENG> 1 inch</ENG> pleat separation.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.15.4   Weather Hood</TTL><BRK/>
<BRK/>
<TXT>Steel intake hood and filter housings shall be coated with a chemically resistant coating and entire unit element 
shall be resistant to moisture and chemicals to which it will be exposed.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.16   NOISE MINIMIZATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Equipment selection should consider the pressure drop through silencer 
or muffler.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Flexible connections and silencers, muffler or sound barriers shall be installed on the equipment [discharge] 
[inlet and discharge] to attenuate sound level.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.16.1   Silencer</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Canister type silencers should be considered for attenuation of low frequency 
sound levels, pressures higher than 5 kPa (20 inches of water) and velocities 
greater than 20 meters per second (4,000 feet per minute).  Use high temperature 
acoustical packing for temperature greater than 122 degrees C (250 degrees F).</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each blower shall be provided with [inlet] [and] [discharge] silencers.  Silencers shall be for [standard] [critical] 
grade silencing.  Intake silencers shall be of the [absorption] [cannister] [chamber] type.  Discharge silencers 
shall be of the [absorption] [cannister] [chamber] [combination chamber-absorption] type.  Canister type silencer 
shall be constructed of two concentric perforated cylinders lined with high temperature acoustical packing forming 
an annular flow path, with an internal plug creating a blocked line of sight.  Silencer size shall be as recommended 
by the silencer manufacturer and shall be compatible with the blower requirements.  Silencer connections shall 
match the adjacent piping.  Mounting brackets shall be provided as required for silencer support.  Silencer shall 
be constructed of heavy-duty rolled and welded steel plate with the inner liner welded to the outer shell to 
acoustically deaden the outer shell.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.2   Muffler</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Hot-gas mufflers should be considered to effectively minimize the transmission 
of hot-gas pulsations whenever the noise level is an important consideration.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Hot-gas muffler shall be installed [on the intake] [on the exhaust] [in-line] and shall minimize the transmission 
of hot-gas pulsations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.3   Acoustical Insulation</TTL><BRK/>
<BRK/>
<TXT>Silencers, [interior air piping,] [expansion joints,] [valves,] [and] [drive guards] shall be wrapped with<MET> 25 
mm</MET><ENG> 1 inch</ENG> thick high density woven glass fiber mat having a minimum density of<MET> 4.6 kg/square meter</MET><ENG> 15 ounces/square 
foot</ENG> and shall be lagged with a<MET> 0.41 mm</MET><ENG> 0.0l6 inch</ENG> thick aluminum jacket.  Insulation shall conform to EPA requirements 
in accordance with Section <SRF>01 62 35</SRF> RECYCLED / RECOVERED MATERIALS.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.16.4   Sound Barriers</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Barriers generally have limited high frequency attenuation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Sound barriers shall be made of insulated ductwork fastened to sheet steel walls.  Flow velocity parallel to 
barriers shall be limited to<MET> 1200 m</MET><ENG> 4000 feet</ENG> per minute at pressures less than<MET> 5 kPa</MET><ENG> 20 inches of water</ENG>.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.17   MONITORING</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  On projects with extensive process monitoring and control, replace text 
with a reference to Section <SRF>40 95 00</SRF> PROCESS CONTROL.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each unit shall be equipped for monitoring the flow downstream of any bypass connections.  Calibration of sensors 
shall be with standards traceable to NIST and in conformance with <RID>NIST SP 250</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.17.1   Flow</TTL><BRK/>
<BRK/>
<TXT>[A turbine type flow meter equipped with transmitter and recorder shall be provided for continuous metering of 
the process flow.  Accuracy shall be within 0.5 percent of full scale.]  [Gas meters shall conform to <RID>AGA B109.2</RID>
.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.2   Temperature</TTL><BRK/>
<BRK/>
<SPT><TTL>2.17.2.1   Thermometers</TTL><BRK/>
<BRK/>
<TXT>Thermometers shall conform to <RID>ASME PTC 19.3</RID> with wells and temperature range suitable for the use encountered.  
Thermometers shall be provided to indicate [inlet air temperature,] [discharge air temperature,] [and] [lubrication 
oil temperature.]  Thermometers shall be either red-reading mercury-in-glass type or dial type.  Scale range 
shall include full range of expected operation and up to 125 percent, but not more than 150 percent of maximum.  
Accuracy shall be within 0.5 percent of full scale.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.2.2   Thermocouples</TTL><BRK/>
<BRK/>
<TXT>Sensors shall conform to <RID>ISA MC96.1</RID>, Type K, and shall be provided downstream of each blower or as otherwise 
directed.  The thermocouple shall be suitable for continuous operation and control at temperatures up to [_____] 
degrees<MET> C</MET><ENG> F</ENG>, shall be accurate to [0.75] [_____] percent of full scale, and shall be long enough to be inserted<MET>
 150 mm</MET><ENG> 6 inches</ENG> into the air flow.  The thermocouple shall be provided with an adjustable flange and with a 
protecting tube suitable for insertion into the air flow without support of the projecting end.  Compensating 
lead wire<MET> 1.52 mm</MET><ENG> 16 gauge</ENG> in diameter and<MET> 30 m</MET><ENG> 100 feet</ENG> long with a weatherproof braid shall be supplied for 
connecting the thermocouple to the instrument.  The installed unit shall indicate gas passage temperatures and 
shall activate the high temperature alarm when the set point temperature is exceeded.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.17.3   Pressure</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Verify the pressure ranges for the system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>High and low pressure connections shall be<MET> 6 mm</MET><ENG> 1/4 inch</ENG> NPT female with a [stainless steel bar stock valve] 
[suitable shutoff cock] at each connection.  [The high pressure connection to the gauge shall have a<MET> 10 micrometer</MET><ENG>
 10 micron</ENG> pleated paper filter and the low pressure connection shall have a fine mesh stainless steel strainer.] 
[Each pressure connection to the gauge shall have a snubber.]</TXT><BRK/>
<BRK/>
<SPT><TTL>2.17.3.1   Draft Gauge</TTL><BRK/>
<BRK/>
<TXT>Gauge shall conform to <RID>ASME B40.100</RID> with a diaphragm or bellows actuating system, a circular scale and a zero 
adjustment screw.  Inlet gauges shall have a range of<MET> 0 to 7.5 kPa</MET><ENG> 0 to 30 inches water gauge vacuum</ENG>.  Gauges 
shall include the accessories for [control panel] [wall] [pipe] mounting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.3.2   Pressure Gauge</TTL><BRK/>
<BRK/>
<TXT>Gauges shall conform to <RID>ASME B40.100</RID> with a single Bourdon tube style actuating system, a circular scale and 
a zero adjustment screw.  Discharge gauges shall have a range of<MET> 0 to 75 kPa</MET><ENG> 0 to 11 psi</ENG>.  Gauges shall include 
the accessories for [control panel] [wall] [pipe] mounting.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.3.3   Differential Pressure Gauge</TTL><BRK/>
<BRK/>
<TXT>The housing of each unit shall be equipped with a direct-reading gauge that measures the differential pressure 
range [of<MET> 0 to 100 kPa</MET><ENG> 0 to 14.5 psi</ENG> with an accuracy of plus or minus 2 percent of full scale, calibrated linearly 
with<MET> 2 kPa</MET><ENG> 0.34 psi</ENG> scale graduations] [necessary to operate in conjunction with the corresponding venturi tube].  
During operating conditions the pointer shall be within the mid-range of the gauge.  Accuracy shall be within 
0.5 percent of full scale.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.3.4   Piston Element</TTL><BRK/>
<BRK/>
<TXT>Piston type element shall consist of a spring-supported, corrosion resistant piston moving inside a glass cylinder 
with an operating pressure of<MET> 1.03 MPa</MET><ENG> 150 psi</ENG>.  The cylinder shall have stainless steel end flanges with Viton 
O-ring seals and a cylinder burst pressure of not less than<MET> 4.15 MPa</MET><ENG> 600 psi</ENG>.  Construction of the gauge shall 
be such that a 3-valve manifold is not necessary.  If only one bar stock valve is closed, the gauge shall not 
be damaged by up to<MET> 2.1 MPa</MET><ENG> 300 psi</ENG> differential pressure in either direction.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.3.5   Bellows Element</TTL><BRK/>
<BRK/>
<TXT>Bellows pressure sensing element shall be installed to measure pressure differential across the air moving equipment 
and shall be dual opposed, liquid filled, rupture-proof type with bellows movement converted to rotation and 
transmitted by a torque tube.  Bellows housing shall be stainless steel and shall have a rated working pressure 
of not less than<MET> 3.5 MPa</MET><ENG> 500 psi</ENG>.  Liquid used to fill the bellows shall be suitable for the expected maximum 
temperature of the off-gas and the minimum ambient temperature.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.17.4   Contaminant Monitoring and Sampling</TTL><BRK/>
<BRK/>
<SPT><TTL>2.17.4.1   Explosimeter</TTL><BRK/>
<BRK/>
<TXT>Continuous monitoring and recording of percentages of upper and lower explosive limits shall be performed.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.4.2   Hygrometer</TTL><BRK/>
<BRK/>
<TXT>Humidity sensor shall be located downstream of the heat exchanger or blower.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.4.3   Sampler</TTL><BRK/>
<BRK/>
<TXT>Sampling port and equipment for collecting discrete and composite samples shall be provided with adequate access 
for personnel and equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.4.4   Transmitter</TTL><BRK/>
<BRK/>
<TXT>Transmitter shall provide an analog two-wire electrical 4-20 milliamp signal directly proportional to the differential 
pressure and accurate to within 0.25 percent of sensor indication.  Transmitter shall be provided with built-in 
pulsation damper and suitable over-range protection.  Transmitter shall not require recalibration due to power 
outages.  Transmitter shall be UL listed for [Class 1, Division 1, Group D hazardous locations] [the electrical 
classification for the area as indicated on the drawings].  Each transmitter shall be supplied with a factory 
assembled five-valve stainless steel manifold.  Vent valves shall be furnished on upper ports of each transmitter.  
Transmitter shall be mounted and installed according to manufacturer's recommendations.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.17.4.5   Remote Indicator and Recorder</TTL><BRK/>
<BRK/>
<TXT>Monitored parameters and excursion alarms shall be displayed locally and displayed on the control panel.  Digital 
data shall be recorded at intervals not exceeding one minute.  Process data shall be maintained in the control 
room and recorded on magnetic media in the approved micro computer compatible digital format.  Flow information 
shall include rate monitoring, integration and totalizing.  Hard copies of recorded data and summaries of recorded 
data shall be maintained in the control room.  The copies shall be available upon request.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.18   <SUB>CONTROL SYSTEM</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The designer will decide which automatic controls are needed and delete 
any inapplicable items.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Unit shall have [a manual][an automatic] control system.  Automatic controls shall be responsible for the balancing 
of the capacity with system requirements.  These controls shall automatically balance the equipment capacity 
with the load.  The system shall be provided with the necessary control devices required for normal operation.  
The automatic controls shall also include each of the following: a safe system operating mode when controls fail, 
indications for system failure, protective mechanisms and controls that are required for the safe operation of 
system equipment in an enclosure conforming to <RID>NEMA ICS 6</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.18.1   Sequence of Control</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Develop and insert the sequence of control for each system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The sequence of control shall be as follows: [_____].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.2   Sequence of Equipment Operation</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Develop the sequence of equipment operation and insert requirements in 
this paragraph.</NPR><BRK/>
<BRK/>
<NPR>Include instrumentation to modulate the output to meet pressure and/or volume 
demands as well as start or stop units if the system requires pressure and/or 
volume control.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Logic shall be included to allow for automatic or manual alternation of lead/lag/standby assignments of units 
installed in parallel.  <SUB>Instrumentation</SUB> to modulate the pressure and volume output as well as start or stop units 
shall be included to meet pressure and/or volume demands.  Off-gas systems with safety, emission, or process 
controls shall be subject to automatic control logic permissives.  Controls shall include start and stop push 
button switches, [hand-off-automatic (H-O-A) switches where the system controls operation] [safety features such 
as blade and belt guards, vibration or temperature switches] [surge warning and shutdown,] [low oil pressure,] 
[high oil temperature switches] [process oriented switches such as upstream or downstream process equipment failure 
shutdown or emission detection shutdown].  Additional controls or protective devices shall be as indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.3   Intake Volume Control</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Under colder air operating conditions, in centrifugal blowers with a 
relatively flat characteristic flow curve, volume may be controlled over a narrow 
working range by adjusting variable inlet guide vanes to vary the pressure-volume 
characteristics.  Variable inlet vanes are acceptable, but inefficient.  A butterfly 
valve may be used to create inlet head losses to throttle the blower inlet and 
reduce volumetric flow rate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Automatically] [Manually] controlled [adjustable guide vanes] [line sized butterfly valve] shall be installed 
on blower inlet to create inlet head losses and reduce the volumetric flow rate.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.4   Outlet Volume Control</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The most efficient method to vary both volume and pressure is to vary 
the speed of the driver.</NPR><BRK/>
<BRK/>
<NPR>Other methods of controlling output are outlet damper and eddy current coupling 
(generally an outdated way to achieve speed control).  Outlet dampers may serve 
if high pressure at low volume is desired and high energy costs are not of concern.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Variable speed control shall be installed to control output volume] [Automatically controlled bypass shall be 
provided to recirculate directly around the blower] [Manual line sized [unloading] [check] [butterfly] valve 
shall be installed on blower outlet to create system head losses and reduce the volumetric flow rate].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.5   Panel</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete inapplicable items.  Consider site location and operational factors 
for alarm requirements.  Indicate equipment on drawings and/or reference other 
specifications as appropriate.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A NEMA [4] [7] [12] [explosion proof] [weather proof] [instrument panel] [control panel] enclosing relays, Contractor, 
timers, and selector switches shall be [floor mounted] [wall mounted] [mounted with vibration isolators on the 
unit] and provided with hinged cover and latch.  Instruments shall be of the direct reading type and shall be 
factory mounted and connected.  Shutdown feature shall be connected to the annunciator on the instrument panel 
and each shutdown feature shall be identified.  Panel shall include the following features and instruments:</TXT><BRK/>
<BRK/>
<LST>a.  Running time meter.</LST><BRK/>
<BRK/>
<LST>b.  Alarm annunciator [with single audible alarm] [and] [with contacts to operate a remote alarm] and 
individual lights for each alarm condition.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.6   Protective Devices</TTL><BRK/>
<BRK/>
<TXT>Blower protective devices, upon alarm condition, shall cause immediate de-energization of the motor, shall initiate 
the automatic shutdown sequence, and shall provide audible and visual alarm indication.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.18.6.1   Bearing Temperature</TTL><BRK/>
<BRK/>
<TXT>Temperature sensors with switches shall be installed on each bearing.  The control relay, selector switch, test 
push buttons, and running indicator, or light, on the panel shall indicate bearing status.  High temperature 
of any bearing shall initiate protective shutdown and the indicator, or light, shall indicate the affected bearing.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.6.2   Surge and Overload Protection</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Centrifugal blowers are subject to a characteristic called "surge" or 
minimum flow point below which the blower performance is unstable.  The instability 
manifests itself in pressure pulsations and flow reversals which can become 
severe enough to damage the blower or system.  Surge occurs when the system 
resistance is greater than the pressure that the blower is capable of producing 
at a given inlet volume; this results in a backward rush through the blower 
and out the inlet, lowering the pressure in the discharge line at which time 
normal compression resumes and cycle is repeated, until discharge pressure is 
decreased or blower pressure increased.  Surge may be prevented by using manual 
or automatic controls.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A set-point controller shall monitor current input to the motor.  The controller shall open and close the inlet 
[guide vanes] [butterfly valve] in response to current.  The controller shall initiate automatic shutdown sequence 
and give visual indication of reason for shutdown if surge conditions are indicated by the motor current.  Manual 
control and override shall be provided to enable equipment startup and shutdown.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.18.6.3   Oil Temperature and Pressure</TTL><BRK/>
<BRK/>
<TXT>Temperature and pressure sensors with switches shall be installed on each oil pump.  The control relay, selector 
switch, test push buttons, and running indicator, or light, on the panel shall indicate status.  High oil temperature, 
high oil pressure or low oil pressure shall initiate protective shutdown and the indicator, or light, shall indicate 
the affected setting.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.19   ELECTRICAL EQUIPMENT</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Show hazardous area classification on the drawings.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Electrical equipment shall conform to Section <SRF>26 20 00</SRF> INTERIOR DISTRIBUTION SYSTEM.  Electrical motor driven 
equipment herein specified shall be provided complete with motors, motor starters, and controls.  Electrical 
equipment and wiring shall be in accordance with <RID>NFPA 70</RID>, with proper consideration given to environmental conditions 
such as moisture, dirt, corrosive agents, and hazardous area classification.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.19.1   Electric Motors</TTL><BRK/>
<BRK/>
<TXT>Each electric motor-driven unit shall be driven by a weather-protected, Type [I][II][totally-enclosed fan cooled] 
continuous-duty electric motor.  Motor shall have a [_____] service factor.  Motors shall be [squirrel-cage induction][synchronous] 
having normal-starting-torque and low-starting-current characteristics, and shall be sized to avoid exceeding 
the nameplate power rating throughout the entire published characteristic curve.  Integral size motors shall 
be the premium efficiency type in accordance with <RID>NEMA MG 1</RID>.  Motor bearings shall provide smooth operations 
under the conditions encountered for the life of the motor.  Adequate thrust bearing shall be provided in the 
motor to carry the weight of the rotating parts plus the hydraulic thrust and shall be capable of withstanding 
upthrust imposed during starting [and under variable head] conditions specified.  Motors shall be rated [_____] 
volts, [_____] phase, 60 Hz and such rating shall be stamped on the nameplate.  Motors shall conform to <RID>NEMA MG 1</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.2   Control Equipment</TTL><BRK/>
<BRK/>
<TXT>[Manually controlled units shall have START-STOP pushbutton in cover.][Automatically controlled units shall have 
three-position MANUAL-OFF-AUTOMATIC selector switch in cover.]  Additional controls or protective devices shall 
be as indicated.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.3   <SUB>Variable Speed Controls</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include this paragraph if any of the motors has a variable speed control.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>The variable speed motor controller shall convert 460 volt plus 15 percent, minus 5 percent, three phase, 60 
Hz (plus or minus 2 Hz) utility power to adjustable voltage/frequency, three phase, ac power for stepless motor 
control from 5 percent to 105 percent of base speed.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.19.3.1   Description</TTL><BRK/>
<BRK/>
<TXT>The variable speed drive shall produce an adjustable ac voltage/frequency output for complete motor speed control.  
The variable speed drive shall be automatically controlled by [a pneumatic<MET> 20.7 to 103.4 kPa</MET><ENG> 3 to 15 psig</ENG> control 
signal] [a grounded electronic control signal].  The variable speed drive shall be self contained, totally enclosed 
in a <RID>NEMA MG 1</RID> ventilated cabinet and shall be capable of operation between<MET> 0 and 40 degrees C</MET><ENG> 32 and 104 degrees 
F</ENG>.  The variable speed drive maximum output current rating shall be equal to or exceed the motor nameplate full 
load.  The manufacturer shall advise the maximum recommended motor sine wave current for each controller rating.  
Variable speed drive multiple motor operation at same frequency/speed shall be possible as long as the sum of 
connected motor full load sine wave currents are less than or equal to the variable speed drive maximum continuous 
current rating.  Variable speed drive shall be [85] [90] [95] percent efficient at 100 percent of rated output 
power.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.3.2   Governing Requirements</TTL><BRK/>
<BRK/>
<TXT>Variable speed drive shall comply with <RID>47 CFR 15</RID> regulation of RF1/EM1 emission limits for Class A computing 
devices.  The FCC label of compliance shall be displayed on the variable speed drive.  Variable speed drive and 
option design and construction thereof shall comply with the applicable provisions of <RID>NFPA 70</RID>, Article 43D, Sections 
A-L.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.3.3   Basic Features</TTL><BRK/>
<BRK/>
<TXT>The variable speed drive shall have the following basic features:</TXT><BRK/>
<BRK/>
<LST>a.  Hand/off/auto operation.</LST><BRK/>
<BRK/>
<LST>b.  Manual/auto speed reference switch.</LST><BRK/>
<BRK/>
<LST>c.  Minimum/maximum adjustable speeds.</LST><BRK/>
<BRK/>
<LST>d.  Speed potentiometer.</LST><BRK/>
<BRK/>
<LST>e.  Auto restart.</LST><BRK/>
<BRK/>
<LST>f.  Linear timed acceleration and deceleration for soft starting and stopping.</LST><BRK/>
<BRK/>
<LST>g.  Controlled speed range 3-63 Hz.  (Factory set at 15 Hz minimum).</LST><BRK/>
<BRK/>
<LST>h.  Terminal connections for time clock control, fire, smoke, freeze detectors, and EP relay pre-set 
speed override.</LST><BRK/>
<BRK/>
<LST>i.  Output frequency terminals for remote metering.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.3.4   Protective Circuits and Features</TTL><BRK/>
<BRK/>
<TXT>The variable speed drive controller shall include the following protective circuits/features:</TXT><BRK/>
<BRK/>
<LST>a.  Current limits to 100 percent design by slowing the down motor.</LST><BRK/>
<BRK/>
<LST>b.  Instantaneous electronic trip to automatically shut down the motor if current exceeds 120 percent 
of design or phase-to-phase output short circuit occurs.</LST><BRK/>
<BRK/>
<LST>c.  The variable speed drive will restart automatically when input line returns to normal in the event 
of intermittent power outage or phase loss or overvoltage shutdown.</LST><BRK/>
<BRK/>
<LST>d.  Input power protection shuts down the unit on low input line voltage or loss of an input phase.</LST><BRK/>
<BRK/>
<LST>e.  Insensitive to incoming power phase.</LST><BRK/>
<BRK/>
<LST>f.  Fast acting current limiting input fuses, (Class J) rated with 200,000 interrupting amperes capability.</LST><BRK/>
<BRK/>
<LST>g.  Isolated 115 volt control circuit and dedicated control transformer.</LST><BRK/>
<BRK/>
<LST>h.  Line-to-line fault protection.</LST><BRK/>
<BRK/>
<LST>i.  Line-to-ground short circuiting and accidental motor grounding protection.</LST><BRK/>
<BRK/>
<LST>j.  Output thermal overload relay trip.</LST><BRK/>
<BRK/></SPT>
<SPT><TTL>2.19.3.5   Adjustments</TTL><BRK/>
<BRK/>
<TXT>The variable speed drive shall have 0 to 75 percent of minimum speed, and 100 percent of maximum speed, adjustments 
available via potentiometers located on the faceplate of a single, regulator printed circuit board.</TXT><BRK/>
<BRK/></SPT>
</SPT></SPT><SPT><TTL>2.20   APPURTENANCES</TTL><BRK/>
<BRK/>
<SPT><TTL>2.20.1   Dielectric Fittings</TTL><BRK/>
<BRK/>
<TXT>Dielectric fittings shall be installed between threaded ferrous and nonferrous metallic pipe, fittings and valves.  
Dielectric fittings shall prevent metal-to-metal contact of dissimilar metallic piping elements and shall be 
suitable for the required working pressure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.2   Isolation Joints</TTL><BRK/>
<BRK/>
<TXT>Isolation joints shall be installed between nonthreaded ferrous and nonferrous metallic pipe, fittings and valves.  
Isolation joints shall consist of a sandwich-type flange isolation gasket of the dielectric type, isolation washers, 
and isolation sleeves for flange bolts.  Isolation gaskets shall be full faced with outside diameter equal to 
the flange outside diameter.  Bolt isolation sleeves shall be full length.  Units shall be of a shape to prevent 
metal-to-metal contact of dissimilar metallic piping elements.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.20.2.1   Sleeve-type Couplings</TTL><BRK/>
<BRK/>
<TXT>Sleeve-type couplings shall be used for joining plain end pipe sections.  The two couplings shall consist of 
one steel middle ring, two steel followers, two gaskets, and the necessary steel bolts and nuts to compress the 
gaskets.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.2.2   Split-sleeve Type Couplings</TTL><BRK/>
<BRK/>
<TXT>Split-sleeve type couplings shall be used in aboveground installations when approved in special situations, and 
shall consist of gaskets and a housing in two or more sections with the necessary bolts and nuts.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.20.3   Valves</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Evaluate the need for silencers and/or carbon adsorption units if handling 
toxic gases downstream of relief and/or unloading valves.</NPR><BRK/>
<BRK/>
<NPR>Threaded connections are common on valves 25 mm (1 inch) and smaller, and are 
sometimes used on valves up to 50 mm (2 inch).  If a welded end connection is 
desired for valves 50 mm (2 inch) and smaller, a socketweld is usually chosen.  
Socketweld end dimensions are standardized by ASME B16.11.  Buttweld ends are 
preferred when zero leakage is required.  The valve body material must be compatible 
with the adjoining pipe material for welding.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Valve diameter shall be equal to the diameter of the pipe in which the valve is located unless otherwise indicated.  
Valves shall be [screw] [socket weld] [buttweld] [sweat] [flange] connected.  Rated operating conditions shall 
be [_____] degrees<MET> C</MET><ENG> F</ENG> and [_____]<MET> kPa</MET><ENG> psig</ENG>, minimum.  Materials of construction shall be [aluminum] [bronze] 
[stainless steel] [_____] body, [bronze] [316 stainless steel] trim, and [Buna-N] [EPR] [Viton] [PTFE] elastomers.  
Valves shall be marked in accordance with <RID>MSS SP-25</RID> to identify the manufacturer, valve sizes, pressure rating, 
body and seat material.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.20.3.1   Relief Valve</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Relief valves are provided in the following configurations: weighted 
type (install in horizontal position only), spring type and pilot operated diaphragm 
type which (with an optional solenoid valve) can be used for an unloading valve 
as well.  Relief valves are also used to relieve possible thermal expansion 
in a pipe line if no other provisions exist.  Indicate on the drawings a site 
flow indicator downstream of each relief valve. Indicate the operating pressure 
required for each valve.</NPR><BRK/>
<BRK/>
<NPR>ASTM F 1508 covers only spring-loaded, angle style valves.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Relief valve capable of maintaining a constant upstream pressure regardless of the downstream demand shall be 
provided for each air mover.  Valve shall be [<RID>ASTM F 1508</RID> angle spring loaded] [weighted] [pilot-operated diaphragm] 
differential pressure relief valve with a [_____] percent accumulation.  Valve shall be rated to relieve [the 
full capacity of the air moving equipment] [[_____] cubic<MET> meters/second</MET><ENG> feet/minute</ENG>].  Valve shall be factory-set 
to open at the [actual] [gauge] [pressure] [vacuum] of [_____]<MET> kPa</MET><ENG> psi</ENG> and shall be field adjustable within a 
minimum range of plus or minus 20 percent.  Valve shall be located within [_____]<MET> m</MET><ENG> feet</ENG> upstream of vacuum equipment 
or downstream of pressure equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.2   Unloading Valve</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Unloading valves allow the blower to start under reduced pressure.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Unloading valve shall be [pilot-operated diaphragm valve with auxiliary solenoid operator] [butterfly valve] 
actuated by the system controls and shall be field adjustable within a minimum range of plus or minus 20 percent.  
Unloading valve shall be set to relieve [_____] cubic<MET> m/second</MET><ENG> feet/minute</ENG> at a set gage pressure of [_____]<MET>kPa</MET><ENG>
 psi</ENG> or a vacuum of [_____]<MET> kPa</MET><ENG> inches Hg</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.3   Combination Relief and Unloading Valve</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Combination valves should be carefully located with respect to heavily 
contaminated off-gas streams or deleted in favor of separate valves.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Combination relief and unloading valve shall be set to relieve at a set [actual] [gauge] [pressure] [vacuum] 
of [_____]<MET> kPa</MET><ENG> psi</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.4   Purge Valve</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  For vacuum pump applications, an automatic purge valve is useful in clearing 
the system of vapors which may condense in shutdown or startup.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Each vacuum unit shall be equipped with a manually adjustable, normally closed automatic purge valve.  Valve 
shall be factory-set to open at at the gauge pressure of<MET> 0.5 kPa</MET><ENG> 0.15 inches Hg</ENG> and shall be field adjustable 
within a minimum range of plus or minus 20 percent.   Valve shall be located within<MET> 1 m</MET><ENG> 3.3 feet</ENG> downstream of 
vacuum equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.5   Vacuum Breaker</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Edit the settings appropriately for the equipment required.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Pilot-operated diaphragm type with auxiliary solenoid operator] [Butterfly valve actuated by blower system controls] 
vacuum breaker shall be provided to protect blower or vacuum pump from surges.  Valve shall be rated to relieve<MET>
 0.05 cubic m/second</MET><ENG> 1.76 cfm</ENG> at a set gage pressure of<MET> 100 kPa</MET><ENG> 14.7 psi</ENG> or a vacuum of<MET> -50 kPa</MET><ENG> -15 inches Hg</ENG>
.  Materials shall be [aluminum] [bronze] [stainless steel] body, [bronze] [316 stainless steel] trim, and [Buna-N] 
[EPR] [Viton] [Teflon] elastomers.  Rating shall be<MET> 100 degrees C</MET><ENG> 212 degrees F</ENG> and<MET> 1000 kPa</MET><ENG> 147 psi</ENG>, minimum.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.6   Check Valve</TTL><BRK/>
<BRK/>
<TXT>Valve shall be a [pilot-operated diaphragm valve with auxiliary solenoid operator] [butterfly valve actuated 
by system controls] with a closing time of 1 to 5 seconds, located on the discharge side of each air mover.  
Valve shall prevent reverse flow and shall open at a controlled rate to keep air mover starting surges from shocking 
downstream equipment.  Opening rate shall be adjustable from 5 to 60 seconds.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.7   Control Valve</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Starting and stopping the air moving equipment is preferable to operation 
against a closed system.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Valve shall be a [pilot-operated diaphragm valve with auxiliary solenoid operator] [butterfly valve actuated 
by system controls].</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.8   Back Pressure Valve</TTL><BRK/>
<BRK/>
<TXT>Valve shall be capable of maintaining a constant upstream pressure regardless of the downstream demand.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.3.9   Manual Valve</TTL><BRK/>
<BRK/>
<TXT>[Ball valves shall be in accordance with <RID>MSS SP-72</RID>.  Gate, plug and ball valves shall be in accordance with <RID>API Spec 6D</RID>
.  Thermoplastic gas shutoffs and valves shall be in accordance with <RID>ASME B16.40</RID>.  Manual valve shall be wrench 
operated, rising stem, with cap.] [Non-automatic valve shall be as required by Section <SRF>31 21 00</SRF> PIPING; OFF-GAS.]</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.20.4   Inlet and Discharge Elbows</TTL><BRK/>
<BRK/>
<TXT>Inlet and discharge elbows shall be of the long sweep type with <RID>ASME B16.1</RID>, Class 125 flanges.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.5   Expansion Coupling</TTL><BRK/>
<BRK/>
<TXT>The inlet and the outlet of each unit shall be provided with flexible expansion couplings of extra heavy gauge 
rubber, wire reinforced type suitable for temperature range of<MET> minus 29 to plus 121 degrees C</MET><ENG> minus 20 to plus 
250 degrees F</ENG> and pressure range from<MET> 51 to 103 kPa</MET><ENG> 15 inches of mercury vacuum to 15 psig</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.6   Heat Exchanger</TTL><BRK/>
<BRK/>
<TXT>[An air-to-air] [A water cooled] heat exchanger shall be provided on the blower [inlet] [outlet] with sufficient 
capacity to reduce the air temperature [_____] degrees<MET> C</MET><ENG> F</ENG>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.7   <SUB>Flame Arrestor</SUB></TTL><BRK/>
<BRK/>
<TXT>Flame arrestor shall be located immediately upstream of any source of flame.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.8   Drip Trap</TTL><BRK/>
<BRK/>
<TXT>Drip trap shall be in accordance with <RID>ASTM F 1139</RID>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.9   Liquid Receiver</TTL><BRK/>
<BRK/>
<TXT>Liquid receivers shall be designed, fitted, and rated for<MET> 0.345 Mpa</MET><ENG> 50 psi</ENG> working pressure.  Each receiver shall 
have a storage capacity not less than [_____]<MET> L</MET><ENG> gal</ENG>.  Each receiver shall be equipped with inlet and outlet drop 
pipe, drain with valve, relief valve and two bull's-eye liquid-level sight glasses.  Sight glasses shall be in 
the same vertical plane, 90 degrees apart, perpendicular to the axis of the receiver, and not over<MET> 75 mm</MET><ENG> 3 inches</ENG>
 horizontally from the drop pipe measured along the axis of the receiver.  In lieu of bull's-eye sight glass, 
external gauge glass with metal glass guard and automatic closing stop valves shall be provided.  The outside 
of liquid receivers shall be galvanized or supplied with commercial enamel finish.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.20.10   Air Receiver</TTL><BRK/>
<BRK/>
<TXT>Receiver shall be designed for<MET> 0.345 Mpa</MET><ENG> 50 psi</ENG> working pressure.  Receivers shall be equipped with safety relief 
valves and accessories, including pressure gauges and automatic and manual drains. Receivers shall be designed 
and constructed in accordance with <RID>ASME BPVC SEC VIII D1</RID> and shall have the design working pressures specified 
herein.  A display of the ASME seal on the receiver or a certified test report from an approved independent testing 
laboratory indicating conformance to the ASME Code shall be provided.  The outside of air receivers shall be 
galvanized or supplied with commercial enamel finish.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>2.21   BASE PLATE</TTL><BRK/>
<BRK/>
<TXT>Each unit shall be mounted on all-welded structural steel or cast iron base complete with vibration isolators 
with published load rating.  The base plate shall have vertical jacking screws to facilitate leveling.  The entire 
unit shall be isolated from the building structure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.22   WEATHERPROOF ENCLOSURE</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Include this paragraph for equipment mounted partially or completely 
outdoors.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>A weatherproof enclosure shall be provided for the air moving equipment and motor assembly.  The enclosure shall 
have lockable access doors and shall be louvered for ventilation.  [The enclosure shall be insulated and equipped 
with a thermostatically controlled electric heating and ventilation.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.23   ATTACHMENTS</TTL><BRK/>
<BRK/>
<TXT>Shafts, chains or gear driven equipment shall be provided with all-metal guards enclosing the drive mechanism.  
Guard shall be constructed of galvanized sheet steel, or galvanized woven wire, or expanded metal set in galvanized 
steel frame.  Guards shall be secured in position by steel braces or straps which will permit easy removal for 
servicing the equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.24   COATINGS OR FINISHES</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Consult with coatings supplier on specific coating once liquid and gas 
composition are known.  Be aware of the VOC content of the coating and the regulations 
that restrict application of high VOC coatings; use low VOC coatings unless 
quality of coating will not meet requirements.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Motors, casings and similar parts of equipment finished in the shop shall be cleaned, primed and given two finish 
coats with [alkyd primer followed by two alkyd modified silicone final coats] [severe chemical service phenolic 
type coatings] [paint suitable for the environment in which the unit is to be placed] at the factory.  Ferrous 
surfaces not painted at the factory shall be given a shop coat of grease or other suitable rust resistant coating.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25   <TST>FACTORY TESTS</TST></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Delete inapplicable tests.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Equipment shall be subject to in-plant shop and quality control inspections before approval for shipment from 
manufacturer's facilities.  Rotating parts of the equipment shall operate throughout the required range without 
excessive end thrust, vibration or noise.</TXT><BRK/>
<BRK/>
<SPT><TTL>2.25.1   Integrity</TTL><BRK/>
<BRK/>
<TXT>Each [impeller] [rotor] assembly shall be tested by being operated at a speed to [20] [_____] percent above operating 
speed and checked for cracks using the dye penetrant method or similar method of equal accuracy.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.2   Balance</TTL><BRK/>
<BRK/>
<TXT>Rotating parts shall be statically and dynamically balanced in accordance with <RID>ASA S2.19</RID>.  First critical speed 
shall be at least 150 percent of maximum operating speed.  Rotating parts shall be statically and dynamically 
balanced.  The shaft and impeller or blade assembly shall be statically and dynamically balanced as a unit.  
Removing of metal from the impeller or blades by boring is not an acceptable means of balancing the shaft and 
impeller unit.  Impeller or blade assemblies shall be statically and dynamically balanced to within 0.5 percent 
of W times R squared, where W equals weight and R equals impeller radius.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.3   Deflection</TTL><BRK/>
<BRK/>
<TXT>Total shaft peak-to-peak dynamic deflection measured by vibrometer at seal face shall not exceed<MET> 5.1 microns</MET><ENG> 
2 mils</ENG> under the complete range of operating conditions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.4   Vibration</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Deflection is normally specified for centrifugal blowers.  Velocity is 
normally specified for positive displacement blowers.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>[Vibration shall not exceed<MET> 2.5 microns</MET><ENG> 1.0 mil</ENG> at the bearing housing with the equipment operating.] [Peak vibration 
velocity shall be less than<MET> 7.62 mm/second</MET><ENG> 0.30 inch per second</ENG>.]</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.5   Capacity</TTL><BRK/>
<BRK/>
<TXT>Volume and pressure characteristics of air moving equipment shall be determined by the [manufacturer] [a nationally 
recognized testing agency] in accordance with <RID>AMCA 210</RID>.  Certified test results and sample calculation from test 
readings shall be submitted to the Contracting Officer.  Where two or more identical units are specified, the 
capacity of only one representative unit needs to be tested.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.6   Noise</TTL><BRK/>
<BRK/>
<TXT>Air moving equipment shall be tested with sound attenuation devices installed by the [manufacturer] [a nationally 
recognized testing agency].  Certified test results and sample calculation from test readings shall be submitted 
to the Contracting Officer.  Where two or more identical units are specified, only one representative unit needs 
to be tested.  Fans shall be tested in accordance with <RID>AMCA 300</RID> with results interpreted in accordance with <RID>AMCA 301</RID>
.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.7   Variable Speed Drive</TTL><BRK/>
<BRK/>
<TXT>Each variable speed drive shall be subjected to an in-plant quality control inspection.  Integrated circuits 
shall undergo a 160-hour "burn-in" to test reliability.  During the "burn-in" the temperature shall be cycled 
between<MET> 0 and 70 degrees C</MET><ENG> 32 and 158 degrees F</ENG>.  Each completed unit shall undergo a fully loaded 24-hour "burn-in".</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.8   Continuity</TTL><BRK/>
<BRK/>
<TXT>Wiring and instrumentation assembled at the factory shall be checked for continuity prior to shipping.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.9   Receivers</TTL><BRK/>
<BRK/>
<TXT>Receivers shall be factory air tested to 1.5 times the specified working pressure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>2.25.10   Valve Testing</TTL><BRK/>
<BRK/>
<TXT>Relief valves shall be tested in accordance with <RID>ASME PTC 25</RID>.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT><PRT><TTL>PART 3   EXECUTION</TTL><BRK/>
<BRK/>
<SPT><TTL>3.1   EXAMINATION</TTL><BRK/>
<BRK/>
<TXT>After becoming familiar with all details of the work, verify all dimensions in the field and  advise the Contracting 
Officer of any discrepancy before performing the work.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2   INSTALLATION</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Rotary lobe blowers must be absolutely horizontal to operate properly.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Vibration dampener shall be installed in sufficient quantity to isolate each unit from the structural base on 
which the unit is installed.  Each air moving unit and motor shall be installed, aligned and leveled in accordance 
with the written instruction of the manufacturer [and under the direct supervision of the manufacturer's representative].  
[Deviation from horizontal shall be below limits of measurement.] [Impellers shall be set by the manufacturer's 
representative].  Flexible couplings shall not be used to compensate for misalignment between driver and driven 
unit.  Blower venting shall not violate the provisions of either <RID>ACGIH-2092S</RID> or <RID>AMCA 99</RID>.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.2.1   Concrete Foundations</TTL><BRK/>
<BRK/>
<TXT>Concrete for equipment foundations shall [be as specified in Section <SRF>03 31 00.00 10</SRF> CAST-IN-PLACE STRUCTURAL 
CONCRETE] [have a minimum compressive strength of at least<MET> 17 Mpa</MET><ENG> 2,500 psi</ENG>].  Concrete foundations shall be 
[integral with and of the same class as that of the building floor] [entirely separated from the surrounding 
floor with a premolded filler strip installed between the foundation and floor slab as shown].  Foundation bolts, 
as required, shall be furnished for proper positioning during the placement of the concrete.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.2.2   Seismic Requirements</TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  Provide seismic requirements, if a Government designer (either Corps 
office of A/E) is the Engineer of Record and show on the drawings.  Delete the 
bracketed phrase if seismic details are not provided.  Pertinent portions of 
UFC 3-310 and Sections <SRF>13 48 00</SRF> SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT 
and <SRF>13 48 00.00 10</SRF> SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT, properly edited, 
must be included in the contract documents.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Equipment and attached valves shall be supported and braced to resist seismic loads as specified under UFC 3-310-04 
SEISMIC DESIGN FOR BUILDNGS and Sections <SRF>13 48 00</SRF> SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT and 
<SRF>13 48 00.00 10</SRF> SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT[as shown on the drawings].</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.3   FIELD PAINTING</TTL><BRK/>
<BRK/>
<TXT>Stainless steel, galvanized steel, and nonferrous surfaces shall not be painted.</TXT><BRK/>
<BRK/>
<SPT><TTL>3.3.1   Touch-Up Painting</TTL><BRK/>
<BRK/>
<TXT>Factory painted items, requiring touching up in the field, shall be cleaned of foreign material and shall be 
primed top-coated with the manufacturer's standard factory finish, provided it does not discolor in the presence 
of hydrogen sulfide fumes, high water vapor atmosphere, alkaline water vapor, and concentrated chlorine (oxidizing) 
conditions.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.3.2   Exposed Ferrous Surfaces</TTL><BRK/>
<BRK/>
<TXT>Equipment which did not receive a factory finish and other exposed ferrous surfaces shall be painted as specified 
in Section <SRF>09 90 00</SRF> PAINTS AND COATINGS.  Coating shall be not less than<MET> 0.05 mm</MET><ENG> 1.75 mils</ENG> thick.</TXT><BRK/>
<BRK/></SPT>
</SPT><SPT><TTL>3.4   MANUFACTURER'S FIELD SERVICES</TTL><BRK/>
<BRK/>
<TXT>Provide the services of a manufacturer's representative experienced in the installation, adjustment, and operation 
of the equipment specified.  The representative shall supervise the installing, adjusting, and testing of the 
equipment.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.5   POSTING FRAMED INSTRUCTIONS</TTL><BRK/>
<BRK/>
<TXT>Post framed instructions containing wiring and control diagrams where directed.  Condensed operating instructions 
shall be posted as specified.  The framed instructions shall be posted before acceptance testing of the systems.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.6   <SUB>FIELD TRAINING</SUB></TTL><BRK/>
<NTE><BRK/>
<AST/><BRK/>
<NPR>NOTE:  The number of hours required to instruct a Government representative 
in operation and maintenance of the system will depend on the complexity of 
the system specified.  Designer is to establish the number of hours of training 
based on equipment manufacturer recommendations, system complexity and consultation 
with the installation.</NPR><BRK/>
<AST/><BRK/></NTE>
<BRK/>
<TXT>Conduct a field training course for designated operating, maintenance and supervisory staff members.  Training 
shall be provided for a total period of [16] [24] [_____] hours of normal working time and shall start after 
the system is functionally complete but prior to final acceptance tests.  Field training shall cover the items 
contained in the <SUB>operating and maintenance instructions</SUB>.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7   <SUB>FIELD TESTING</SUB></TTL><BRK/>
<BRK/>
<SPT><TTL>3.7.1   Deficiencies</TTL><BRK/>
<BRK/>
<TXT>If any deficiencies are revealed during any tests, such deficiencies shall be corrected and the tests shall be 
reconducted.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.2   Correct Installation</TTL><BRK/>
<BRK/>
<TXT>Tests shall assure that the units and appurtenances have been installed correctly, there is no objectionable 
heating or vibration, noise from any part is not excessive, and manual and automatic controls function properly.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.3   <TST>Field Equipment Test</TST></TTL><BRK/>
<BRK/>
<TXT>After installation of the air moving units and appurtenances is complete, operating tests shall be carried out 
to ensure that the installation operates properly.  [Make arrangements to have the manufacturer's representative 
present when field equipment tests are made.] Each unit shall be given a running field test in the presence of 
the Contracting Officer for a minimum of [4] [_____] hours [at its rated capacity] [at the point of maximum power 
requirement indicated on the head-capacity curve or point on the curve selected by the Contracting Officer].  
Provide an accurate and acceptable method of measuring the discharge flow and pressure.</TXT><BRK/>
<BRK/></SPT>
<SPT><TTL>3.7.4   Noise Suppression</TTL><BRK/>
<BRK/>
<TXT>Sound level shall be less than [60] [70] [80] dB measured at<MET> 1.5 m</MET><ENG> 5 feet</ENG> from the source.</TXT><BRK/>
<BRK/></SPT>
</SPT></PRT>    <END/><BRK/></SEC>